Rehabilitation and Recovery Plan for the Magnitude 6.5 Earthquake in Leyte

2018-2021

National Economic and

Office of Civil Defense

Development Authority

Regional Office VIII

Regional Office VIII

City of Ormoc

Municipality of

Municipality of

Municipality of

Kananga, Leyte

Carigara, Leyte

Jaro, Leyte

PAGLAUM: Rehabilitation and Recovery Plan of the Magnitude 6.5 Earthquake in Leyte 2018-2021

Table of Contents

vi | PAGLAUM: Rehabilitation and Recovery Plan for the Magnitude 6.5 Earthquake in Leyte 2018-2021

PAGLAUM: Rehabilitation and Recovery Plan for the Magnitude 6.5 Earthquake in Leyte 2018-2021 | vii

viii | PAGLAUM: Rehabilitation and Recovery Plan for the Magnitude 6.5 Earthquake in Leyte 2018-2021

PAGLAUM: Rehabilitation and Recovery Plan for the Magnitude 6.5 Earthquake in Leyte 2018-2021 | ix

MESSAGE

x | PAGLAUM: Rehabilitation and Recovery Plan for the Magnitude 6.5 Earthquake in Leyte 2018-2021

MESSAGE

PAGLAUM: Rehabilitation and Recovery Plan for the Magnitude 6.5 Earthquake in Leyte 2018-2021 | xi

MESSAGE

xii | PAGLAUM: Rehabilitation and Recovery Plan for the Magnitude 6.5 Earthquake in Leyte 2018-2021

MESSAGE

PAGLAUM: Rehabilitation and Recovery Plan for the Magnitude 6.5 Earthquake in Leyte 2018-2021 | xiii

MESSAGE

xiv | PAGLAUM: Rehabilitation and Recovery Plan for the Magnitude 6.5 Earthquake in Leyte 2018-2021

MESSAGE

PAGLAUM: Rehabilitation and Recovery Plan for the Magnitude 6.5 Earthquake in Leyte 2018-2021 | xv

List of Tables and Figures Chapter 1

Background and Description of Affected Areas

Chapter 2

Description of the Hazard Event

Chapter 3

Assessment of the Effects of the Earthquake

xvi | PAGLAUM: Rehabilitation and Recovery Plan for the Magnitude 6.5 Earthquake in Leyte 2018-2021

Chapter 4

Overall Rehabilitation and Recovery Framework

Chapter 5

Investment Program

Chapter 6

Implementation, Monitoring and Evaluation Mechanism

PAGLAUM: Rehabilitation and Recovery Plan for the Magnitude 6.5 Earthquake in Leyte 2018-2021 | xvii

List of Abbreviations and Acronyms

xviii | PAGLAUM: Rehabilitation and Recovery Plan for the Magnitude 6.5 Earthquake in Leyte 2018-2021

PAGLAUM: Rehabilitation and Recovery Plan for the Magnitude 6.5 Earthquake in Leyte 2018-2021 | xix

Introduction

1 | PAGLAUM: Rehabilitation and Recovery Plan for the Magnitude 6.5 Earthquake in Leyte 2018-2021

Chapter 1

Background and Description of Affected Areas Ormoc City General Profile

Chapter 1 Background and Description of Affected Area | 2

Socioeconomic Profile Productive Sector

Social Sector

FACILITY

PUBLIC

PRIVATE

Barangay Health Center

82

-

Barangay Health Station

33

-

Center for Elderly

1

-

Hospital

1

3

Medical Clinic

-

17

Main CHD

1

-

Dialysis Center

-

1

3 | PAGLAUM: Rehabilitation and Recovery Plan for the Magnitude 6.5 Earthquake in Leyte 2018-2021

Infrastructure and Utilities Sector

Hazard Profile

Chapter 1 Background and Description of Affected Area | 4

5 | PAGLAUM: Rehabilitation and Recovery Plan for the Magnitude 6.5 Earthquake in Leyte 2018-2021

Kananga, Leyte General Profile

Socioeconomic Profile Productive Sector

Chapter 1 Background and Description of Affected Area | 6

Infrastructure Sector

Social Sector

Hazard Profile

7 | PAGLAUM: Rehabilitation and Recovery Plan for the Magnitude 6.5 Earthquake in Leyte 2018-2021

Chapter 1 Background and Description of Affected Area | 8

9 | PAGLAUM: Rehabilitation and Recovery Plan for the Magnitude 6.5 Earthquake in Leyte 2018-2021

Carigara, Leyte General Profile

Socioeconomic Profile Productive Sector

Chapter 1 Background and Description of Affected Area | 10

INSTITUTION

PUBLIC

PRIVATE

Day Care Center

50

2

Pre-Elementary School

30

1

Elementary School

30

1

High School

4

1

College

1

1

Infrastructure Sector

Social Sector

Hazard Profile

11 | PAGLAUM: Rehabilitation and Recovery Plan for the Magnitude 6.5 Earthquake in Leyte 2018-2021

Chapter 1 Background and Description of Affected Area | 12

13 | PAGLAUM: Rehabilitation and Recovery Plan for the Magnitude 6.5 Earthquake in Leyte 2018-2021

Jaro, Leyte General Profile

Socioeconomic Profile Productive Sector

Chapter 1 Background and Description of Affected Area | 14

AREA MAJOR CROP

LOCATION

HA

ANNUAL PRODUCTION

UTILIZATION

VOLUME

(%)

(MT)

PRODUCT MARKET

VALUE (PhP)

LOCAL

EXPORT



TYPE OF FARMING TECHNOLOGY

1. Rice Irrigated

13 barangays

967.00

6.54

7,736.00

116,040,000.00



Modern

135 barangays

317.50

2.14

1,083.20

16,248,000.00



2. Coconut

Municipal-wide

10,172.00

68.82

2,034.00

61,020,000.00





Traditional

3. Banana

Municipal-wide

1,410.00

9.54

8,460.00

101,520,000.00





Modern

4. Vegetables

Municipal-wide

203.00

1.37

1,421.00

21,315,000.00





Modern

5. Corn

42 barangays

215.00

1.45

451.50

5,869,500.00



6. Root Crops

Municipal-wide

281.50

1.90

2,533.50

25,335,000.00



13,566.00

91.76

Lowland Rainfed

Traditional

Lowland

TOTAL

23,719.20 347,347,500.00

Social Sector

15 | PAGLAUM: Rehabilitation and Recovery Plan for the Magnitude 6.5 Earthquake in Leyte 2018-2021

Modern √

Traditional

Infrastructure Sector

Hazard Profile

Chapter 1 Background and Description of Affected Area | 16

17 | PAGLAUM: Rehabilitation and Recovery Plan for the Magnitude 6.5 Earthquake in Leyte 2018-2021

Chapter 2

Description of the Hazard Event

Chapter 2 Description of Hazard Event | 18

Chapter 3

Assessment of the Effects of the Earthquake

SECTOR

DAMAGE

LOSSES

NEEDS

Infrastructure

96,257,443.32

40,902,516.83

257,687,310.12

Productive

36,995,690.00

3,039,913.24

36,191,700.00

412,001,076.77

48,866,341.43

935,970,146.77

75,421,260.00

223,786,100.00

169,610,000.00

620,675,470.09

316,594,871.50

1,399,459,156.89

Social Cross-Sectoral TOTAL

19 | PAGLAUM: Rehabilitation and Recovery Plan for the Magnitude 6.5 Earthquake in Leyte 2018-2021

A. Infrastructure Sector

SUBSECTOR

DAMAGE

LOSSES

NEEDS

Power

3,927,054.00

37,791,937.51

6,572,210.00

Water

4,759,427.42

2,735,579.32

48,013,436.42

87,570,961.90

375,000.00

203,101,663.70

1,951,637.00

45,000.00

4,879,094.30

85,619,324.90

330,000.00

198,222,569.40

Roads

79,785,811.00

330,000.00

186,179,677.00

Bridges

5,833,513.90

Transportation Air Transportation Land Transportation

TOTAL

96,257,443.32

-

12,042,892.40 40,902,516.83

257,687,310.12

Chapter 3 Assessment of the Effects of the Earthquake | 20

SERVICE PROVIDER

DAMAGE

LOSSES

NEEDS

Ormoc Waterworks

1,961,993.02

467,947.00

2,500.000.00

Kananga Waterworks

2,297,434.40

697,632.32

3,823,816.42

1,330,000.00

38,000,000.00

500,000.00

240,000.00

3,689,620.00

4,759,427.42

2,735,579.32

48,013,436.42

Metro Carigara Water District Jaro Water District TOTAL

-

21 | PAGLAUM: Rehabilitation and Recovery Plan for the Magnitude 6.5 Earthquake in Leyte 2018-2021

CATEGORY

DAMAGE

LOSSES

NEEDS

Roads National

38,381,000.00

-

106,405,000.00

Local

41,404,811.00

330,000.00

79,774,677.00

Subtotal Roads

79,785,811.00

330,000.00

186,179,677.00

Bridges National

3,820,800.00

-

8,302,000.00

Local

2,012,713.90

-

3,740,892.40

Subtotal Bridges

5,833,513.90

-

12,042,892.40

TOTAL

85,619,324.90

LGU

LOCAL ROADS

330,000.00

LOCAL BRIDGES

198,222,569.40

TOTAL

Ormoc City

31,140,800.00

1,260,000.00

32,400,800.00

Kananga, Leyte

10,106,011.00

752,713.90

10,858,724.90

Carigara, Leyte

128,000.00

-

128,000.00

30,000.00

-

30,000.00

Jaro, Leyte TOTAL

41,404,811.00

2,012,713.90

43,417,524.90

Chapter 3 Assessment of the Effects of the Earthquake | 22

B. Productive Sector

SUBSECTOR

DAMAGE

Agriculture

LOSSES

17,220.000.00

NEEDS 106,250.00

Crops

-

62,250.00

Livestock

-

44,000.00

Infrastructure and Utilities Fisheries Trade and Industry Tourism TOTAL

17,220,000.00

-

27,093,450.00 44,000.00 27,049,000.00

15,000.00

1,649,991.00

65,250.00

19,550,000.00

1,207,772.24

8,800,000.00

210,690.00

75,900.00

223,000.00

36,995,690.00

3,039,913.24

36,191,700.00

23 | PAGLAUM: Rehabilitation and Recovery Plan for the Magnitude 6.5 Earthquake in Leyte 2018-2021

LGU

DAMAGE

Ormoc City Kananga, Leyte Carigara, Leyte

-

Jaro, Leyte

-

TOTAL

LOSSES

NEEDS

14,220,000.00

-

12,049,000.00*

3,000,000.00

-

15,000,000.00

-

17,220,000.00

105,800.00

44,000.00

105,800.00

27,093,000.00

Chapter 3 Assessment of the Effects of the Earthquake | 24

LGU

DAMAGE

Ormoc City

LOSSES 15,000.00

NEEDS

1,074,543.00

20,000.00

575,448.00

45,250.00*

Kananga, Leyte

-

Carigara, Leyte

-

-

-

Jaro, Leyte

-

-

-

TOTAL

15,000.00

LGU

DAMAGE

Ormoc City Kananga, Leyte

1,649,991.00

LOSSES

65,250.00

NEEDS

150,000.00

32,880.00*

19,400,000.00

1,024,892.24

8,800,000.00

Carigara, Leyte

-

-

-

Jaro, Leyte

-

-

-

TOTAL

19,550,000.00

1,207,772.24

25 | PAGLAUM: Rehabilitation and Recovery Plan for the Magnitude 6.5 Earthquake in Leyte 2018-2021

8,800,000.00

LGU

DAMAGE

Ormoc City

LOSSES 210,690.00

NEEDS 207,900.00

233,000.00

Kananga, Leyte

-

-

-

Carigara, Leyte

-

-

-

Jaro, Leyte

-

-

-

TOTAL

210,690.00

207,900.00

233,000.00

C. Social Sector

SUBSECTOR Education

DAMAGE

LOSSES

NEEDS

160,047,976.77

2,858,100.00

174,211,976.77

9,483,100.00

16,388,799.99

11,700,000.00

Housing

242,470,000.00

29,619,441.44

778,058,170.00

TOTAL

412,001,076.77

48,866,341.43

935,970,146.77

Health

Chapter 3 Assessment of the Effects of the Earthquake | 26

INFRASTRUCTURE DAMAGE LGU

CLASSROOMS

Ormoc City Kananga, Leyte

NON-INFRASTRUCTURE DAMAGE

WATER AND

SCHOOL

LEARNING

COMPUTERIZATION

SANITATION

FURNITURE

RESORCES

PACKAGES

120,956,000.00

-

36,871,000.00

-

1,552,320.00

TOTAL

-

342,841.93

122,851,161.93

-

-

325,814.84

37,196,814.84

Carigara, Leyte

-

-

-

-

-

-

Jaro, Leyte

-

-

-

-

-

-

157,872,000.00

-

-

668,656.77

TOTAL

1,552,320.00

160,047,976.77

D. Cross-Sectoral

LGU

PARTIALLY DAMAGED

TOTALLY DAMAGED

TOTAL

Ormoc City

1,112

1,150

2,272

Kananga, Leyte

2,713

480

3,193

Carigara, Leyte

91

2

93

111

2

113

4,037

1,634

5,671

Jaro, Leyte TOTAL

27 | PAGLAUM: Rehabilitation and Recovery Plan for the Magnitude 6.5 Earthquake in Leyte 2018-2021

LGU

PARTIALLY DAMAGED

TOTALLY DAMAGED

TOTAL

Ormoc City

22,800,000.00

109,900,000.00

132,700,000.00

Kananga, Leyte

29,300,000.00

80,470,000.00

109,770,000.00

Carigara, Leyte

-

-

-

Jaro, Leyte

-

-

-

TOTAL

52,100,000.00

LGU Governance/DRRM Environment TOTAL

LGU Ormoc City

DAMAGE 72,921,260.00

190,370,000.00

LOSSES

242,470,000.00

NEEDS

-

151,110,000.00

2,500,000.00

223,786,100.00

18,500,000.00

75,421,260.00

223,786,100.00

169,610,000.00

DAMAGE

NEEDS

9,832,260.00

13,960,000.00

Kananga, Leyte

63,089,000.00

137,150,000.00

TOTAL

72,921,260.00

151,110,000.00

Chapter 3 Assessment of the Effects of the Earthquake | 28

Social Impact

29 | PAGLAUM: Rehabilitation and Recovery Plan for the Magnitude 6.5 Earthquake in Leyte 2018-2021

Macroeconomic Impact

Chapter 3 Assessment of the Effects of the Earthquake | 30

31 | PAGLAUM: Rehabilitation and Recovery Plan for the Magnitude 6.5 Earthquake in Leyte 2018-2021

Chapter 4

Overall Rehabilitation and Recovery Framework

Chapter 4 Overall Rehabilitation and Recovery Framework | 32

B. Rehabilitation and Recovery Strategies

Infrastructure Sector

A. Objectives of the Plan

33 | PAGLAUM: Rehabilitation and Recovery Plan for the Magnitude 6.5 Earthquake in Leyte 2018-2021

Productive Sector Social Sector

Chapter 4 Overall Rehabilitation and Recovery Framework | 34

Cross-Sectoral

35 | PAGLAUM: Rehabilitation and Recovery Plan for the Magnitude 6.5 Earthquake in Leyte 2018-2021

C. Summary of Rehabilitation and Recovery Interventions/Needs

Productive Sector

Infrastructure Sector

Chapter 4 Overall Rehabilitation and Recovery Framework | 36

Cross-Sectoral

Social Sector

37 | PAGLAUM: Rehabilitation and Recovery Plan for the Magnitude 6.5 Earthquake in Leyte 2018-2021

D. Policy Recommendations

Infrastructure Sector

Productive Sector

Social Sector

Chapter 4 Overall Rehabilitation and Recovery Framework | 38

Cross-Sectoral

39 | PAGLAUM: Rehabilitation and Recovery Plan for the Magnitude 6.5 Earthquake in Leyte 2018-2021

Chapter 5

Investment Program Investment Demand Distribution Immediate Investments

Medium-Term Investments

Sectors Infrastructure Sector Productive Sector

Social Sector Cross Sectoral TOTAL

Cost (in thousand PhP) 2018

Total

2019

2020

2021

6,516.79

754,227.29

69,000.00

38,000.00

867,744.08

277.00

147,675.00

27,645.00

21,382.50

196,979.50

257,452.00

424,535.42

67,030.75

73,242.30

822,260.47

230.00

254,380.00

77,000.00

151,000.00

482,610.00

264,476.24

1,580,817.71

240,675.75

283,624.80

2,369,594.04

Chapter 5 Investment Program

| 40

Sectors Infrastructure Sector Productive Sector Social Sector Cross Sectoral TOTAL

Cost (in thousand PhP) 2018

Total

2019

6,516.79

754,227.29

760,744.08

277.00

147,675.00

147,952.00

257,452.00

424,535.42

681,987.42

230.00

254,380.00

254,610.00

264,476.24

1,580,817.71

1,845,293.95

Spatial Distribution of Rehabilitation and Recovery Investments

Sectors

Cost (in thousand PhP) 2020

Total

2021

Infrastructure Sector

69,000.00

38,000.00

107,000.00

Productive Sector

27,645.00

21,382.50

49,027.50

Social Sector

67,030.75

73,242.30

140,273.05

Cross Sectoral

77,000.00

151,000.00

228,000.00

240,675.75

283,624.80

524,300.55

TOTAL

41 | PAGLAUM: Rehabilitation and Recovery Plan for the Magnitude 6.5 Earthquake in Leyte 2018-2021

Cost (in thousand PhP)

Sectors

2018

ORMOC CITY

2019

2020

2021

Total

261,949.79

1,030,278.71

147,650.00

113,338.00

1,553,216.50

4,256.79

569,996.68

69,000.00

38,000.00

681,253.47

233.00

50,179.00

23,150.00

16,838.00

90,400.00

257,230.00

331,273.03

15,500.00

18,500.00

622,503.03

Cross-Sectoral

230.00

78,830.00

40,000.00

40,000.00

159,060.00

KANANGA, LEYTE

2,260.00

356,191.08

49,892.00

49,892.00

458,235.08

2,260.00

130,140.99

-

-

132,400.99

-

-

15,000.00

Infrastructure Sector Productive Sector Social Sector

Infrastructure Sector Productive Sector

-

15,000.00

Social Sector

-

73,900.09

Cross-Sectoral

-

137,150.00

-

-

137,150.00

CARIGARA, LEYTE

-

38,800.00

-

-

38,800.00

Infrastructure Sector

-

38,300.00

-

-

38,300.00

Productive Sector

-

-

-

-

-

Social Sector

-

-

-

-

-

Cross-Sectoral

-

500.00

-

-

500.00

266.00

29,944.62

-

-

30,210.62

-

15,789.62

-

-

15,789.62

-

-

44.00

-

-

14,377.00

-

-

JARO, LEYTE Infrastructure Sector Productive Sector

44.00

Social Sector

222.00

Cross-Sectoral

264,475.79

Sectors

14,155.00

-

TOTAL

49,892.00

1,455,214.41

197,542.00

49,892.00

163,230.00

Cost (in thousand PhP) 2018

2019

2020

2021

173,684.09

2,080,462.19

Total

Productive Sector

-

82,496.00

4,495.00

4,544.50

91,535.50

Social Sector

-

5,207.30

1,638.75

4,850.30

11,696.35

Cross-Sectoral

-

37,900.00

37,000.00

111,000.00

185,900.00

TOTAL

-

125,603.30

43,133.75

120,394.80

289,131.85

Chapter 5 Investment Program

| 42

Sectoral Investment Program

Infrastructure Rehabilitation and Recovery Investments

Productive Sector Rehabilitation and Recovery Investments

Subsectors

Cost (in thousand PhP)

2018

2019

2020

2021

344,572.21

38,000.00

38,000.00

Total

Power

6,506.79

Water Utilities

-

62,783.41

-

-

62,783.41

Air Transportation

-

4,879.09

-

-

4,879.09

Land Transportation

-

341,992.57

31,000.00

-

372,992.57

Roads

-

298,794.68

11,000.00

-

309,794.68

Bridges

-

43,197.89

20,000.00

-

63,197.89

-

10.00

Water Transportation TOTAL

10.00 6,516.79

754,227.29

69,000.00

43 | PAGLAUM: Rehabilitation and Recovery Plan for the Magnitude 6.5 Earthquake in Leyte 2018-2021

38,000.00

427,079.00

867,744.08

Social Services Rehabilitation and Recovery Investments

Subsectors

Cost (in thousand PhP) 2018

Agriculture and Fisheries Industry, Trade and

44.45 -

2019

2020

2021

Total

42,179.00

10,150.00

3,838.00

56,211.45

105,496.00

17,495.00

17,544.50

140,535.50

Services Tourism

233.00

TOTAL

277.45

Subsectors Health Housing and Social

147,675.00

27,645.00

21,382.50

Cost (in thousand PhP) 2018 257,452.00

2019

233.00 196,979.95

Total

2020

2021

30,233.33

16,433.33

19,433.33

66,100.00

216,673.79

50,597.42

53,808.97

578,532.44

Services Education TOTAL

257,452.00

177,628.03 424,535.42

67,030.75

73,242.30

177,628.03 822,260.47

Chapter 5 Investment Program

| 44

Cross-Sectoral Rehabilitation and Recovery Investments

Subsectors

Governance/DRRM

Cost (in thousand PhP) 2018

-

2021

Total

2019

2020

215,980.00

40,000.00

40,000.00

295,980.00

Environment

230.00

38,400.00

37,000.00

111,000.00

186,630.00

TOTAL

230.00

254,380.00

77,000.00

151,000.00

482,610.00

45 | PAGLAUM: Rehabilitation and Recovery Plan for the Magnitude 6.5 Earthquake in Leyte 2018-2021

Infrastructure Sector

List of Programs, Projects and Activities

Chapter 5 Investment Program

| 46

47 | PAGLAUM: Rehabilitation and Recovery Plan for the Magnitude 6.5 Earthquake in Leyte 2018-2021

Ormoc City

Repair and restoration of identified minor damages

2

-

Kananga, Leyte Ormoc City

Ormoc City

Ormoc City

Repair/Rehabilitation of Milagro-Welcome Tongonan Road Section

Repair/Rehabilitation of Welcome-Cabao-An Road

Repair/Rehabilitation of Cambantug-Cabingtan Ormoc City Road Section Ormoc City

Repair/Rehabilitation of Palo-Carigara-Ormoc Road

Repair/Rehabilitation of Danao-Gaas-Liberty Road Section

Repair/Rehabilitation of Valencia-San JoseSabang-Bao-Labrador -Liloan Road Section

2

3

4

5

6

7

-

-

-

Kananga, Leyte

Repair/Rehabilitation of Kananga-Tongonan Hot Spring Road -

-

-

2018

1

Land Transportation—Roads

Subtotal for Water Transportation

Ormoc City

Ormoc City

Inspection and evaluation of port facilities

Water Transportation

Subtotal for Air Transportation

Runway and Perimeter Fence

Repair/Rehabilitation of Ormoc City Airport

LOCATION

1

1

Air Transportation

Transportation Subsector

PROGRAM/PROJECT/ACTIVITY

10.00

10.00

15,000.00

48,000.00

28,000.00

-

80,000.00

50,000.00

50,000.00

-

-

4,879.09

4,879.09

2019

-

-

-

11,000.00

-

-

-

-

-

-

-

2020

COST (IN THOUSAND PhP)

-

-

-

-

-

-

-

-

-

-

-

2021

15,000.00

48,000.00

28,000.00

11,000.00

80,000.00

50,000.00

50,000.00

4,879.09

10.00

4,879.09

4,879.09

TOTAL

LGU Ormoc

LGU Ormoc

LGU Ormoc

LGU Ormoc

LGU Ormoc

DPWH

DPWH

PPA-PMO Western Leyte/Biliran

PPA-PMO Western Leyte/Biliran

CAAP

AGENCY

IMPLEMENTING

Chapter 5 Investment Program

| 48

-

Repair/Rehabilitation of Brgy Can-Adieng Road Ormoc City along Ormoc Cemetery Kananga, Leyte Kananga, Leyte Kananga, Leyte Kananga, Leyte Kananga, Leyte Kananga, Leyte Kananga, Leyte Carigara, Leyte Jaro, Leyte

Repair/Rehabilitation of Barangay Limao Road

Repair/Rehabilitation of Barangay Libertad Road

Repair/Rehabilitation of Barangay Tagaytay Road

Repair/Rehabilitation of Barangay Poblacion Road

Repair/Rehabilitation of Barangay Mahawan Road

Repair/Rehabilitation of Barangay Rizal Road

Repair/Rehabilitation of Barangay Santo Domingo Road

Repair/Rehabilitation of Barangay Hiluctogan Road

Repair/Rehabilitation of Barangay Villa Conzoilo Road going to Silawa Falls

11

12

13

14

15

16

17

18

19

20

Subtotal for Land Transportation - Roads

-

Ormoc City

Repair/Rehabilitation of Brgy Linao-CCF Road

10

-

-

-

-

-

-

-

-

-

-

Ormoc City

Repair/Rehabilitation of Curva-Mabato Road Section

9

-

Ormoc City

2018

Repair/Rehabilitation of Liloan-Lao Road Section

LOCATION

8

PROGRAM/PROJECT/ACTIVITY

298,794.68

100.00

300.00

510.08

500.00

3,486.60

2,864.00

3,402.00

1,142.00

6,140.00

200.00

150.00

6,000.00

3,000.00

2019

11,000.00

-

-

-

-

-

-

-

-

-

-

-

-

-

2020

COST (IN THOUSAND PhP)

-

-

-

-

-

-

-

-

-

-

-

-

-

-

2021

309,794.68

100.00

300.00

510.08

500.00

3,486.60

2,864.00

3,402.00

1,142.00

6,140.00

200.00

150.00

6,000.00

3,000.00

TOTAL

LGU Jaro

LGU Carigara

LGU Kananga

LGU Kananga

LGU Kananga

LGU Kananga

LGU Kananga

LGU Kananga

LGU Kananga

LGU Ormoc

LGU Ormoc

LGU Ormoc

LGU Ormoc

AGENCY

IMPLEMENTING

49 | PAGLAUM: Rehabilitation and Recovery Plan for the Magnitude 6.5 Earthquake in Leyte 2018-2021

Kananga, Leyte Kananga, Leyte Kananga, Leyte Ormoc City Ormoc City Ormoc City

Ormoc City Ormoc City Ormoc City Ormoc City

Ormoc City Ormoc City Brgy. Ipil (San Roque I), Ormoc City Ormoc City Brgy. Uguiao, Jaro, Leyte Brgy. Bias-Zabala, Jaro, Leyte Jaro, Leyte

Repair/Rehabilitation of Nahiloan Bridge

Repair/Rehabilitation of Natubgan Bridge

Repair/Rehabilitation of Cacao Bridge

Repair/Rehabilitation of Kinaohangan Bridge

Repair/Rehabilitation of Ormoc-Lake Imelda Road

Repair/Rehabilitation of Old Balion Bridge

Repair/Rehabilitation of Tabugokon Bridge

Repair/Rehabilitation of New Balion Bridge

Repair/Rehabilitation of Manlilinao Bridge

Repair/Rehabilitation of Mas-in Bridge

Repair/Rehabilitation of San Juan Bridge

Repair/Rehabilitation of Lao Bridge

Rehabilitation of Barangay. Ipil Concrete Footbridge

Repair/Rehabilitation of Brgy Naungan Road going to Naungan Footbridge

Repair/Rehabilitation of Agongongan Bridge (box culvert 5 barrel)

Repair/Rehabilitation of Mainit Bridge (box culvert 5 barrel)

Repair/Rehabilitation of Hambabalod Bridge (box culvert 5 barrel)

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

Subtotal for Transportation Subsector

Subtotal for Land Transportation - Bridges

Ormoc City

Repair/Rehabilitation of Pagsanga-an Bridge

LOCATION

1

Land Transportation—Bridges

PROGRAM/PROJECT/ACTIVITY

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

2018

10.00

4,000.00

4,000.00

4,000.00

200.00

350.00

5,000.00

5,000.00

346,871.66

43,197.89

-

-

-

-

5,000.00

6,405.00

1,500.00

940.89

3,000.00

2,500.00

1,302.00

2019

31,000.00

20,000.00

-

-

-

-

-

5,000.00

5,000.00

5,000.00

-

-

5,000.00

-

-

-

-

-

-

-

2020

COST (IN THOUSAND PhP)

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

2021

377,881.66

63,197.89

4,000.00

4,000.00

4,000.00

200.00

350.00

5,000.00

5,000.00

5,000.00

5,000.00

5,000.00

5,000.00

5,000.00

6,405.00

1,500.00

940.89

3,000.00

2,500.00

1,302.00

TOTAL

LGU Jaro

LGU Jaro

LGU Jaro

LGU Ormoc

LGU Ormoc

LGU Ormoc

LGU Ormoc

LGU Ormoc

LGU Ormoc

LGU Ormoc

LGU Ormoc

LGU Ormoc

DPWH

DPWH

LGU Kananga

DPWH

DPWH

DPWH

AGENCY

IMPLEMENTING

Chapter 5 Investment Program

| 50

Ormoc City to Tongonan, L. Danao, Gaas, Liberty, Cabintan, Ormoc City

Repair/Restoration of Feeder 13 Circuit

11

Subtotal for Power Subsector

4,246.79

2,260.00

6,506.79

-

Ormoc City

Rizal, Hiloctogan, Kananga Proper to Tongonan, Kananga, Leyte

Repair/Restoration of Feeder 61 Circuit

10

-

Non-RE (mobile diesel plant)

Libongao to Kananga to Rizal

Repair/Rehabilitation of Feeder F61 Circuit

9

-

14

Marshalling, Tongonan, Kananga

Repair/Rehabilitation of Feeder F61 Circuit

8

-

-

Ormoc City

Repair/Rehabilitation of Distribution Transformers

7

-

Brgy. San Ignacio, Ormoc City and Brgy. Nueva Vista

Libongao to Valencia, Ormoc City

Repair/Rehabilitation of Feeder F63 Circuit

6

-

Renewable energy (mini-hydro)

Solowakan, Tongonan Ormoc City

Repair/Rehabilitation of Feeder F61 Circuit

5

-

13

Cabaon-an to Campsite, Ormoc City

Repair/Rehabilitation of Feeder F61 Circuit

4

-

-

Milagro to So. Welcome, Cabaonan, Ormoc City

Repair/Rehabilitation of Feeder F61 Circuit

3

-

Implementation of distributed generation (embedded)

Simangan to Liberty, Ormoc City

Repair/Rehabilitation of Feeder F13 Circuit

2

-

2018

12

Ormoc City

Repair/Rehabilitation of LEYECO V Main Office

LOCATION

1

Power Subsector

PROGRAM/PROJECT/ACTIVITY

990.65

840.96

206.98

171.60

135.48

344.08

1,324.65

344,572.21

38,000.00

300,000.00

-

-

-

100.00 2,457.83

2019

38,000.00

38,000.00

-

-

-

-

-

-

-

-

-

-

-

-

-

2020

COST (IN THOUSAND PhP)

38,000.00

38,000.00

-

-

-

-

-

-

-

-

-

-

-

-

-

2021

427,079.00

114,000.00

300,000.00

-

4,246.79

2,260.00

990.65

840.96

206.98

171.60

135.48

344.08

1,324.65

2,457.83

100.00

TOTAL

LEYECO V

LEYECO V

LEYECO V

LEYECO V

LEYECO V

LEYECO V

LEYECO V

LEYECO V

LEYECO V

LEYECO V

LEYECO V

LEYECO V

LEYECO V

AGENCY

IMPLEMENTING

51 | PAGLAUM: Rehabilitation and Recovery Plan for the Magnitude 6.5 Earthquake in Leyte 2018-2021

Carigara, Leyte Carigara, Leyte

Carigara, Leyte Carigara, Leyte Kananga, Leyte

Kananga, Leyte Brgys. Nueva Vista, Cabingtan, Cabaon-an, Gaas, Lake Danao, Ormoc City Brgys. Cabingtan, Lake Danao, Ormoc City Ormoc City Brgy. Lake Danao, Ormoc City Ormoc City

Construction of retaining walls (gabions)

Construction of box culvert or embankment at landslide affected areas

Construction of an alternative water source (groundwater)

Procurement of pumps for underground water extraction

Repair/Improvement of Brgy Water System at Brgy Mahawan, Kananga, Leyte

Repair of damaged pipelines, pipe laying at Brgy Natubgan, Kananga

Repair of damaged water pipelines

Repair/Restoration of four (4) units damaged spring box

Procurement of 15 units generator sets

Upgrading and improvement of waterworks system

Repair of spring box and water pipeline

5

6

7

8

9

10

11

12

13

14

15

-

-

-

-

-

-

-

-

-

-

-

-

6,516.79

Carigara, Leyte

Construction of filtration plant

4

-

GRAND TOTAL FOR INFRASTRUCTURE SECTOR

Jaro, Leyte

Re-opening of the dug well

3

-

-

Jaro, Leyte

Installation of new submersible pump

2

-

2018

Subtotal for Water Subsector

Jaro, Leyte

Development of new water source

LOCATION

1

Water Subsector

PROGRAM/PROJECT/ACTIVITY

754,227.29

62,783.41

2,500.00

2,000.00

10,270.00

189.94

2,310.04

1,558.66

2,265.16

1,000.00

2,000.00

5,000.00

15,000.00

15,000.00

380.00

1,310.00

1,999.62

2019

69,000.00

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

2020

COST (IN THOUSAND PhP)

38,000.00

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

2021

Jaro Water District

Jaro Water District

Jaro Water District

AGENCY

IMPLEMENTING

867,744.08

62,783

2,500.00

2,000.00

10,270.00

190.00

2,310.00

LGU Ormoc

LGU Ormoc

ORWASA

ORWASA

ORWASA

1,559.00 Kananga Waterworks

2,265.00 Kananga Waterworks

1,000.00 Metro Carigara Water District

2,000.00 Metro Carigara Water District

5,000.00 Metro Carigara Water District

15,000.00 Metro Carigara Water District

15,000.00 Metro Carigara Water District

380 .00

1,310.00

2,000.00

TOTAL

Productive Sector

List of Programs, Projects and Activities

Chapter 5 Investment Program

| 52

53 | PAGLAUM: Rehabilitation and Recovery Plan for the Magnitude 6.5 Earthquake in Leyte 2018-2021

Ormoc City

City

Brgy Macabug, Ormoc

-

-

Construction/establishment of perimeter fence Brgy. Macabug, Ormoc with electric post for safety and security City reason 6 sites in highland areas of Ormoc City (2 sites in Brgy. Cabintan, 2 in Brgy. Lake Danao, 1 in Brgy. Ga-as, and 1 in Brgy. Dolores) Ormoc City Ormoc City Kananga

Rehabilitation of Sloping Agricultural Land Technology (SALT4) with livestock component

Distribution of farm inputs under a grant rollover scheme to vegetable farmer groups

Repair/Retrofitting of Bao River Irrigation System

Repair/Retrofitting of Tugbong Communal Irrigation System

Improvement of post harvest facilities (PHF) of Ormoc City existing Farmers Irrigators Services Cooperative (FISCOs) to cater buffer stock of viable seeds

3

4

5

6

7

-

-

-

-

-

Brgy. Macabug, Ormoc City

Re-drilling of existing deep well for submersible water pumps for sufficient and continuous water supply

-

-

-

2018

Brgy. Macabug, Ormoc City

Rehabilitation of the freshwater hatchery and grow-out pond

operators

For distribution to backyard fishpond

Freshwater hatchery and grow-out ponds

Provision of feeds for breeders and tilapia fingerlings for 1 year cropping

LOCATION

Minor repair of freshwater hatchery and growout pond

2

1

Agriculture and Fisheries Subsector

PROGRAM/PROJECT/ACTIVITY

110.00

1,200.00

15,000.00

11,979.00

2,000.00

1,000.00

1,500.00

1,400.00

20.00

2,000.00

2019

-

-

-

2,000.00

1,000.00

-

-

-

2,000.00

-

2020

COST (IN THOUSAND PhP)

-

-

-

1,000.00

2,000.00

-

-

-

-

-

2021

1,200.00

15,000.00

11,979.00

5,000.00

4,000.00

1,500.00

1,400.00

20.00

4,000.00

110.00

TOTAL

NIA

NIA

NIA

DA, LGU Ormoc

DA, LGU Ormoc

BFAR

BFAR

BFAR

BFAR

BFAR

AGENCY

IMPLEMENTING

Chapter 5 Investment Program

| 54

-

Ormoc City Ormoc City Brgy. Olotan and Brgy. Sta. Cruz, Jaro, Leyte Brgy. Dolores, Ormoc City Sitio Catmonay, Brgy. Cabintan, Ormoc City

Abaca rehabilitation

Establishment of abaca nurseries

Distribution of animal stocks

Repair of Ormoc Uphill Processing Center

Construction of retaining wall/riprap at the base of the tramline

10

11

12

13

14

Ormoc City and Kananga, Leyte Ormoc City and Kananga, Leyte Ormoc City and Kananga, Leyte

Ormoc City and Kananga, Leyte Ormoc City and Kananga, Leyte

SBC entrepreneurial kits for MEs

Pondo Para sa Pagbabago at Pag-asenso (P3 Program)

SBC Credit Guarantee Financing

Negosyo Center Business Development Services

Kapatid Mentor Me Program (KMME)

1

2

3

4

5

Industry, Trade and Services Subsector

Subtotal for Agriculture and Fisheries Subsector

-

Brgy. Alegria, Ormoc City

Repair of Agri-Fishery and Trading Center (AFTC)/Bagsakan Center

9

-

-

-

-

-

-

-

-

-

Port Area, Ormoc City

2018

Repair of Quarantine Office

LOCATION

8

PROGRAM/PROJECT/ACTIVITY

44.00

44.00

300.00

500.00

100.00

450.00

296.00

20,000.00

10,000.00

750.00

42,179.00

-

50.00

20.00

5,000.00

2019

-

-

-

-

495.00

10,150.00

-

-

-

150.00

5,000.00

-

-

2020

COST (IN THOUSAND PhP)

38.00

800.00

-

-

-

-

544.50

3,838.00

-

-

-

-

-

2021

50.00

20.00

DA, LGU Ormoc

LGU Ormoc

AGENCY

IMPLEMENTING

DTI through SBC

DTI through SBC and MFis

DTI through SBC

DA-PhilMech

DA, DTI

LGU Jaro

1,489.50 DTI through SBC and MFis

296.00 DTI through Negosyo Centers

20,000.00

10,000.00

750.00

56,211.00

300.00

500.00

44.00

288.00 LGU Ormoc, PhilFIDA

10,800.00 LGU Ormoc, PhilFIDA

TOTAL

55 | PAGLAUM: Rehabilitation and Recovery Plan for the Magnitude 6.5 Earthquake in Leyte 2018-2021

LOCATION 2018

2019

-

Ormoc City

Establishment and operationalization of a technology center for pineapple fiber in Ormoc City

ICT-based farm management farming for small Ormoc City -hold sugarcane farmers in Ormoc City

Establishment and operationalization of a climate controlled facility for vegetables and fruits

Subtotal for ITS Subsector

-

Ormoc City

Establishment and operationalization of wine and vinegar processing in Ormoc City

50.00

277.00

Ormoc City

Repair of view deck in Lake Danao Natural Park

4

30.00

GRAND TOTAL FOR PRODUCTIVE SECTOR

Ormoc City

Repair of toilet/comfort room in Lake Danao Natural Park

3

150.00

3.00

233.00

Ormoc City

Rehabilitation of information center in Lake Danao Natural Park

2

-

-

-

Subtotal for Tourism Subsector

Brgy. Cabintan, Ormoc City

Clearing of Tres Aguas Falls pathway

1

Ormoc City and Kananga, Leyte

-

Ormoc City and Kananga, Leyte

Establishment and operationalization of technology center for ready-to-eat food products for disaster resiliency

-

Ormoc City

Rehabilitation of Ormoc City slaughter house into a triple A class

-

Ormoc City and Kananga, Leyte

Establishment and operationalization of pilot farm on biofloc for - White shrimps - Tiger prawns

147,675.00

-

-

-

-

-

105,496.00

40,000.00

3,000.00

5,000.00

5,000.00

1,000.00

10,000.00

10,000.00

27,645.00

-

-

-

-

-

17,495.00

2,000.00

1,000.00

1,000.00

1,000.00

1,000.00

10,000.00

1,000.00

2020

COST (IN THOUSAND PhP)

Rehabilitation and upgrading of affected MSMEs Eco-system by Community Empowerment thru Science and Technology (CEST)

Tourism Subsector

6

PROGRAM/PROJECT/ACTIVITY

21,382.50

-

-

-

-

-

17,544.50

2,000.00

1,000.00

1,000.00

1,000.00

1,000.00

10,000.00

1,000.00

2021

196,979.50

233.00

50.00

30.00

150.00

3.00

140,535.50

44,000.00

5,000.00

7,000.00

7,000.00

3,000.00

30,000.00

12,000.00

TOTAL

LGU Ormoc, DENR

LGU Ormoc, DENR

LGU Ormoc, DENR

LGU Ormoc

DOST, DTI, DA, LGUs Ormoc and Kananga

DOST, DTI, DA, LGU Ormoc

DOST, DTI, DA, LGU Ormoc

DOST, DTI, DA, LGU Ormoc

DOST, DTI, LGUs Ormoc and Kananga

LGU Ormoc, NMIS

DOST, DA, DTI, LGUs Ormoc and Kananga

AGENCY

IMPLEMENTING

Social Sector

List of Programs, Projects and Activities

Chapter 5 Investment Program

| 56

57 | PAGLAUM: Rehabilitation and Recovery Plan for the Magnitude 6.5 Earthquake in Leyte 2018-2021

-

Batuan, Tambulilid, Punta, San Isidro, Cogon, Alta Vista, District 28, Patag, Milagro, Lake Danao, Cabingtan, Tongonan, Cagbuhangin, Cabulihan, Concepcion, Dayhagan, Ormoc City Batuan, Tambulilid, Punta, San Isidro, Cogon, Alta Vista, District 28, Patag, Milagro, Lake Danao, Cabingtan, Tongonan, Cagbuhangin, Cabulihan, Concepcion, Dayhagan, Ormoc City

Kananga, Leyte

Provision of medical equipment and medical supplies

Purchase of ambulance for health emergencies CHD-Ormoc City and disasters including equipment 6 District Health Centers, 1 CHO Ormoc District Hospital

Repair of barangay health centers

Back-up power facility (generator set)

Repair/Rehabilitation of 7 Health Stations

3

4

5

6

7

Subtotal for Health Subsector

-

Ipil, Dolores, Linao, DFM, Valencia, Ormoc City

Provision of medical equipment and medical supplies

2

-

-

-

-

-

Ipil, Dolores, Linao, DFM, Valencia, Ormoc City -

2018

Repair of district health centers

LOCATION

1

Health Subsector

PROGRAM/PROJECT/ACTIVITY

30,233.33

933.33

5,200.00

4,100.00

3,000.00

6,000.00

3,000.00

8,000.00

2019

933.33 16,433.33

-

-

2,500.00

5,000.00

-

8,000.00

2020

COST (IN THOUSAND PhP)

19,433.33

933.33

7,000.00

-

2,500.00

5,000.00

-

4,000.00

2021

66,100.00

2,800.00

12,200.00

4,100.00

8,000.00

16,000.00

3,000.00

20,000.00

TOTAL

DOH and LGU Kananga

LGU Ormoc and EDC

LGU Ormoc

DOH and LGU Ormoc

DOH and LGU Ormoc

DOH and LGU Ormoc

DOH and LGU Ormoc

AGENCY

IMPLEMENTING

Chapter 5 Investment Program

| 58

-

Brgy, Canhandugan, Jaro, Leyte Gaas, Liberty, Milagro, Tongonan Cabaon-an, Lake Danao, Cabingtan, Omoc City

Kananga, Leyte Kananga, Leyte Kananga, Leyte Ormoc City and Kananga, Carigara, Jaro, Leyte

Repair of partially damaged houses

Cash for Work

Repair of 10 day care centers

Provision of Emergency Shelter Assistance (ESA)

Provision of transitional shelter

Provision of permanent housing for families living in danger zones

Livelihood skills training and certification program

3

4

5

6

7

8

9

Subtotal for Housing and Social Services Subsector

-

Bagong, Nueva Vista, Quezon Jr., San Jose, Maticaa, Hugpa

Construction of core shelter

2

222.00

257,452.00

-

-

-

-

-

Gaas, Liberty, Milagro, Tongonan Cabaon-an, Lake Danao, Cabingtan 257,230.00

2018

Construction of permanent housing

LOCATION

1

Housing and Social Services Subsector

PROGRAM/PROJECT/ACTIVITY

216,673.79

5,207.30

48,958.67

3,856.50

20,151.59

-

-

-

138,500.00

-

2019

50,597.42

1,638.75

48,958.67

-

-

-

-

-

-

-

2020

COST (IN THOUSAND PhP)

53,808.97

4,850.30

48,958.67

-

-

-

-

-

-

-

2021

578,532.44

11,696.35

146,876.00

3,856.50

20,151.59

-

-

222.00

138,500.00

257,230.00

TOTAL

TESDA

NHA and LGU Kananga

DSWD

DSWD

LGU Ormoc

DSWD

DSWD

DSWD

NHA, DSWD

AGENCY

IMPLEMENTING

59 | PAGLAUM: Rehabilitation and Recovery Plan for the Magnitude 6.5 Earthquake in Leyte 2018-2021

34 Schools in Ormoc City 2 Schools in Ormoc City Brgy. Uguiao, Jaro, Leyte

Repair/Rehabilitation of school buildings

Schools for further investigation by a Structural Engineer

Repair/Rehabilitation of school buildings

2

3

4

GRAND TOTAL FOR SOCIAL SECTOR

Subtotal for Education Subsector

29 Schools in Ormoc City

Construction of school buildings

LOCATION

1

Education Subsector

PROGRAM/PROJECT/ACTIVITY

257,452.00

-

-

-

-

-

2018

424,535.42

177,628.03

14,155.00

22,633.03

140,840.00

2019

67,030.75

-

-

-

-

-

2020

COST (IN THOUSAND PhP)

73,242.30

-

-

-

-

-

2021

822,260.47

177,628.03

14,155.00

-

22,633.03

140,840.00

TOTAL

DepEd, DPWH

DepEd, DPWH

DepEd, DPWH

DepEd, DPWH

AGENCY

IMPLEMENTING

Cross-Sectoral

List of Programs, Projects and Activities

Chapter 5 Investment Program

| 60

61 | PAGLAUM: Rehabilitation and Recovery Plan for the Magnitude 6.5 Earthquake in Leyte 2018-2021

LOCATION

-

-

Brgy. Dayhagan, Ormoc City Brgy. Juaton, Ormoc City Brgy. Cabulihan, Ormoc City Brgy. Mahayahay, Ormoc City Brgy. Quezon Jr., Ormoc City Brgy. Quezon Jr., Ormoc City Brgy. Can-untog, Ormoc City

Barangay Hall

Barangay Hall

Barangay Hall

Barangay Stage

Barangay Learning Center

Tanod Outpost

Multi-purpose Hall

-

-

-

-

Brgy. Cabaonan, Ormoc City

-

Brgy. Stage & Tanod Outpost

Ormoc City

5 Repair/Rehabilitation of Government Infrastructures

-

Brgy. Milagro, Ormoc City

Ormoc City

4 Construction of Storage/Warehouse for supplies including lot purchase

-

Barangay Hall

Ormoc City

3 Capacity Building on Camp Coordination and Camp Management (CCCM)

-

Brgy. Bagong, Ormoc City

Ormoc City

2 Land/Site Development

-

2018

Brgy. Hall, Day Care Center & Tanod Outpost

Ormoc City

1 Lot purchase for resettlement areas

Governance and Disaster Risk Reduction and Management (DRRM)

PROGRAM/PROJECT/ACTIVITY

100.00

50.00

50.00

50.00

50.00

50.00

50.00

50.00

40.00

280.00

25,000.00

5,000.00

20,000.00

15,000.00

2019

-

-

-

-

-

-

-

-

-

-

-

5,000.00

20,000.00

15,000.00

2020

COST (IN THOUSAND PhP)

-

-

-

-

-

-

-

-

-

-

-

5,000.00

20,000.00

15,000.00

2021

100.00

50.00

50.00

50.00

50.00

50.00

50.00

50.00

40.00

280.00

25,000.00

15,000.00

60,000.00

45,000.00

TOTAL

LGU Ormoc

LGU Ormoc

LGU Ormoc

LGU Ormoc

LGU Ormoc

LGU Ormoc

LGU Ormoc

LGU Ormoc

LGU Ormoc

LGU Ormoc

LGU Ormoc

LGU Ormoc

LGU Ormoc

LGU Ormoc

LGU Ormoc

AGENCY

IMPLEMENTING

Chapter 5 Investment Program

| 62

Brgy. Mahayahay, Ormoc City Brgy. Ipil, Ormoc City

Brgy. Boroc, Ormoc City Brgy. Danhug, Ormoc City

Barangay Stage

Brgy. Hall (Multi-Purpose) and 3 in 1 building (extension)

Barangay Hall

Multi-purpose Hall

Brgy. Maticaa, Ormoc City

-

Brgy. Hugpa, Ormoc City

Barangay Hall

Barangay Facility/Hall

-

Brgy. Alta Vista, Ormoc City

Barangay Center

Brgy. Guintigui-an, Ormoc City

-

Brgy. Bantigue, Ormoc City

Barangay Hall

Senior Citizen Building

-

Brgy. Can-adeing, Ormoc City

Multi-purpose Hall

Brgy. Guintigui-an, Ormoc City

-

Brgy. Donghol, Ormoc City

Barangay Stage

Day Care Center

-

Brgy. Donghol, Ormoc City

Multi-purpose Hall

-

-

-

-

-

-

-

-

Brgy. Danao, Ormoc City

Multi-purpose Hall/ Day Care Center Building

-

2018

Brgy. Don Revilla, Ormoc City

LOCATION

Barangay Hall

PROGRAM/PROJECT/ACTIVITY

2019

250.00

50.00

200.00

50.00

50.00

300.00

50.00

50.00

50.00

100.00

100.00

50.00

100.00

260.00

50.00

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

2020

COST (IN THOUSAND PhP)

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

2021 50.00

250.00

50.00

200.00

50.00

50.00

300.00

50.00

50.00

50.00

100.00

100.00

50.00

100.00

260.00

TOTAL

LGU Ormoc

LGU Ormoc

LGU Ormoc

LGU Ormoc

LGU Ormoc

LGU Ormoc

LGU Ormoc

LGU Ormoc

LGU Ormoc

LGU Ormoc

LGU Ormoc

LGU Ormoc

LGU Ormoc

LGU Ormoc

LGU Ormoc

AGENCY

IMPLEMENTING

63 | PAGLAUM: Rehabilitation and Recovery Plan for the Magnitude 6.5 Earthquake in Leyte 2018-2021

-

-

-

-

Brgy. Punta, Ormoc City

Brgy. Punta, Ormoc City Brgy. Bagong, Ormoc City Brgy. Naungan, Ormoc City Brgy. Batuan, Ormoc City Brgy. Batuan, Ormoc City Brgy. Alegria, Ormoc City Brgy. Alegria, Ormoc City Brgy. Tongonan, Ormoc City Brgy. Patag, Ormoc City Brgy. Patag, Ormoc City Ormoc City Ormoc City Ormoc City

Brgy. Hall Extension (Evacuation Center/Session Hall)

Covered Court

Library Building

Brgy. Hall/Day Care Center

Barangay Hall

Covered Court

Barangay Hall

Landscape

Sagip Kapamilya Building

Multi-purpose Hall

Tanod Outpost

Manpower Building

CDRRM Office

Fire Station

-

-

-

2018

Brgy. Kadaohan, Ormoc City

LOCATION

Barangay Facility/Halll

PROGRAM/PROJECT/ACTIVITY

50.00

50.00

1,000.00

50.00

50.00

100.00

30.00

50.00

20.00

40.00

150.00

80.00

70.00

30.00

100.00

2019

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

2020

COST (IN THOUSAND PhP)

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

2021

50.00

50.00

1,000.00

50.00

50.00

100.00

30.00

50.00

20.00

40.00

150.00

80.00

70.00

30.00

100.00

TOTAL

LGU Ormoc

LGU Ormoc

LGU Ormoc

LGU Ormoc

LGU Ormoc

LGU Ormoc

LGU Ormoc

LGU Ormoc

LGU Ormoc

LGU Ormoc

LGU Ormoc

LGU Ormoc

LGU Ormoc

LGU Ormoc

LGU Ormoc

AGENCY

IMPLEMENTING

Chapter 5 Investment Program

| 64

6

-

-

-

Ormoc City

Ormoc City Ormoc City Ormoc City

Ormoc City Ormoc City Ormoc City Ormoc City Kananga, Leyte Poblacion, Kananga Poblacion, Kananga, Leyte Poblacion, Kananga, Leyte Brgy, Rizal, Kananga, Leyte Brgy, Rizal, Kananga, Leyte

Public Market Building 2

Jeepney Terminal

Bus Terminal

Post Office

Superdome Building

New Ormoc City Hall

Ecolodge

DENR Administration Building

Repair/Rehabilitation of Government Infrastructure

Public Market Building

Municipal Hall

PNP Building

Barangay Hall

Covered Court/Evacuation Center

-

-

-

-

-

-

Ormoc City

Public Market Building 1

-

2018

Ormoc City

LOCATION

DSWD Holding Area

PROGRAM/PROJECT/ACTIVITY

350.00

400.00

100.00

100.00

100.00

100.00

600.00

2,500.00

1,000.00

400.00

200.00

30,000.00

30.00

200.00

7,500.00

2019

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

2020

COST (IN THOUSAND PhP)

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

2021

2,500.00

1,000.00

400.00

200.00

30,000.00

30.00

200.00

7,500.00

350.00

400.00

100.00

100.00

100.00

100.00

600.00

TOTAL

LGU Kananga

LGU Kananga

LGU Kananga

LGU Kananga

LGU Kananga

LGU Kananga

DENR

LGU Ormoc

LGU Ormoc

LGU Ormoc

LGU Ormoc

LGU Ormoc

LGU Ormoc

LGU Ormoc

LGU Ormoc

LGU Ormoc

AGENCY

IMPLEMENTING

65 | PAGLAUM: Rehabilitation and Recovery Plan for the Magnitude 6.5 Earthquake in Leyte 2018-2021

Brgy. Lim-ao, Kananga, Leyte Brgy. Tongonan, Kananga, Leyte Brgy. Tongonan, Kananga, Leyte

Covered Court / Evacuation Center

Barangay Hall

Covered Court / Evacuation Center

Affected areas Affected areas Jaro, Ormoc City Jaro, Leyte (Brgys. Villa Conzoilo, San Pedro, Rubas, Tinambacan, Canhandugan) Affected areas Brgy. Hiluctogan, Carigara, Leyte

Geohazard site investigation of proposed relocation sites

Geohazard site investigation of proposed LGU infrastructure projects

Engineering, Geological and Geohazard Assessment of Jaro-Cabintan Road

Survey, Mapping and Planning of the forest/ mountainous areas with landslide incidents

Watershed Protection

Slope Protection Wall

5

6

7

8

9

10

-

-

-

-

-

-

-

230.00

Affected areas

Identification of critical hazard zones and posting of corresponding hazard/warning signages

4

-

GRAND TOTAL FOR CROSS-SECTORAL

LDNP, Ormoc City (50 ha) and Jaro, Leyte (300 ha)

Expanded National Greening Program (eNGP)

3

30.00

200.00

230.00

Sitio Mongbong, Ormoc City

Rehabilitation of the LDNP Administration Building

2

-

-

-

-

-

2018

Subtotal for Environment Subsector

Sitio Mongbong, Ormoc City

Rehabilitation of the Lake Danao Natural Park (LDNP) Ecolodge

1

Environment Subsector

Subtotal for Governance/DRRM

Brgy. Lim-ao, Kananga, Leyte

LOCATION

Barangay Hall

PROGRAM/PROJECT/ACTIVITY

500.00

254,380.00

38,400.00

-

-

300.00

250.00

50.00

300.00

37,000.00

-

-

215,980.00

50,000.00

50.00

50,000.00

3,000.00

2019

77,000.00

37,000.00

-

-

-

-

-

-

-

37,000.00

-

-

40,000.00

-

-

-

-

2020

COST (IN THOUSAND PhP)

151,000.00

111,000.00

-

-

-

-

-

-

-

111,000.00

-

-

40,000.00

-

-

-

-

2021

500.00

482,610.00

186,630.00

-

-

300.00

250.00

50.00

300.00

185,000.00

30.00

200.00

295,980.00

50,000.00

50.00

50,000.00

3,000.00

TOTAL

DPWH and LGU Carigara

DENR

DENR, MGB

MGB

MGB

MGB

MGB

DENR

DENR

DENR

LGU Kananga

LGU Kananga

LGU Kananga

LGU Kananga

AGENCY

IMPLEMENTING

Chapter 6

Implementation, Monitoring and Evaluation Mechanism Plan Implementation

Chapter 5 Implementation, Monitoring and Evaluation Mechanism

| 66



 



Monitoring and Evaluation

67 | PAGLAUM: Rehabilitation and Recovery Plan for the Magnitude 6.5 Earthquake in Leyte 2018-2021

Chapter 5 Implementation, Monitoring and Evaluation Mechanism

| 68

PAGLAUM: Rehabilitation and Recovery Plan for the Magnitude 6.5 Earthquake in Leyte 2018-2021 Secretariat Overall Secretariat (NEDA VIII) Chapter 4

Chapter 5

Chapter 6 Chapter 1

Chapter 2 Chapter 3

69 | PAGLAUM: Rehabilitation and Recovery Plan for the Magnitude 6.5 Earthquake in Leyte 2018-2021

Rehabilitation and Recovery Plan for the Magnitude 6.5 Earthquake in Leyte 2018-2021

Published by: National Economic and Development Authority Regional Office VIII Government Center, Baras, Palo, Leyte Tel: (053) 832-2140 / (053) 323-2975 loc 203 Email: [email protected] http://nro8.neda.gov.ph

Related Documents

Rehabilitation
April 2020 20
Tori's College Planpdf
December 2019 21
Recovery
November 2019 53

More Documents from "sambashivarao"

Projek Uteh
October 2019 61
Ucapan
October 2019 56
Milling Machine.pptx
April 2020 33
These And Those.docx
April 2020 28