News Release Jan 09 Dulles Metrorail

  • Uploaded by: Dewita Soeharjono
  • 0
  • 0
  • December 2019
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View News Release Jan 09 Dulles Metrorail as PDF for free.

More details

  • Words: 386
  • Pages: 2
News Release www.VAmegaprojects.comĀ  TRAFFIC ADVISORY FOR IMMEDIATE RELEASE Contact: Steven Titunik 571-483-2591, 703-928-6569

Jan. 9, 2009 NR09-DR61

Tysons Corner Utiliy Relocation for the Dulles Corridor Metrorail Project Weather permitting the following lane closures are scheduled:

Leesburg Pike West (Route 7) Night Work 1. When: What: Where: Why: 2. When: What: Where: Why:

Tues. through Thur., Jan. 13-15, 9:30 p.m. to 5:00 a.m. Left lane closure Leesburg Pike west (Route 7), between Tyco Road and Dulles Toll Road (Route 267) Utility relocation Wed. through Fri., Jan 21-23, Mon. through Fri., Jan. 26-30, 9:30 p.m. to 5:00 a.m. Right lane closure Leesburg Pike west (Route 7), between Tyco Road and Dulles Toll Road (Route 267) Utility relocation

Leesburg Pike East (Route 7) Night Work 1. When: What: Where: Why: 2. When: What: Where: Why:

Mon., Jan. 12, 9:30 p.m. to 5:00 a.m. Left lane closure Leesburg Pike east (Route 7) between Dulles Toll Road (Route 267) and Westwood Center Drive Utility relocation Mon. through Wed., Jan. 12-14, 9:30 p.m. to 5:00 a.m. Left turn lane closure Leesburg Pike east (Route 7) at Spring Hill Road Soil borings

Chain Bridge Road South (Route 123) When: What: Where: Why:

Thur., Jan 15 and Wed. and Thur., Jan 21-22, 9:30 p.m. to 5:00 a.m. Right turn lane closure Chain Bridge Road south (Route 123) at Tysons Boulevard Utility relocation

Westpark Drive North at Leesburg Pike (Route 7) When: What: Where: Why:

Mon. through Thur., Jan. 12-15, one hour each night between 9:30 p.m. to 5:00 a.m. Left lane closure Westpark Drive southbound at Leesburg Pike (Route 7) Utility relocation

Gosnell Road South (Route 939) at Leesburg Pike (Route 7) When: What: Where: Why:

Mon. through Thur., Jan. 12-15, one hour each night between 9:30 p.m. to 5:00 a.m. Right lane closure Gosnell Road northbound at Leesburg Pike (Route 7) Utility relocation

In addition, closures will continue in several sections of the service roads adjacent to east and westbound Leesburg Pike (Route 7); Leesburg Pike between Chain Bridge Road (Route 123) and the Dulles Toll Road. Motorists should stay alert and be prepared to alter their travel on these service roads. Access to all businesses will be maintained throughout the work periods. A 24/7 emergency hotline is available for utility construction related issues: 877-585-6789. For general project information: www.dullesmetro.com or 703-572-0506

##

Related Documents

Jan 09 News 2
December 2019 31
Puma News Jan 09
December 2019 31
News Release
June 2020 7
News Release
June 2020 10

More Documents from ""