Partida: 1 IP3-Control de Obras 2018

IP-3 SOFTWARE (DEMO) RIF: OBRA: REMODELACION DE BAÑO CONTRATISTA: IP-3 SOFTWARE (DEMO)

ANALISIS DE PRECIO UNITARIO CONSTRUCCION DE LOSA DE PISO

Código: E412110007

Unidad: m3

Cantidad: 1.00

Rendimiento:

25.0000

1.-MATERIALES No 1

Descripción

Und

Cantidad

Desp

Precio

Total

saco

30.0000

5.00

5.00

157.50

m

2.4500

5.00

40.00

102.90

3 ARENA

m

1.7500

5.00

32.00

58.80

4 AGUA

m3

0.2170

5.00

0.50

0.11

5 ACERO FY-4200 Kg/cm2 (1/2 PULG)

kg

10.0000

5.00

7.00

73.50

6 ACERO FY-4200 Kg/cm2 (3/8 PULG)

kg

20.0000

5.00

6.00

126.00

7 ALAMBRE No 18

kg

5.0000

5.00

3.00

15.75

CEMENTO TIPO I (SACO DE 42,5 kg)

2 PIEDRA 3/4

Flete por Transporte:

80.00

Total Materiales:

429.76

2.-EQUIPOS No

Descripción

1

Cantidad

Deprec

1.000

Precio

Total

0.035000

0.00

0.00

Total Equipos:

0.00

3.-MANO DE OBRA No

Descripción

Cantidad

Jornal

Bono

T.Jornal

T.Bono

1

MAESTRO DE OBRAS DE PRIMERA

0.25

3.00

0.00

4.00

0.00

2

ALBAÑIL DE PRIMERA

1.00

3.00

0.00

3.00

0.00

3

AYUDANTE

1.00

3.00

0.00

3.00

0.00

4

OBRERO DE PRIMERA

2.00

3.00

0.00

3.00

0.00

5

GUINCHERO

0.20

3.00

EMPRESA: IP-3 SOFTWARE (DEMO)

0.00

3.00

0.00

Sub-Total Mano de Obra:

16.00

0.00

3810.00% Prestaciones Sociales:

0.00

Total Jornal y Bono:

16.00

Total Mano de Obra:

0.00

16.00 Costo Directo Sub-Total A:

5.00% Administración y Gastos Generales: Sub-Total B: 10.00% Utilidad o Imprevistos: Sub-Total C: 0.00% Financiamiento: Precio Unitario:

Partida: 1 IP3-Control de Obras 2018

99.85%

429.76

0.00

0.15%

0.64 430.40 21.52 451.92 45.19 497.11 0.00 497.11

Partida: 2 IP3-Control de Obras 2018

IP-3 SOFTWARE (DEMO) RIF: OBRA: REMODELACION DE BAÑO CONTRATISTA: IP-3 SOFTWARE (DEMO)

ANALISIS DE PRECIO UNITARIO CONSTRUCCION DE LOSA DE ELEMETOS ESTRUCTURALES DE INFRAESTRUCTURA

Código: E542S/C001

Unidad: pto

Cantidad: 1.00

Rendimiento:

25.0000

1.-MATERIALES No

Descripción

Und

Cantidad

Desp

Precio

Total

1

TOMACORRIENTE DOBLE 2 FASES, 30 AMP

pza

1.0000

0.0

117.94

117.94

2

TAPA PLASTICA PARA TOMACORRIENTE DOBLE

pza

1.0000

0.0

24.00

24.00

3

CAJETIN RECTANGULAR 2 x 4 x 1-1/2", SALIDA = 3/4"

pza

1.0000

0.0

101.61

101.61

4

TUBERIA H.G. EMT, D = 1/2"

m

4.5000

5.0

216.48

1,022.87

5

CONECTOR GALVANIZADO EMT D = 1/2"

pza

1.0000

0.0

11.47

11.47

6

CABLE TW # 10 AWG (60ºC, 600 V)

m

9.0000

10.0

44.48

440.35

7

TEIPE NEGRO COBRA

rollo

0.1000

10.0

240.00

26.40

Flete por Transporte:

0.00

Total Materiales:

1,744.64

2.-EQUIPOS No 1

Descripción EQUIPO DE ELECTRICIDAD

Cantidad

Deprec

1.000

Precio

1.000000

Total

567.87

567.87

Total Equipos:

567.87

3.-MANO DE OBRA No

Descripción

Cantidad

Jornal

Bono

T.Jornal

T.Bono

1

MAESTRO ELECTRICISTA

0.20

60.00

6.00

12.00

1.20

2

ELECTRICISTA DE PRIMERA

1.00

60.00

6.00

60.00

6.00

3

ELECTRICISTA DE SEGUNDA

1.00

60.00

6.00

60.00

6.00

4

AYUDANTE

2.00

60.00

6.00

120.00

12.00 25.20

EMPRESA: IP-3 SOFTWARE (DEMO)

Sub-Total Mano de Obra:

252.00

3810.00% Prestaciones Sociales:

9,601.20

Total Jornal y Bono:

9,853.20

Total Mano de Obra:

25.20

9,878.40 Costo Directo Sub-Total A:

15.00% Administración y Gastos Generales: Sub-Total B: 10.00% Utilidad o Imprevistos: Sub-Total C: 0.00% Financiamiento: Precio Unitario:

Partida: 2 IP3-Control de Obras 2018

80.68%

1,744.64

1.05%

22.71

18.27%

395.14 2,162.49 324.37 2,486.86 248.69 2,735.55 0.00 2,735.55

Partida: 3 IP3-Control de Obras 2018

IP-3 SOFTWARE (DEMO) RIF: OBRA: REMODELACION DE BAÑO CONTRATISTA: IP-3 SOFTWARE (DEMO)

ANALISIS DE PRECIO UNITARIO CONSTRUCCION DE ELEMENTOS ESTRUCTURALES DE SUPERESTRUCTURA (NIVEL 1)

Código: E581S/C001

Unidad: pto

Cantidad: 1.00

Rendimiento:

25.0000

1.-MATERIALES No

Descripción

Und

Cantidad

Desp

Precio

Total

1

CAJETIN OCTOGONAL 4 x 1-1/2", SALIDA = 3/4"

pza

1.0000

0.0

174.18

174.18

2

CAJETIN RECTANGULAR 2 x 4 x 1-1/2", SALIDA = 3/4"

pza

1.0000

0.0

101.61

101.61

3

TUBERIA H.G. EMT, D = 1/2"

m

3.7500

5.0

216.48

852.39

4

CONECTOR GALVANIZADO EMT D = 1/2"

pza

2.0000

0.0

11.47

22.94

5

INTERRUPTOR SIMPLE DE 10 AMP

pza

1.0000

0.0

112.86

112.86

6

CABLE TW # 10 AWG (60ºC, 600 V)

m

7.5000

10.0

44.48

366.96

7

TEIPE NEGRO COBRA

rollo

0.1000

10.0

240.00

26.40

Flete por Transporte:

0.00

Total Materiales:

1,657.34

2.-EQUIPOS No 1

Descripción EQUIPO DE ELECTRICIDAD

Cantidad

Deprec

1.000

Precio

1.000000

Total

567.87

567.87

Total Equipos:

567.87

3.-MANO DE OBRA No

Descripción

Cantidad

Jornal

Bono

T.Jornal

T.Bono

1

MAESTRO ELECTRICISTA

0.20

60.00

6.00

12.00

1.20

2

ELECTRICISTA DE PRIMERA

1.00

60.00

6.00

60.00

6.00

3

ELECTRICISTA DE SEGUNDA

1.00

60.00

6.00

60.00

6.00

4

AYUDANTE

2.00

60.00

6.00

120.00

12.00 25.20

EMPRESA: IP-3 SOFTWARE (DEMO)

Sub-Total Mano de Obra:

252.00

3810.00% Prestaciones Sociales:

9,601.20

Total Jornal y Bono:

9,853.20

Total Mano de Obra:

25.20

9,878.40 Costo Directo Sub-Total A:

15.00% Administración y Gastos Generales: Sub-Total B: 10.00% Utilidad o Imprevistos: Sub-Total C: 0.00% Financiamiento: Precio Unitario:

Partida: 3 IP3-Control de Obras 2018

79.86%

1,657.34

1.09%

22.71

19.04%

395.14 2,075.19 311.28 2,386.47 238.65 2,625.12 0.00 2,625.12

Partida: 4 IP3-Control de Obras 2018

IP-3 SOFTWARE (DEMO) RIF: OBRA: REMODELACION DE BAÑO CONTRATISTA: IP-3 SOFTWARE (DEMO)

ANALISIS DE PRECIO UNITARIO MAMPOSTERIA (NIVEL PB)

Código: E581202000

Unidad: pza

Cantidad: 1.00

Rendimiento:

18.0000

1.-MATERIALES No

Descripción

Und

Cantidad

Desp

Precio

Total

1

LAMPARA EMBUTIDA LE-20, 1 x 50 w, DICROICO

pza

1.0000

0.0

348.48

348.48

2

TEIPE NEGRO COBRA

rollo

0.1000

10.0

240.00

26.40

Flete por Transporte:

0.00

Total Materiales:

374.88

2.-EQUIPOS No 1

Descripción EQUIPO DE ELECTRICIDAD

Cantidad

Deprec

1.000

Precio

1.000000

Total

567.87

567.87

Total Equipos:

567.87

3.-MANO DE OBRA No

Descripción

Cantidad

Jornal

Bono

T.Jornal

T.Bono

1

MAESTRO ELECTRICISTA

0.20

60.00

6.00

12.00

1.20

2

ELECTRICISTA DE PRIMERA

1.00

60.00

6.00

60.00

6.00

3

AYUDANTE

1.00

60.00

6.00

60.00

6.00

Sub-Total Mano de Obra:

132.00

13.20

3810.00% Prestaciones Sociales:

5,029.20

Total Jornal y Bono:

5,161.20

EMPRESA: IP-3 SOFTWARE (DEMO)

Total Mano de Obra:

13.20

5,174.40 Costo Directo Sub-Total A:

15.00% Administración y Gastos Generales: Sub-Total B: 10.00% Utilidad o Imprevistos: Sub-Total C: 0.00% Financiamiento: Precio Unitario:

Partida: 4 IP3-Control de Obras 2018

54.03%

374.88

4.55%

31.55

41.43%

287.47 693.90 104.09 797.99 79.80 877.79 0.00 877.79

Partida: 5 IP3-Control de Obras 2018

IP-3 SOFTWARE (DEMO) RIF: OBRA: REMODELACION DE BAÑO CONTRATISTA: IP-3 SOFTWARE (DEMO)

ANALISIS DE PRECIO UNITARIO CONSTRUCCION DE LOSA (NIVEL 1)

Código: E669311051

Unidad: pza

Cantidad: 1.00

Rendimiento:

25.0000

1.-MATERIALES No

Descripción

Und

Cantidad

Desp

Precio

Total

1

REJILLA CIRCULAR DE BRONCE D = 2" x 3"

pza

1.0000

0.0

187.20

187.20

2

PLOMO EN LINGOTES (25 kgf/lingote)

kgf

0.6810

5.0

100.00

71.51

3

ESTOPA PARA CALAFATEAR (PAQUETE 24 kgf)

kgf

0.0650

5.0

240.00

16.38

4

CEMENTO BLANCO (SACO DE 21.25 kgf)

saco

0.0700

5.0

300.00

22.05

Flete por Transporte:

0.00

Total Materiales:

297.14

2.-EQUIPOS No

Descripción

Cantidad

Deprec

Precio

Total

1

CRISOL PARA FUNDIR PLOMO

1.000

0.003000

456.00

1.37

2

SOPLETE SOLDAR ESTAÑO/PLOMO

1.000

0.010000

2,016.00

20.16

3

ARCO PARA SEGUETA PROFESIONAL 12" STANLEY

1.000

0.010000

900.00

9.00

4

HOJA DE SEGUETA 12"

2.000

0.030000

26.40

1.58

5

CUCHARA PLANA DE 6" PUNTA REDONDA

1.000

0.020000

196.02

3.92

6

TOBO PARA ALBAÑIL CAP. 10 litros

1.000

0.010000

184.32

1.84

7

NIVEL DE 3 BURBUJAS 14", STANLEY

1.000

0.007000

101.85

0.71

8

CINTA METRICA GLOBAL STANLEY DE 5 m

1.000

0.010000

360.00

3.60

Total Equipos:

42.18

3.-MANO DE OBRA No

Descripción

Cantidad

Jornal

Bono

T.Jornal

T.Bono

1

MAESTRO PLOMERO DE PRIMERA

0.25

60.00

6.00

15.00

1.50

2

PLOMERO DE PRIMERA

1.00

60.00

6.00

60.00

6.00

3

AYUDANTE

1.00

60.00

6.00

60.00

6.00

Sub-Total Mano de Obra:

135.00

13.50

3810.00% Prestaciones Sociales:

5,143.50

Total Jornal y Bono:

5,278.50

EMPRESA: IP-3 SOFTWARE (DEMO)

Total Mano de Obra:

13.50

5,292.00 Costo Directo Sub-Total A:

15.00% Administración y Gastos Generales: Sub-Total B: 10.00% Utilidad o Imprevistos: Sub-Total C: 0.00% Financiamiento: Precio Unitario:

Partida: 5 IP3-Control de Obras 2018

58.20%

297.14

0.33%

1.69

41.46%

211.68 510.51 76.58 587.09 58.71 645.80 0.00 645.80

Partida: 6 IP3-Control de Obras 2018

IP-3 SOFTWARE (DEMO) RIF: OBRA: REMODELACION DE BAÑO CONTRATISTA: IP-3 SOFTWARE (DEMO)

ANALISIS DE PRECIO UNITARIO W.C. DE ASIENTO, CON FLUXOMETRO INCLUIDO, DESCARGA AL PISO, BLANCO O COLOR CLARO. INCLUYE GRIFERIA, BRIDA, SELLO DE CERA Y TORNILLOS. Código: E662141100

Unidad: pza

Cantidad: 1.00

Rendimiento:

4.0000

1.-MATERIALES No

Descripción

Und

Cantidad

Desp

Precio

Total

1

W.C. CARLTON PARA FLUXOMETRO, CON ASIENTO

pza

1.0000

0.0

17,000.00

17,000.00

2

FLUXOMETRO MANUAL PARA W.C. SLOAN

pza

1.0000

0.0

13,000.00

13,000.00

3

TEFLON (ROLLO 1/2" x 12 m)

rollo

0.2000

10.0

50.00

11.00

4

CEMENTO BLANCO (SACO DE 21.25 kgf)

saco

0.0700

5.0

300.00

22.05

Flete por Transporte:

1,031.76

Total Materiales:

31,064.81

2.-EQUIPOS No

Descripción

Cantidad

Deprec

Precio

Total

1

LLAVE DE TUBO # 14 RIDGID HD

2.000

0.007000

1,800.00

25.20

2

LLAVE DE TUBO # 8 RIDGID HD

2.000

0.007000

900.00

12.60

3

LLAVE AUXILIAR DE PLOMERO RIDGID

1.000

0.007000

954.00

6.68

4

TALADRO ELECTRICO 3/8" BOSCH 1800 rpm 450 W PERCUTOR

1.000

0.007000

41,779.20

292.45

5

JUEGO DE DESTORNILLADORES 6 pza STANLEY

1.000

0.010000

1,002.24

10.02

6

ARCO PARA SEGUETA PROFESIONAL 12" STANLEY

1.000

0.010000

900.00

9.00

7

HOJA DE SEGUETA 12"

2.000

0.030000

26.40

1.58

8

NIVEL DE 3 BURBUJAS 14", STANLEY

1.000

0.007000

101.85

0.71

9

CINTA METRICA GLOBAL STANLEY DE 5 m

1.000

0.010000

360.00

3.60

10 CARRETILLA RUEDA DE GOMA CAP. 55 litros

1.000

0.003500

2,760.00

9.66

11 CUCHARA PLANA DE 6" PUNTA REDONDA

2.000

0.020000

196.02

7.84

12 TOBO PARA ALBAÑIL CAP. 10 litros

2.000

0.010000

184.32

3.69

13 WINCHE CABRESTANTE CAP. 2 tf, 24 hp, ELECTRICO

0.050

0.003500

120,000.00

21.00

Total Equipos:

404.03

3.-MANO DE OBRA No

Descripción

Cantidad

Jornal

Bono

T.Jornal

T.Bono

1

MAESTRO PLOMERO DE PRIMERA

0.25

60.00

6.00

15.00

1.50

2

PLOMERO DE PRIMERA

1.00

60.00

6.00

60.00

6.00

3

AYUDANTE

1.00

60.00

6.00

60.00

6.00

4

OBRERO DE PRIMERA

1.00

60.00

6.00

60.00

6.00

5

GUINCHERO

0.05

60.00

EMPRESA: IP-3 SOFTWARE (DEMO)

6.00

3.00

0.30

Sub-Total Mano de Obra:

198.00

19.80

3810.00% Prestaciones Sociales:

7,543.80

Total Jornal y Bono:

7,741.80

Total Mano de Obra:

19.80

7,761.60 Costo Directo Sub-Total A:

15.00% Administración y Gastos Generales: Sub-Total B: 10.00% Utilidad o Imprevistos:

Sub-Total C: 0.00% Financiamiento: Precio Unitario:

Partida: 6 IP3-Control de Obras 2018

93.83%

31,064.81

0.31%

101.01

5.86%

1,940.40 33,106.22 4,965.93 38,072.15 3,807.22

41,879.37 0.00 41,879.37

Partida: 7 IP3-Control de Obras 2018

IP-3 SOFTWARE (DEMO) RIF: OBRA: REMODELACION DE BAÑO CONTRATISTA: IP-3 SOFTWARE (DEMO)

ANALISIS DE PRECIO UNITARIO LAVAMANOS PARA EMPOTRAR, DE DOS LLAVES, GRIFERIA 4", BLANCO O COLOR CLARO, MENOR A 54 cm DE ANCHO, OVALADO. INCLUYE GRIFERIA Y LLAVE DE ARRESTO. Código: E661324112

Unidad: pza

Cantidad: 1.00

Rendimiento:

6.0000

1.-MATERIALES No

Descripción

Und

Cantidad

Desp

Precio

Total

1

LAVAMANOS PARA EMPOTRAR 2 LLAVES, OVALADO

pza

1.0000

0.0

5,760.00

5,760.00

2

GRIFERIA 4" PARA LAVAMANOS, POMOS METALICOS

pza

1.0000

0.0

2,500.00

2,500.00

3

CANILLA METALICA FLEXIBLE D = 1/2" x 1/2"

pza

2.0000

0.0

380.00

760.00

4

DESAGÜE PARA LAVAMANOS, METALICO CROMADO, D = 1-1/4"

pza

1.0000

0.0

800.00

800.00

5

SIFON METALICO CROMADO D = 1-1/4"

pza

1.0000

0.0

432.00

432.00

6

GOMA REDUCTORA DE 2" A 1-1/4"

und

1.0000

0.0

30.00

30.00

7

LLAVE DE ARRESTO CROMADA LINEA FP D = 1/2"

pza

2.0000

0.0

432.00

864.00

8

ROSETA D = 1/2"

pza

2.0000

0.0

42.00

84.00

9

TEFLON (ROLLO 1/2" x 12 m)

rollo

0.2500

10.0

50.00

13.75

und

0.2500

5.0

400.00

105.00

10 SILICON EN CARTUCHO SILIPEX

Flete por Transporte:

759.42

Total Materiales:

12,108.17

2.-EQUIPOS No

Descripción

Cantidad

Deprec

Precio

Total

1

LLAVE DE TUBO # 14 RIDGID HD

2.000

0.007000

1,800.00

25.20

2

LLAVE DE TUBO # 8 RIDGID HD

2.000

0.007000

900.00

12.60

3

LLAVE AUXILIAR DE PLOMERO RIDGID

1.000

0.007000

954.00

6.68

4

JUEGO DE DESTORNILLADORES 6 pza STANLEY

1.000

0.010000

1,002.24

10.02

5

ARCO PARA SEGUETA PROFESIONAL 12" STANLEY

1.000

0.010000

900.00

9.00

6

HOJA DE SEGUETA 12"

2.000

0.030000

26.40

1.58

7

NIVEL DE 3 BURBUJAS 14", STANLEY

1.000

0.007000

101.85

0.71

8

CINTA METRICA GLOBAL STANLEY DE 5 m

1.000

0.010000

360.00

3.60

9

CARRETILLA RUEDA DE GOMA CAP. 55 litros

1.000

0.003500

2,760.00

9.66

WINCHE CABRESTANTE CAP. 2 tf, 24 hp, ELECTRICO

0.050

0.003500

10

120,000.00

21.00

Total Equipos:

100.05

3.-MANO DE OBRA No

Descripción

Cantidad

Jornal

Bono

T.Jornal

T.Bono

1

MAESTRO PLOMERO DE PRIMERA

0.25

60.00

6.00

15.00

1.50

2

PLOMERO DE PRIMERA

1.00

60.00

6.00

60.00

6.00

3

AYUDANTE

1.00

60.00

6.00

60.00

6.00

4

OBRERO DE PRIMERA

1.00

60.00

6.00

60.00

6.00

5

GUINCHERO

0.05

60.00

6.00

3.00

0.30 19.80

EMPRESA: IP-3 SOFTWARE (DEMO)

Sub-Total Mano de Obra:

198.00

3810.00% Prestaciones Sociales:

7,543.80

Total Jornal y Bono:

7,741.80

Total Mano de Obra:

19.80

7,761.60 Costo Directo Sub-Total A:

15.00% Administración y Gastos Generales: Sub-Total B: 10.00% Utilidad o Imprevistos: Sub-Total C: 0.00% Financiamiento: Precio Unitario:

Partida: 7 IP3-Control de Obras 2018

90.24%

12,108.17

0.12%

16.68

9.64%

1,293.60 13,418.45

2,012.77 15,431.22 1,543.12 16,974.34 0.00 16,974.34

Partida: 8 IP3-Control de Obras 2018

IP-3 SOFTWARE (DEMO) RIF: OBRA: REMODELACION DE BAÑO CONTRATISTA: IP-3 SOFTWARE (DEMO)

ANALISIS DE PRECIO UNITARIO CONSTRUCCION DE REVESTIMIENTO DE PISOS CON BALDOSAS DE CERAMICA NACIONAL, ACABADO NATURAL. INCLUYE MORTERO BASE Código: E414094050

Unidad: m2

Cantidad: 1.00

Rendimiento:

25.0000

1.-MATERIALES No

Descripción

Und

Cantidad

Desp

Precio

Total

1

BALDOSA DE CERAMICA NACIONAL 20 x 30 cm

m2

1.0000

10.0

520.00

572.00

2

MORTERO CEMENTO - ARENA 1:3

m3

0.0500

0.0

2,778.52

138.93

3

CEMENTO BLANCO (SACO DE 21.25 kgf)

saco

0.0700

5.0

300.00

22.05

4

PEGO BLANCO MONTELUPO (20 kgf/sco)

sco

0.1500

5.0

180.00

28.35

5

LANA DE ACERO Nº 5

rollo

0.2000

10.0

400.00

88.00

Flete por Transporte:

0.00

Total Materiales:

849.33

2.-EQUIPOS No

Descripción

Cantidad

Deprec

Precio

Total

1

EQUIPO PARA VACIADO DE PISOS

1.000

1.000000

134.11

2

EQUIPO PARA COLOCACION DE CERAMICA

134.11

1.000

1.000000

85.38

85.38

3

WINCHE CABRESTANTE CAP. 2 tf, 24 hp, ELECTRICO

0.250

0.003500

120,000.00

105.00

Total Equipos:

324.49

3.-MANO DE OBRA No

Descripción

Cantidad

Jornal

Bono

T.Jornal

T.Bono

1

MAESTRO DE OBRAS DE PRIMERA

0.25

60.00

6.00

15.00

1.50

2

ALBAÑIL DE PRIMERA

1.00

60.00

6.00

60.00

6.00

3

AYUDANTE

1.00

60.00

6.00

60.00

6.00

4

OBRERO DE PRIMERA

2.00

60.00

6.00

120.00

12.00

5

GUINCHERO

0.25

60.00

EMPRESA: IP-3 SOFTWARE (DEMO)

6.00

15.00

1.50

Sub-Total Mano de Obra:

270.00

27.00

3810.00% Prestaciones Sociales:

10,287.00

Total Jornal y Bono:

10,557.00

Total Mano de Obra:

27.00

10,584.00 Costo Directo Sub-Total A:

15.00% Administración y Gastos Generales: Sub-Total B: 10.00% Utilidad o Imprevistos: Sub-Total C: 0.00% Financiamiento: Precio Unitario:

Partida: 8 IP3-Control de Obras 2018

66.06%

849.33

1.01%

12.98

32.93%

423.36 1,285.67 192.85 1,478.52 147.85 1,626.37 0.00 1,626.37

Related Documents


More Documents from ""

Partidas Casa.xlsx
December 2019 9
Intersecion.docx
April 2020 27
Doc3.docx
November 2019 43
Franco Sullca.pdf
November 2019 44
7.1
October 2019 33