PARTIDAS EJECUTADAS Y VALORIZADAS Proyecto: AMPLIACION Y MEJORAMIENTO DEL SIST.DE AGUA POTABLE Y SANEAMIENTO DEL BARRIO CHALAMPAMPA - PAMPAS, PROV. TAYACAJA Prop. :

MUNICIPALIDAD PROVINCIAL DE TAYACAJA

Contratista: CONSTRUCTING INTERNATIONAL S.R.L.

Provincia:

TAYACAJA

Region:

HUANCAVELICA

Elaborado: Ing. LUISAR ITEM

DESCRIPCION

UND

METRADO

PRECIO

TOTAL

METRADO

PRECIO

TOTAL

BASE

UNITARIO

PROGRAMADO

EJECUTADO

UNITARIO

EJECUTADO

01 OBRAS PROVISIONALES 01.01 CARTEL DE IDENTIFICACION DE LA OBRA DE3.60M X 2.40M.

und

1.00

1,242.42

1,242.42

1.00

1,242.42

1,242.42

01.02 ALQUILER DE ALMACEN, OFICINA Y GUARDIANIA

mes

3.00

1,450.00

4,350.00

3.00

1,450.00

4,350.00

01.03 MOVILIZACION Y DESMOVILIZACION DE EQUIPO

GLB

1.00

3,840.00

3,840.00

1.00

3,840.00

3,840.00

GLB

1.00

6,376.26

6,376.26

1.00

6,376.26

6,376.26

m

650.47

2.73

1,775.78

650.47

2.73

1,775.78

02.02.01 EXCAVACION DE ZANJAS EN MATERIAL COMUN

m3

260.19

32.29

8,401.54

260.19

32.29

8,401.54

02.02.02 REFINE, NIVELACION DE ZANJAS PARA TUBERIAS

m

650.47

2.22

1,444.04

650.47

2.22

1,444.04

CAMA DE APOYO PARA TUB. AGUA e=10 cm ( PREPARACION Y 02.02.03 COLOCACION)

m

650.47

4.15

2,699.45

650.47

4.15

2,699.45

02.02.04 RELLENO COMPACTADO CON MATERIAL SELECCIONADO

m

650.47

12.94

8,417.08

650.47

12.94

8,417.08

02.02.05 ELIMINACION DE MATERIAL EXCEDENTE

m3

4.09

23.49

96.07

4.09

23.49

96.07

02.03.01 TUBERIA PVC CLASE 7.5, D=3"

m

373.24

15.58

5,815.08

373.24

15.58

5,815.08

02.03.02 TUBERIA PVC CLASE 7.5 D=2"

m

277.23

9.60

2,661.41

277.23

9.60

2,661.41

1.04 APERTURA DE CALLES 02 SISTEMA DE AGUA POTABLE 02.01 TRABAJOS PRELIMINARES 02.01.01 TRAZO, NIVELACION Y REPLANTEO DE ZANJAS 02.02 MOVIMIENTO DE TIERRAS

02.03 SUMINISTRO DE INSTALACION DE TUBERIAS

02.04 SUMINISTRO E INSTALACION DE ACCESORIOS 02.04.01 TEE PVC-SAP 3"* 2" PARA AGUA

und

2.00

33.65

67.30

2.00

33.65

67.30

02.04.02 TEE PVC- 3" PARA AGUA

und

5.00

33.65

168.25

5.00

33.65

168.25

02.04.03 CRUZ DE PVC PARA AGUA POTABLE DE 3"X 3".

und

1.00

33.65

33.65

1.00

33.65

33.65

02.04.04 REDUCCION PVC PARA RED AGUA POTABLE DE 3" A 2"

und

2.00

33.65

67.30

2.00

33.65

67.30

02.04.05 TAPON DE PVC PARA RED AGUA POTABLE TUBERIA DE 2"

101.12

4.00

25.28

101.12

und

4.00

25.28

02.04.06 CODO PVC SAL 3"X90°

pza

1.00

30.24

30.24

1.00

30.24

30.24

02.04.07 CODO PVC 3"

und

4.00

33.69

134.76

4.00

33.69

134.76

02.04.08 CODO PVC 2"

pza

3.00

26.61

79.83

3.00

26.61

79.83

m

650.47

2.17

1,411.52

650.47

2.17

1,411.52

02.06.01 CONEXIONES DOMICILIARIAS NUEVAS DE AGUA POTABLE DE 1/2" P/TUB 2"

und

32.00

284.69

9,110.08

32.00

284.69

9,110.08

02.06.02 CONEXIONES DOMICILIARIAS NUEVAS DE AGUA POTABLE DE 1/2" P/TUB 3"

und

17.00

299.85

5,097.45

17.00

299.85

5,097.45

02.07.01 ACCESORIOS PARA VALVULA DE CONTROL 3"

und

3.00

625.80

1,877.40

3.00

625.80

1,877.40

02.07.02 TAPA METALICA 0.4X0.4X1/8"

und

3.00

101.05

303.15

3.00

101.05

303.15

m2

18.00

20.39

367.02

18.00

20.39

367.02

02.05 PRUEBA HIDRAULICA 02.05.01 PRUEBA HIDRAULICA Y DESINFECCION DE REDES DE AGUA 02.06 CONEXIONES DOMICILIARIAS DE AGUA NUEVAS

02.07 VARIOS

02.08 ROTURA DE PAVIMENTOS 02.08.01 ROTURA DE PAVIMENTO RIGIDO C/EQ. E=0.20M

02.08.02 ELIMINACION DE DESMONTE C/EQ. HASTA R=1KM

m3

3.60

29.51

106.24

3.60

29.51

106.24

02.09 REPOSICION DE PAVIMENTO RIGIDO

ITEM

DESCRIPCION

UND

METRADO

PRECIO

TOTAL

BASE

UNITARIO

PROGRAMADO

METRADO

PRECIO

TOTAL

EJECUTADO

UNITARIO

EJECUTADO

02.09.01 BASE AFIRMADA E=0.30 M

m2

18.00

12.95

233.10

18.00

12.95

233.10

02.09.02 PAVIMENTO RIGIDO DEL CONCRETO E=0.20M

m2

18.00

90.45

1,628.10

18.00

90.45

1,628.10

03.01.01 TRAZO Y REPLANTEO

m

1,706.10

1.70

2,900.37

1,706.10

1.70

2,900.37

03.01.02 CONTROL TOPOGRAFICO DURANTE LA EJECUCION DE LA OBRA

m

1,706.10

2.35

4,009.34

1,706.10

2.35

4,009.34

03.01.03 TRAZO, NIVELACION, REPLANTEO FINAL

m

1,706.10

1.25

2,132.63

1,706.10

1.25

2,132.63

03.02.01.01 DEMOLICION DE BUZONES EXISTENTES

m3

11.36

71.36

810.65

11.36

71.36

810.65

03.02.01.02 DEMOLICION DE BUZON EXISTENTE PARA EMPALME DE TUBERIA

m3

0.42

71.36

29.97

0.42

71.36

29.97

03.02.01.03 EXCAVACION MANUAL EN T/ NORMAL P/BUZONES DE 0.90M - 1.50M

m3

61.07

31.79

1,941.42

61.07

31.79

1,941.42

03.02.01.04 EXCAVACION MANUAL EN T/ NORMAL P/BUZONES DE 1.51M - 2.00M

m3

21.24

34.13

724.92

21.24

34.13

724.92

03.02.01.05 EXCAVACION MANUAL EN T/ NORMAL P/BUZONES DE 2.01M - 2.50m

m3

4.73

36.86

174.35

4.73

36.86

174.35

03 SISTEMA DE RED DE ALCANTARILLADO 03.01 TRABAJOS PRELIMINARES

03.02 MOVIMIENTO DE TIERRAS 03.02.01 EXCAVACION PARA BUZONES

03.02.02 EXCAVACION C/ MAQUINARIA PARA ZANJAS 03.02.02.01

EXCV. C/MAQUINARIA DE ZANJA PARA TUB. D=160MM - 315MM H=0.90 A 1.50M T/NORMAL

m

969.91

8.08

7,836.87

969.91

8.08

7,836.87

03.02.02.02

EXCV. C/MAQUINARIA DE ZANJA PARA TUB. D=160MM - 315MM H=1.51 A 2.00M T/NORMAL

m

364.39

9.22

3,359.68

364.39

9.22

3,359.68

EXCV. C/MAQUINARIA DE ZANJA PARA TUB. D=160MM - 315MM H=2.01 A 03.02.02.03 2.50M T/NORMAL

m

371.80

10.78

4,008.00

371.80

10.78

4,008.00

m

1,706.10

2.17

3,702.24

1,706.10

2.17

3,702.24

m

1,706.10

3.69

6,295.51

1,706.10

3.69

6,295.51

03.02.05.01 PRIMER RELLENO H=0.30M MATERIAL SELECCIONADO A=0.70M

m

1,706.10

8.80

15,013.68

1,706.10

8.80

15,013.68

SEGUNDO RELLENO MATERIAL PROPIO Y COMPACTADO DE ZANJAS DE 03.02.05.02 0.90M-1.50M A=0.70M

m

969.91

16.93

16,420.58

969.91

16.93

16,420.58

SEGUNDO RELLENO MATERIAL PROPIO Y COMPACTADO DE ZANJAS DE 03.02.05.03 1.51M-2.00M A=0.70M

m

364.39

19.32

7,040.01

364.39

19.32

7,040.01

SEGUNDO RELLENO MATERIAL PROPIO Y COMPACTADO DE ZANJAS DE 03.02.05.04 2.01M-2.50M A=0.70M

m

371.80

24.51

9,112.82

371.80

24.51

9,112.82

m3

538.65

27.20

14,651.28

538.65

27.20

14,651.28

03.03.01 SUMINISTRO E INST. TUB. PVC NORMA ISO 4435 DN=Ø 160 mm S-25

m

155.02

33.75

5,231.93

155.02

33.75

5,231.93

03.03.02 SUMINISTRO E INST. TUB. PVC NORMA ISO 4435 DN=Ø 200 mm S-25

m

513.99

50.78

26,100.41

513.99

50.78

26,100.41

03.03.03 SUMINISTRO E INST. TUB. PVC NORMA ISO 4435 DN=Ø 250 mm S-25

m

591.38

60.77

35,938.16

591.38

60.77

35,938.16

03.03.04 SUMINISTRO E INST. TUB. PVC NORMA ISO 4435 DN=Ø 315 mm S-25

m

445.71

102.74

45,792.25

445.71

102.74

45,792.25

03.03.03 ALINEAMIENTO Y AJUSTE DE TUBERIA PVC ISO 4435

m

1,706.10

1.27

2,166.75

1,706.10

1.27

2,166.75

m

1,706.10

2.51

4,282.31

1,706.10

2.51

4,282.31

m2

54.64

41.46

2,265.37

54.64

41.46

2,265.37

03.02.03 REFINE, NIVEL Y FONDOS P/TUBERIA PVC 03.02.03.01 REFINE, NIVELACION Y FONDOS P/TUB. PVC EN T/NORMAL ANCHO 0.70M 03.02.04 PREPARACION CAMA DE APOYO P/FONDOS TUB. PVC H=0.10M 03.02.04.01

PREPARACION Y COLOCACION DE CAMA DE APOYO CON MATERIAL DE PRESTAMO E=0.10M

03.02.05 RELLENO DE ZANJAS

03.02.06 ELIMINACION DE MATERIAL EXCEDENTE 03.02.06.01

ELIMINACION DE MATERIAL EXCEDENTE, DIST. PROM. 2.0KM, CARGUIO C/MAQ.

03.03 SUMINISTRO E INSTALACION DE TUBERIAS

03.04 PRUEBA HIDRAHULICA 03.04.01 PRUEBA HIDRAULICA TUB. PVC P/DESAGUE 03.05 CONSTRUCCION DE BUZONES 03.05.01 SOLADO 4" PARA BUZONES (MEZCLA 1:12 CEMENTO:HORMIGON)

CONSTRUCCION DE BUZON ESTANDAR TIPO I F'C=210KG/CM2 H=0.90M 1.50M

und

23.00

1,499.39

34,485.97

23.00

1,499.39

34,485.97

CONSTRUCCION DE BUZON ESTANDAR TIPO I F'C=210KG/CM2 H=1.51M 03.05.03 2.00M

und

6.00

1,911.61

11,469.66

6.00

1,911.61

11,469.66

CONSTRUCCION DE BUZON ESTANDAR TIPO I F'C=210KG/CM2 H=2.01M 03.05.04 2.50M

und

3.00

2,432.37

7,297.11

3.00

2,432.37

7,297.11

03.05.02

03.06 EMPALMES

ITEM

DESCRIPCION

03.06.01 DADOS DE CONCRETO FC=140KG/CM2

UND

METRADO

PRECIO

TOTAL

METRADO

PRECIO

TOTAL

BASE

UNITARIO

PROGRAMADO

EJECUTADO

UNITARIO

EJECUTADO

m3

5.52

281.74

1,555.20

5.52

281.74

1,555.20

03.07.01 TRAZO Y REPLANTEO DE CONEXIONES DOMICILIARIAS

m

564.00

2.15

1,212.60

564.00

2.15

1,212.60

03.07.02 EXCV. C/MAQUINARIA DE ZANJA P T/NORMAL

m

564.00

15.66

8,832.24

564.00

15.66

8,832.24

03.07.03 REFINE/NIVELACION DE ZANJA A=0.60M

m

564.00

2.17

1,223.88

564.00

2.17

1,223.88

03.07.04 CAMA DE ARENA MANUAL E=0.10 M ZANJA P/TUBERIA

m

564.00

3.69

2,081.16

564.00

3.69

2,081.16

03.07.05 RELLENO COMPACTADO MANUAL CON MATERIAL PROPIO

m

564.00

11.41

6,435.24

564.00

11.41

6,435.24

und

94.00

354.93

33,363.42

94.00

354.93

33,363.42

03.08.01 ROTURA DE PAVIMENTO RIGIDO C/EQ. E=0.20M

m2

20.20

20.39

411.88

20.20

20.39

411.88

03.08.02 ELIMINACION DE DESMONTE C/EQ. HASTA R=1KM

m3

20.20

29.51

596.10

20.20

29.51

596.10

03.09.01 BASE AFIRMADA E=0.30 M

m2

20.20

12.95

261.59

20.20

12.95

261.59

03.09.02 PAVIMENTO RIGIDO DEL CONCRETO E=0.20M

m2

20.20

90.45

1,827.09

20.20

90.45

1,827.09

GLB

1.00

5,700.00

5,700.00

1.00

5,700.00

5,700.00

GLB

1.00

4,500.00

4,500.00

1.00

4,500.00

4,500.00

GLB

1.00

31,418.81

31,418.81

1.00

31,418.81

31,418.81

03.07 CONEXIONES DOMICILIARIAS

03.07.06 CONEX. DOM. DESAGUE D=160MM - PVC 03.08 ROTURA DE PAVIMENTOS

03.09 REPOSICION DE PAVIMENTO RIGIDO

04 CAPACITACION 04.01 CAPACITACION EN EDUCACION SANITARIA 05 MITIGACION AMBIENTAL 05.01 MITIGACION AMBIENTAL 06 VARIOS 06.01 FLETE TERRESTRE

METRADOS REALMENTE EJECUTADOS Proyecto: AMPLIACION Y MEJORAMIENTO DEL SIST.DE AGUA POTABLE Y SANEAMIENTO DEL BARRIO CHALAMPAMPA - PAMPAS, PROV. TAYACAJA Prop. :

MUNICIPALIDAD PROVINCIAL DE TAYACAJA

Contratista: CONSTRUCTING INTERNATIONAL S.R.L.

Provincia:

TAYACAJA

Region:

HUANCAVELICA

Elaborado: Ing. LUISAR ITEM

DESCRIPCION

UND

METRADO

METRADO

DIFERENCIA

% DE

BASE

EJECUTADO

DE METRADOS

EJECUCION

01 OBRAS PROVISIONALES 01.01 CARTEL DE IDENTIFICACION DE LA OBRA DE3.60M X 2.40M.

und

1.00

1.00

0.00

100.00

01.02 ALQUILER DE ALMACEN, OFICINA Y GUARDIANIA

mes

3.00

3.00

0.00

100.00

01.03 MOVILIZACION Y DESMOVILIZACION DE EQUIPO

GLB

1.00

1.00

0.00

100.00

GLB

1.00

1.00

0.00

100.00

m

650.47

650.47

0.00

100.00

02.02.01 EXCAVACION DE ZANJAS EN MATERIAL COMUN

m3

260.19

260.19

0.00

100.00

02.02.02 REFINE, NIVELACION DE ZANJAS PARA TUBERIAS

m

650.47

650.47

0.00

100.00

02.02.03 CAMA DE APOYO PARA TUB. AGUA e=10 cm ( PREPARACION Y COLOCACION)

m

650.47

650.47

0.00

100.00

02.02.04 RELLENO COMPACTADO CON MATERIAL SELECCIONADO

m

650.47

650.47

0.00

100.00

02.02.05 ELIMINACION DE MATERIAL EXCEDENTE

m3

4.09

4.09

0.00

100.00

02.03.01 TUBERIA PVC CLASE 7.5, D=3"

m

373.24

373.24

0.00

100.00

02.03.02 TUBERIA PVC CLASE 7.5 D=2"

m

277.23

277.23

0.00

100.00

1.04 APERTURA DE CALLES 02 SISTEMA DE AGUA POTABLE 02.01 TRABAJOS PRELIMINARES 02.01.01 TRAZO, NIVELACION Y REPLANTEO DE ZANJAS 02.02 MOVIMIENTO DE TIERRAS

02.03 SUMINISTRO DE INSTALACION DE TUBERIAS

02.04 SUMINISTRO E INSTALACION DE ACCESORIOS 02.04.01 TEE PVC-SAP 3"* 2" PARA AGUA

und

2.00

2.00

0.00

100.00

02.04.02 TEE PVC- 3" PARA AGUA

und

5.00

5.00

0.00

100.00

02.04.03 CRUZ DE PVC PARA AGUA POTABLE DE 3"X 3".

und

1.00

1.00

0.00

100.00

02.04.04 REDUCCION PVC PARA RED AGUA POTABLE DE 3" A 2"

und

2.00

2.00

0.00

100.00

02.04.05 TAPON DE PVC PARA RED AGUA POTABLE TUBERIA DE 2"

und

4.00

4.00

0.00

100.00

02.04.06 CODO PVC SAL 3"X90°

pza

1.00

1.00

0.00

100.00

02.04.07 CODO PVC 3"

und

4.00

4.00

0.00

100.00

02.04.08 CODO PVC 2"

pza

3.00

3.00

0.00

100.00

m

650.47

650.47

0.00

100.00

02.06.01 CONEXIONES DOMICILIARIAS NUEVAS DE AGUA POTABLE DE 1/2" P/TUB 2"

und

32.00

32.00

0.00

100.00

02.06.02 CONEXIONES DOMICILIARIAS NUEVAS DE AGUA POTABLE DE 1/2" P/TUB 3"

und

17.00

17.00

0.00

100.00

02.07.01 ACCESORIOS PARA VALVULA DE CONTROL 3"

und

3.00

3.00

0.00

100.00

02.07.02 TAPA METALICA 0.4X0.4X1/8"

und

3.00

3.00

0.00

100.00

02.08.01 ROTURA DE PAVIMENTO RIGIDO C/EQ. E=0.20M

m2

18.00

18.00

0.00

100.00

02.08.02 ELIMINACION DE DESMONTE C/EQ. HASTA R=1KM

m3

3.60

3.60

0.00

100.00

02.05 PRUEBA HIDRAULICA 02.05.01 PRUEBA HIDRAULICA Y DESINFECCION DE REDES DE AGUA 02.06 CONEXIONES DOMICILIARIAS DE AGUA NUEVAS

02.07 VARIOS

02.08 ROTURA DE PAVIMENTOS

02.09 REPOSICION DE PAVIMENTO RIGIDO

02.09.01 BASE AFIRMADA E=0.30 M

ITEM

DESCRIPCION

02.09.02 PAVIMENTO RIGIDO DEL CONCRETO E=0.20M

m2

UND

18.00

18.00

0.00

100.00

METRADO

METRADO

DIFERENCIA

% DE

BASE

EJECUTADO

DE METRADOS

EJECUCION

m2

18.00

18.00

0.00

100.00

03.01.01 TRAZO Y REPLANTEO

m

1,706.10

1,706.10

0.00

100.00

03.01.02 CONTROL TOPOGRAFICO DURANTE LA EJECUCION DE LA OBRA

m

1,706.10

1,706.10

0.00

100.00

03.01.03 TRAZO, NIVELACION, REPLANTEO FINAL

m

1,706.10

1,706.10

0.00

100.00

03.02.01.01 DEMOLICION DE BUZONES EXISTENTES

m3

11.36

11.36

0.00

100.00

03.02.01.02 DEMOLICION DE BUZON EXISTENTE PARA EMPALME DE TUBERIA

m3

0.42

0.42

0.00

100.00

03.02.01.03 EXCAVACION MANUAL EN T/ NORMAL P/BUZONES DE 0.90M - 1.50M

m3

61.07

61.07

0.00

100.00

03.02.01.04 EXCAVACION MANUAL EN T/ NORMAL P/BUZONES DE 1.51M - 2.00M

m3

21.24

21.24

0.00

100.00

03.02.01.05 EXCAVACION MANUAL EN T/ NORMAL P/BUZONES DE 2.01M - 2.50m

m3

4.73

4.73

0.00

100.00

03.02.02.01 EXCV. C/MAQUINARIA DE ZANJA PARA TUB. D=160MM - 315MM H=0.90 A 1.50M T/NORMAL

m

969.91

969.91

0.00

100.00

03.02.02.02 EXCV. C/MAQUINARIA DE ZANJA PARA TUB. D=160MM - 315MM H=1.51 A 2.00M T/NORMAL

m

364.39

364.39

0.00

100.00

03.02.02.03 EXCV. C/MAQUINARIA DE ZANJA PARA TUB. D=160MM - 315MM H=2.01 A 2.50M T/NORMAL

m

371.80

371.80

0.00

100.00

m

1,706.10

1,706.10

0.00

100.00

m

1,706.10

1,706.10

0.00

100.00

03.02.05.01 PRIMER RELLENO H=0.30M MATERIAL SELECCIONADO A=0.70M

m

1,706.10

1,706.10

0.00

100.00

03.02.05.02 SEGUNDO RELLENO MATERIAL PROPIO Y COMPACTADO DE ZANJAS DE 0.90M-1.50M A=0.70M

m

969.91

969.91

0.00

100.00

03.02.05.03 SEGUNDO RELLENO MATERIAL PROPIO Y COMPACTADO DE ZANJAS DE 1.51M-2.00M A=0.70M

m

364.39

364.39

0.00

100.00

03.02.05.04 SEGUNDO RELLENO MATERIAL PROPIO Y COMPACTADO DE ZANJAS DE 2.01M-2.50M A=0.70M

m

371.80

371.80

0.00

100.00

m3

538.65

538.65

0.00

100.00

03.03.01 SUMINISTRO E INST. TUB. PVC NORMA ISO 4435 DN=Ø 160 mm S-25

m

155.02

155.02

0.00

100.00

03.03.02 SUMINISTRO E INST. TUB. PVC NORMA ISO 4435 DN=Ø 200 mm S-25

m

513.99

513.99

0.00

100.00

03.03.03 SUMINISTRO E INST. TUB. PVC NORMA ISO 4435 DN=Ø 250 mm S-25

m

591.38

591.38

0.00

100.00

03.03.04 SUMINISTRO E INST. TUB. PVC NORMA ISO 4435 DN=Ø 315 mm S-25

m

445.71

445.71

0.00

100.00

03.03.03 ALINEAMIENTO Y AJUSTE DE TUBERIA PVC ISO 4435

m

1,706.10

1,706.10

0.00

100.00

m

1,706.10

1,706.10

0.00

100.00

03.05.01 SOLADO 4" PARA BUZONES (MEZCLA 1:12 CEMENTO:HORMIGON)

m2

54.64

54.64

0.00

100.00

03.05.02 CONSTRUCCION DE BUZON ESTANDAR TIPO I F'C=210KG/CM2 H=0.90M - 1.50M

und

23.00

23.00

0.00

100.00

03.05.03 CONSTRUCCION DE BUZON ESTANDAR TIPO I F'C=210KG/CM2 H=1.51M - 2.00M

und

6.00

6.00

0.00

100.00

03.05.04 CONSTRUCCION DE BUZON ESTANDAR TIPO I F'C=210KG/CM2 H=2.01M - 2.50M

und

3.00

3.00

0.00

100.00

m3

5.52

5.52

0.00

100.00

03 SISTEMA DE RED DE ALCANTARILLADO 03.01 TRABAJOS PRELIMINARES

03.02 MOVIMIENTO DE TIERRAS 03.02.01 EXCAVACION PARA BUZONES

03.02.02 EXCAVACION C/ MAQUINARIA PARA ZANJAS

03.02.03 REFINE, NIVEL Y FONDOS P/TUBERIA PVC 03.02.03.01 REFINE, NIVELACION Y FONDOS P/TUB. PVC EN T/NORMAL ANCHO 0.70M 03.02.04 PREPARACION CAMA DE APOYO P/FONDOS TUB. PVC H=0.10M 03.02.04.01 PREPARACION Y COLOCACION DE CAMA DE APOYO CON MATERIAL DE PRESTAMO E=0.10M 03.02.05 RELLENO DE ZANJAS

03.02.06 ELIMINACION DE MATERIAL EXCEDENTE 03.02.06.01 ELIMINACION DE MATERIAL EXCEDENTE, DIST. PROM. 2.0KM, CARGUIO C/MAQ. 03.03 SUMINISTRO E INSTALACION DE TUBERIAS

03.04 PRUEBA HIDRAHULICA 03.04.01 PRUEBA HIDRAULICA TUB. PVC P/DESAGUE 03.05 CONSTRUCCION DE BUZONES

03.06 EMPALMES 03.06.01 DADOS DE CONCRETO FC=140KG/CM2 03.07 CONEXIONES DOMICILIARIAS

03.07.01 TRAZO Y REPLANTEO DE CONEXIONES DOMICILIARIAS

m

564.00

564.00

0.00

100.00

03.07.02 EXCV. C/MAQUINARIA DE ZANJA P T/NORMAL

m

564.00

564.00

0.00

100.00

ITEM

DESCRIPCION

UND

METRADO

METRADO

DIFERENCIA

% DE

BASE

EJECUTADO

DE METRADOS

EJECUCION

03.07.03 REFINE/NIVELACION DE ZANJA A=0.60M

m

564.00

564.00

0.00

100.00

03.07.04 CAMA DE ARENA MANUAL E=0.10 M ZANJA P/TUBERIA

m

564.00

564.00

0.00

100.00

03.07.05 RELLENO COMPACTADO MANUAL CON MATERIAL PROPIO

m

564.00

564.00

0.00

100.00

und

94.00

94.00

0.00

100.00

03.08.01 ROTURA DE PAVIMENTO RIGIDO C/EQ. E=0.20M

m2

20.20

20.20

0.00

100.00

03.08.02 ELIMINACION DE DESMONTE C/EQ. HASTA R=1KM

m3

20.20

20.20

0.00

100.00

03.09.01 BASE AFIRMADA E=0.30 M

m2

20.20

20.20

0.00

100.00

03.09.02 PAVIMENTO RIGIDO DEL CONCRETO E=0.20M

m2

20.20

20.20

0.00

100.00

GLB

1.00

1.00

0.00

100.00

GLB

1.00

1.00

0.00

100.00

GLB

1.00

1.00

0.00

100.00

03.07.06 CONEX. DOM. DESAGUE D=160MM - PVC 03.08 ROTURA DE PAVIMENTOS

03.09 REPOSICION DE PAVIMENTO RIGIDO

04 CAPACITACION 04.01 CAPACITACION EN EDUCACION SANITARIA 05 MITIGACION AMBIENTAL 05.01 MITIGACION AMBIENTAL 06 VARIOS 06.01 FLETE TERRESTRE