Ocean General Overview 05-1c-DH-1X Offshore Training Report 10th Feb 2007 – 9th Mar 2007
Nguyễn Việt Hùng Exploration Group Japan Vietnam Petroleum Company
1
Ocean General is a semi-submersible rig owned by Diamond Offshore Drilling. It was used for Nam Côn Sơn Basin as there is a deep water area (245m), out of jack-up rig range.
Tension leg Production Platform
Drilling vessel
Jacket Production Platform
Semi-submersible rig
Onshore rig
Jack-up rig
2
Main parts of Ocean General Derrick Tensioners Main deck Cranes
Helideck
Life boat Anchor Controllers 3
1. Derrick It is 50m high, can load 250 tons drill string.
4
Derrick’s function is to support rotating systems loading and drilling equipments’ traveling.
5
Drill floor is under derrick, it is the place where floormen and driller work.
6
2. Main deck For units, equipments occupied and workers do their jobs.
7
3. Helideck deck Supports taking off and landing of helicopter. Its diameter is 22m.
8
4. Crane There are always 2 cranes on each rig. They are for transporting containers, equipments and people within the rig and to supply boat.
9
5. Ballasts A typical part of a semi-sub rig, they are floatable buoys with occupied water inside.
Ballasts 10
6. Tensioners
It is available on a semi-sub rig only. It consist of hydraulic cylinders and cables system. Tensioners work automatically and continously to minimize the rig’s heave due to sea wave.
11
7. Anchors and anchor controllers Each semi-sub rig has 8-12 anchors. They keep the rig’s stability and were handled by Anchor Handling Vessel. The anchor controllers were controlled automatically by Dynamic Balance System to balance the tension of each opposite anchor cables.
12
8. Generators and Power supply system There are 4 engines use diesel to ensure the power for system operation and other life activities.
13
9. Circulating system Circulates the drill mud into the bore hole and support mud logging job. This system will be regarded with more details in following section.
14
10. Transportation a. Helicopter: For personnel changeout and moving small items. It takes 1.5 hour from Vũng Tàu Airport to Ocean General by helicopter.
15