MEMORANDUM IN CONNECTION WITH S&T DN FOR CHANGING OF GROUP RELAY BASE WIREING OF POINT NO-26A/B DATE 25/26-03-2019( NIGHT TIME) AT BZN. Date of S & T Block: • On date 25/26-03-2019 in Night Time Purpose of disconnection: • Replacement of Group Relay base wiring of Point No-26A/B DN MN to C/LOOP at BZN. Duration of S&T disconnection required: • One hours (01 hours )on date 25/26.03.2019 ( in Night Time) Repercussion during S&T Block period • DN MN Home Signal S-2 ---------------------------- P/IN • Reception of train towards C/LOOP ------------ Will be P/IN • C/LOOP UP Starter S-5 ------------------------------ P/OUT
__________________ ________________ DTI/MCA
_____________________ ADSTE/SRC
______________________ Sr. DSTE(Co)/KGP ___________________ Sr. DOM(G)/KGP
____________________ SMR/BZN
SSE/SIG//KIG