New Portable Document 1.docx

  • Uploaded by: Ananta Chaulya
  • 0
  • 0
  • November 2019
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View New Portable Document 1.docx as PDF for free.

More details

  • Words: 115
  • Pages: 1
MEMORANDUM IN CONNECTION WITH S&T DN FOR CHANGING OF GROUP RELAY BASE WIREING OF POINT NO-26A/B DATE 25/26-03-2019( NIGHT TIME) AT BZN. Date of S & T Block: • On date 25/26-03-2019 in Night Time Purpose of disconnection: • Replacement of Group Relay base wiring of Point No-26A/B DN MN to C/LOOP at BZN. Duration of S&T disconnection required: • One hours (01 hours )on date 25/26.03.2019 ( in Night Time) Repercussion during S&T Block period • DN MN Home Signal S-2 ---------------------------- P/IN • Reception of train towards C/LOOP ------------ Will be P/IN • C/LOOP UP Starter S-5 ------------------------------ P/OUT

__________________ ________________ DTI/MCA

_____________________ ADSTE/SRC

______________________ Sr. DSTE(Co)/KGP ___________________ Sr. DOM(G)/KGP

____________________ SMR/BZN

SSE/SIG//KIG

Related Documents

New Document
May 2020 0
Portable Memory
June 2020 10
Portable Apps
December 2019 17
New Wordpad Document (4)
November 2019 4

More Documents from ""