. Biaya Investasi

Biaya Pembagunan Kantor Item Kayu 10/10 Kayu 5/10 Kayu 5/5 Tripleks Tebal Tipis Paku 10 7 5 Semen Pasir Batu Gunung Timbunan Seng Seng Plat Paku Seng Batu Tela Mandor Tukang Pekerja Total

Jumlah 15 50 60

Satuan Batang Batang Batang

Harga Satuan Rp. 200.000 Rp. 50,000 Rp. 25,000

Total Rp. 3.000.000 Rp. 2.500.000 Rp. 1.500.000

40 35

Lembar Lembar

Rp. 155.000 Rp. 62.500

Rp. 6.200.000 Rp. 2.187.500

5 5 8 30 30 15 24 40 8 5 800 1 2 5

Kg Kg Kg Sak m3 m3 m3

Rp. 19.000 Rp. 19.000 Rp. 19.000 Rp. 80.000 Rp. 450.000 Rp. 200.000 Rp. 500.000 Rp. 53.000 Rp. 28.000 Rp. 50000 Rp. 3.000 Rp. 5.000.000 Rp. 4.500.000 Rp. 4.000.000 Rp. 15.413.500

Rp. 95.000 Rp. 95.000 Rp. 152.000 Rp. 2.400.000 Rp. 13.500.000 Rp. 3.000.000 Rp. 12.000.000 Rp. 2.120.000.00 Rp. 224.000 Rp. 250.000 Rp. 2.400.000 Rp. 5.000.000 Rp. 9.000.000 Rp. 20.000.000 Rp. 85.623.500

Lembar meter Buah Orang Orang Orang

Biaya Pembangunan Parkian item Kayu 10/10 Kayu 5/10 Kayu 5/5 Paku 10 7 5 Semen Pasir Seng Paku Seng Mandor Tukang Pekerja Total

Jumlah 10 7 5

Satuan Batang Batang Batang

Harga Satuan Rp. 200.000 Rp. 50,000 Rp. 25.000

Total Rp 2,000,000 Rp 350,000 Rp 125,000

2 2 2 10 3 10 1 1 1 3

Kg Kg Kg Sak M3 Lembar Kg Orang Orang Orang

Rp. 19.000 Rp. 19.000 Rp. 19.000 Rp. 80,000.00 Rp. 450.000 Rp. 53.000 Rp. 50,000.00 Rp. 4.000.000 Rp. 3.500.000 Rp. 3.000.000 Rp 11,465,000.00

Rp 38,000 Rp 38,000 Rp 38,000 Rp 800,000 Rp 1,350,000 Rp 530,000 Rp. 50.000 Rp. 4.000.000 Rp 3,500,000 Rp 9,000,000 Rp 21,819,000.00

Biaya Pembagunan Rumah Mesin

item Jumlah Satuan Kayu 10/10 5 Batang Kayu 5/5 7 Batang Kayu 5/10 5 Batang Paku 10 2 Kg 7 2 Kg 5 2 Kg Semen 7 Sak Pasir 4 m3 seng 15 m3 Seng Plat 3 m Paku Seng 3 Kg Batu Tela 1550 Buah Mandor 1 Orang Tukang 1 Orang Pekerja 3 Orang Total

Harga Satuan Rp 200,000 Rp 25,000 Rp 50,000

Total Rp 1,000,000 Rp 175,000 Rp 250,000 Rp Rp 38,000 Rp 38,000 Rp 38,000 Rp 560,000 Rp 1,800,000 Rp 795,000 Rp 84,000 Rp 150,000 Rp 4,650,000 Rp 4,000,000.00 Rp 3,500,000 Rp 9,000,000 Rp 26,078,000

Rp 19,000 Rp 19,000 Rp 19,000 Rp 80,000 Rp 450,000 Rp 53,000 Rp 28,000 Rp 50,000 Rp 3,000 Rp 4,000,000 Rp 3,500,000 Rp 3,000,000 Rp 11,496,000

Biaya Pembangunan Bengkel item Jumlah Satuan Harga Satuan Kayu 10/10 15 Batang Rp 200,000 Kayu 5/5 20 Batang Rp 25,000 Kayu 5/10 15 Batang Rp 50,000 Paku 10 2 Kg Rp 19,000 7 3 Kg Rp 19,000 5 5 Kg Rp 19,000 Semen 10 Sak Rp 80,000 Pasir 5 m3 Rp 450,000 seng 15 Lembar Rp 53,000 Paku Seng 4 kg Rp 50,000 Mandor 1 Orang Rp 5,000,000 Tukang 2 Orang Rp 4,500,000 Pekerja 3 Orang Rp 4,000,000 Total

Total Rp 3,000,000 Rp 500,000 Rp 750,000 Rp 38,000 Rp 57,000 Rp 95,000 Rp 800,000 Rp 2,250,000 Rp 795,000 Rp 200,000 Rp 5,000,000 Rp 9,000,000 Rp 12,000,000 Rp 34,485,000

Biaya Pembangunan Pos Jaga item Jumlah Satuan Kayu 10/10 3 Batang Kayu 5/10 6 Batang Kayu 5/5 6 Batang Tripleks 4 Lembar Paku 10 2 Kg 7 1 Kg 5 1 Kg Pasir 4 m3 Seng 8 Lembar Seng Plat 4 m Paku Seng 1 kg Batu tela 1500 Buah Mandor 1 Orang Tukang 1 Orang Pekerja 3 Orang Total

Harga Satuan

Total

Rp 200,000.00 Rp 50,000.00 Rp 25,000.00 Rp 62,500.00

Rp 600,000.00 Rp 300,000.00 Rp 150,000.00 Rp 250,000.00

Rp 19,000.00 Rp 19,000.00 Rp 19,000.00 Rp 450,000.00 Rp 53,000.00 Rp 28,000.00 Rp 50,000.00 Rp 3,000.00 Rp 4,000,000.00 Rp 3,500,000.00 Rp 2,000,000.00 Rp 10,478,500.00

Rp 38,000.00 Rp 19,000.00 Rp 19,000.00 Rp 1,800,000.00 Rp 424,000.00 Rp 112,000.00 Rp 50,000.00 Rp 4,500,000.00 Rp 4,000,000.00 Rp 3,500,000.00 Rp 6,000,000.00 Rp 21,762,000.00

Biaya Perurusan Ijin Item Perurusan Ijin

Total Rp 85,000,000.00

Total Biaya Investasi Item Jumlah Total Backhoe 3 Rp 7,500,000,000.00 Dump Truck 6 Rp 3,900,000,000.00 Biaya Pembangunan Kantor Rp 85,623,500.00 Biaya Pembangunan Parkiran Rp 21,819,000.00 Biaya Pembangunan R. Mesin Rp 26,078,000.00 Biaya Pembangunan Bengkel Rp 34,485,000.00 Biaya Pembangunan Pos Jaga Rp 21,762,000.00 Pengurusan Ijin Rp 85,000,000.00 Total Rp 5,484,767,500.00

Biaya Bahan Bakar Nama Biaya Bahan Bakar No Alat ( Per Jam ) 1 Excavator Rp 1,198,662.00 2 Truck Rp 103,309.00

Biaya Bahan Bakar ( Per Hari ) Rp 7,191,972.00 Rp 619,854.00 Total

Biaya Bahan Bakar ( Per Bulan ) Rp 186,991,272.00 Rp 16,116,204.00

Biaya Bahan Bakar ( Per Tahun ) Rp 2,243,895,264.00 Rp 193,394,448.00 Rp 2,438,289,712.00

Biaya Operasional

Biaya Pelumas

No Nama Alat

Biaya Bahan Bakar ( Per Jam )

Biaya Bahan Bakar ( Per Hari )

Biaya Bahan Bakar ( Per Bulan )

Biaya Bahan Bakar ( Per Tahun )

1

Excavator

Rp 59,225.00

Rp 355,350.00

Rp 9,239,100.00

Rp 110,869,200.00

2

Truck

Rp 50,100.00

Rp 300,600.00 Total

Rp 7,815,600.00

Rp 93,787,200.00 Rp. 204.656.400.00

Biaya Perawatan Alat

No

Nama Alat

Biaya Bahan Bakar ( Per Jam )

Biaya Bahan Bakar ( Per Hari )

Biaya Bahan Biaya Bahan Bakar Bakar ( Per Bulan ( Per Tahun ) )

1

Excavator

Rp 21,263.00

Rp 127,578.00

Rp 3,317,028.00

Rp 39,804,336.00

2

Truck

Rp 39,997.00

Rp 239,982.00

Rp 6,239,532.00

Rp 74,874,384.00

Total

Rp 114,678,720.00

Gaji Karyawan

No

Jabatan

Pendidikan

Jumlah Karyawan

Gaji/Bulan

1

Direktur

S2

1

Rp

10,000,000.00

2

Manajer

S1

3

Rp

8,000,000.00

3

Kep. Bagian

S1

5

Rp

7,000,000.00

4

Staff

S1

5

Rp

4,000,000.00

5

Karyawan

SMU/SMK

5

Rp

3,000,000.00

6

Operator

SMK

9

Rp

3,000,000.00

7

Sopir

2

Rp

2,000,000.00

8

Satpam

SMA/SMK Pensiunan Polisi/TNI

2

Rp

1,800,000.00

9

Juru Masak Cleaning Service

SMA/SMK

2

Rp

3,000,000.00

SMA/SMK

2

Rp

1,500,000.00

10 Total

46

Rp 43,300,000.00

Total Gaji/Bulan Rp 10,000,000.00 Rp 24,000,000.00 Rp 35,000,000.00 Rp 20,000,000.00 Rp 15,000,000.00 Rp 27,000,000.00 Rp 4,000,000.00 Rp 3,600,000.00 Rp 6,000,000.00 Rp 3,000,000.00 Rp 147,600,000.00

Total Gaji/Tahun Rp 120,000,000.00 Rp 288,000,000.00 Rp 420,000,000.00 Rp 240,000,000.00 Rp 180,000,000.00 Rp 324,000,000.00 Rp 48,000,000.00 Rp 43,200,000.00 Rp 72,000,000.00 Rp 36,000,000.00 Rp 1,771,200,000.00

Total Biaya Operasional No 1 2 3 4

Item Biaya Bahan Bakar Biaya Pelumas Biaya Perawatan Alat Gaji Total

Jumlah Rp. 3,884,373,792.00 Rp. 273,499,200.00 Rp. 473,391,360.00 Rp. 2,275,200,000.00 Rp. 6,906,464,352.00