PT PLN (PERSERO) PEMBANGKITAN CILEGON BIODATA SINGKAT NAMA TTL NIP JABATAN
: EDWARD MEIDRIANSYAH : SERANG, 07 MEI 1984 : 8407006 CLG : TERAMPIL OPERASI LOKAL HRSG & TURBIN
RIWAYAT SEKOLAH : SD : SDN WALANTAKA IV SMP : SLTPN 4 SERANG SMA : SMUN 1 CIPOCOK JAYA SERANG PTN : TEKNIK MESIN, POLITEKNIK NEGERI BANDUNG RIWAYAT PEKERJAAN : PT. PLN (PERSERO) PEMBANGKITAN PLTGU CILEGON RIWAYAT KURSUS/SERTIFIKASI : KURSUS DIKLAT & PRAJABATAN D1 BIDANG THERMAL KURSUS BASIC ENGLISH COMBINE BASIC 2 & 3 SERTIFIKASI KOMPETENSI SISTEM PELUMASAN SERANG, 4 AGUSTUS 2008 PENGOPERASIAN TURBIN GAS PADA UNIT PLTGU CILEGON
JOB POSTING JUNIOR OPERATOR CONTROL ROOM
PT PLN (PERSERO) PEMBANGKITAN CILEGON PRINSIP KERJA OPERASI
PENGAMATAN
PENGOPERASIAN
OPERATOR
PELAPORAN
JOB POSTING JUNIOR OPERATOR CONTRO; ROOM
KOORDINASI
PT PLN (PERSERO) PEMBANGKITAN CILEGON PRINSIP KERJA OPERASI PLTGU
JOB POSTING JUNIOR OPERATOR CONTROL ROOM
PT PLN (PERSERO) PEMBANGKITAN CILEGON
Open Cycle Pengoperasian tanpa Turbin Uap, hanya Turbin Gas Efisiensi lebih rendah (output maks 240 MW/GT) Di operasikan pada saat terjadi pemeliharaan Turbin Uap, kekurangan pasokan bahan bakar gas dan atau permintaan dari P3B (region) Combine Cycle Pengoperasian 1/2 Block (1:1:1) atau Full Block (2:2:1) dg Fasilitas APS (Automatic Power Plant Start Up/Shut Down System) Efisiensi lebih besar (Output maks 740 MW) Pengoperasian lebih rumit karena melibatkan pengoperasian Alat Bantu yang lebih banyak
JOB POSTING JUNIOR OPERATOR CONTROL ROOM
PT PLN (PERSERO) PEMBANGKITAN CILEGON Prinsip Dasar Turbin Gas
• • • •
Udara dikompresi oleh Kompresor diperlukan untuk proses pembakaran dengan gas di dalam ruang bakar. Semburan gas panas hasil pembakaran digunakan untuk memutar Turbin Gas. Putaran Turbin Gas dimanfaatkan untuk memutar Generator. Putaran Generator menghasilkan listrik yang kemudian disalurkan kepada pelanggan melalui jaringan transmisi.
JOB POSTING JUNIOR OPERATOR CONTROL ROOM
PT PLN (PERSERO) PEMBANGKITAN CILEGON STRUKTUR DASAR TURBIN GAS M701F
JOB POSTING JUNIOR OPERATOR CONTROL ROOM
PT PLN (PERSERO) PEMBANGKITAN CILEGON PROSEDUR PENGOPERASIAN TURBIN GAS Persiapan dan Pelaksanaan, sebelum operasi Gas Turbine peralatan berikut ini sudah operasi normal : • Lube oil system • Control oil system • CCW system • Gen. seal oil/H2 system • Turbine cooling air system • Inlet & exhaust duct • Package ventilation system • Circulating demi water system • Instrument air system • Service air for back up system • HP purge air system • Water injection system • Fuel gas and Fuel oil system • CO2 fire fighting system
JOB POSTING JUNIOR OPERATOR CONTROL ROOM
PT PLN (PERSERO) PEMBANGKITAN CILEGON Persiapan Start, pastikan kondisi Gas Turbin unit normal pada bagian : MECHANICAL Pastikan semua pompa, fan, motor, control valve pada posisi REMOTE/AUTO CONTROL MODE Pastikan H2 gas system dalam kondisi siap dioperasikan dan tekanan H2 di dalam Gas Turbine Generator normal. Periksa status operasi CO2 Fire Fighting system bekerja dengan normal. Pastikan seluruh instalasi pada masing-masing system sudah terpasang dengan benar sesuai dengan P& ID CONTROL & INSTRUMENT Pastikan semua signals and communications dari lokal Gas Turbine system beserta peralatan bantunya masuk ke control unit Semua alarms dan trip interlock system sudah dinormalkan. Pastikan Air instrument system beroperasi dengan normal. ELECTRICAL Pastikan semua MV/LV switch gear & MCC dalam kondisi bertegangan. Pastikan Generator protection relay and inter-trip test antara Generator dengan Turbine system bekerja dengan normal JOB POSTING JUNIOR OPERATOR CONTROL ROOM
PT PLN (PERSERO) PEMBANGKITAN CILEGON
JOB POSTING JUNIOR OPERATOR CONTROL ROOM
PT PLN (PERSERO) PEMBANGKITAN CILEGON MODE OPERASI GAS TURBINE UNIT
JOB POSTING JUNIOR OPERATOR CONTROL ROOM
PT PLN (PERSERO) PEMBANGKITAN CILEGON MODE OPERASI GAS TURBINE UNIT
select [NORMAL] select [ALR ON] jika GT dipersiapkan u/ startup dari APS( Combined Cylce operation) select [ALR OFF] jika GT dipersiapkan u/ Simple operation select [LOAD LIMIT] jika pengaturan beban dibatasi dari CRT select [CHANGE AVAIL] jika Fuel Gas/Oil dalam kondisi siap operasi select [GAS SELECT] unit dioperasikan pertama kali dengan bahan bakar GAS water injection select [ ON] jika unit beroperasi kontinu dengan Fuel OIL( load up > 75%) advanced CPFM Auto adjustment control [ON] u/ mengontrol combustor press. secara Auto select [CCR] semua mode operasi GT dilakukan/dieksekusi dari CCR
JOB POSTING JUNIOR OPERATOR CONTROL ROOM
PT PLN (PERSERO) PEMBANGKITAN CILEGON START _exec on CRT GT Master siganl ON GT Starting Motor akan running 5 detik kemudian Starting Device Run [ON] akan aktif sebagai indikasi aktual GT Starting Motor run Starting Device Run[OFF] akan aktif sebagai indikasi aktual GT Starting Motor stop GT SYNCHRONIZING - setelah RTD Speed [3000 rpm] tercapai penuh - pastikan 41E Excitation CB CLOSE dan out put tegangan GT GENERATOR tercapai pada ±14.5 V AUTO SYNCHRO MODE - Generator Control diposisikan [REMOTE] - [52G SELECT] GT GMCB status open atau close Gen. Sync MODE AUTO _exec on CRT GT GMCB akan close setelah syarat-syarat untuk Synchronizing sudah terpenuhi (estimasi waktu ±6 sec) Gas Turbine diposisikan pada 12 MW *Minimum Load (5% load) Normal Loading Rate 5%/min (12 MW/min) Maximum Loading Rate 6.7%/min (16 MW/min) JOB POSTING JUNIOR OPERATOR CONTROL ROOM
PT PLN (PERSERO) PEMBANGKITAN CILEGON BATASAN OPERASI Speed Up Rate Load change rate Purge period Speed increase rate Over speed setting
: 135 rpm/min : 6,7 % /min : 5 min : 135 rpm/min : Mechanical over speed 110±1% of rated speed ( 3270 ~ 3330 rpm )
Vibration Limits Setting Value ( peak to peak) : Alarm > 125 µm Trip > 200 µm Lube Oil Pressure Setting: Lube oil supply pressure control : 1.5 kg / cm2 Lube oil supply pressure alarm < 1.08 kg / cm2 Lube oil supply pressure trip < 0.88 kg / cm2 Turning interlock < 0.41 kg / cm2 Lube oil filter differential pressure high alarm > 1.0 kg / cm2 JOB POSTING JUNIOR OPERATOR CONTROL ROOM
PT PLN (PERSERO) PEMBANGKITAN CILEGON
Lube Oil Temperature Setting : Lube oil supply temperature control : 460 C Lube oil supply temperature alarm > 600 C Journal bearing metal temperature alarm > 1070 C Thrust bearing metal temperature alarm > 990 C Bearing drain oil temperatur alarm > 770 C Cooling Air Temperature Setting : Rotor cooling air alarm > 2600 C No. 2 disc cavity temperature alarm > 4600 C No. 3 disc cavity temperature alarm > 4600 C No. 4 disc cavity temperature alarm > 4600 C Down stream of No. 4 turbine disc temp. Alarm > 4100 C Exhaust Gas Pressure Setting Exhaust gas pressure alarm > 500 mmH2O Exhaust gas pressure trip > 600 mmH2O
JOB POSTING JUNIOR OPERATOR CONTROL ROOM
PT PLN (PERSERO) PEMBANGKITAN CILEGON
Blade Path And Exhaust Temperature Alarm Settings : Blade path temp. High trip > 6800 C Blade path temp. control deviation high trip > 450 C Exhaust gas temp. High trip > 6200 C Exhaust gas temp. control deviation high trip > 450 C Blade path temp. spread alarm, untuk gas fuel : -30 / +200 C dan oil fuel : ±600 C Blade path temp. spread shut down, untuk gas fuel : -40 / +250 C dan oil fuel : ±700 C Blade path temp. spread trip, untuk gas fuel : -60 / +300 C dan oil fuel : ±800 C Low Frequency Operation Interlock Summary Alarm : 47.5 Hz + 0 sec Generator breaker off : 47.5 Hz + 15 sec Trip : 47.5 Hz + 0.1 sec
JOB POSTING JUNIOR OPERATOR CONTROL ROOM
PT PLN (PERSERO) PEMBANGKITAN CILEGON
REAL TIMING CHART for GT START-UP Estimasi Run Up Time
Deskripsi
GT Continuous Turning START executed on CRT GT MASTER signal ON zero
TCOP operation Comp. IGV 0 % open to 39.5% TCA cooler fan A_B_C operation Comp. HP bleed valve CLOSE
JOB POSTING JUNIOR OPERATOR CONTROL ROOM
GT Speed
3 RPM
PT PLN (PERSERO) PEMBANGKITAN CILEGON
+ 10 sec
GT Starting Motor operation
+ 23 sec
GT Turning Motor OFF (Comp. IGV open 39.5 %)
+ 17 sec
Purging operation (High 180 sec, Low 120 sec)
300 RPM 750 RPM (hold 300 sec)
Comb. By Pass valve control opening 100% Fuel request + 300 sec
Igniter insert
Down to 550 RPM
Fuel gas vent valve close, Fuel gas shut-off valve open Ignition ON for fuel gas firing 10 sec, oil firing 300 sec + 10 sec
Flame ON
+ 5 sec
Acceleration ON
JOB POSTING JUNIOR OPERATOR CONTROL ROOM
Up to 600 RPM
PT PLN (PERSERO) PEMBANGKITAN CILEGON
+ 650 sec
GT Starting Motor OFF
2010 RPM
+ 325 sec
Comp. IGV 39.5% close to 0% is min open
2745 RPM
+ 35 sec
Comp. LP bleed valve CLOSE
2815 RPM
+ 5 sec
Comp. MP bleed valve CLOSE GT RTD speed is completed
+ 85 sec
3000 RPM
Aux Oil pump OFF Comb. By pass valve closing Comp. IGV close to 0% is min open Continous RTD speed operation Total estimasi RUN UP time 1465 sec ( 25 min)
JOB POSTING JUNIOR OPERATOR CONTROL ROOM
3000 RPM
PT PLN (PERSERO) PEMBANGKITAN CILEGON
GT synchroning - Circuit Breaker 41 E Close - Circuit Breaker GMCB 52G Close GT in partial load up 100% (240MW) - Comb. By pass valve opening in control position (max.open 100%) - Comp. IGV opening in control position (max.open 39.5%)
JOB POSTING JUNIOR OPERATOR CONTROL ROOM
3000 RPM
PT PLN (PERSERO) PEMBANGKITAN CILEGON
Ilustrasi Dasar Rotor Cooling
JOB POSTING JUNIOR OPERATOR CONTROL ROOM
PT PLN (PERSERO) PEMBANGKITAN CILEGON
Spin Cooling Operation
Spin Cooling Operation 2.Dilakukan setelah Turbin Gas shutdown untuk mengurangi Casing Thermal Distortion 3.Spin Cooling dilaks jika GT shutdown 6 s/d 30 jam, jika GT shutdown 1,5 s/d 6 jam atau > 30 jam maka GT boleh direstart tanpa spin cooling 4.Shutdown < 1,5 jam GT tdk boleh distart, utk menghindari kerusakan compressor blade tip karena oval deformation
JOB POSTING JUNIOR OPERATOR CONTROL ROOM
PT PLN (PERSERO) PEMBANGKITAN CILEGON
JOB POSTING JUNIOR OPERATOR CONTROL ROOM
PT PLN (PERSERO) PEMBANGKITAN CILEGON
SEKIAN TERIMA KASIH
JOB POSTING JUNIOR OPERATOR CONTROL ROOM
PT PLN (PERSERO) PEMBANGKITAN CILEGON
JOB POSTING JUNIOR OPERATOR CONTROL ROOM