NEXUS ENGINEERING & TECHNOLOGY SERVICES PRELIMINARY DESIGN REPORT
Given Information from Client: Structural Drawings. Proposed Load for each room i.e 1.5 Tons AC, LED, Power/Light Outlets/Switches. Required Information from Client: Architectural Drawings. Ceiling/lighting Plan. Existing Equipments:
UPS and Batteries.
Electrical Works scope:
Lighting and Power Plan Lighting and Power equipment Selection UPS Solar System HVAC Plumbing ELV (CCTV, BMS)
Proposal by Consultant:
Main Supply Wiring System. 1. Single phase 2 wire System. (220V) 2. Single phase 3 wire system. (220V) 3. Three Phase 4 wire system. (415V) Circuit Breaker selection (MCCB, ELCB, RCB, MCB) _____________________________________________________________________ _____________________________________________________________________ _____________________________________________________________________ _____________________________________________________________________ ____________ Cable Selection Brand/Size _____________________________________________________________________ _____________________________________________________________________ _____________________________________________________________________ _____________________________________________________________________ ____________
Attachments:
Demand Load Sheet Working Plan Existing Dwgs
Prepared By:
Checked By:
Reviewed By:
Engr. Hassan Yar
Engr. Imran Haider
Dr. Muhammad Anser Kazim
Approved By:
Address: Paradise Floor, Valencia Mall, Main Baulevard, K1-Valencia Town, Lahore Phone: 042-35226625