Radiogram No. 4912u Form 24 for 03/22/07 Install Progress 358 docking mechanism. Regul String 1 Test GMT 12:00-12:10 12:00-12:05 12:05-12:10

CREW FE-1, FE-2 CDR

ACTIVITY Morning inspection SLEEP - data logging Morning inspection

12:10-12:40

Post-sleep

12:40-13:30

BREAKFAST

13:30-13:40

Prep for Work

13:40-13:55

Daily Planning Conference (S-band)

13:55-14:15

Prep for Work

14:15-17:00

CDR, FE-2

14:15-14:45

PILOT. Hardware set up and installation. Tagup with specialists (S-band)

14:45-16:25 16:25-16:45

Integrated Station Lan (ISL) Installation in LAB forward PILOT. Experiment ops. Tagup with specialists (S-band)

FE-1

16:45-17:45

PILOT. Disassemble work site. Tagup with specialists (as necessary) (Sband) Physical Exercise (VELO+RED) day 1

17:05-17:15

CDR

CWC audit

17:10-18:40

FE-2

Physical Exercise (TVIS)

17:15-18:45

CDR

Physical Exercise (CEVIS)

17:45-18:45

FE-1

Equipment prepack for return on Soyuz

18:40-18:45

FE-2

On MCC Go ISS O2 repress from Progress 358 СрПК (start)

18:45-19:45

LUNCH

19:45-19:50

FE-2

ISS O2 repress using Progress 358 СрПК (terminate)

19:50-20:30

FE-1

Filling EDV [KOB] (separation) for Elektron

19:50-22:05

CDR, FE-2

Integrated Station Lan (ISL) Installation in LAB forward

20:30-21:00 21:00-22:30

FE-1

СОЖ Maintenance Physical Exercise (TVIS) day 1

22:05-22:10

FE-2

ALTEA - dosimeter activation

22:10-23:10

CDR

Physical Exercise (RED)

22:25-22:30

FE-2

ALTEA - dosimeter activation

22:30-23:30

FE-1, FE-2

Stowing hardware in Progress 358 for disposal and IMS update

23:10-23:30

CDR

IMS Update

FE-2

Physical Exercise (RED)

CDR, FE-1

Install Progress 358 docking mechanism

00:30-00:35

FE-2

Transfer TVIS/RED/CEVIS/HRM data to MEC

00:30-01:00

CDR, FE-1

00:35-01:00

FE-2

23:30-00:30

Evening work prep

01:00-01:15

Daily Planning Conference (S-band)

01:15-01:30

Evening work prep

01:30-02:00

DINNER

02:00-02:30

Daily food prep

02:30-03:30

Pre-sleep

03:30-12:00

SLEEP

Task List

FE-1

ТБУ (Universal Bioengineering Thermostat). Temperature check

URAGAN. Observation and photography Note: See OSTP for references to US activities. End of Radiogram