LTE2100 Layer Addition (Note: update the yellow background area content base on specific change .)

Middle East Region Customized Implementation Solution Template V5.0 Prepared by:

Anan

Date: 30/03/2017

Saleem 84031507 Reviewed by:

ZhuShiche

Date: 30/03/2017

ng 00707424 Approved by:

wangzhen0 0192668

Date: 30/03/2017

Implementation Solution for Change

Contents Live network information ....................................................... Error! Bookmark not defined.

2

3

4

1.1

Live network topology ........................................ Error! Bookmark not defined.

1.2

Business volume ................................................................................................... 4

1.3

Main existing problems ......................................................................................... 4

1.4

Remote access information ................................................................................... 4

Purpose and Requirements ................................................................................................ 4 2.1

Change purpose ..................................................................................................... 4

2.2

Change scenario .................................................................................................... 4

2.3

Change scope & scale ........................................................................................... 6

2.4

Change Period ....................................................................................................... 6

Description of Change and Change Influence................................................................... 6 3.1

NE list & version number or patch number before and after change .................... 6

3.2

Surrounding NEs and version number involved by the change ............................ 6

3.3

Change relevance .................................................................................................. 6

3.4

Description of changed software ........................................................................... 6

3.5

Description of changed hardware .......................................................................... 7

Change Preparations ......................................................................................................... 7 4.1

Composition of Change Team and Responsibility of Team Members ................. 7

Change Team of XX Company .............................................................................................. 7 Huawei Change Team .............................................................................................................. 7 Huawei Support & Guarantee Team ........................................................................................ 7

5

4.2

Check of Equipment Running ............................................................................... 8

4.3

Change Risks and Countermeasures ..................................................................... 8

4.4

Check Before Change ........................................................................................... 8

Operation Steps for Change .............................................................................................. 8 5.1

Change Steps ......................................................................................................... 8

Technical support website: http://support.huawei.com

Technical support hotline: Fax:

Page 2 of 11

Implementation Solution for Change

5.2

Test and Verification ............................................................................................. 9

5.3

Solution for Changeback In the Case of Failure ................................................... 9

5.3.1

Definition of Change Failure ............................................................................... 9

Definition of Change Failure ................................................................................................ 9 Rollback decision ................................................................................................................... 9 5.3.2

Overall Description of Changeback ................................................................... 9

5.3.3

Information Collection Before Changeback .................................................... 10

5.3.4

Changeback Steps ............................................... Error! Bookmark not defined.

5.3.5

Equipment Status Check ................................................................................... 10

5.3.6

Tests After Changeback .................................................................................... 10

5.3.7

Changeback Risk Analysis ............................................................................... 10

5.4 6

Change of Spare Parts and Emergency Workstation........................................... 10

Work After Change ......................................................................................................... 11 6.1

Observation ......................................................................................................... 11

6.2

Provision of Materials ......................................................................................... 11

6.3

Provision of Software.......................................................................................... 11

6.4

Training ............................................................................................................... 11

6.5

Matters Needing Attention .................................................................................. 11

Technical support website: http://support.huawei.com

Technical support hotline: Fax:

Page 3 of 11

Implementation Solution for Change

1.1

Business volume

LTE2100 collocating on the existing LTE1800 using RRU3953 2X80W to be SDR with U2100 which will be shifted from BTS to DBS

1.2

Main existing problems

No any existing problem

1.3

Remote access information

Remote access is not allowed generally but in case of emergency we can ask our BO guy to provide VPN information .i.e. user name and password e.t.c.

2 Purpose and Requirements 2.1

Change purpose

The purpose of the activity is to onair the LTE2100 and shift U2100 from BTS to DBS solution to be SDR UL2100

2.2

Change scenario

 U2100 will be shifted from BTS to DBS using RRU3953  Existing U2100 Feeders will be dismantles  Exiting WRFU/WRFUe will be dismantled  U2100 and LTE1800 BBUs will be interconnected using UCI card  UBBPe4 will be added to the LTE1800 BBU to be used as base band resource for LTE2100  LTE2100 bandwidth will be 10MHz  Generate script including implementation and the rollback script  Open RFC

Technical support website: http://support.huawei.com

Technical support hotline: Fax:

Page 4 of 11

Implementation Solution for Change

Scenarios involved in the solution

Generated Script and Roll Back

Technical support website: http://support.huawei.com

Technical support hotline: Fax:

Page 5 of 11

Implementation Solution for Change

2.3

Change scope & scale

The total scope in 4G6 will be for 864 sites, and currently to be implemented on pilot cluter Damm3 32 sites

2.4

Change Period

Change Date 2017-April-11

Change Start Time 02:00 AM

Change End Time 06:00 AM

3 Description of Change and Change Influence 3.1

NE list & version number or patch number before and after change

NE list and Version will keep same before and after

3.2

Surrounding NEs and version number involved by the change

Not involved

3.3

Change relevance

The change will occure on U2100 and LTE2100

3.4

Description of changed software

U2100 will be shifted from BTS using WRFU/WRFUe to DBS using RRU3953, LTE2100 new layer will be collocated on existing LTE1800

Technical support website: http://support.huawei.com

Technical support hotline: Fax:

Page 6 of 11

Implementation Solution for Change

3.5

Description of changed hardware

U2100 will be shifted from BTS using WRFU/WRFUe to DBS using RRU3953, LTE2100 new layer will be collocated on existing LTE1800 GSM900/1800, LTE1800, and LTE2300 will keep same and no change will be happen

4 Change Preparations 4.1 Composition of Change Team and Responsibility of Team Members Change Team of STC Company

Name

Job Role

Email or Telephone No.

Amir shamshad

Integration Engineer

Ameen Uddin Mohammed

Integration Engineer

0538157699 0534731505

Huawei Change Team Name

Responsibility

Arsalan Mohammed

Chief commander

Telephone No. 0530044467

Huawei Support & Guarantee Team Name

Responsibility

Telephone No. +86 XXXXXXXXX

Staff Name & ID

Supporting overall coordination as the technical expert

Staff Name & ID

Product support contact person

+86 XXXXXXXXX

Technical support website: http://support.huawei.com

Technical support hotline: Fax:

Page 7 of 11

Implementation Solution for Change

4.2

Check of Equipment Running

Before running the script all alarm log should be collected for the last 24 hours including RCN, NodeB, and Enode Blevel and then there should not be any alarm on hardware before start

4.3

Change Risks and Countermeasures

Not involved.

4.4

Check Before Change

No.

Preparations Before Change

Owner

Completion Date

1

Data backup

Change owner

1 day before change date

5 Operation Steps for Change 5.1

Step

Change Steps

Time (local)

Task

Owner

1

02:00-05:00

Onsite installation

Field team

1

02:00-05:00

Implement scripts

Implementation person

1

05:00-05:30

RF parameter configuratio

Imp RF team

1

05:00-06:00

KPI verification

Imp RF team

Technical support website: http://support.huawei.com

Technical support hotline: Fax:

Page 8 of 11

Implementation Solution for Change

5.2

Test and Verification

DT on site will do drive tes to verify the services and no sector swap and HO functionality

5.3

Solution for Changeback In the Case of Failure

5.3.1 Definition of Change Failure Definition of Change Failure After hardware and parameter change if any abnormal behavior observe and in case of KPI degradation then activity should be rolled back to restore the services Rollback decision

SN 1

From Huawei (essential)

Decision Person Haoenlong 00966557443892

Decision Time(Local) Before 05:00

5.3.2 Overall Description of Changeback

SN

Step

Owner

Time (start ,end)

1

After changing the hardware and parameters check all the KPIs and services. If any degradation roll it back to original hardware and roll back the configuration changes on U2100 and LTE1800

Field team

05:00 – 06:00

2

Roll back test: Check the service status and performance and abnormal events. If all are normal then keep monitoring.

Implementation and RF team

05:00 – 06:00

Technical support website: http://support.huawei.com

Technical support hotline: Fax:

Page 9 of 11

Implementation Solution for Change

5.3.3 Information Collection before Changeback Collect data configuration, alarms and script generated

5.3.4 Equipment Status Check After rollback check there should be no new equipment level alarms and all services are running fine.

5.3.5 Tests after Changeback

No.

Operation Item

Operation Method

Owner

Time(Start ,end )

1

No abnormal service KPI

Verify 2G, 3G and LTE1800 service not facing any degradation

Implementation person

05:00 – 06:00

2

No abnormal alarm

Compare the post activity alarm with the alarms being saved before the operation and both should be same

Implementation person

04:00– 05:00

5.3.6 Changeback Risk Analysis

SN

1

5.4

Risk Description

KPI degradation

Possibility

Low

Impact

Countermeasure

High

In case of abnormal KPI on any technology involved in this activity as new configuration and Hardware are added so need to take the correct decision in correct time to do the roll back

Change of Spare Parts and Emergency Workstation All the required material is issued to the field team to be used during the activity as there is a buffer material dispatched to the region in case of material fault

Technical support website: http://support.huawei.com

Technical support hotline: Fax:

Page 10 of 11

Implementation Solution for Change

6 Work after Change 6.1

Observation

Observation Ite m

Expecte d result

Observation Perio

Owner

d (start , end)

Check all alarms

No new

and should be same as

alarm , If

before change

there have

6:00AM- 23:00PM

Implementation/NO C

new alarm it should not affect service

6.2

Provision of Materials

Material is prepared base on approved design from HQ

6.3

Provision of Software

Software version is verified by HQ for the proposed changes

6.4

Training

Sufficient training is delivered to the field teams for the implementation procedured

6.5

Matters Needing Attention

NA

Technical support website: http://support.huawei.com

Technical support hotline: Fax:

Page 11 of 11

Related Documents

Mop Boxes.pptx
November 2019 13
April Mop
April 2020 8
Mop Pen
November 2019 21
Structuur Mop
December 2019 11
Mop All
October 2019 8

More Documents from ""