Nasa 177010main 05 22 2007 Tl

  • October 2019
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View Nasa 177010main 05 22 2007 Tl as PDF for free.

More details

  • Words: 403
  • Pages: 2
Radiogram No. 5385nu

GMT

Revised Form 24 for 05/22/2007 ВСС test

CREW

06:00-06:10 .

ACTIVITY Morning inspection

06:10-06:40 .

Post-sleep

06:40-07:30 .

BREAKFAST

07:30-07:45 FE-1

БМП Ф2 filter regeneration (start)

07:30-07:45 CDR, FE-2

Work prep

07:45-08:00 .

Daily planning conference (S-band)

08:00-08:10 CDR

Monitor secondary purification unit temperature after Elektron system activation

08:00-08:15 FE-2

Work prep

08:00-08:20 FE-1

Work prep

08:10-08:25 CDR

Work prep

08:15-08:45 FE-2

EMU battery charge (start)

08:20-08:30 FE-1

Install first 825M3 unit (No. 1262760161, 00043413R, ФГБ_113_1 in bag 353-1) for charging and start charging first unit

08:30-09:00 CDR

СОЖ maintenance

08:45-10:45 FE-2

Prepare equipment for return aboard Shuttle 13A

08:30-10:30 FE-1

CARDIOCOG. Experiment ops. Tagup with specialists (S-band)

09:00-10:00 CDR

Physical Exercise (RED)

10:00-10:05 CDR

CARDIOCOG. Experiment photography

10:05-13:05 CDR

Search of Russian EVA equipment and tools. Tagup with specialists (S-band)

10:45-12:15 FE-2

Search of US EVA tools

10:30-11:30 FE-1

Physical exercise (VELO+RED), day 3

11:30-13:00 FE-1

Physical exercise (TVIS), day 3

12:15-13:15 FE-2

Physical Exercise (RED)

13:00-13:15 FE-1

Private medical conference (S-band)

13:15-14:15 .

LUNCH

14:15-14:25 FE-2

PAO hardware setup

14:25-14:35 .

Crew prep for PAO

14:35-14:55 .

PAO TV event with MSNBC and CBS (Ku+S-band)

14:55-16:55 CDR, FE-1

Integrated kit assembly and photo imagery. Tagup with specialists (S-band)

14:55-15:10 FE-2

MELFI: disconnect PCS.

15:10-15:25 FE-2

MELFI: stow PCS equipment for storage

15:30-16:00 FE-2

Record audiogram using EARQ software

16:00-17:30 FE-2

Physical exercise (TVIS)

16:55-17:10 CDR

Private medical conference (S-band)

16:55-17:10 FE-1

File prep with photos of carryout EVA hardware for downlink via OCA

17:10-17:30 CDR

Record audiogram using EARQ software

17:15-17:30 FE-1

Private medical conference (S-band)

17:30-17:50 FE-2

Edit IMS data

17:30-17:55 FE-1

Record audiogram using EARQ software

17:30-18:15 CDR

Physical exercise (TVIS), day 3

17:50-18:20 FE-2

Expedition crew conference (Ku+S-band)

17:55-18:45 FE-1

PILLE dosimeter reading

18:15-19:00 CDR

Physical Exercise (VELO), day 3

18:25-18:40 FE-2

Private medical conference (S-band)

18:40-18:55 FE-2

Evening work prep

18:45-19:00 FE-1

Evening work prep

18:55-19:00 FE-2

Transfer TVIS, RED, CEVIS, and HRM data to MEC

19:00-19:15 .

Daily planning conference (S-band)

19:15-19:30 CDR, FE-2

Evening work prep

19:15-19:30 FE-1

Daily food prep

19:30-20:00 .

DINNER

20:00-20:15 FE-1

Daily food prep

20:00-20:30 CDR, FE-2

Daily food prep

20:15-21:15 FE-1

Pre-sleep

20:30-21:30 CDR, FE-2

Pre-sleep

21:15-21:30 FE-1

БМП Ф2 filter regeneration (complete)

21:30-06:00 . Task List

SLEEP

CDR, FE-1

ISS RS Audit

FE-1

Process EDV condensate using БПК

CDR

ALTCRISS. Data downlink via OCA

See OSTP for references to US activities. End of radiogram

Related Documents