Radiogram No. 5385nu
GMT
Revised Form 24 for 05/22/2007 ВСС test
CREW
06:00-06:10 .
ACTIVITY Morning inspection
06:10-06:40 .
Post-sleep
06:40-07:30 .
BREAKFAST
07:30-07:45 FE-1
БМП Ф2 filter regeneration (start)
07:30-07:45 CDR, FE-2
Work prep
07:45-08:00 .
Daily planning conference (S-band)
08:00-08:10 CDR
Monitor secondary purification unit temperature after Elektron system activation
08:00-08:15 FE-2
Work prep
08:00-08:20 FE-1
Work prep
08:10-08:25 CDR
Work prep
08:15-08:45 FE-2
EMU battery charge (start)
08:20-08:30 FE-1
Install first 825M3 unit (No. 1262760161, 00043413R, ФГБ_113_1 in bag 353-1) for charging and start charging first unit
08:30-09:00 CDR
СОЖ maintenance
08:45-10:45 FE-2
Prepare equipment for return aboard Shuttle 13A
08:30-10:30 FE-1
CARDIOCOG. Experiment ops. Tagup with specialists (S-band)
09:00-10:00 CDR
Physical Exercise (RED)
10:00-10:05 CDR
CARDIOCOG. Experiment photography
10:05-13:05 CDR
Search of Russian EVA equipment and tools. Tagup with specialists (S-band)
10:45-12:15 FE-2
Search of US EVA tools
10:30-11:30 FE-1
Physical exercise (VELO+RED), day 3
11:30-13:00 FE-1
Physical exercise (TVIS), day 3
12:15-13:15 FE-2
Physical Exercise (RED)
13:00-13:15 FE-1
Private medical conference (S-band)
13:15-14:15 .
LUNCH
14:15-14:25 FE-2
PAO hardware setup
14:25-14:35 .
Crew prep for PAO
14:35-14:55 .
PAO TV event with MSNBC and CBS (Ku+S-band)
14:55-16:55 CDR, FE-1
Integrated kit assembly and photo imagery. Tagup with specialists (S-band)
14:55-15:10 FE-2
MELFI: disconnect PCS.
15:10-15:25 FE-2
MELFI: stow PCS equipment for storage
15:30-16:00 FE-2
Record audiogram using EARQ software
16:00-17:30 FE-2
Physical exercise (TVIS)
16:55-17:10 CDR
Private medical conference (S-band)
16:55-17:10 FE-1
File prep with photos of carryout EVA hardware for downlink via OCA
17:10-17:30 CDR
Record audiogram using EARQ software
17:15-17:30 FE-1
Private medical conference (S-band)
17:30-17:50 FE-2
Edit IMS data
17:30-17:55 FE-1
Record audiogram using EARQ software
17:30-18:15 CDR
Physical exercise (TVIS), day 3
17:50-18:20 FE-2
Expedition crew conference (Ku+S-band)
17:55-18:45 FE-1
PILLE dosimeter reading
18:15-19:00 CDR
Physical Exercise (VELO), day 3
18:25-18:40 FE-2
Private medical conference (S-band)
18:40-18:55 FE-2
Evening work prep
18:45-19:00 FE-1
Evening work prep
18:55-19:00 FE-2
Transfer TVIS, RED, CEVIS, and HRM data to MEC
19:00-19:15 .
Daily planning conference (S-band)
19:15-19:30 CDR, FE-2
Evening work prep
19:15-19:30 FE-1
Daily food prep
19:30-20:00 .
DINNER
20:00-20:15 FE-1
Daily food prep
20:00-20:30 CDR, FE-2
Daily food prep
20:15-21:15 FE-1
Pre-sleep
20:30-21:30 CDR, FE-2
Pre-sleep
21:15-21:30 FE-1
БМП Ф2 filter regeneration (complete)
21:30-06:00 . Task List
SLEEP
CDR, FE-1
ISS RS Audit
FE-1
Process EDV condensate using БПК
CDR
ALTCRISS. Data downlink via OCA
See OSTP for references to US activities. End of radiogram