Mvrpc: Dayton Ohio Streetcar Background

  • July 2020
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View Mvrpc: Dayton Ohio Streetcar Background as PDF for free.

More details

  • Words: 1,168
  • Pages: 54
Aviation Heritage Street Car Project

Presentation Overview 1. 2.

Street Cars Yesterday & Today Aviation Heritage Street Car Project ƒ Capital ƒ Operating

3. Economic Impact! 4. If we build it, will they ride?

Streetcars in the U.S. ƒ By 1890s rapidly replaced animal and cable car operations. ƒ Gave farmers, villagers, and other access to opportunities offered by urban centers. ƒ Service began to fade after WWI

Ohio and streetcars ƒ By 1916 Ohio had 2,798 miles of interurban lines ƒ Most of any state ƒ Comprised 20% of national network ƒ 66 Ohio interurban companies ƒ Some Ohio service until 1958

Dayton’s streetcar history ƒ From 1870 through 1940 Dayton’s chief public transportation. ƒ 8 interurban companies serviced Dayton Area. ƒ Second largest interurban center in the country

Do other cities use streetcars today? ƒ ƒ ƒ ƒ ƒ ƒ ƒ ƒ ƒ

Charlotte, NC Dallas, TX Denver, CO Ft. Collins, CO Galveston, TX Issaquah, WA Kenosha, WI Little Rock, AR Lowell, MA

ƒ ƒ ƒ ƒ ƒ ƒ ƒ ƒ ƒ

Memphis, TN New Orleans, LA Portland, OR San Francisco, CA San Jose, CA Seattle, WA Tampa, FL Tucson, AR Yakima, WA

Under Construction

ƒ ƒ ƒ

Philadelphia, PA San Pedro, CA Tacoma, WA

Cities Actively Studying or Planning ƒ ƒ ƒ ƒ ƒ ƒ ƒ ƒ ƒ

Birmingham, AL Chicago, IL Cincinnati, OH Colorado Springs, CO Columbus, OH Corpus Christi, TX Dubuque, IA Madison, WI Miami, FL

ƒ ƒ ƒ ƒ ƒ ƒ ƒ ƒ

Omaha, NB Richmond, VI Sacramento, CA St. Joseph, MO San Antonia, TX Santa Cruz, CA Savannah, GA Sioux City IA

Streetcars run with traffic

Streetcar Stop in Memphis

Kenosha Condo & Museum Development

Aviation Heritage Street Car Project

Why build a street car system? ƒ Attract economic development ƒ Connect numerous destination locations ƒ Connect scattered-site national park ƒ Act as a downtown circulator ƒ Provide park & ride options ƒ Provide unique transportation amenity

Aviation Heritage Street Car System ƒ 16 mile street car system ƒ 3 different interconnected routes ƒ Phased in over a 7 year period ƒ $60 million capital cost ƒ Annual operating cost of approximately $1.8 million when fully completed

Downtown Loop SOUTH (Phase 1)

Downtown Loop NORTH (Phase 2)

Air Force Museum Route (Phase 3)

Visitor Enhancement: ƒ ƒ ƒ ƒ

Air Force Museum DAI Wright-Dunbar Convention Center

1,200,000 per year 300,000 per year 92,400 per year 500,000 per year

Visitor Enhancement: ƒ ƒ ƒ ƒ ƒ

Oregon District Dragons RiverScape Carillon Park Eastwood Park

1,200,000 per year 600,000 per year 340,000 per year 160,000 per year 1,075,000 per year

Worker/Student Enhancement: ƒ ƒ ƒ ƒ

CBD workers Sinclair Community College MV Hospital* UD

27,000 24,000 5,700 11,200

* MV Hospital has 300,000 patients and visitors per year.

Capital Cost Estimate Completed System

Capital & Maint. Facility *

43,013,787

Contingencies

8,037,613

Legal, ROW & Engineering

8,917,633

TOTAL * Maintenance Facility estimated at $1,180,000

59,969,033

Capital Sources Completed System FTA (new start)

29,984,517

ODOT-CMAQ

5,996,903

GDRTA (state transit $)

8,995,355

National Park Service

2,998,452

MVRPC-CMAQ

5,996,903

Federal Earmarks

5,996,903

TOTAL

59,969,033

Operating Cost Analysis and Projections

Operating Revenue Assumptions ƒ $1.25 fare (+$.05 every 2 years) ƒ 25% of fares are promotional (unpaid) ƒ Route 1 - 850 to 1,600 riders PD ƒ Route 2 - 1,150 to 1,950 riders PD ƒ Route 3 – 650 to 1,450 riders PD

10-Year Ridership Requirements All Phases

Phase 1

1st Year

2nd Year

3rd Year

4th Year

5th Year

850

900

950

1,300

1,350

1,150

1,200

1,250

Phase 2 Phase 3 TOTAL % of GDRTA ADR

650 850

900

2,100

2,500

3,250

2.4%

2.5%

5.9%

7.0%

9.1%

10-Year Ridership Requirements All Phases 6st Year

7th Year

8th Year

9th Year 10th Year

Phase 1

1,400

1,450

1,500

1,550

1,600

Phase 2

1,600

1,650

1,700

1,775

1,825

Phase 3

700

750

1,100

1,150

1,200

TOTAL % of GDRTA ADR

3,700

3,850

4,300

4,475

4,625

10.4%

10.8%

12.1%

12.6%

13.0%

Operating Revenue Assumptions ƒ FTA fixed route subsidy ƒ MVRPC 3 year start-up subsidy ƒ National Park Service subsidy ƒ Endowment Income

Operating Endowment Sources ƒ Naming rights to line, cars and stops ƒ Advertising inside of cars ƒ Donations from beneficiaries ƒ Donations from users

Operating Costs Assumptions

ƒ 3% annual + in operating costs ƒ Paid full-time street car operators ƒ Paid full-time maintenance staff ƒ 10% overhead charge for operations

10-Year Revenue Projection All Phases th 4th Year 5 Year

1st Year

2nd Year

3rd Year

Fare Box

286,875

303,750

708,750

843,750

1,096,875

FTA

151,320

151,320

217,360

217,360

451,360

MVRPC

100,000

100,000

200,000

100,000

200,000

Park Srv

20,000

20,000

40,000

40,000

60,000

Endow

17,500

17,500

35,525

36,066

54,648

TOTAL

575,695

592,570

1,201,635

1,237,176

1,862,883

10-Year Revenue Projection All Phases 6st Year

7nd Year 8rd Year

9th Year

10th Year

Fare Box 1,248,750 1,299,375 1,451,250 1,510,313 1,560,938 FTA

451,360

451,360

MVRPC

100,000

100,000

Park Srv

60,000

Endow TOTAL

451,360

451,360

451,360

60,000

60,000

60,000

60,000

55,762

57,435

59,158

60,932

62,760

1,915,872

1,968,170

2,021,768

2,082,605

2,135,058

Economic Development Impact

Short Run Impacts Capital Construction (Montgomery County) Project Phases

Output

Earnings

Jobs

Phase 1

16,667,234

3,842,094

118

Phase 2

26,651,045

6,143,540

188

Phase 3

20,003,093

4,611,069

141

63,321,372

14,596,704

448

Total Impact

Short Run Impacts Operating Expenditures (Montgomery County) Project Phases

Output

Earnings

Jobs

Phase 1

1,120,889

270,235

12

Phase 2

1,254,116

302,355

13

Phase 3

564,932

136,199

6

2,939,938

708,790

31

Total Impact

Annual Fiscal (TAX) Impacts Type of Tax Hotel Property Sales Earnings Total

Tax Rate

Tax Revenue

1.5%

26,061

81.55 mills

137,957

7.5%

160,600

2.25%

15,948 340,566

Long Run ED Impacts Location WrightDunbar

Property

Sales

Earnings 25,110

Total

Retail Jobs

583,628

62

221,265 1,517,163

102

Office Jobs

35,393

523,125

NCR Site

435,273

860,625

Tech Town

256,882

364,500

621,382

408

Riverside

229,560

218,775

448,335

355

Total

957,108 1,383,750

829,650 3,170,508

164

204

967

If we build it, will they ride? ƒ Conducted at various locations:

5/3 Field

Dayton Art Institute

Carillon Historical Park

University of Dayton

Sinclair Comm. College

Air Force Museum

ƒ Fall 2004 ƒ 1,000 + respondents

RiverScape

Huffman Field

Wright Cycle Co. Building

How did you arrive? 12% 3% 3% Drove & Parked

4%

Dropped Off Tour RTA Bus Walked/Biked 78%

Use GDRTA bus service? 2% 3% 12%

Never Monthly or Less Weekly More than once a week

83%

Ridden electric-type “historic” rail streetcar?

47% 53%

Yes

No

Preference assuming same service? 14%

Electric Steetcar

Transit Bus

86%

Reason for choosing streetcar? 9%

12% 5% Convenince/Comfort Speed of Travel Nostalgia Other

74%

What fare would you pay? 2%3% 12%

83%

$1-2

$2-3

$3-4

$4-5

How long would you wait? 6%

1% 5%

11% 5 minutes of less Up to 10 minutes Up to 20 minutes

26%

Up to 30 minutes More than 30 minutes

51%

Would adapt to schedule

Where do we go from here? ƒ RTA commits to project ƒ Community supports project ƒ Stakeholder committee is formed ƒ Finalize study w/preferred alternative ƒ Add project to LRTP ƒ Secure capital funding

Related Documents