GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Monthly Production Report Month : August' 2008
Working Days
:
24 Days Out Of 31 Days.
Working Hours
:
192 Hours
General Overtime
:
96 Hours
Actual Working Hours
:
288 Hours
Power Failure
:
156.33 Hours
Number Of Total Machine
:
547 Nos.(Knitting 5G & 7G With All Other Machine)
Number Of Machine Use
:
543 Nos.
PRODUCTION
ADMINSTRATIVE
TOTAL
A) At The beginning Of Month
:
764
44
808
B) New Recruit
:
38
0
38
C) Separated during the Month
:
35
0
35
Total at the close of Month (A+B- C)
:
767
44
811
Approved Manpower
:
869 Nos
Avarage Attendance
Present
93.50%
Absent
6.50%
Hours
Hours
Hours
A) Requisition Over Time
:
50045
1492
51537
B) General Over Time
:
14820
2414
17234
C) Total Over Time (A+B)
:
64865
3906
68771
D) Over Time Amount
:
772542
46520
819063
Factory Closed On
:
01) 05 Fri Day
01) 02 Holy Day
__________________ Personnel-In-Charge
________________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Monthly Production Report Month : July' 2008
Working Days
:
27 Days Out Of 31 Days.
Working Hours
:
216 Hours
General Overtime
:
108 Hours
Actual Working Hours
:
324 Hours
Power Failure
:
149.18 Hours
Number Of Total Machine
:
547 Nos.(Knitting 5G & 7G With All Other Machine)
Number Of Machine Use
:
541 Nos.
PRODUCTION
ADMINSTRATIVE
TOTAL
A) At The beginning Of Month
:
757
44
801
B) New Recruit
:
42
0
42
C) Separated during the Month
:
35
0
35
Total at the close of Month (A+B- C)
:
764
44
808
Approved Manpower
:
869 Nos
Avarage Attendance
Present
93.55%
Absent
6.45%
Hours
Hours
Hours
A) Requisition Over Time
:
33680
1144
34824
B) General Over Time
:
14734
2432
17166
C) Total Over Time (A+B)
:
48414
3576
51990
D) Over Time Amount
:
576611
42590
619201
Factory Closed On
:
01) 04 Fri Day
__________________ Personnel-In-Charge
________________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Monthly Production Report Month : June' 2008
Working Days
:
27 Days Out Of 31 Days.
Working Hours
:
208 Hours
General Overtime
:
104 Hours
Actual Working Hours
:
312 Hours
Power Failure
:
199.18 Hours
Number Of Total Machine
:
547 Nos.(Knitting 5G & 7G With All Other Machine)
Number Of Machine Use
:
541 Nos.
PRODUCTION
ADMINSTRATIVE
TOTAL
A) At The beginning Of Month
:
755
44
799
B) New Recruit
:
30
0
30
C) Separated during the Month
:
28
0
28
Total at the close of Month (A+B- C)
:
757
44
801
Approved Manpower
:
869 Nos
Avarage Attendance
Present
91.03%
Absent
8.97%
Hours
Hours
Hours
A) Requisition Over Time
:
29831
1020
30851
B) General Over Time
:
13034
2664
15698
C) Total Over Time (A+B)
:
42865
3684
46549
D) Over Time Amount
:
510522
43876
554399
Factory Closed On
:
01) 04 Fri Day
__________________ Personnel-In-Charge
________________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Monthly Production Report Month : May' 2008
Working Days
:
26 Days Out Of 31 Days.
Working Hours
:
208 Hours
General Overtime
:
104 Hours
Actual Working Hours
:
312 Hours
Power Failure
:
188.47 Hours
Number Of Total Machine
:
547 Nos.(Knitting 5G & 7G With All Other Machine)
Number Of Machine Use
:
541 Nos.
PRODUCTION
ADMINSTRATIVE
TOTAL
A) At The beginning Of Month
:
748
44
792
B) New Recruit
:
44
0
44
C) Separated during the Month
:
37
0
37
Total at the close of Month (A+B- C)
:
755
44
799
Approved Manpower
:
869 Nos
Avarage Attendance
Present
92.84%
Absent
7.16%
Hours
Hours
Hours
A) Requisition Over Time
:
22739
719
23458
B) General Over Time
:
13907
2602
16509
C) Total Over Time (A+B)
:
36646
3321
39967
D) Over Time Amount
:
436454
39553
476007
Factory Closed On
:
01) 04 Fri Day (Now In Wednes Day) 02) 1 Day 1st May
__________________ Personnel-In-Charge
________________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Monthly Production Report Month : April' 2008
Working Days
:
24 Days Out Of 30 Days.
Working Hours
:
192 Hours
General Overtime
:
96 Hours
Actual Working Hours
:
288 Hours
Power Failure
:
169.50 Hours
Number Of Total Machine
:
547 Nos.(Knitting 5G & 7G With All Other Machine)
Number Of Machine Use
:
541 Nos.
PRODUCTION
ADMINSTRATIVE
TOTAL
A) At The beginning Of Month
:
744
44
788
B) New Recruit
:
43
0
43
C) Separated during the Month
:
39
0
39
Total at the close of Month (A+B- C)
:
748
44
792
Approved Manpower
:
869 Nos
Avarage Attendance
Present
93.31%
Absent
6.69%
Hours
Hours
Hours
A) Requisition Over Time
:
27935
851
28786
B) General Over Time
:
13809
2346
16155
C) Total Over Time (A+B)
:
41744
3197
44941
D) Over Time Amount
:
497171
38076
535247
Factory Closed On
:
01) 05 Fri Day (Now In Wednes Day) 02) 01 Day For 1st Boishak.
__________________ Personnel-In-Charge
________________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD
269 DEWAN HAT CHITTAGONG
Monthly Production Report Month : March' 2008
Working Days
:
26 Days Out Of 31 Days.
Working Hours
:
208 Hours
General Overtime
:
104 Hours
Actual Working Hours
:
312 Hours
Power Failure
:
73.55 Hours
Number Of Total Machine
:
547 Nos.(Knitting 5G & 7G With All Other Machine)
Number Of Machine Use
:
541 Nos.
PRODUCTION
ADMINSTRATIVE
TOTAL
A) At The beginning Of Month
:
733
44
777
B) New Recruit
:
31
0
31
C) Separated during the Month
:
20
0
20
Total at the close of Month (A+B- C)
:
744
44
788
Approved Manpower
:
869 Nos
Avarage Attendance
Present
93.92%
Absent
6.08%
Hours
Hours
Hours
A) Requisition Over Time
:
25147
672
25819
B) General Over Time
:
13857
2099
15956
C) Total Over Time (A+B)
:
39004
2771
41775
D) Over Time Amount
:
464538
33003
497540
Factory Closed On
:
01) 04 Fri Day (Now In Wednes Day) 02) 01 Day For Melad-Un-Nabi.
__________________ Personnel-In-Charge
________________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Monthly Production Report Month : February' 2008
Working Days
:
24 Days Out Of 29 Days.
Working Hours
:
192 Hours
General Overtime
:
96 Hours
Actual Working Hours
:
288 Hours
Power Failure
:
60.45 Hours
Number Of Total Machine
:
547 Nos.(Knitting 5G & 7G With All Other Machine)
Number Of Machine Use
:
541 Nos.
PRODUCTION
ADMINSTRATIVE
TOTAL
A) At The beginning Of Month
:
729
44
773
B) New Recruit
:
49
0
49
C) Separated during the Month
:
45
0
45
Total at the close of Month (A+B- C)
:
733
44
777
Approved Manpower
:
869 Nos
Avarage Attendance
Present
95.09%
Absent
4.91%
Hours
Hours
Hours
A) Requisition Over Time
:
26280
690
26970
B) General Over Time
:
12050
2076
14126
C) Total Over Time (A+B)
:
38330
2766
41096
D) Over Time Amount
:
456510
32943
489453
Factory Closed On
:
01) 04 Fri Day (Now In Wednes Day) 02) 01 Day For 21st February .
__________________ Personnel-In-Charge
________________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Monthly Production Report
Month : January' 2008
Working Days
:
26 Days Out Of 31 Days.
Working Hours
:
208 Hours
General Overtime
:
104 Hours
Actual Working Hours
:
312 Hours
Power Failure
:
73.00 Hours
Number Of Total Machine
:
547 Nos.(Knitting 5G & 7G With All Other Machine)
Number Of Machine Use
:
536 Nos.
PRODUCTION
ADMINSTRATIVE
TOTAL
A) At The beginning Of Month
:
726
44
770
B) New Recruit
:
49
0
49
C) Separated during the Month
:
46
0
46
Total at the close of Month (A+B- C)
:
729
44
773
Approved Manpower
:
869 Nos
Avarage Attendance
Present
94.67%
Absent
5.33%
Hours
Hours
Hours
A) Requisition Over Time
:
13100
423
13523
B) General Over Time
:
9439
2191
11630
C) Total Over Time (A+B)
:
22539
2614
25153
D) Over Time Amount
:
268439
31133
299572
Factory Closed On
:
01) 05 Fri Day (Now In Wednes Day)
__________________ Personnel-In-Charge
________________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Monthly Production Report Month : December' 2007
Working Days
:
22 Days Out Of 31 Days.
Working Hours
:
176 Hours
General Overtime
:
88 Hours
Actual Working Hours
:
264 Hours
Power Failure
:
39.55 Hours
Number Of Total Machine
:
547 Nos.(Knitting 5G & 7G With All Other Machine)
Number Of Machine Use
:
534 Nos.
PRODUCTION
ADMINSTRATIVE
TOTAL
A) At The beginning Of Month
:
687
44
731
B) New Recruit
:
31
1
32
C) Separated during the Month
:
32
1
33
Total at the close of Month (A+B- C)
:
686
44
730
Approved Manpower
:
869 Nos
Avarage Attendance
Present
89.55%
Absent
10.45%
Hours
Hours
Hours
A) Requisition Over Time
:
8532
394
8926
B) General Over Time
:
7230
2244
9474
C) Total Over Time (A+B)
:
15762
2638
18400
D) Over Time Amount
:
154152
25800
219144
Factory Closed On
:
01) 05 Holy Day During Eid-Ul-Azha 02) 04 Fri Day (Now In Wednes Day)
__________________ Personnel-In-Charge
________________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Monthly Production Report Month : November' 2007
Working Days
:
26 Days Out Of 30 Days.
Working Hours
:
208 Hours
General Overtime
:
104 Hours
Actual Working Hours
:
312 Hours
Power Failure
:
82.07 Hours
Number Of Total Machine
:
547 Nos.(Knitting 5G & 7G With All Other Machine)
Number Of Machine Use
:
527 Nos.
PRODUCTION
ADMINSTRATIVE
TOTAL
A) At The beginning Of Month
:
677
45
722
B) New Recruit
:
25
1
26
C) Separated during the Month
:
15
2
17
Total at the close of Month (A+B- C)
:
687
44
731
Approved Manpower
:
869 Nos
Avarage Attendance
Present
93.78%
Absent
6.22%
Hours
Hours
Hours
A) Requisition Over Time
:
13246
772
14018
B) General Over Time
:
7893
1980
9873
C) Total Over Time (A+B)
:
21139
2752
23891
D) Over Time Amount
:
206739
26915
233654
Factory Closed On
:
02) 04 Fri Day (Now In Wednes Day)
__________________ Personnel-In-Charge
________________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Monthly Production Report Month : October' 2007
Working Days
:
22 Days Out Of 31 Days.
Working Hours
:
176 Hours
General Overtime
:
88 Hours
Actual Working Hours
:
264 Hours
Power Failure
:
62.35 Hours
Number Of Total Machine
:
547 Nos.(Knitting 5G & 7G With All Other Machine)
Number Of Machine Use
:
527 Nos.
PRODUCTION
ADMINSTRATIVE
TOTAL
A) At The beginning Of Month
:
702
45
747
B) New Recruit
:
9
0
9
C) Separated during the Month
:
34
0
34
Total at the close of Month (A+B- C)
:
677
45
722
Approved Manpower
:
869 Nos
Avarage Attendance
Present
85.15%
Absent
14.85%
Hours
Hours
Hours
A) Requisition Over Time
:
8063
457
8520
B) General Over Time
:
3651
2405
6056
C) Total Over Time (A+B)
:
11714
2862
14576
D) Over Time Amount
:
114563
27990
142553
Factory Closed On
:
01) 06 Holy Day During Eid-Ul-Fitre 02) 03 Fri Day (Now In Wednes Day)
__________________ Personnel-In-Charge
________________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Monthly Production Report Month : September' 2007
Working Days
:
27 Days Out Of 30 Days (Including Extra Working Day For Khatoni)
Working Hours
:
216 Hours
General Overtime
:
108 Hours
Actual Working Hours
:
324 Hours
Power Failure
:
82.40 Hours
Number Of Total Machine
:
547 Nos.(Knitting 5G & 7G With All Other Machine)
Number Of Machine Use
:
527 Nos.
PRODUCTION
ADMINSTRATIVE
TOTAL
A) At The beginning Of Month
:
702
45
747
B) New Recruit
:
10
0
10
C) Separated during the Month
:
10
0
10
Total at the close of Month (A+B- C)
:
702
45
747
Approved Manpower
:
869 Nos
Avarage Attendance
Present
91.10%
Absent
8.90%
Hours
Hours
Hours
A) Requisition Over Time
:
20253
474
20727
B) General Over Time
:
7385
2254
9639
C) Total Over Time (A+B)
:
27638
2728
30366
D) Over Time Amount
:
270300
26680
296979
Factory Closed On
:
01) 03 Fri Day (Now Wednes Day)
__________________ Personnel-In-Charge
________________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Monthly Production Report Month : August' 2007
Working Days
:
25 Days Out Of 31 Days
Working Hours
:
200 Hours
General Overtime
:
100 Hours
Actual Working Hours
:
300 Hours
Power Failure
:
47.50 Hours
Number Of Total Machine
:
547 Nos.(Knitting 5G & 7G With All Other Machine)
Number Of Machine Use
:
527 Nos.
PRODUCTION
ADMINSTRATIVE
TOTAL
A) At The beginning Of Month
:
703
45
748
B) New Recruit
:
2
0
2
C) Separated during the Month
:
3
0
3
Total at the close of Month (A+B- C)
:
702
45
747
Approved Manpower
:
869 Nos
Avarage Attendance
Present
91.10%
Absent
8.90%
Hours
Hours
Hours
A) Requisition Over Time
:
9082
160
9242
B) General Over Time
:
5610
2390
8000
C) Total Over Time (A+B)
:
14692
2550
17242
D) Over Time Amount
:
143688
24939
168627
Factory Closed On
:
01) 05 Fri Day (Now Wednes Day) 02) 01 Holy Day For Shob-E-Borat
__________________ Personnel-In-Charge
________________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Monthly Production Report Month : July' 2007
Working Days
:
27 Days Out Of 31 Days
Working Hours
:
216 Hours
General Overtime
:
108 Hours
Actual Working Hours
:
324 Hours
Power Failure
:
114.50 Hours
Number Of Total Machine
:
547 Nos.(Knitting 5G & 7G With All Other Machine)
Number Of Machine Use
:
527 Nos.
PRODUCTION
ADMINSTRATIVE
TOTAL
A) At The beginning Of Month
:
708
45
753
B) New Recruit
:
29
0
29
C) Separated during the Month
:
34
0
34
Total at the close of Month (A+B- C)
:
703
45
748
Approved Manpower
:
869 Nos
Avarage Attendance
Present
90.64%
Absent
9.36%
Hours
Hours
Hours
A) Requisition Over Time
:
16996
360
17356
B) General Over Time
:
32909
3059
35968
C) Total Over Time (A+B)
:
49905
3419
53324
D) Over Time Amount
:
488071
33438
521509
Factory Closed On
:
01) 04 Fri Day Now (Wednes Day)
_________________ Personnel-In-Charge
________________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Monthly Production Report Month : June'2007
Working Days
:
26 Days Out Of 30 Days
Working Hours
:
208 Hours
General Overtime
:
104 Hours
Actual Working Hours
:
312 Hours
Power Failure
:
87.50 Hours
Number Of Total Machine
:
549 Nos.(Knitting 5G & 7G With All Other Machine)
Number Of Machine Use
:
537 Nos.
PRODUCTION
ADMINSTRATIVE
TOTAL
A) At The beginning Of Month
:
700
45
745
B) New Recruit
:
41
0
41
C) Separated during the Month
:
33
0
33
Total at the close of Month (A+B- C)
:
708
45
753
Approved Manpower
:
869 Nos
Avarage Attendance
Present
90.90%
Absent
9.10%
Hours
Hours
Hours
A) Requisition Over Time
:
4455
415
4870
B) General Over Time
:
35364
2332
37696
C) Total Over Time (A+B)
:
39819
2747
42566
D) Over Time Amount
:
389430
26866
416295
Factory Closed On
:
01) 04 Fri Day Now (Wednes Day)
_________________ Personnel-In-Charge
________________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Monthly Production Report Month : May'2007
Working Days
:
25 Days Out Of 31 Days
Working Hours
:
200 Hours
General Overtime
:
100 Hours
Actual Working Hours
:
300 Hours
Power Failure
:
81.00 Hours
Number Of Total Machine
:
549 Nos.(Knitting 5G & 7G With All Other Machine)
Number Of Machine Use
:
537 Nos.
PRODUCTION
ADMINSTRATIVE
TOTAL
A) At The beginning Of Month
:
708
45
753
B) New Recruit
:
41
0
41
C) Separated during the Month
:
30
0
30
Total at the close of Month (A+B- C)
:
719
45
764
Approved Manpower
:
869 Nos
Avarage Attendance
Present
90.90%
Hours
Absent
Hours
9.10%
Hours
A) Requisition Over Time
:
0
B) General Over Time
:
0
C) Total Over Time (A+B)
:
0
0
0
D) Over Time Amount
:
0
0
0
Factory Closed On
:
01) 05 Fri Day 02) 01 Holi Day (May Day)
_________________ Personnel-In-Charge
________________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Monthly Production Report Month : April'2007
Working Days
:
25 Days Out Of 30 Days
Working Hours
:
200 Hours
General Overtime
:
100 Hours
Power Failure
:
55.35 Hours
Actual Working Hours
:
300 Hours
Number Of Total Machine
:
549 Nos.(Knitting 5G & 7G With All Other Machine)
Number Of Machine Use
:
537 Nos.
PRODUCTION
ADMINSTRATIVE
TOTAL
A) At The beginning Of Month
:
750
42
792
B) New Recruit
:
27
0
27
C) Separated during the Month
:
20
0
20
Total at the close of Month (A+B- C)
:
757
42
799
Approved Manpower
:
869 Nos
Avarage Attendance
Present
91.65%
Absent
8.35%
Hours
Hours
Hours
A) Requisition Over Time
:
8096
490
8586
B) General Over Time
:
33800
2609
36409
C) Total Over Time (A+B)
:
41896
3099
44995
D) Over Time Amount
:
409743
30308
440051
Factory Closed On
:
01) 04 Fri Day 02) 01 Holi Day
_________________ Personnel-In-Charge
________________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Monthly Production Report Month : April'2007
Working Days
:
25 Days Out Of 30 Days
Working Hours
:
200 Hours
General Overtime
:
100 Hours
Power Failure
:
55.35 Hours
Actual Working Hours
:
300 Hours
Number Of Total Machine
:
549 Nos.(Knitting 5G & 7G With All Other Machine)
Number Of Machine Use
:
537 Nos.
PRODUCTION
ADMINSTRATIVE
TOTAL
A) At The beginning Of Month
:
750
42
792
B) New Recruit
:
27
0
27
C) Separated during the Month
:
20
0
20
Total at the close of Month (A+B- C)
:
757
42
799
Approved Manpower
:
869 Nos
Avarage Attendance
Present
91.65%
Absent
8.35%
Hours
Hours
Hours
A) Requisition Over Time
:
8096
490
8586
B) General Over Time
:
33800
2609
36409
C) Total Over Time (A+B)
:
41896
3099
44995
D) Over Time Amount
:
409743
30308
440051
Factory Closed On
:
01) 04 Fri Day 02) 01 Holi Day
_________________ Personnel-In-Charge
________________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Monthly Production Report Month : March'2007
Working Days
:
27 Days Out Of 31 Days
Working Hours
:
216 Hours
General Overtime
:
104 Hours
Power Failure
:
27.45 Hours (Without Generator from 17.03.07 to 31.03.07)
Actual Working Hours
:
324 Hours
Number Of Total Machine
:
549 Nos.(Knitting 5G & 7G With All Outher Machine)
Number Of Machine Use
:
537 Nos.
PRODUCTION
ADMINSTRATIVE
TOTAL
A) At The beginning Of Month
:
753
42
795
B) New Recruit
:
34
0
34
C) Separated during the Month
:
30
0
30
Total at the close of Month (A+B- C)
:
757
42
799
Avarage Attendance
Present
88.70%
Absent
11.30%
Hours
Hours
Hours
A) Requisition Over Time
:
6732
609
7341
B) General Over Time
:
30936
1971
32907
C) Total Over Time (A+B)
:
37668
2580
40248
D) Over Time Amount
:
368393
25232
393625
Factory Closed On
:
01) 03 fridays (02 Fridays adjust with 02 exsisting festivalholidy for Eid-ul-azha, i.e general workingdays) 02) 01 Holi Day
_________________ Personnel-In-Charge
________________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Monthly Production Report Month : February'2007
Working Days
:
23 Days Out Of 28 Days
Working Hours
:
224 Hours
General Overtime
:
112 Hours
Power Failure
:
147.41 Hours (Without Generator)
Actual Working Hours
:
336 Hours
Number Of Total Machine
:
549 Nos.(Knitting 5G & 7G With All Outher Machine)
Number Of Machine Use
:
537 Nos.
PRODUCTION
ADMINSTRATIVE
TOTAL
A) At The beginning Of Month
:
708
40
748
B) New Recruit
:
41
0
41
C) Separated during the Month
:
29
0
29
Total at the close of Month (A+B- C)
:
720
40
760
Avarage Attendance
Present
89.73%
Absent
10.27%
Hours
Hours
Hours
A) Requisition Over Time
:
7566
848
8414
B) General Over Time
:
26853
1787
28640
C) Total Over Time (A+B)
:
34419
2635
37054
D) Over Time Amount
:
336618
25770
362388
Factory Closed On
:
01) 04 Fri Day 02) 01 Holy Day (Mother Language Day).
_________________ Personnel-In-Charge
________________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Monthly Production Report Month : January'2007
Working Days
:
23 Days Out Of 31 Days
Working Hours
:
184 Hours
General Overtime
:
92 Hours
Power Failure
:
110.34 Hours (Without Generator)
Actual Working Hours
:
276 Hours
Number Of Total Machine
:
549 Nos.(Knitting 5G & 7G With All Outher Machine)
Number Of Machine Use
:
537 Nos.
PRODUCTION
ADMINSTRATIVE
TOTAL
A) At The beginning Of Month
:
689
40
729
B) New Recruit
:
57
0
57
C) Separated during the Month
:
38
0
38
Total at the close of Month (A+B- C)
:
708
40
748
Avarage Attendance
Present
88.00%
Absent
12.00%
Hours
Hours
Hours
A) Requisition Over Time
:
20099
848
20947
B) General Over Time
:
14722
1385
16107
C) Total Over Time (A+B)
:
34821
2233
37054
D) Over Time Amount
:
340549
21839
362388
Factory Closed On
:
01) 04 Fri Day 02) 04 Holy Day (For Eid-Ul-Azha)
_________________ Personnel-In-Charge
________________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Monthly Production Report Month : December'2006
Working Days
:
24 Days Out Of 31 Days
Working Hours
:
192 Hours
General Overtime
:
96 Hours
Power Failure
:
81.53 Hours (Without Generator)
Actual Working Hours
:
288 Hours
Number Of Total Machine
:
549 Nos.(Knitting 5G & 7G With All Outher Machine)
Number Of Machine Use
:
543 Nos.
PRODUCTION
ADMINSTRATIVE
TOTAL
A) At The beginning Of Month
:
762
40
802
B) New Recruit
:
0
0
0
C) Separated during the Month
:
20
0
20
Total at the close of Month (A+B- C)
:
742
40
782
Avarage Attendance
Present
81.96%
Absent
18.04%
Hours
Hours
Hours
A) Requisition Over Time
:
965
122
1087
B) General Over Time
:
3726
1800
5526
C) Total Over Time (A+B)
:
4691
1922
6613
D) Over Time Amount
:
45878
18797
64675
Factory Closed On
:
01) 03 Fri Day 02) 04 Holy Day
______________ Personnel-In-Charge
________________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Monthly Production Report Month : November'2006
Working Days
:
26 Days Out Of 30 Days
Working Hours
:
208 Hours
General Overtime
:
104 Hours
Power Failure
:
117.05 Hours (Without Generator)
Actual Working Hours
:
312 Hours
Number Of Total Machine
:
543 Nos.(Knitting 5G & 7G With All Outher Machine)
Number Of Machine Use
:
531 Nos.
PRODUCTION
ADMINSTRATIVE
TOTAL
A) At The beginning Of Month
:
771
45
816
B) New Recruit
:
1
0
1
C) Separated during the Month
:
10
0
10
Total at the close of Month (A+B- C)
:
762
45
807
Avarage Attendance
Present
84.08%
Absent
15.92%
Hours
Hours
Hours
A) Requisition Over Time
:
20665
289
20954
B) General Over Time
:
18691
2046
20737
C) Total Over Time (A+B)
:
39356
2335
41691
D) Over Time Amount
:
384902
22836
407738
Factory Closed On
:
01) 04 Fri Day
______________ Personnel-In-Charge
________________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Monthly Production Report Month :
'2006
Working Days
:
Days Out Of
Working Hours
:
Hours
General Overtime
:
Power Failure
:
Actual Working Hours
:
Number Of Total Machine
:
Number Of Machine Use
:
Days
Hours Hours (Without Generator) Hours Nos.(Knitting 5G & 7G With All Outher Machine) Nos.
PRODUCTION
A) At The beginning Of Month
:
B) New Recruit
:
C) Separated during the Month
:
Total at the close of Month (A+B- C)
:
Avarage Attendance
ADMINSTRATIVE
Present
Hours A) Requisition Over Time
:
B) General Over Time
:
C) Total Over Time (A+B)
:
D) Over Time Amount
:
Factory Closed On
:
TOTAL
Absent
Hours
Hours
01) 02)
____________________ Personnel-In-Charge
_________________ Executive (A/C)
________________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Monthly Production Report Month : October'2006
Working Days
:
23 Days Out Of 31 Days
Working Hours
:
184 Hours
General Overtime
:
92 Hours
Power Failure
:
37.33 Hours (Without Generator)
Actual Working Hours
:
276 Hours
Number Of Total Machine
:
543 Nos.(Knitting 5G & 7G With All Outher Machine)
Number Of Machine Use
:
531 Nos.
PRODUCTION
ADMINSTRATIVE
TOTAL
A) At The beginning Of Month
:
774
45
819
B) New Recruit
:
12
0
12
C) Separated during the Month
:
15
0
15
Total at the close of Month (A+B- C)
:
771
45
816
Avarage Attendance
Present
86.50%
Absent
13.50%
Hours
Hours
Hours
A) Requisition Over Time
:
9657
470
10127
B) General Over Time
:
27506
2420
29926
C) Total Over Time (A+B)
:
37163
2890
40053
D) Over Time Amount
:
363454
28264
391718
Factory Closed On
:
01) 04 Fri Day 02) 04 Holy Day
______________ Pre pared By
________________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Monthly Production Report Month : September'2006
Working Days
:
24 Days Out Of 30 Days
Working Hours
:
192 Hours
General Overtime
:
96 Hours
Power Failure
:
108.05 Hours (Without Generator)
Actual Working Hours
:
288 Hours
Number Of Total Machine
:
543 Nos.(Knitting 5G & 7G With All Outher Machine)
Number Of Machine Use
:
531 Nos.
PRODUCTION
ADMINSTRATIVE
TOTAL
A) At The beginning Of Month
:
794
45
839
B) New Recruit
:
0
0
0
C) Separated during the Month
:
20
0
20
Total at the close of Month (A+B- C)
:
774
45
819
Avarage Attendance
Present
89.15%
Absent
10.85%
Hours
Hours
Hours
A) Requisition Over Time
:
38366
1003
39369
B) General Over Time
:
25080
2645
27725
C) Total Over Time (A+B)
:
63446
3648
67094
D) Over Time Amount
:
620502
35677
656179
Factory Closed On
:
01) 05 Fri Day 02) 01 Holy Day
______________ Pre pared By
________________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Monthly Production Report Month : August'2006
Working Days
:
26 Days Out Of 31 Days
Working Hours
:
208 Hours
General Overtime
:
104 Hours
Power Failure
:
90.46 Hours (Without Generator)
Actual Working Hours
:
312 Hours
Number Of Total Machine
:
543 Nos.(Knitting 5G & 7G With All Outher Machine)
Number Of Machine Use
:
531 Nos.
PRODUCTION
ADMINSTRATIVE
TOTAL
A) At The beginning Of Month
:
788
45
833
B) New Recruit
:
30
0
30
C) Separated during the Month
:
24
0
24
Total at the close of Month (A+B- C) :
794
45
839
Avarage Attendance
Present
92.79%
Absent
7.21%
Hours
Hours
Hours
A) Requisition Over Time
:
44665
0
44665
B) General Over Time
:
30179
1810
31989
C) Total Over Time (A+B)
:
74844
1810
76654
D) Over Time Amount
:
731974
17702
749676
Factory Closed On
:
01) 04 Fri Day 02) 01 Holy Day
______________ Pre pared By
________________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Monthly Production Report Month : July'2006
Working Days
:
27 Days Out Of 31 Days
Working Hours
:
216 Hours
General Overtime
:
108 Hours
Power Failure
:
84.37 Hours (Without Generator)
Actual Working Hours
:
324 Hours
Number Of Total Machine
:
557 Nos.(Knitting 5G & 7G With All Outher Machine)
Number Of Machine Use
:
543 Nos.
PRODUCTION
ADMINSTRATIVE
TOTAL
A) At The beginning Of Month
:
751
43
794
B) New Recruit
:
25
0
25
C) Separated during the Month
:
12
0
12
Total at the close of Month (A+B- C) :
764
43
807
Avarage Attendance
Present
91.13%
Absent
8.87%
Hours
Hours
Hours
A) Requisition Over Time
:
42701
0
42701
B) General Over Time
:
25595
3647
29242
C) Total Over Time (A+B) D) Over Time Amount
:
68296
3647
71943
:
667935
35668
703603
Factory Closed On
:
1) 04 Fri Day
______________ Pre pared By
________________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Monthly Production Report Month : June'2006
Working Days
:
25 Days Out Of 30 Days
Working Hours
:
200 Hours
General Overtime
:
100 Hours
Power Failure
:
66.55 Hours (Without Generator)
Actual Working Hours
:
300 Hours
Number Of Total Machine
:
570 Nos.(Knitting 5G & 7G With All Outher Machine)
Number Of Machine Use
:
543 Nos.
PRODUCTION
ADMINSTRATIVE
TOTAL
A) At The beginning Of Month
:
721
42
763
B) New Recruit
:
35
0
35
C) Separated during the Month
:
5
0
5
751
42
793
Total at the close of Month (A+B- C) :
Avarage Attendance
Present
92.12%
Absent
7.88%
Hours
Hours
Hours
A) Requisition Over Time
:
40227
0
40227
B) General Over Time
:
16312
1407
17719
C) Total Over Time (A+B) D) Over Time Amount
:
56539
1407
57946
:
452312.00
11256.00
566711.88
Factory Closed On
:
1) 05 Fri Day
______________ Pre pared By
________________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Monthly Production Report Month : May'2006
Working Days
:
26 Days Out Of 31 Days
Working Hours
:
208 Hours
General Overtime
:
104 Hours
Power Failure
:
118.5 Hours (Without Generator)
Actual Working Hours
:
312 Hours
Number Of Total Machine
:
570 Nos.(Knitting 5G & 7G With All Outher Machine)
Number Of Machine Use
:
543 Nos.
PRODUCTION
ADMINSTRATIVE
TOTAL
A) At The beginning Of Month
:
701
42
743
B) New Recruit
:
25
0
25
C) Separated during the Month
:
5
0
5
Total at the close of Month (A+B- C) :
Avarage Attendance
721
Present
42
91.13%
Absent
763
8.87%
Hours
Hours
Hours
A) Requisition Over Time
:
24975
0
24975
B) General Over Time
:
14109
3213
17322
C) Total Over Time (A+B) D) Over Time Amount
:
39084
3213
42297
:
312672.00
25704.00
338376.00
Factory Closed On
:
1) 04 Fri Day 2) 1 HolyDay( May Day)
______________ Pre pared By
________________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Monthly Production Report Month : April'2006
Working Days
:
25 Days Out Of 30 Days
Working Hours
:
200 Hours
General Overtime
:
100 Hours
Power Failure
:
61.49 Hours (Without Generator)
Actual Working Hours
:
300 Hours
Number Of Total Machine
:
570 Nos.(Knitting 5G & 7G With All Outher Machine)
Number Of Machine Use
:
543 Nos.
PRODUCTION
ADMINSTRATIVE
TOTAL
A) At The beginning Of Month
:
713
42
755
B) New Recruit
:
22
0
22
C) Separated during the Month
:
34
0
34
Total at the close of Month (A+B- C) :
Avarage Attendance
701
Present
42
90.12%
Absent
743
9.88%
Hours
Hours
Hours
A) Requisition Over Time
:
12895
0
12895
B) General Over Time
:
11981
2769
14750
C) Total Over Time (A+B) D) Over Time Amount
:
24876
2769
27645
:
199008.00
22152.00
221160.00
Factory Closed On
:
1) 04 Fri Day 2) 1 HolyDay( Eid-E-Miladunnabi)
______________ Pre pared By
________________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Monthly Production Report Month : March'2006
Working Days
:
25 Days Out Of 31 Days
Working Hours
:
200 Hours
General Overtime
:
100 Hours
Power Failure
:
38.12 Hours (Without Generator)
Actual Working Hours
:
300 Hours
Number Of Total Machine
:
570 Nos.(Knitting 5G & 7G With All Outher Machine)
Number Of Machine Use
:
543 Nos.
PRODUCTION
ADMINSTRATIVE
TOTAL
A) At The beginning Of Month
:
709
42
751
B) New Recruit
:
24
0
24
C) Separated during the Month
:
20
0
20
Total at the close of Month (A+B- C) :
Avarage Attendance
713
Present
42
89.61%
Absent
755
10.39%
Hours
Hours
Hours
A) Requisition Over Time
:
12667
0
12667
B) General Over Time
:
12003
2720
14723
C) Total Over Time (A+B) D) Over Time Amount
:
24670
2720
27390
:
197360.00
21760.00
219120.00
Factory Closed On
:
1) 5 Fri Day 2) 1 HolyDay( Independent Day)
______________ Pre pared By
________________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Monthly Production Report Month : February'2006
Working Days
:
23 Days Out Of 28 Days
Working Hours
:
184 Hours
General Overtime
:
92 Hours
Power Failure
:
32.37 Hours (Without Generator)
Actual Working Hours
:
276 Hours
Number Of Total Machine
:
570 Nos.(Knitting 5G & 7G With All Outher Machine)
Number Of Machine Use
:
558 Nos.
PRODUCTION
ADMINSTRATIVE
TOTAL
A) At The beginning Of Month
:
749
49
798
B) New Recruit
:
0
0
0
C) Separated during the Month
:
40
0
40
Total at the close of Month (A+B- C) :
Avarage Attendance
709
Present
49
91.21%
Absent
758
8.79%
Hours
Hours
Hours
A) Requisition Over Time
:
10517
0
10517
B) General Over Time
:
11789
2372
14161
C) Total Over Time (A+B) D) Over Time Amount
:
22306
2372
24678
:
178448.00
18976.00
197424.00
Factory Closed On
:
1) 4 Fri Day 2) 1 HolyDay( Mother Language Day)
______________ Pre pared By
________________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Monthly Production Report Month : January'2006
Working Days
:
23 Days Out Of 31 Days
Working Hours
:
184 Hours
General Overtime
:
92 Hours
Power Failure
:
22.38 Hours (Without Generator)
Actual Working Hours
:
276 Hours
Number Of Total Machine
:
570 Nos.(Knitting 5G & 7G With All Outher Machine)
Number Of Machine Use
:
558 Nos.
PRODUCTION
ADMINSTRATIVE
TOTAL
A) At The beginning Of Month
:
787
49
836
B) New Recruit
:
2
0
2
C) Separated during the Month
:
40
0
40
Total at the close of Month (A+B- C) :
Avarage Attendance
749
Present
49
88.00%
Absent
798
12.00%
Hours
Hours
Hours
A) Requisition Over Time
:
4832
0
4832
B) General Over Time
:
6454
2543
8997
C) Total Over Time (A+B) D) Over Time Amount
:
11286
2543
13829
:
90288.00
20344.00
110632.00
Factory Closed On
:
1) 2 Fri Day 2) 6 HolyDay( Eid Ul Azha)
______________ Pre pared By
________________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Monthly Production Report Month : December' 2005
Working Days
:
31 Days Out Of 26 Days
Working Hours
:
208 Hours
General Overtime
:
104 Hours
Power Failure
:
23.22 Hours (Without Generator)
Actual Working Hours
:
312 Hours
Number Of Total Machine
:
570 Nos.(Knitting 5G & 7G With All Outher Machine)
Number Of Machine Use
:
558 Nos.
PRODUCTION
ADMINSTRATIVE
TOTAL
A) At The beginning Of Month
:
798
49
847
B) New Recruit
:
4
0
4
C) Separated during the Month
:
15
0
15
Total at the close of Month (A+B- C) :
Avarage Attendance
787
Present
49
93.00%
Absent
836
7.00%
Hours
Hours
Hours
A) Requisition Over Time
:
7347
0
7347
B) General Over Time
:
30401
2733
33134
C) Total Over Time (A+B) D) Over Time Amount
:
37748
2733
40481
:
301984.00
21864.00
323848.00
Factory Closed On
:
1) 5 Fri Day 2) 3)
______________ Pre pared By
________________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Monthly Production Report Month : November' 2005
Working Days
:
30 Days Out Of 22 Days
Working Hours
:
176 Hours
General Overtime
:
88 Hours
Power Failure
:
17.45 Hours (Without Generator)
Actual Working Hours
:
264 Hours
Number Of Total Machine
:
570 Nos.(Knitting 5G & 7G With All Outher Machine)
Number Of Machine Use
:
558 Nos.
PRODUCTION
ADMINSTRATIVE
TOTAL
A) At The beginning Of Month
:
795
49
844
B) New Recruit
:
20
0
20
C) Separated during the Month
:
17
0
17
Total at the close of Month (A+B- C) :
Avarage Attendance
798
Present
49
87.15%
Absent
847
12.85%
Hours
Hours
Hours
A) Requisition Over Time
:
9512
0
9512
B) General Over Time
:
32160
2959
35119
C) Total Over Time (A+B) D) Over Time Amount
:
41672
2959
44631
:
333376.00
23672.00
357048.00
Factory Closed On
:
1) 4 Fri Day 2) 4 Holy Day 3)
______________ Pre pared By
________________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Monthly Production Report Month : October' 2005
Working Days
:
25 Days Out Of 31 Days
Working Hours
:
200 Hours
General Overtime
:
100 Hours
Power Failure
:
39.13 Hours (Without Generator)
Actual Working Hours
:
300 Hours
Number Of Total Machine
:
572 Nos.(Knitting 5G & 7G With All Outher Machine)
Number Of Machine Use
:
569 Nos.
PRODUCTION
ADMINSTRATIVE
TOTAL
A) At The beginning Of Month
:
781
45
826
B) New Recruit
:
1
0
1
C) Separated during the Month
:
24
0
24
Total at the close of Month (A+B- C) :
Avarage Attendance
758
Present
45
90.00%
Absent
803
10.00%
Hours
Hours
Hours
A) Requisition Over Time
:
0
0
0
B) General Over Time
:
52428
4075
56503
C) Total Over Time (A+B) D) Over Time Amount
:
52428
4075
56503
:
419424.00
32600.00
452024.00
Factory Closed On
:
1) 4 Fri Day 2) 2 Holy Day 3) 4)
______________ Pre pared By
________________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Monthly Production Report Month : July ' 2005
Working Days
:
31 Days Out Of 26 Days
Working Hours
:
208 Hours
General Overtime
:
104 Hours
Power Failure
:
50.08 Hours (Without Generator)
Actual Working Hours
:
312 Hours
Number Of Total Machine
:
572 Nos.(Knitting 5G & 7G With All Outher Machine)
Number Of Machine Use
:
569 Nos.
PRODUCTION
ADMINSTRATIVE
TOTAL
A) At The beginning Of Month
:
827
45
872
B) New Recruit
:
5
0
5
C) Separated during the Month
:
17
0
17
Total at the close of Month (A+B- C) :
Avarage Attendance
815
Present
45
89.46%
Absent
860
10.54%
Hours
Hours
Hours
A) Requisition Over Time
:
14019
0
14019
B) General Over Time
:
3861
47174
51035
C) Total Over Time (A+B) D) Over Time Amount
:
17880
47174
65054
:
143040.00
377392.00
520432.00
Factory Closed On
:
1) 5 Fri Day 2) 3) 4)
______________ Pre pared By
________________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Monthly Production Report Month : June ' 2005
Working Days
:
30 Days Out Of 19 Days
Working Hours
:
152 Hours
General Overtime
:
76 Hours
Power Failure
:
35.13 Hours (Without Generator)
Actual Working Hours
:
300 Hours
Number Of Total Machine
:
572 Nos.(Knitting 5G & 7G With All Outher Machine)
Number Of Machine Use
:
569 Nos.
PRODUCTION
ADMINSTRATIVE
TOTAL
A) At The beginning Of Month
:
882
45
927
B) New Recruit
:
7
0
7
C) Separated during the Month
:
62
0
62
Total at the close of Month (A+B- C) :
Avarage Attendance
827
Present
45
89.46%
Absent
872
10.54%
Hours
Hours
Hours
A) Requisition Over Time
:
1817
0
1817
B) General Over Time
:
29031
3370
32401
C) Total Over Time (A+B) D) Over Time Amount
:
30848
3370
34218
:
246784.00
26960.00
273744.00
Factory Closed On
:
1) 4 Fri Day 2) 7 Days Strike 3) 4)
______________ Pre pared By
________________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Monthly Production Report Month : May' 2005
Working Days
:
31 Days Out Of 25 Days
Working Hours
:
200 Hours
General Overtime
:
100 Hours
Power Failure
:
48.18 Hours (Without Generator)
Actual Working Hours
:
300 Hours
Number Of Total Machine
:
572 Nos.(Knitting 5G & 7G With All Outher Machine)
Number Of Machine Use
:
569 Nos.
PRODUCTION
ADMINSTRATIVE
TOTAL
A) At The beginning Of Month
:
832
45
877
B) New Recruit
:
34
0
34
C) Separated during the Month
:
29
0
29
Total at the close of Month (A+B- C) :
Avarage Attendance
837
Present
45
92.61%
Absent
882
7.39%
Hours
Hours
Hours
A) Requisition Over Time
:
3632
0
3632
B) General Over Time
:
38325
3713
42038
C) Total Over Time (A+B) D) Over Time Amount
:
41957
3713
45670
:
335656.00
29704.00
365360.00
Factory Closed On
:
1) 4 Fri Day 2) 2 Holy Day 3) 4)
______________ Pre pared By
________________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Monthly Production Report Month : April' 2005
Working Days
:
30 Days Out Of 24 Days
Working Hours
:
192 Hours
General Overtime
:
96 Hours
Power Failure
:
31.5 Hours (Without Generator)
Actual Working Hours
:
288 Hours
Number Of Total Machine
:
572 Nos.(Knitting 5G & 7G With All Outher Machine)
Number Of Machine Use
:
569 Nos.
PRODUCTION
ADMINSTRATIVE
TOTAL
A) At The beginning Of Month
:
815
45
860
B) New Recruit
:
29
0
29
C) Separated during the Month
:
12
0
12
Total at the close of Month (A+B- C) :
Avarage Attendance
832
Present
45
90.14%
Absent
877
9.86%
Hours
Hours
Hours
A) Requisition Over Time
:
1130
0
1130
B) General Over Time
:
33021
3427
36448
C) Total Over Time (A+B) D) Over Time Amount
:
34151
3427
37578
:
273208.00
27416.00
300624.00
Factory Closed On
:
1) 5 Fri Day 2) 1 Holy Day 3) 4)
______________ Pre pared By
________________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Monthly Production Report Month : March' 2005
Working Days
:
31 Days Out Of 26 Days
Working Hours
:
208 Hours
General Overtime
:
104 Hours
Power Failure
:
2 Hours (Without Generator)
Actual Working Hours
:
312 Hours
Number Of Total Machine
:
572 Nos.(Knitting 5G & 7G With All Outher Machine)
Number Of Machine Use
:
769 Nos.
PRODUCTION
ADMINSTRATIVE
TOTAL
A) At The beginning Of Month
:
735
45
B) New Recruit
:
69
0
69
C) Separated during the Month
:
34
0
34
Total at the close of Month (A+B- C) :
Avarage Attendance
770
Present
45
93.00%
Absent
35
7.00%
Hours
Hours
Hours
A) Requisition Over Time
:
14669
0
14669
B) General Over Time
:
17210
3394
20604
C) Total Over Time (A+B) D) Over Time Amount
:
31879
3394
35273
:
255032.00
27152.00
282184.00
Factory Closed On
:
1) 4 Fri Day 2) 1 Holy Day 3) 4)
______________ Pre pared By
________________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Monthly Production Report Month : February'2005
Working Days
:
22 Days Out Of 28 Days
Working Hours
:
176 Hours
General Overtime
:
88 Hours
Power Failure
:
2 Hours (Without Generator)
Actual Working Hours
:
264 Hours
Number Of Total Machine
:
571 Nos.(Knitting 5G & 7G With All Outher Machine)
Number Of Machine Use
:
560 Nos.
PRODUCTION
ADMINSTRATIVE
TOTAL
A) At The beginning Of Month
:
755
45
825
B) New Recruit
:
4
0
4
C) Separated during the Month
:
24
0
24
Total at the close of Month (A+B- C) :
Avarage Attendance
735
Present
45
91.00%
Absent
805
9.00%
Hours
Hours
Hours
A) Requisition Over Time
:
4684
0
4684
B) General Over Time
:
5884
2386
8270
C) Total Over Time (A+B) D) Over Time Amount
:
10568
2386
12954
:
84544.00
19088.00
103632.00
Factory Closed On
:
1) 4 Fri Day 2) 1 Holy Day 3) 1 Special Holy Day 4)
______________ Pre pared By
_______________________ Production-Co-Ordinator
________________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Monthly Production Report Month :January'2005
Working Days
:
20 Days Out Of 31 Days
Working Hours
:
160 Hours
General Overtime
:
80 Hours
Power Failure
:
2 Hours (Without Generator)
Actual Working Hours
:
240 Hours
Number Of Total Machine
:
571 Nos.(Knitting 5G & 7G With All Outher Machine)
Number Of Machine Use
:
560 Nos.
PRODUCTION
ADMINSTRATIVE
TOTAL
A) At The beginning Of Month
:
765
45
825
B) New Recruit
:
2
0
2
C) Separated during the Month
:
12
0
12
Total at the close of Month (A+B- C) :
Avarage Attendance
755
Present
45
86.00%
Absent
815
14.00%
Hours
Hours
Hours
A) Requisition Over Time
:
2022
0
2022
B) General Over Time
:
2120
2943
5063
C) Total Over Time (A+B) D) Over Time Amount
:
4142
2943
7085
:
33136.00
23544.00
56680.00
Factory Closed On
:
1) 4 Fri Day 2) 5 Holy Day 3) 4)
______________ Pre pared By
_______________________ Production-Co-Ordinator
________________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Monthly Production Report Month :December'2004
Working Days
:
31 Days Out Of 25 Days
Working Hours
:
200 Hours
General Overtime
:
100 Hours
Power Failure
:
2 Hours (Without Generator)
Actual Working Hours
:
300 Hours
Number Of Total Machine
:
571 Nos.(Knitting 5G & 7G With All Outher Machine)
Number Of Machine Use
:
560 Nos.
PRODUCTION
ADMINSTRATIVE
TOTAL
A) At The beginning Of Month
:
765
45
810
B) New Recruit
:
7
0
7
C) Separated during the Month
:
10
0
10
Total at the close of Month (A+B- C) :
Avarage Attendance
762
Present
45
90.00%
Absent
807
10.00%
Hours
Hours
Hours
A) Requisition Over Time
:
16491
0
16491
B) General Over Time
:
17201
3248
20449
C) Total Over Time (A+B) D) Over Time Amount
:
33692
3248
36940
:
269536.00
25984.00
295520.00
Factory Closed On
:
1) 5 Fri Day 2) 1 Holy Day 3) 4)
______________ Pre pared By
_______________________ Production-Co-Ordinator
________________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Monthly Production Report Month :November'2004
Working Days
:
30 Days Out Of 22 Days
Working Hours
:
176 Hours
General Overtime
:
88 Hours
Power Failure
:
2 Hours (Without Generator)
Actual Working Hours
:
262 Hours
Number Of Total Machine
:
571 Nos.(Knitting 5G & 7G With All Outher Machine)
Number Of Machine Use
:
560 Nos.
PRODUCTION
ADMINSTRATIVE
TOTAL
A) At The beginning Of Month
:
799
45
844
B) New Recruit
:
0
0
0
C) Separated during the Month
:
34
0
34
Total at the close of Month (A+B- C) :
Avarage Attendance
765
Present
45
88.00%
Absent
810
12.00%
Hours
Hours
Hours
A) Requisition Over Time
:
28230
0
28230
B) General Over Time
:
9712
3758
13470
C) Total Over Time (A+B) D) Over Time Amount
:
37942
3758
41700
:
303536.00
30064.00
333600.00
Factory Closed On
:
1) 4 Fri Day 2) 4 Holy Day 3) 4)
______________ Pre pared By
_______________________ Production-Co-Ordinator
________________ Plant-In-Charge
90 Start 1250 Ltr Disel
1713635184 Babul
24 to 31 New Eng.
19/20
1 to 22 Old Engine
8/9
90 Start 1250 Ltr Disel
1713635184 Babul
24 to 31 New Eng.
19/20
1 to 22 Old Engine
8/9
90 Start 1250 Ltr Disel
1713635184 Babul
24 to 31 New Eng.
19/20
1 to 22 Old Engine
8/9
90 Start 1250 Ltr Disel
1713635184 Babul
24 to 31 New Eng.
19/20
1 to 22 Old Engine
8/9
90 Start 1250 Ltr Disel
1713635184 Babul
24 to 31 New Eng.
19/20
1 to 22 Old Engine
8/9
90 Start 1250 Ltr Disel
1713635184 Babul
24 to 31 New Eng.
19/20
1 to 22 Old Engine
8/9
90 Start 1250 Ltr Disel
1713635184 Babul
24 to 31 New Eng.
19/20
1 to 22 Old Engine
8/9
90 Start 1250 Ltr Disel
1713635184 Babul
24 to 31 New Eng.
19/20
1 to 22 Old Engine
8/9
90 Start 1250 Ltr Disel
1713635184 Babul
24 to 31 New Eng.
19/20
1 to 22 Old Engine
8/9
90 Start 1250 Ltr Disel
1713635184 Babul
24 to 31 New Eng.
19/20
1 to 22 Old Engine
8/9
90 Start 1250 Ltr Disel
1713635184 Babul
24 to 31 New Eng.
19/20
1 to 22 Old Engine
8/9
r Khatoni)
90 Start 1250 Ltr Disel
1713635184 Babul
24 to 31 New Eng.
19/20
1 to 22 Old Engine
8/9
90 Start 1250 Ltr Disel
1713635184 Babul
24 to 31 New Eng.
19/20
1 to 22 Old Engine
8/9
90 Start 1250 Ltr Disel
1713635184 Babul
24 to 31 New Eng.
19/20
1 to 22 Old Engine
8/9
90 Start 1250 Ltr Disel
1713635184 Babul
24 to 31 New Eng.
19/20
1 to 22 Old Engine
8/9
90 Start 1250 Ltr Disel
1713635184 Babul
24 to 31 New Eng.
19/20
1 to 22 Old Engine
8/9
90 Start 1250 Ltr Disel
1713635184 Babul
1 to 22 Old Engine
8/9
24 to 31 New Eng.
19/20
90 Start 1250 Ltr Disel
1 to 22 Old Engine
8/9
24 to 31 New Eng.
19/20
1 to 22 Old Engine
8/9
1713635184 Babul
90 Start 1250 Ltr Disel
24 to 31 New Eng.
19/20
1 to 22 Old Engine
8/9
24 to 31 New Eng.
19/20
1713635184 Babul
90 Start 1250 Ltr Disel
1713635184 Babul
90 Start 1250 Ltr Disel
1 to 22 Old Engine
8/9
24 to 31 New Eng.
19/20
832
832
832
832
832
832
832
832
832
832
832
832
832
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Production Details
Date : 01.09.2008
All Figure In DZ
Month : August'2008 SL
Buyer
Style No.
P.O No.
0006
GG
Total Order Qty
Production Target Achive
5G
890
200
383
5G
430
430
131
01
Sage
03
G.Gold
9L-397
04
G.Gold
9L-432
5G
246
0
13
05
Sears
TSF8-3540
5G
334
334
334
06
Sears
VLF8-1513
5G
375
375
385
07
Sears
3517
5G
65
0
48
08
Quelle
3835
5G
83
83
85
09
Quelle
8105
5G
83
0
120
2506
1422
1500
50
50
67
83
83
117
117
71
71
0
13158
Sub Total (5GG) 09
Eurofrente
11533
10
Eurofrente
11544
11
Eurofrente
11225
7G
12
Eurofrente
11532
7G
13
Eurofrente
11529
7G
83
83
87
14
K-Mart
9L-592
13750
7G
586
375
483
15
K-Mart
9L-592
13945
7G
841
841
630
15
K-Mart
9L-592
13949
7G
2026
0
44
16
G.Gold
9L-708
14278
7G
1400
1150
1400
17
G.Gold
9L-708
13807
7G
700
350
69
18
Sears
7G
109
109
111
Sub Total (7GG)
6066
3229
3092
Grand Total
8573
4651
4592
7G 7G
NJF8-3508
Remarks
83 119
Production Target Status SL
Buyer
Style/P.O No
Item
GG
Total Order Qty
Production Target Achive
Remarks
01 02 03
Total
______________________ Production-Co-Ordinator
0
__________________ Finishing-In-Charge
0
0
________________ Knitting-In-Charge
______________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Production Details
Date : 01.08.2008
All Figure In DZ
Month : July'2008 GG
Total Order Qty
MT-8016
5G
150
33
43
Sears
TCF8-4579
5G
291
291
302
03
Sage
06/NI/NJ/AL
5G
1442
1442
765
04
Sears
NJF8-3517
5G
65
48
22
05
G.Gold
5G
246
246
234
06
Sears
NJF8-3517
5G
467
45
07
Sage
0008
507224
5G
394
350
08
G.Union
84000
ET-9659
5G
257
1
SL
Buyer
Style No.
01
G.Union
02
9L432
P.O No.
13273
Sub Total (5GG)
Production Target Achive
3312
2060
1762
200
167
181
2026
1584
200
200
200
200
205
09
G.Union
MT-8212-B
10
G.Gold
9L 592
11
Sears
TSF8-3527
7G
12
Sears
TSF8-3528
7G
13
G.Gold
9L 708
7G
3009
500
1196
14
G.Gold
9L592
7G
586
586
112
15
G.Union
84004/ET-898
7G
700
0
3
16
Eurofrente
11530
7G
38
38
17
Eurofrente
11531
7G
50
50
18
Eurofrente
11528
7G
71
71
Sub Total (7GG)
7079
3395
3529
Grand Total
10391
5456
5290
7G 13749
13750
7G
Remarks
1631 202
Production Target Status SL
Buyer
Style/P.O No
Item
GG
Total Order Qty
Production Target Achive
Remarks
01 02 03
Total
______________________ Production-Co-Ordinator
0
__________________ Finishing-In-Charge
0
0
________________ Knitting-In-Charge
______________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Production Details
Date : 01.07.2008
All Figure In DZ
Month : June'2008 SL
Buyer
Style No.
P.O No.
GG
Total Order Qty
Production Target Achive
01
Sears
NJF8-3504
5G
257
82
88
02
Sears
NJF8-3517
5G
467
467
481
03
Sears
VLF8-1513
5G
375
375
0
04
Sears
VLF8-1508
5G
150
150
0
05
Sears
NJF-3505
5G
319
167
0
06
Li & Fung
RC-45
5G
721
437
378
07
G.Union
MT-8016 BL
5G
150
150
113
08
G.Union
4000
CS-9659
5G
1000
09
G.Union
ET-9659
5G
Sub Total (5GG)
4 242
3439
1828
1305
166
166
168
10
Sears
TSF8-3527
11
Sears
TSF8-3528
7G
126
126
12
G.Union
4004/CS-898
7G
1200
199
13
G.Union
84004/ET-898
7G
700
700
680
14
G.Union
MT-898BL
7G
200
200
24
15
G.Gold
9L 708
7G
8831
1000
1242
16
G.Gold
9L592
7G
2026
833
360
17
Eurofrente
11447
7G
4150
7G
MT-8212
13749
Remarks
130 229
3
Sub Total (7GG)
17399
3224
2835
Grand Total
20837
5052
4141
Production Target Status SL
Buyer
Style/P.O No
Item
GG
Total Order Qty
Production Target Achive
01
Remarks
0
02 03
Total
______________________ Production-Co-Ordinator
0.00
__________________ Finishing-In-Charge
0.00
0
________________ Knitting-In-Charge
______________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Production Details
Date : 01.06.2008
All Figure In DZ
Month : May'2008 Style No.
P.O No.
GG
Total Order Qty
G.Union
1011CV
CS-8000
5G
150
33
49
02
G.Gold
9L446
13346
5G
543
543
547
03
Li & Fung
RC-45
5G
1221
333
284
04
Sears
NJF8-3505
5G
319
319
05
Sears
VLF8-1513
5G
375
375
06
Sears
NJF8-3517
5G
467
467
07
Sears
NJF8-3504
5G
08
G.Union
SL
Buyer
01
4000
CS-9659
5G
Sub Total (5GG)
Production Target Achive
175 1000
123
4075
2071
1178
2092
1208
1275
7G
4150
1333
7G
1200
533
Sub Total (7GG)
7442
3075
3616
Grand Total
11517
5146
4794
09
K-Mart
9L440
10
Eirpfremte
11447
11
G.Union
4004
13116
CS-898
7G
Remarks
1341 1001
Production Target Status SL
Buyer
Style/P.O No
Item
GG
Total Order Qty
Production Target Achive
01
Remarks
0
02 03
Total
______________________ Production-Co-Ordinator
0.00
__________________ Finishing-In-Charge
0.00
0
________________ Knitting-In-Charge
______________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Production Details
Date : 01.05.2008
All Figure In DZ
Month : April'2008 Style No.
P.O No.
GG
Total Order Qty
G.Union
84007
ET-8001
5G
500
80
166
02
G.Gold
29L275
5G
300
133
162
03
Quelle
7374
5G
217
175
235
04
Quelle
3835
5G
357
265
251
05
G.Union
4000
5G
1000
583
888
06
Li & Fung
RC
5G
1221
638
07
Branex
LM-870
5G
133
8
08
G.Gold
9L446
13346
5G
2808
1
09
G.Union
1011CV
CS-8000
5G
300
48
10
G.Union
1011CV
CS-8000
5G
150
107
SL
Buyer
01
CS-9659
Sub Total (5GG) 11
Eurofrente
11447
ET-898
12
G.Union
8401
ET-8037
13
G.Union
4010
CS-8003-1
14
G.Gold
9L440
13116
Production Target Achive
6986
1874
1867
7G
4150
2867
1908
7G
500
333
292
7G
1000
6
2092
830
Sub Total (7GG)
7742
3200
3036
Grand Total
14728
5074
4903
Remarks
Production Target Status SL
Buyer
Style/P.O No
Item
GG
Total Order Qty
Production Target Achive
01
Remarks
0
02 03
Total
______________________ Production-Co-Ordinator
0.00
__________________ Finishing-In-Charge
0.00
0
________________ Knitting-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
______________ Plant-In-Charge
Production Details
Date : 01.04.2008
All Figure In DZ
Month : March'2008 Style No.
P.O No.
GG
Total Order Qty
G.Union
4016
CS-8037
5G
1000
417
455
02
Atlantic
14256
5G
182
182
191
03
N.Mann
550/477
5G
133
117
118
04
G.Gold
29L275
5G
300
300
139
05
Branex
LM-869
5G
133
133
135
06
Branex
LM-870
5G
133
133
126
07
Branex
LM-871
5G
133
133
134
08
Branex
LM-874
5G
133
133
135
09
G.Union
87007
ET-8001
5G
500
500
344
10
G.Union
3805
CK-8013
5G
300
300
307
11
G.Union
84006
ET-8000
5G
500
31
12
G.Union
1011CV
CS-8000
5G
300
152
13
Quelle
7374
5G
2600
25
14
Quelle
3835
5G
357
110
SL
Buyer
01
Sub Total (5GG)
Production Target Achive
6705
2348
2401
15
G.Union
84004
ET-898
7G
300
113
123
16
G.Union
4036
CS-8034
7G
1000
333
341
17
G.Union
4010
CS-8003-1
7G
1000
1000
1005
18
Quelle
3423
7G
83
83
85
19
Eurofrente
11447
7G
4150
1567
938
20
G.Union
4005
CS-6840
7G
700
2
21
G.Union
84016
ET-8037
7G
500
214
Sub Total (7GG)
7733
3096
2707
Grand Total
14438
5444
5108
Remarks
Production Target Status SL
Buyer
Style/P.O No
Item
GG
Total Order Qty
Production Target Achive
01
Remarks
0
02 03
Total
______________________ Production-Co-Ordinator
0.00
__________________ Finishing-In-Charge
0.00
0
________________ Knitting-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
______________ Plant-In-Charge
Production Details
Date : 01.03.2008
All Figure In DZ
Month : February'2008 Style No.
P.O No.
GG
Total Order Qty
G.Union
84006
ET-8000
5G
500
392
379
02
G.Union
84000
ET-9659
5G
500
83
86
03
G.Union
4016
CS-8037
5G
1000
0
554
04
G.Union
1011CV
CS-8000
5G
300
250
105
05
Atlantic
15684
5G
617
617
623
06
Atlantic
19056
5G
25
0
26
07
N.Mann
550/477
5G
133
0
17
3075
1342
1790
7G
600
150
177
7G
750
237
150
7G
283
242
252
7G
500
105
115
7G
700
75
112
7G
700
450
526
7G
300
300
182
7G
1000
1000
668
Sub Total (7GG)
4833
2559
2180
Grand Total
7909
3901
3970
SL
Buyer
01
Sub Total (5GG) 08
Global Gold
9 L 120
12770
09
Global Gold
9 l 119
12772
10
Branex
11
G.Union
84005
ET- 6840
12
G.Union
4005
CS-6840
13
G.Union
4004
CS-898
14
G.Union
84004
ET-898
15
G.Union
4036
CS-8034
LBW 9060
Production Target Achive
Remarks
Recvd From GSGL-1
Production Target Status SL
Buyer
Style/P.O No
Item
GG
Total Order Qty
Production Target Achive
01
Remarks
0
02 03
Total
______________________ Production-Co-Ordinator
0.00
__________________ Finishing-In-Charge
0.00
0
________________ Knitting-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
______________ Plant-In-Charge
Production Details
Date : 01.02.2008
All Figure In DZ
Month : January'2008 GG
Total Order Qty
5G
133
133
139
CS-9659
5G
1000
125
146
4006
CS-8000
5G
500
500
565
G.Union
8400
ET-8000
5G
500
500
99
G.Union
84000
ET-9659
5G
500
500
422
2633
1758
1371
7G
167
167
169
7G
83
83
84
7G
267
267
271
7G
283
283
39
7G
750
750
513
7G
600
600
442
7G
700
255
179
7G
500
483
377
7G
300
133
247
Sub Total (7GG)
3650
3022
2322
Grand Total
6283
4780
3693
SL
Buyer
Style No.
01
N.Mann
550/477
02
G.Union
4000
03
G.Union
04 05
P.O No.
Sub Total (5GG) 08
Branex
LM-862
09
Branex
LM-863
10
Branex
LM-861
11
Branex
LBW 9060
12
Global Gold
9 L 119
12772
13
Global Gold
9 l 120
12770
14
G.Union
4005
CS-6840
15
G.Union
84005
ET- 6840
16
G.Union
84004
ET-898
Production Target Achive
Remarks
Production Target Status SL
Buyer
Style/P.O No
Item
GG
Total Order Qty
Production Target Achive
01
Remarks
0
02 03
Total
______________________ Production-Co-Ordinator
0.00
__________________ Finishing-In-Charge
0.00
0
________________ Knitting-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
______________ Plant-In-Charge
Production Details
Date : 01.01.2008
All Figure In DZ
Month : December'2007 SL
Buyer
GG
Total Order Qty
8912
5G
542
58
50
5G
125
125
128
Style No.
P.O No.
Production Target Achive
01
Quelle
02
N.Mann
550/477
03
G.Gold
9 J020
12714
5G
110
110
112
04
G.Gold
9 J020
12716
5G
24
24
27
05
G.Gold
9 J020
12685
5G
280
280
287
06
G.Union
4000
CS-9659
5G
1000
1000
871
07
Atlantic
19056
5G
230
0
20
2311
1597
1494
7G
667
250
286
7G
708
150
115
7
258
258
261
500
500
587
333
333
349
167
167
0
83
83
0
267
267
0
700
0
445
0
0
17
Sub Total (7GG)
3683
2008
2060
Grand Total
5994
3606
3554
Sub Total (5GG) 08
Quelle
4000
09
Quelle
8832
10
Quelle
8824
11
Quelle
8832
12
Quelle
8703
13
Branex
LM-862
14
Branex
LM-863
15
Branex
LM-861
16
G.Union
4005
CS-6840
17
G.Union
84005
ET-6840
Remarks
Production Target Status SL
Buyer
Style/P.O No
Item
GG
Total Order Qty
Production Target Achive
01
Remarks
0
02 03
Total
______________________ Production-Co-Ordinator
0.00
__________________ Finishing-In-Charge
0.00
0
________________ Knitting-In-Charge
GLOBAL KNIT-WEAR LTD
______________ Plant-In-Charge
269 DEWAN HAT CHITTAGONG
Production Details
Date : 01.12.2007
All Figure In DZ
Month : November'2007 GG
Total Order Qty
10764
5G
143
0
2
Eurofrente
10877
5G
208
0
7
03
Quelle
3835
5G
275
275
265
04
Quelle
8912
5G
542
542
501
1168
817
775
7G
1042
1042
1064
7G
708
417
536
7G
667
667
401
7G
542
542
527
7G
125
0
12
7G
500
250
303
7G
241
0
107
7G
334
0
1
7G
500
500
468
Sub Total (7GG)
4658
3417
3419
Grand Total
5826
4233
4194
SL
Buyer
Style No.
01
Eurofrente
02
P.O No.
Sub Total (5GG) 05
Quelle
8832
06
Quelle
8832-B
07
Quelle
4000
08
Quelle
8820
09
Les. Line
5868
10
Les. Line
5872
11
Les. Line
5870
12
G.Union
7603
13
G.Gold
012630
Production Target Achive
Remarks
Production Target Status SL
Buyer
Style/P.O No
Item
GG
Total Order Qty
Production Target Achive
01
Remarks
0
02 03
Total
______________________ Production-Co-Ordinator
0.00
__________________ Finishing-In-Charge
0.00
0
________________ Knitting-In-Charge
______________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Production Details
Date : 03.11.2007
All Figure In DZ
Month : October'2007 GG
Total Order Qty
10764
5G
143
117
125
Eurofrente
10877
5G
208
117
115
03
Quelle
3835
5G
275
0
13
04
Sfera
0766/8021
5G
161
0
18
787
233
271
7G
250
250
259
7G
542
0
27
7G
142
142
144
7G
267
267
275
7G
500
500
183
7G
457
457
431
7G
334
334
195
7G
500
500
37
Sub Total (7GG)
2991
2449
1551
Grand Total
3778
2683
1822
SL
Buyer
Style No.
01
Eurofrente
02
P.O No.
Sub Total (5GG) 05
Quelle
3512
06
Quelle
8820
07
Quelle
3204
08
Quelle
8703
09
Les. Line
5872
10
Les. Line
5870
11
G.Union
7603
12
G.Gold
9H269/12630
Production Target Achive
Remarks
Production Target Status SL
Buyer
Style/P.O No
Item
GG
Total Order Qty
Production Target Achive
01
Remarks
0
02 03
Total
______________________ Production-Co-Ordinator
0.00
__________________ Finishing-In-Charge
0.00
0
________________ Knitting-In-Charge
______________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Production Details
Date : 02.10.2007
All Figure In DZ
Month : September'2007 GG
Total Order Qty
10764
5G
143
143
19
Eurofrente
10877
5G
208
208
101
03
Quelle
3835
5G
150
150
154
04
Sfera
0766/8021
5G
161
164
148
662
665
422
SL
Buyer
Style No.
01
Eurofrente
02
P.O No.
Sub Total (5GG)
Production Target Achive
05
Quelle
8711
7G
133
67
70
06
Quelle
8711-B
7G
342
342
346
07
Quelle
8824
7G
583
483
501
08
Quelle
8824-B
7G
350
350
361
09
Quelle
8821
7G
373
343
397
10
Quelle
3885
7G
133
0
8
11
Quelle
8703
7G
133
133
140
12
Les. Line
18902
7G
412
412
413
13
Les. Line
5870
7G
457
0
18
14
G.Union
7603
7G
334
0
144
15
N.Mann
017/531
7G
200
200
206
Sub Total (7GG)
3451
2330
2603
Grand Total
4113
2996
3025
Remarks
Production Target Status SL
Buyer
Style/P.O No
Item
GG
Total Order Qty
Production Target Achive
01
Remarks
0
02 03
Total
______________________ Production-Co-Ordinator
0.00
__________________ Finishing-In-Charge
0.00
0
________________ Knitting-In-Charge
______________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Production Details
Date : 01.09.2007
All Figure In DZ
Month : August'2007 SL
Buyer
Style No.
P.O No.
GG
Total Order Qty
Production Target Achive
01
Quelle
3835
5G
67
67
69
02
G.Gold
19H987
5G
250
83
87
03
G.Gold
19H542
12229
5G
662
0
41
04
G.Gold
19H542
12227
5G
80
0
27
05
G.Gold
19H542
12228
5G
696
696
625
1755
846
849
Sub Total (5GG) 06
Sears
3547
7G
333
167
173
07
Quelle
8711
7G
133
0
67
08
Quelle
8824
7G
583
583
97
09
Quelle
8821
7G
1200
1200
57
10
Quelle
3885
7G
133
0
130
11
Quelle
8703
7G
192
192
167
12
L.Line
47902
7G
639
0
41
13
Zara
5747/246
7G
833
833
817
14
Zara
5747/296
7G
206
206
209
Sub Total (7GG)
4253
3181
1758
Grand Total
6007
4027
2607
Remarks
Production Target Status SL
Buyer
Style/P.O No
Item
GG
Total Order Qty
Production Target Achive
01
Remarks
0
02 03
Total
______________________ Production-Co-Ordinator
0.00
__________________ Finishing-In-Charge
0.00
0
________________ Knitting-In-Charge
______________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Production Details
Date : 05.08.2007
All Figure In DZ
Month : July'2007 SL
Buyer
GG
Total Order Qty
3835
5G
200
200
202
Style No.
P.O No.
Production Target Achive
01
Quelle
02
Tiara
4H215
5G
162
0
75
03
K-Mart
9H049
5G
1564
1500
1550
04
Sears
1504
5G
167
0
1
05
Sears
1513
5G
233
0
15
06
G.Gold
19H542
12229
5G
379
379
343
07
G.Gold
19H542
12227
5G
80
80
54
08
G.Gold
19H542
12228
5G
696
160
82
3481
2319
2322
Sub Total (5GG) 09
Sears
1535
7G
167
0
1
10
Sears
3544
7G
317
303
310
11
Sears
3547
7G
333
333
170
12
Quelle
8820
7G
443
443
762
13
Quelle
3885
7G
333
333
345
14
Quelle
8703
7G
225
225
236
15
Les. Line
47902
7G
639
622
630
16
Zara
5747/246
7G
458
0
19
Sub Total (7GG)
2915
2260
2473
Grand Total
6396
4579
4795
Remarks
Production Target Status SL
Buyer
Style/P.O No
Item
GG
Total Order Qty
Production Target Achive
01
Remarks
0
02 03
Total
______________________ Production-Co-Ordinator
0.00
__________________ Finishing-In-Charge
0.00
0
________________ Knitting-In-Charge
______________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Production Details
Date : 01.07.2007
All Figure In DZ
Month : June'2007 SL
Buyer
Style No.
P.O No.
GG
Total Order Qty
Production Target Achive
01 N.Mann
138/751
5G
42
42
44
02 N.Mann
327/052
5G
42
42
41
03 G.Union
8480
5G
1000
0
51
04 Tiara
4H215
5G
1006
767
724
05 Sears
1537
5G
375
0
121
06 Sears
1504
5G
167
167
170
07 Sears
1513
5G
233
233
223
9H 049
5G
1564
897
37
4428
2148
1411
08 G.Gold(K-Mart)
Sub Total (5GG) 09
Sears
3543
7G
309
200
232
10
Sears
1535
7G
167
167
171
11
Sears
3544
7G
317
0
13
12
Quelle
3204
7G
667
125
160
13
Quelle
8820
7G
3010
3010
2317
14
Quelle
3885
7G
133
133
138
Sub Total (7GG)
4602
3635
3031
Grand Total
9030
5783
4442
Remarks
Production Target Status SL
Buyer
Style/P.O No
Item
GG
Total Order Qty
Production Target Achive
01
Remarks
0
02 03
Total
______________________ Production-Co-Ordinator
0.00
__________________ Finishing-In-Charge
0.00
0
________________ Knitting-In-Charge
GLOBAL KNIT-WEAR LTD
______________ Plant-In-Charge
269 DEWAN HAT CHITTAGONG
Production Details
Date : 01.06.2007
All Figure In DZ
Month : May'2007 SL
Buyer
Style No.
P.O No.
GG
Total Order Qty
Production Target Achive
01 Quelle
3212
5G
333
225
233
02 Great Union
8480
5G
1000
933
899
03 Tiara
4H215/28813
5G
408
0
232
04 Sears
VLF7-1537
5G
292
292
263
05 Sears
VLF7-1500
5G
99
0
75
06 Sears
VLF7-1513
5G
233
233
0
07 N.Mann
138/751
5G
42
42
0
08 N.Mann
327/052
5G
42
42
0
2449
1767
1702
Sub Total (5GG) 09
Sears
TSF7-3542
7G
123
98
110
10
Sears
TSF7-3543
7G
309
309
84
11
Sears
TSF7-3544
7G
214
214
219
12
Sears
VLF7-1535
7G
167
167
0
13
Quelle
2479
7G
142
100
109
14
Quelle
3204
7G
667
667
525
15
Great Union
1603
7G
300
300
307
16
Tiara
4H216/28659
7G
500
333
381
17
Eurofrente
10394
7G
1223
917
959
Sub Total (7GG)
3643
3103
2694
Grand Total
6092
4871
4396
Remarks
Production Target Status SL
Buyer
Style/P.O No
Item
GG
Total Order Qty
Production Target Achive
01
Remarks
0
02 03
Total
______________________ Production-Co-Ordinator
0.00
__________________ Finishing-In-Charge
0.00
0
________________ Knitting-In-Charge
GLOBAL KNIT-WEAR LTD
______________ Plant-In-Charge
269 DEWAN HAT CHITTAGONG
Production Details
Date : 01.05.2007
All Figure In DZ
Month : April'2007 SL
Buyer
Style No.
P.O No.
GG
Total Order Qty
Production Target Achive
01 Quelle
3733
5G
333
333
245
02 Quelle
3885
5G
208
208
206
03 Quelle
3915
5G
133
133
136
04 Quelle
3212
5G
333
0
103
05 N.Mann
138/751
5G
83
83
62
06 N.Mann
327/052
5G
83
83
45
07 Sears
VLF7-1500
5G
568
568
580
08 Sears
VLF7-1500-B
5G
188
188
192
09 Sears
VLF7-1500-C
5G
50
50
34
10 Sears
VLF7-1504/44
5G
83
83
0
11 Sears
VLF7-1513/50
5G
117
117
0
12 G.Union
17200
5G
500
0
34
13 G.Union
8480
5G
1000
0
61
3680
1847
1698
Sub Total (5GG) 14
G.Union
1604
7G
300
167
231
15
Quelle
3885
7G
333
333
322
16
Quelle
8711
7G
367
367
373
17
Quelle
2479
7G
142
142
146
18
Quelle
2479-B
7G
142
0
38
19
Tiara
28658
7G
500
500
505
20
Tiara
28659
7G
500
500
126
21
Eurofrente
10394
7G
1223
0
277
22
Sears
TSF6-3542
7G
123
123
20
23
Sears
TSF6-3544
7G
214
214
0
Sub Total (7GG)
3842
2344
2038
Grand Total
7522
4191
3736
Remarks
Production Target Status SL
Buyer
Style/P.O No
Item
GG
Total Order Qty
Production Target Achive
01
Remarks
0
02 03
Total
______________________ Production-Co-Ordinator
0.00
__________________ Finishing-In-Charge
0.00
0
________________ Knitting-In-Charge
______________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Production Details
Date : 01.04.2007
All Figure In DZ
Month : March'2007 GG
Total Order Qty
1612
5G
300
300
259
G.Union
17200
5G
500
500
474
03
G.Union
17201
5G
500
500
507
04
G.Union
7600
5G
1000
208
255
05
N.Mann
327/052
5G
83
83
86
06
N.Mann
138/751
5G
83
83
74
05
Quelle
3733
5G
333
333
57
06
Quelle
3835
5G
208
0
40
3008
2008
1752
SL
Buyer
01
G.Union
02
Style No.
P.O No.
Sub Total (5GG)
Production Target Achive
08
G.Union
7606
7G
700
0
134
09
G.Union
7603
7G
700
533
575
10
G.Union
7613
7G
500
500
510
11
G.Union
1613
7G
300
300
299
12
G.Union
1603
7G
300
300
306
12
G.Union
1604
7G
300
300
81
13
Quelle
3885
7G
333
333
23
14
Eurofrente
10394(EX-09447)
7G
527
527
0
Sub Total (7GG)
3660
2794
1928
Grand Total
6668
4802
3680
Remarks
Production Target Status SL
Buyer
Style/P.O No
Item
GG
Total Order Qty
Production Target Achive
01
0
02 03
Total
0.00
0.00
0
Remarks
_____________ Prepared By
________________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Production Details
Date : 01.03.2007
All Figure In DZ
Month : February'2007 GG
Total Order Qty
1615
5G
700
208
94
G.Union
7609
5G
1000
542
901
03
G.Union
7600
5G
1000
1000
707
04
G.Union
1612
5G
300
0
42
3000
1750
1743
SL
Buyer
01
G.Union
02
Style No.
P.O No.
Sub Total (5GG)
Production Target Achive
08
Quelle
8711
7G
525
275
273
09
Quelle
8706
7G
150
150
154
10
G.Union
7604
7G
700
83
109
11
G.Union
7605
7G
1000
375
332
12
G.Union
7606
7G
700
700
574
12
G.Union
7603
7G
700
700
134
13
G.Union
1613
7G
300
0
7
Sub Total (7GG)
4075
2283
1583
Grand Total
7075
4033
3326
Remarks
Production Target Status SL
Buyer
Style/P.O No
Item
GG
Total Order Qty
Production Target Achive
01
0
02 03
Total
0.00
0.00
0
Remarks
_____________ Prepared By
________________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Production Details
Date : 01.02.2007
All Figure In DZ
Month : January'2007 GG
Total Order Qty
550/477
5G
100
100
106
Quelle
7692
5G
333
258
256
03
Quelle
3212
5G
333
0
11
04
Quelle
3812
5G
100
100
104
05
G.Union
7615
5G
700
700
614
06
G.Union
7609
5G
1000
0
109
07
G.Union
7600
5G
1000
0
56
3567
1158
1256
SL
Buyer
01
N.Mann
02
Style No.
P.O No.
Sub Total (5GG)
Production Target Achive
08
Quelle
8711
7G
833
525
245
09
Quelle
7452
7G
133
0
57
10
Quelle
3252
7G
267
0
73
11
Quelle
8706
7G
150
150
0
12
G.Union
7604
7G
700
333
605
13
G.Union
7605
7G
1000
1000
683
Sub Total (7GG)
3083
2008
1663
Grand Total
6650
3167
2919
Remarks
Production Target Status SL 01
Buyer
Style/P.O No
Item
GG
Total Order Qty
Production Target Achive 0
Remarks
02 03
Total
0.00
_____________ Prepared By
0.00
0
________________________ Production-Co-Ordinator
________________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Production Details
Date : 06.01.2007
All Figure In DZ
Month : December '2006 GG
Total Order Qty
550/477
5G
100
58
10
Quelle
3212
5G
333
333
323
Quelle
7692
5G
333
333
71
767
725
404
SL
Buyer
01
N.Mann
02 03
Style No.
P.O No.
04
Production Target Achive
Remarks
5G Sub Total (5GG)
05
Quelle
8711
7G
833
833
742
06
Quelle
8706
7G
833
833
849
07
Quelle
3252
7G
267
267
196
08
Quelle
7452
7G
133
133
80
Sub Total (7GG)
2067
2067
1867
Grand Total
2833
2792
2271
Production Target Status SL
Buyer
Style/P.O No
Item
GG
Total Order Qty
Production Target Achive
Remarks
01
0
02 03
Total
0.00
_____________ Prepared By
0.00
0
________________________ Production-Co-Ordinator
________________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Production Details
Date : 02.12.2006
All Figure In DZ
Month : November '2006 GG
Total Order Qty
09750
5G
521
202
224
Eurofrente
09770
5G
150
133
147
03
Quelle
3795
5G
125
125
127
04
N.Mann
550/477
5G
100
0
95
896
460
592
SL
Buyer
Style No.
01
Eurofrente
02
P.O No.
Sub Total (5GG)
Production Target Achive
05
Quelle
7452(B)
7G
88
0
31
06
Quelle
7452(C)
7G
175
175
77
07
Quelle
7452(D)
7G
100
16
113
08
Quelle
8703
7G
2083
2083
2114
Sub Total (7GG)
2446
2274
2335
Grand Total
3343
2734
2928
Remarks
Production Target Status SL
Buyer
Style/P.O No
Item
GG
Total
Production
Remarks
SL
Buyer
Style/P.O No
Item
GG
Order Qty
Target
01
Remarks
Achive 0
02 03
Total
0.00
_____________ Prepared By
0.00
0
________________________ Production-Co-Ordinator
________________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Production Details
Date :
All Figure In DZ
Month : SL
Buyer
Style No.
Sub Total (5GG)
P.O No.
GG
Total Order Qty
0
Production Target Achive
0
0
Remarks
Sub Total (7GG) Grand Total
Production Target Status SL
Buyer
Style/P.O No
Item
GG
Total Order Qty
Production Target Achive
01
Remarks
0
02 03
Total
_____________ Prepared By
________________________ Production-Co-Ordinator
________________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Production Details
Date : 01.11.2006
All Figure In DZ
Month : October '2006 GG
Total Order Qty
550/477
5G
83
83
35
Eurofrente
09769
5G
487
487
435
03
Eurofrente
09750
5G
521
521
319
04
Eurofrente 09770 Sub Total (5GG)
5G
150 1242
150 1242
9 798
13
Sears
3534
7G
124
0
38
14
Quelle
8609
7G
433
250
346
15
Quelle
3905
7G
98
0
31
16
Quelle
7294
7G
134
83
93
17
Quelle
3955
7G
154
83
188
18
Quelle
3792
7G
471
408
270
22
Quelle
3792(B)
7G
321
125
122
23
Quelle
7392
7G
250
250
253
24
Quelle
7392(B)
7G
58
0
60
SL
Buyer
01
N.Mann
02
Style No.
P.O No.
Production Target Achive
Remarks
19
Quelle
7452
7G
87
87
91
25
Quelle
7452(B)
7G
88
88
77
20
Quelle
7452(C)
7G
175
175
73
21
Quelle
7G
100 2494
100 1650
5 1647
3735
2892
2445
7452(D) Sub Total (7GG) Grand Total
Production Target Status SL
Buyer
Style/P.O No
Item
GG
Total Order Qty
Production Target Achive
01
Remarks
0
02 03
Total
0.00
_____________ Prepared By
0.00
0
________________________ Production-Co-Ordinator
________________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Production Details
Date : 03.10.2006
All Figure In DZ
Month : September '2006 SL
Buyer
Style No.
P.O No.
GG
Total Order Qty
Production Target Achive
01
G.Gold
21D050CT
010075
5G
220
83
56
02
G.Gold
1D158
010251
5G
1380
1005
1228
03
G.Gold
1D158
010249
5G
783
783
101
04
N.Mann
550/477
5G
83
0
43
05
Sears
3542
5G
217
217
150
06
Eurofrente 9769 Sub Total (5GG)
5G
487 3170
0 2088
54 1632
13
Rajan
MK-413608
7G
400
0
39
14
Sears
TSF6-3534
7G
158
158
160
15
Sears
TSF6-3534
7G
124
124
92
16
Sears
VLS7-1500
7G
200
200
205
17
Tiara
44D788RS
7G
500
0
92
18
Quelle
3575
7G
150
83
84
Remarks
22
Quelle
8609
7G
408
181
216
23
Quelle
8609(B)
7G
433
433
94
24
Quelle
8602
7G
233
208
186
19
Quelle
8602(B)
7G
208
0
213
25
Quelle
3732
7G
367
367
375
20
Quelle
3905
7G
200
200
173
21
Quelle
7G
208 3590
208 2163
119 2048
6760
4251
3680
7294 Sub Total (7GG) Grand Total
Production Target Status SL
Buyer
Style/P.O No
Item
GG
Total Order Qty
Production Target Achive
01
Remarks
0
02 03
Total
0.00
_____________ Prepared By
0.00
0
________________________ Production-Co-Ordinator
________________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Production Details
Date : 01.09.2006
All Figure In DZ
Month : August '2006 SL
Buyer
Style No.
P.O No.
GG
Total Order Qty
Production Target Achive
10
G.Gold
21D050CT
010074
5G
330
330
333
11
G.Gold
21D050CT
010075
5G
220
220
168
12
G.Gold
1D158
010251
5G
1380
167
96
05
N.Mann
550/477
5G
127
127
129
06
Quelle
3795
5G
250
133
138
07
Quelle
7214
5G
238
0
71
08
Quelle
3023
5G
104
104
96
09
Quelle
3033
5G
108
108
77
01
Sears
3537
5G
500
500
444
02
Sears
3538
5G
144
167
144
03
Sears
1500
5G
151
151
158
04
Sears
5G
200 3752
210 2217
204 2058
13
Quelle
8609
7G
333
208
285
14
Quelle
3792
7G
167
0
153
3540 Sub Total (5GG)
Remarks
15
Quelle
2670
7G
167
167
172
16
Quelle
3575
7G
150
150
71
17
Quelle
8602
7G
233
233
51
18
Quelle
8609
7G
408
0
5
22
Rajan
MK-413609
7G
400
400
406
23
Rajan
MK-413612
7G
400
400
408
24
Rajan
MK-413608
7G
300
300
268
19
Sears
1511
7G
125
0
102
25
Tiara
44D788RS
7G
500
500
111
20
W.Smith
611166
7G
410
410
415
21
W.Smith
7G
410 4002
410 3177
422 2869
7754
5394
4927
611165 Sub Total (7GG) Grand Total
Production Target Status SL
Buyer
Style/P.O No
Item
GG
Total Order Qty
Production Target Achive
01
Remarks
0
02 03
Total
0.00
_____________ Prepared By
0.00
0
________________________ Production-Co-Ordinator
________________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Production Details
Date : 01.08.2006
All Figure In DZ
Month : July '2006 SL
Buyer
GG
Total Order Qty
60252-C
5G
432
83
60
Style/P.O No
Item
Production Target Achive
01
Sears
02
Quelle
3537
5G
500
167
60
03
Quelle
3795
5G
125
125
130
04
Quelle
3795 B
5G
250
250
251
05
Quelle
3595
5G
167
0
82
06
Quelle
8614
5G
1008
1879
1972
07
Quelle
7214
5G
238
238
171
08
Quelle
3023
5G
104
104
11
09
Quelle
5G
108 2931
108 2954
35 2772
10
Quelle
8602
7G
293
83
206
11
Quelle
3094
7G
500
417
460
3033 Sub Total (5GG)
Remarks
12
Quelle
8609
7G
333
333
54
13
Quelle
3792
7G
167
167
16
14
Quelle
3142
7G
67
67
67
15
Sears
1504
7G
224
399
404
16
Sears
1502
7G
237
237
139
17
Sears
3536
7G
417
333
397
18
Sears
3534
7G
667
0
201
19
Sears
1511
7G
158
158
54
20
N.Mann
017/477
7G
146
146
153
21
Wehmeyer
WR-08
7G
200
100
123
Sub Total (7GG)
3408
2440
2274
Grand Total
6340
5394
5046
7G 7G
60552 Production Target Status SL
Buyer
Style/P.O No
Item
GG
Total Order Qty
Production Target Achive
01
Remarks
0
02 03
Total
0.00
_____________ Prepared By
0.00
0
________________________ Production-Co-Ordinator
________________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Production Details
Date : 01.07.2006
All Figure In DZ
Month : June '2006 SL
Buyer
Style/P.O No
Item
GG
Total Order Qty
Production Target Achive
01
Sears
1500
5G
35
35
36
02
Sears
60252-C
5G
432
432
435
03
Sears
60252-C(B)
5G
432
167
350
04
Quelle
3595
5G
167
167
89
05
Quelle
3795
5G
175
300
180
06
Quelle
8614
5G
1675
250
277
07
Quelle
8614(B)
5G
2021
1010
1276
4935
2360
2643
05
Sub Total (5GG)
5G
06
N.Mann
017/531
7G
271
79
93
07
N.Mann
017/477
7G
146
83
92
Remarks
08
Sears
3531
7G
625
442
455
09
Sears
3532
7G
334
334
332
10
Sears
3534
7G
237
237
242
11
Sears
3534(B)
7G
667
375
472
01
Sears
3536
7G
417
0
24
12
Eurofrente
09447
7G
460
0
25
12
Quelle
3732
7G
167
167
171
12
Quelle
8602
7G
658
658
463
13
Quelle
3094
7G
500
233
52
13
Wehmeyer
WR-08
7G
200
0
80
Sub Total (7GG)
4680
2608
2501
Grand Total
9615
4967
5144
13
7G
13
7G
Production Target Status SL
Buyer
Style/P.O No
Item
GG
Total Order Qty
Production Target Achive
01
Remarks
0
02 03
Total
0.00
_____________ Prepared By
0.00
0
________________________ Production-Co-Ordinator
________________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Production Details
Date : 01.07.2006
All Figure In DZ
Month : June '2006 SL
Buyer
Style/P.O No
Item
GG
Total Order Qty
Production Target Achive
01
Sears
1500
5G
35
35
36
02
Sears
60252-C
5G
432
432
435
03
Sears
60252-C(B)
5G
432
167
350
04
Quelle
3595
5G
167
167
89
05
Quelle
3795
5G
175
300
180
06
Quelle
8614
5G
1675
250
277
07
Quelle
8614(B)
5G
2021
1010
1276
4935
2360
2643
05
Sub Total (5GG)
5G
06
N.Mann
017/531
7G
271
79
93
07
N.Mann
017/477
7G
146
83
92
Remarks
08
Sears
3531
7G
625
442
455
09
Sears
3532
7G
334
334
332
10
Sears
3534
7G
237
237
242
11
Sears
3534(B)
7G
667
375
472
01
Sears
3536
7G
417
0
24
12
Eurofrente
09447
7G
460
0
25
12
Quelle
3732
7G
167
167
171
12
Quelle
8602
7G
658
658
463
13
Quelle
3094
7G
500
233
52
13
Wehmeyer
WR-08
7G
200
0
80
Sub Total (7GG)
4680
2608
2501
Grand Total
9615
4967
5144
13
7G
13
7G
Production Target Status SL
Buyer
Style/P.O No
Item
GG
Total Order Qty
Production Target Achive
01
Remarks
0
02 03
Total
0.00
_____________ Prepared By
0.00
0
________________________ Production-Co-Ordinator
________________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Production Details
Date : 02.06.2006
All Figure In DZ
Month : May '2006 SL
Buyer
Style/P.O No
Item
GG
Total Order Qty
Production Target Achive
01
Quelle
7214
5G
150
0
154
02
Quelle
8614
5G
1675
258
1410
03
Sears
1500
5G
666
0
65
04
N.Mann
550/477
5G
75
75
15
05
G.Union
5G
100 2666
0 333
61 1705
06
Quelle
2619
7G
233
0
25
07
Quelle
3295
7G
183
0
113
08
Quelle
2615
7G
292
0
279
09
Quelle
2479
7G
200
200
205
10
Quelle
2670
7G
333
333
342
S-373 Sub Total (5GG)
Remarks
11
Quelle
2667
7G
267
133
276
01
Eurofrente
09447
7G
960
0
73
12
Sears
3531
7G
625
625
174
12
Sears
3532
7G
334
334
7
12
Sears
3533
7G
500
0
126
13
N.Mann
017/531
7G
271
271
188
13
N.Mann
017/477
7G
146
146
63
13
G.Union
3029
7G
350
350
360
13
G.Union
7G
104 4798
104 2496
108 2339
7464
2829
4044
6030 Sub Total (7GG) Grand Total
Production Target Status SL
Buyer
Style/P.O No
Item
GG
Total Order Qty
Production Target Achive
01
Remarks
0
02 03 04 05 06
Total
0.00
_____________ Prepared By
0.00
0
________________________ Production-Co-Ordinator
________________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Production Details
Date : 02.05.2006
All Figure In DZ
Month : April '2006 SL
Buyer
Style/P.O No
Item
GG
Total Order Qty
Production Target Achive
01
Quelle
3023
5G
150
150
150
02
Quelle
3033
5G
150
150
155
03
Quelle
3795
5G
342
342
76
04
Scope
13463
5G
40
0
42
05
N.Mann
550/477
5G
67
67
69
06
N.Mann
550/477(B)
5G
75
0
65
07
G.Union
S-372
5G
100
100
87
08
G.Union
S-373
5G
100
100
57
09
Eurofrente
09029
5G
113
25
68
10
Eurofrente
08206
5G
186
100
96
11
Sears
1500
5G
666
666
618
Remarks
Sub Total (5GG)
1988
1699
1483
01
Eurofrente
09447
7G
960
0
4
02
Quelle
2620
7G
233
0
143
03
Quelle
8602
7G
325
0
306
04
Quelle
2619
7G
233
233
214
05
Quelle
3792
7G
167
167
137
06
Quelle
3792(B)
7G
166
166
171
07
Quelle
2627
7G
200
200
206
08
Quelle
3295
7G
183
0
72
09
Quelle
2611
7G
200
200
206
10
Quelle
2615
7G
292
292
24
11
Quelle
2479
7G
200
0
6
12
Sears
3533
7G
500
500
378
13
Rajan
7G
300 3960
0 1758
11 1878
5948
3458
3361
MK-413315 Sub Total (7GG) Grand Total
Production Target Status SL
Buyer
Style/P.O No
Item
GG
Total Order Qty
Production Target Achive
01
Remarks
0
02 03 04 05 06
Total
0.00
_____________ Prepared By
0.00
0
________________________ Production-Co-Ordinator
________________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Production Details
Date : 02.04.2006
All Figure In DZ
Month : March '2006 SL
Buyer
Style/P.O No
Item
GG
Total Order Qty
Production Target Achive
01
Scope
13463
5G
200
117
87
02
Scope
13465
5G
200
200
202
03
Zara
5747/541
5G
301
233
332
04
Quelle
3023
5G
150
150
153
05
Quelle
3033
5G
150
0
152
06
Quelle
3795
5G
342
0
271
07
Quelle
7214
5G
150
150
152
Remarks
08
Eurofrente
09209
5G
113
0
45
09
Eurofrente
08206
5G
186
186
94
1791
1036
1488
Sub Total (5GG) 01
Quelle
2620
7G
233
0
94
02
Quelle
8602
7G
325
0
35
03
Quelle
3732
7G
133
133
137
04
Quelle
3792
7G
167
333
39
05
Eurofrente
09447
7G
960
960
870
06
Rajan
MK-413315
7G
300
300
298
07
G.Union
L-444
7G
300
217
145
08
G.Union
8497
7G
188
188
157
Sub Total (7GG)
2607
2131
1775
Grand Total
4398
3167
3263
Production Target Status SL
Buyer
Style/P.O No
Item
GG
Total Order Qty
Production Target Achive
01
Remarks
0
02 03 04 05 06
Total
0.00
_____________ Prepared By
0.00
0
________________________ Production-Co-Ordinator
________________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Production Details
Date : 01.03.2006
All Figure In DZ
Month : February '2006 SL
Buyer
Style/P.O No
Item
GG
Total Order Qty
Production Target Achive
01
Scope
13463
5G
200
200
117
02
Scope
13465
5G
200
200
0
03
Zara
5747/541
5G
321
333
205
04
Zara
5747/541 (B)
100
0
13
Remarks
Sub Total (5GG)
821
733
335
01
Quelle
8609
7G
900
0
99
02
Quelle
8609(B)
7G
708
708
620
03
Quelle
7382
7G
100
58
60
04
Quelle
3732
7G
192
192
196
05
Quelle
8602
7G
700
700
706
06
Eurofrente
08997
7G
90
90
94
07
N.Mann
429/546
7G
308
308
321
08
G.Union
L-444
7G
300
300
162
09
G.Union
8497
7G
188
0
35
Sub Total (7GG)
3486
2357
2293
Grand Total
4307
3090
2628
Production Target Status SL
Buyer
Style/P.O No
Item
GG
Total Order Qty
Production Target Achive
01
Remarks
0
02 03 04 05 06
Total
0.00
_____________ Prepared By
0.00
0
________________________ Production-Co-Ordinator
________________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Production Details
Date : 01.02.2006
All Figure In DZ
Month : January '2006 SL 01 02
Buyer Zara
Style/P.O No 5747/504
Item
GG
Total Order Qty
5G
321
Production Target Achive 100
57
Remarks
Sub Total (5GG)
321
100
57
03
Quelle
8603
7G
1250
0
31
04
Quelle
8609
7G
1708
1708
1202
05
Quelle
3732
7G
67
67
80
06
Quelle
7382
7G
100
100
39
Sub Total (7GG)
3125
1875
1352
Grand Total
3446
1975
1409
Production Target Status SL
Buyer
Style/P.O No
Item
GG
Total Order Qty
Production Target Achive
01
Remarks
0
02 03 04 05 06
Total
0.00
_____________ Prepared By
0.00
0
________________________ Production-Co-Ordinator
________________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Production Details
Date : 01.12.2006
All Figure In DZ
Month : December '2005 SL 01 02
Buyer Zara
Style/P.O No 5747/504
Item
GG
Total Order Qty
5G
321
Production Target Achive 513
266
Remarks
Sub Total (5GG) 03
N.Mann
04
321
513
266
317/349
7G
708
388
Quelle
8602
7G
833
833
855
05
Quelle
8603
7G
1250
1250
1254
06
Quelle
8609
7G
600
417
65
07
Quelle
8603 (B)
7G
650
650
627
08
Quelle
7382
7G
100
100
105
09
Quelle
3732
7G
67
67
62
Sub Total (7GG)
4208
3317
3355
Grand Total
4529
3829
3622
Production Target Status SL
Buyer
Style/P.O No
Item
GG
Total Order Qty
Production Target Achive
01
Remarks
0
02 03 04 05 06
Total
0.00
_____________ Prepared By
0.00
0
________________________ Production-Co-Ordinator
________________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Production Details
Date : 01.12.2005
All Figure In DZ
Month : November '2005 SL 01 02 03 04 05
Buyer Zara
Style/P.O No 5747/600
Item
GG
Total Order Qty
5G
406
Production Target Achive 406
319
Remarks
06
Sub Total (5GG)
406
406
319
07
Quelle
8602
7G
10000
10000
784
08
Bay-City
451
7G
1600
0
379
09
Sears
07MCS6-2486
7G
596
596
607
10
Sears
07MCS6-2472
7G
267
267
271
11
N.Mann
317/349
7G
708
708
324
12
Quelle
8602 (B)
7G
833
417
11
Sub Total (7GG)
14004
11988
2375
Grand Total
14410
12394
2694
Production Target Status SL
Buyer
Style/P.O No
Item
GG
Total Order Qty
Production Target Achive
01
Remarks
0
02 03 04 05 06
Total
0.00
_____________ Prepared By
0.00
0
________________________ Production-Co-Ordinator
________________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Production Details
Date : 01.11.2005
All Figure In DZ
Month : October '2005 GG
Total Order Qty
08206
5G
360
0
5
Eurofrent
09209
5G
16
0
18
03
Sears
1539
5G
153
0
20
04
Sears
1538
5G
112
0
23
SL
Buyer
Style/P.O No
01
Eurofrent
02
Item
Production Target Achive
Remarks
05
Sears
1537
5G
99
99
64
06
Sears
1536
5G
137
137
140
876
235
270
Sub Total (5GG) 07
Bay-City
451
7G
1800
1610
1189
08
Bay-City
449
7G
758
454
474
09
Dynesty
9106
7G
333
0
56
10
Quelle
8602
7G
1333
1333
1342
11
Quelle
8602(B)
7G
1000
417
241
12
Sears
07MCS6-2472R
7G
267
267
Sub Total (7GG)
5492
4081
3302
Grand Total
6368
4316
3572
Production Target Status SL
Buyer
Style/P.O No
Item
GG
Total Order Qty
Production Target Achive
01
Remarks
0
02 03 04 05 06
Total
0.00
_____________ Prepared By
0.00
0
________________________ Production-Co-Ordinator
________________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Production Details
Date : 01.10.2005
All Figure In DZ
Month : September '2005 GG
Total Order Qty
452
5G
1625
1208
1157
Eurofrente
09029
5G
140
140
140
Eurofrente
08206
5G
360
360
360
SL
Buyer
01
Bay-City
02 03
Style/P.O No
Item
Production Target Achive
Remarks
04
Sears
1539
5G
153
0
136
05
Sears
1538
5G
112
0
93
06
Sears
1537
5G
99
0
36
07
Sears
1531
5G
175
175
0
08
Sears
1536
5G
137
137
0
2800
2020
1922
09
Sub Total (5GG)
09
Quelle
7610
7G
313
135
135
10
Quelle
7610(C)
7G
63
92
92
10
Rajan
515043
7G
268
250
191
11
Rajan
516078
7G
13
13
11
12
Rajan
515029
7G
216
216
210
13
Rajan
515028
7G
216
216
140
14
Bay-City
451
7G
1800
417
199
15
Bay-City
449
7G
758
758
289
16
Dynesty
9106
7G
300
0
198
Sub Total (7GG)
3946
2097
1465
Grand Total
6746
4117
3386
17
7G
18
7G 7G
Production Target Status SL
Buyer
Style/P.O No
Item
GG
Total Order Qty
Production Target Achive
01
Remarks
0
02 03 04 05 06
Total
0.00
_____________ Prepared By
0.00
0
________________________ Production-Co-Ordinator
________________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Production Details
Date : 02.09.2005
All Figure In DZ
Month : August '2005 SL
Buyer
Style/P.O No
Item
GG
Total Order Qty
Production Target Achive
01
Sears
1514
5G
382
108
101
02
Sears
1516
5G
362
0
8
Remarks
03
Sears
3530
5G
500
350
358
04
Sears
3534
5G
517
517
524
05
G.Gold
7358
5G
300
300
308
06
Bay-City
452
5G
1625
500
486
3685
1775
1785
07
5G
08
5G
09
5G
Sub Total (5GG)
09
Rajan
515043
7G
222
0
9
10
Rajan
516086
7G
226
0
41
10
Rajan
516076
7G
66
0
41
11
Rajan
515043
7G
268
0
78
12
Rajan
516078
7G
13
0
2
13
Rajan
515029
7G
216
0
4
14
Quelle
7610
7G
1000
1000
917
15
Quelle
7610(B)
7G
917
917
917
16
Quelle
7610(C)
7G
313
313
142
Sub Total (7GG)
3240
2229
2151
Grand Total
6925
4004
3936
17
7G
18
7G 7G
Production Target Status SL
Buyer
Style/P.O No
Item
GG
Total Order Qty
Production Target Achive
01
Remarks
0
02 03 04 05 06
Total
0.00
_____________ Prepared By
0.00
0
________________________ Production-Co-Ordinator
________________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Production Details
Date : 01.08.2005
All Figure In DZ
Month : July '2005 SL 01
Buyer Sears
Style/P.O No 1514
Item
GG
Total Order Qty
5G
382
Production Target Achive 333
216
Remarks
02
Sears
1516
5G
362
0
59
03
Sears
3516
5G
501
0
4
04
Sears
1330
5G
175
125
126
05
Sears
3530
5G
500
125
147
06
Sears
3515
5G
750
750
759
07
Rajan
MK-412651
5G
200
0
8
07
Rajan
MK-413162
5G
200
200
4
07
Bernardi
237-W
5G
180
180
191
08
Zara
5G
271 3520
0 1713
254 1768
09
Rajan
MK-412960
7G
250
125
98
10
Rajan
MK-515048
7G
200
200
201
10
Rajan
MK-516086
7G
226
227
186
11
Rajan
MK-515043
7G
222
222
214
12
Rajan
MK-516076
7G
66
79
26
13
Bay-City
162979
7G
1000
167
139
14
Bay-City
162989
7G
750
333
288
15
Bernardi
46-C
7G
280
233
264
16
Quelle
7824
7G
67
67
70
17
Quelle
7610
7G
1000
0
115
Sub Total (7GG)
4060
1653
1601
Grand Total
7580
3366
3369
5747/830 Sub Total (5GG)
18
7G 7G
Production Target Status SL
Buyer
Style/P.O No
Item
GG
Total Order Qty
Production Target Achive
01
Remarks
0
02 03 04 05 06
Total
0.00
_____________ Prepared By
0.00
0
________________________ Production-Co-Ordinator
________________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Production Details
Date : 01.06.2005
All Figure In DZ
Month : June '2005 SL
Buyer
Style/P.O No
Item
GG
Total
Production
Remarks
SL
Buyer
Style/P.O No
Item
GG
Order Qty
Target
Achive
01
Sears
1516
5G
362
362
220
02
Sears
1514
5G
382
382
70
03
Sears
3531
5G
500
500
448
04
Sears
3516
5G
501
501
267
05
Sears
1311
5G
228
228
160
06
Sears
1330
5G
175
175
54
07
Rajan
412651
5G
200
200
85
08
G.Gold
5G
100 2447
100 2447
18 1323
09
Rajan
412960
7G
250
250.00
127
10
G.Gold
8151
7G
250
250.00
116
10
Quelle
2480
7G
166.67
166.67
31
11
Quelle
2481
7G
183.33
183.33
36
12
Quelle
2486
7G
166.67
166.67
142
13
Quelle
2485
7G
166.67
166.67
168
14
Bay-City
162979
7G
750.00
750.00
159
15
Bay-City
192689
7G
562.50
562.50
344
16
Sears
1304
7G
321.58
321.58
212
17
Sears
1310
7G
342.42
342.42
163
18
Bernardi
46-C
7G
363.33
363.33
110
Sub Total (7GG)
3523
3523
1608
Grand Total
5970
5970
2931
7548 Sub Total (5GG)
Remarks
7G
Production Target Status SL
Buyer
Style/P.O No
Item
GG
Total Order Qty
Production Target Achive
Remarks
01 02 03 04 05 06
Total
0.00
_____________ Prepared By
0.00
0
________________________ Production-Co-Ordinator
________________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Production Details
Date : 01.06.2005
All Figure In DZ
Month : May'2005 SL
Buyer
Style/P.O No
Item
GG
Total
Production
Remarks
SL
Buyer
Style/P.O No
01
Whemeyer
WR-1
02
Sears
03
Item
GG
Order Qty
Target
Achive
5G
427
427
437
50108-C
5G
594
594
585
Sears
1309
5G
272
272
276
04
Sears
1516
5G
362
237
79
05
Sears
3531
5G
500
500
62
06
Rajan
MK-412651 Sub Total (5GG)
5G
200 2355
200 2230
67 1506
09
Rajan
MK-412654
7G
200
0.00
18
10
Rajan
MK-412960
7G
250.00
0.00
26
11
Rajan
MK-412727
7G
300.00
300.00
190
12
Rajan
MK-412655
7G
200.00
200.00
158
13
Quelle
2479
7G
216.67
163.58
152
14
Quelle
2480
7G
166.67
79.58
78
15
Quelle
2481
7G
183.33
183.33
151
16
Bay-City
162979
7G
750.00
750.00
706
17
Bay-City
162989
7G
562.50
562.50
132
18
Sears
1304
7G
260.33
260.33
264
19
Sears
1304-B
7G
321.58
321.58
119
20
Sears
1310
7G
342.42
342.42
184
21
G.Gold
08151
7G
250.00
250.00
143
Sub Total (7GG)
4004
3413
2321
Grand Total
6358
5643
3827
22
Remarks
7G 7G
Production Target Status SL
Buyer
Style/P.O No
Item
GG
Total Order Qty
Production Target Achive
Remarks
01 02 03 04 05 06
_____________ Prepared By
Total
0.00
0.00
________________________ Production-Co-Ordinator
0
________________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Production Details All Figure In DZ
Date : 01.05.2005
Month :April'2005 GG
Total Order Qty
08207
5G
119
119
41
08206
5G
219
219
153
MK-412892
5G
200
200
205
007999
5G
500
500
516
Sears
1308
5G
140
140
143
06
Sears
1307
5G
271
271
274
07
Sears
5G
276 1724
276 1724
284 1616
08
Quelle
7824
7G
66.75
66.75
52
09
Rajan
MK-412654
7G
200
200.00
117
10
Rajan
MK-413066
7G
200.00
200.00
203
11
Rajan
MK-413076
7G
300.00
300.00
301
12
G.Gold
17653(8040)
7G
418.00
418.00
116
13
G.Gold
17653(8041)
7G
300.00
300.00
307
14
G.Gold
17653(8039)
7G
200
200.00
204
15
Scope
58417
7G
138
138.00
120
16
Scope
58413
7G
138
138.00
116
17
Scope
58415
7G
138
138.00
140
18
Scope
58403
7G
138
138.00
140
19
Quelle
2480
7G
166.67
166.67
87
20
Quelle
2479
7G
216.67
216.67
43
21
Rajan
MK-412727
7G
300.00
300.00
114
22
Rajan
MK-412655
7G
200.00
200.00
37
Sub Total (7GG)
3120
3120
2099
Grand Total
4844
4844
3715
SL
Buyer
Style/P.O No
01
Eurofrente
02
Eurofrente
03
Rajan
04
G.Gold
05
Item
1307-B Sub Total (5GG)
Production Target Achive
Remarks
7G
Production Target Status SL
Buyer
Style/P.O No
Item
GG
Total Order Qty
Production Target Achive
Remarks
01 02 03 04 05 06
_____________ Prepared By
Total
0.00
0.00
________________________ Production-Co-Ordinator
0
________________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Production Details
Date : 01.04.2005
All Figure In DZ
Month :March'2005 Style/P.O No
Item
GG
Total Order Qty
Production Target Achive
SL
Buyer
01
Bay-City
16-A
5G
566.67
566.67
571.00
02
Eurofrente
08207
5G
118.5
118.5
82.08
03
Eurofrente
08206
5G
219
219
71.58
904.17
904.17
724.67
Remarks
04 05 06 07
Sub Total (5GG)
08
Bay-City
5D-366
7G
960.00
250.00
245.58
09
Bay-City
380-44/49
7G
2917.5
2833.33
2833.00
10
N.Mann
115/149
7G
356.25
183.33
191.50
11
N.Mann
115/827
7G
152.92
152.92
159.67
12
Quelle
7824
7G
66.75
66.75
16.33
13
Rajan
MK-41654
7G
200.00
200.00
74.25
14
G.Gold
17653
7G
418
418
310.58
15
Scope
58417
7G
138
16
Scope
7G
138 5347.42
4104.33
24.42 3875.00
6251.58
5008.50
4599.67
58413 Sub Total (7GG) Grand Total
19.67
Production Target Status SL
Buyer
Style/P.O No
Item
GG
Total Order Qty
Production Target Achive
Remarks
01 02 03 04 05 06
_____________ Prepared By
Total
0.00
0.00
________________________ Production-Co-Ordinator
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Production Details
0
________________ Plant-In-Charge
Date : 02.03.2005
All Figure In DZ
Month :February'2005 SL
Buyer
Style/P.O No
Item
GG
Total Order Qty
Production Target Achive
01
Scope
58423
5G
250
0
7.00
02
G.Union
C-603
5G
300
300
302.33
03
G.Union
C-603/B
5G
125
125
127.83
675
425
437.17
Remarks
04 05 06 07
Sub Total (5GG)
08
Scope
58417
7G
300.00
0.00
2.67
09
Bay-City
5-E
7G
960
960.00
965.92
10
Bay-City
5-D
7G
1600.00
1600.00
1379.83
11
Bay-City
380-44/49
7G
2917.50
0.00
99.33
12
N.Mann
115/149
7G
356.25
356.25
175.75
Sub Total (7GG)
6133.75
2916.25
2623.50
Grand Total
6808.75
3341.25
3060.67
13
7G
14 15 16 17
Reason For Short Fall Production Target Status SL
Buyer
Style/P.O No
Item
GG
Total Order Qty
Production Target Achive
Remarks
01 02 03 04 05 06 07
_____________ Prepared By
Total
0.00
0.00
________________________ Production-Co-Ordinator
0
________________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Production Details All Figure In DZ
Date : 01.12.2004
Month :November'2004 SL
Buyer
Style/P.O No
01
Eurofrenty
08231
Item
GG 5G
Total Order Qty
Production Target Achive
78.5
78.5
42.33
78.5
78.5
42.33
Remarks
02 03 04 05 06 07
Sub Total (5GG)
08
Hong-Song
YS-14214-S
7G
1179
1179
65.58
09
Hong-Song
WS-14212-S
7G
332
332
288.75
10
Sears
CTS5-2298 R
7G
433.33
433.33
353.75
11
Karstadt
K-03
7G
417.00
417.00
371.33
12
N.Mann
115/667
7G
125.00
125.00
129.17
13
N.Mann
115/149
7G
1250.00
1250.00
664.17
Sub Total (7GG)
3736.33
3736.33
1872.75
Grand Total
3814.83
3814.83
1915.08
14 15 16 17
Reason For Short Fall Production Target Status SL
Buyer
Style/P.O No
Item
GG
Total Order Qty
Production Target Achive
01 Eurofrenty
78.50
78.50
42.33
02 HongSong
1511.00
1511.00
354.33
03 Sears
433.33
433.33
353.75
04 Karstadt
417.00
417.00
371.33
05 N.Mann
1375.00
1375.00
793.33
3814.83
3814.83
1915.07
Remarks
06 07
_____________ Prepared By
Total
________________________ Production-Co-Ordinator
________________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Shipment Details Date : 01.09.2008
All Figure In DZ
Month : August' 2008 SL
Buyer
Style/P.O No
GG
Total Order Qty
Shipped Qty
Short/Over Shipped Qty
Ship Date
01
Sears
3517
5G
63
64
1
6-Aug
02
Sears
3517-B
5G
65
65
0
6-Aug
03
G.Gold
9L-432
5G
245
233
-12
7-Aug
04
Sage
0008
5G
394
394
0
9-Aug
05
Sage
0006
5G
890
403
Balance Qty
12-Aug
06
Sears
3540
5G
334
215
Partial
27-Aug
07
Quelle
3835
5G
83
82
-1
28-Aug
08
Sears
1513
5G
375
375
2449
1831
-12
Sub Total (5GG)
30-Aug
09
K-Mart
9L-592/13749
7G
2026
888
Partial
6-Aug
10
K-Mart
9L-592/13749
7G
-
123
Partial
7-Aug
11
G.Gold
9L-708/14279
7G
1400
1370
Partial
26-Aug
12
K-Mart
9L-592/13749
7G
-
42
Partial
21-Aug
13
G.Gold
9L-708/14278
7G
1400
249
Partial
28-Aug
14
G.Gold
9L-708/13807
7G
700
153
Partial
28-Aug
15
Sears
3508
7G
109
105
-4
28-Aug
16
K-Mart
9L-592/13750
7G
586
586
17
Eurofrente
11225
7G
117
50
Partial
Sub Total (7GG)
6338
3566
-4
Grand Total (5+7) GG
8787
5397
-16
______________________ Production-Co-Ordinator
__________________ Finishing-In-Charge
Remarks
20-Aug 14-Aug
________________ Knitting-In-Charge
GLOBAL KNIT-WEAR LTD
______________ Plant-In-Charge
269 DEWAN HAT CHITTAGONG
Shipment Details Date : 01.08.2008
All Figure In DZ
Month : July' 2008 Style/P.O No
GG
Total Order Qty
Shipped Qty
1011CV/ CS-8000
5G
150
150
Li & Fung
RC-45
5G
503
400
Parctial
4-Jul
03
Li & Fung
RC-45
5G
84
-18
6-Jul
04
G.Union
8212/MT-8016
5G
150
150
05
Sage
0008
5G
394
59
Parctial
21-Jul
06
Sears
TSF8-4579
5G
290
297
7
23-Jul
07
Sage
06/NI/NJ/AL
5G
890
247
Parctial
30-Jul
2377
1388
-11
SL
Buyer
01
G.Union
02
Sub Total (5GG)
Short/Over Shipped Qty
Ship Date 3-Jul
G. Union
84004
7G
700
700
09
G. Union
4004/CS-898
7G
700
690
-10
4-Jul
10
Sears
3527
7G
54
54
0
6-Jul
11
Sears
3528
7G
126
42
Blance Qty
6-Jul
12
G. Union
8212
7G
200
200
13
Sears
3527
7G
200
109
14
G.Gold
9L708
7G
3009
209
15
G.Gold
9L 592/ 13749
7G
2026
935
Partial
30-Jul
16
Sears
TSF8-3528
7G
200
203
3
30-Jul
17
Sears
TSF8-3527
7G
90
Blance Qty
31-Jul
18
Sefra
8306
12G
3-Jul Assortment Problem
17-Jul Partial
23-Jul 27-Jul
784
392
Sub Total (7GG)
7999
3623
-7
Grand Total (5+7) GG
10376
5011
-19
__________________ Finishing-In-Charge
Quality & Assort. Problem
17-Jul
08
______________________ Production-Co-Ordinator
Remarks
24-Jul
________________ Knitting-In-Charge
Rcvc From CSL Stitchitn To Export
______________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Shipment Details Date : 01.07.2008
All Figure In DZ
Month : June' 2008 SL
Buyer
Style/P.O No
GG
Total Order Qty
Shipped Qty
Short/Over Shipped Qty
Ship Date
01
Li & Fung
RC-45
5G
665
23
Partial
6-Jan
02
Li & Fung
RC-45
5G
140
Partial
18-Jun
03
G. Union
4000/CS-9659
5G
1000
500
Partial
18-Jun
04
G.Gold
9L446
5G
542
529
-14
18-Jun
05
G. Union
4000/CS-9659
5G
500
Balance Qty
19-Jun
06
Sears
3504
5G
257
255
-2
26-Jun
07
Sears
3517
5G
467
297
Partial
26-Jun
2931
2243
-16
Sub Total (5GG) 08
G.Gold
9L524
7G
283
136
6-Jun
09
Eurofrente
11447
7G
1100
1100
10-Jun
10
G.Gold
4004/CS-898
7G
500
400
22-Jun
11
Sears
3527
7G
166
110
Partial
26-Jun
12
Sears
3528
7G
126
84
Partial
26-Jun
Sub Total (7GG)
2175
1830
0
Grand Total (5+7) GG
5106
4073
-16
______________________ Production-Co-Ordinator
__________________ Finishing-In-Charge
________________ Knitting-In-Charge
Remarks
Quality & Assortment Problem
Quality Problem
Rcvd from CSL For Linking to Poly
Shipped Swt. Complex
______________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Shipment Details Date : 01.06.2008
All Figure In DZ
Month : May' 2008 SL
Buyer
Style/P.O No
GG
Total Order Qty
Shipped Qty
Short/Over Shipped Qty
Ship Date
01
Branex
LM-869
5G
133
133
27-May
02
Branex
LM-870
5G
133
131
27-May
03
Branex
LM-871
5G
133
133
27-May
04
Branex
LM-874
5G
133
134
27-May
533
532
0
4150
2500
Partial
20-May
550
Balance Qty
30-May
2092
2083
-10
31-May
Sub Total (7GG)
6242
5133
-10
Grand Total (5+7) GG
6775
5664
-10
Sub Total (5GG) 05
Eurofrente
11447
7G
06
Eurofrente
11447
7G
07
K-Mart
9L440
7G
______________________ Production-Co-Ordinator
__________________ Finishing-In-Charge
________________ Knitting-In-Charge
Remarks
______________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Shipment Details Date : 03.05.2008
All Figure In DZ
Month : April' 2008 SL
Buyer
Style/P.O No
GG
Total Order Qty
Shipped Qty
Short/Over Shipped Qty
Ship Date
Remarks
7374
5G
269
92
Partial
17-Apr
Ttl Qty 3900 Pcs 3226 Pcs GKL 674 Pcs G.S.G.L-1
500
424
Partial
18-Apr
76
Balance Qty
19-Apr
01
Quelle
02
G.Union
84007/ET-8001
5G
03
G.Union
84007/ET-8001
5G
04
G.Union
1011CV/CS-8000
5G
300
300
05
G.Gold
29L275
5G
300
296
-4
21-Apr
06
Quelle
7374
5G
102
Balance Qty
24-Apr
07
Quelle
3835
5G
355
-2
24-Apr
Emb Problem
08
Quelle
7374
5G
65
-10
30-Apr
Knitting Qty. Can Not done For Yarn Problem
1726
1710
-16
Sub Total (5GG) 09
Quelle
10 11
357
21-Apr
3423
7G
83
83
10-Apr
G.Union
4010/CS-8003/1
7G
1000
1000
13-Apr
G.Union
84016/ET-8037
7G
500
500
18-Apr
Sub Total (7GG)
1583
1583
0
Grand Total (5+7) GG
3309
3293
-16
______________________ Production-Co-Ordinator
__________________ Finishing-In-Charge
________________ Knitting-In-Charge
Quality Problem
______________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Shipment Details Date : 01.04.2008
All Figure In DZ
Month : March' 2008 Style/P.O No
GG
Total Order Qty
Shipped Qty
Short/Over Shipped Qty
Ship Date
G.Union
8400/ET-9659
5G
500
424
Partial
5-Mar
02
G.Union
4000GT/CS-9659
5G
300
300
03
G.Union
8400/ET-9659
5G
0
76
04
G.Union
84006/ET-8000
5G
500
500
10-Mar
05
G.Union
4016/CS-8037
5G
1000
1000
25-Mar
06
N.Mann
500/477
5G
133
135
07
Atlantic
14256
5G
182
183
29-Mar
08
G.Union
3805/CK-8013
5G
300
300
31-Mar
2915
2918
2
SL
Buyer
01
Sub Total (5GG)
10-Mar Balance Qty
2
10-Mar
27-Mar
09
G.Union
84005/ET-6840
7G
500
424
Partial
5-Mar
10
G.Union
4004/CS-898
7G
700
400
Partial
10-Mar
11
G.Union
84004/ET-898
7G
300
200
Partial
10-Mar
12
G.Union
4005GT/CS-6840
7G
300
300
13
G.Union
84005/ET-6840
7G
0
76
Balance Qty
10-Mar
14
G.Union
4004/CS-898
7G
0
300
Balance Qty
10-Mar
15
G.Union
84004/ET-898
7G
0
100
Balance Qty
10-Mar
16
G.Union
4036GT/ CS-8034
7G
300
300
24-Mar
17
G.Union
4036 P/ CS-8034
7G
500
500
25-Mar
18
G.Union
4036 Line CS-8034
7G
200
200
25-Mar
19
Branex
LBW-9060
7G
283
284
1
Sub Total (7GG)
3083
3084
1
Grand Total (5+7) GG
5998
6002
3
______________________ Production-Co-Ordinator
__________________ Finishing-In-Charge
Remarks
10-Mar
31-Mar
________________ Knitting-In-Charge
______________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Shipment Details Date : 01.03.2008
All Figure In DZ
Month : February' 2008 Style/P.O No
GG
Total Order Qty
Shipped Qty
Short/Over Shipped Qty
Ship Date
Atlantic
15684
5G
617
167
Partial
20-Feb
02
G.Union
4006/CS-8000
5G
500
432
Partial
23-Feb
03
Atlantic
15684
5G
450
451
1
24-Feb
04
G.Union
4000/CS9659
5G
700
700
0
25-Feb
05
G.Union
4006/CS-8000
5G
500
68
Balance Qty
26-Feb
06
G.Union
4006/CS-8000
5G
58
35
0
Recvd from Orchid Swt.Knitting & Linking Proces
07
Atlantic
19056
5G
25
13
0
Rcvd From GSGL-1 Knitting
2850
1866
1
SL
Buyer
01
Sub Total (5GG) 08
Branex
LM-861
7G
267
266
0
7-Feb
09
Branex
LM-863
7G
83
82
-1
7-Feb
10
G.Gold
9L-119/2770
7G
750
750
0
9-Feb
11
G.Gold
9L-120/2772
7G
600
600
0
11-Feb
12
Branex
LM-862
7G
167
166
0
14-Feb
13
G.Union
4005/CS-6840
7G
400
400
0
25-Feb
14
Zara
5747/001
12G
48
48
0
15-Feb
Sub Total (7GG)
2315
2313
-1
Grand Total (5+7) GG
5165
4178
0
______________________ Production-Co-Ordinator
__________________ Finishing-In-Charge
________________ Knitting-In-Charge
Remarks
Assortment Problem
______________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Shipment Details Date : 01.02.2008
All Figure In DZ
Month : January' 2008 SL
Buyer
01
N.Mann
Style/P.O No
GG
Total Order Qty
Shipped Qty
Short/Over Shipped Qty
Ship Date
8912
5G
133
134
1
24-Jan
133
134
1
Sub Total (5GG) 07
Quelle
8832
5G
500
515
15
10-Jan
08
Quelle
8824
7G
258
259
1
10-Jan
09
Quelle
8703
7G
333
336
3
24-Jan
10
Zara
5747/521
12G
18
18
0
3-Jan
11
Zara
5747/522
12G
83
83
0
18-Jan
12
Safara
816/8007
12G
182
182
0
28-Jan
Sub Total (7GG)
1375
1393
18
Grand Total (5+7) GG
1508
1527
19
______________________ Production-Co-Ordinator
__________________ Finishing-In-Charge
________________ Knitting-In-Charge
Remarks
______________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Shipment Details Date : 02.12.2007
All Figure In DZ
Month : November' 2007 SL
Buyer
Style/P.O No
GG
Total Order Qty
Shipped Qty
Short/Over Shipped Qty
Ship Date
01
Quelle
3835
5G
275
276
1
22-Nov
01
Eurofrente
10764
5G
143
143
0
29-Nov
02
Eurofrente
10877
5G
208
208
0
29-Nov
626
627
1
Sub Total (5GG) 03
Les. Line
5870
7G
441
441
0
3-Nov
04
Les. Line
5872
7G
483
483
0
13-Nov
05
Les. Line
5868
7G
119
119
0
13-Nov
06
Quelle
8820
7G
542
542
0
22-Nov
07
G.Gold
012630
7G
500
498
-2
29-Nov
08
Cellio
V-Stripe
12G
83
33
Partial
6-Nov
Sub Total (7GG)
2168
2116
-2
Grand Total (5+7) GG
2794
2743
-1
______________________ Production-Co-Ordinator
__________________ Finishing-In-Charge
________________ Knitting-In-Charge
Remarks
______________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Shipment Details Date : 03.10.2007
All Figure In DZ
Month : October' 2007 SL
Buyer
Style/P.O No
GG
Total Order Qty
Shipped Qty
Short Shipped Qty
Ship Date
01
Sfera
0766/8021
5G
161
140
0
20-Oct
01
Sfera
0766/8021
5G
161
21
0
23-Oct
02
N.Mann
017/531
5G
200
200
0
4-Oct
361
221
0
Sub Total (5GG) 03
Quelle
8824
7G
350
357
7
10-Oct
04
Quelle
8703
7G
138
137
-1
10-Oct
05
Quelle
3512
7G
250
251
1
25-Oct
06
Quelle
8703
7G
267
271
4
31-Oct
07
Quelle
3204
7G
142
142
0
31-Oct
08
Les. Line
18902
7G
407
407
0
11-Oct
09
G.Union
7603
7G
334
334
0
31-Oct
Sub Total (7GG)
1888
1899
11
Grand Total (5+7) GG
2249
2120
11
______________________ Production-Co-Ordinator
__________________ Finishing-In-Charge
________________ Knitting-In-Charge
Remarks
______________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Shipment Details Date : 02.10.2007
All Figure In DZ
Month : September' 2007 SL
Buyer
01
G. Gold
02
Quelle
Style/P.O No
GG
Total Order Qty
Shipped Qty
Short Shipped Qty
Ship Date
19H987
5G
258
176
Partial
2-Aug
3835
5G
150
146
-4
26-Sep
408
322
-4
Sub Total (5GG) 03
Quelle
8821
7G
1200
68
Prtial
6-Sep
04
Seras
3549
7G
250
125
Partial
7-Sep
05
Zara
5747/296
7G
206
46
Nill
1-Sep
06
Zara
5747/296
7G
160
27
Partial
7-Sep
07
Zara
5747/296
7G
160
133
08
Quelle
8821
7G
373
381
0
13-Sep
09
Quelle
8703
7G
192
196
0
13-Sep
10
Quelle
3885
7G
67
67
11
Quelle
8824
7G
583
567
-16
14-Sep
12
Quelle
8711
7G
342
329
-13
26-Sep
13
Quelle
8711
7G
133
134
0
26-Sep
14
Quelle
3885
7G
133
131
-2
26-Sep
3799
2204
-31
Sub Total (7GG)
Remarks
1752
12-Sep
13-Sep
15
Zara
5747/260
7G
954
236
Partial
20-Sep
Rcvd. From Dhaka
16
Zara
5747/260
7G
954
233
Partial
23-Sep
Rcvd. From Dhaka
17
Zara
5747/260
7G
954
321
Partial
23-Sep
Rcvd. From Dhaka
Sub Total (12GG)
2862
790
0
Grand Total (5+7+12) GG
7069
3316
-35
______________________ Production-Co-Ordinator
__________________ Finishing-In-Charge
________________ Knitting-In-Charge
______________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Shipment Details Date : 01.09.2007
All Figure In DZ
Month : August' 2007
SL
Buyer
Style/P.O No
GG
Total Order Qty
Shipped Qty
Short Shipped Qty
Ship Date
01
G.Gold
19H542
5G
459
461
02
G.Gold
19H542/12228
5G
696
657
Partial
19-Aug
03
G.Gold
19H542/12228
5G
696
39
Partial
27-Aug
1851
1157
0
Sub Total (5GG) 12
Les.Line
14
12-Aug
47902W
7G
639
626
-13
13-Aug
Sears
3547
7G
333
335
0
16-Aug
15
Zara
5747/246 36362
7G
375
375
0
18-Aug
16
Zara
5747/246 36361
7G
458
458
0
18-Aug
Sub Total (7GG)
1805
1794
-13
Grand Total (5+7) GG
3656
2951
-13
Remarks
______________________ Production-Co-Ordinator
__________________ Finishing-In-Charge
________________ Knitting-In-Charge
______________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Shipment Details Date : 05.08.2007
All Figure In DZ
Month : July' 2007 SL
Buyer
Style/P.O No
GG
Total Order Qty
Shipped Qty
Short Shipped Qty
Ship Date
1537
5G
292
292
0
4-Jul
01
Sears
02
N.Mann
138/751
5G
42
42
0
6-Jul
03
N.Mann
327/052
5G
42
43
0
6-Jul
04
Tiara
4H215/28875
5G
162
162
0
8-Jul
05
Tiara
4H215/28803
5G
338
338
0
8-Jul
06
Quelle
3835
5G
200
192
8
13-Jul
07
Sears
1504
5G
167
165
2
18-Jul
08
Sears
1513
5G
233
231
2
18-Jul
09
K-Mart
9H049/12186
5G
1564
780
Partial
22-Jul
10
K-Mart
9H049/12186
5G
1564
784
Partial
29-Jul
11
Sears
1500
5G
50
50
0
29-Jul
12
Sears
1537
5G
83
84
0
29-Jul
4736
3162
12
Sub Total (5GG) 12
Quelle
8820
7G
879
872
7
6-Jul
14
Sears
1535
7G
167
167
0
8-Jul
15
Sears
3543
7G
309
309
0
11-Jul
16
Sears
3544
7G
317
318
0
12-Jul
17
Quelle
8820
7G
510
496
14
12-Jul
18
Quelle
8820
7G
283
293
0
27-Jul
19
Quelle
3885
7G
333
330
3
27-Jul
20
Quelle
8703
7G
225
231
0
27-Jul
Remarks
Sub Total (7GG)
3024
3016
24
108
108
0
Sub Total (12GG)
108
108
0
Grand Total (5+7+12) GG
7868
6286
36
21
Eurofrente
10610
______________________ Production-Co-Ordinator
12G
__________________ Finishing-In-Charge
31-Jul
________________ Knitting-In-Charge
______________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Shipment Details Date : 01.07.2007
All Figure In DZ
Month : June'2007 Style/P.O No
GG
Total Order Qty
Shipped Qty
Short Shipped Qty
Ship Date
8480
5G
1000
1000
0
12-Jun
Tiara
4H215/28813
5G
408
408
0
23-Jun
Tiara
4H215/28802
5G
100
100
0
23-Jun
1508
1508
0
SL
Buyer
01
G.Union
02 03
Sub Total (5GG) 04
G.Union
1603
7G
300
300
0
2-Jun
05
Sears
3542
7G
123
124
0
12-Jun
06
Sears
3544
7G
214
215
0
12-Jun
07
Quelle
2479
7G
142
145
0
14-Jun
08
Quelle
3204
7G
667
661
7
14-Jun
09
Quelle
8820
7G
2500
1621
Partial
28-Jun
10
Quelle
3885
7G
133
134
0
28-Jun
Sub Total (7GG)
4079
3200
7
Grand Total
5587
4708
7
Remarks
Shipment Target Status SL 01 02
Buyer
Style/P.O No
GG
Total Order Qty
Shipment Target Actual Revised
Remarks
03 04 05 Total
______________________ Production-Co-Ordinator
__________________ Finishing-In-Charge
________________ Knitting-In-Charge
______________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Shipment Details Date : 01.06.2007
All Figure In DZ
Month : May'2007 Style/P.O No
GG
Total Order Qty
Shipped Qty
Short Shipped Qty
Ship Date
N.Mann
138/751
5G
42
42
0
9-May
02
N.Mann
327/052
5G
42
42
0
9-May
03
Sears
VLF7-1500
5G
188
188
0
15-May
04
Quelle
3212
5G
333
329
4
29-May
05
Sears
VLF7-1500
5G
50
50
0
31-May
655
651
4
SL
Buyer
01
Sub Total (5GG) 06
Tiara
4H216/28658
7G
500
500
0
7-May
07
Quelle
2479
7G
141
142
0
9-May
08
Eurofrente
10394
7G
800
800
0
22-May
09
Tiara
4H216/28659
7G
500
498
2
21-May
10
Eurofrente
10394
7G
423
423
0
31-May
Sub Total (7GG)
2364
2363
0
Grand Total
3019
3014
4
Remarks
504
Quality Problem
Quality Problem
Shipment Target Status SL 01 02
Buyer
Style/P.O No
GG
Total Order Qty
Shipment Target Actual Revised
Remarks
03 04 05 Total
______________________ Production-Co-Ordinator
__________________ Finishing-In-Charge
________________ Knitting-In-Charge
______________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Shipment Details Date : 01.05.2007
All Figure In DZ
Month : April'2007 Style/P.O No
GG
Total Order Qty
Shipped Qty
N.Mann
138/751
5G
83
83
5-Apr
02
N.Mann
327/052
5G
83
83
5-Apr
03
Quelle
3733
5G
333
333
12-Apr
04
Quelle
3835
5G
208
202
6
12-Apr
05
Quelle
3915
5G
133
134
0
18-Apr
03
G.Union
17200
5G
500
500
22-Apr
04
Sears
VLF7-1500
5G
568
569
28-Apr
1908
1904
SL
Buyer
01
Sub Total (5GG)
Short Shipped Qty
Ship Date
Remarks
Embd. Problem
6
06
G.Union
7613
7G
500
500
9-Apr
07
G.Union
1603
7G
300
300
9-Apr
07
G.Union
1604
7G
300
300
22-Apr
08
Quelle
3885
7G
333
331
09
Quelle
8711
7G
367
369
Sub Total (7GG)
1800
1800
2
Grand Total
3708
3704
8
2
12-Apr
Print Problem
27-Apr
Shipment Target Status SL
Buyer
Style/P.O No
GG
Total
Shipment Target
Remarks
SL
Buyer
Style/P.O No
GG
Order Qty
Actual
Remarks
Revised
01 02 03 04 05 Total
______________________ Production-Co-Ordinator
__________________ Finishing-In-Charge
________________ Knitting-In-Charge
______________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Shipment Details Date : 01.04.2007
All Figure In DZ
Month : March'2007 Style/P.O No
GG
Total Order Qty
Shipped Qty
Short Shipped Qty
Ship Date
G.Union
7609
5G
1000
1000
0
1-Mar
02
G.Union
7615
5G
700
168
Partial
11-Mar
03
G.Union
7600
5G
1000
168
Partial
11-Mar
04
G.Union
7600
5G
832
832
Partial
16-Mar
05
G.Union
17201
5G
500
500
0
31-Mar
4032
2668
0
SL
Buyer
01
Sub Total (5GG) 06
G.Union
7606
7G
700
168
Partial
11-Mar
07
G.Union
7603
7G
700
168
Partial
13-Mar
08
G.Union
7606
7G
532
532
0
16-Mar
09
G.Union
7603
7G
532
532
0
29-Mar
10
G.Union
1613
7G
300
300
0
29-Mar
Sub Total (7GG)
2764
1700
0
Grand Total
6796
4368
0
Remarks
Shipment Target Status SL 01
Buyer
Style/P.O No
GG
Total Order Qty
Shipment Target Actual Revised
Remarks
02 03 04 05 06 07 08 Total
____________ Prepared By
________________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Shipment Details Date : 01.04.2007
All Figure In DZ
Month : March' 2007 SL
Buyer
Style/P.O No
GG
Total Order Qty
Shipped Qty
01
N.Mann
550/477
5G
100
103
02
G.Union
7615
5G
700
532
Partial
800
635
0
Sub Total (5GG)
Short Shipped Qty
Ship Date
Remarks
1-Feb 28-Feb
03
Quelle
8706
7G
833
818
-15
1-Feb
Due To Printing Problem
04
Quelle
8711
7G
525
502
-23
22-Feb
Due To Yarn Dying Problem
05
Quelle
8706
7G
150
151
0
22-Feb
06
G.Union
7604
7G
700
700
0
21-Feb
07
G.Union
7605
7G
1000
1000
0
21-Feb
Sub Total (7GG)
3208
3171
-38
Grand Total
4008
3806
-38
Shipment Target Status SL 01 02 03 04
Buyer
Style/P.O No
GG
Total Order Qty
Shipment Target Actual Revised
Remarks
05 06 07 08 Total
____________ Prepared By
________________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Shipment Details Date : 01.03.2007
All Figure In DZ
Month : February' 2007 SL
Buyer
Style/P.O No
GG
Total Order Qty
Shipped Qty
01
N.Mann
550/477
5G
100
103
02
G.Union
7615
5G
700
532
Partial
800
635
0
Sub Total (5GG)
Short Shipped Qty
Ship Date
Remarks
1-Feb 28-Feb
03
Quelle
8706
7G
833
818
-15
1-Feb
Due To Printing Problem
04
Quelle
8711
7G
525
502
-23
22-Feb
Due To Yarn Dying Problem
05
Quelle
8706
7G
150
151
0
22-Feb
06
G.Union
7604
7G
700
700
0
21-Feb
07
G.Union
7605
7G
1000
1000
0
21-Feb
Sub Total (7GG)
3208
3171
-38
Grand Total
4008
3806
-38
Shipment Target Status SL 01 02 03 04
Buyer
Style/P.O No
GG
Total Order Qty
Shipment Target Actual Revised
Remarks
05 06 07 08 Total
____________ Prepared By
________________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Shipment Details Date : 01.02.2007
All Figure In DZ
Month : January' 2007 SL
Buyer
Style/P.O No
GG
Total Order Qty
Shipped Qty
Short Shipped Qty
Ship Date
01
Quelle
3212
5G
333
328
-5
11-Jan
02
Quelle
7692
5G
333
322
-11
18-Jan
03
Quelle
3812
5G
100
100
0
25-Jan
766
750
-16
Sub Total (5GG) 05
Quelle
3252
7G
267
265
-2
11-Jan
06
Quelle
7452
7G
133
134
0
25-Jan
Sub Total (7GG)
400
399
-2
Grand Total
1166
1149
-18
07
7G
08
7G
09
7G
Remarks
Shipment Target Status SL 01 02 03 04
Buyer
Style/P.O No
GG
Total Order Qty
Shipment Target Actual Revised
Remarks
05 06 07 08 Total
____________ Prepared By
________________________ Production-Co-Ordinator
________________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Shipment Details Date : 06.01.2007
All Figure In DZ
Month : December' 2006 SL
Buyer
Style/P.O No
GG
Total Order Qty
Shipped Qty
Short Shipped Qty
Ship Date
01
N.Mann
550/477
5G
100
101
0
20-Dec
100
101
0
02
5G
03
5G
04
5G
05
5G Sub Total (5GG)
Remarks
05
Quelle
8703
7G
212
202
11
6-Dec
Quality Problem
06
Quelle
8711
7G
833
781
52
28-Dec
Due To Over Weight
Sub Total (7GG)
1045
983
63
Grand Total
1145
1084
63
07
7G
08
7G
09
7G
10
7G
11
7G
12
7G
Shipment Target Status SL
Buyer
Style/P.O No
GG
Total
Shipment Target
Remarks
SL
Buyer
Style/P.O No
GG
Order Qty
Actual
Remarks
Revised
01 02 03 Total
____________ Prepared By
________________________ Production-Co-Ordinator
________________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Shipment Details Date : 02.12.2006
All Figure In DZ
Month : November' 2006 SL
Buyer
Style/P.O No
GG
Total Order Qty
Shipped Qty
Short Shipped Qty
Ship Date
01
N.Mann
550/477
5G
83
83
0
9-Nov
02
Eurofrente
09769
5G
487
487
0
16-Nov
03
Eurofrente
09770
5G
150
150
0
16-Nov
04
Eurofrente
09750
5G
521
513
8
18-Nov
05
Quelle
3795
5G
125
75
Partial
30-Nov
1366
1308
8
Sub Total (5GG) 05
Quelle
7392
7G
210
190
20
2-Nov
06
Quelle
7452
7G
175
165
Partial
9-Nov
07
Quelle
3955
7G
183
83
100
9-Nov
08
Quelle
3792
7G
58
59
0
9-Nov
09
Quelle
7452
7G
275
246
29
23-Nov
10
Quelle
7392
7G
58
62
0
23-Nov
11
Quelle
8703
7G
2083
1871
Partial
30-Nov
12
Leasure Line
17908
7G
63
23
Partial
5-Nov
3105
2699
149
102
7
Partial
Sub Total (7GG)
102
7
Grand Total
4573
4014
Sub Total (12GG) 15
Zara
5747/260
12G
157
9-Nov
Remarks
100 DZ Stock Lot
Rcvd. From Savar Swtr.
Shipment Target Status SL
Buyer
Style/P.O No
GG
Total Order Qty
Shipment Target Actual Revised
Remarks
01 02 03 Total
____________ Prepared By
________________________ Production-Co-Ordinator
________________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Shipment Details Date : 01.11.2006
All Figure In DZ
Month : October' 2006 SL
Buyer
Style/P.O No
GG
Total Order Qty
Shipped Qty
Short Shipped Qty
01
G.Gold
1D159
3G
42
13
Partial
21-Oct Rcvd From SAVAR Swtr.
42
13
Sub Total (1.5GG)
Ship Date
02
G.Gold
1D158/10251
5G
546
216
Partial
2-Oct
03
G.Gold
1D158/10251
5G
268
200
Partial
10-Oct
04
G.Gold
1D158/10251
5G
130
36
Partial
11-Oct
05
G.Gold
1D158/10249
5G
100
98
2
11-Oct
1044
550
2
Sub Total (5GG)
Remarks
Assortment Problem
06
Sears
VSL7-1500
7G
200
200
0
1-Oct
07
Sears
TSF6-3534
7G
124
123
1
12-Oct
08
Quelle
3732
7G
367
132
Partial
5-Oct
09
Quelle
3905
7G
200
73
Partial
5-Oct
10
Quelle
3732
7G
234
100
Partial
6-Oct
11
Quelle
3905
7G
127
29
Partial
6-Oct
12
Quelle
7294
7G
208
74
Partial
6-Oct
13
Quelle
8609
7G
433
124
Partial
12-Oct
14
Quelle
3732
7G
134
122
13
12-Oct
Printing Problem
15
Quelle
3905
7G
98
87
11
12-Oct
Quality Problem
16
Quelle
3792
7G
408
129
Partial
12-Oct
17
Quelle
7294
7G
134
119
15
13-Oct Quality & Printing Problem
18
Quelle
8609
7G
309
303
6
19-Oct
Yarn Shading Problem
19
Quelle
3792
7G
344
345
19-Oct
20
Quelle
7392
7G
250
40
Partial
21-Oct
21
Leasure Line
17908
7G
185
34
Partial
20-Oct Rcvd From SAVAR Swtr.
22
Leasure Line
17908
7G
185
17
Partial
21-Oct Rcvd From SAVAR Swtr.
Sub Total (7GG)
3940
2051
46
Grand Total
5026
2614
48
Shipment Target Status SL
Buyer
Style/P.O No
GG
Total Order Qty
Shipment Target Actual Revised
Remarks
01 02 Total
____________ Prepared By
________________________ Production-Co-Ordinator
________________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Shipment Details Date : 03.10.2006
All Figure In DZ
Month : September' 2006 SL
Buyer
Style/P.O No
GG
Total Order Qty
Shipped Qty
Short Shipped Qty
Ship Date
Remarks
01
Zara
5747/703
1.5G
409
134
0
19-Sep
Savar Sweater
02
Zara
5747/703
1.5G
132
46
Partial
25-Sep
Savar Sweater
541
180
Sub Total (1.5GG) 03
G.Gold
21D050CT/10074
5G
330
330
0
5-Sep
04
G.Gold
21D050CT/10075
5G
220
220
0
5-Sep
05
Rajan
MK-413609
5G
400
400
0
6-Sep
06
Rajan
MK-413612
5G
400
400
0
6-Sep
07
Rajan
MK-413608
5G
300
300
0
6-Sep
08
Sears
TSF6-3540
5G
200
201
0
11-Sep
09
Sears
TSF6-3542
5G
217
216
1
13-Sep
10
Bay-City
303696/30
5G
161
56
Partial
18-Sep
11
G.Gold
1D158/010251
5G
1380
834
Partial
30-Sep
3608
2957
1
Sub Total (5GG) 12
Quelle
3575
7G
150
147
3
8-Sep
13
Quelle
8602
7G
233
46
Partial
8-Sep
14
Rajan
LK-41CROP
7G
300
104
Partial
11-Sep
15
Quelle
8602
7G
187
181
6
15-Sep
Savar Sweater
Savar Sweater
16
Quelle
8609
7G
408
274
Partial
15-Sep
17
Quelle
8609
7G
135
130
5
21-Sep
16
Quelle
8602
7G
208
213
0
28-Sep
17
Sears
3534
7G
157
158
0
28-Sep
Sub Total (7GG)
1778
1253
14
Grand Total
5927
4390
15
Shipment Target Status SL
Buyer
Style/P.O No
GG
Total Order Qty
Shipment Target Actual Revised
Remarks
01 02 Total
____________ Prepared By
________________________ Production-Co-Ordinator
________________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Shipment Details Date : 01.08.2006
All Figure In DZ
Month : July' 2006 SL
Buyer
Style/P.O No
GG
Total Order Qty
Shipped Qty
01
Tiara
4D-769
3G
400
160
400
160
Sub Total (3GG)
Short Shipped Qty
Ship Date
Remarks
3-Jul
OSL
02
Quelle
8614
5G
1008
540
Partial
7-Jul
03
Quelle
8614
5G
1680
469
Partial
13-Jul
04
Quelle
3795
5G
125
89
Partial
13-Jul
05
Quelle
3795
5G
36
37
0
20-Jul
06
Quelle
3595
5G
167
157
10
20-Jul
07
Quelle
8614
5G
1213
612
Partial
21-Jul
08
Quelle
8614
5G
600
589
11
28-Jul
09
Sears
60252-C
5G
432
415
17
16-Jul
5261
2908
38
Sub Total (5GG) 10
M.Hidary
FGB06821
7G
42
17
0
3-Jul
11
Sears
3534
7G
667
667
0
10-Jul
12
Sears
3536
7G
417
228
Partial
16-Jul
13
Sears
1502
7G
237
234
3
26-Jul
14
Sears
1504
7G
399
172
Partial
27-Jul
15
Quelle
8602
7G
152
124
Partial
13-Jul
OSL
16
Quelle
8602
7G
293
142
Partial
7-Jul
17
Quelle
3094
7G
500
112
Partial
21-Jul
18
Quelle
3094
7G
388
271
Partial
28-Jul
19
Quelle
3142
7G
67
66
1
20-Jul
20
Wehmeyer
WR-08
7G
200
135
Partial
13-Jul
21
Wehmeyer
WR-08
7G
65
63
2
20-Jul
22
N.Mann
017/477
7G
146
83
Partial
28-Jul
Sub Total (7GG)
3573
2314
6
Grand Total
9234
5382
44
Shipment Target Status SL
Buyer
Style/P.O No
GG
Total Order Qty
Shipment Target Actual Revised
Remarks
01 02 03 Total
____________ Prepared By
________________________ Production-Co-Ordinator
________________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Shipment Details Date : 01.07.2006
All Figure In DZ
Month : June' 2006 SL
Buyer
Style/P.O No
GG
Total Order Qty
Shipped Qty
Short Shipped Qty
Ship Date
01
Quelle
8614
5G
1675
1253
Partial
1-Jun
02
Eurofrente
09181
5G
186
186
0
9-Jun
03
Eurofrente
09182
5G
113
107
6
9-Jun
04
Quelle
8614
5G
422
418
4
9-Jun
05
Quelle
3023
5G
150
142
8
15-Jun
06
Quelle
3033
5G
150
140
10
15-Jun
07
Quelle
7214
5G
150
141
9
15-Jun
08
Sears
60252-C
5G
432
416
16
18-Jun
09
Quelle
8614
5G
2021
337
Partial
22-Jun
10
Quelle
3795
5G
175
165
10
22-Jun
11
Quelle
8614
5G
2021
676
Partial
29-Jun
7495
3981
63
Sub Total (5GG) 01
Quelle
2667
7G
267
40
Partial
1-Jun
02
Sears
3533
7G
500
492
8
8-Jun
Remarks
03
N.Mann
017/531
7G
271
263
7
9-Jun
04
N.Mann
017/477
7G
146
140
6
9-Jun
05
Sears
1500
7G
35
35
0
12-Jun
06
Sears
3531
7G
625
619
6
15-Jun
07
Sears
3534
7G
237
232
5
18-Jun
08
Sears
3532
7G
334
332
1
22-Jun
09
Quelle
3732
7G
167
155
12
22-Jun
10
Eurofrente
09447
7G
460
460
0
26-Jun
11
Quelle
8602
7G
658
365
Partial
29-Jun
Sub Total (7GG)
3700
3133
45
Grand Total
11195
7114
108
3252
Shipment Target Status SL
Buyer
Style/P.O No
GG
Total Order Qty
Shipment Target Actual Revised
Remarks
01 02 03 Total
____________ Prepared By
________________________ Production-Co-Ordinator
________________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Shipment Details Date : 02.06.2006
All Figure In DZ
Month : May' 2006 SL
Buyer
Style/P.O No
GG
Total Order Qty
Shipped Qty
Short Shipped Qty
Ship Date
01
Scope
13463
5G
40
40
0
2-May
02
N.Mann
550/477
5G
67
67
0
4-May
03
G.Union
S-372
5G
100
98
2
7-May
04
G.Union
S-373
5G
100
100
0
7-May
05
Rajan
MK-413315
5G
300
294
6
8-May
06
Sears
1500
5G
666
670
0
17-May
07
N.Mann
550/477
5G
75
76
0
25-May
1348
1345
8
Sub Total (5GG) 01
Quelle
2627
7G
200
200
0
10-May
02
Quelle
2611
7G
200
202
0
10-May
03
Quelle
3295
7G
183
179
4
11-May
04
Quelle
2620
7G
233
231
2
11-May
Remarks
05
Quelle
3792
7G
166
166
0
17-May
06
Quelle
2619
7G
233
229
4
17-May
07
Quelle
8602
7G
325
324
1
17-May
08
Quelle
2615
7G
292
289
3
19-May
09
Quelle
2667
7G
267
230
Partial
25-May
10
Quelle
2479
7G
200
202
0
25-May
11
Quelle
2670
7G
333
337
0
25-May
12
Eurofrente
09447
7G
900
500
Partial
27-May
13
G.Union
CS-3029
7G
350
350
0
31-May
14
G.Union
ET-6030
7G
104
104
Partial
31-May
Sub Total (7GG)
3986
3543
14
Grand Total
5334
4888
22
Shipment Target Status SL
Buyer
Style/P.O No
GG
Total Order Qty
Shipment Target Actual Revised
Remarks
01 02 03 04 05 Total
____________ Prepared By
________________________ Production-Co-Ordinator
________________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Shipment Details Date : 02.05.2006
All Figure In DZ
Month : April' 2006 SL
Buyer
Style/P.O No
GG
Total Order Qty
Shipped Qty
Short Shipped Qty
Ship Date
01
Quelle
7214
5G
150
147
3
27-Apr
02
Quelle
3033
5G
150
150
0
27-Apr
03
Quelle
3023
5G
150
151
0
27-Apr
04
Scope
13463
5G
200
201
0
30-Apr
05
Scope
13465
5G
200
200
0
30-Apr
850
849
3
Sub Total (5GG) 01
G.Union
8497
7G
188
188
0
3-Apr
02
G.Union
L-444
7G
300
299
1
10-Apr
Remarks
03
Quelle
3732
7G
133
134
0
19-Apr
04
Quelle
3792
7G
167
167
0
27-Apr
05
Quelle
3792(B)
7G
342
339
3
27-Apr
Sub Total (7GG)
1130
1127
4
Grand Total
1980
1976
7
Shipment Target Status SL
Buyer
Style/P.O No
GG
Total Order Qty
Shipment Target Actual Revised
Remarks
01 02 03 04 05 Total
____________ Prepared By
________________________ Production-Co-Ordinator
________________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Shipment Details Date : 02.04.2006
All Figure In DZ
Month : March' 2006 SL
Buyer
Style/P.O No
GG
Total Order Qty
Shipped Qty
Short Shipped Qty
Ship Date
01
Zara
5747/541
7G
201
201
0
7-Mar
02
Zara
5747/541
7G
100
100
0
9-Mar
03
Zara
5747/541
7G
241
241
0
16-Mar
542
542
0
Sub Total (5GG)
Remarks
01
N.Mann
429/546
7G
308
311
0
2-Mar
02
Eurofrente
08997
7G
50
50
0
2-Mar
03
Quelle
3732
7G
192
192
0
16-Mar
04
Quelle
8602
7G
700
701
0
29-Mar
Sub Total (7GG)
1250
1254
0
Grand Total
1792
1796
0
Shipment Target Status SL
Buyer
Style/P.O No
GG
Total Order Qty
Shipment Target Actual Revised
Remarks
01 02 03 04 05 Total
____________ Prepared By
________________________ Production-Co-Ordinator
________________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Shipment Details Date : 01.03.2006
All Figure In DZ
Month : February' 2006 SL
Buyer
Style/P.O No
GG
01
5G
02
5G
Total Order Qty
Shipped Qty
Short Shipped Qty
Ship Date
Remarks
Sub Total (5GG)
0
0
0
01
Quelle
8609
7G
900
852
48
3-Feb Yarn & Shading Problem
02
Quelle
7382
7G
100
93
7
8-Feb
03
Quelle
3732
7G
67
67
0
8-Feb
04
Quelle
8609
7G
708
709
1
17-Feb
05
Eurofrente
08997
7G
90
40
Partial
25-Feb
Sub Total (7GG)
1865
1761
56
Grand Total
1865
1761
56
Printing Problem
Shipment Target Status SL
Buyer
Style/P.O No
GG
Total Order Qty
Shipment Target Actual Revised
Remarks
01 02 03 04 05 Total
____________ Prepared By
________________________ Production-Co-Ordinator
________________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Shipment Details Date : 01.02.2006
All Figure In DZ
Month : January' 2006 SL
Buyer
Style/P.O No
GG
Total Order Qty
Shipped Qty
Short Shipped Qty
Ship Date
01
Zara
5747/504
5G
321
316
5
9-Jan
02
5G
Remarks
Sub Total (5GG)
321
316
5
05
Quelle
8603(B)
7G
650
636
14
5-Jan
Shading Problem
06
Quelle
7382
7G
100
99
1
5-Jan
Assortment Problem
07
Quelle
3732
7G
67
67
0
5-Jan
08
Quelle
8609
7G
600
600
0
25-Jan
Sub Total (7GG)
1417
1402
15
Grand Total
1738
1718
20
Shipment Target Status SL
Buyer
Style/P.O No
GG
Total Order Qty
Shipment Target Actual Revised
Remarks
01 02 03 04 05 Total
____________ Prepared By
________________________ Production-Co-Ordinator
________________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Shipment Details Date : 01.12.2005
All Figure In DZ
Month : December' 2005 SL
Buyer
Style/P.O No
GG
Total Order Qty
Shipped Qty
Short Shipped Qty
Ship Date
01
Zara
574/600
5G
596
596
0
1-Dec
02
Putteman
RH3335TG
5G
100
100
0
12-Dec
Remarks
Sub Total (5GG)
696
696
0
05
Sears
2486
7G
406
406
0
1-Dec
06
N.Mann
317/349
7G
708
700
8
8-Dec
07
Quelle
8602
7G
833
844
0
15-Dec
08
Quelle
8603
7G
1250
1250
0
29-Dec
Sub Total (7GG)
3197
3200
8
Grand Total
3893
3896
8
Shipment Target Status SL
Buyer
Style/P.O No
GG
Total Order Qty
Shipment Target Actual Revised
Remarks
01 02 03 04 05 Total
____________ Prepared By
________________________ Production-Co-Ordinator
________________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Shipment Details Date : 01.12.2005
All Figure In DZ
Month : November ' 2005 SL
Buyer
Style/P.O No
GG
Total Order Qty
Shipped Qty
Short Shipped Qty
Ship Date
01
Eurofrente
9029
5G
16
16
0
7-Nov
02
5G
Remarks
03
5G
04
5G
05
5G
06
5G
Sub Total (5GG)
16
16
0
05
Quelle
8602
7G
1333
1333
0
2-Nov
06
Bay-City
451
7G
1800
830
Partial
15-Nov
07
Bay-City
451
7G
1800
75
Partial
16-Nov
08
Bay-City
451
7G
1800
395
Partial
17-Nov
09
Bay-City
451
7G
1800
265
Partial
18-Nov
10
Quelle
8602
7G
1000
993
7
24-Nov
11
Bay-City
451
7G
35
35
12
Sears
07MCS6-2472
7G
267
267
0
Sub Total (7GG)
9835
4193
7
Grand Total
9851
4209
7
13
26-Nov 27-Nov
7G
Shipment Target Status SL
Buyer
Style/P.O No
GG
Total Order Qty
Shipment Target Actual Revised
Remarks
01 02 03 04 05 Total
____________ Prepared By
________________________ Production-Co-Ordinator
________________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Shipment Details Date : 01.11.2005
All Figure In DZ
Month : October ' 2005 SL
Buyer
Style/P.O No
GG
Total Order Qty
Shipped Qty
Short Shipped Qty
Ship Date
01
Sears
1539
5G
153
155
0
10-Oct
02
Sears
1538
5G
112
113
0
10-Oct
Remarks
03
Sears
1537
5G
99
99
0
10-Oct
04
Sears
1536
5G
137
137
0
10-Oct
05
Eurofrente
09209
5G
140
140
0
23-Oct
06
Eurofrente
08206
5G
360
360
0
23-Oct
1001
1004
0
Sub Total (5GG) 05
Bay-City
452
7G
1625
1625
0
1-Oct
06
Wal Mart
9106
7G
333
33
0
10-Oct
07
Wal Mart
9106
7G
333
100
0
10-Oct
08
Bay-City
449
7G
758
758
0
17-Oct
Sub Total (7GG)
3049
2516
0
Grand Total
4050
3520
0
09
7G
10
7G
11
7G
12
7G
13
7G
Shipment Target Status SL
Buyer
Style/P.O No
GG
Total Order Qty
Shipment Target Actual Revised
Remarks
01 02 03 04 05 Total
____________ Prepared By
________________________ Production-Co-Ordinator
________________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Shipment Details Date : 01.10.2005
All Figure In DZ
Month : September' 2005 SL
Buyer
Style/P.O No
GG
Total Order Qty
Shipped Qty
Short Shipped Qty
Ship Date
Remarks
01
Sears
1516
5G
194
193
1
1-Sep
Process Loss
02
Sears
1514
5G
382
382
0
1-Sep
03
G.Gold
7358
5G
300
300
0
6-Sep
04
Bay-City
452
5G
1625
0
0
29-Sep
2501
875
1
Sub Total (5GG) 05
Quelle
7610(B)
7G
917
860
Partial
1-Sep
06
Quelle
7610
7G
57
57
0
8-Sep
07
Quelle
7610
7G
63
63
0
8-Sep
08
Quelle
7610
7G
250
251
0
8-Sep
09
Rajan
W515043
7G
268
266
2
22-Sep
Process Loss
10
Rajan
W515029
7G
216
212
4
22-Sep
Process Loss
11
Rajan
W515028
7G
133
129
4
22-Sep
Process Loss
12
Rajan
W515078-L
7G
13
12
1
22-Sep
Process Loss
13
Quelle
3575
7G
133
64
Partial
22-Sep
2050
1914
11
42
0
Sub Total (7GG) 17
Zara
5747/800
1.5G
10-Sep
18
Sub Total (1.5G)
0
42
0
Grand Total
4551
2831
12
19 20
Shipment Target Status SL
Buyer
Style/P.O No
GG
Total Order Qty
Shipment Target Actual Revised
Remarks
01 02 03 04 05 Total
____________ Prepared By
________________________ Production-Co-Ordinator
________________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Shipment Details Date : 02.08.2005
All Figure In DZ
Month : August' 2005 SL
Buyer
Style/P.O No
GG
Total Order Qty
Shipped Qty
01
Sears
3515
5G
750
752
02
Rajan
MK-412651
5G
200
190
Short Shipped Qty
Ship Date
Remarks
1-Aug 10
9-Aug
Process Loss
03
Sears
3534
5G
517
518
04
Sears
1516
5G
362
167
Partial
1829
1627
10
Sub Total (5GG) 05
G.Gold
27750
7G
50
18
06
Rajan
MK-412655
7G
200
198
07
Rajan
MK-412960
7G
250
08
Rajan
W-515048
7G
09
Rajan
W-515043
10
Quelle
11
29-Aug 29-Aug
2-Aug
GSGL-1
2
6-Aug
Process Loss
248
2
6-Aug
Process Loss
200
194
6
11-Aug
Process Loss
7G
222
218
4
11-Aug
Process Loss
7824
7G
67
66
1
11-Aug
Process Loss
Zara
5747/830
7G
271
248
23
11-Aug
Assortment Problem
12
Zara
5747/830
7G
271
4
13-Aug
Shiped From Orchid
13
Rajan
MK-516086
7G
226
223
17-Aug
Process Loss
14
Rajan
MK-516076
7G
66
66
17-Aug
15
Sears
TSF5-3530
7G
500
504
21-Aug
16
Quelle
7610
7G
1000
1003
25-Aug
Sub Total (7GG)
3323
2990
41
Grand Total
5152
4617
51
3
17 18
7G
19
7G
20
7G
Shipment Target Status SL
Buyer
Style/P.O No
GG
Total Order Qty
Shipment Target Actual Revised
Remarks
01 02 03 04 05 Total
____________ Prepared By
________________________ Production-Co-Ordinator
________________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Shipment Details Date : 02.08.2005
All Figure In DZ
Month : July' 2005
SL
Buyer
Style/P.O No
GG
Total Order Qty
Shipped Qty
Short Shipped Qty
Ship Date
Remarks
01
Sears
1311
5G
228
226
2
4-Jul
Process Loss
02
Sears
3516
5G
501
495
6
10-Jul
Process Loss
03
Sears
1330
5G
175
179
0
17-Jul
04
Bernardi
237/W
5G
180
180
0
31-Jul
1084
1080
8
Sub Total (5GG) 05
G.Gold
27822
7G
250
140
Partial
5-Jul
06
Sears
1304
7G
322
323
0
7-Jul
07
G.Gold
27822
7G
250
110
Partial
10-Jul
08
Bernardi
05/C-46W
7G
363
83
Partial
15-Jul
09
Bay-City
162979
7G
1000
500
Partial
17-Jul
10
Bay-City
162989
7G
750
413
Partial
17-Jul
11
G.Gold
17653/8039
7G
200
196
4
17-Jul
12
Bay-City
162979
7G
501
200
Partial
18-Jul
13
Bay-City
162989
7G
338
150
Partial
18-Jul
14
Bay-City
162979
7G
250
250
0
20-Jul
15
Bay-City
162989
7G
188
188
0
20-Jul
16
Rajan
MK-412654
7G
200
140
60
20-JulApplique Dyeing Quality Rejec
17
G.Gold
17653/8040
7G
418
330
88
23-Jul
18
G.Gold
17653/8041
7G
300
130
Partial
24-Jul
19
G.Gold
17653/8041
7G
300
150
Partial
26-Jul
20
Bernardi
05/C-46W
7G
280
280
0
31-Jul
Sub Total (7GG)
5910
3583
152
Grand Total
6994
4663
160
Fack Fur Short.
Shipment Target Status SL
Buyer
Style/P.O No
GG
Total Order Qty
Shipment Target Actual Revised
Remarks
01 02 03 04 05 Total
____________ Prepared By
________________________ Production-Co-Ordinator
________________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Shipment Details Date : 02.07.2005
All Figure In DZ
Month : June' 2005 SL
Buyer
Style/P.O No
GG
Total Order Qty
Shipped Qty
Short Shipped Qty
Ship Date
01
Sears
1309
5G
272
273
0
4-Jun
02
Sears
50108
5G
594
585
9
26-Jun
03
Sears
3531
5G
500
486
14
26-Jun
04
Sears
1307
5G
276
274
2
14-Jun
05
G.Gold
7548
5G
100
94
6
28-Jun
1742
1712
31
Sub Total (5GG) 04
Sears
1304
7G
260
260
0
4-Jun
05
Bay-City
366/367
7G
2643
1280
Partial
9-Jun
06
Sears
1310
7G
342
338
2
12-Jun
07
Quelle
2479
7G
217
218
0
15-Jun
08
Quelle
2480
7G
167
167
0
15-Jun
09
Quelle
2481
7G
183
181
2
15-Jun
10
Bay-City
366/367
7G
2560
1264
Partial
15-Jun
11
Quelle
2482
7G
167
158
9
30-Jun
12
Quelle
2485
7G
167
159
8
30-Jun
13
Quelle
2486
7G
167
164
3
30-Jun
Sub Total (7GG)
6873
4189
24
Grand Total
8615
5901
55
Remarks
Shipment Target Status SL
Buyer
Style/P.O No
GG
Total Order Qty
Shipment Target Actual Revised
Remarks
01 02 03 04 05 06 07 Total
____________ Prepared By
________________________ Production-Co-Ordinator
________________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Shipment Details Date : 02.06.2005
All Figure In DZ
Month : May' 2005 SL
Buyer
Style/P.O No
GG
Total Order Qty
Shipped Qty
Short Shipped Qty
Ship Date
01
Rajan
MK-412692
5G
200
200
0.00
15-May
02
G.Gold
007999
5G
500
400
Partial
15-May
03
Eurofrente
08206
5G
119
120
18-May
04
Eurofrente
08207
5G
219
220
18-May
05
Wehemer
WR-01
5G
427
427
25-May
1465
1367
0.00
Remarks
5G
Sub Total (5GG) 08
Rajan
MK-413066
7G
200
200
0
15-May
09
Rajan
Mk-412727
7G
300
260
Partial
15-May
10
Rajan
MK-412727
7G
40
36
4
16-May
11
Rajan
MK-413076
7G
300
298
2
16-May
Sub Total (7GG)
840
794
6
Grand Total
2305
2161
6
Shipment Target Status SL
Buyer
Style/P.O No
GG
Total Order Qty
Shipment Target Actual Revised
Remarks
01 02 03 04 05 06 07 Total
____________ Prepared By
________________________ Production-Co-Ordinator
________________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Shipment Details Date : 02.05.2005
All Figure In DZ
Month : April' 2005 SL
Buyer
Style/P.O No
GG
Total Order Qty
Shipped Qty
Short Shipped Qty
Ship Date
01
Bay-City
370
5G
567
567
0.00
24-Apr
02
Sears
1307
5G
271
269
2
28-Apr P.Loss & Quality Rejection
03
Sears
1308
5G
140
138
2
28-Apr P.Loss & Quality Rejection
978
974
4.00
04
5G
05
5G
06
5G
Remarks
07 Sub Total (5GG) 08
Bay-City
380-44/49
7G
2086.5
1043
Partial
6-Apr
09
Bay-City
380-44/49
7G
1044
446
Partial
11-Apr
10
Bay-City
380-44/49
7G
599
599
Partial
21-Apr
11
Quelle
7824
7G
67
62
5
28-Apr
12
Scope
58417
7G
138
138
28-Apr
13
Scope
58413
7G
138
138
28-Apr
14
Scope
58415
7G
138
138
28-Apr
15
Scope
59403
7G
138
138
28-Apr
Sub Total (7GG)
4348.5
2702
5
Grand Total
5326.5
3676
9
Printing Problem
16 17 18
Shipment Target Status SL
Buyer
01 02 03 04 05 06 07 Total
Style/P.O No
GG
Total Order Qty
Shipment Target Actual Revised
Remarks
____________ Prepared By
________________________ Production-Co-Ordinator
________________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Shipment Details Date : 01.04.2005
All Figure In DZ
Month : March' 2005 SL
Buyer
Style/P.O No
GG
Total Order Qty
Shipped Qty
Short Shipped Qty
Ship Date
01
G.Union
C-603
5G
300
300
12-Mar
02
G.Union
C-603 B
5G
125
125
12-Mar
425
425
Remarks
03 04 05 06 07 Sub Total (5GG)
0
08
N.Mann
115/149
7G
356.25
356.92
10-Mar
09
G.Union
38497
7G
225
225
12-Mar
10
Casabawa
Dec 04-A
7G
220
220
22-Mar
11
Casabawa
Dec 04-B
7G
176.67
176.67
22-Mar
12
Bay-City
380-44/49
7G
2917.5
831
13
N.Mann
115/827
7G
152.92
155.17
30-Mar
14
G.Union
6596
7G
350
350
31-Mar
15
G.Union
38497
7G
350
350
31-Mar
Sub Total (7GG)
4748.34
2665
0
Grand Total
5173.34
3090
0
Partial
30-Mar
16 17 18
Shipment Target Status SL
Buyer
01 02 03 04 05 06 07 Total
Style/P.O No
GG
Total Order Qty
Shipment Target Actual Revised
Remarks
____________ Prepared By
________________________ Production-Co-Ordinator
________________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Shipment Details Date : 02.02.2005
All Figure In DZ
Month :January'2005 SL
Total Order Qty
Shipped Qty
Short Shipped Qty
0
0
0
500
501
0
Sub Total (7GG)
500
501
0
Grand Total
500
501
0
Buyer
Style/P.O No
GG
Ship Date
Remarks
01 02 03 04 05 06 07 Sub Total (5GG) 08
N.Mann
115/827
7G
09
7G
10
7G
11
7G
12
7G
13
7G
14
7G
15
7G
17-Jan
16 17 18
Shipment Target Status SL 01 02 03 04 05 06 07
Buyer
Style/P.O No
GG
Total Order Qty
Shipment Target Actual Revised
Remarks
Total
____________ Prepared By
________________________ Production-Co-Ordinator
________________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Shipment Details Date : 02.01.2005
All Figure In DZ
Month :December'2004 SL
Buyer
Style/P.O No
GG
Total Order Qty
Shipped Qty
Short Shipped Qty
0
0
0
Ship Date
Remarks
01 02 03 04 05 06 07 Sub Total (5GG) 08
Sears
2298
7G
433.33
419.83
13.5
5-Dec
09
N.Mann
115/149
7G
1250
1241.83
8.17
9-Dec
10
Karstadt
K-03
7G
417
342
75
9-Dec
11
Seras
2300
7G
400
400.17
0
28-Dec
12
Zara
5747/001
7G
1566.7
1567
0
30-Dec
Sub Total (7GG)
4067.03
3970.83
96.67
Grand Total
4067.03
3970.83
96.67
13
7G
14
7G
15
7G
16 17 18
Shipment Target Status SL 01 02 03 04 05 06 07
Buyer
Style/P.O No
GG
Total Order Qty
Shipment Target Actual Revised
Remarks
Total
____________ Prepared By
________________________ Production-Co-Ordinator
________________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Shipment Details Date : 01.12.2004
All Figure In DZ
Month :November'2004 SL
Buyer
Style/P.O No
GG
Total Order Qty
Shipped Qty
Short Shipped Qty
Ship Date
01
Eufrenty
08206
7G
250
244
6
11-Nov
02
Eufrenty
08207
7G
167
164.5
2.5
11-Nov
03
Eufrenty
08231
7G
78.5
78.42
0
11-Nov
495.5
486.92
8.5
Remarks
04 05 06 07 Sub Total (5GG) 08
N.Mann
115/509
7G
132.92
133.17
0
4-Nov
09
N.Mann
115/667
7G
125
127.17
0
10-Nov
10
Hong Song
YS-14214
7G
1179
1162
17
12-Nov
11
Quelle
3532
7G
33.33
33.33
0
11-Nov
12
Karstadt
K-03
7G
417
4.5
Partial
27-Nov
13
Casabawa
Nob-10 B
7G
83.33
92
14
Hong Song
WS-14212
7G
332
320
12
15
Hong Song
YS-14213-S
7G
604
599.17
4.83
Sub Total (7GG)
2906.58
2471.34
33.83
Grand Total
3402.08
2958.26
42.33
27-Nov 29-Nov
16 17 18
Shipment Target Status SL
Buyer
01 02 03 04 05 06 07 Total
Style/P.O No
GG
Total Order Qty
Shipment Target Actual Revised
Remarks
____________ Prepared By
________________________ Production-Co-Ordinator
________________ Plant-In-Charge
2395
var Swtr.
900
996
VAR Swtr.
ng Problem
Problem
5688
VAR Swtr.
VAR Swtr.
10008
g Problem
Quality Rejec
y Rejection
y Rejection
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Short Shipment (If Any)
Date : 01.09.2008
All Figure In DZ
Month : August' 2008 SL 01
Buyer G.Gold
Style/P.O No GG 9L-432
5G
245
233
-12
245
233
-12
109
105
-4
Total (7GG)
109
105
-4
Grand Total (5GG&7GG)
354
338
-16
Total (5GG) 02
Total Shipped Short Order Qty Qty Shipped Qty
Sears
3508
7G
Reason For Short Shipped Assortment Problem
Assortment Problem
Statement Of Shortage in Importer Consignment : Description Of Itme
Qty As Per PI
______________________ Production-Co-Ordinator
Qty As Per Invoice
__________________ Finishing-In-Charge
Qty Received
________________ Knitting-In-Charge
Remarks
______________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Short Shipment (If Any)
Date : 01.08.2008
All Figure In DZ
Month : July' 2008 SL
Buyer
01
Li & Fung
Style/P.O No GG RC-45
5G
Total (5GG) 02
G.Union
03
Sears
Total Shipped Short Order Qty Qty Shipped Qty 503
484
-18
503
484.17
-18
4004/CS898
7G
700
690
-10
3527
7G
54
54
0
Total (7GG)
754
744
-10
Grand Total (5GG&7GG)
1257
1228
-28
Reason For Short Shipped Quality & Assort. Problem
Assortment Problem
Statement Of Shortage in Importer Consignment : Description Of Itme
Qty As Per PI
______________________ Production-Co-Ordinator
Qty As Per Invoice
__________________ Finishing-In-Charge
Qty Received
________________ Knitting-In-Charge
Remarks
______________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Short Shipment (If Any)
Date : 01.07.2008
All Figure In DZ
Month : June' 2008 SL
Buyer
01
G.Gold
02
Sears
Style/P.O No GG
Total Shipped Short Order Qty Qty Shipped Qty
Reason For Short Shipped
9L446
5G
542
529
-14
Quality & Assortment Problem
3504
5G
257
255
-2
Quality Problem
Total (5GG)
799
783.42
-16
Total (7GG)
0
0
0
Grand Total (5GG&7GG)
799
783
-16
Statement Of Shortage in Importer Consignment : Description Of Itme
Qty As Per PI
______________________ Production-Co-Ordinator
Qty As Per Invoice
__________________ Finishing-In-Charge
Qty Received
________________ Knitting-In-Charge
Remarks
______________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Short Shipment (If Any)
Date : 01.06.2008
All Figure In DZ
Month : May' 2008 SL
Buyer
Style/P.O No GG
Total Shipped Short Order Qty Qty Shipped Qty
Reason For Short Shipped
01
Total (5GG) 01
0
0
0
2092
2083
-10
Total (7GG)
2092
2083
-10
Grand Total (5GG&7GG)
2092
2083
-10
K-Mart
9L440
7G
Quality Problem
Statement Of Shortage in Importer Consignment : Description Of Itme
Qty As Per PI
______________________ Production-Co-Ordinator
Qty As Per Invoice
__________________ Finishing-In-Charge
Qty Received
________________ Knitting-In-Charge
Remarks
______________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Short Shipment (If Any)
Date : 03.05.2008
All Figure In DZ
Month : April' 2007 SL
Buyer
Style/P.O No GG
Total Shipped Short Order Qty Qty Shipped Qty
Reason For Short Shipped
01
G.Gold
29L275
5G
300
296
-4
Quality Problem
02
Quelle
3835
5G
357
355
-2
Emb Problem
03
Quelle
7374
5G
269
259
-10
Knitting Qty. Can Not done For Yarn Problem
926
910
-16
2092
2083
-10
Total (7GG)
2092
2083
-10
Grand Total (5GG&7GG)
3018
2993
-25
Total (5GG) K-Mart
9L440
7G
Quality Problem
Statement Of Shortage in Importer Consignment : Description Of Itme
Qty As Per PI
______________________ Production-Co-Ordinator
Qty As Per Invoice
__________________ Finishing-In-Charge
Qty Received
________________ Knitting-In-Charge
Remarks
______________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Short Shipment (If Any)
Date : 01.01.2008
All Figure In DZ
Month : December' 2007 SL
Buyer
Style/P.O No GG
01
5G
02
5G Total (5GG)
01
Total Shipped Short Order Qty Qty Shipped Qty Nill 0
0
0
667
648
-19
Total (7GG)
667
648
-19
Grand Total (5GG&7GG)
667
648
-19
Quelle
4000
7G
02
7G
03
7G
Reason For Short Shipped
Short For Twist Problem
Statement Of Shortage in Importer Consignment : Description Of Itme
Qty As Per PI
______________________ Production-Co-Ordinator
Qty As Per Invoice
__________________ Finishing-In-Charge
Qty Received
________________ Knitting-In-Charge
Remarks
______________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Short Shipment (If Any)
Date : 03.11.2007
All Figure In DZ
Month : October' 2007 SL
Buyer
Style/P.O No GG
01
5G
02
5G Total (5GG)
Total Shipped Short Order Qty Qty Shipped Qty
0
0
0
Total (7GG)
0
0
0
Grand Total (5GG&7GG)
0
0
0
01
7G
02
7G
03
7G
Reason For Short Shipped
Statement Of Shortage in Importer Consignment : Description Of Itme
Qty As Per PI
______________________ Production-Co-Ordinator
Qty As Per Invoice
__________________ Finishing-In-Charge
Qty Received
________________ Knitting-In-Charge
Remarks
______________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Short Shipment (If Any)
Date : 02.10.2007
All Figure In DZ
Month : September' 2007 SL 01
Buyer Quelle
Style/P.O No GG 3835
02
5G
Total Shipped Short Order Qty Qty Shipped Qty 150
146
4
150
146
4
Reason For Short Shipped Short For Embd. Problem.
5G Total (5GG)
01
Quelle
8824
7G
583
567
16
Short For Printing Problem.
02
Quelle
8711
7G
342
329
13
Short For Shading Problem
03
Quelle
3885
7G
133
131
2
Short For Printing Problem.
Total (7GG)
1058
1027
31
Grand Total (5GG&7GG)
1208
1173
35
Statement Of Shortage in Importer Consignment : Description Of Itme
Qty As Per PI
______________________ Production-Co-Ordinator
Qty As Per Invoice
__________________ Finishing-In-Charge
Qty Received
________________ Knitting-In-Charge
Remarks
______________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Short Shipment (If Any)
Date : 01.09.2007
All Figure In DZ
Month : August' 2007 SL
Buyer
Style/P.O No GG
01
5G
02
5G
02
5G Total (5GG)
01
Total Shipped Short Order Qty Qty Shipped Qty
0
0
0
639
626
-13
Total (7GG)
639
626
-13
Grand Total (5GG&7GG)
639
626
-13
Les. Line
47902W
7G
02
7G
03
7G
Reason For Short Shipped
For Quality & Assortment Problem
Statement Of Shortage in Importer Consignment : Description Of Itme
Qty As Per PI
______________________ Production-Co-Ordinator
Qty As Per Invoice
__________________ Finishing-In-Charge
Qty Received
________________ Knitting-In-Charge
Remarks
______________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Short Shipment (If Any)
Date : 05.08.2007
All Figure In DZ
Month : July' 2007 SL
Buyer
Style/P.O No GG
Total Shipped Short Order Qty Qty Shipped Qty
Reason For Short Shipped
01
Quelle
3835
5G
200
192
8
Embd. & Quality Problem
02
Sears
1504
5G
167
165
2
Process Loss
02
Sears
1513
5G
233
231
2
Quality Problem
600
588
12
Total (5GG) 01
Quelle
8820
7G
510
496
14
Printing & Yarn Shahding Problem
02
Quelle
3885
7G
333
329
3
Printing Problem
03
Quelle
8820
7G
879
872
7
Printing & Yarn Shahding Problem
Total (7GG)
1722
1697
24
Grand Total (5GG&7GG)
2322
2285
36
Statement Of Shortage in Importer Consignment : Description Of Itme
Qty As Per PI
______________________ Production-Co-Ordinator
Qty As Per Invoice
__________________ Finishing-In-Charge
Qty Received
________________ Knitting-In-Charge
Remarks
______________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Short Shipment (If Any)
Date : 01.07.2007
All Figure In DZ
Month : June,2007 SL
Buyer
Style/P.O No GG
01
5G
02
5G Total (5GG)
01
Total Shipped Short Order Qty Qty Shipped Qty
0
0
0
667
661
6
Total (7GG)
667
661
6
Grand Total (5GG&7GG)
667
661
6
Quelle
3204
02
7G
Reason For Short Shipped
Shading & Quality Problem
7G
Statement Of Shortage in Importer Consignment : Description Of Itme
Qty As Per PI
______________________ Production-Co-Ordinator
Qty As Per Invoice
__________________ Finishing-In-Charge
Qty Received
________________ Knitting-In-Charge
Remarks
______________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Short Shipment (If Any)
Date : 01.06.2007
All Figure In DZ
Month : May,2007 SL 01
Buyer Quelle
Style/P.O No GG 3212
333
329
4
333
329
4
500
498
2
Total (7GG)
500
498
2
Grand Total (5GG&7GG)
833
827
6
02
5G
Reason For Short Shipped Quality Problem
5G Total (5GG)
01
Total Shipped Short Order Qty Qty Shipped Qty
Tiara
2H216/28659
02
7G
Shading & Quality Problem
7G
Statement Of Shortage in Importer Consignment : Description Of Itme
Qty As Per PI
______________________ Production-Co-Ordinator
Qty As Per Invoice
__________________ Finishing-In-Charge
Qty Received
________________ Knitting-In-Charge
Remarks
______________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Short Shipment (If Any)
Date : 01.05.2007
All Figure In DZ
Month : April,2007 SL 01
Buyer Quelle
Style/P.O No GG 3835
208
202
6
208
202
6
333
331
2
Total (7GG)
333
331
2
Grand Total (5GG&7GG)
541
533
8
02
5G
Reason For Short Shipped Embd. Problem
5G Total (5GG)
01
Total Shipped Short Order Qty Qty Shipped Qty
Quelle
3885
02
7G
Printing Problem
7G
Statement Of Shortage in Importer Consignment : Description Of Itme
Qty As Per PI
______________________ Production-Co-Ordinator
Qty As Per Invoice
__________________ Finishing-In-Charge
Qty Received
________________ Knitting-In-Charge
Remarks
______________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Short Shipment (If Any)
Date : 01.04.2007
All Figure In DZ
Month : March,2007 SL
Buyer
Style/P.O No GG
01
Total Shipped Short Order Qty Qty Shipped Qty
Reason For Short Shipped
5G
02
Nill
5G
Total (5GG)
0
0
0
Total (7GG)
0
0
0
Grand Total (5GG&7GG)
0
0
0
01
7G
02
Nill
7G
Statement Of Shortage in Importer Consignment : Description Of Itme
____________ Prepared By
Qty As Per PI
Qty As Per Invoice
Qty Received
Remarks
________________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Short Shipment (If Any)
Date : 01.03.2007
All Figure In DZ
Month : February,2007 SL
Buyer
Style/P.O No GG
01
5G
02
5G Total (5GG)
Total Shipped Short Order Qty Qty Shipped Qty
0
0
0
Reason For Short Shipped
01
Quelle
8706
7G
833
818
-15
Due To Printing Problem
02
Quelle
8711
7G
525
502
-23
Due To Yarn Dying Problem
Total (7GG)
1358
1320
-38
Grand Total (5GG&7GG)
1358
1320
-38
Statement Of Shortage in Importer Consignment : Description Of Itme
____________ Prepared By
Qty As Per PI
Qty As Per Invoice
Qty Received
Remarks
________________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Short Shipment (If Any)
Date : 01.02.2007
All Figure In DZ
Month : January,2007 SL
Buyer
Style/P.O No GG
Total Shipped Short Order Qty Qty Shipped Qty
Reason For Short Shipped
01
Quelle
3212
5G
333
328
5
Over Weight
02
Quelle
7692
5G
333
322
11
Over Weight
666
650
16
267
265
2
Total (7GG)
267
265
2
Grand Total (5GG&7GG)
933
915
18
Total (5GG) 01
Quelle
3252
7G
Quality Problem
Statement Of Shortage in Importer Consignment : Description Of Itme
____________ Prepared By
Qty As Per PI
Qty As Per Invoice
_________________________ Production-Co-Ordinator
Qty Received
Remarks
________________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Short Shipment (If Any)
Date : 06.01.2007
All Figure In DZ
Month : December,2006 SL
Buyer
Style/P.O No GG
01
Total Shipped Short Order Qty Qty Shipped Qty
Reason For Short Shipped
5G
Total (5GG)
0
0
0
01 Quelle
8703
7G
212
202
11
Quality Problem
02 Quelle
8711
7G
833
781
52
Due To Over Weight
Total (7GG)
1045
983
63
Grand Total (5GG&7GG)
1045
983
63
03
Statement Of Shortage in Importer Consignment : Description Of Itme
____________ Prepared By
Qty As Per PI
Qty As Per Invoice
_________________________ Production-Co-Ordinator
Qty Received
Remarks
________________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Short Shipment (If Any)
Date : 02.12.2006
All Figure In DZ
Month : November,2006 SL
Buyer
01 Eurofrente
Style/P.O No GG 09750
5G
Total (5GG)
Total Shipped Short Order Qty Qty Shipped Qty 521
513
8
521
513
8
Reason For Short Shipped Process Loss.
01 Quelle
7392
7G
210
190
20
Quality Problem.
02 Quelle
3955
7G
183
83
100
Stock Lot.
03 Quelle
7452
7G
275
246
29
Embd. Problem.
Total (7GG)
668
519
149
Grand Total (5GG&7GG)
1189
1032
157
Statement Of Shortage in Importer Consignment : Description Of Itme
____________ Prepared By
Qty As Per PI
Qty As Per Invoice
_________________________ Production-Co-Ordinator
Qty Received
Remarks
________________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Short Shipment (If Any)
Date :
All Figure In DZ
Month : SL
Buyer
Style/P.O No GG
Total Shipped Short Order Qty Qty Shipped Qty
Reason For Short Shipped
Total (5GG)
Total (7GG) Grand Total (5GG&7GG)
Statement Of Shortage in Importer Consignment : Description Of Itme
____________ Prepared By
Qty As Per PI
Qty As Per Invoice
_________________________ Production-Co-Ordinator
Qty Received
Remarks
________________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Short Shipment (If Any)
Date : 01.11.2006
All Figure In DZ
Month : October,2006 SL
Buyer
01 G.Gold
Style/P.O No GG 1D158/10249
5G
Total (5GG)
Total Shipped Short Order Qty Qty Shipped Qty 100
98
2
100
98
2
Reason For Short Shipped Assortment Problem
01 Quelle
3732
7G
134
122
13
Printing Problem
02 Quelle
3905
7G
98
87
11
Quality Problem
03 Quelle
7294
7G
134
119
15
Quality & Printing Problem
04 Quelle
8609
7G
309
303
6
Yarn Shading Problem
TSF6-3534
7G
124
123
1
Assortment Problem
Total (7GG)
799
754
46
Grand Total (5GG&7GG)
899
852
48
05 Sears 06
Statement Of Shortage in Importer Consignment : Description Of Itme
____________ Prepared By
Qty As Per PI
Qty As Per Invoice
_________________________ Production-Co-Ordinator
Qty Received
Remarks
________________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Short Shipment (If Any)
Date : 01.10.2006
All Figure In DZ
Month : September,2006 SL
Buyer
01 Sears
Style/P.O No GG TSF6-3542
5G
Total (5GG)
Total Shipped Short Order Qty Qty Shipped Qty 217
216
1
217
216
1
Reason For Short Shipped Quality Problem.
01 Quelle
3575
7G
150
147
3
Precess Loss
02 Quelle
8602
7G
187
181
6
Due To Yarn Shading.
03 Quelle
8609
7G
135
130
5
Quality Problem.
Total (7GG)
472
458
14
Grand Total (5GG&7GG)
689
674
15
Statement Of Shortage in Importer Consignment : Description Of Itme
____________ Prepared By
Qty As Per PI
Qty As Per Invoice
_________________________ Production-Co-Ordinator
Qty Received
Remarks
________________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Short Shipment (If Any)
Date : 01.09.2006
All Figure In DZ
Month : August,2006 SL
Buyer
Style/P.O No GG
Total Shipped Short Order Qty Qty Shipped Qty
01 Quelle
3033
5G
108
107
1
02 Quelle
7214
5G
238
234
4
03 Sears
3538
5G
144
142
2
490
483
7
Reason For Short Shipped
Due To Quality Problem
04 Total (5GG) 01 N.Mann
017/477
7G
63
62
1
02 Quelle
3795
7G
250
248
2
03 Quelle
8609
7G
246
241
5
04 Quelle
2670
7G
167
166
1
05 Sears
3536
7G
188
179
9
Process Loss
06 Sears
1511
7G
158
149
9
Process Loss/Shading Problem
07 W.Smith
611166
7G
410
406
4
Assortment Problem.
08 W.Smith
611165
7G
410
409
1
Total (7GG)
1892
1860
32
Grand Total (5GG&7GG)
2382
2343
39
Yarn Shading Problem
Statement Of Shortage in Importer Consignment : Description Of Itme
____________
Qty As Per PI
Qty As Per Invoice
_________________________
Qty Received
Remarks
________________
Prepared By
Production-Co-Ordinator
Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Short Shipment (If Any)
Date : 01.08.2006
All Figure In DZ
Month : July,2006 SL
Buyer
01 Sears
Style/P.O No GG
Total Shipped Short Order Qty Qty Shipped Qty
Reason For Short Shipped
60252-C
5G
432
415
17
Due To Worng Yarn Reqr. Prob.
02 Quelle
3595
5G
167
157
10
Quality With Print Problrm.
03 Quelle
8614
5G
600
589
11
Quality Problrm.
1199
1161
38
Total (5GG) 01 Quelle
3142
7G
67
66
1
WR-08
7G
65
63
2
1502
7G
237
234
3
Total (7GG)
369
363
6
Grand Total (5GG&7GG)
1568
1524
44
02 Wehmeyer 03 Sears
Quality Problem
Statement Of Shortage in Importer Consignment : Description Of Itme
____________
Qty As Per PI
Qty As Per Invoice
_________________________
Qty Received
Remarks
________________
Prepared By
Production-Co-Ordinator
Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Short Shipment (If Any)
Date : 01.07.2006
All Figure In DZ
Month : June,2006 SL
Buyer
Style/P.O No GG
Total Shipped Short Order Qty Qty Shipped Qty
01 Eurofrenty
09182
5G
113
107
6
02 Quelle
8614
5G
422
418
4
03 Quelle
3023
5G
150
142
8
04 Quelle
3033
5G
150
140
10
05 Quelle
7214
5G
150
141
9
06 Quelle
3795
5G
175
165
10
60252-C
5G
432
416
16
1592
1529
63
07 Sears
Total (5GG) 01 Sears
3533
7G
500
492
8
02 N.Mann
017/531
7G
271
263
7
03 N.Mann
017/477
7G
146
140
6
04 Sears
3531
7G
625
619
6
05 Sears
3534
7G
237
232
5
05 Sears
3532
7G
334
332
1
05 Quelle
3732
7G
167
155
12
Total (7GG)
2280
2233
45
Grand Total (5GG&7GG)
3872
3762
108
Reason For Short Shipped
Assortment Problem.
Statement Of Shortage in Importer Consignment : Description Of Itme
Qty As Per PI
Qty As Per Invoice
Qty Received
Remarks
____________ Prepared By
_________________________ Production-Co-Ordinator
________________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Short Shipment (If Any)
Date : 02.06.2006
All Figure In DZ
Month : April,2006 SL
Buyer
01 G.Union 02 Rajan
Style/P.O No GG
Total Shipped Short Order Qty Qty Shipped Qty
Reason For Short Shipped
S-372
5G
100
98
2
Assortment Problem.
MK-413315
5G
300
394
6
Assortment Problem.
400
492
8
Total (5GG) 01 Quelle
3295
7G
183
179
4
02 Quelle
2620
7G
233
231
2
03 Quelle
2619
7G
233
229
4
04 Quelle
8602
7G
325
324
1
05 Quelle
2615
7G
292
289
3
Total (7GG)
1266
1252
14
Grand Total (5GG&7GG)
1666
1744
22
Yarn Problem
Statement Of Shortage in Importer Consignment : Description Of Itme
Qty As Per PI
Qty As Per Invoice
Qty Received
Remarks
____________ Prepared By
_________________________ Production-Co-Ordinator
________________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Short Shipment (If Any)
Date : 02.05.2006
All Figure In DZ
Month : April,2006 SL
Buyer
01 Quelle
Style/P.O No GG 7214
5G
Total Shipped Short Order Qty Qty Shipped Qty 150
147
3
150
147
3
Reason For Short Shipped Process Loss
02
Total (5GG) 01 G.Union
L-444
7G
300
299
1
3792(B)
7G
342
339
3
Total (7GG)
642
638
4
Grand Total (5GG&7GG)
792
785
7
02 Quelle
Process Loss
Statement Of Shortage in Importer Consignment : Description Of Itme
Qty As Per PI
Qty As Per Invoice
Qty Received
Remarks
____________ Prepared By
_________________________ Production-Co-Ordinator
________________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Short Shipment (If Any) All Figure In DZ
Date : 01.04.2006
Month : March,2006 SL
Buyer
Style/P.O No GG
01
Total Shipped Short Order Qty Qty Shipped Qty
Reason For Short Shipped
5G
02
Total (5GG)
0
0
0
01 Quelle
8609
7G
900
852
48
Yarn & Shading Problem
02 Quelle
7382
7G
100
93
7
Printing Problem
Total (7GG)
1000
945
55
Grand Total (5GG&7GG)
1000
945
55
Statement Of Shortage in Importer Consignment :
Description Of Itme
Qty As Per PI
____________ Prepared By
Qty As Per Invoice
Qty Received
_________________________ Production-Co-Ordinator
Remarks
________________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Short Shipment (If Any) All Figure In DZ
Date : 01.03.2006
Month : February,2006 SL
Buyer
Style/P.O No GG
01
Total Shipped Short Order Qty Qty Shipped Qty
Reason For Short Shipped
5G
02
Total (5GG)
0
0
0
01 Quelle
8609
7G
900
852
48
Yarn & Shading Problem
02 Quelle
7382
7G
100
93
7
Printing Problem
1000
945
55
Total (7GG)
Grand Total (5GG&7GG)
1000
945
55
Statement Of Shortage in Importer Consignment : Description Of Itme
Qty As Per PI
____________ Prepared By
Qty As Per Invoice
Qty Received
_________________________ Production-Co-Ordinator
Remarks
________________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Short Shipment (If Any) All Figure In DZ
Date : 01.02.2006
Month : January,2006 SL
Buyer
01 Zara
Style/P.O No GG 5747/504
5G
Total Shipped Short Order Qty Qty Shipped Qty 321
316
5
321
316
5
Reason For Short Shipped
02
Total (5GG) 03 Quelle
8603 (B)
7G
650
636
14
Shading Problem
04 Quelle
7382
7G
100
99
1
Assortment Problem
05
Total (7GG)
750
735
15
Grand Total (5GG&7GG)
1071
1051
20
Statement Of Shortage in Importer Consignment : Description Of Itme
____________ Prepared By
Qty As Per PI
Qty As Per Invoice
Qty Received
_________________________ Production-Co-Ordinator
Remarks
________________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Short Shipment (If Any) All Figure In DZ
Date : 01.01.2006
Month : December,2005 SL 01 02
Buyer
Style/P.O No GG 5G
Total Shipped Short Order Qty Qty Shipped Qty
Reason For Short Shipped
Total (5GG)
0
0
0
708
700
8
Total (7GG)
708
700
8
Grand Total (5GG&7GG)
708
700
8
03 N.Mann
317/349
7G
Yarn Problem
04 05
Statement Of Shortage in Importer Consignment : Description Of Itme
____________ Prepared By
Qty As Per PI
Qty As Per Invoice
Qty Received
_________________________ Production-Co-Ordinator
Remarks
________________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Short Shipment (If Any) All Figure In DZ
Date : 01.11.2005
Month : November,2005 SL 01
Buyer
Style/P.O No GG 5G
Total Shipped Short Order Qty Qty Shipped Qty
Reason For Short Shipped
02
Total (5GG)
0
0
0
1000
993
7
Total (7GG)
1000
993
7
Grand Total (5GG&7GG)
1000
993
7
03 Quelle
8602
7G
Assortment Problem
04 05
Statement Of Shortage in Importer Consignment : Description Of Itme
Qty As Per PI
____________ Prepared By
Qty As Per Invoice
Qty Received
_________________________ Production-Co-Ordinator
Remarks
________________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Short Shipment (If Any) All Figure In DZ
Date : 01.10.2005
Month : September,2005 SL
Buyer
01 Sears 02
Style/P.O No GG 1516
5G 5G
Total Shipped Short Order Qty Qty Shipped Qty 194
193
1
Reason For Short Shipped Process Loss
Total (5GG)
194
193
1
03 Rajan
W515043
7G
268
266
2
Process Loss
04 Rajan
W515029
7G
216
212
4
Process Loss
05 Rajan
W-515028
7G
133
129
4
Process Loss
06 Rajan
W-515078-L
7G
12
13
1
Process Loss
Total (7GG)
629
620
11
Grand Total (5GG&7GG)
823
813
12
Statement Of Shortage in Importer Consignment : Description Of Itme
____________ Prepared By
Qty As Per PI
Qty As Per Invoice
Qty Received
_________________________ Production-Co-Ordinator
Remarks
________________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Short Shipment (If Any) All Figure In DZ
Date : 02.09.2005
Month : August,2005 SL
Buyer
Style/P.O No GG
Total Shipped Short Order Qty Qty Shipped Qty
Reason For Short Shipped
01 Rajan
MK-412651
02
5G
200
190
10
200
190
10
Process Loss
5G
Total (5GG) 03 Rajan
MK-412655
7G
200
198
2
Process Loss
04 Rajan
MK-412960
7G
250
248
2
Process Loss
05 Rajan
W-515048
7G
200
194
6
Process Loss
06 Rajan
W-515043
7G
222
218
4
Process Loss
07 Quelle
7824
7G
67
66
1
Process Loss
08 Zara
5747/830
7G
271
248
23
Assortment Problem
09 Rajan
MK-516076
7G
226
223
3
Process Loss
Total (7GG)
1436
1395
41
Grand Total (5GG&7GG)
1636
1585
51
10
7G
Statement Of Shortage in Importer Consignment : Description Of Itme
____________ Prepared By
Qty As Per PI
Qty As Per Invoice
Qty Received
_________________________ Production-Co-Ordinator
Remarks
________________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Short Shipment (If Any) All Figure In DZ
Month : July,2005
Date : 02.08.2005
SL
Buyer
Style/P.O No GG
Total Shipped Short Order Qty Qty Shipped Qty
Reason For Short Shipped
01 Sears
1311
5G
228
226
2
Process Loss
02 Sears
3516
5G
501
495
6
Process Loss
729
721
8
03
5G
04
5G Total (5GG)
03 G.Gold
17653/8039
7G
200
193
4
Process Loss
04 Rajan
MK-412654
7G
200
140
60
Applique Dyeing Quality Rejection
05 G.Gold
17653/8040
7G
418
330
88
Fack Fur Short
Total (7GG)
818
663
152
Grand Total (5GG&7GG)
1547
1384
160
06
7G
07
7G
Statement Of Shortage in Importer Consignment : Description Of Itme
____________ Prepared By
Qty As Per PI
Qty As Per Invoice
Qty Received
_________________________ Production-Co-Ordinator
Remarks
________________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Short Shipment (If Any) All Figure In DZ
Date : 01.06.2005
Month : June,2005 SL
Buyer
Style/P.O No GG
Total Shipped Short Order Qty Qty Shipped Qty
Reason For Short Shipped
01 Sears
50108
5G
594
585
9
Yarn Problem
02 Sears
3531
5G
500
486
14
Process Loss
03 Sears
1307
5G
276
274
2
Process Loss
04 G.Gold
7548
5G
100
94
6
Process Loss
1469.83
1439
31
Total (5GG) 03 Sears
1310
7G
342
338
2
Process Loss
04 Quelle
2481
7G
183
181
2
Quality Problem
05 Quelle
2482
7G
167
158
9
Knitting Short
06 Quelle
2485
7G
167
159
8
Process Loss
07 Quelle
2486
7G
167
164
3
Quality Problem
Total (7GG)
1026
1000
24
Grand Total (5GG&7GG)
2495.83
2439
55
Statement Of Shortage in Importer Consignment : Description Of Itme
____________ Prepared By
Qty As Per PI
Qty As Per Invoice
Qty Received
_________________________ Production-Co-Ordinator
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Short Shipment (If Any)
Remarks
________________ Plant-In-Charge
Date : 01.06.2005
All Figure In DZ
Month : May,2005 SL
Buyer
Style/P.O No GG
01
5G
02
5G Total (5GG)
Total Shipped Short Order Qty Qty Shipped Qty
0
0
0
Reason For Short Shipped
03 Rajan
MK-412727
7G
40
36
4
Process Loss
04 Rajan
MK-413076
7G
300
298
2
Process Loss
Total (7GG)
340
334
6
Grand Total (5GG&7GG)
340
334
6
05 06 07
Statement Of Shortage in Importer Consignment : Description Of Itme
____________ Prepared By
Qty As Per PI
Qty As Per Invoice
Qty Received
_________________________ Production-Co-Ordinator
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Remarks
________________ Plant-In-Charge
Short Shipment (If Any)
Date : 02.05.2005
All Figure In DZ
Month : April,2005 SL
Buyer
Style/P.O No GG
Total Shipped Short Order Qty Qty Shipped Qty
Reason For Short Shipped
01 Sears
1307
5G
271
269
2
P.Loss & Quality Rejection
02 Sears
1308
5G
140
138
2
P.Loss & Quality Rejection
411
407
4
67
62
5
Total (7GG)
67
62
5
Grand Total (5GG&7GG)
478
469
9
Total (5GG) 03 Quelle
7824
04
7G
Printing Problem
7G
05 06 07
Statement Of Shortage in Importer Consignment : Description Of Itme
____________ Prepared By
Qty As Per PI
Qty As Per Invoice
_________________________ Production-Co-Ordinator
Qty Received
Remarks
________________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Short Shipment (If Any)
Date : 02.01.2005
All Figure In DZ
Month : December,2004 SL
Buyer
Style/P.O No GG
01 Sears
Total Shipped Short Order Qty Qty Shipped Qty
2298
7G
433.33
419.83
13.5
02 N.Mann
115/149
7G
1250
1241.83
8.17
03 Karstadt
K-03
7G
417
342
75
2100.33
2003.66
96.67
Reason For Short Shipped
04 05 06 07 08 09 10 11 12 13 14 Grand Total
Statement Of Shortage in Importer Consignment : Description Of Itme
Qty As Per PI
Qty As Per Invoice
Qty Received
Remarks
____________ Prepared By
_________________________ Production-Co-Ordinator
________________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Short Shipment (If Any) All Figure In DZ
Date : 01.12.2004
Month :November,2004 SL
Buyer
Style/P.O No GG
Total Shipped Short Order Qty Qty Shipped Qty
01 Eufrenty
08206
5G
250
244
6
02 Eufrenty
08207
5G
167
164.5
2.5
03 Hong Song
YS-14214-S
7G
1179
1162
17
04 Hong Song
WS-14212-S
7G
332
320
12
05 Hong Song
YS-14213-S
7G
604
599.17
4.83
2532
2489.67
42.33
06 07 08 09 10 11 12 13 14 Grand Total
Reason For Short Shipped
Statement Of Shortage in Importer Consignment : Description Of Itme
____________ Prepared By
Qty As Per PI
Qty As Per Invoice
_________________________ Production-Co-Ordinator
Qty Received
Remarks
________________ Plant-In-Charge
rtment Problem
hading Problem
Yarn Reqr. Prob.
ng Quality Rejection
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Date : 01.09.2008
MONTHLY Q.C REPORT SUMMARY FOR THE MONTH OF AUGUST' 2008
Position
Internal
External
Aql
2.5
2.5
TTL Inspection
TTL Passed
TTL Re-Check
% Of Error
12
12
Nill
6.5%
6
6
Nill
5.63%
Remarks
% Error = (TTL Major Defect / Inspected Qty X 100)
_______________ Prepared By
_______________ Q.A.D In-Charge
_______________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
MONTHLY Q.C REPORT SUMMARY FOR THE MONTH OF JULY' 2008
Date : 01.08.2008
Position
Internal
External
Aql
2.5
2.5
TTL Inspection
TTL Passed
TTL Re-Check
% Of Error
3
3
Nill
5.9%
16
14
2
6.05%
Remarks
Sears Style #3528, Recheck Due to Measurement Discrepecny Style-3527 Recheck Due to Tack Massing.
% Error = (TTL Major Defect / Inspected Qty X 100)
_______________ Prepared By
_______________ Q.A.D In-Charge
_______________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Date : 01.07.2008
MONTHLY Q.C REPORT SUMMARY FOR THE MONTH OF JUNE' 2008
Position
Internal
Aql
2.5
TTL Inspection
TTL Passed
TTL Re-Check
% Of Error
2
2
Nill
5%
Remarks
External
2.5
12
10
2
6.34%
Sears Style #3528,3504 Recheck Due to Measurement Discrepecny
% Error = (TTL Major Defect / Inspected Qty X 100)
_______________ Prepared By
_______________ Q.A.D In-Charge
_______________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Date : 01.07.2008
MONTHLY Q.C REPORT SUMMARY FOR THE MONTH OF JUNE'2008
Position
Internal
External
Aql
2.5
2.5
TTL Inspection
TTL Passed
TTL Re-Check
% Of Error
2
2
Nill
5%
12
10
2
6.34%
% Error = (TTL Major Defect / Inspected Qty X 100)
Remarks
Sears Style #3528,3504 Recheck Due to Measurement Discrepecny
_______________ Prepared By
_______________ Q.A.D In-Charge
_______________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Date : 01.06.2008
MONTHLY Q.C REPORT SUMMARY FOR THE MONTH OF MAY'2008
Position
Aql
TTL Inspection
TTL Passed
TTL Re-Check
% Of Error
Internal
2.5
2
2
Nill
4.66
External
4
3
3
Nill
4.80%
% Error = (TTL Major Defect / Inspected Qty X 100)
Remarks
_______________ Prepared By
_______________ Q.A.D In-Charge
_______________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Date : 01.05.2008
MONTHLY Q.C REPORT SUMMARY FOR THE MONTH OF APRIL'2008
Position
Aql
Internal
2.5
External
4
TTL Inspection
TTL Passed
TTL Re-Check
% Of Error
Nill
Nill
Nill
Nill
13
13
Nill
4.67%
% Error = (TTL Major Defect / Inspected Qty X 100)
Remarks
_______________ Prepared By
_______________ Q.A.D In-Charge
_______________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Date : 01.04.2008
MONTHLY Q.C REPORT SUMMARY FOR THE MONTH OF MARCH'2008
Position
Aql
Internal
2.5
External
4
TTL Inspection
TTL Passed
TTL Re-Check
% Of Error
Nill
Nill
Nill
Nill
19
19
Nill
6.73%
Remarks
% Error = (TTL Major Defect / Inspected Qty X 100)
_______________ Prepared By
_______________ Q.A.D In-Charge
_______________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Date : 01.03.2008
MONTHLY Q.C REPORT SUMMARY FOR THE MONTH OF FEBRUARY'2008
Position
Aql
TTL Inspection
TTL Passed
TTL Re-Check
% Of Error
Internal
0
0
0
0
0.00%
External
4
9
9
0
6.21%
Remarks
9L 119 & 9L 120 Inspection Report not Recvd From Buyer
% Error = (TTL Major Defect / Inspected Qty X 100)
_______________ Prepared By
_______________ Q.A.D In-Charge
_______________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
MONTHLY Q.C REPORT SUMMARY FOR THE MONTH OF JANUARY'2008
Date : 01.02.2008
Position
Aql
TTL Inspection
TTL Passed
TTL Re-Check
% Of Error
Internal
2.5
3
3
0
5.67%
External
2.5
5
5
0
3.68%
Remarks
% Error = (TTL Major Defect / Inspected Qty X 100)
_______________ Prepared By
_______________ Q.A.D In-Charge
_______________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Date : 01.01.2008
MONTHLY Q.C REPORT SUMMARY FOR THE MONTH OF DECEMBER'2007
Position
Aql
TTL Inspection
TTL Passed
TTL Re-Check
% Of Error
Internal
2.5
3
2
1
6.25%
External
2.5
12
9
3
4.62%
Remarks # 9J020 Due to side Seam Shape poor St# 4000 Due to Twist Problem. St# 8832, Due to Dirty Problem
% Error = (TTL Major Defect / Inspected Qty X 100)
_______________ Prepared By
_______________ Q.A.D In-Charge
_______________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Date : 01.12.2007
MONTHLY Q.C REPORT SUMMARY FOR THE MONTH OF NOVEMBER'2007
Position
Aql
TTL Inspection
TTL Passed
TTL Re-Check
% Of Error
Internal
2.5
4
2
2
7.50%
External
2.5
5
5
Nill
2.73%
% Error = (TTL Major Defect / Inspected Qty X 100)
Remarks # 10764 & 10877, Eurofrente, recheck due to dirt, ndl drop, pocket joining, problem.
_______________ Prepared By
_______________ Q.A.D In-Charge
_______________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Date : 03.11.2007
MONTHLY Q.C REPORT SUMMARY FOR THE MONTH OF OCTOBER'2007
Position
Aql
TTL Inspection
TTL Passed
TTL Re-Check
% Of Error
Remarks
Internal
2.5
2
1
1
7.50%
# 0766/8021, Sfera recheck due to NDL drop & assortment problem.
External
2.5
10
9
1
4.13%
St # 18902 recheck due to Neck shapepoor & bottom sweep minus.
% Error = (TTL Major Defect / Inspected Qty X 100)
_______________ Prepared By
_______________ Q.A.D In-Charge
_______________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Date : 02.09.2007
MONTHLY Q.C REPORT SUMMARY FOR THE MONTH OF SEP'2007
Position
Aql
TTL Inspection
TTL Passed
TTL Re-Check
% Of Error
Remarks
Internal
2.5
7
6
1
8.00%
St #19H987, Recheck Due to Dirty, Hood & Bottom Rolled,EMB Thick & Thin .
External
2.5
11
10
1
3.55%
St # 3885 Olive Color Recheck Due to uneven Dyeing Problem.
% Error = (TTL Major Defect / Inspected Qty X 100)
_______________ Prepared By
_______________ Q.A.D In-Charge
_______________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Date : 01.07.2007
MONTHLY Q.C REPORT SUMMARY FOR THE MONTH OF JUNE '2007
TTL Inspection
TTL Passed
TTL Re-Check
% Of Error
Internal
2
2
Nill
4.29%
External
10
10
Nill
5.44%
Position
Remarks
% Error = (TTL Major Defect / Inspected Qty X 100)
_______________ Prepared By
_______________ Q.A.D In-Charge
_______________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Date : 01.06.2007
MONTHLY Q.C REPORT SUMMARY FOR THE MONTH OF MAY '2007
TTL Inspection
TTL Passed
TTL Re-Check
% Of Error
Internal
4
4
0
4.79%
External
6
6
0
3.45%
Position
Remarks
% Error = (TTL Major Defect / Inspected Qty X 100)
_______________ Prepared By
_______________ Q.A.D In-Charge
_______________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Date : 01.05.2007
MONTHLY Q.C REPORT SUMMARY FOR THE MONTH OF APRIL '2007
Position
TTL Inspection
TTL Passed
% Of Error
Remarks
2
4.21%
327/052 Recheck Due To Iron,Trimining & Hole Problem
Nill
Internal External
TTL Re-Check
15
13
% Error = (TTL Major Defect / Inspected Qty X 100)
_______________ Prepared By
_______________ Q.A.D In-Charge
_______________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Date : 01.04.2007
MONTHLY Q.C REPORT SUMMARY FOR THE MONTH OF MARCH '2007
TTL Inspection
TTL Passed
TTL Re-Check
% Of Error
Internal
9
9
0
4.79%
External
Nill
Nill
Nill
0.00%
Position
Remarks
% Error = (TTL Major Defect / Inspected Qty X 100)
_______________ Prepared By
_______________ Q.A.D In-Charge
_______________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Date : 01.03.2007
MONTHLY Q.C REPORT SUMMARY FOR THE MONTH OF FEBRUARY '2007
Position Internal External
TTL Inspection Nill 12
TTL Passed 0 10
TTL Re-Check 0 2
% Of Error 0.00% 4.03%
Remarks # 8706 Recheck Due To Uneven deying,Dirty,Knot Etc #8711 Recheck Due To Yarn deying Prob.,Ring Mark Etc
% Error = (TTL Major Defect / Inspected Qty X 100) Note :
_______________ Prepared By
Buyer : Great Union # 7615 Final Inspection report did not found from Buyer/Inspector.
_______________ Q.A.D In-Charge
_______________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Date : 01.02.2007
MONTHLY Q.C REPORT SUMMARY FOR THE MONTH OF JANUARY '2007
Position Internal External
TTL Inspection 0 8
TTL Passed 0 8
TTL Re-Check 0 0
% Of Error 0.00% 3.45%
Remarks
% Error = (TTL Major Defect / Inspected Qty X 100)
_______________ Prepared By
_______________ Q.A.D In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
_______________ Plant-In-Charge
Date : 06.01.2007
MONTHLY Q.C REPORT SUMMARY FOR THE MONTH OF DECEMBER '2006
Position Internal External
TTL Inspection 0 8
TTL Passed 0 8
TTL Re-Check 0 0
% Of Error 0.00% 3.45%
Remarks
% Error = (TTL Major Defect / Inspected Qty X 100)
_______________ Prepared By
_______________ Q.A.D In-Charge
_______________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
MONTHLY Q.C REPORT SUMMARY FOR THE MONTH OF NOVEMBER '2006
Date : 02.12.2006
Position
TTL Inspection
TTL Passed
TTL Re-Check
% Of Error
Internal
6
4
2
4.46%
External
13
13
0
3.40%
Remarks 01. St:# 09769 For ArmHole(-) tendency,Nk Seam (1x1) Open. 02. St:# 09750 Pocket Link Open,Mest. Problem.
% Error = (TTL Major Defect / Inspected Qty X 100)
_______________ Prepared By
_______________ Q.A.D In-Charge
_______________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
MONTHLY Q.C REPORT SUMMARY FOR THE MONTH OF
Date :
Position
TTL Inspection
TTL Passed
TTL Re-Check
% Of Error
Remarks
% Error = (TTL Major Defect / Inspected Qty X 100)
_______________ Prepared By
_______________ Q.A.D In-Charge
_______________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Date : 03.11.2006
MONTHLY Q.C REPORT SUMMARY FOR THE MONTH OF OCTOBER '2006
Position Internal
TTL Inspection 3
TTL Passed 3
TTL Re-Check Nill
% Of Error 5.86%
Remarks
External
22
19
3
4.04%
St:# 7294 For Hole,Oil Mark St:# 3955 For Poor Neck Shape.
% Error = (TTL Major Defect / Inspected Qty X 100)
_______________ Prepared By
_______________ Q.A.D In-Charge
_______________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Date : 03.10.2006
MONTHLY Q.C REPORT SUMMARY FOR THE MONTH OF SEPTEMBER '2006
Position Internal
TTL Inspection 10
TTL Passed 9
TTL Re-Check 1
% Of Error 3.93%
Remarks St:# MK-413612 For NDL Drop
External
14
13
1
5.06%
St:# 8602 For Hole,Linking Defect, Knot, Chest Stripe Un-even.
% Error = (TTL Major Defect / Inspected Qty X 100)
_______________ Prepared By
_______________ Q.A.D In-Charge
_______________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
MONTHLY Q.C REPORT SUMMARY FOR THE MONTH OF August '2006
Date : 01.09.2006
Internal
TTL Inspection 4
TTL Passed 4
TTL Re-Check Nill
% Of Error 5.09%
External
25
23
2
5.09%
Position
Remarks Recheck : # 7214(Quelle)
% Error = (TTL Major Defect / Inspected Qty X 100)
_______________ Prepared By
_______________ Q.A.D In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
_______________ Plant-In-Charge
Date : 01.08.2006
MONTHLY Q.C REPORT SUMMARY FOR THE MONTH OF July '2006
Internal
TTL Inspection 2
TTL Passed 2
TTL Re-Check Nill
% Of Error 5.36%
External
36
34
2
5.02%
Position
Remarks Recheck : # 3795 # 3595(Quelle)
% Error = (TTL Major Defect / Inspected Qty X 100)
_______________ Prepared By
_______________ Q.A.D In-Charge
_______________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Date : 01.07.2006
MONTHLY Q.C REPORT SUMMARY FOR THE MONTH OF June '2006
Internal
TTL Inspection 3
TTL Passed 3
TTL Re-Check Nill
% Of Error 3.60%
External
42
40
2
4.73%
Position
Remarks Recheck : #3023(Quelle) #3534(Sears)
% Error = (TTL Major Defect / Inspected Qty X 100)
_______________ Prepared By
_______________ Q.A.D In-Charge
_______________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Date : 02.05.2006
MONTHLY Q.C REPORT SUMMARY FOR THE MONTH OF April '2006
Internal
Nill
TTL Inspection 0
External
2.5
18
Position
A.Q.L
No Of Recheck Nill
% Of Error 0.00%
2
4.57%
Remarks Note : 01
% Error = (TTL Major Defect / Inspected Qty X 100)
Note : 01
:
_______________ Prepared By
Style No # 8497,#13463,#13465 Inspection Is Ok But Inspection Report Is Not Rcvd. From Buyer/ Marchandiser.
_______________ Q.A.D In-Charge
_______________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Date : 02.04.2006
MONTHLY Q.C REPORT SUMMARY FOR THE MONTH OF March '2006
Internal
2.5
TTL Inspection 5
External
2.5
6
Position
A.Q.L
No Of Recheck Nill
% Of Error 4.14%
Nill
3.50%
Remarks
% Error = (TTL Major Defect / Inspected Qty X 100)
_______________ Prepared By
_______________ Q.A.D In-Charge
_______________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Date : 01.03.2006
MONTHLY Q.C REPORT SUMMARY FOR THE MONTH OF February '2006
Internal
2.5
TTL Inspection 1
External
2.5
7
Position
A.Q.L
No Of Recheck Nill
% Of Error 6
Nill
3.77
Remarks
% Error = (TTL Major Defect / Inspected Qty X 100)
_______________ Prepared By
_______________ Q.A.D In-Charge
_______________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Date : 02.09.2005
MONTHLY Q.C REPORT SUMMARY FOR THE MONTH OF August '2005
Position Internal External
A.Q.L 2.5 2.5/4
TTL Inspection 9 5
No Of Recheck 1 2
% Of Error 5.23 4.77
Remarks
% Error = (TTL Major Defect / Inspected Qty X 100)
_______________ Prepared By
_______________ Q.A.D In-Charge
_______________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Date : 01.08.2005
MONTHLY Q.C REPORT SUMMARY FOR THE MONTH OF July '2005
Position Internal External
A.Q.L 2.5 4
TTL Inspection 6 10
No Of Recheak 2 2
% Of Error 4.26 4.7
Remarks
% Error = (TTL Major Defect / Inspected Qty X 100)
_______________ Prepared By
_______________ Q.A.D In-Charge
_______________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Date : 02.06.2005
MONTHLY Q.C REPORT SUMMARY FOR THE MONTH OF May '2005
Position Internal External
A.Q.L 2.5 4
TTL Inspection 3 5
No Of Recheak 2 Nill
% Of Error 3.78 4.82
Remarks Eurofrente
% Error = (TTL Major Defect / Inspected Qty X 100)
_______________ Prepared By
_______________ Q.A.D In-Charge
_______________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Date : 01.05.2005
MONTHLY Q.C REPORT SUMMARY FOR THE MONTH OF April '2005
Position Internal External
A.Q.L 0 2.5
TTL Inspection 0 9
No Of Recheak 0 1
% Of Error 0 4
Remarks
% Error = (TTL Major Defect / Inspected Qty X 100)
_______________ Prepared By
_______________ Q.A.D In-Charge
_______________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Date : 01.05.2005
MONTHLY Q.C REPORT SUMMARY FOR THE MONTH OF April '2005
Position Internal External
A.Q.L 0 2.5
TTL Inspection 0 9
No Of Recheak 0 1
% Of Error 0 4
Remarks
% Error = (TTL Major Defect / Inspected Qty X 100)
_______________ Prepared By
_______________ Q.A.D In-Charge
_______________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Date : 02.04.2005
MONTHLY Q.C REPORT SUMMARY FOR THE MONTH OF February '2005
Position Internal External External
A.Q.L 2.5 4 2.5
TTL Inspection 1 4 4
No Of Recheak Nil Nil Nil
% Of Error 4 4.58 2.66
Remarks Left Over
% Error = (TTL Major Defect / Inspected Qty X 100)
_______________ Prepared By
_______________ Q.A.D In-Charge
_______________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Date : 02.02.2005
MONTHLY Q.C REPORT SUMMARY FOR THE MONTH OF February '2005
Position Internal External
A.Q.L Nill 4
TTL Inspection Nill 2
No Of Recheak Nil Nil
% Of Error Nill 5.23
Remarks
% Error = (TTL Major Defect / Inspected Qty X 100)
_______________ Prepared By
_______________ Q.A.D In-Charge
_______________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Date : 02.02.2005
MONTHLY Q.C REPORT SUMMARY FOR THE MONTH OF January '2005
Position Internal External
A.Q.L 2.5 2.5
TTL Inspection 1 1
No Of Recheak Nil Nil
% Of Error 4 2.85
Remarks
% Error = (TTL Major Defect / Inspected Qty X 100)
_______________ Prepared By
_______________ Q.A.D In-Charge
_______________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Date : 02.01.2005
MONTHLY Q.C REPORT SUMMARY FOR THE MONTH OF December '2004
Position Internal External
A.Q.L 2.5 2.5
TTL
No Of
% Of
Inspection 1 5
Recheak Nil Nil
Error 3.17 2.8
Remarks
% Error = (TTL Major Defect / Inspected Qty X 100)
_______________ Prepared By
_______________ Q.A.D In-Charge
_______________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Date :01.12.2004
MONTHLY Q.C REPORT SUMMARY FOR THE MONTH OF November'2004
Position Internal External
A.Q.L Nil Nil
TTL Inspection 4 7
No Of Recheak Nil 5
% Of Error 6.26 3.28
Remarks 01 Stock Lot In Casabawa
% Error = (TTL Major Defect / Inspected Qty X 100)
_______________ Prepared By
_______________ Q.A.D In-Charge
_______________ Plant-In-Charge
nspector.
vd. From
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Date : 01.09.2008
Factory Wise Total Machine Status For The Month Of August' 08 SL
Description Of Machine
No Of Total M/C
No Of M/C In Use
01
Knitting 5G
140
140
02
Knitting 7G
210
204
03
Auto Placket Machine
3
3
04
Winding Machine
8
8
05
Flat Linking Machine
9
9
06
Dial Linking Machine
84
84
07
Flat Lock Machine
3
3
08
Over Lock Machine
2
2
09
Interlock Machine
3
3
10
Button Hole Machine
5
5
11
Button Attached Machine
3
3
12
Sewing Machine
20
20
13
Label Cutter Machine
1
1
14
Boilar Machine
1
1
15
Washing Machine
3
3
16
Water Separator
2
2
17
Dryer Machine
4
4
18
Iron Machine
13
13
19
Generator
1
1
20
Water Pump
5
5
21
Glass Table (1st Insp.)
13
13
22
Glass Lamp (Final)
3
3
23
Bengin Gun
2
2
24
Welding
1
1
25
Blouer Machine
1
1
26
Dril Machine
2
2
27
Grinding Machine
2
2
28
Wood Cutter Machine
1
1
29
Vacuam Cleaner
1
1
30
Computer
1
1
31
IPS
2
2
549
543
Total
Stock In Hand
Remarks
6
6
______________________
__________________
________________
Production-Co-Ordinator
Finishing-In-Charge
Knitting-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
______________ Plant-In-Charge
Date : 01.08.2008
Factory Wise Total Machine Status For The Month Of July' 08 SL
Description Of Machine
No Of Total M/C
No Of M/C In Use
01
Knitting 5G
140
140
02
Knitting 7G
210
204
03
Auto Placket Machine
3
3
04
Winding Machine
8
8
05
Flat Linking Machine
9
9
06
Dial Linking Machine
84
84
07
Flat Lock Machine
3
3
08
Over Lock Machine
2
2
09
Interlock Machine
3
3
10
Button Hole Machine
4
4
11
Button Attached Machine
2
2
12
Sewing Machine
20
20
13
Label Cutter Machine
1
1
14
Boilar Machine
1
1
15
Washing Machine
3
3
16
Water Separator
2
2
17
Dryer Machine
4
4
18
Iron Machine
13
13
19
Generator
1
1
20
Water Pump
5
5
21
Glass Table (1st Insp.)
13
13
22
Glass Lamp (Final)
3
3
23
Bengin Gun
2
2
24
Welding
1
1
25
Blouer Machine
1
1
26
Dril Machine
2
2
27
Grinding Machine
2
2
28
Wood Cutter Machine
1
1
29
Vacuam Cleaner
1
1
30
Computer
1
1
31
IPS
2
2
547
541
Total
Stock In Hand
Remarks
6
6
______________________
__________________
________________
Production-Co-Ordinator
Finishing-In-Charge
Knitting-In-Charge
______________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Factory Wise Total Machine Status
Date : 01.07.2008
For The Month Of June' 08 SL
Description Of Machine
No Of Total M/C
No Of M/C In Use
01
Knitting 5G
140
140
02
Knitting 7G
210
204
03
Auto Placket Machine
3
3
04
Winding Machine
8
8
05
Flat Linking Machine
9
9
06
Dial Linking Machine
84
84
07
Flat Lock Machine
3
3
08
Over Lock Machine
2
2
09
Interlock Machine
3
3
10
Button Hole Machine
4
4
11
Button Attached Machine
2
2
12
Sewing Machine
20
20
13
Label Cutter Machine
1
1
14
Boilar Machine
1
1
15
Washing Machine
3
3
16
Water Separator
2
2
17
Dryer Machine
4
4
18
Iron Machine
13
13
19
Generator
1
1
20
Water Pump
5
5
21
Glass Table (1st Insp.)
13
13
22
Glass Lamp (Final)
3
3
23
Bengin Gun
2
2
24
Welding
1
1
25
Blouer Machine
1
1
26
Dril Machine
2
2
27
Grinding Machine
2
2
28
Wood Cutter Machine
1
1
29
Vacuam Cleaner
1
1
30
Computer
1
1
31
IPS
2
2
547
541
Total
Stock In Hand
Remarks
6
6
______________________
__________________
________________
Production-Co-Ordinator
Finishing-In-Charge
Knitting-In-Charge
______________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Date : 01.06.2008
Factory Wise Total Machine Status For The Month Of May' 08 SL
Description Of Machine
No Of
No Of M/C
Stock In Hand
Remarks
SL
Description Of Machine
Total M/C
In Use
01
Knitting 5G
140
140
02
Knitting 7G
210
204
03
Auto Placket Machine
3
3
04
Winding Machine
8
8
05
Flat Linking Machine
9
9
06
Dial Linking Machine
84
84
07
Flat Lock Machine
3
3
08
Over Lock Machine
2
2
09
Interlock Machine
3
3
10
Button Hole Machine
4
4
11
Button Attached Machine
2
2
12
Sewing Machine
20
20
13
Label Cutter Machine
1
1
14
Boilar Machine
1
1
15
Washing Machine
3
3
16
Water Separator
2
2
17
Dryer Machine
4
4
18
Iron Machine
13
13
19
Generator
1
1
20
Water Pump
5
5
21
Glass Table (1st Insp.)
13
13
22
Glass Lamp (Final)
3
3
23
Bengin Gun
2
2
24
Welding
1
1
25
Blouer Machine
1
1
26
Dril Machine
2
2
27
Grinding Machine
2
2
28
Wood Cutter Machine
1
1
29
Vacuam Cleaner
1
1
30
Computer
1
1
31
IPS
2
2
547
541
Total
Stock In Hand
Remarks
6
6
______________________
__________________
________________
Production-Co-Ordinator
Finishing-In-Charge
Knitting-In-Charge
______________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Date : 01.05.2008
Factory Wise Total Machine Status For The Month Of April' 08 SL 01
Description Of Machine Knitting 5G
No Of Total M/C
No Of M/C In Use
140
140
Stock In Hand
Remarks
210
204
Auto Placket Machine
3
3
04
Winding Machine
8
8
05
Flat Linking Machine
9
9
06
Dial Linking Machine
84
84
07
Flat Lock Machine
3
3
08
Over Lock Machine
2
2
09
Interlock Machine
3
3
10
Button Hole Machine
4
4
11
Button Attached Machine
2
2
12
Sewing Machine
20
20
13
Label Cutter Machine
1
1
14
Boilar Machine
1
1
15
Washing Machine
3
3
16
Water Separator
2
2
17
Dryer Machine
4
4
18
Iron Machine
13
13
19
Generator
1
1
20
Water Pump
5
5
21
Glass Table (1st Insp.)
13
13
22
Glass Lamp (Final)
3
3
23
Bengin Gun
2
2
24
Welding
1
1
25
Blouer Machine
1
1
26
Dril Machine
2
2
27
Grinding Machine
2
2
28
Wood Cutter Machine
1
1
29
Vacuam Cleaner
1
1
30
Computer
1
1
31
IPS
2
2
547
541
02
Knitting 7G
03
Total
6
6
______________________
__________________
________________
Production-Co-Ordinator
Finishing-In-Charge
Knitting-In-Charge
______________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Date : 01.04.2008
Factory Wise Total Machine Status For The Month Of March' 08 SL
Description Of Machine
No Of Total M/C
No Of M/C In Use
01
Knitting 5G
140
140
02
Knitting 7G
210
204
03
Auto Placket Machine
3
3
Stock In Hand
6
Remarks
04
Winding Machine
8
8
05
Flat Linking Machine
9
9
06
Dial Linking Machine
84
84
07
Flat Lock Machine
3
3
08
Over Lock Machine
2
2
09
Interlock Machine
3
3
10
Button Hole Machine
4
4
11
Button Attached Machine
2
2
12
Sewing Machine
20
20
13
Label Cutter Machine
1
1
14
Boilar Machine
1
1
15
Washing Machine
3
3
16
Water Separator
2
2
17
Dryer Machine
4
4
18
Iron Machine
13
13
19
Generator
1
1
20
Water Pump
5
5
21
Glass Table (1st Insp.)
13
13
22
Glass Lamp (Final)
3
3
23
Bengin Gun
2
2
24
Welding
1
1
25
Blouer Machine
1
1
26
Dril Machine
2
2
27
Grinding Machine
2
2
28
Wood Cutter Machine
1
1
29
Vacuam Cleaner
1
1
30
Computer
1
1
31
IPS
2
2
547
541
Total
6
______________________
__________________
________________
Production-Co-Ordinator
Finishing-In-Charge
Knitting-In-Charge
______________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Date : 01.03.2008
Factory Wise Total Machine Status For The Month Of February' 08 SL
Description Of Machine
No Of Total M/C
No Of M/C In Use
01
Knitting 5G
140
140
02
Knitting 7G
210
204
03
Auto Placket Machine
3
3
04
Winding Machine
8
8
Stock In Hand
6
Remarks
05
Flat Linking Machine
9
9
06
Dial Linking Machine
84
84
07
Flat Lock Machine
3
3
08
Over Lock Machine
2
2
09
Interlock Machine
3
3
10
Button Hole Machine
4
4
11
Button Attached Machine
2
2
12
Sewing Machine
20
20
13
Label Cutter Machine
1
1
14
Boilar Machine
1
1
15
Washing Machine
3
3
16
Water Separator
2
2
17
Dryer Machine
4
4
18
Iron Machine
13
13
19
Generator
1
1
20
Water Pump
5
5
21
Glass Table (1st Insp.)
13
13
22
Glass Lamp (Final)
3
3
23
Bengin Gun
2
2
24
Welding
1
1
25
Blouer Machine
1
1
26
Dril Machine
2
2
27
Grinding Machine
2
2
28
Wood Cutter Machine
1
1
29
Vacuam Cleaner
1
1
30
Computer
1
1
31
IPS
2
2
547
541
Total
6
______________________
__________________
________________
Production-Co-Ordinator
Finishing-In-Charge
Knitting-In-Charge
______________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Date : 01.02.2008
Factory Wise Total Machine Status For The Month Of January' 08 SL
Description Of Machine
No Of Total M/C
No Of M/C In Use
Stock In Hand
01
Knitting 5G
140
136
4
02
Knitting 7G
210
204
6
03
Auto Placket Machine
3
3
04
Winding Machine
8
8
05
Flat Linking Machine
9
9
Remarks
06
Dial Linking Machine
84
84
07
Flat Lock Machine
3
3
08
Over Lock Machine
2
2
09
Interlock Machine
3
3
10
Button Hole Machine
4
3
11
Button Attached Machine
2
2
12
Sewing Machine
20
20
13
Label Cutter Machine
1
1
14
Boilar Machine
1
1
15
Washing Machine
3
3
16
Water Separator
2
2
17
Dryer Machine
4
4
18
Iron Machine
13
13
19
Generator
1
1
20
Water Pump
5
5
21
Glass Table (1st Insp.)
13
13
22
Glass Lamp (Final)
3
3
23
Bengin Gun
2
2
24
Welding
1
1
25
Blouer Machine
1
1
26
Dril Machine
2
2
27
Grinding Machine
2
2
28
Wood Cutter Machine
1
1
29
Vacuam Cleaner
1
1
30
Computer
1
1
31
IPS
2
2
547
536
Total
1
11
______________________
__________________
________________
Production-Co-Ordinator
Finishing-In-Charge
Knitting-In-Charge
______________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Date : 01.01.2008
Factory Wise Total Machine Status For The Month Of December' 07 SL
Description Of Machine
No Of Total M/C
No Of M/C In Use
Stock In Hand
01
Knitting 5G
140
136
4
02
Knitting 7G
210
204
6
03
Auto Placket Machine
3
3
04
Winding Machine
8
8
05
Flat Linking Machine
9
9
Remarks
06
Dial Linking Machine
84
84
07
Flat Lock Machine
3
2
08
Over Lock Machine
2
2
09
Interlock Machine
3
3
10
Button Hole Machine
4
3
11
Button Attached Machine
2
2
12
Sewing Machine
20
19
13
Label Cutter Machine
1
1
14
Boilar Machine
1
1
15
Washing Machine
3
3
16
Water Separator
2
2
17
Dryer Machine
4
4
18
Iron Machine
13
13
19
Generator
1
1
20
Water Pump
5
5
21
Glass Table (1st Insp.)
13
13
22
Glass Lamp (Final)
3
3
23
Bengin Gun
2
2
24
Welding
1
1
25
Blouer Machine
1
1
26
Dril Machine
2
2
27
Grinding Machine
2
2
28
Wood Cutter Machine
1
1
29
Vacuam Cleaner
1
1
30
Computer
1
1
31
IPS
2
2
547
534
Total
1
1 1
13
______________________
__________________
________________
Production-Co-Ordinator
Finishing-In-Charge
Knitting-In-Charge
______________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Date : 02.12.2007
Factory Wise Total Machine Status For The Month Of November' 07 SL
Description Of Machine
No Of Total M/C
No Of M/C In Use
Stock In Hand
01
Knitting 5G
140
135
5
02
Knitting 7G
210
200
10
03
Auto Placket Machine
3
3
04
Winding Machine
8
8
05
Flat Linking Machine
9
9
Remarks
06
Dial Linking Machine
84
84
07
Flat Lock Machine
3
2
08
Over Lock Machine
2
2
09
Interlock Machine
3
3
10
Button Hole Machine
4
3
11
Button Attached Machine
2
2
12
Sewing Machine
20
19
13
Label Cutter Machine
1
1
14
Boilar Machine
1
1
15
Washing Machine
3
3
16
Water Separator
2
2
17
Dryer Machine
4
4
18
Iron Machine
13
13
19
Generator
1
1
20
Water Pump
5
3
21
Glass Table (1st Insp.)
13
13
22
Glass Lamp (Final)
3
3
23
Bengin Gun
2
2
24
Welding
1
1
25
Blouer Machine
1
1
26
Dril Machine
2
2
27
Grinding Machine
2
2
28
Wood Cutter Machine
1
1
29
Vacuam Cleaner
1
1
30
Computer
1
1
31
IPS
2
2
547
527
Total
1
1 1
2
20
______________________
__________________
________________
Production-Co-Ordinator
Finishing-In-Charge
Knitting-In-Charge
______________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Date : 03.11.2007
Factory Wise Total Machine Status For The Month Of October' 07 SL
Description Of Machine
No Of Total M/C
No Of M/C In Use
Stock In Hand
01
Knitting 5G
140
135
5
02
Knitting 7G
210
200
10
03
Auto Placket Machine
3
3
04
Winding Machine
8
8
05
Flat Linking Machine
9
9
Remarks
06
Dial Linking Machine
84
84
07
Flat Lock Machine
3
2
08
Over Lock Machine
2
2
09
Interlock Machine
3
3
10
Button Hole Machine
4
3
11
Button Attached Machine
2
2
12
Sewing Machine
20
19
13
Label Cutter Machine
1
1
14
Boilar Machine
1
1
15
Washing Machine
3
3
16
Water Separator
2
2
17
Dryer Machine
4
4
18
Iron Machine
13
13
19
Generator
1
1
20
Water Pump
5
3
21
Glass Table (1st Insp.)
13
13
22
Glass Lamp (Final)
3
3
23
Bengin Gun
2
2
24
Welding
1
1
25
Blouer Machine
1
1
26
Dril Machine
2
2
27
Grinding Machine
2
2
28
Wood Cutter Machine
1
1
29
Vacuam Cleaner
1
1
30
Computer
1
1
31
IPS
2
2
547
527
Total
1
1 1
2
20
______________________
__________________
________________
Production-Co-Ordinator
Finishing-In-Charge
Knitting-In-Charge
______________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Date : 01.09.2007
Factory Wise Total Machine Status For The Month Of August' 07 SL
Description Of Machine
No Of Total M/C
No Of M/C In Use
Stock In Hand
01
Knitting 5G
140
135
5
02
Knitting 7G
210
200
10
03
Auto Placket Machine
3
3
04
Winding Machine
8
8
05
Flat Linking Machine
9
9
Remarks
06
Dial Linking Machine
84
84
07
Flat Lock Machine
3
2
08
Over Lock Machine
2
2
09
Interlock Machine
3
3
10
Button Hole Machine
4
3
11
Button Attached Machine
2
2
12
Sewing Machine
20
19
13
Label Cutter Machine
1
1
14
Boilar Machine
1
1
15
Washing Machine
3
3
16
Water Separator
2
2
17
Dryer Machine
4
4
18
Iron Machine
13
13
19
Generator
1
1
20
Water Pump
5
3
21
Glass Table (1st Insp.)
13
13
22
Glass Lamp (Final)
3
3
23
Bengin Gun
2
2
24
Welding
1
1
25
Blouer Machine
1
1
26
Dril Machine
2
2
27
Grinding Machine
2
2
28
Wood Cutter Machine
1
1
29
Vacuam Cleaner
1
1
30
Computer
1
1
31
IPS
2
2
547
527
Total
1
1 1
2
20
______________________
__________________
________________
Production-Co-Ordinator
Finishing-In-Charge
Knitting-In-Charge
______________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Date : 05.08.2007
Factory Wise Total Machine Status For The Month Of July' 07 SL
Description Of Machine
No Of Total M/C
No Of M/C In Use
Stock In Hand
01
Knitting 5G
140
135
5
02
Knitting 7G
210
200
10
03
Auto Placket Machine
3
3
04
Winding Machine
8
8
05
Flat Linking Machine
9
9
06
Dial Linking Machine
84
84
07
Flat Lock Machine
3
2
08
Over Lock Machine
2
2
1
Remarks
09
Interlock Machine
3
3
10
Button Hole Machine
4
3
11
Button Attached Machine
2
2
12
Sewing Machine
20
19
13
Label Cutter Machine
1
1
14
Boilar Machine
1
1
15
Washing Machine
3
3
16
Water Separator
2
2
17
Dryer Machine
4
4
18
Iron Machine
13
13
19
Generator
1
1
20
Water Pump
5
3
21
Glass Table (1st Insp.)
13
13
22
Glass Lamp (Final)
3
3
23
Bengin Gun
2
2
24
Welding
1
1
25
Blouer Machine
1
1
26
Dril Machine
2
2
27
Grinding Machine
2
2
28
Wood Cutter Machine
1
1
29
Vacuam Cleaner
1
1
30
Computer
31
IPS
1 2
1 2
547
527
Total
1 1
2
20
______________________
__________________
________________
Production-Co-Ordinator
Finishing-In-Charge
Knitting-In-Charge
______________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Date : 01.07.2007
Factory Wise Total Machine Status For The Month Of June'07 SL
Description Of Machine
No Of Total M/C
No Of M/C In Use
No Of Total Idle Machine
01
Knitting 5G
140
140
02
Knitting 7G
212
212
03
Auto Placket Machine
3
3
04
Winding Machine
8
8
05
Flat Linking Machine
14
14
06
Dial Linking Machine
84
84
07
Flat Lock Machine
4
0
4
08
Over Lock Machine
4
2
2
Remarks
Savar + AMGL For Repair
09
Interlock Machine
3
3
10
Button Hole Machine
3
0
3
11
Button Attached Machine
2
0
2
12
Sewing Machine
18
18
13
Label Cutter Machine
1
1
14
Boilar Machine
1
1
15
Washing Machine
3
3
16
Water Separator
2
2
17
Dryer Machine
4
4
18
Iron Machine
13
13
19
Generator
1
1
20
Water Pump
3
2
21
Glass Table (1st Insp.)
13
13
22
Glass Lamp (Final)
3
3
23
Bengin Gun
2
2
24
Welding
1
1
25
Blouer Machine
1
1
26
Dril Machine
2
2
27
Grinding Machine
2
2
28
Wood Cutter Machine
1
1
29
Vacuam Cleaner
1
1
549
537
Total
1
12
______________________
__________________
________________
Production-Co-Ordinator
Finishing-In-Charge
Knitting-In-Charge
______________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Date : 01.05.2007
Factory Wise Total Machine Status For The Month Of April'07 SL
Description Of Machine
No Of Total M/C
No Of M/C In Use
No Of Total Idle Machine
01
Knitting 5G
140
140
02
Knitting 7G
212
212
03
Auto Placket Machine
3
3
04
Winding Machine
8
8
05
Flat Linking Machine
14
14
06
Dial Linking Machine
84
84
07
Flat Lock Machine
4
0
4
08
Over Lock Machine
4
2
2
09
Interlock Machine
3
3
10
Button Hole Machine
3
0
3
Remarks
Savar + AMGL For Repair
11
Button Attached Machine
2
0
12
Sewing Machine
18
18
13
Label Cutter Machine
1
1
14
Boilar Machine
1
1
15
Washing Machine
3
3
16
Water Separator
2
2
17
Dryer Machine
4
4
18
Iron Machine
13
13
19
Generator
1
1
20
Water Pump
3
2
21
Glass Table (1st Insp.)
13
13
22
Glass Lamp (Final)
3
3
23
Bengin Gun
2
2
24
Welding
1
1
25
Blouer Machine
1
1
26
Dril Machine
2
2
27
Grinding Machine
2
2
28
Wood Cutter Machine
1
1
29
Vacuam Cleaner
1
1
549
537
Total
2
1
12
______________________
__________________
________________
Production-Co-Ordinator
Finishing-In-Charge
Knitting-In-Charge
______________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Date : 01.04.2007
Factory Wise Total Machine Status For The Month Of March'07 SL
Description Of Machine
No Of Total M/C
No Of M/C In Use
No Of Total Idle Machine
01
Knitting 5G
140
140
02
Knitting 7G
212
212
03
Auto Placket Machine
3
3
04
Winding Machine
8
8
05
Flat Linking Machine
14
14
06
Dial Linking Machine
84
84
07
Flat Lock Machine
4
0
4
08
Over Lock Machine
4
2
2
09
Interlock Machine
3
3
10
Button Hole Machine
3
0
3
11
Button Attached Machine
2
0
2
12
Sewing Machine
18
18
Remarks
Savar + AMGL For Repair
13
Label Cutter Machine
1
1
14
Boilar Machine
1
1
15
Washing Machine
3
3
16
Water Separator
2
2
17
Dryer Machine
4
4
18
Iron Machine
13
13
19
Generator
1
1
20
Water Pump
3
2
21
Glass Table (1st Insp.)
13
13
22
Glass Lamp (Final)
3
3
23
Bengin Gun
2
2
24
Welding
1
1
25
Blouer Machine
1
1
26
Dril Machine
2
2
27
Grinding Machine
2
2
28
Wood Cutter Machine
1
1
29
Vacuam Cleaner
1
1
549
537
Total
1
12
___________
________________
Prepared By
Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Date : 01.01.2007
Factory Wise Total Machine Status For The Month Of January'07 SL
Description Of Machine
No Of Total M/C
No Of M/C In Use
No Of Total Idle Machine
01
Knitting 5G
140
140
02
Knitting 7G
212
212
03
Auto Placket Machine
3
3
04
Winding Machine
8
8
05
Flat Linking Machine
14
14
06
Dial Linking Machine
84
84
07
Flat Lock Machine
4
0
4
08
Over Lock Machine
4
2
2
09
Interlock Machine
3
3
10
Button Hole Machine
3
0
3
11
Button Attached Machine
2
0
2
12
Sewing Machine
18
18
13
Label Cutter Machine
1
1
Remarks
Savar + AMGL For Repair
14
Boilar Machine
1
1
15
Washing Machine
3
3
16
Water Separator
2
2
17
Dryer Machine
4
4
18
Iron Machine
13
13
19
Generator
1
1
20
Water Pump
3
2
21
Glass Table (1st Insp.)
13
13
22
Glass Lamp (Final)
3
3
23
Bengin Gun
2
2
24
Welding
1
1
25
Blouer Machine
1
1
26
Dril Machine
2
2
27
Grinding Machine
2
2
28
Wood Cutter Machine
1
1
29
Vacuam Cleaner
1
1
549
537
Total
1
12
___________
________________________
________________
Prepared By
Production-Co-Ordinator
Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Date : 01.12.2006
Factory Wise Total Machine Status For The Month Of November'06 SL
Description Of Machine
No Of Total M/C
No Of M/C In Use
No Of Total Idle Machine
01
Knitting 5G
112
112
02
Knitting 7G
240
240
03
Auto Placket Machine
3
3
04
Winding Machine
8
8
05
Flat Linking Machine
14
14
06
Dial Linking Machine
84
84
07
Flat Lock Machine
4
0
4
08
Over Lock Machine
4
2
2
09
Interlock Machine
3
3
10
Button Hole Machine
3
0
3
11
Button Attached Machine
2
0
2
12
Sewing Machine
18
18
13
Label Cutter Machine
1
1
14
Boilar Machine
1
1
Remarks
Savar + AMGL For Repair
15
Washing Machine
3
3
16
Water Separator
2
2
17
Dryer Machine
4
4
18
Iron Machine
13
13
19
Generator
1
1
20
Water Pump
3
2
21
Glass Table (1st Insp.)
13
13
22
Glass Lamp (Final)
3
3
23
Bengin Gun
2
2
24
Welding
1
1
25
Blouer Machine
1
1
26
Dril Machine
2
2
27
Grinding Machine
2
2
28
Wood Cutter Machine
1
1
29
Vacuam Cleaner
1
1
549
537
Total
1
12
___________
________________________
________________
Prepared By
Production-Co-Ordinator
Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Date : 01.11.2006
Factory Wise Total Machine Status For The Month Of October'06 SL
Description Of Machine
No Of Total M/C
No Of M/C In Use
No Of Total Idle Machine
01
Knitting 5G
112
112
02
Knitting 7G
240
240
03
Auto Placket Machine
3
3
04
Winding Machine
8
8
05
Flat Linking Machine
20
20
06
Dial Linking Machine
72
72
07
Flat Lock Machine
4
0
4
08
Over Lock Machine
4
2
2
09
Interlock Machine
3
3
10
Button Hole Machine
3
0
3
11
Button Attached Machine
2
0
2
12
Sewing Machine
18
18
13
Label Cutter Machine
1
1
14
Boilar Machine
1
1
15
Washing Machine
3
3
Remarks
Savar + AMGL For Repair
16
Water Separator
2
2
17
Dryer Machine
4
4
18
Iron Machine
13
13
19
Generator
1
1
20
Water Pump
3
2
21
Glass Table (1st Insp.)
13
13
22
Glass Lamp (Final)
3
3
23
Bengin Gun
2
2
24
Welding
1
1
25
Blouer Machine
1
1
26
Dril Machine
2
2
27
Grinding Machine
2
2
28
Wood Cutter Machine
1
1
29
Vacuam Cleaner
1
1
543
531
Total
1
12
___________
________________________
________________
Prepared By
Production-Co-Ordinator
Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Date : 03.10.2006
Factory Wise Total Machine Status For The Month Of September'06 SL
Description Of Machine
No Of Total M/C
No Of M/C In Use
No Of Total Idle Machine
01
Knitting 5G
112
112
02
Knitting 7G
240
240
03
Auto Placket Machine
3
3
04
Winding Machine
8
8
05
Flat Linking Machine
20
20
06
Dial Linking Machine
72
72
07
Flat Lock Machine
4
0
4
08
Over Lock Machine
4
2
2
09
Interlock Machine
3
3
10
Button Hole Machine
3
0
3
11
Button Attached Machine
2
0
2
12
Sewing Machine
18
18
13
Label Cutter Machine
1
1
14
Boilar Machine
1
1
15
Washing Machine
3
3
16
Water Separator
2
2
Remarks
Savar + AMGL For Repair
17
Dryer Machine
4
4
18
Iron Machine
13
13
19
Generator
1
1
20
Water Pump
3
2
21
Glass Table (1st Insp.)
13
13
22
Glass Lamp (Final)
3
3
23
Bengin Gun
2
2
24
Welding
1
1
25
Blouer Machine
1
1
26
Dril Machine
2
2
27
Grinding Machine
2
2
28
Wood Cutter Machine
1
1
29
Vacuam Cleaner
1
1
543
531
Total
1
12
___________
________________________
________________
Prepared By
Production-Co-Ordinator
Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Date : 01.03.2006
Factory Wise Total Machine Status For The Month Of February'06 SL
Description Of Machine
No Of Total M/C
No Of M/C In Use
No Of Total Idle Machine
01
Knitting 5G
51
51
02
Knitting 7G
301
289
03
Auto Placket Machine
3
3
04
Winding Machine
8
8
05
Flat Linking Machine
50
35
06
Dial Linking Machine
65
65
07
Flat Lock Machine
4
08
Over Lock Machine
4
4
09
Interlock Machine
2
2
10
Twist Machine
1
1
11
Button Hole Machine
3
3
12
Button Attached Machine
4
4
13
Sewing Machine
18
18
14
Label Cutter Machine
1
1
15
Boilar Machine
1
1
16
Washing Machine
3
3
4
Remarks
17
Water Separator
2
2
18
Dryer Machine
4
4
19
Iron Machine
14
14
20
Generator
1
1
21
Water Pump
5
5
22
Glass Table
13
13
23
Glass Lamp
3
3
24
Bengin Gun
2
2
25
Welding
1
1
26
Blouer Machine
1
1
27
Dril Machine
2
2
28
Grinding Machine
2
2
29
Wood Cutter Machine
1
1
570
531
Total
12
___________
________________________
________________
Prepared By
Production-Co-Ordinator
Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Date : 02.06.2005
Factory Wise Total Machine Status For The Month Of May '05 SL
Description Of Machine
No Of Total M/C
No Of M/C In Use
01
Knitting 5G
51
51
02
Knitting 7G
301
301
03
Auto Placket Machine
3
3
04
Winding Machine
8
8
05
Flat Linking Machine
50
50
06
Dial Linking Machine
65
65
07
Super Dial Machine
2
2
08
Flat Lock Machine
4
4
09
Over Lock Machine
4
4
10
Interlock Machine
2
2
11
Twist Machine
1
1
12
Button Hole Machine
3
3
13
Button Attached Machine
4
4
14
Sewing Machine
18
18
No Of Total Idle Machine
Remarks
15
Label Cutter Machine
1
1
16
Boilar Machine
1
1
17
Washing Machine
3
3
18
Water Separator
2
2
19
Dryer Machine
4
3
20
Iron Machine
14
14
21
Generator
1
1
22
Water Pump
5
5
23
Glass Table
13
13
24
Glass Lamp
3
2
1
25
Bengin Gun
2
1
1
26
Welding
1
1
27
Blouer Machine
1
1
28
Dril Machine
2
2
29
Grinding Machine
2
2
30
Wood Cutter Machine
1
1
572
569
Total
1
3
___________
________________
Prepared By
Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Date : 01.05.2005
Factory Wise Total Machine Status For The Month Of April'05 SL
Description Of Machine
No Of Total M/C
No Of M/C In Use
01
Knitting 5G
51
51
02
Knitting 7G
301
301
03
Auto Placket Machine
3
3
04
Winding Machine
8
8
05
Flat Linking Machine
50
50
06
Dial Linking Machine
65
65
07
Super Dial Machine
2
2
08
Flat Lock Machine
4
4
09
Over Lock Machine
4
4
10
Interlock Machine
2
2
11
Twist Machine
1
1
12
Button Hole Machine
3
3
13
Button Attached Machine
4
4
14
Sewing Machine
18
18
15
Label Cutter Machine
1
1
16
Boilar Machine
1
1
No Of Total Idle Machine
Remarks
17
Washing Machine
3
3
18
Water Separator
2
2
19
Dryer Machine
4
3
20
Iron Machine
14
14
21
Generator
1
1
22
Water Pump
5
5
23
Glass Table
13
13
24
Glass Lamp
3
2
1
25
Bengin Gun
2
1
1
26
Welding
1
1
27
Blouer Machine
1
1
28
Dril Machine
2
2
29
Grinding Machine
2
2
30
Wood Cutter Machine
1
1
572
569
Total
1
3
___________
________________
Prepared By
Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Date : 02.03.2005
Factory Wise Total Machine Status For The Month Of February'05 SL
Description Of Machine
No Of Total M/C
No Of M/C In Use
01
Knitting 5G
51
51
02
Knitting 7G
301
301
03
Auto Placket Machine
3
3
04
Winding Machine
8
8
05
Flat Linking Machine
50
50
06
Dial Linking Machine
65
65
07
Super Dial Machine
2
2
08
Flat Lock Machine
4
4
09
Over Lock Machine
4
4
10
Interlock Machine
2
2
11
Twist Machine
1
1
12
Button Hole Machine
3
3
13
Button Attached Machine
4
4
14
Sewing Machine
18
18
15
Label Cutter Machine
1
1
16
Boilar Machine
1
1
17
Washing Machine
3
3
18
Water Separator
2
2
No Of Total Idle Machine
Remarks
19
Dryer Machine
4
3
20
Iron Machine
14
14
21
Generator
1
1
22
Water Pump
5
5
23
Glass Table
13
13
24
Glass Lamp
3
2
1
25
Bengin Gun
2
1
1
26
Welding
1
1
27
Blouer Machine
1
1
28
Dril Machine
2
2
29
Grinding Machine
2
2
30
Wood Cutter Machine
1
1
572
569
Total
1
3
___________
________________
Prepared By
Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Date : 02.02.2005
Factory Wise Total Machine Status For The Month Of January'05 SL
Description Of Machine
No Of M/C In Use
01 Knitting 5G
151
02 Knitting 7G
201
03 Auto Placket Machine
2
04 Winding Machine
8
05 Flat Linking Machine
50
06 Dial Linking Machine
65
07 Super Dial Machine
3
08 Flat Lock Machine
4
09 Over Lock Machine
4
10 Interlock Machine
2
11 Twist Machine
1
12 Button Hole Machine
3
13 Button Attached Machine
4
14 Sewing Machine
15
15 Label Cutter Machine
1
16 Boilar Machine
1
No Of Total Idle Machine
1 1
Remarks
17 Washing Machine
3
18 Water Separator
2
19 Dryer Machine
3
20 Iron Machine
14
21 Generator
1
22 Water Pump
5
23 Glass Table
13
24 Glass Lamp
2
1
25 Bengin Gun
1
1
26 Welder
1
27 Blouer Machine
1
28 Dril Machine
2
29 Grinding Machine
2
30 Wood Cutter Machine
1
Total
___________ Prepared By
566
1
5
________________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Date : 01.09.2008
All Figure In DZ Buyer Wise Production & Export Summarry For The Month Of August'08 SL
Buyer
Gauge
Product.In.Dz
Export In Dz.
01
Sage
5G
384
797
02
G.Gold
5G
144
233
03
Sears
5G
767
719
04
Quelle
5G
205
82
1500
1831
Total 5GG 05
Eurofrente
7G
356
50
06
K-Mart
7G
1139
1639
07
G.Gold
7G
1469
1772
08
Sears
7G
108
105
Total 7GG
3072
3566
Grand Total (5G+7G)
4572
5397
______________________ Production-Co-Ordinator
__________________ Finishing-In-Charge
________________ Knitting-In-Charge
Remarks
______________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Date : 01.08.2008
All Figure In DZ Buyer Wise Production & Export Summarry For The Month Of July'08
SL
Buyer
Gauge
Product.In.Dz
Export In Dz.
01
G.Union
5G
44
300
02
G.Gold
5G
234
0
03
Sage
5G
1115
306
04
Sears
5G
369
297
05
Li & Fung
5G
0
484
1762
1388
Total 5GG 05
G.Gold
7G
2938
1144
06
G.Union
7G
184
1590
07
Seara
7G
407
497
08
Safra
12G
0
392
Total 7GG
3529
3623
Grand Total (5G+7G)
5290
5011
______________________ Production-Co-Ordinator
__________________ Finishing-In-Charge
________________ Knitting-In-Charge
Remarks
______________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Date : 01.07.2008
All Figure In DZ Buyer Wise Production & Export Summarry For The Month Of June'08 SL
Buyer
Gauge
Product.In.Dz
Export In Dz.
Remarks
01
Sears
5G
569
552
02
Li& Fung
5G
378
163
03
G.Union
5G
359
1000
04
G.Gold
5G
529
Total 5GG
1305
2243
05
G.Gold
7G
1601
536
06
Sears
7G
298
194
07
Eurofrente
7G
3
1100
08
G.Union
7G
933
Total 7GG
2835
1830
Grand Total (5G+7G)
4141
4073
______________________ Production-Co-Ordinator
__________________ Finishing-In-Charge
________________ Knitting-In-Charge
______________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Date : 01.06.2008
All Figure In DZ Buyer Wise Production & Export Summarry For The Month Of May'08 SL 01
Buyer G.Union
Gauge
Product.In.Dz
5G
172
Export In Dz.
Remarks
02
Sears
5G
175
03
G.Gold
5G
547
04
Li& Fung
5G
284
05
Branex
5G
532
Total 5GG
1178
532
06
G.Union
7G
1001
07
K-Mart
7G
1275
2083
08
Eurofrente
7G
1341
3050
Total 7GG
3616
5133
Grand Total (5G+7G)
4794
5664
______________________ Production-Co-Ordinator
__________________ Finishing-In-Charge
________________ Knitting-In-Charge
______________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Date : 02.05.2008
All Figure In DZ Buyer Wise Production & Export Summarry For The Month Of April'08 SL
Buyer
Gauge
Product.In.Dz
Export In Dz.
01
G.Union
5G
1209
800
02
Quelle
5G
486
614
Remarks
03
G.Gold
5G
164
296
04
Branex
5G
8
0
1867
1710
Total 5GG 05
G.Union
7G
298
1500
06
G.Gold
7G
830
0
07
Eurofrente
7G
1908
0
08
Quelle
7G
0
83
Total 7GG
3036
1583
Grand Total (5G+7G)
4903
3293
______________________ Production-Co-Ordinator
__________________ Finishing-In-Charge
________________ Knitting-In-Charge
______________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Date : 01.04.2008
All Figure In DZ Buyer Wise Production & Export Summarry For The Month Of March'08 SL
Buyer
Gauge
Product.In.Dz
Export In Dz.
01
G.Union
5G
1288
2600
02
Branex
5G
530
0
03
Quelle
5G
135
0
04
N.Mann
5G
118
135
Remarks
05
Atlantic
5G
191
06
G.Gold
5G
139
Total 5GG
183
2401
2918
07
G.Union
7G
1684
2800
08
Quelle
7G
85
0
09
Eurofrente
7G
938
0
10
Branex
7G
0
284
Total 7GG
2707
3084
Grand Total (5G+7G)
5108
6002
______________________ Production-Co-Ordinator
__________________ Finishing-In-Charge
________________ Knitting-In-Charge
______________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Date : 01.03.2008
All Figure In DZ Buyer Wise Production & Export Summarry For The Month Of February'08 SL
Buyer
Gauge
Product.In.Dz
Export In Dz.
01
Atlantic
5G
649
631
02
G.Union
5G
1123
1235
03
N.Mann
5G
17
0
1790
1866
Total 5GG
Remarks
04
G.Gold
7G
327
1350
05
Branex
7G
252
514
06
G.Union
7G
1602
400
07
Zara
12G
0
48
Total 7GG
2180
2312
Grand Total (5G+7G)
3970
4178
______________________ Production-Co-Ordinator
__________________ Finishing-In-Charge
________________ Knitting-In-Charge
Recvd From Swt.Complex
______________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Date : 01.02.2008
All Figure In DZ Buyer Wise Production & Export Summarry For The Month Of January'08 SL
Buyer
Gauge
Product.In.Dz
Export In Dz.
01
N.Mann
5G
139
134
02
G.Union
5G
1232
0
1371
134
955
0
Total 5GG 03
G.Gold
7G
Remarks
04
Branex
7G
564
0
05
G.Union
7G
803
0
06
Quelle
7G
0
1110
07
Zara
12G
0
101
Recvd From Swt.Complex
08
Sfara
12G
0
182
Recvd From Swt.Complex
Total 7GG
2323
1393
Grand Total (5G+7G)
3693
1527
______________________ Production-Co-Ordinator
__________________ Finishing-In-Charge
________________ Knitting-In-Charge
______________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Date : 01.01.2008
All Figure In DZ Buyer Wise Production & Export Summarry For The Month Of December'07 SL
Buyer
Gauge
Product.In.Dz
Export In Dz.
01
G.Gold
5G
425
414
02
Quelle
5G
50
619
03
Atlantic
5G
20
0
Remarks
04
N.Mann
5G
128
126
05
G.Union
5G
871
0
1494
1159 2372
Total 5GG 06
Quelle
7G
1598
07
G.Union
7G
462
08
G.Gold
7G
0
49
Total 7GG
2060
2421
Grand Total (5G+7G)
3554
3580
______________________ Production-Co-Ordinator
__________________ Finishing-In-Charge
________________ Knitting-In-Charge
______________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Date : 02.12.2007
All Figure In DZ Buyer Wise Production & Export Summarry For The Month Of November'07 SL
Buyer
Gauge
Product.In.Dz
Export In Dz.
01
Eurofrente
5G
9
351
02
Quelle
5G
766
276
775
627
2529
542
Total 5GG 05
Quelle
7G
Remarks
06
Les. Line
7G
422
1043
07
G.Union
7G
1
0
08
G.Gold
7G
468
498
09
Cellio
12G
0
33
Total 7GG
3420
2116
Grand Total (5G+7G)
4195
2743
______________________ Production-Co-Ordinator
__________________ Finishing-In-Charge
________________ Knitting-In-Charge
______________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Date : 03.11.2007
All Figure In DZ Buyer Wise Production & Export Summarry For The Month Of October'07 SL
Buyer
Gauge
Product.In.Dz
Export In Dz.
01
Eurofrente
5G
240
0
02
Quelle
5G
13
0
03
Sfera
5G
18
161
04
N.Mann
5G
0
200
271
361
Total 5GG
Remarks
05
Quelle
7G
705
1158
06
Les. Line
7G
614
407
07
G.Union
7G
195
334
08
G.Gold
7G
37
0
09
7G
10
7G Total 7GG
1551
1899
Grand Total (5G+7G)
1822
2260
______________________ Production-Co-Ordinator
__________________ Finishing-In-Charge
________________ Knitting-In-Charge
______________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Date : 02.10.2007
All Figure In DZ Buyer Wise Production & Export Summarry For The Month Of September'07 SL
Buyer
Gauge
Product.In.Dz
Export In Dz.
01
Eurofrente
5G
120
0
02
Quelle
5G
154
146
03
G.Gold
5G
0
176
04
Sfera
5G
148
0
422
322
1823
1873
Total 5GG 05
Quelle
7G
Remarks
06
Less. Line
7G
431
0
07
G.Union
7G
144
0
08
N.Mann
7G
206
0
09
Zara
7G
0
206
10
Sears
7G
0
125
2604
2204
0
790
Total 7GG 11
Zara
12G Total 7GG
0
790
Grand Total (5G+7G+12)
3026
3316
______________________ Production-Co-Ordinator
__________________ Finishing-In-Charge
________________ Knitting-In-Charge
______________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Date : 01.09.2007
All Figure In DZ Buyer Wise Production & Export Summarry For The Month Of August'07 SL
Buyer
Gauge
Product.In.Dz
Export In Dz.
01
Quelle
5G
69
0
02
G.Gold
5G
780
1157
849
1157
173
335
Total 5GG 07
Sears
7G
Remarks
08
Quelle
7G
518
0
09
Les. Line
7G
41
626
10
Zara
7G
1026
833
Total 7GG
1758
1794
Grand Total (5G & 7G)
2607
2951
______________________ Production-Co-Ordinator
__________________ Finishing-In-Charge
________________ Knitting-In-Charge
______________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Date : 05.08.2007
All Figure In DZ Buyer Wise Production & Export Summarry For The Month Of July'07 SL
Buyer
Gauge
Product.In.Dz
Export In Dz.
01
Quelle
5G
202
192
02
Tiara
5G
75
500
03
K-Mart
5G
1550
1564
04
Sears
5G
16
822
05
G.Gold
5G
479
0
Remarks
06
N.Mann
5G
Total 5GG
0
85
2322
3163
07
Sears
7G
481
794
08
Quelle
7G
1343
2222
09
Les. Line
7G
630
0
10
Zara
7G
19
0
2473
3016
0
108
Total 7GG 11
Eurofrente
7G
Total 12GG
0
108
Grand Total (5G & 7G)
4795
6287
______________________ Production-Co-Ordinator
__________________ Finishing-In-Charge
________________ Knitting-In-Charge
______________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Date : 01.07.2007
All Figure In DZ Buyer Wise Production & Export Summarry For The Month Of June'07 SL
Buyer
Gauge
Product.In.Dz
Export In Dz.
01
N.Mann
5G
85
0
02
G.Union
5G
51
1000
03
Tiara
5G
724
508
04
Sears
5G
514
0
05
G.Gold (K-Mart)
5G
37
0
1411
1508
Total 5GG
Remarks
05
Sears
7G
416
339
06
Quelle
7G
2615
2561
07
G.Union
7G
0
300
Total 7GG
3031
3200
Grand Total (5G & 7G)
4442
4708
______________________ Production-Co-Ordinator
__________________ Finishing-In-Charge
________________ Knitting-In-Charge
______________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Date : 01.07.2007
All Figure In DZ Buyer Wise Production & Export Summarry For The Month Of June'07 SL
Buyer
Gauge
Product.In.Dz
Export In Dz.
01
N.Mann
5G
85
0
02
G.Union
5G
51
1000
03
Tiara
5G
724
508
04
Sears
5G
514
0
05
G.Gold (K-Mart)
5G
37
0
1411
1508
Total 5GG 05
Sears
7G
416
339
06
Quelle
7G
2615
2561
Remarks
07
G.Union
0
300
Total 7GG
3031
3200
Grand Total (5G & 7G)
4442
4708
______________________ Production-Co-Ordinator
7G
__________________ Finishing-In-Charge
________________ Knitting-In-Charge
______________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Date : 01.06.2007
All Figure In DZ Buyer Wise Production & Export Summarry For The Month Of May'07 SL
Buyer
Gauge
Product.In.Dz
Export In Dz.
01
Quelle
5G
233
329
02
G.Union
5G
899
0
03
Tiara
5G
232
0
04
Sears
5G
338
238
05
N.Mann
5G
0
84
1702
651
Total 5GG 04
Sears
7G
413
0
05
Quelle
7G
634
142
06
G.Union
7G
307
0
Remarks
07
Tiara
7G
381
998
08
Eurofrente Total 7GG
7G
959 2694
1223 2363
4396
3014
Grand Total (5G & 7G)
______________________ Production-Co-Ordinator
__________________ Finishing-In-Charge
________________ Knitting-In-Charge
______________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Date : 01.05.2007
All Figure In DZ Buyer Wise Production & Export Summarry For The Month Of April'07 SL 01 02 03 03
Buyer Quelle N.Mann Sears G.Union Total 5GG
Gauge 5G 5G 5G 5G
Product.In.Dz 690 107 806 95 1698
Export In Dz. 669 166 569 500 1904
04
G.Union
7G
231
1100
05 06 07 08
Quelle Tiara Eurofrente Sears Total 7GG
7G 7G 7G 7G
880 630 277 20 2038
700 0 0 0 1800
3736
3704
Grand Total (5G & 7G)
Remarks
______________________ Production-Co-Ordinator
__________________ Finishing-In-Charge
________________ Knitting-In-Charge
______________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Date : 01.04.2007
All Figure In DZ Buyer Wise Production & Export Summarry For The Month Of March'07 SL 01
Buyer G.Union
02 03 04 05
Gauge 5G
Product.In.Dz 1495
Export In Dz. 2668
N.Mann
5G
160
0
Quelle Total 5GG G.Union Quelle Total 7GG
5G
97 1752.00 1905 23 1928.00
0 2668.00 1700 0 1700.00
3680
4368
7G 7G
Grand Total (5G & 7G)
Remarks
____________ Prepared By
________________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Date : 01.03.2007
All Figure In DZ Buyer Wise Production & Export Summarry For The Month Of February'07 SL 01
Buyer G.Union
Gauge 5G
Product.In.Dz 1743
Export In Dz. 532
02
N.Mann
5G
0
103
04 05
Total 5GG Quelle G.Union Total 7GG
7G 7G
1743.00 426 1157 1583.00
635.00 1471 1700 3171.00
3326
3806
Grand Total (5G & 7G)
____________ Prepared By
Remarks
________________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Date : 01.02.2007
All Figure In DZ Buyer Wise Production & Export Summarry For The Month Of January'07 SL 01
Buyer N.Mann
02 03 04 05
Gauge 5G
Product.In.Dz 106
Export In Dz. 0
Quelle
5G
371
750
G.Union Total 5GG Quelle G.Union Total 7GG
5G
779 1256.00 375 1288 1663.00
0 750.00 399 0 399.00
2919
1149
7G 7G
Grand Total (5G & 7G)
____________ Prepared By
_______________________ Production-Co-Ordinator
Remarks
________________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Date : 02.12.2006
All Figure In DZ Buyer Wise Production & Export Summarry For The Month Of November'06 SL 01 02 03 04 05
Buyer Eurofrente Quelle N.Mann Total 5GG Quelle Leasure Line
Gauge
Product.In.Dz
Export In Dz.
5G 5G 5G
370 127 95 592.00 2335 0
1150 75 83 1308.00 2676 23
2335.00
2699.00
7G 7G
Total 7GG 06
7G
Zara
0
7
Total 12GG
0
7
Grand Total(1.5G,5G&7G)
2927
4014
____________ Prepared By
_______________________ Production-Co-Ordinator
Remarks
________________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Date :
All Figure In DZ Buyer Wise Production & Export Summarry For The Month Of SL 01
Buyer
Gauge
Product.In.Dz
Export In Dz.
Remarks
Total 1.5GG
Total 5GG
Total 7GG
Grand Total(1.5G,5G&7G)
____________ Prepared By
_______________________ Production-Co-Ordinator
________________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Date : 01.11.2006
All Figure In DZ Buyer Wise Production & Export Summarry For The Month Of October'06 SL 01
Buyer G.Gold
Gauge 3G
Product.In.Dz 0
Export In Dz. 13
02
Total 1.5GG N.Mann
5G
0.00 35
13.00 0
03
Eurofrente
5G
763
0
03
G.Gold
5G
0
550
798.00
550.00
Total 5GG 08 08
Sears
7G
Quelle
7G
38
323
1609
1728
Total 7GG
1647
2051
Grand Total(1.5G,5G&7G)
2445
2614
____________ Prepared By
_______________________ Production-Co-Ordinator
Remarks
________________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Date : 03.10.2006
All Figure In DZ Buyer Wise Production & Export Summarry For The Month Of September'06 SL 01 02
Buyer Zara Total 1.5GG G.Gold
03
N.Mann
5G
43
0
04 05 06 07
5G 5G 5G 5G
08
Sears Eurofrente Bay-City Rajan Total 5GG Rajan
7G
150 54 0 0 1632.00 39
417 0 56 1100 2957.00 104
08
Sears
7G
457
158
92
0
1460
991
Total 7GG
2048
1253
Grand Total(1.5G,5G&7G)
3680
4390
09 10
5G
Product.In.Dz 0 0.00 1385
Export In Dz. 180 180.00 1384
7G
Tiara Quelle
____________ Prepared By
Gauge 1.5 G
7G
_______________________ Production-Co-Ordinator
Remarks
________________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Date : 01.09.2006
All Figure In DZ Buyer Wise Production & Export Summarry For The Month Of August'06 SL 01 02
Buyer G.Gold N.Mann
Gauge 5G 5G
Product.In.Dz 597 129
Export In Dz. 0 128
03
Quelle
5G
581
5G 5G
04 05 06
Sears Rajan Total 5GG Quelle Rajan Sears
7G 7G 7G
382 950 0 2058.00 737 1082 102
04 04
795.00 60.00 1564.00 1015 317 552
07
Tiara
7G
111
0
837 0
815 62
Total 5GG
2869
2761
Grand Total(5G&7G)
4927
4325
08
W.Smith N.Mann
____________ Prepared By
7G 7G
_______________________ Production-Co-Ordinator
Remarks
________________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Date : 01.08.2006
All Figure In DZ Buyer Wise Production & Export Summarry For The Month Of July'06 SL 01
Tiara
Buyer
02
Sears
03
Gauge 3G 5G
Product.In.Dz 0 0.00 120
Export In Dz. 160 160.00 415
Quelle
5G
2652
2493
04 05 06
Total 5GG Quelle Sears N.Mann
7G 7G 7G
2772.00 803 1195 153
2908.00 715 1318 83
07
Wehmeyer
7G
123
198
Total 5GG
2274
2314
Grand Total(5G&7G)
5046
5382
Total 3GG
Remarks
7G
____________ Prepared By
_______________________ Production-Co-Ordinator
________________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Date : 01.07.2006
All Figure In DZ Buyer Wise Production & Export Summarry For The Month Of June'06 SL 01 02 03 04
Buyer Quelle Sears N.Mann G.Union
Gauge 5G 5G 5G 5G
Product.In.Dz 1822 821 0 0
Export In Dz. 3272 416 0 0.00
05
Rajan
5G
0
06
Eurofrente
5G
0 0
293.00
07 08 09
Total 5GG Eurofrente Quelle Sears
7G 7G 7G
2643.00 25 686 1525
3981.00 460 560 1710
10
N.Mann
7G
185
403
11
Wehmeyer
7G
80
Total 5GG
2501
3133
Grand Total(5G&7G)
5144
7114
____________ Prepared By
Remarks
_______________________ Production-Co-Ordinator
________________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Date : 02.06.2006
All Figure In DZ Buyer Wise Production & Export Summarry For The Month Of May'06 SL 01 02 03 04
Buyer Quelle Sears N.Mann G.Union
Gauge 5G 5G 5G 5G
Product.In.Dz 1564 65 15 61
Export In Dz. 0 670 143 198.00
05
Rajan
5G
294
06
Scope
5G
0 0
40.00
07 08 09
Total 5GG Eurofrente Quelle Sears
7G 7G 7G
1705.00 73 1240 307
1345.00 500 2589 0
10
N.Mann
7G
251
0
468
454
Total 5GG
2339
3543
Grand Total(5G&7G)
4044
4888
11
G.Union
____________ Prepared By
7G
_______________________ Production-Co-Ordinator
Remarks
________________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Date : 01.03.2006
All Figure In DZ Buyer Wise Production & Export Summarry For The Month Of February'06 SL 01 02
Scope Zara
Buyer
Gauge 5G 5G
Product.In.Dz 117 218
Export In Dz.
03 04 05
Total 5GG Quelle Eurofrente N.Mann
7G 7G 7G
335.00 1681 94 321
0.00 1721 40
06
G.Union
7G
197
Total 5GG
2293
1761
Grand Total(5G&7G)
2628
1761
____________ Prepared By
_______________________ Production-Co-Ordinator
Remarks
________________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Date : 01.02.2006
All Figure In DZ Buyer Wise Production & Export Summarry For The Month Of January'06 SL 01
Zara
Buyer
Gauge 5G
Product.In.Dz 57
Export In Dz. 316
02
Total 5GG Quelle
7G
57.00 1352
316.00 1402
Total 5GG
1352
1402
Grand Total(5G&7G)
1409
1718
____________ Prepared By
_______________________ Production-Co-Ordinator
Remarks
________________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Date : 01.11.2005
All Figure In DZ Buyer Wise Production & Export Summarry For The Month Of October'05 SL 01
Buyer Eurofrente
02
Sears
Gauge 5G
Product.In.Dz 23
Export In Dz. 500
5G
247
504.00
270.00
1004.00
Total 5GG 06
Bay-City
7G
1663
2383.00
07
Dynasty
7G
56
133
08
Quelle
7G
1583
09 10 11
Total 5GG
3302.00
2516.00
Grand Total(5G&7G)
3572.00
3520.00
Remarks
____________ Prepared By
_______________________ Production-Co-Ordinator
________________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Date : 01.12.2005
All Figure In DZ Buyer Wise Production & Export Summarry For The Month Of November'05 SL 01
Zara
Buyer
02
Eurofrente
Gauge 5G
Product.In.Dz 319
Export In Dz.
5G
0
16.00
319.00
16.00
795
2326
379
1600
878
267
Total 5GG 06 07 08 09
Quelle Bay-City
7G 7G 7G
Sears N.Mann
7G
324
10 11
Total 5GG
2375
4193.00
Grand Total(5G&7G)
2694
4209.00
Remarks
____________ Prepared By
_______________________ Production-Co-Ordinator
________________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Date : 01.11.2005
All Figure In DZ Buyer Wise Production & Export Summarry For The Month Of October'05 SL 01
Buyer Eurofrente
02
Sears
Gauge 5G
Product.In.Dz 23
Export In Dz. 500
5G
247
504.00
270.00
1004.00
Total 5GG 06
Bay-City
7G
1663
2383.00
07
Dynasty
7G
56
133
08
Quelle
7G
1583
09 10 11
Total 5GG
3302.00
2516.00
Grand Total(5G&7G)
3572.00
3520.00
Remarks
____________ Prepared By
_______________________ Production-Co-Ordinator
________________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Date : 01.10.2005
All Figure In DZ Buyer Wise Production & Export Summarry For The Month Of September'05 SL
Buyer
Gauge
Product.In.Dz
Export In Dz. 575
01
Sears
5G
265
02 03 04 05 06
Bay-City Eurofrente G.Gold
5G 5G 5G
1157 500
Total 5GG
300.00
1922.00
875.00
06
Quelle
7G
227
1295.00
07
Rajan
7G
552
619
08
Bay-City
7G
488
09
Dynasty
7G
198
10
Zara
1.5 G
42
11
Total 5GG
1465.00
1956.00
Grand Total(5G&7G)
3387.00
2831.00
Remarks
____________ Prepared By
_______________________ Production-Co-Ordinator
________________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Date : 02.09.2005
All Figure In DZ Buyer Wise Production & Export Summarry For The Month Of August'05 SL
Buyer
Gauge
Product.In.Dz
Export In Dz.
01
Sears
5G
991
1437
02 03 04 05 06
G.Gold Bay-City Rajan
5G 5G 5G
308 486 0
190.00
1785.00
1627.00
Total 5GG 06
Rajan
7G
175
1147.00
07
Quelle
7G
1976
1069
08
G.Gold
7G
0
18.00
09
Zara
7G
0
252.00
10
Sears
7G
0
504
Total 5GG
2151.00
2990.00
Grand Total(5G&7G)
3936.00
4617.00
11
Remarks
____________ Prepared By
_______________________ Production-Co-Ordinator
________________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Date : 02.08.2005
All Figure In DZ Buyer Wise Production & Export Summarry For The Month Of July'05
SL 01 02 03 04 05
Buyer Sears Rajan Bernardi Zara
Gauge 5G 5G 5G 5G
Product.In.Dz 1311 12 191 254
Export In Dz. 900
1768.00
1080.00
Remarks
180
06 Total 5GG 06
Rajan
7G
725
140.00
07
Bay-City
7G
427
1701
08
Bernardi
7G
264
363.00
09
Quelle
7G
185
10
G.Gold
7G
1056
11
Sears
7G
323
Total 5GG
1601.00
3583.00
Grand Total(5G&7G)
3369.00
4663.00
____________ Prepared By
_______________________ Production-Co-Ordinator
________________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Date : 01.06.2005
All Figure In DZ Buyer Wise Production & Export Summarry For The Month Of May '05 SL 01 02 03 04 05 06
Buyer Whemeyer Sears Rajan Eurofrente G.Gold
Gauge 5G 5G 5G 5G 5G
Product.In.Dz 437 1002 67
Export In Dz. 427.00
1367.00 794.00
06 07 08 09
Total 5GG Rajan Quelle Bay-City Sears
7G 7G 7G 7G
1506.00 392 381 838 567
10
G.Gold
7G
143
Remarks
200 340.00 400.00
Total 5GG
2321.00
794.00
Grand Total(5G&7G)
3827.00
2161.00
____________
_______________________
________________
Prepared By
Production-Co-Ordinator
Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Date : 02.05.2005
All Figure In DZ Buyer Wise Production & Export Summarry For The Month Of April '05 SL 01 02 03 04 05 06 07 08 09
Buyer Eurofrente Rajan G.Gold Sears Bay-City Total 5GG Quelle Rajan G.Gold Scope
10
Bay-City
Gauge 5G 5G 5G 5G 5G
Export In Dz.
7G 7G 7G 7G
Product.In.Dz 194.00 205.00 516.00 701.00 0.00 1616.00 182.00 772.00 628.00 516.00
7G
0
2088
Total 5GG
2098.00
2702.00
Grand Total(5G&7G)
3714.00
3676.00
Remarks
407.00 567.00 974.00 62.00 552.00
____________
_______________________
________________
Prepared By
Production-Co-Ordinator
Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Date : 02.03.2005
All Figure In DZ Buyer Wise Production & Export Summarry For The Month Of February'05 SL 01 02 03 04 05 06 07 08
Buyer Scope G.Union Scope Bay-City N.Mann Casabawa
Total
Gauge 5G 5G 7G 7G 7G 7G 7G
Product.In.Dz 7.00 430.16 2.67 2445.08 175.75
Export In Dz. 252.00
3060.66
783.5
300.00 64.83 166.67
Remarks
____________
_______________________
________________
Prepared By
Production-Co-Ordinator
Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Date :02.02.2005
All Figure In DZ Buyer Wise Production & Export Summarry For The Month Of January'05 SL 01 02 03 04 05 06 07
Buyer Scope G.Union N.Mann Scope
Gauge 5G 7G 7G 7G 7G 7G 7G
Product.In.Dz 249.50 832.34 516.67 301.92
Export In Dz. 501.00
Remarks
08
Total
____________ Prepared By
1900.43
_______________________ Production-Co-Ordinator
501
________________ Plant-In-Charge
Rajan
MK-412692 5G 200
200
Rajan
MK-413066 7G 200
200
Rajan
Mk-412727 7G 300
260
Rajan
Mk-412727 7G 300
260
Rajan
MK-412692 5G 200
200
Rajan
MK-413066 7G 200
200
Rajan
Mk-412727 7G 300
260
Rajan
Mk-412727 7G 300
260
Rajan
MK-412692 5G 200
200
Rajan
MK-413066 7G 200
200
Rajan
Mk-412727 7G 300
260
Rajan
Mk-412727 7G 300
260
Rajan
MK-412692 5G 200
200
Rajan
MK-413066 7G 200
200
Rajan
Mk-412727 7G 300
260
Rajan
Mk-412727 7G 300
260
Rajan
Mk-412727 7G 300
260
Rajan
MK-412692 5G 200
200
Rajan
MK-413066 7G 200
200
Rajan
Mk-412727 7G 300
260
Rajan
Mk-412727 7G 300
260
Rajan
Mk-412727 7G 300
260
Rajan
MK-412692 5G 200
200
Rajan
MK-413066 7G 200
200
Rajan
Mk-412727 7G 300
260
Rajan
Mk-412727 7G 300
260
Rajan
Mk-412727 7G 300
260
Rajan
MK-412692 5G 200
200
Rajan
MK-413066 7G 200
200
Rajan
Mk-412727 7G 300
260
Rajan
Mk-412727 7G 300
260
Rajan
Mk-412727 7G 300
260
Rajan
Mk-412727 7G 300
260
Rajan
Mk-412727 7G 300
260
Rajan
MK-412692 5G 200
200
Rajan
MK-413066 7G 200
200
Rajan
Mk-412727 7G 300
260
Rajan
Mk-412727 7G 300
260
Rajan
Mk-412727 7G 300
260
Rajan
Mk-412727 7G 300
260
Rajan
Mk-412727 7G 300
260
Rajan
MK-412692 5G 200
200
Rajan
MK-413066 7G 200
200
Rajan
Mk-412727 7G 300
260
Rajan
Mk-412727 7G 300
260
Rajan
MK-412692 5G 200
200
Rajan
MK-412692 5G 200
200
Rajan
MK-413066 7G 200
200
Rajan
Mk-412727 7G 300
260
Rajan
Mk-412727 7G 300
260
Rajan
Mk-412727 7G 300
260
Rajan
Mk-412727 7G 300
260
Rajan
MK-412692 5G 200
200
Rajan
MK-412692 5G 200
200
Rajan
MK-412692 5G 200
200
G.Gold
007999
5G 500
400
Rajan
MK-413066 7G 200
200
Rajan
Mk-412727 7G 300
260
Rajan
Mk-412727 7G 300
260
Rajan
Mk-412727 7G 300
260
Rajan
Mk-412727 7G 300
260
Rajan
Mk-412727 7G 300
260
Rajan
MK-412692 5G 200
200
Rajan
MK-412692 5G 200
200
Rajan
MK-412692 5G 200
200
G.Gold
Rajan
007999
5G 500
400
MK-413066 7G 200
200
Rajan
Mk-412727 7G 300
260
Rajan
Mk-412727 7G 300
260
Rajan
Mk-412727 7G 300
260
Rajan
Mk-412727 7G 300
260
Rajan
Mk-412727 7G 300
260
Rajan
Mk-412727 7G 300
260
Rajan
MK-412692 5G 200
200
G.Gold
Rajan
007999
5G 500
400
MK-413066 7G 200
200
Rajan
Mk-412727 7G 300
260
Rajan
Mk-412727 7G 300
260
Rajan
Mk-412727 7G 300
260
Rajan
MK-412692 5G 200
200
G.Gold
007999
5G 500
400
G.Gold
007999
5G 500
400
G.Gold
007999
5G 500
400
G.Gold
007999
5G 500
400
G.Gold
007999
5G 500
400
Rajan
MK-413066 7G 200
200
Rajan
Mk-412727 7G 300
260
Rajan
Mk-412727 7G 300
260
Rajan
Mk-412727 7G 300
260
Rajan
Mk-412727 7G 300
260
Rajan
MK-412692 5G 200
200
G.Gold
007999
5G 500
400
G.Gold
007999
5G 500
400
G.Gold
007999
5G 500
400
G.Gold
007999
5G 500
400
Rajan
MK-413066 7G 200
200
Rajan
Mk-412727 7G 300
260
Rajan
Mk-412727 7G 300
260
Rajan
MK-412692 5G 200
200
G.Gold
007999
5G 500
400
G.Gold
007999
5G 500
400
G.Gold
007999
5G 500
400
G.Gold
007999
5G 500
400
Rajan
MK-413066 7G 200
200
Rajan
Mk-412727 7G 300
260
Rajan
MK-413066 7G 200
200
Rajan
Mk-412727 7G 300
260
Rajan
MK-413066 7G 200
200
Rajan
MK-412692 5G 200
200
G.Gold
007999
5G 500
400
G.Gold
007999
5G 500
400
G.Gold
007999
5G 500
400
Rajan
MK-413066 7G 200
200
Rajan
Mk-412727 7G 300
260
Rajan
MK-413066 7G 200
200
Rajan
Mk-412727 7G 300
260
Rajan
MK-413066 7G 200
200
Rajan
MK-412692 5G 200
200
G.Gold
007999
5G 500
400
G.Gold
007999
5G 500
400
Rajan
MK-413066 7G 200
200
Rajan
Mk-412727 7G 300
260
Rajan
MK-412692 5G 200
200
G.Gold
007999
5G 500
400
G.Gold
007999
5G 500
400
Rajan
MK-413066 7G 200
200
Rajan
Mk-412727 7G 300
260
Rajan
MK-412692 5G 200
200
G.Gold
007999
5G 500
400
G.Gold
007999
5G 500
400
Rajan
MK-413066 7G 200
200
Rajan
Mk-412727 7G 300
260
Rajan
MK-412692 5G 200
200
G.Gold
007999
5G 500
400
G.Gold
007999
5G 500
400
Rajan
MK-413066 7G 200
200
Rajan
Mk-412727 7G 300
260
Rajan
Mk-412727 7G 300
260
Rajan
MK-412692 5G 200
200
G.Gold
007999
5G 500
400
G.Gold
007999
5G 500
400
G.Gold
007999
5G 500
400
G.Gold
007999
5G 500
400
Rajan
MK-413066 7G 200
200
Rajan
Mk-412727 7G 300
260
Rajan
MK-412727 7G
40
36
Rajan
MK-413076 7G 300
298
Rajan
MK-412692 5G 200
200
G.Gold
007999
5G 500
400
G.Gold
007999
5G 500
400
G.Gold
007999
5G 500
400
G.Gold
007999
5G 500
400
Rajan
MK-413066 7G 200
200
Rajan
Mk-412727 7G 300
260
Rajan
MK-412727 7G
40
36
Rajan
MK-413076 7G 300
298
Rajan
MK-412692 5G 200
200
G.Gold
007999
5G 500
400
Eurofrente
08206
5G 119
120
Rajan
MK-413066 7G 200
200
Rajan
Mk-412727 7G 300
260
Rajan
MK-412727 7G
40
36
Rajan
MK-413076 7G 300
298
Rajan
MK-412692 5G 200
200
G.Gold
007999
5G 500
400
Eurofrente
08206
5G 119
120
Rajan
MK-413066 7G 200
200
Rajan
Mk-412727 7G 300
260
Rajan
MK-412727 7G
40
36
Rajan
MK-413076 7G 300
298
Rajan
MK-412692 5G 200
200
Rajan
MK-412692 5G 200
200
G.Gold
007999
5G 500
400
Eurofrente
08206
5G 119
120
Rajan
MK-413066 7G 200
200
Rajan
Mk-412727 7G 300
260
Rajan
MK-412727 7G
40
36
Rajan
MK-413076 7G 300
298
Rajan
MK-412692 5G 200
200
G.Gold
007999
5G 500
400
Eurofrente
08206
5G 119
120
Wehemer
WR-01
5G 427
427
Eurofrente
08206
5G 119
120
Wehemer
WR-01
5G 427
427
Rajan
MK-413066 7G 200
200
Rajan
Mk-412727 7G 300
260
Rajan
MK-412727 7G
40
36
Rajan
MK-413076 7G 300
298
Rajan
MK-412692 5G 200
200
G.Gold
007999
5G 500
400
Eurofrente
08206
5G 119
120
Wehemer
WR-01
5G 427
427
Eurofrente
08206
5G 119
120
Wehemer
WR-01
5G 427
427
Rajan
MK-413066 7G 200
200
Rajan
Mk-412727 7G 300
260
Rajan
MK-412727 7G
40
36
Rajan
MK-413076 7G 300
298
Rajan
MK-412692 5G 200
200
G.Gold
007999
5G 500
400
Eurofrente
08206
5G 119
120
Wehemer
WR-01
5G 427
427
Rajan
MK-413066 7G 200
200
Rajan
Mk-412727 7G 300
260
Rajan
MK-412727 7G
40
36
Rajan
MK-413076 7G 300
298
Rajan
MK-412692 5G 200
200
G.Gold
007999
5G 500
400
Eurofrente
08206
5G 119
120
Wehemer
WR-01
5G 427
427
Rajan
MK-413066 7G 200
200
Rajan
Mk-412727 7G 300
260
Rajan
MK-412727 7G
40
36
Rajan
MK-413076 7G 300
298
Rajan
MK-412692 5G 200
200
G.Gold
007999
5G 500
400
Eurofrente
08206
5G 119
120
Eurofrente
08207
5G 219
220
Eurofrente
08207
5G 219
220
Wehemer
WR-01
5G 427
427
Rajan
MK-413066 7G 200
200
Rajan
Mk-412727 7G 300
260
Rajan
MK-412727 7G
40
36
Rajan
MK-413076 7G 300
298
Rajan
MK-412692 5G 200
200
G.Gold
007999
5G 500
400
Eurofrente
08206
5G 119
120
Eurofrente
08207
5G 219
220
Eurofrente
08207
5G 219
220
Wehemer
WR-01
5G 427
427
Rajan
MK-413066 7G 200
200
Rajan
Mk-412727 7G 300
260
Rajan
MK-412727 7G
40
36
Rajan
MK-413076 7G 300
298
Rajan
MK-412692 5G 200
200
G.Gold
007999
5G 500
400
Eurofrente
08206
5G 119
120
Eurofrente
08207
5G 219
220
Eurofrente
08207
5G 219
220
Wehemer
WR-01
5G 427
427
Rajan
MK-413066 7G 200
200
Rajan
Mk-412727 7G 300
260
Rajan
MK-412727 7G
40
36
Rajan
MK-413076 7G 300
298
Rajan
MK-412692 5G 200
200
G.Gold
007999
5G 500
400
Eurofrente
08206
5G 119
120
Eurofrente
08207
5G 219
220
Wehemer
WR-01
5G 427
427
Rajan
MK-413066 7G 200
200
Rajan
Mk-412727 7G 300
260
Rajan
MK-412727 7G
40
36
Rajan
MK-413076 7G 300
298
Rajan
MK-412692 5G 200
200
G.Gold
007999
5G 500
400
Eurofrente
08206
5G 119
120
Eurofrente
08207
5G 219
220
Wehemer
WR-01
5G 427
427
Rajan
MK-413066 7G 200
200
Rajan
Mk-412727 7G 300
260
Rajan
MK-412727 7G
40
36
Rajan
MK-413076 7G 300
298
Rajan
MK-412692 5G 200
200
G.Gold
007999
5G 500
400
Eurofrente
08206
5G 119
120
Eurofrente
08207
5G 219
220
Wehemer
WR-01
5G 427
427
Rajan
MK-413066 7G 200
200
Rajan
Mk-412727 7G 300
260
Rajan
MK-412727 7G
40
36
Rajan
MK-413076 7G 300
298
Rajan
MK-412692 5G 200
200
G.Gold
007999
5G 500
400
Eurofrente
08206
5G 119
120
Eurofrente
08207
5G 219
220
Wehemer
WR-01
5G 427
427
Rajan
MK-413066 7G 200
200
Rajan
Mk-412727 7G 300
260
Rajan
MK-412727 7G
40
36
Rajan
MK-413076 7G 300
298
GLOBAL KNITWEAR LTD 269 DEWAN HAT CHITTAGONG
Date : 01.09.2008
Needle Consumption Report For The Month Of August' 2008 Sl 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58
Types Of Needle DB X 1-2 DB X 1-2 DB X 1-2 DB X 1-2 DB X 1-2 DB X 1KM DP X 5 DP X 5 DP X 5 DP X 5 DP X 5 DP X 5 DP X 5 BB DC X 27 DC X 27 DC X 27 DC X 27 DC X 27 TV X 7 TV X 7 TV X 7 TV X 7 TV X 7 TQ X 7 TQ X 1 UO X 113 UO X 113 UO X 113 UO X 113 UY X 1 UY X 14 TO X 7 TO X 7 TO X 7 TO X 7 TO X 7 DM X 13 DM X 13 DM X 13 10" KNIFE 8" KNIFE A BELT 1/2" KNIFE USSUE (7G) 7G KNITTING NEEDLE 5G KNITTING NEEDLE 12G KNITTING NEEDLE 3G KNITTING NEEDLE PYC - 22 PYE - 23 PYC - 21 PAY - 7 PAY - 4 PAY - 23 HARA DOMI HARACHI 7G HARACHI 5G
# # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # #
This Month Consumption 11 Pkt 12 14 Pkt 16 6 Pkt 18 9 11 12 14 Pkt 16 2 Pkt 17 Pkt 21 22 21 Pkt 11 12 14 16 2 Pkt 18 Pkt 11 12 14 16 Pkt 18 16 8 Pkt 16 Pkt 11 12 14 10 16 Pkt 10 Pkt 18 11 12 14 16 18 16/18 14 16/18
532 396
6
Pcs 13800 Pcs 8200 Pcs Pcs Pcs Pkt Pkt 1 Pkt 2 Pkt Pkt Pkt Pcs 300 Pcs 100 Pcs
Total Consumption Pkt Pkt 45 Pkt
Pkt 13 Pkt Pkt
Pkt
16 Pkt Pkt
Pkt 10 Pkt 39 Pkt
4 Pkt Pkt
114600 55200
15 11
2500 700
Pcs Pcs Pcs Pcs Pcs Pkt Pkt Pkt Pkt Pkt Pkt Pcs Pcs Pcs
Remarks
______________________ Production-Co-Ordinator
________________ Plant-In-Charge
GLOBAL KNITWEAR LTD 269 DEWAN HAT CHITTAGONG
Date : 01.08.2008
Needle Consumption Report For The Month Of July' 2008 Sl 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58
Types Of Needle DB X 1-2 DB X 1-2 DB X 1-2 DB X 1-2 DB X 1-2 DB X 1KM DP X 5 DP X 5 DP X 5 DP X 5 DP X 5 DP X 5 DP X 5 BB DC X 27 DC X 27 DC X 27 DC X 27 DC X 27 TV X 7 TV X 7 TV X 7 TV X 7 TV X 7 TQ X 7 TQ X 1 UO X 113 UO X 113 UO X 113 UO X 113 UY X 1 UY X 14 TO X 7 TO X 7 TO X 7 TO X 7 TO X 7 DM X 13 DM X 13 DM X 13 10" KNIFE 8" KNIFE A BELT 1/2" KNIFE USSUE (7G) 7G KNITTING NEEDLE 5G KNITTING NEEDLE 12G KNITTING NEEDLE 3G KNITTING NEEDLE PYC - 22 PYE - 23 PYC - 21 PAY - 7 PAY - 4 PAY - 23 HARA DOMI HARACHI 7G HARACHI 5G
# # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # #
11 12 14 16 18 9 11 12 14 16 17 21 22 21 11 12 14 16 18 11 12 14 16 18 16 16 11 12 14 10 16 10 18 11 12 14 16 18 16/18 14 16/18
532 396
6
This Month Consumption Pkt
Total Consumption Pkt
Pkt 6 Pkt
Pkt 39 Pkt
Pkt 4 Pkt Pkt
Pkt 11 Pkt Pkt
Pkt
Pkt
2 Pkt Pkt
14 Pkt Pkt
Pkt
Pkt
Pkt 4 Pkt
2 Pkt 39 Pkt
Pkt Pkt
4 Pkt Pkt
Pcs 17000 Pcs 6000 Pcs Pcs Pcs Pkt Pkt 2 Pkt 2 Pkt Pkt Pkt Pcs Pcs Pcs
Pcs Pcs Pcs Pcs Pcs Pkt Pkt Pkt Pkt Pkt Pkt Pcs Pcs Pcs
100800 47000
14 9
2200 600
Remarks
______________________ Production-Co-Ordinator
________________ Plant-In-Charge
GLOBAL KNITWEAR LTD 269 DEWAN HAT CHITTAGONG
Date : 01.07.2008
Needle Consumption Report For The Month Of June' 2008 Sl 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58
Types Of Needle DB X 1-2 DB X 1-2 DB X 1-2 DB X 1-2 DB X 1-2 DB X 1KM DP X 5 DP X 5 DP X 5 DP X 5 DP X 5 DP X 5 DP X 5 BB DC X 27 DC X 27 DC X 27 DC X 27 DC X 27 TV X 7 TV X 7 TV X 7 TV X 7 TV X 7 TQ X 7 TQ X 1 UO X 113 UO X 113 UO X 113 UO X 113 UY X 1 UY X 14 TO X 7 TO X 7 TO X 7 TO X 7 TO X 7 DM X 13 DM X 13 DM X 13 10" KNIFE 8" KNIFE A BELT 1/2" KNIFE USSUE (7G) 7G KNITTING NEEDLE 5G KNITTING NEEDLE 12G KNITTING NEEDLE 3G KNITTING NEEDLE PYC - 22 PYE - 23 PYC - 21 PAY - 7 PAY - 4 PAY - 23 HARA DOMI HARACHI 7G HARACHI 5G
# # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # #
11 12 14 16 18 9 11 12 14 16 17 21 22 21 11 12 14 16 18 11 12 14 16 18 16 16 11 12 14 10 16 10 18 11 12 14 16 18 16/18 14 16/18
532 396
6
This Month Consumption Pkt
Total Consumption Pkt
Pkt 9 Pkt
Pkt 33 Pkt
Pkt 2 Pkt Pkt
Pkt 7 Pkt Pkt
Pkt
Pkt
2 Pkt Pkt
12 Pkt Pkt
Pkt
Pkt
Pkt 5 Pkt
2 Pkt 35 Pkt
Pkt Pkt
4 Pkt Pkt
Pcs 15400 Pcs 6400 Pcs Pcs Pcs Pkt Pkt 2 Pkt 1 Pkt Pkt Pkt Pcs 200 Pcs 200 Pcs
Pcs Pcs Pcs Pcs Pcs Pkt Pkt Pkt Pkt Pkt Pkt Pcs Pcs Pcs
83800 41000
12 7
2200 600
Remarks
______________________ Production-Co-Ordinator
________________ Plant-In-Charge
GLOBAL KNITWEAR LTD 269 DEWAN HAT CHITTAGONG
Date : 01.06.2008
Needle Consumption Report For The Month Of May' 2008 Sl 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56
Types Of Needle DB X 1-2 DB X 1-2 DB X 1-2 DB X 1-2 DB X 1-2 DB X 1KM DP X 5 DP X 5 DP X 5 DP X 5 DP X 5 DP X 5 DP X 5 BB DC X 27 DC X 27 DC X 27 DC X 27 DC X 27 TV X 7 TV X 7 TV X 7 TV X 7 TV X 7 TQ X 7 TQ X 1 UO X 113 UO X 113 UO X 113 UO X 113 UY X 1 UY X 14 TO X 7 TO X 7 TO X 7 TO X 7 TO X 7 DM X 13 DM X 13 DM X 13 10" KNIFE 8" KNIFE A BELT 1/2" KNIFE USSUE (7G) 7G KNITTING NEEDLE 5G KNITTING NEEDLE 12G KNITTING NEEDLE 3G KNITTING NEEDLE PYC - 22 PYE - 23 PYC - 21 PAY - 7 PAY - 4 PAY - 23 HARA DOMI
# # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # #
11 12 14 16 18 9 11 12 14 16 17 21 22 21 11 12 14 16 18 11 12 14 16 18 16 16 11 12 14 10 16 10 18 11 12 14 16 18 16/18 14 16/18
532 396
6
This Month Consumption Pkt
Total Consumption Pkt
Pkt 5 Pkt
Pkt 24 Pkt
Pkt 2 Pkt Pkt
Pkt 5 Pkt Pkt
Pkt
Pkt
2 Pkt Pkt
10 Pkt Pkt
Pkt
Pkt
Pkt 11 Pkt
2 Pkt 30 Pkt
Pkt Pkt
4 Pkt Pkt
Pcs 14600 Pcs 3400 Pcs Pcs Pcs Pkt Pkt 2 Pkt 1 Pkt Pkt Pkt Pcs
Pcs 68400 Pcs 34600 Pcs Pcs Pcs Pkt Pkt 10 Pkt 6 Pkt Pkt Pkt Pcs
Remarks
57 HARACHI 7G 58 HARACHI 5G
# #
200 Pcs 100 Pcs
2000 Pcs 400 Pcs
______________________ Production-Co-Ordinator
________________ Plant-In-Charge
GLOBAL KNITWEAR LTD 269 DEWAN HAT CHITTAGONG
Date : 01.05.2008
Needle Consumption Report For The Month Of April' 2008 Sl 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56
Types Of Needle DB X 1-2 DB X 1-2 DB X 1-2 DB X 1-2 DB X 1-2 DB X 1KM DP X 5 DP X 5 DP X 5 DP X 5 DP X 5 DP X 5 DP X 5 BB DC X 27 DC X 27 DC X 27 DC X 27 DC X 27 TV X 7 TV X 7 TV X 7 TV X 7 TV X 7 TQ X 7 TQ X 1 UO X 113 UO X 113 UO X 113 UO X 113 UY X 1 UY X 14 TO X 7 TO X 7 TO X 7 TO X 7 TO X 7 DM X 13 DM X 13 DM X 13 10" KNIFE 8" KNIFE A BELT 1/2" KNIFE USSUE (7G) 7G KNITTING NEEDLE 5G KNITTING NEEDLE 12G KNITTING NEEDLE 3G KNITTING NEEDLE PYC - 22 PYE - 23 PYC - 21 PAY - 7 PAY - 4 PAY - 23 HARA DOMI
# # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # #
11 12 14 16 18 9 11 12 14 16 17 21 22 21 11 12 14 16 18 11 12 14 16 18 16 16 11 12 14 10 16 10 18 11 12 14 16 18 16/18 14 16/18
532 396
6
This Month Consumption Pkt
Total Consumption Pkt
Pkt 5 Pkt
Pkt 19 Pkt
Pkt Pkt Pkt
Pkt 3 Pkt Pkt
Pkt
Pkt
2 Pkt Pkt
8 Pkt Pkt
Pkt
Pkt
Pkt 4 Pkt
2 Pkt 19 Pkt
2 Pkt Pkt
4 Pkt Pkt
Pcs 13000 Pcs 8600 Pcs Pcs Pcs Pkt Pkt 2 Pkt 1 Pkt Pkt Pkt Pcs
Pcs 53800 Pcs 31200 Pcs Pcs Pcs Pkt Pkt 8 Pkt 5 Pkt Pkt Pkt Pcs
Remarks
57 HARACHI 7G 58 HARACHI 5G
# #
600 Pcs 200 Pcs
1800 Pcs 300 Pcs
______________________ Production-Co-Ordinator
________________ Plant-In-Charge
GLOBAL KNITWEAR LTD 269 DEWAN HAT CHITTAGONG
Date : 01.04.2008
Needle Consumption Report For The Month Of March' 2008 Sl 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54
Types Of Needle DB X 1-2 DB X 1-2 DB X 1-2 DB X 1-2 DB X 1-2 DB X 1KM DP X 5 DP X 5 DP X 5 DP X 5 DP X 5 DP X 5 DP X 5 BB DC X 27 DC X 27 DC X 27 DC X 27 DC X 27 TV X 7 TV X 7 TV X 7 TV X 7 TV X 7 TQ X 7 TQ X 1 UO X 113 UO X 113 UO X 113 UO X 113 UY X 1 UY X 14 TO X 7 TO X 7 TO X 7 TO X 7 TO X 7 DM X 13 DM X 13 DM X 13 10" KNIFE 8" KNIFE A BELT 1/2" KNIFE USSUE (7G) 7G KNITTING NEEDLE 5G KNITTING NEEDLE 12G KNITTING NEEDLE 3G KNITTING NEEDLE PYC - 22 PYE - 23 PYC - 21 PAY - 7 PAY - 4
# # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # #
This Month Consumption 11 Pkt 12 14 Pkt 16 2 Pkt 18 9 11 12 14 Pkt 16 Pkt 17 Pkt 21 22 21 Pkt 11 12 14 16 2 Pkt 18 Pkt 11 12 14 16 Pkt 18 16 Pkt 16 Pkt 11 12 14 10 16 Pkt 10 Pkt 18 11 12 14 16 18 16/18 14 16/18
532 396
6
Pcs 11600 Pcs 11200 Pcs Pcs Pcs Pkt Pkt Pkt 2 Pkt Pkt
Total Consumption Pkt Pkt 14 Pkt
Pkt 3 Pkt Pkt
Pkt
6 Pkt Pkt
Pkt 2 Pkt 15 Pkt
2 Pkt Pkt
40800 22600
6 4
Pcs Pcs Pcs Pcs Pcs Pkt Pkt Pkt Pkt Pkt
Remarks
55 56 57 58
PAY - 23 HARA DOMI HARACHI 7G HARACHI 5G
# # # #
Pkt Pcs 500 Pcs 100 Pcs
Pkt Pcs 1200 Pcs 100 Pcs
______________________ Production-Co-Ordinator
________________ Plant-In-Charge
GLOBAL KNITWEAR LTD 269 DEWAN HAT CHITTAGONG
Date : 01.03.2008
Needle Consumption Report For The Month Of February' 2008 Sl 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53
Types Of Needle DB X 1-2 DB X 1-2 DB X 1-2 DB X 1-2 DB X 1-2 DB X 1KM DP X 5 DP X 5 DP X 5 DP X 5 DP X 5 DP X 5 DP X 5 BB DC X 27 DC X 27 DC X 27 DC X 27 DC X 27 TV X 7 TV X 7 TV X 7 TV X 7 TV X 7 TQ X 7 TQ X 1 UO X 113 UO X 113 UO X 113 UO X 113 UY X 1 UY X 14 TO X 7 TO X 7 TO X 7 TO X 7 TO X 7 DM X 13 DM X 13 DM X 13 10" KNIFE 8" KNIFE A BELT 1/2" KNIFE USSUE (7G) 7G KNITTING NEEDLE 5G KNITTING NEEDLE 12G KNITTING NEEDLE 3G KNITTING NEEDLE PYC - 22 PYE - 23 PYC - 21 PAY - 7
# # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # #
This Month Consumption 11 Pkt 12 14 Pkt 16 8 Pkt 18 9 11 12 14 Pkt 16 Pkt 17 Pkt 21 22 21 Pkt 11 12 14 16 2 Pkt 18 Pkt 11 12 14 16 Pkt 18 16 Pkt 16 7 Pkt 11 12 14 10 16 Pkt 10 Pkt 18 11 12 14 16 18 16/18 14 16/18
532 396
Pcs 13400 Pcs 6800 Pcs Pcs Pcs Pkt Pkt 2 Pkt 7 Pkt
Total Consumption Pkt Pkt 12 Pkt
Pkt 3 Pkt Pkt
Pkt
4 Pkt Pkt
Pkt 2 Pkt 15 Pkt
2 Pkt Pkt
Pcs 29200 Pcs 11400 Pcs Pcs Pcs Pkt Pkt 6 Pkt 2 Pkt
Remarks
54 55 56 57 58
PAY - 4 PAY - 23 HARA DOMI HARACHI 7G HARACHI 5G
# # # # #
6
Pkt Pkt Pcs 100 Pcs Pcs
Pkt Pkt Pcs 700 Pcs Pcs
______________________ Production-Co-Ordinator
________________ Plant-In-Charge
GLOBAL KNITWEAR LTD 269 DEWAN HAT CHITTAGONG
Date : 01.02.2008
Needle Consumption Report For The Month Of January' 2008 Sl 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52
Types Of Needle DB X 1-2 DB X 1-2 DB X 1-2 DB X 1-2 DB X 1-2 DB X 1KM DP X 5 DP X 5 DP X 5 DP X 5 DP X 5 DP X 5 DP X 5 BB DC X 27 DC X 27 DC X 27 DC X 27 DC X 27 TV X 7 TV X 7 TV X 7 TV X 7 TV X 7 TQ X 7 TQ X 1 UO X 113 UO X 113 UO X 113 UO X 113 UY X 1 UY X 14 TO X 7 TO X 7 TO X 7 TO X 7 TO X 7 DM X 13 DM X 13 DM X 13 10" KNIFE 8" KNIFE A BELT 1/2" KNIFE USSUE (7G) 7G KNITTING NEEDLE 5G KNITTING NEEDLE 12G KNITTING NEEDLE 3G KNITTING NEEDLE PYC - 22 PYE - 23 PYC - 21
# # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # #
11 12 14 16 18 9 11 12 14 16 17 21 22 21 11 12 14 16 18 11 12 14 16 18 16 16 11 12 14 10 16 10 18 11 12 14 16 18 16/18 14 16/18
532 396
This Month Consumption Pkt
Total Consumption Pkt
Pkt 4 Pkt
Pkt 4 Pkt
Pkt 3 Pkt Pkt
Pkt 3 Pkt Pkt
Pkt
Pkt
2 Pkt Pkt
2 Pkt Pkt
Pkt
Pkt
2 Pkt 8 Pkt
2 Pkt 8 Pkt
2 Pkt Pkt
2 Pkt Pkt
Pcs 15800 Pcs 4600 Pcs Pcs Pcs Pkt Pkt 4 Pkt
Pcs 15800 Pcs 4600 Pcs Pcs Pcs Pkt Pkt 4 Pkt
Remarks
53 54 55 56 57 58
PAY - 7 PAY - 4 PAY - 23 HARA DOMI HARACHI 7G HARACHI 5G
# # # # # #
6
1 Pkt Pkt Pkt Pcs 600 Pcs Pcs
1 Pkt Pkt Pkt Pcs 600 Pcs Pcs
______________________ Production-Co-Ordinator
________________ Plant-In-Charge
GLOBAL KNITWEAR LTD 269 DEWAN HAT CHITTAGONG
Date : 01.01.2008
Needle Consumption Report For The Month Of December' 2007 Sl 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49
Types Of Needle DB X 1-2 DB X 1-2 DB X 1-2 DB X 1-2 DB X 1-2 DB X 1KM DP X 5 DP X 5 DP X 5 DP X 5 DP X 5 DP X 5 DP X 5 BB DC X 27 DC X 27 DC X 27 DC X 27 DC X 27 TV X 7 TV X 7 TV X 7 TV X 7 TV X 7 TQ X 7 UO X 113 UO X 113 UO X 113 UO X 113 UY X 1 UY X 14 TO X 7 TO X 7 TO X 7 TO X 7 TO X 7 DM X 13 DM X 13 DM X 13 10" KNIFE 8" KNIFE A BELT 1/2" KNIFE USSUE (7G) 7G KNITTING NEEDLE 5G KNITTING NEEDLE 12G KNITTING NEEDLE 3G KNITTING NEEDLE PYC - 22
# # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # #
This Month Consumption 11 Pkt 12 14 Pkt 16 8 Pkt 18 9 11 12 14 Pkt 16 2 Pkt 17 Pkt 21 22 21 Pkt 11 12 14 16 2 Pkt 18 Pkt 11 12 14 16 Pkt 18 16 1 Pkt 11 12 14 10 16 Pkt 10 Pkt 18 11 12 14 16 18 16/18 14 16/18
532 396
Pcs 12400 Pcs 4800 Pcs Pcs Pcs Pkt
Total Consumption Pkt Pkt 66 Pkt
Pkt 16 Pkt 2 Pkt
Pkt
13 Pkt 6 Pkt
2 Pkt 16 Pkt
8 Pkt 2 Pkt
10 153600 77800 430 200
Pcs Pcs Pcs Pcs Pcs Pkt
Remarks
50 51 52 53 54 55 56 57
PYE - 23 PYC - 21 PAY - 7 PAY - 4 PAY - 23 HARA DOMI HARACHI 7G HARACHI 5G
# # # # # # # #
6
Pkt 1 Pkt Pkt Pkt Pkt Pcs 0 Pcs 200 Pcs
3 12 26 3 500 1900 1300
Pkt Pkt Pkt Pkt Pkt Pcs Pcs Pcs
______________________ Production-Co-Ordinator
________________ Plant-In-Charge
GLOBAL KNITWEAR LTD 269 DEWAN HAT CHITTAGONG
Date : 02.12.2007
Needle Consumption Report For The Month Of November' 2007 Sl 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47
Types Of Needle DB X 1-2 DB X 1-2 DB X 1-2 DB X 1-2 DB X 1-2 DB X 1KM DP X 5 DP X 5 DP X 5 DP X 5 DP X 5 DP X 5 DP X 5 BB DC X 27 DC X 27 DC X 27 DC X 27 DC X 27 TV X 7 TV X 7 TV X 7 TV X 7 TV X 7 TQ X 7 UO X 113 UO X 113 UO X 113 UO X 113 UY X 1 UY X 14 TO X 7 TO X 7 TO X 7 TO X 7 TO X 7 DM X 13 DM X 13 DM X 13 10" KNIFE 8" KNIFE A BELT 1/2" KNIFE USSUE (7G) 7G KNITTING NEEDLE 5G KNITTING NEEDLE 12G KNITTING NEEDLE
# # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # #
This Month Consumption 11 Pkt 12 14 Pkt 16 6 Pkt 18 9 11 12 14 Pkt 16 Pkt 17 Pkt 21 22 21 Pkt 11 12 14 16 3 Pkt 18 Pkt 11 12 14 16 Pkt 18 16 2 Pkt 11 12 14 10 16 Pkt 10 Pkt 18 11 12 14 16 18 16/18 14 16/18
532 396
Pcs 18700 Pcs 1600 Pcs Pcs
Total Consumption Pkt Pkt 58 Pkt
Pkt 14 Pkt 2 Pkt
Pkt
11 Pkt 6 Pkt
2 Pkt 15 Pkt
8 Pkt 2 Pkt
10 141200 73000 430
Pcs Pcs Pcs Pcs
Remarks
48 49 50 51 52 53 54 55 56 57
3G KNITTING NEEDLE PYC - 22 PYE - 23 PYC - 21 PAY - 7 PAY - 4 PAY - 23 HARA DOMI HARACHI 7G HARACHI 5G
# # # # # # # # # #
6
Pcs Pkt Pkt Pkt 2 Pkt Pkt Pkt Pcs 500 Pcs Pcs
200 Pcs Pkt Pkt 2 Pkt 12 Pkt 26 Pkt 3 Pkt 500 Pcs 1900 Pcs 1100 Pcs
______________________ Production-Co-Ordinator
________________ Plant-In-Charge
GLOBAL KNITWEAR LTD 269 DEWAN HAT CHITTAGONG
Date : 02.10.2007
Needle Consumption Report For The Month Of September' 2007 Sl 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45
Types Of Needle DB X 1-2 DB X 1-2 DB X 1-2 DB X 1-2 DB X 1-2 DB X 1KM DP X 5 DP X 5 DP X 5 DP X 5 DP X 5 DP X 5 DP X 5 BB DC X 27 DC X 27 DC X 27 DC X 27 DC X 27 TV X 7 TV X 7 TV X 7 TV X 7 TV X 7 TQ X 7 UO X 113 UO X 113 UO X 113 UO X 113 UY X 1 UY X 14 TO X 7 TO X 7 TO X 7 TO X 7 TO X 7 DM X 13 DM X 13 DM X 13 10" KNIFE 8" KNIFE A BELT 1/2" KNIFE USSUE (7G) 7G KNITTING NEEDLE
# # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # #
11 12 14 16 18 9 11 12 14 16 17 21 22 21 11 12 14 16 18 11 12 14 16 18 16 11 12 14 10 16 10 18 11 12 14 16 18 16/18 14 16/18
532
This Month Consumption Pkt
Total Consumption Pkt
Pkt 7 Pkt
Pkt 52 Pkt
Pkt 4 Pkt Pkt
Pkt 14 Pkt 2 Pkt
Pkt
Pkt
2 Pkt Pkt
8 Pkt 6 Pkt
Pkt
2 Pkt
2 Pkt
13 Pkt
Pkt Pkt
8 Pkt 2 Pkt
Pcs 14800 Pcs
10 Pcs 122500 Pcs
Remarks
46 47 48 49 50 51 52 53 54 55 56 57
5G KNITTING NEEDLE 12G KNITTING NEEDLE 3G KNITTING NEEDLE PYC - 22 PYE - 23 PYC - 21 PAY - 7 PAY - 4 PAY - 23 HARA DOMI HARACHI 7G HARACHI 5G
# # # # # # # # # # # #
396
6
3000 Pcs 30 Pcs Pcs Pkt Pkt Pkt Pkt 1 Pkt Pkt Pcs 400 Pcs 100 Pcs
71400 Pcs 430 Pcs 200 Pcs Pkt Pkt 2 Pkt 10 Pkt 26 Pkt 3 Pkt 500 Pcs 1400 Pcs 1100 Pcs
______________________ Production-Co-Ordinator
________________ Plant-In-Charge
GLOBAL KNITWEAR LTD 269 DEWAN HAT CHITTAGONG
Date : 01.09.2007
Needle Consumption Report For The Month Of August' 2007 Sl 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43
Types Of Needle DB X 1-2 DB X 1-2 DB X 1-2 DB X 1-2 DB X 1-2 DB X 1KM DP X 5 DP X 5 DP X 5 DP X 5 DP X 5 DP X 5 DP X 5 BB DC X 27 DC X 27 DC X 27 DC X 27 DC X 27 TV X 7 TV X 7 TV X 7 TV X 7 TV X 7 TQ X 7 UO X 113 UO X 113 UO X 113 UO X 113 UY X 1 UY X 14 TO X 7 TO X 7 TO X 7 TO X 7 TO X 7 DM X 13 DM X 13 DM X 13 10" KNIFE 8" KNIFE A BELT 1/2" KNIFE
# # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # #
This Month Consumption 11 Pkt 12 14 Pkt 16 8 Pkt 18 9 11 12 14 Pkt 16 Pkt 17 Pkt 21 22 21 Pkt 11 12 14 16 Pkt 18 2 Pkt 11 12 14 16 Pkt 18 16 Pkt 11 12 14 10 16 Pkt 10 Pkt 18 11 12 14 16 18 16/18 14 16/18
Total Consumption Pkt Pkt 45 Pkt
Pkt 10 Pkt 2 Pkt
Pkt
6 Pkt 6 Pkt
2 Pkt 11 Pkt
8 Pkt 2 Pkt
Remarks
44 45 46 47 48 49 50 51 52 53 54 55 56 57
USSUE (7G) 7G KNITTING NEEDLE 5G KNITTING NEEDLE 12G KNITTING NEEDLE 3G KNITTING NEEDLE PYC - 22 PYE - 23 PYC - 21 PAY - 7 PAY - 4 PAY - 23 HARA DOMI HARACHI 7G HARACHI 5G
# # # # # # # # # # # # # #
532 396
6
Pcs 9600 Pcs 2200 Pcs Pcs Pcs Pkt Pkt 2 Pkt Pkt 18 Pkt Pkt Pcs 200 Pcs Pcs
10 107700 68400 400 200
2 10 25 3 500 1000 1000
Pcs Pcs Pcs Pcs Pcs Pkt Pkt Pkt Pkt Pkt Pkt Pcs Pcs Pcs
______________________ Production-Co-Ordinator
________________ Plant-In-Charge
GLOBAL KNITWEAR LTD 269 DEWAN HAT CHITTAGONG
Date : 05.08.2007
Needle Consumption Report For The Month Of July' 2007 Sl 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41
Types Of Needle DB X 1-2 DB X 1-2 DB X 1-2 DB X 1-2 DB X 1-2 DB X 1KM DP X 5 DP X 5 DP X 5 DP X 5 DP X 5 DP X 5 DP X 5 BB DC X 27 DC X 27 DC X 27 DC X 27 DC X 27 TV X 7 TV X 7 TV X 7 TV X 7 TV X 7 TQ X 7 UO X 113 UO X 113 UO X 113 UO X 113 UY X 1 UY X 14 TO X 7 TO X 7 TO X 7 TO X 7 TO X 7 DM X 13 DM X 13 DM X 13 10" KNIFE 8" KNIFE
# # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # #
This Month Consumption 11 Pkt 12 14 Pkt 16 8 Pkt 18 9 11 12 14 Pkt 16 2 Pkt 17 Pkt 21 22 21 Pkt 11 12 14 16 2 Pkt 18 Pkt 11 12 14 16 Pkt 18 16 2 Pkt 11 12 14 10 16 5 Pkt 10 Pkt 18 11 12 14 16 18 16/18 14 16/18
Total Consumption Pkt Pkt 37 Pkt
Pkt 10 Pkt 2 Pkt
Pkt
6 Pkt 4 Pkt
2 Pkt 11 Pkt
8 Pkt 2 Pkt
Remarks
42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57
A BELT 1/2" KNIFE USSUE (7G) 7G KNITTING NEEDLE 5G KNITTING NEEDLE 12G KNITTING NEEDLE 3G KNITTING NEEDLE PYC - 22 PYE - 23 PYC - 21 PAY - 7 PAY - 4 PAY - 23 HARA DOMI HARACHI 7G HARACHI 5G
# # # # # # # # # # # # # # # #
532 396
6
Pcs 25100 Pcs 12200 Pcs Pcs Pcs Pkt Pkt Pkt 9 Pkt Pkt Pkt Pcs 200 Pcs Pcs
10 98100 66200 400 200
10 7 3 500 800 1000
Pcs Pcs Pcs Pcs Pcs Pkt Pkt Pkt Pkt Pkt Pkt Pcs Pcs Pcs
______________________ Production-Co-Ordinator
________________ Plant-In-Charge
GLOBAL KNITWEAR LTD 269 DEWAN HAT CHITTAGONG
Date : 01.07.2007
Needle Consumption Report For The Month Of June' 2007 Sl 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39
Types Of Needle DB X 1-2 DB X 1-2 DB X 1-2 DB X 1-2 DB X 1-2 DB X 1KM DP X 5 DP X 5 DP X 5 DP X 5 DP X 5 DP X 5 DP X 5 BB DC X 27 DC X 27 DC X 27 DC X 27 DC X 27 TV X 7 TV X 7 TV X 7 TV X 7 TV X 7 TQ X 7 UO X 113 UO X 113 UO X 113 UO X 113 UY X 1 UY X 14 TO X 7 TO X 7 TO X 7 TO X 7 TO X 7 DM X 13 DM X 13 DM X 13
# # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # #
This Month Consumption 11 Pkt 12 14 Pkt 16 4 Pkt 18 9 11 12 14 Pkt 16 2 Pkt 17 Pkt 21 22 21 Pkt 11 12 14 16 2 Pkt 18 Pkt 11 12 14 16 Pkt 18 16 2 Pkt 11 12 14 10 16 Pkt 10 Pkt 18 11 12 14 16 18 16/18 14
Total Consumption Pkt Pkt 29 Pkt
Pkt 8 Pkt 2 Pkt
Pkt
4 Pkt 4 Pkt
2 Pkt 9 Pkt
3 Pkt 2 Pkt
Remarks
40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57
10" KNIFE 8" KNIFE A BELT 1/2" KNIFE USSUE (7G) 7G KNITTING NEEDLE 5G KNITTING NEEDLE 12G KNITTING NEEDLE 3G KNITTING NEEDLE PYC - 22 PYE - 23 PYC - 21 PAY - 7 PAY - 4 PAY - 23 HARA DOMI HARACHI 7G HARACHI 5G
# # # # # # # # # # # # # # # # # #
16/18
532 396
6
Pcs 14000 Pcs 7000 Pcs Pcs Pcs Pkt Pkt Pkt Pkt 3 Pkt Pkt Pcs 300 Pcs 200 Pcs
10 73000 54000 400 200
1 7 3 500 600 1000
Pcs Pcs Pcs Pcs Pcs Pkt Pkt Pkt Pkt Pkt Pkt Pcs Pcs Pcs
______________________ Production-Co-Ordinator
________________ Plant-In-Charge
GLOBAL KNITWEAR LTD 269 DEWAN HAT CHITTAGONG
Date : 01.06.2007
Needle Consumption Report For The Month Of May' 2007 Sl 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37
Types Of Needle DB X 1-2 DB X 1-2 DB X 1-2 DB X 1-2 DB X 1-2 DB X 1KM DP X 5 DP X 5 DP X 5 DP X 5 DP X 5 DP X 5 DP X 5 BB DC X 27 DC X 27 DC X 27 DC X 27 DC X 27 TV X 7 TV X 7 TV X 7 TV X 7 TV X 7 TQ X 7 UO X 113 UO X 113 UO X 113 UO X 113 UY X 1 UY X 14 TO X 7 TO X 7 TO X 7 TO X 7 TO X 7 DM X 13
# # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # #
This Month Consumption 11 Pkt 12 14 Pkt 16 7 Pkt 18 9 11 12 14 Pkt 16 Pkt 17 Pkt 21 22 21 Pkt 11 12 14 16 2 Pkt 18 Pkt 11 12 14 16 Pkt 18 16 Pkt 11 12 14 10 16 Pkt 10 Pkt 18 11 12 14 16 18
Total Consumption Pkt Pkt 25 Pkt
Pkt 6 Pkt 2 Pkt
Pkt
2 Pkt 4 Pkt
2 Pkt 7 Pkt
3 Pkt 2 Pkt
Remarks
38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57
DM X 13 DM X 13 10" KNIFE 8" KNIFE A BELT 1/2" KNIFE USSUE (7G) 7G KNITTING NEEDLE 5G KNITTING NEEDLE 12G KNITTING NEEDLE 3G KNITTING NEEDLE PYC - 22 PYE - 23 PYC - 21 PAY - 7 PAY - 4 PAY - 23 HARA DOMI HARACHI 7G HARACHI 5G
# # # # # # # # # # # # # # # # # # # #
16/18 14 16/18
532 396
6
Pcs 14200 Pcs 10400 Pcs Pcs Pcs Pkt Pkt Pkt Pkt 1 Pkt Pkt Pcs Pcs 200 Pcs
10 59000 47000 400 200
1 4 3 500 300 800
Pcs Pcs Pcs Pcs Pcs Pkt Pkt Pkt Pkt Pkt Pkt Pcs Pcs Pcs
______________________ Production-Co-Ordinator
________________ Plant-In-Charge
GLOBAL KNITWEAR LTD 269 DEWAN HAT CHITTAGONG
Date : 01.05.2007
Needle Consumption Report For The Month Of April' 2007 Sl 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35
Types Of Needle DB X 1-2 DB X 1-2 DB X 1-2 DB X 1-2 DB X 1-2 DB X 1KM DP X 5 DP X 5 DP X 5 DP X 5 DP X 5 DP X 5 DP X 5 BB DC X 27 DC X 27 DC X 27 DC X 27 DC X 27 TV X 7 TV X 7 TV X 7 TV X 7 TV X 7 TQ X 7 UO X 113 UO X 113 UO X 113 UO X 113 UY X 1 UY X 14 TO X 7 TO X 7 TO X 7 TO X 7
# # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # #
This Month Consumption 11 Pkt 12 14 Pkt 16 4 Pkt 18 9 11 12 14 Pkt 16 Pkt 17 Pkt 21 22 21 Pkt 11 12 14 16 18 Pkt 11 12 14 16 Pkt 18 16 Pkt 11 12 14 10 16 Pkt 10 Pkt 18 11 12 14
Total Consumption Pkt Pkt 18 Pkt
Pkt 6 Pkt 2 Pkt
Pkt
4 Pkt
2 Pkt 7 Pkt
3 Pkt 2 Pkt
Remarks
36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57
TO X 7 DM X 13 DM X 13 DM X 13 10" KNIFE 8" KNIFE A BELT 1/2" KNIFE USSUE (7G) 7G KNITTING NEEDLE 5G KNITTING NEEDLE 12G KNITTING NEEDLE 3G KNITTING NEEDLE PYC - 22 PYE - 23 PYC - 21 PAY - 7 PAY - 4 PAY - 23 HARA DOMI HARACHI 7G HARACHI 5G
# # # # # # # # # # # # # # # # # # # # # #
16 18 16/18 14 16/18
532 396
6
Pcs 11400 Pcs 9200 Pcs Pcs Pcs Pkt Pkt Pkt 1 Pkt Pkt Pkt 500 Pcs 100 Pcs 200 Pcs
10 44800 36600 400 200
1 3 3 500 300 600
Pcs Pcs Pcs Pcs Pcs Pkt Pkt Pkt Pkt Pkt Pkt Pcs Pcs Pcs
______________________ Production-Co-Ordinator
________________ Plant-In-Charge
GLOBAL KNITWEAR LTD 269 DEWAN HAT CHITTAGONG
Date : 01.04.2007
Needle Consumption Report For The Month Of March' 2007 Sl
Types Of Needle
This Month Consumption Pkt
Total Consumption
01 DB X 1-2
#
11
Pkt
02 DB X 1-2
#
12
03 DB X 1-2
#
14
Pkt
Pkt
04 DB X 1-2
#
16
8 Pkt
14 Pkt
05 DB X 1-2
#
18
06 DB X 1KM
#
9
07 DP X 5
#
11
08 DP X 5
#
12
09 DP X 5
#
14
Pkt
Pkt
10 DP X 5
#
16
2 Pkt
6 Pkt
11 DP X 5
#
17
2 Pkt
2 Pkt
12 DP X 5
#
21
13 DP X 5
#
22
14 BB
#
21
Pkt
Pkt
15 DC X 27
#
11
16 DC X 27
#
12
17 DC X 27
#
14
18 DC X 27
#
16
19 DC X 27
#
18
Pkt
4 Pkt
20 TV X 7
#
11
21 TV X 7
#
12
22 TV X 7
#
14
23 TV X 7
#
16
Pkt
2 Pkt
24 TV X 7
#
18
25 TQ X 7
#
16
5 Pkt
7 Pkt
26 UO X 113
#
11
27 UO X 113
#
12
28 UO X 113
#
14
29 UO X 113
#
10
30 UY X 1
#
16
3 Pkt
3 Pkt
31 UY X 14
#
10
2 Pkt
2 Pkt
Remarks
32 TO X 7
#
18
33 TO X 7
#
11
34 TO X 7
#
12
35 TO X 7
#
14
36 TO X 7
#
16
37 DM X 13
#
18
38 DM X 13
#
39 DM X 13
#
40 10" KNIFE
#
41 8" KNIFE
#
42 A BELT
#
43 1/2" KNIFE
#
44 USSUE (7G)
#
45 7G KNITTING NEEDLE
#
46 5G KNITTING NEEDLE
#
47 12G KNITTING NEEDLE
16/18 14 16/18
10 Pcs
10 Pcs
532
10100 Pcs
33400 Pcs
396
10500 Pcs
27400 Pcs
#
200 Pcs
400 Pcs
48 3G KNITTING NEEDLE
#
200 Pcs
200 Pcs
49 PYC - 22
#
Pkt
Pkt
50 PYE - 23
#
Pkt
Pkt
51 PYC - 21
#
Pkt
Pkt
52 PAY - 7
#
Pkt
Pkt
53 54 55 56
# # # #
PAY - 4 PAY - 23 HARACHI 7G HARACHI 5G
6
1 Pkt 3 Pkt 100 Pcs 100 Pcs
3 3 200 400
Pkt Pkt Pcs Pcs
______________ Prepared By
________________ Plant-In-Charge
GLOBAL KNITWEAR LTD 269 DEWAN HAT CHITTAGONG
Date : 01.03.2007
Needle Consumption Report For The Month Of February' 2007 Sl
Types Of Needle
This Month Consumption Pkt
Total Consumption
01 DB X 1-2
#
11
Pkt
02 DB X 1-2
#
12
03 DB X 1-2
#
14
Pkt
Pkt
04 DB X 1-2
#
16
Pkt
6 Pkt
05 DB X 1-2
#
18
06 DB X 1KM
#
9
07 DP X 5
#
11
08 DP X 5
#
12
09 DP X 5
#
14
Pkt
Pkt
10 DP X 5
#
16
4 Pkt
4 Pkt
11 DP X 5
#
18
12 DP X 5
#
21
13 DP X 5
#
22
14 BB
#
21
Pkt
Pkt
15 DC X 27
#
11
16 DC X 27
#
12
17 DC X 27
#
14
18 DC X 27
#
16
19 DC X 27
#
18
2 Pkt
4 Pkt
20 TV X 7
#
11
21 TV X 7
#
12
22 TV X 7
#
14
23 TV X 7
#
16
2 Pkt
2 Pkt
24 TV X 7
#
18
25 TQ X 7
#
16
2 Pkt
2 Pkt
26 UO X 113
#
11
Remarks
27 UO X 113
#
12
28 UO X 113
#
14
29 UO X 113
#
10
30 UY X 14
#
10
31 TO X 7
#
18
32 TO X 7
#
11
33 TO X 7
#
12
34 TO X 7
#
14
35 TO X 7
#
16
36 DM X 13
#
18
37 DM X 13
#
38 DM X 13
#
39 10" KNIFE
#
40 8" KNIFE
#
41 A BELT
#
42 1/2" KNIFE
#
43 7G KNITTING NEEDLE
#
44 5G KNITTING NEEDLE
#
44 12G KNITTING NEEDLE
Pkt
Pkt
532
13100 Pcs
23300 Pcs
396
6600 Pcs
16900 Pcs
#
Pcs
200 Pcs
45 PYC - 22
#
Pkt
Pkt
46 PYE - 23
#
Pkt
Pkt
47 PYC - 21
#
Pkt
Pkt
48 PAY - 7
#
Pkt
Pkt
49 50 51 52
# # # #
Pkt Pkt Pcs 100 Pcs
2 Pkt Pkt 100 Pcs 300 Pcs
PAY - 4 PAY - 23 HARACHI 7G HARACHI 5G
16/18 14 16/18
6
______________ Prepared By
________________ Plant-In-Charge
GLOBAL KNITWEAR LTD 269 DEWAN HAT CHITTAGONG
Date : 01.02.2007
Needle Consumption Report For The Month Of January' 2007 Sl
Types Of Needle
This Month Consumption Pkt
Total Consumption
01 DB X 1-2
#
11
Pkt
02 DB X 1-2
#
12
03 DB X 1-2
#
14
Pkt
Pkt
04 DB X 1-2
#
16
6 Pkt
6 Pkt
05 DB X 1-2
#
18
06 DB X 1KM
#
9
07 DP X 5
#
11
08 DP X 5
#
12
09 DP X 5
#
14
Pkt
Pkt
10 DP X 5
#
16
11 DP X 5
#
18
12 DP X 5
#
21
13 DP X 5
#
22
14 BB
#
21
Pkt
Pkt
15 DC X 27
#
11
16 DC X 27
#
12
17 DC X 27
#
14
18 DC X 27
#
16
19 DC X 27
#
18
2 Pkt
2 Pkt
20 TV X 7
#
11
21 TV X 7
#
12
22 TV X 7
#
14
23 TV X 7
#
16
24 TV X 7
#
18
Remarks
25 TQ X 7
#
16
Pkt
Pkt
26 UO X 113
#
11
27 UO X 113
#
12
28 UO X 113
#
14
29 UO X 113
#
10
30 UY X 14
#
10
Pkt
Pkt
31 TO X 7
#
18
32 TO X 7
#
11
33 TO X 7
#
12
34 TO X 7
#
14
35 TO X 7
#
16
36 DM X 13
#
18
37 DM X 13
#
38 DM X 13
#
39 10" KNIFE
#
40 8" KNIFE
#
41 A BELT
#
42 1/2" KNIFE
#
43 7G KNITTING NEEDLE
#
532
10200 Pcs
10200 Pcs
44 5G KNITTING NEEDLE
#
396
10300 Pcs
10300 Pcs
44 12G KNITTING NEEDLE
#
200 Pcs
200 Pcs
45 PYC - 22
#
Pkt
Pkt
46 PYE - 23
#
Pkt
Pkt
47 PYC - 21
#
Pkt
Pkt
48 PAY - 7
#
Pkt
Pkt
49 50 51 52
# # # #
2 Pkt Pkt 100 Pcs 200 Pcs
2 Pkt Pkt 100 Pcs 200 Pcs
PAY - 4 PAY - 23 HARACHI 7G HARACHI 5G
16/18 14 16/18
6
______________ Prepared By
________________ Plant-In-Charge
GLOBAL KNITWEAR LTD 269 DEWAN HAT CHITTAGONG
Date : 06.01.2007
Needle Consumption Report For The Month Of December' 2006 Sl
Types Of Needle
This Month Consumption Pkt
Total Consumption
01 DB X 1-2
#
11
3 Pkt
02 DB X 1-2
#
12
03 DB X 1-2
#
14
Pkt
Pkt
04 DB X 1-2
#
16
7 Pkt
249 Pkt
05 DB X 1-2
#
18
06 DB X 1KM
#
9
07 DP X 5
#
11
08 DP X 5
#
12
09 DP X 5
#
14
Pkt
17 Pkt
10 DP X 5
#
16
11 DP X 5
#
18
12 DP X 5
#
21
13 DP X 5
#
22
14 BB
#
21
Pkt
Pkt
15 DC X 27
#
11
16 DC X 27
#
12
17 DC X 27
#
14
18 DC X 27
#
16
19 DC X 27
#
18
Pkt
54 Pkt
20 TV X 7
#
11
21 TV X 7
#
12
22 TV X 7
#
14
Remarks
23 TV X 7
#
16
24 TV X 7
#
18
25 TQ X 7
#
16
26 UO X 113
#
11
27 UO X 113
#
12
28 UO X 113
#
14
29 UO X 113
#
10
30 UY X 14
#
10
31 TO X 7
#
18
32 TO X 7
#
11
33 TO X 7
#
12
34 TO X 7
#
14
35 TO X 7
#
16
36 DM X 13
#
18
37 DM X 13
#
38 DM X 13
#
39 10" KNIFE
#
40 8" KNIFE
#
41 A BELT
#
42 1/2" KNIFE
#
43 7G KNITTING NEEDLE
#
44 5G KNITTING NEEDLE
Pkt
17 Pkt
Pkt
1 Pkt
532
9800 Pcs
177600 Pcs
#
396
5500 Pcs
73100 Pcs
44 5G KNITTING NEEDLE
#
494
Pcs
Pcs
45 PYC - 22
#
Pkt
Pkt
46 PYE - 23
#
Pkt
27 Pkt
47 PYC - 21
#
Pkt
Pkt
48 PAY - 7
#
1 Pkt
15 Pkt
49 50 51 52
# # # #
Pkt Pkt Pcs 100 Pcs
3 Pkt Pkt 6800 Pcs 700 Pcs
PAY - 4 PAY - 23 HARACHI 7G HARACHI 5G
16/18 14 16/18
6
______________ Prepared By
________________ Plant-In-Charge
GLOBAL KNITWEAR LTD 269 DEWAN HAT CHITTAGONG
Date : 02.12.2006
Needle Consumption Report For The Month Of November' 2006 Sl
Types Of Needle
This Month Consumption Pkt
Total Consumption
01 DB X 1-2
#
11
3 Pkt
02 DB X 1-2
#
12
03 DB X 1-2
#
14
Pkt
Pkt
04 DB X 1-2
#
16
22 Pkt
242 Pkt
05 DB X 1-2
#
18
06 DB X 1KM
#
9
07 DP X 5
#
11
08 DP X 5
#
12
09 DP X 5
#
14
Pkt
17 Pkt
10 DP X 5
#
16
11 DP X 5
#
18
12 DP X 5
#
21
13 DP X 5
#
22
14 BB
#
21
Pkt
Pkt
15 DC X 27
#
11
16 DC X 27
#
12
17 DC X 27
#
14
18 DC X 27
#
16
19 DC X 27
#
18
2 Pkt
54 Pkt
20 TV X 7
#
11
Remarks
21 TV X 7
#
12
22 TV X 7
#
14
23 TV X 7
#
16
24 TV X 7
#
18
25 TQ X 7
#
16
26 UO X 113
#
11
27 UO X 113
#
12
28 UO X 113
#
14
29 UO X 113
#
10
30 UY X 14
#
10
31 TO X 7
#
18
32 TO X 7
#
11
33 TO X 7
#
12
34 TO X 7
#
14
35 TO X 7
#
16
36 DM X 13
#
18
37 DM X 13
#
38 DM X 13
#
39 10" KNIFE
#
40 8" KNIFE
#
41 A BELT
#
42 1/2" KNIFE
#
43 7G KNITTING NEEDLE
#
44 5G KNITTING NEEDLE
Pkt
17 Pkt
Pkt
1 Pkt
532
13200 Pcs
167800 Pcs
#
396
1000 Pcs
67600 Pcs
44 5G KNITTING NEEDLE
#
494
Pcs
Pcs
45 PYC - 22
#
Pkt
Pkt
46 PYE - 23
#
1 Pkt
27 Pkt
47 PYC - 21
#
Pkt
Pkt
48 PAY - 7
#
2 Pkt
14 Pkt
49 50 51 52
# # # #
Pkt Pkt 300 Pcs Pcs
3 Pkt Pkt 6800 Pcs 600 Pcs
PAY - 4 PAY - 23 HARACHI 7G HARACHI 5G
16/18 14 16/18
6
______________ Prepared By
________________ Plant-In-Charge
GLOBAL KNITWEAR LTD 269 DEWAN HAT CHITTAGONG
Date : 01.11.2006
Needle Consumption Report For The Month Of October' 2006 Sl
Types Of Needle
This Month Consumption Pkt
Total Consumption
01 DB X 1-2
#
11
3 Pkt
02 DB X 1-2
#
12
03 DB X 1-2
#
14
Pkt
Pkt
04 DB X 1-2
#
16
27 Pkt
220 Pkt
05 DB X 1-2
#
18
06 DB X 1KM
#
9
07 DP X 5
#
11
08 DP X 5
#
12
09 DP X 5
#
14
Pkt
17 Pkt
10 DP X 5
#
16
11 DP X 5
#
18
12 DP X 5
#
21
13 DP X 5
#
22
14 BB
#
21
Pkt
Pkt
15 DC X 27
#
11
16 DC X 27
#
12
17 DC X 27
#
14
18 DC X 27
#
16
Remarks
19 DC X 27
#
18
Pkt
52 Pkt
20 TV X 7
#
11
21 TV X 7
#
12
22 TV X 7
#
14
23 TV X 7
#
16
24 TV X 7
#
18
25 TQ X 7
#
16
Pkt
17 Pkt
26 UO X 113
#
11
27 UO X 113
#
12
28 UO X 113
#
14
29 UO X 113
#
10
30 UY X 14
#
10
Pkt
1 Pkt
31 TO X 7
#
18
32 TO X 7
#
11
33 TO X 7
#
12
34 TO X 7
#
14
35 TO X 7
#
16
36 DM X 13
#
18
37 DM X 13
#
38 DM X 13
#
39 10" KNIFE
#
40 8" KNIFE
#
41 A BELT
#
42 1/2" KNIFE
#
43 7G KNITTING NEEDLE
#
532
16000 Pcs
154600 Pcs
44 5G KNITTING NEEDLE
#
396
2400 Pcs
66600 Pcs
44 5G KNITTING NEEDLE
#
494
Pcs
Pcs
45 PYC - 22
#
Pkt
Pkt
46 PYE - 23
#
2 Pkt
26 Pkt
47 PYC - 21
#
Pkt
Pkt
48 PAY - 7
#
Pkt
12 Pkt
49 50 51 52
# # # #
Pkt Pkt 200 Pcs Pcs
3 Pkt Pkt 6500 Pcs 600 Pcs
PAY - 4 PAY - 23 HARACHI 7G HARACHI 5G
16/18 14 16/18
6
______________ Prepared By
________________ Plant-In-Charge
GLOBAL KNITWEAR LTD 269 DEWAN HAT CHITTAGONG
Date : 03.10.2006
Needle Consumption Report For The Month Of September' 2006 Sl
Types Of Needle
This Month Consumption 2
Pkt
Total Consumption
01 DB X 1-2
#
11
3 Pkt
02 DB X 1-2
#
12
03 DB X 1-2
#
14
Pkt
Pkt
04 DB X 1-2
#
16
19 Pkt
193 Pkt
05 DB X 1-2
#
18
06 DB X 1KM
#
9
07 DP X 5
#
11
08 DP X 5
#
12
09 DP X 5
#
14
Pkt
17 Pkt
10 DP X 5
#
16
11 DP X 5
#
18
12 DP X 5
#
21
13 DP X 5
#
22
14 BB
#
21
Pkt
Pkt
15 DC X 27
#
11
16 DC X 27
#
12
Remarks
17 DC X 27
#
14
18 DC X 27
#
16
19 DC X 27
#
18
20 TV X 7
#
11
21 TV X 7
#
12
22 TV X 7
#
14
23 TV X 7
#
16
24 TV X 7
#
18
25 TQ X 7
#
16
26 UO X 113
#
11
27 UO X 113
#
12
28 UO X 113
#
14
29 UO X 113
#
10
30 UY X 14
#
10
31 TO X 7
#
18
32 TO X 7
#
11
33 TO X 7
#
12
34 TO X 7
#
14
35 TO X 7
#
16
36 DM X 13
#
18
37 DM X 13
#
38 DM X 13
#
39 10" KNIFE
#
40 8" KNIFE
#
41 A BELT
#
42 1/2" KNIFE
#
43 7G KNITTING NEEDLE
#
44 5G KNITTING NEEDLE
2 Pkt
52 Pkt
Pkt
17 Pkt
Pkt
1 Pkt
532
17000 Pcs
138600 Pcs
#
396
8400 Pcs
64200 Pcs
44 5G KNITTING NEEDLE
#
494
Pcs
Pcs
45 PYC - 22
#
Pkt
Pkt
46 PYE - 23
#
2 Pkt
24 Pkt
47 PYC - 21
#
Pkt
Pkt
48 PAY - 7
#
2 Pkt
12 Pkt
49 50 51 52
# # # #
Pkt Pkt 300 Pcs Pcs
3 Pkt Pkt 6300 Pcs 600 Pcs
PAY - 4 PAY - 23 HARACHI 7G HARACHI 5G
16/18 14 16/18
6
______________ Prepared By
________________ Plant-In-Charge
GLOBAL KNITWEAR LTD 269 DEWAN HAT CHITTAGONG
Date : 01.09.2006
Needle Consumption Report For The Month Of August' 2006 Sl 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15
Types Of Needle DB X 1-2 DB X 1-2 DB X 1-2 DB X 1-2 DB X 1-2 DB X 1KM DP X 5 DP X 5 DP X 5 DP X 5 DP X 5 DP X 5 DP X 5 BB DC X 27
# # # # # # # # # # # # # # #
This Month Consumption 11 1 Pkt 12 14 Pkt 16 20 Pkt 18 9 11 12 14 1 Pkt 16 18 21 22 21 Pkt 11
Total Consumption 1 Pkt Pkt 174 Pkt
17 Pkt
Pkt
Remarks
16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 44 45 46 47 48 49 50 51 52
DC X 27 DC X 27 DC X 27 DC X 27 TV X 7 TV X 7 TV X 7 TV X 7 TV X 7 TQ X 7 UO X 113 UO X 113 UO X 113 UO X 113 UY X 14 TO X 7 TO X 7 TO X 7 TO X 7 TO X 7 DM X 13 DM X 13 DM X 13 10" KNIFE 8" KNIFE A BELT 1/2" KNIFE 7G KNITTING NEEDLE 5G KNITTING NEEDLE 5G KNITTING NEEDLE PYC - 22 PYE - 23 PYC - 21 PAY - 7 PAY - 4 PAY - 23 HARACHI 7G HARACHI 5G
# # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # #
12 14 16 18 11 12 14 16 18 16 11 12 14 10 10 18 11 12 14 16 18 16/18 14 16/18
532 396 494
6
1 Pkt
50 Pkt
Pkt
17 Pkt
Pkt
1 Pkt
25800 Pcs 9800 Pcs Pcs Pkt 3 Pkt Pkt 3 Pkt Pkt Pkt 100 Pcs 200 Pcs
121600 Pcs 55800 Pcs Pcs Pkt 22 Pkt Pkt 10 Pkt 3 Pkt Pkt 6000 Pcs 600 Pcs
______________ Prepared By
________________ Plant-In-Charge
GLOBAL KNITWEAR LTD 269 DEWAN HAT CHITTAGONG
Date : 01.08.2006
Needle Consumption Report For The Month Of July' 2006 Sl 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16
Types Of Needle DB X 1-2 DB X 1-2 DB X 1-2 DB X 1-2 DB X 1-2 DB X 1KM DP X 5 DP X 5 DP X 5 DP X 5 DP X 5 DP X 5 DP X 5 BB DC X 27 DC X 27
# # # # # # # # # # # # # # # #
This Month Consumption 11 Pkt 12 14 Pkt 16 32 Pkt 18 9 11 12 14 Pkt 16 18 21 22 21 Pkt 11 12
Total Consumption Pkt Pkt 154 Pkt
16 Pkt
Pkt
Remarks
17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 44 45 46 47 48 49 50 51 52
DC X 27 DC X 27 DC X 27 TV X 7 TV X 7 TV X 7 TV X 7 TV X 7 TQ X 7 UO X 113 UO X 113 UO X 113 UO X 113 UY X 14 TO X 7 TO X 7 TO X 7 TO X 7 TO X 7 DM X 13 DM X 13 DM X 13 10" KNIFE 8" KNIFE A BELT 1/2" KNIFE 7G KNITTING NEEDLE 5G KNITTING NEEDLE 5G KNITTING NEEDLE PYC - 22 PYE - 23 PYC - 21 PAY - 7 PAY - 4 PAY - 23 HARACHI 7G HARACHI 5G
# # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # #
14 16 18 11 12 14 16 18 16 11 12 14 10 10 18 11 12 14 16 18 16/18 14 16/18
532 396 494
6
18 Pkt
49 Pkt
Pkt
17 Pkt
Pkt
1 Pkt
25400 Pcs 13200 Pcs Pcs Pkt 2 Pkt Pkt 4 Pkt Pkt Pkt 200 Pcs 100 Pcs
95800 Pcs 46000 Pcs Pcs Pkt 19 Pkt Pkt 7 Pkt 3 Pkt Pkt 5900 Pcs 400 Pcs
______________ Prepared By
________________ Plant-In-Charge
GLOBAL KNITWEAR LTD 269 DEWAN HAT CHITTAGONG
Date : 02.06.2006
Needle Consumption Report For The Month Of June' 2006 Sl
Types Of Needle
This Month Consumption Pkt
Total Consumption
01 DB X 1-2
#
11
Pkt
02 DB X 1-2
#
12
03 DB X 1-2
#
14
Pkt
Pkt
04 DB X 1-2
#
16
33 Pkt
122 Pkt
05 DB X 1-2
#
18
06 DB X 1KM
#
9
07 DP X 5
#
11
08 DP X 5
#
12
09 DP X 5
#
14
3 Pkt
16 Pkt
10 DP X 5
#
16
11 DP X 5
#
18
12 DP X 5
#
21
13 DP X 5
#
22
14 BB
#
21
Pkt
Pkt
15 DC X 27
#
11
16 DC X 27
#
12
17 DC X 27
#
14
Remarks
18 DC X 27
#
16
19 DC X 27
#
18
20 TV X 7
#
11
21 TV X 7
#
12
22 TV X 7
#
14
23 TV X 7
#
16
24 TV X 7
#
18
25 TQ X 7
#
16
26 UO X 113
#
11
27 UO X 113
#
12
28 UO X 113
#
14
29 UO X 113
#
10
30 UY X 14
#
10
31 TO X 7
#
18
32 TO X 7
#
11
33 TO X 7
#
12
34 TO X 7
#
14
35 TO X 7
#
16
36 DM X 13
#
18
37 DM X 13
#
38 DM X 13
#
39 10" KNIFE
#
40 8" KNIFE
#
41 A BELT
#
42 1/2" KNIFE
#
43 7G KNITTING NEEDLE
#
44 5G KNITTING NEEDLE
9 Pkt
31 Pkt
3 Pkt
17 Pkt
1 Pkt
1 Pkt
532
13200 Pcs
70400 Pcs
#
396
11200 Pcs
32800 Pcs
44 5G KNITTING NEEDLE
#
494
Pcs
Pcs
45 PYC - 22
#
Pkt
Pkt
46 PYE - 23
#
5 Pkt
17 Pkt
47 PYC - 21
#
Pkt
Pkt
48 49 50 51 52
# # # # #
Pkt 2 Pkt Pkt 100 Pcs Pcs
3 Pkt 3 Pkt Pkt 5700 Pcs 300 Pcs
PAY - 7 PAY - 4 PAY - 23 HARACHI 7G HARACHI 5G
16/18 14 16/18
6
______________ Prepared By
________________ Plant-In-Charge
GLOBAL KNITWEAR LTD 269 DEWAN HAT CHITTAGONG
Date : 02.06.2006
Needle Consumption Report For The Month Of May' 2006 Sl
Types Of Needle
This Month Consumption Pkt
Total Consumption
01 DB X 1-2
#
11
Pkt
02 DB X 1-2
#
12
03 DB X 1-2
#
14
Pkt
Pkt
04 DB X 1-2
#
16
28 Pkt
89 Pkt
05 DB X 1-2
#
18
06 DB X 1KM
#
9
07 DP X 5
#
11
08 DP X 5
#
12
09 DP X 5
#
14
1 Pkt
13 Pkt
10 DP X 5
#
16
11 DP X 5
#
18
12 DP X 5
#
21
13 DP X 5
#
22
14 BB
#
21
Pkt
Pkt
15 DC X 27
#
11
16 DC X 27
#
12
Remarks
17 DC X 27
#
14
18 DC X 27
#
16
19 DC X 27
#
18
20 TV X 7
#
11
21 TV X 7
#
12
22 TV X 7
#
14
23 TV X 7
#
16
24 TV X 7
#
18
25 TQ X 7
#
16
26 UO X 113
#
11
27 UO X 113
#
12
28 UO X 113
#
14
29 UO X 113
#
10
30 UY X 14
#
10
31 TO X 7
#
18
32 TO X 7
#
11
33 TO X 7
#
12
34 TO X 7
#
14
35 TO X 7
#
16
36 DM X 13
#
18
37 DM X 13
#
38 DM X 13
#
39 10" KNIFE
#
40 8" KNIFE
#
41 A BELT
#
42 1/2" KNIFE
#
43 7G KNITTING NEEDLE
#
44 5G KNITTING NEEDLE
8 Pkt
22 Pkt
2 Pkt
14 Pkt
Pkt
Pkt
532
19000 Pcs
57200 Pcs
#
396
7000 Pcs
21600 Pcs
44 5G KNITTING NEEDLE
#
494
Pcs
Pcs
45 PYC - 22
#
Pkt
Pkt
46 PYE - 23
#
5 Pkt
12 Pkt
47 PYC - 21
#
Pkt
Pkt
48 PAY - 7
#
1 Pkt
3 Pkt
49 50 51 52
# # # #
Pkt Pkt Pcs Pcs
1 Pkt Pkt 5600 Pcs 300 Pcs
PAY - 4 PAY - 23 HARACHI 7G HARACHI 5G
16/18 14 16/18
6
______________ Prepared By
________________ Plant-In-Charge
GLOBAL KNITWEAR LTD 269 DEWAN HAT CHITTAGONG
Date : 02.05.2006
Needle Consumption Report For The Month Of April' 2006 Sl
Types Of Needle
This Month Consumption Pkt
Total Consumption
01 DB X 1-2
#
11
Pkt
02 DB X 1-2
#
12
03 DB X 1-2
#
14
Pkt
Pkt
04 DB X 1-2
#
16
27 Pkt
61 Pkt
05 DB X 1-2
#
18
06 DB X 1KM
#
9
07 DP X 5
#
11
08 DP X 5
#
12
09 DP X 5
#
14
2 Pkt
12 Pkt
10 DP X 5
#
16
11 DP X 5
#
18
12 DP X 5
#
21
13 DP X 5
#
22
14 BB
#
21
Pkt
Pkt
Remarks
15 DC X 27
#
11
16 DC X 27
#
12
17 DC X 27
#
14
18 DC X 27
#
16
19 DC X 27
#
18
20 TV X 7
#
11
21 TV X 7
#
12
22 TV X 7
#
14
23 TV X 7
#
16
24 TV X 7
#
18
25 TQ X 7
#
16
26 UO X 113
#
11
27 UO X 113
#
12
28 UO X 113
#
14
29 UO X 113
#
10
30 UY X 14
#
10
31 TO X 7
#
18
32 TO X 7
#
11
33 TO X 7
#
12
34 TO X 7
#
14
35 TO X 7
#
16
36 DM X 13
#
18
37 DM X 13
#
38 DM X 13
#
39 10" KNIFE
#
40 8" KNIFE
#
41 A BELT
#
42 1/2" KNIFE
#
43 7G KNITTING NEEDLE
#
44 5G KNITTING NEEDLE
6 Pkt
14 Pkt
4 Pkt
12 Pkt
Pkt
Pkt
532
15400 Pcs
38200 Pcs
#
396
7600 Pcs
14600 Pcs
44 5G KNITTING NEEDLE
#
494
Pcs
Pcs
45 PYC - 22
#
Pkt
Pkt
46 PYE - 23
#
4 Pkt
7 Pkt
47 PYC - 21
#
Pkt
Pkt
48 PAY - 7
#
2 Pkt
2 Pkt
49 50 51 52
# # # #
Pkt Pkt 400 Pcs 300 Pcs
1 Pkt Pkt 5600 Pcs 300 Pcs
PAY - 4 PAY - 23 HARACHI 7G HARACHI 5G
16/18 14 16/18
6
______________ Prepared By
________________ Plant-In-Charge
GLOBAL KNITWEAR LTD 269 DEWAN HAT CHITTAGONG
Date : 01.02.2006
Needle Consumption Report For The Month Of January 2006 Sl
Types Of Needle
This Month Consumption Pkt
Total Consumption
01 DB X 1-2
#
11
Pkt
02 DB X 1-2
#
12
03 DB X 1-2
#
14
Pkt
Pkt
04 DB X 1-2
#
16
12 Pkt
12 Pkt
05 DB X 1-2
#
18
06 DB X 1KM
#
9
07 DP X 5
#
11
08 DP X 5
#
12
09 DP X 5
#
14
Pkt
Pkt
10 DP X 5
#
16
11 DP X 5
#
18
12 DP X 5
#
21
Remarks
13 DP X 5
#
22
14 BB
#
21
15 DC X 27
#
11
16 DC X 27
#
12
17 DC X 27
#
14
18 DC X 27
#
16
19 DC X 27
#
18
20 TV X 7
#
11
21 TV X 7
#
12
22 TV X 7
#
14
23 TV X 7
#
16
24 TV X 7
#
18
25 TQ X 7
#
16
26 UO X 113
#
11
27 UO X 113
#
12
28 UO X 113
#
14
29 UO X 113
#
10
30 UY X 14
#
10
31 TO X 7
#
18
32 TO X 7
#
11
33 TO X 7
#
12
34 TO X 7
#
14
35 TO X 7
#
16
36 DM X 13
#
18
37 DM X 13
#
38 DM X 13
#
39 10" KNIFE
#
40 8" KNIFE
#
41 A BELT
#
42 1/2" KNIFE
#
43 7G KNITTING NEEDLE
#
44 5G KNITTING NEEDLE
Pkt
Pkt
4 Pkt
4 Pkt
Pkt
Pkt
Pkt
Pkt
532
12000 Pcs
12000 Pcs
#
396
400 Pcs
400 Pcs
44 5G KNITTING NEEDLE
#
494
Pcs
Pcs
45 PYC - 22
#
Pkt
Pkt
46 PYE - 23
#
2 Pkt
2 Pkt
47 PYC - 21
#
Pkt
Pkt
48 PAY - 6
#
Pkt
Pkt
49 50 51 52
# # # #
Pkt Pkt 5200 Pcs Pcs
Pkt Pkt 5200 Pcs Pcs
PAY - 4 PAY - 23 HARACHI 7G HARACHI 5G
16/18 14 16/18
6
______________ Prepared By
________________ Plant-In-Charge
GLOBAL KNITWEAR LTD 269 DEWAN HAT CHITTAGONG
Date : 01.11.2005
Needle Consumption Report For The Month Of October 2005 Sl
Types Of Needle
This Month Consumption 1
Pkt
Total Consumption
01 DB X 1-2
#
11
2 Pkt
02 DB X 1-2
#
12
03 DB X 1-2
#
14
Pkt
Pkt
04 DB X 1-2
#
16
18 Pkt
146 Pkt
05 DB X 1-2
#
18
06 DB X 1KM
#
9
07 DP X 5
#
11
08 DP X 5
#
12
09 DP X 5
#
14
5 Pkt
26 Pkt
10 DP X 5
#
16
Remarks
11 DP X 5
#
18
12 DP X 5
#
21
13 DP X 5
#
22
14 BB
#
21
15 DC X 27
#
11
16 DC X 27
#
12
17 DC X 27
#
14
18 DC X 27
#
16
19 DC X 27
#
18
20 TV X 7
#
11
21 TV X 7
#
12
22 TV X 7
#
14
23 TV X 7
#
16
24 TV X 7
#
18
25 TQ X 7
#
16
26 UO X 113
#
11
27 UO X 113
#
12
28 UO X 113
#
14
29 UO X 113
#
10
30 UY X 14
#
10
31 TO X 7
#
18
32 TO X 7
#
11
33 TO X 7
#
12
34 TO X 7
#
14
35 TO X 7
#
16
36 DM X 13
#
18
37 DM X 13
#
38 DM X 13
#
39 10" KNIFE
#
40 8" KNIFE
#
41 A BELT
#
42 1/2" KNIFE
#
43 7G KNITTING NEEDLE
#
44 5G KNITTING NEEDLE
Pkt
3 Pkt
6 Pkt
51 Pkt
4 Pkt
20 Pkt
Pkt
Pkt
532
11900 Pcs
109500 Pcs
#
396
1600 Pcs
47000 Pcs
44 5G KNITTING NEEDLE
#
494
Pcs
Pcs
45 PYC - 22
#
Pkt
Pkt
46 PYE - 23
#
4 Pkt
56 Pkt
47 PYC - 21
#
Pkt
Pkt
48 PAY - 6
#
1 Pkt
10 Pkt
49 50 51 52
# # # #
Pkt Pkt 500 Pcs Pcs
Pkt Pkt 2600 Pcs 1500 Pcs
PAY - 6 PAY - 23 HARACHI 7G HARACHI 5G
16/18 14 16/18
______________ Prepared By
________________ Plant-In-Charge
GLOBAL KNITWEAR LTD 269 DEWAN HAT CHITTAGONG
Date : 02.09.2005
Needle Consumption Report For The Month Of August 2005 Sl
Types Of Needle
This Month Consumption Pkt
Total Consumption
01 DB X 1-2
#
11
1 Pkt
02 DB X 1-2
#
12
03 DB X 1-2
#
14
Pkt
Pkt
04 DB X 1-2
#
16
23 Pkt
114 Pkt
05 DB X 1-2
#
18
06 DB X 1KM
#
9
07 DP X 5
#
11
08 DP X 5
#
12
Remarks
09 DP X 5
#
14
1 Pkt
17 Pkt
10 DP X 5
#
16
11 DP X 5
#
18
12 DP X 5
#
21
13 DP X 5
#
22
14 BB
#
21
Pkt
3 Pkt
15 DC X 27
#
11
16 DC X 27
#
12
17 DC X 27
#
14
18 DC X 27
#
16
19 DC X 27
#
18
9 Pkt
38 Pkt
20 TV X 7
#
11
21 TV X 7
#
12
22 TV X 7
#
14
23 TV X 7
#
16
24 TV X 7
#
18
25 TQ X 7
#
16
26 UO X 113
#
11
1 Pkt
13 Pkt
27 UO X 113
#
12
28 UO X 113
#
14
29 UO X 113
#
10
30 UY X 14
#
10
Pkt
Pkt
31 TO X 7
#
18
32 TO X 7
#
11
33 TO X 7
#
12
34 TO X 7
#
14
35 TO X 7
#
16
36 DM X 13
#
18
37 DM X 13
#
38 DM X 13
#
39 10" KNIFE
#
40 8" KNIFE
#
41 A BELT
#
42 1/2" KNIFE
#
43 7G KNITTING NEEDLE
#
532
6800 Pcs
83800 Pcs
44 5G KNITTING NEEDLE
#
396
7400 Pcs
38600 Pcs
44 5G KNITTING NEEDLE
#
494
Pcs
Pcs
45 PYC - 22
#
Pkt
Pkt
46 PYE - 23
#
8 Pkt
45 Pkt
47 PYC - 21
#
Pkt
Pkt
48 PAY - 6
#
2 Pkt
7 Pkt
49 50 51 52
# # # #
Pkt Pkt 200 Pcs 200 Pcs
Pkt Pkt 1000 Pcs 1100 Pcs
PAY - 6 PAY - 23 HARACHI 7G HARACHI 5G
16/18 14 16/18
______________ Prepared By
________________ Plant-In-Charge
GLOBAL KNITWEAR LTD 269 DEWAN HAT CHITTAGONG
Date : 02.08.2005
Needle Consumption Report For The Month Of June 2005 Sl
Types Of Needle
This Month Consumption 1
Pkt
Total Consumption
01 DB X 1-2
#
11
1 Pkt
02 DB X 1-2
#
12
03 DB X 1-2
#
14
Pkt
Pkt
04 DB X 1-2
#
16
16 Pkt
91 Pkt
05 DB X 1-2
#
18
06 DB X 1KM
#
9
Remarks
07 DP X 5
#
11
08 DP X 5
#
12
09 DP X 5
#
14
10 DP X 5
#
16
11 DP X 5
#
18
12 DP X 5
#
21
13 DP X 5
#
22
14 BB
#
21
15 DC X 27
#
11
16 DC X 27
#
12
17 DC X 27
#
14
18 DC X 27
#
16
19 DC X 27
#
18
20 TV X 7
#
11
21 TV X 7
#
12
22 TV X 7
#
14
23 TV X 7
#
16
24 TV X 7
#
18
25 TQ X 7
#
16
26 UO X 113
#
11
27 UO X 113
#
12
28 UO X 113
#
14
29 UO X 113
#
10
30 UY X 14
#
10
31 TO X 7
#
18
32 TO X 7
#
11
33 TO X 7
#
12
34 TO X 7
#
14
35 TO X 7
#
16
36 DM X 13
#
18
37 DM X 13
#
38 DM X 13
#
39 10" KNIFE
#
40 8" KNIFE
#
41 A BELT
#
42 1/2" KNIFE
#
43 7G KNITTING NEEDLE
#
44 5G KNITTING NEEDLE
Pkt
16 Pkt
Pkt
3 Pkt
12 Pkt
29 Pkt
Pkt
12 Pkt
Pkt
Pkt
532
8400 Pcs
77000 Pcs
#
396
7400 Pcs
31200 Pcs
44 5G KNITTING NEEDLE
#
494
Pcs
Pcs
45 PYC - 22
#
Pkt
Pkt
46 PYE - 23
#
11 Pkt
37 Pkt
47 PYC - 21
#
Pkt
Pkt
48 PAY - 6
#
1 Pkt
5 Pkt
49 50 51 52
# # # #
Pkt Pkt 300 Pcs 300 Pcs
Pkt Pkt 800 Pcs 900 Pcs
PAY - 6 PAY - 23 HARACHI 7G HARACHI 5G
16/18 14 16/18
______________ Prepared By
________________ Plant-In-Charge
GLOBAL KNITWEAR LTD 269 DEWAN HAT CHITTAGONG
Date : 02.06.2005
Needle Consumption Report For The Month Of May 2005 Sl
Types Of Needle
This Month Consumption Pkt
Total Consumption
01 DB X 1-2
#
11
Pkt
02 DB X 1-2
#
12
03 DB X 1-2
#
14
Pkt
Pkt
04 DB X 1-2
#
16
15 Pkt
47 Pkt
Remarks
05 DB X 1-2
#
18
06 DB X 1KM
#
9
07 DP X 5
#
11
08 DP X 5
#
12
09 DP X 5
#
14
10 DP X 5
#
16
11 DP X 5
#
18
12 DP X 5
#
21
13 DP X 5
#
22
14 BB
#
21
15 DC X 27
#
11
16 DC X 27
#
12
17 DC X 27
#
14
18 DC X 27
#
16
19 DC X 27
#
18
20 TV X 7
#
11
21 TV X 7
#
12
22 TV X 7
#
14
23 TV X 7
#
16
24 TV X 7
#
18
25 TQ X 7
#
16
26 UO X 113
#
11
27 UO X 113
#
12
28 UO X 113
#
14
29 UO X 113
#
10
30 UY X 14
#
10
31 TO X 7
#
18
32 TO X 7
#
11
33 TO X 7
#
12
34 TO X 7
#
14
35 TO X 7
#
16
36 DM X 13
#
18
37 DM X 13
#
38 DM X 13
#
39 10" KNIFE
#
40 8" KNIFE
#
41 A BELT
#
42 1/2" KNIFE
#
43 7G KNITTING NEEDLE
#
44 5G KNITTING NEEDLE
4 Pkt
16 Pkt
1 Pkt
3 Pkt
4 Pkt
12 Pkt
3 Pkt
11 Pkt
Pkt
Pkt
532
15000 Pcs
53000 Pcs
#
396
8800 Pcs
15000 Pcs
44 5G KNITTING NEEDLE
#
494
Pcs
Pcs
45 PYC - 22
#
Pkt
Pkt
46 PYE - 23
#
8 Pkt
19 Pkt
47 PYC - 21
#
Pkt
Pkt
48 PAY - 6
#
Pkt
2 Pkt
49 50 51 52
# # # #
Pkt Pkt 100 Pcs 200 Pcs
Pkt Pkt 300 Pcs 400 Pcs
PAY - 6 PAY - 23 HARACHI 7G HARACHI 5G
16/18 14 16/18
______________ Prepared By
________________ Plant-In-Charge
GLOBAL KNITWEAR LTD 269 DEWAN HAT CHITTAGONG
Date : 01.05.2005
Needle Consumption Report For The Month Of April 2005 Sl
Types Of Needle
This Month Consumption
01 DB X 1-2
#
11
02 DB X 1-2
#
12
Pkt
Total Consumption Pkt
Remarks
03 DB X 1-2
#
14
Pkt
Pkt
04 DB X 1-2
#
16
15 Pkt
32 Pkt
05 DB X 1-2
#
18
06 DB X 1KM
#
9
07 DP X 5
#
11
08 DP X 5
#
12
09 DP X 5
#
14
3 Pkt
12 Pkt
10 DP X 5
#
16
11 DP X 5
#
18
12 DP X 5
#
21
13 DP X 5
#
22
14 BB
#
21
Pkt
2 Pkt
15 DC X 27
#
11
16 DC X 27
#
12
17 DC X 27
#
14
18 DC X 27
#
16
19 DC X 27
#
18
2 Pkt
8 Pkt
20 TV X 7
#
11
21 TV X 7
#
12
22 TV X 7
#
14
23 TV X 7
#
16
24 TV X 7
#
18
25 TQ X 7
#
16
5 Pkt
8 Pkt
26 UO X 113
#
11
27 UO X 113
#
12
28 UO X 113
#
14
29 UO X 113
#
10
30 UY X 14
#
10
Pkt
Pkt
31 TO X 7
#
18
32 TO X 7
#
11
33 TO X 7
#
12
34 TO X 7
#
14
35 TO X 7
#
16
36 DM X 13
#
18
37 DM X 13
#
38 DM X 13
#
39 10" KNIFE
#
40 8" KNIFE
#
41 A BELT
#
42 1/2" KNIFE
#
43 7G KNITTING NEEDLE
#
532
14000 Pcs
35000 Pcs
44 5G KNITTING NEEDLE
#
396
5200 Pcs
8000 Pcs
44 5G KNITTING NEEDLE
#
494
Pcs
Pcs
45 PYC - 22
#
Pkt
Pkt
46 PYE - 23
#
4 Pkt
11 Pkt
47 PYC - 21
#
Pkt
Pkt
48 PAY - 6
#
1 Pkt
2 Pkt
49 50 51 52
# # # #
Pkt Pkt 100 Pcs 200 Pcs
Pkt Pkt 200 Pcs 200 Pcs
PAY - 6 PAY - 23 HARACHI 7G HARACHI 5G
16/18 14 16/18
______________ Prepared By
________________ Plant-In-Charge
GLOBAL KNITWEAR LTD 269 DEWAN HAT CHITTAGONG
Date : 02.03.2005
Needle Consumption Report For The Month Of February 2005 Sl
Types Of Needle
This Month Consumption
Total Consumption
Remarks
01 DB X 1-2
#
11
02 DB X 1-2
#
12
03 DB X 1-2
#
14
Pkt
Pkt
04 DB X 1-2
#
16
5 Pkt
17 Pkt
05 DB X 1-2
#
18
06 DB X 1KM
#
9
07 DP X 5
#
11
08 DP X 5
#
12
09 DP X 5
#
14
9 Pkt
9 Pkt
10 DP X 5
#
16
11 DP X 5
#
18
12 DP X 5
#
21
13 DP X 5
#
22
14 BB
#
21
2 Pkt
2 Pkt
15 DC X 27
#
11
16 DC X 27
#
12
17 DC X 27
#
14
18 DC X 27
#
16
19 DC X 27
#
18
4 Pkt
6 Pkt
20 TV X 7
#
11
21 TV X 7
#
12
22 TV X 7
#
14
23 TV X 7
#
16
24 TV X 7
#
18
25 TQ X 7
#
16
3 Pkt
3 Pkt
26 UO X 113
#
11
27 UO X 113
#
12
28 UO X 113
#
14
29 UO X 113
#
10
30 UY X 14
#
10
Pkt
Pkt
31 TO X 7
#
18
32 TO X 7
#
11
33 TO X 7
#
12
34 TO X 7
#
14
35 TO X 7
#
16
36 DM X 13
#
18
37 DM X 13
#
38 DM X 13
#
39 10" KNIFE
#
40 8" KNIFE
#
41 A BELT
#
42 1/2" KNIFE
#
43 7G KNITTING NEEDLE
#
532
11000 Pcs
21000 Pcs
44 5G KNITTING NEEDLE
#
396
2000 Pcs
2800 Pcs
44 5G KNITTING NEEDLE
#
494
Pcs
Pcs
45 PYC - 22
#
Pkt
Pkt
46 PYE - 23
#
3 Pkt
7 Pkt
47 PYC - 21
#
Pkt
Pkt
48 PAY - 6
#
Pkt
1 Pkt
49 50 51 52
# # # #
Pkt Pkt Pcs Pcs
Pkt Pkt 100 Pcs Pcs
PAY - 6 PAY - 23 HARACHI 7G HARACHI 5G
Pkt
Pkt
16/18 14 16/18
______________ Prepared By
________________ Plant-In-Charge
GLOBAL KNITWEAR LTD 269 DEWAN HAT CHITTAGONG
Needle Consumption Report For The Month Of January 2005
Date : 02.03.2005
Sl
Types Of Needle
This Month Consumption
Total Consumption
01 DB X 1-2
#
11
02 DB X 1-2
#
12
03 DB X 1-2
#
14
Pkt
Pkt
04 DB X 1-2
#
16
12 Pkt
12 Pkt
05 DB X 1-2
#
18
06 DB X 1KM
#
9
07 DP X 5
#
11
08 DP X 5
#
12
09 DP X 5
#
14
Pkt
Pkt
10 DP X 5
#
16
11 DP X 5
#
18
12 DP X 5
#
21
13 DP X 5
#
22
14 BB
#
21
Pkt
Pkt
15 DC X 27
#
11
16 DC X 27
#
12
17 DC X 27
#
14
18 DC X 27
#
16
19 DC X 27
#
18
2 Pkt
2 Pkt
20 TV X 7
#
11
21 TV X 7
#
12
22 TV X 7
#
14
23 TV X 7
#
16
24 TV X 7
#
18
25 TQ X 7
#
16
Pkt
Pkt
26 UO X 113
#
11
27 UO X 113
#
12
28 UO X 113
#
14
29 UO X 113
#
10
30 UY X 14
#
10
Pkt
Pkt
31 TO X 7
#
18
32 TO X 7
#
11
33 TO X 7
#
12
34 TO X 7
#
14
35 TO X 7
#
16
36 DM X 13
#
18
37 DM X 13
#
38 DM X 13
#
39 10" KNIFE
#
40 8" KNIFE
#
41 A BELT
#
42 1/2" KNIFE
#
43 7G KNITTING NEEDLE
#
532
10000 Pcs
10000 Pcs
44 5G KNITTING NEEDLE
#
396
800 Pcs
800 Pcs
44 5G KNITTING NEEDLE
#
494
Pcs
Pcs
45 PYC - 22
#
Pkt
Pkt
46 PYE - 23
#
2 Pkt
2 Pkt
47 PYC - 21
#
Pkt
Pkt
48 PAY - 6
#
1 Pkt
1 Pkt
49 50 51 52
# # # #
Pkt Pkt 100 Pcs Pcs
Pkt Pkt 100 Pcs Pcs
PAY - 6 PAY - 23 HARACHI 7G HARACHI 5G
Pkt
Remarks
Pkt
16/18 14 16/18
______________ Prepared By
________________ Plant-In-Charge
GLOBAL KNITWEAR LTD 269 DEWAN HAT CHITTAGONG
Date : 02.01.2005
Needle Consumption Report For The Month Of January 2005 Sl
Types Of Needle
Total Consumption
01 DB X 1-2
#
11
02 DB X 1-2
#
12
03 DB X 1-2
#
14
Pkt
195 Pkt
04 DB X 1-2
#
16
12 Pkt
21 Pkt
05 DB X 1-2
#
18
06 DB X 1KM
#
9
07 DP X 5
#
11
08 DP X 5
#
12
09 DP X 5
#
14
Pkt
19 Pkt
10 DP X 5
#
16
11 DP X 5
#
18
12 DP X 5
#
21
13 DP X 5
#
22
14 BB
#
21
Pkt
8 Pkt
15 DC X 27
#
11
16 DC X 27
#
12
17 DC X 27
#
14
18 DC X 27
#
16
19 DC X 27
#
18
2 Pkt
47 Pkt
20 TV X 7
#
11
21 TV X 7
#
12
22 TV X 7
#
14
23 TV X 7
#
16
24 TV X 7
#
18
25 TQ X 7
#
16
Pkt
20 Pkt
26 UO X 113
#
11
27 UO X 113
#
12
28 UO X 113
#
14
29 UO X 113
#
10
30 UY X 14
#
10
Pkt
3 Pkt
31 TO X 7
#
18
32 TO X 7
#
11
33 TO X 7
#
12
34 TO X 7
#
14
35 TO X 7
#
16
36 DM X 13
#
18
37 DM X 13
#
38 DM X 13
#
39 10" KNIFE
#
40 8" KNIFE
#
41 A BELT
#
42 1/2" KNIFE
#
43 7G KNITTING NEEDLE
#
532
10000 Pcs
222000 Pcs
44 5G KNITTING NEEDLE
#
396
800 Pcs
81000 Pcs
44 5G KNITTING NEEDLE
#
494
Pcs
Pcs
45 PYC - 22
#
Pkt
3 Pkt
46 PYE - 23
#
2 Pkt
50 Pkt
47 PYC - 21
#
Pkt
Pkt
48 PAY - 6
#
Pkt
6 Pkt
49 50 51 52
# # # #
1 Pkt Pkt 100 Pcs Pcs
PAY - 6 PAY - 23 HARACHI 7G HARACHI 5G
Pkt
Remarks
7 Pkt
16/18 14 16/18
______________ Prepared By
19 8 4700 1800
Pkt Pkt Pcs Pcs ________________ Plant-In-Charge
GLOBAL KNITWEAR LTD
269 DEWAN HAT CHITTAGONG
Date : 02.01.2005
Needle Consumption Report For The Month Of December 2004 Sl
Types Of Needle
Total Consumption
01 DB X 1-2
#
11
02 DB X 1-2
#
12
03 DB X 1-2
#
14
Pkt
195 Pkt
04 DB X 1-2
#
16
4 Pkt
9 Pkt
05 DB X 1-2
#
18
06 DB X 1KM
#
9
07 DP X 5
#
11
08 DP X 5
#
12
09 DP X 5
#
14
Pkt
19 Pkt
10 DP X 5
#
16
11 DP X 5
#
18
12 DP X 5
#
21
13 DP X 5
#
22
14 BB
#
21
Pkt
8 Pkt
15 DC X 27
#
11
16 DC X 27
#
12
17 DC X 27
#
14
18 DC X 27
#
16
19 DC X 27
#
18
1 Pkt
45 Pkt
20 TV X 7
#
11
21 TV X 7
#
12
22 TV X 7
#
14
23 TV X 7
#
16
24 TV X 7
#
18
25 TQ X 7
#
16
Pkt
20 Pkt
26 UO X 113
#
11
27 UO X 113
#
12
28 UO X 113
#
14
29 UO X 113
#
10
30 UY X 14
#
10
Pkt
3 Pkt
31 TO X 7
#
18
32 TO X 7
#
11
33 TO X 7
#
12
34 TO X 7
#
14
35 TO X 7
#
16
36 DM X 13
#
18
37 DM X 13
#
38 DM X 13
#
39 10" KNIFE
#
40 8" KNIFE
#
41 A BELT
#
42 1/2" KNIFE
#
43 7G KNITTING NEEDLE
#
532
14400 Pcs
212000 Pcs
44 5G KNITTING NEEDLE
#
396
Pcs
80200 Pcs
44 5G KNITTING NEEDLE
#
494
Pcs
Pcs
45 PYC - 22
#
Pkt
3 Pkt
46 PYE - 23
#
3 Pkt
48 Pkt
47 PYC - 21
#
Pkt
Pkt
48 PAY - 6
#
Pkt
6 Pkt
49 50 51 52
# # # #
1 Pkt Pkt 200 Pcs Pcs
PAY - 6 PAY - 23 HARACHI 7G HARACHI 5G
______________
Pkt
Remarks
7 Pkt
16/18 14 16/18
18 8 4600 1800
Pkt Pkt Pcs Pcs ________________
Prepared By
Plant-In-Charge
GLOBAL KNITWEAR LTD 269 DEWAN HAT CHITTAGONG
Date : 01.12.2004
Needle Consumption Report For The Month Of November 2004 Sl 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 44 45 46 47 48 49 50 51 52
Types Of Needle DB X 1-2 DB X 1-2 DB X 1-2 DB X 1-2 DB X 1-2 DB X 1KM DP X 5 DP X 5 DP X 5 DP X 5 DP X 5 DP X 5 DP X 5 BB DC X 27 DC X 27 DC X 27 DC X 27 DC X 27 TV X 7 TV X 7 TV X 7 TV X 7 TV X 7 TQ X 7 UO X 113 UO X 113 UO X 113 UO X 113 UY X 14 TO X 7 TO X 7 TO X 7 TO X 7 TO X 7 DM X 13 DM X 13 DM X 13 10" KNIFE 8" KNIFE A BELT 1/2" KNIFE 7G KNITTING NEEDLE 5G KNITTING NEEDLE 5G KNITTING NEEDLE PYC - 22 PYE - 23 PYC - 21 PAY - 6 PAY - 6 PAY - 23 HARACHI 7G HARACHI 5G
______________ Prepared By
# # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # #
11 12 14 16 18 9 11 12 14 16 18 21 22 21 11 12 14 16 18 11 12 14 16 18 16 11 12 14 10 10 18 11 12 14 16 18 16/18 14 16/18
532 396 494
Pkt
Total Consumption 7 Pkt
Pkt 5 Pkt
195 Pkt 5 Pkt
Pkt
19 Pkt
Pkt
8 Pkt
Pkt
44 Pkt
Pkt
20 Pkt
Pkt
3 Pkt
19800 Pcs 200 Pcs Pcs Pkt 2 Pkt Pkt 1 Pkt Pkt Pkt 200 Pcs Pcs
197600 Pcs 80200 Pcs Pcs 3 Pkt 45 Pkt Pkt 6 Pkt 17 Pkt 8 Pkt 4400 Pcs 1800 Pcs
Remarks
________________ Plant-In-Charge
GLOBAL KNITWEAR LTD 269 DEWAN HAT CHITTAGONG
BUYER WISE PRODUCTION SUMMERRY For The Month Of August'08 5GG
D.T
Sage
Sage
0006
0006-B
Quelle 8105
Sears
Quelle
1513
3517
4 29 49 97 173 160 0 124 177 112 177 265 265 196 153
144 194 66 10 70 36 0 27 22 3 0 0 0 0 0 0 0 0 0 0 0 0 0 0
3540
3835
G.Gold 9L 432 9 L 397
3-Aug 4-Aug 5-Aug 6-Aug 7-Aug 8-Aug 9-Aug 10-Aug 11-Aug 12-Aug 13-Aug 14-Aug 15-Aug 16-Aug 17-Aug 18-Aug 19-Aug 20-Aug 21-Aug 22-Aug 23-Aug 24-Aug 25-Aug
586 539 331 194 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
69 552 520 0 484 552 714 60 0 0 0 0 0 0 0 0 0 0 0 0 0
48 377 144 8 0
84 116 146 118 200 200
26-Aug 27-Aug 28-Aug 29-Aug 30-Aug 31-Aug
188 313 404 344 257 271 167 167 151 140 142 96
8 5 145 198 134 110 184 226 251 233 234 217 239 239 403 253 224 146 240 250
25 118 197 204 202 0 88 80 88 15 3 0 0 0 0 0 0 0 0 0 0 0 0
9L708
9L 592 /49
599 759 813 927 708 502 0 645 468 420 597 546 546 0 427
132 137 206 52 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
3 0 8 26 38 53 49 51 20 34 0 55 64 65 61 57 66 76 76 100 117 135 103 160 160
413 484 540 602 431 769 615 615 707 1036 936 620 900 1000
27 63 63 0
5G
G.Gold
0 734 835 968 774 1070 921 0 731 857 963 310 462 514 350 297 0 427 603 720 638 548 554 482 482 738 626 647 463 600 610
1-Aug 2-Aug
Ttl
Eurofrente
9L 592 /50 9L 592 /45
469 576 592 670 696 678 0 681 519 424 284 140 61 0 0 0 0 0 0 0 0 0 0 0
10 48 158 0 166 321 290 402 549 361 553 446 446 651 407 628 487 720 700
11225
12 53 137 0 152 190 243 226 349 62 0 0 0 0 0 0 0 0 0 0 0
Sears
11529
0
11544
11533
0
126
72
79
9
101 202 135 145 103 54 51 51
36 77 102 78 56 72 68 68 184 112 67
3508
0
20 34 42 69 66 56
5 46 167 194 190 200
129 152 157 143 114 132 72 72 38
Ttl
Ttl
7G
(5G+7G)
0 1200 1472 1611 1661 1457 1317 0 1478 1177 1107 1151 1125 1094 66 737 0 1000 1205 1336 1517 1065 1580 1252 1252 1585 1601 1798 1301 1810 1900
0 1934 2307 2579 2435 2527 2238 0 2209 2034 2070 1461 1587 1608 416 1034 0 1427 1808 2056 2155 1613 2134 1734 1734 2323 2227 2445 1764 2410 2510
Total
1650
2951
1441
4621
572
3939
1020
153
1577
17924
17625
527
5790
7343
1424
1047
1001
802
1296
36855
54779
In DZ
138
246
120
385
48
328
85
13
131
1494
1469
44
483
612
119
87
83
67
108
3071
4565
____________ Prepared By
GLOBAL KNITWEAR LTD 269 DEWAN HAT CHITTAGONG
BUYER WISE PRODUCTION SUMMERRY For The Month Of July'08 5GG
D.T 1-Jul 2-Jul 3-Jul
G. Union G. Union 8210-G 8210-G
75 57 19
75 57 19
Ttl
G.Gold 84000 9L432
0006
4579
9L 592
839 1065 982
554 874 898
838 676 453 360 500 395
771 916 676 512 387 417
411 421 469 357 297 257
316 274 234 325 501 763
250 218 287 250 93 57
292 296 347 379 453 501
746 892 922 1079 1111 1115
63 0 0
259
86 70 144 0 212 198 239 204 279 267 225 449 457 539 480 481 332 271 687 824 688 804 844 834 0 860 892 1181 1215 1142 1488
688 612 557 535 727 639
1055 1164 1033 875 651 506
166 477 695
166 477 695
259
16392
14346
19567
1338
1338
13 125 3
7-Jul 8-Jul 9-Jul 10-Jul 11-Jul 12-Jul 13-Jul 14-Jul 15-Jul
37 71 82 119 51
37 71 82 119 51
16-Jul 17-Jul 18-Jul 19-Jul 20-Jul 21-Jul 22-Jul 23-Jul 24-Jul
2 9 45 84 51 115 96 118 140 141 135 105 132 161 190 178 187 181
65 405 517 473 626 657 653
199 176 153 105 66 36
661 716 1028 1110 1076 1193
2805
9180
209 198 237 195 234 183 137 263 279 302 289 340 197 101 150 146 25
25-Jul 26-Jul 27-Jul 28-Jul 29-Jul 30-Jul 31-Jul Total
511
511
14
3623
Sears
9L708
11
6-Jul
G. Union
5G
3517-B
4-Jul 5-Jul
G.Gold 9L592b
9L592b
ET-898 MT-8212 MT-8212
33 4 0
37
193 314 367
193 314 367
302 288 274 290 135 12
302 288 274 290 135 12
2175
2175
3527
82 209 236 203 234 237
0
2419
Ttl
Ttl
7G
(5G+7G)
1812 2571 2614 0 2295 2377 1913 1655 1391 1073 0 977 913 990 932 891 1077 0 1101 1188 1269 1458 1564 1616 0 1743 1776 1590 1742 2332 2535
1898 2641 2758 0 2507 2575 2152 1859 1670 1340 225 1426 1370 1529 1412 1372 1409 271 1788 2012 1957 2262 2408 2450 0 2603 2668 2771 2957 3474 4023
43395
59787
In DZ
43
43
1
234
765
302
22
1366
1196
1631
112
112
3
181
181
0
202
3616
4982
Ttl
Ttl
8212
7G
(5G+7G)
8 30 254
5 413 718 786 872 0 1130 1215 1141 957 619 883 416 970 1153 1193 1109 1355 1064 0 1215 1395 1512 1681 1955 2142 0 2250 2276 2377
13 793 1360 1483 1555 58 1741 1923 1784 1635 1342 1641 573 1729 1917 2130 1847 1961 1651 0 1501 1693 1804 1907 2027 2198 0 2300 2310 2692
____________ Prepared By
GLOBAL KNITWEAR LTD 269 DEWAN HAT CHITTAGONG
BUYER WISE PRODUCTION SUMMERRY For The Month Of June'08 5GG
D.T 1-Jun 2-Jun 3-Jun 4-Jun 5-Jun
Sears 3504
Sears 3504
3517
8 183 230 294 200
8 183 230 294 200
16 96 130 207
125 12 5
125 12 5
6-Jun 7-Jun 8-Jun 9-Jun 10-Jun 11-Jun 12-Jun
239 429 407 423 429 491
13-Jun 14-Jun 15-Jun 16-Jun 17-Jun 18-Jun 19-Jun
500 489 592 572 336 167
LI& Fung G.Union 8016 CS-9659 RC-45
181 316 273 276 58 247 267 231 255 294 267 157 259 275 345 166 270 303
64
20-Jun 21-Jun
41
22-Jun 23-Jun 24-Jun 25-Jun 26-Jun
85 13
160 285 292 226 72 56
27-Jun 28-Jun 29-Jun 30-Jun
8 195
50 26 120
53
Ttl
G.Gold
5G
9L708
8 380 642 697 683 58 611 708 643 678 723 758 157 759 764 937 738 606 587 0 286 298 292 226 72 56 0 50 34 315
5 241 422 445 507
Sears 9L 592
3527
3528
3528
ET-898
172 296 341 365
653 670 589 423 355 233 237 252 246 197 337 401
477 545 545 481
7 53 158 228 196 324 285 369 289 97 1
53 136 110 131 214 199 202 314 187
53 136 110 131 214 199 202 314 187
3
15
15
150 147 188 180 219 293 288
727 727 862 1002 1106 1022
18 221 612 842
455 668 632 458 237 278
1100 1112 1027
779 866 981
363 268 115
0
1-Jul
0
0
Total
1057
1057
5767
0
4538
1351
53
12766
14898
4319
2010
1561
1561
8161
292
32802
45568
In DZ
88
88
481
0
378
113
4
1064
1242
360
168
130
130
680
24
2734
3797
Ttl
Ttl
7G
(5G+7G)
0 839 1003 1143 582 53 0 1433 1205 1285 1300 1337 1479
0 863 1034 1153 592 53 0 1562 1329 1411 1575 1886 1949
1405 1425 1463 1433 1419 1375 911 1585 1609 2020 1797 2146 2216 0
1810 1661 1583 1579 1592 1541 1031 1740 1763 2197 2050 2426 2467 171
____________ Prepared By
GLOBAL KNITWEAR LTD 269 DEWAN HAT CHITTAGONG
BUYER WISE PRODUCTION SUMMERRY For The Month Of May'08 5GG
D.T
G.Union G.Union ET-8000 ET-8000 CS-9659 CS-8000
Branex
LI& Fung RC-45
3
3-May 4-May 5-May
41 30 21 21 51 50 63 76 97 146 173 166 120 155 154 177 253 280 251 171
405 236 120 146 173 166 120 155 154 177 253 280 251 171
21 31 10 10
6-May 7-May 8-May 9-May 10-May 11-May 12-May 13-May
88 94 105 227 299 310
27 199 110
5G
0 24 31 10 10 0 0 129 124 126 275 549 470
1-May 2-May
Ttl
G.Union ET-898
4010
G.Gold CS-898
CS-898
9L440
839 1003 1143 552 53
15
15
128 105 130 147 179 224
128 105 130 147 179 224
1177 995 1025 1006 979 1031
221 342 242 293 339 425 319 686 748 971 891 1071 1108
221 342 242 293 339 425 319 686 748 971 891 1071 1108
963 741 979 847 741 525 273 213 113 78 15 4
3423
14-May 15-May 16-May 17-May 18-May 19-May 20-May 21-May 22-May 23-May 24-May 25-May 26-May 27-May 28-May
231 96 23
111 64
29-May 30-May 31-May
330 295 284
330 295 284
1087 1152 1185
1087 1152 1185
2174 2304 2370
2504 2599 2654
Total
0
0
1476
583
0
0
3405
5464
0
0
12008
12008
15295
0
39311
44775
In DZ
0
0
123
49
0
0
284
455
0
0
1001
1001
1275
0
3276
3731
Ttl
Ttl
7G
(5G+7G)
41 7 26 0 0 0 0 0 0 0 0 0 0 0 91 0 160 320 459 588 572 700 0 796 1008 1072
41 7 26 0 0 0 100 247 0 393 576 701 885 36 1004 56 1058 1181 1444 1576 1687 1543 0 1428 1338 1394
____________ Prepared By
GLOBAL KNITWEAR LTD 269 DEWAN HAT CHITTAGONG
BUYER WISE PRODUCTION SUMMERRY For The Month Of April'08 5GG
D.T
G.Union G.Union ET-8000 ET-8000 CS-9659 CS-8000
Branex CS-8000
1-Apr 2-Apr 3-Apr 4-Apr 5-Apr 6-Apr 7-Apr 8-Apr
100 247
9-Apr 10-Apr 11-Apr 12-Apr 13-Apr
371 532 669 819
14-Apr 15-Apr
827
16-Apr 17-Apr 18-Apr 19-Apr 20-Apr 21-Apr 22-Apr
826 790 896 988 1109 843
22 44 32 66 36 86 56 72 71 89 6
23-Apr 24-Apr 25-Apr 26-Apr
632 258 236
72 86
N.Mann 550/477
Ttl 5G
0 0 0 0 0 0 100 247 0 393 576 701 885 36 913 56 898 861 985 988 1115 843 0 632 330 322
G.Union ET-898
4010
G.Gold CS-6840 CS-6840
9L440
41 7 26
91 160 320 459 588 572 700 796 1008 1072
3423
148 255 108 5
27-Apr 28-Apr 29-Apr 30-Apr
129 341 379 275
277 596 487 280 0
1-May
1154 1028 1176 841
1154 1028 1176 841 0
1431 1624 1663 1121 0
Total
0
0
10659
580
1282
0
0
12521
0
74
0
0
9965
0
10039
22560
In DZ
0
0
888
48
107
0
0
1043
0
6
0
0
830
0
837
1880
Ttl
Ttl
7G
(5G+7G)
675 843 958 880 672 969 1218 1384 1133 1115 998 0 890 978 978 899 737 479 360 509 0 519 414 216
1054 1269 1242 1135 977 1356 1482 1715 1518 1442 1428 0 1213 1615 1854 1907 1682 1444 904 1287 0 929 542 319
____________ Prepared By
GLOBAL KNITWEAR LTD 269 DEWAN HAT CHITTAGONG
BUYER WISE PRODUCTION SUMMERRY For The Month Of March'08 5GG
D.T 1-Mar 2-Mar 3-Mar 4-Mar 5-Mar 6-Mar
G.Union G.Union ET-8000 ET-8000 CK-8013 CS-8000
11 10 9 23 117 197
11 10 9 23 117 197
325 341 158 60 8
7-Mar
45
8 35 24 81
91 263 345 466 541 577 376 555
97 125 195 158 100 71 12 22
8-Mar 9-Mar 10-Mar 11-Mar
Branex N.Mann LM-874 LM-869 550/477
43 75 73 108 115 107 143 185 197 188 158
44 64 65 83 121 138 153 115 146
12-Mar 13-Mar 14-Mar 15-Mar 16-Mar 17-Mar 18-Mar 19-Mar 20-Mar
103 72 121 149 70 49 10
10 175 212 235 234 268 146 201
12 17 66
106 18 5
21-Mar 22-Mar 23-Mar 24-Mar
292 93 32
22 2 3
Ttl
G.Union
5G
ET-898
379 426 284 255 305 387 264 331 385 327 430 0 323 637 876 1008 945 965 544 778 0 410 128 103
321 405 360 321 60 5
4010
Quelle CS-6840 CS-6840
22 11 161 387 664 1021 968 1056 969
22
CS-8034
3423
354 394 598 548 451 577 554 363 165 59 29
890 978 978 899 679 381 291 388
58 98 69 121
393 301 103
126 113 113
25
25-Mar
4
29 0 12 0 0 0 0
26-Mar
12
27-Mar 28-Mar 29-Mar 30-Mar 31-Mar
60
100 121 66 35
160 0 232 160 122 76 108
189 0 244 160 122 76 108
111 94 87 76 108
Total
367
367
3688
1820
1623
1614
1419
10531
1472
12054
22
22
4092
1020
18682
29213
In DZ
31
31
307
152
135
135
118
878
123
1005
2
2
341
85
1557
2434
Ttl
Ttl
____________ Prepared By
GLOBAL KNITWEAR LTD 269 DEWAN HAT CHITTAGONG
BUYER WISE PRODUCTION SUMMERRY For The Month Of February'08 5GG D.T 1-Feb 2-Feb 3-Feb 4-Feb 5-Feb
G.Union G.Union ET-8000 ET-8000 ET-9659
182 324 259 317 355
182 324 259 317 355
196 236 116 50 67
304 314 323 292 287 254 81 111 132 114 139 177 135 19
304 314 323 292 287 254 81 111 132 114 139 177 135 19
47 115 86 40 31 25 6
99
99
6-Feb 7-Feb 8-Feb 9-Feb 10-Feb 11-Feb 12-Feb 13-Feb 14-Feb 15-Feb 16-Feb 17-Feb 18-Feb 19-Feb 20-Feb 21-Feb 22-Feb
5 5 6
N.Mann
Ttl
550/477 5G 378 560 375 367 422 0 351 429 409 332 318 279 87 111 137 119 145 177 135 19 0 99
G.Union ET-898
CS-6840 CS-6840 ET6840 CS-898
141 186 380 208 80
141 186 380 208 80
60 270
165 172 185 197 370
20 3
20 3
251 139 173 175 124 134
346 388 350 312 372 372
320
320
7
6 5 10 37 58 95 91
74
379 379 463 455 452
325
7G (5G+7G) 447 825 544 1104 945 1320 673 1040 800 1222 0 0 637 988 533 962 523 932 487 819 496 814 512 791 0 87 652 763 389 526 416 535 521 666 550 727 543 678 0 19 0 0 399 498
23-Feb 24-Feb 25-Feb
58 95 76
58 95 76 41
26-Feb 27-Feb
83 216 295 413
45
420 168 25 13
503 384 320 471 0 390 405 0 0
561 479 396 512 0 470 594 0 0
24 77
24 77
Total
4548
4548
1031
209
5788
2178
1338
1338
1378
6308
12540
18328
In DZ
379
379
86
17
482
182
112
112
115
526
1045
1527
Ttl
Ttl
28-Feb 29-Feb
56 112
58 95 76 41 0 80 189 0 0
1-Mar 2-Mar
390 405
____________ Prepared By
GLOBAL KNITWEAR LTD 269 DEWAN HAT CHITTAGONG
BUYER WISE PRODUCTION SUMMERRY For The Month Of January'08 5GG D.T
N.Mann N.Mann 550/477 550/477
Ttl CS-8000
1-Dec 2-Dec 3-Dec 4-Dec 5-Dec 6-Dec 7-Dec 8-Dec
136 141 240 210
136 141 240 210
187 186 177 215 124 51 0
187 186 177 215 124 51 0
0 80 178 236 286 261 306
9-Dec 10-Dec 11-Dec 12-Dec 13-Dec 14-Dec 15-Dec 16-Dec 17-Dec 18-Dec 19-Dec 20-Dec
245 276 311 288 324 319 0 397 344 379 384
5G 0 0 80 178 372 427 501 516 0 432 462 488 503 448 370 0 397 344 379 384
9060
G.Union CS-6840 CS-6840 ET6840 CS-898
401 0 470 220 25 9
3 5
401 0 470 220 25 9
3 5
171 0 525 719 855 731 559 526 306 108 29
3 131 295 388
7G (5G+7G) 973 973 0 0 1465 1545 1159 1337 905 1277 749 1176 559 1060 526 1042 0 0 306 738 108 570 35 523 10 513 0 448 0 370 0 0 3 400 131 475 295 674 388 772
21-Dec 22-Dec
0
0
23-Dec 24-Dec 25-Dec 26-Dec 27-Dec 28-Dec
333 398 0 388 434 369 207 39
333 398 0 388 434 369 207 39 0 0 0
9 59 0 53 31 36 60 61 52 43 65
27 89 115 146 171 183 96 183
27 89 115 146 171 183 96 183
29-Dec 30-Dec 31-Dec
400 376 393 242 106 114 148 152 101 118
409 435 0 500 451 372 466 551 570 336 549
742 833 0 888 885 741 673 590 570 336 549
Total
1667
1667
0
6782
8449
469
2143
2143
4529
2967
12251
20700
In DZ
139
139
0
565
704
39
179
179
377
247
1021
1725
Ttl
Ttl
____________ Prepared By
GLOBAL KNITWEAR LTD 269 DEWAN HAT CHITTAGONG
BUYER WISE PRODUCTION SUMMERRY For The Month Of December'07 5GG D.T 12714
G.Gould 12714 12685
N.Ma 550/477
1-Dec 2-Dec 3-Dec 4-Dec
8 15 190
8 15 190
232 203 126 37 162 122 249
232 203 126 37 162 122 249
3 94
5-Dec 6-Dec 7-Dec 8-Dec 9-Dec 10-Dec 11-Dec 12-Dec 13-Dec 14-Dec 15-Dec 16-Dec 17-Dec 18-Dec
267 328 531 549 401 609 600 60
63 126 257 504 496 84
Ttl 5G 0 8 18 284 0 499 531 657 586 626 857 1106 564 496 84 0 0 0
G.U 8824
G.U
G.Union CS-6840 CS-6840 ET6840 7603
151 204 425 311 305 345 271 400 241 292 104 37 8 36
90 174 301 257 313 661
90 174 301 257 313 661
7G (5G+7G) 151 151 204 212 425 443 311 595 0 0 305 804 345 876 271 928 400 986 241 867 292 1149 104 1210 217 781 356 852 638 722 514 514 626 626 1322 1322
0 0 0 0 0 0 0 0 0 0 0 0 0
19-Dec 20-Dec 21-Dec 22-Dec 23-Dec 24-Dec 25-Dec 26-Dec 27-Dec 28-Dec 29-Dec 30-Dec 31-Dec
254 530 474 901 1385
254 530 474 901 1385
34 64 111
0 0 0 0 0 0 0 0 508 1060 982 1866 2881
0 0 0 0 0 0 0 0 508 1060 982 1866 2881
Total
1344
1344
3442
1530
6316
3130
5340
5340
209
0
14019
20335
In DZ
112
112
287
128
526
261
445
445
17
0
1168
1695
Ttl
Ttl
5868
L. Line G.Union 5868 5872 7603
____________ Prepared By
GLOBAL KNITWEAR LTD 269 DEWAN HAT CHITTAGONG
BUYER WISE PRODUCTION SUMMERRY For The Month Of November'07 5GG D.T 10764 1-Nov 2-Nov 3-Nov 4-Nov 5-Nov 6-Nov 7-Nov 8-Nov 9-Nov 10-Nov 11-Nov 12-Nov 13-Nov 14-Nov 15-Nov 16-Nov
16 6
Eurofrente 10764 10877
16 6
Sfera
Ttl 5G 16 6 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8824
550 623 748 906 758 30 12 9 144
144
11
7G (5G+7G) 561 577 623 629 748 748 906 906 758 758 30 30 0 0 12 12 9 9 288 288 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 78 0 0 0 0
17-Nov 18-Nov 19-Nov 20-Nov 21-Nov 22-Nov 23-Nov 24-Nov 25-Nov 26-Nov
78
27-Nov 28-Nov 29-Nov 30-Nov
15
0 0 0 0 0 0 0 0 0 0 0 0 0 15 0
0 0 0 0 0 0 0 0 0 0 78 0 0 15 0
Total
22
22
78
0
100
15
144
144
3636
11
3950
4050
In DZ
2
2
7
0
8
1
12
12
303
1
329
338
Ttl
Ttl
____________ Prepared By
GLOBAL KNITWEAR LTD 269 DEWAN HAT CHITTAGONG
BUYER WISE PRODUCTION SUMMERRY For The Month Of Oct'07 5GG D.T 10764 1-Oct 2-Oct
Eurofrente 10764 10877
5 13
5 13
63 83
24 35 48 63 41 64 15 61
24 35 48 63 41 64 15 61
113 128 166 139 139 111 61 79
3-Oct 4-Oct 5-Oct 6-Oct 7-Oct 8-Oct 9-Oct 10-Oct 11-Oct 12-Oct 13-Oct
Sfera 0766/8021
125 94
Ttl 5G 193 190 0 137 163 214 202 180 175 76 140 0 0
8703
8703
L. Line G.Union 5872 7603
194 126
12 65 74 70 133
12 65 74 70 133
109 156 104 157 187 149 67 122
7G (5G+7G) 194 387 126 316 0 0 109 246 156 319 104 318 181 383 317 497 297 472 207 283 388 528 0 0 0 0
0 0 0 0 27 66 76 0 135 131 0 221 150 0 183 164 115 160
14-Oct 15-Oct 16-Oct 17-Oct 18-Oct 19-Oct 20-Oct
8 33 45
8 33 45
19 33 31
82 88
82 88
53 43
174 129
174 129
47 21
178 144 101 152
178 144 101 152
5 20 14 8
1503 125
1503 125
1376 115
21-Oct 22-Oct 23-Oct 24-Oct 25-Oct 26-Oct 27-Oct 28-Oct 29-Oct 30-Oct 31-Oct Total In DZ
219 18
3098 258
73 171 202 128 143 350
73 171 202 128 143 350
992 744
992 744
125
102
145
145
416 658 649 349
135
0 0 0 0 191 394 488 299 352 864 0 2111 1768 0 518 658 649 774
3302 275
3302 275
2197 183
2344 195
11145 929
14243 1187
Ttl
Ttl
8703
L. Line 47902
7G 0
(5G+7G) 0
45 52 84 43 66 164 127 155
0 0 0 0 218 460 564 299 487 995 0 2332 1918 0 701 822 764 934
____________ Prepared By
GLOBAL KNITWEAR LTD 269 DEWAN HAT CHITTAGONG
BUYER WISE PRODUCTION SUMMERRY For The Month Of AUGUST '07 5GG D.T
Quelle 3835
Sears 1504
Ttl
1-Aug
5G 0
2-Aug
0
50
50
50
3-Aug
0
12
12
12
4-Aug
0
5
5
5
5-Aug
0
0
0
6-Aug
0
0
0
7-Aug
0
0
0
8-Aug
0
0
0
9-Aug
0
0
0
3835
8703
10-Aug
0
0
0
11-Aug
0
0
0
12-Aug
0
0
0
13-Aug
0
0
0
14-Aug
0
54
54
15-Aug
0
0
0
16-Aug
0
190
190
380
380
17-Aug
0
771
771
1542
1542
18-Aug
0
837
837
1674
1674
19-Aug
0
427
427
20-Aug
0
136
136
272
272
21-Aug
0
39
39
78
78
22-Aug
0
0
0
23-Aug
0
0
0
27
27
427
24-Aug
111
111
111
0
111
25-Aug
306
306
306
0
306
26-Aug
230
230
230
0
230
27-Aug
181
181
181
0
181
28-Aug
0
0
0
29-Aug
0
0
0
30-Aug
0
0
0
31-Aug
0
0
0
4494 375
5322 444
Ttl
Ttl
7G 0 0
(5G+7G) 217 257
0
335
Total In DZ
828 69
828 69
0 0
0 0
828 69
2000 167
2000 167
494 41
8703
Leas Line 47902
____________ Prepared By
GLOBAL KNITWEAR LTD 269 DEWAN HAT CHITTAGONG
BUYER WISE PRODUCTION SUMMERRY For The Month Of July '07 5GG D.T 3835
Quelle 3835
2-Jul
205 257
205 257
3-Jul
335
335
1-Jul
Sears 1504
12
Ttl 5G 217 257 335
8703
4-Jul
315
315
315
0
315
5-Jul
367
367
367
0
367
6-Jul
361
361
361
0
361
7-Jul
374
374
374
0
374
8-Jul
214
214
214
0
214
9-Jul
0
7
7
7
10-Jul
0
24
24
24
11-Jul
0
0
0
0
12-Jul
0
90
90
90
13-Jul
0
174
174
174
14-Jul
0
284
284
284
15-Jul
0
31
31
334
396
396
16-Jul
0
215
215
365
795
795
17-Jul
0
202
202
249
653
653
18-Jul
0
191
191
410
792
792
19-Jul
0
191
191
410
792
792
20-Jul
0
219
219
431
869
869
21-Jul
0
596
596
422
1614
1614
22-Jul
0
692
692
443
1827
1827
23-Jul
0
492
492
456
1440
1440
24-Jul
0
533
533
533
25-Jul
0
0
0
26-Jul
0
562
562
562
27-Jul
0
430
430
430
28-Jul
0
465
465
465
29-Jul
0
468
468
468
30-Jul
0
489
489
489
31-Jul
0
508
508
508
Total
2428
2428
0
12
2440
2829
2829
7554
13212
15652
In DZ
202
202
0
1
203
236
236
630
1101
1304
____________ Prepared By
GLOBAL KNITWEAR LTD 269 DEWAN HAT CHITTAGONG
BUYER WISE PRODUCTION SUMMERRY
For The Month Of June '07 5GG D.T 138/751
N.Mann 138/751 327/052
3-Jun
Ttl
51 112
78 132 123
5G 78 183 235
1-Jun 2-Jun
Sears 1537
3544
3544
Ttl
Ttl
7G 0 0 0
(5G+7G) 78 183 235
4-Jun
16
16
136
149
301
0
301
5-Jun
14
14
134
147
295
0
295
0
0
0
137
196
0
196
137
169
0
169
134
191
0
191
155
216
0
216
0
0
0
59
0
59
0
0
0
6-Jun 7-Jun
12
12
8-Jun
32
32
9-Jun
47
47
10-Jun
61
61
47 10
11-Jun 12-Jun
24
24
35
13-Jun 14-Jun
41
41
95
136
0
136
15-Jun
35
35
83
118
0
118
16-Jun
48
48
41
89
0
89
17-Jun
51
51
51
0
51
18-Jun
29
29
29
0
29
19-Jun
23
23
23
0
23
20-Jun
12
12
12
0
12
21-Jun
10
10
10
0
10
22-Jun
5
5
5
0
5
23-Jun
11
11
11
0
11
24-Jun
9
9
9
0
9
25-Jun
4
4
4
0
4
26-Jun
0
0
0
27-Jun
0
0
0
28-Jun
0
0
0
29-Jun
0
17
17
34
34
46
143
143
286
332
0
0
320
2786
30-Jun
46
46
0 Total
530
530
490
1446
2466
160
160
0
In DZ
44
44
41
121
206
13
13
0
27
232
Ttl
Ttl
____________ Prepared By
GLOBAL KNITWEAR LTD 269 DEWAN HAT CHITTAGONG
BUYER WISE PRODUCTION SUMMERRY For The Month Of May '07 5GG D.T
Quelle 3212
Quelle 3212
G.U 8480
Ttl 1500
May Day
1-May
5G 0 536 760 0
G.U 1603
G.U 1603
Euro 10394
106 51
106 51
293 418
137 291
5-May
58
58
407
263
728
405
405
1133
6-May
200
200
423
97
720
373
373
1093
7-May
201
201
354
40
595
384
384
979
8-May
158
158
460
30
648
429
429
1077
9-May
138
138
412
38
588
408
408
996
10-May
258
258
379
637
436
436
1073
0
0
2-May 3-May 4-May
349 361
7G (5G+7G) 0 0 349 885 361 1121 0 0
0
11-May 12-May
132
132
429
561
491
491
1052
13-May
249
249
377
626
535
535
1161
14-May
246
246
274
520
543
543
1063
15-May
263
263
305
568
630
630
1198
0
0
0
16-May 17-May
249
249
394
643
630
630
1273
18-May
132
132
267
399
617
617
1016
19-May
188
188
286
474
704
704
1178
20-May
90
90
358
448
165
165
616
946
1394
21-May
54
54
357
411
298
298
607
1203
1614
22-May
15
15
470
485
462
462
484
1408
1893
0
0
0
23-May 24-May
2
2
527
529
505
505
361
1371
1900
25-May
4
4
524
528
604
604
368
1576
2104
596
596
647
647
457
1751
2347
26-May
27-May
626
626
646
646
464
1756
2382
28-May
570
570
354
354
482
1190
1760
29-May
556
556
376
376
932
0
0
0
731
0
731
30-May
731
31-May Total
2794
2794
10793
896
14483
3681
3681
11510
18872
33355
In DZ
233
233
899
75
1207
307
307
959
1573
2780
Quelle 3885
Quelle 3885
Ttl
Ttl
231 661 870 964
231 661 870 964
690
690
____________ Prepared By
GLOBAL KNITWEAR LTD 269 DEWAN HAT CHITTAGONG
BUYER WISE PRODUCTION SUMMERRY For The Month Of April '07 5GG D.T
Ttl
Quelle 3733
Quelle 3733
3835
4-Apr
150 367 409 415
150 367 409 415
66 168 400 568
5G 216 535 809 983
5-Apr
428
428
397
825
1-Apr 2-Apr 3-Apr
3212
8711
33
0
6-Apr
7G (5G+7G) 462 678 1322 1857 1740 2549 1928 2911 1413
2238
0
0
7-Apr
371
371
405
776
306
306
370
982
1758
8-Apr
360
360
378
738
138
138
709
985
1723
9-Apr
311
311
88
399
704
704
1103
10-Apr
124
124
124
773
773
897
11-Apr
8
8
8
616
628
636
6
6
12-Apr
0
530
530
530
13-Apr
0
182
182
182
14-Apr
0
0
0
15-Apr
0
204
204
204
16-Apr
0
164
164
164
17-Apr
0
137
137
137
18-Apr
0
17
17
17
19-Apr
0
34
34
34
20-Apr
0
0
0
21-Apr
0
7
7
22-Apr
0
0
0
23-Apr
0
0
0
7
24-Apr
51
51
0
51
25-Apr
120
120
0
120
26-Apr
205
205
0
205
0
0
0
27-Apr 28-Apr
251
251
0
251
29-Apr
239
239
0
239
30-Apr
369
369
0
369
0
0
0
Total
2943
2943
2470
1235
6648
3866
3866
4480
12212
18860
In DZ
245
245
206
103
554
322
322
373
1018
1572
Ttl
Ttl
56 40
7G 15 0 56 40
(5G+7G) 508 0 665 774
____________ Prepared By
GLOBAL KNITWEAR LTD 269 DEWAN HAT CHITTAGONG
BUYER WISE PRODUCTION SUMMERRY For The Month Of March '07 5GG D.T
Ttl
G.Uni 1612
G.Uni 1612
493
493
4-Mar
609 734
609 734
5G 493 0 609 734
5-Mar
730
730
730
113
113
843
6-Mar
243
243
243
166
166
409
7-Mar
74
74
74
159
159
233
8-Mar
111
111
111
164
164
275
0
0
232
232
351
1-Mar
17200
2-Mar 3-Mar
7613
7613
1613
15
0
9-Mar 10-Mar
102
102
17
119
11-Mar
8
8
120
128
48
48
215
311
439
267
267
61
61
304
426
693
12-Mar
372
379
62
62
251
375
754
14-Mar
185
185
35
35
212
282
467
15-Mar
426
426
90
90
269
449
875
0
0
13-Mar
7
7
0
16-Mar 17-Mar
408
408
98
98
338
534
942
18-Mar
359
359
108
108
235
451
810
19-Mar
391
391
138
138
255
531
922
20-Mar
467
467
218
218
299
735
1202
21-Mar
326
326
268
268
243
779
1105
22-Mar
455
455
301
301
27
629
1084
23-Mar
154
154
252
252
504
658
24-Mar
349
349
562
562
1124
1473
25-Mar
368
368
585
585
1170
1538
0
0
0
26-Mar 27-Mar
309
309
627
627
1254
1563
28-Mar
236
236
816
816
1632
1868
29-Mar
258
258
760
760
1520
1778
30-Mar
67
67
571
571
1142
1209
31-Mar
155
155
523
523
1046
1201
Total
3111
3111
5689
8800
6123
6123
3593
15839
24639
In DZ
259
259
474
733
510
510
299
1320
2053
Ttl
Ttl
____________ Prepared By
GLOBAL KNITWEAR LTD 269 DEWAN HAT CHITTAGONG
BUYER WISE PRODUCTION SUMMERRY For The Month Of February '07 5GG D.T
Ttl
G.Uni 7615
G.Uni 7615
181 Fri 275 257
288
4-Feb
181 Fri 275 257
279 220
5G 469 0 554 477
5-Feb
169
169
312
481
1-Feb 2-Feb 3-Feb
7609
G.Union G.Union 7604 7604
189
189
238
189 236
189 236
369 241
7G (5G+7G) 616 1085 0 0 747 1301 713 1190
157
157
280
594
7605
1075
6-Feb
101
101
452
553
198
198
337
733
1286
7-Feb
73
73
417
490
154
154
383
691
1181
8-Feb
67
67
481
548
130
130
402
662
1210
9-Feb
Fri
Fri
0
0
310
338
741
0
10-Feb
403
403
11-Feb
492
492
358
358
850
12-Feb
528
528
266
266
794
13-Feb
523
523
354
354
877
14-Feb
541
541
357
357
898
15-Feb
598
598
0
598
0
0
0
106
633
16-Feb
Fri
Fri
14
17-Feb
527
527
18-Feb
627
627
0
627
19-Feb
637
637
0
637
20-Feb
543
543
69
612
0
0
0
704
0
704
0
0
0
21-Feb
Fri
Fri 704
22-Feb 23-Feb
Fri
Fri
43
14
43
20
69
24-Feb
597
597
0
597
25-Feb
632
632
0
632
26-Feb
602
602
0
602
27-Feb
404
404
0
404
0
0
0
0
0
0
0
0
0
0
0
0
28-Feb
Total
1123
1123
10807
11930
1310
1310
3984
6604
18534
In DZ
94
94
901
994
109
109
332
550
1545
____________ Prepared By
GLOBAL KNITWEAR LTD 269 DEWAN HAT CHITTAGONG
BUYER WISE PRODUCTION SUMMERRY For The Month Of January '07
5GG D.T
Quelle 7692
Quelle 7692
Ttl
G.Union 7604
Ttl
Ttl
7G 0 0 0 0
(5G+7G) 0 0 0 0
4-Jan
5G 0 0 0 0
5-Jan
0
0
0
3212
1-Jan 2-Jan 3-Jan
8711
8711
6-Jan
125
125
15
140
0
140
7-Jan
286
286
49
335
0
335
8-Jan
398
398
55
453
9
9
462
9-Jan
431
431
18
449
47
47
496
10-Jan
536
536
536
173
173
709
11-Jan
383
383
383
251
251
634
12-Jan
Fri
Fri
0
0
0
13-Jan
417
417
417
345
345
762
14-Jan
269
269
269
401
401
670
15-Jan
158
158
158
449
449
607
16-Jan
67
67
67
76
76
526
678
745
17-Jan
0
74
74
491
639
639
18-Jan
0
53
53
256
362
362
0
0
19-Jan
Fri
Fri
0
20-Jan
0
170
170
625
965
965
21-Jan
0
147
147
335
629
629
22-Jan
0
198
198
434
830
830
23-Jan
0
160
160
352
672
672
24-Jan
0
265
265
353
883
883
25-Jan
0
326
326
459
1111
1111
0
0
26-Jan
Fri
Fri
0
27-Jan
0
319
319
496
1134
1134
28-Jan
0
224
224
245
693
693
29-Jan
0
229
229
278
736
736
30-Jan
0
220
220
327
767
767
31-Jan
0
482
482
411
1375
1375
Total
3070
3070
137
3207
2943
2943
7263
13149
16356
In DZ
256
256
11
267
245
245
605
1096
1363
____________ Prepared By
148 25
239 269 260 376 311 385
939
362 374 375 382 530 505 272 454 342 183
5 25 15 3
3554
148 25
239 269 260 376 311 385
939
362 374 375 382 530 505 272 454 342 183
5 25 15 3
3554
148 25
939
239 269 260 376 311 385 362 374 375 382 530 505 272 454 342 183
5 25 15 3
3554
148 25
939
239 269 260 376 311 385 362 374 375 382 530 505 272 454 342 183
5 25 15 3
3554
148 25
939
239 269 260 376 311 385 362 374 375 382 530 505 272 454 342 183
5 25 15 3
3554
148 25
939
239 269 260 376 311 385 362 374 375 382 530 505 272 454 342 183
5 25
15 3
3554
148 25
7G)
939
239 269 260 376 311 385 362 374 375 382 530 505 272 454 342 183
5 25 15 3
3554
148 25
7G)
939
239 269 260 376 311 385 362 374 375 382 530 505 272 454 342 183
5 25 15 3
3554
148 25
7G)
939
239 269 260 376 311 385 362 374 375 382 530 505 272 454 342 183
5 25 15 3
3554
148 25
7G)
939
239 269 260 376 311 385 362 374 375 382 530 505 272 454
342 183
5 25 15 3
148 25
7G)
939
5 25 15 3
148 25
7G)
939
7G)
5 25 15 3
148 25
939
5 25 15 3
148 25
7G)
939
5 25 15 3
7G)
148 25
939
7G)
5 25 15 3
148 25
939
7G)
5 25 15 3
148 25
939
7G)
5 25 15 3
148 25
939
5 25 15 3
7G)
148 25
939
5 25 15 3
Required Manpower Status. Date : 31.07.2007
SL
Section
Required Manpower
01
Winding
35
02
Knitting
365
03
1st Inspection
30
04
Linking
145
05
Stitching & Trimmining
50
06
Mending & Final
50
07
Wash & Iron
35
08
Label
30
09
Folding & Packing
20
10
Quality & Checker
30
11
Store
8
12
Maintainance
8
13
Cleaner
12
14
Security
14
15
D.G.M, Executive, Staff
18
Total Required Manpower
850
____________ Prepared By
Remarks
________________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Shipment Details Of Sears Order Up To 19th August 2006 All Figure In DZ
Date : 19.08.2006
Style/P.O No
GG
Total Order Qty
Shipped Qty
Short Shipped Qty
Ship Date
01 Sears
60252-C
5G
432
416
-16
18-Jun
02 Sears
1500
5G
666
670
4
17-May
03 Sears
1500
7G
35
35
0
12-Jun
04 Sears
3538
5G
144
142
-2
17-Aug
05 Sears
60252-C
5G
432
415
-17
16-Jul
1709
1678
-31
SL
Buyer
Sub Total (5GG) 06 Sears
3533
7G
500
492
-8
8-Jun
07 Sears
3531
7G
625
619
-6
15-Jun
08 Sears
3534
7G
237
232
-5
18-Jun
09 Sears
3532
7G
334
332
-2
22-Jun
10 Sears
1511
7G
158
149
-9
13-Aug
11 Sears
3534
7G
667
667
0
10-Jul
12 Sears
3536
7G
417
407
-10
16-Jul
13 Sears
1502
7G
237
234
-3
26-Jul
14 Sears
1504
7G
399
396
-3
27-Jul
Sub Total (7GG)
3574
3528
-46
Total
5283
5206
-77
____________ Prepared By
Remarks
________________ Plant-In-Charge
Production Details
Date : 01.01.2008
All Figure In DZ
Month : December'2007 SL
Buyer
Style No.
GG
Total Order Qty
Production Target Achive
8912
5G
542
58
50
01
Quelle
02
N.Mann
550/477
5G
125
125
128
03
G.Gold
9 J 020/12714
5G
110
110
112
04
G.Gold
9 J 020/12716
5G
24
24
27
05
G.Gold
9 J 020/12685
5G
280
280
287
06
G.Union
4000/CS-9659
5G
1000
1000
871
07
Atlantic
19056
5G
19
0
20
2100
1597
1494
Sub Total (5GG) 08
Quelle
4000
7G
667
250
286
09
Quelle
8832
7G
708
150
115
10
Quelle
8824
7G
258
258
261
11
Quelle
8832
7G
500
500
587
12
Quelle
8703
7G
333
333
349
13
Branex
LM-862
7G
167
167
0
14
Branex
LM-863
7G
83
83
0
15
Branex
LM-861
7G
267
267
0
16
G.Union
CS-6840
7G
700
700
445
17
G.Union
ET-6840
7G
Remarks
17
Sub Total (7GG)
3683
2708
2060
Grand Total
5783
4306
3554 Date : 02.10.2007
All Figure In DZ
Month : September'2007 SL
Buyer
Style No.
GG
Total Order Qty
01
Eurofrente
10764
5G
143
143
19
02
Eurofrente
10877
5G
208
208
101
03
Quelle
3835
5G
150
150
154
04
Sfera
0766/8021
5G
161
164
148
662
665
422
Sub Total (5GG)
Production Target Achive
05
Quelle
8711
7G
133
67
70
06
Quelle
8711-B
7G
342
342
346
07
Quelle
8824
7G
583
483
501
08
Quelle
8824-B
7G
350
350
361
09
Quelle
8821
7G
373
343
397
10
Quelle
3885
7G
133
0
8
11
Quelle
8703
7G
133
133
140
12
Les. Line
18902
7G
412
412
413
13
Les. Line
5870
7G
457
0
18
14
G.Union
7603
7G
334
0
144
15
N.Mann
017/531
7G
200
200
206
Sub Total (7GG)
3451
2330
2603
Grand Total
4113
2996
3025
Production Details All Figure In DZ
Remarks
Date : 01.09.2007
Month : August'2007 SL
Buyer
Style No.
GG
Total Order Qty
Production Target Achive
Remarks
01
Quelle
3835
5G
67
67
69
02
G.Gold
19H987
5G
250
83
87
03
G.Gold
19H542
5G
662
0
41
04
G.Gold
19H542
5G
80
0
27
05
G.Gold
19H542
5G
696
696
625
1755
846
849
Sub Total (5GG) 06
Sears
3547
7G
333
167
173
07
Quelle
8711
7G
133
0
67
08
Quelle
8824
7G
583
583
97
09
Quelle
8821
7G
1200
1200
57
10
Quelle
3885
7G
133
0
130
11
Quelle
8703
7G
192
192
167
12
L.Line
47902
7G
639
0
41
13
Zara
5747/246
7G
833
833
817
14
Zara
5747/296
7G
206
206
209
Sub Total (7GG)
4253
3181
1758
Grand Total
6007
4027
2607
Production Details
Date : 05.08.2007
All Figure In DZ
Month : July'2007 SL
Buyer
Style No.
GG
Total Order Qty
Production Target Achive
3835
5G
200
200
202
01
Quelle
02
Tiara
4H215
5G
162
0
75
03
K-Mart
9H049
5G
1564
1500
1550
04
Sears
1504
5G
167
0
1
05
Sears
1513
5G
233
0
15
06
G.Gold
19H542
5G
379
379
343
07
G.Gold
19H542
5G
80
80
54
08
G.Gold
19H542
5G
696
160
82
3481
2319
2322
Sub Total (5GG) 09
Sears
1535
7G
167
0
1
10
Sears
3544
7G
317
303
310
11
Sears
3547
7G
333
333
170
12
Quelle
8820
7G
443
443
762
13
Quelle
3885
7G
333
333
345
14
Quelle
8703
7G
225
225
236
15
Les. Line
47902
7G
639
622
630
16
Zara
5747/246
7G
458
0
19
Sub Total (7GG)
2915
2260
2473
Grand Total
6396
4579
4795
Production Details
Remarks
Date : 01.07.2007
All Figure In DZ
Month : June'2007 Style No.
GG
Total Order Qty
01 N.Mann
138/751
5G
42
42
44
02 N.Mann
327/052
5G
42
42
41
03 G.Union
8480
5G
1000
0
51
04 Tiara
4H215
5G
1006
767
724
05 Sears
1537
5G
375
0
121
06 Sears
1504
5G
167
167
170
07 Sears
1513
5G
233
233
223
SL
Buyer
Production Target Achive
Remarks
08 G.Gold(K-Mart)
9H 049
5G
Sub Total (5GG)
1564
897
37
4428
2148
1411
09
Sears
3543
7G
309
200
232
10
Sears
1535
7G
167
167
171
11
Sears
3544
7G
317
0
13
12
Quelle
3204
7G
667
125
160
13
Quelle
8820
7G
3010
3010
2317
14
Quelle
3885
7G
133
133
138
Sub Total (7GG)
4602
3635
3031
Grand Total
9030
5783
4442
Production Details
Date : 01.06.2007
All Figure In DZ
Month : May'2007 Style No.
GG
Total Order Qty
01 Quelle
3212
5G
333
225
233
02 Great Union
8480
5G
1000
933
899
03 Tiara
4H215/28813
5G
408
0
232
04 Sears
VLF7-1537
5G
292
292
263
05 Sears
VLF7-1500
5G
99
0
75
06 Sears
VLF7-1513
5G
233
233
0
07 N.Mann
138/751
5G
42
42
0
08 N.Mann
327/052
5G
42
42
0
2449
1767
1702
SL
Buyer
Sub Total (5GG)
Production Target Achive
09
Sears
TSF7-3542
7G
123
98
110
10
Sears
TSF7-3543
7G
309
309
84
11
Sears
TSF7-3544
7G
214
214
219
12
Sears
VLF7-1535
7G
167
167
0
13
Quelle
2479
7G
142
100
109
14
Quelle
3204
7G
667
667
525
15
Great Union
1603
7G
300
300
307
16
Tiara
4H216/28659
7G
500
333
381
17
Eurofrente
10394
7G
1223
917
959
Sub Total (7GG)
3643
3103
2694
Grand Total
6092
4871
4396
Production Details
Remarks
Date : 01.05.2007
All Figure In DZ
Month : April'2007 Style No.
GG
Total Order Qty
01 Quelle
3733
5G
333
333
245
02 Quelle
3885
5G
208
208
206
03 Quelle
3915
5G
133
133
136
04 Quelle
3212
5G
333
0
103
05 N.Mann
138/751
5G
83
83
62
06 N.Mann
327/052
5G
83
83
45
07 Sears
VLF7-1500
5G
568
568
580
08 Sears
VLF7-1500-B
5G
188
188
192
09 Sears
VLF7-1500-C
5G
50
50
34
10 Sears
VLF7-1504/44 5G
83
83
0
11 Sears
VLF7-1513/50 5G
117
117
0
SL
Buyer
Production Target Achive
Remarks
12 G.Union
17200
5G
500
0
34
13 G.Union
8480
5G
1000
0
61
3680
1847
1698
Sub Total (5GG) 14
G.Union
1604
7G
300
167
231
15
Quelle
3885
7G
333
333
322
16
Quelle
8711
7G
367
367
373
17
Quelle
2479
7G
142
142
146
18
Quelle
2479-B
7G
142
0
38
19
Tiara
28658
7G
500
500
505
20
Tiara
28659
7G
500
500
126
21
Eurofrente
10394
7G
1223
0
277
22
Sears
TSF6-3542
7G
123
123
20
23
Sears
TSF6-3544
7G
214
214
0
Sub Total (7GG)
3842
2344
2038
Grand Total
7522
4191
3736
Production Details
Date : 01.04.2007
All Figure In DZ
Month : March'2007 Style No.
GG
Total Order Qty
G.Union
1612
5G
300
300
259
02
G.Union
17200
5G
500
500
474
03
G.Union
17201
5G
500
500
507
04
G.Union
7600
5G
1000
208
255
05
N.Mann
327/052
5G
83
83
86
06
N.Mann
138/751
5G
83
83
74
05
Quelle
3733
5G
333
333
57
06
Quelle
3835
5G
208
0
40
3008
2008
1752
SL
Buyer
01
Sub Total (5GG)
Production Target Achive
08
G.Union
7606
7G
700
0
134
09
G.Union
7603
7G
700
533
575
10
G.Union
7613
7G
500
500
510
11
G.Union
1613
7G
300
300
299
12
G.Union
1603
7G
300
300
306
12
G.Union
1604
7G
300
300
81
13
Quelle
3885
7G
333
333
23
14
Eurofrente
10394(EX-09447) 7G
527
527
0
Sub Total (7GG)
3660
2794
1928
Grand Total
6668
4802
3680
Production Details
Remarks
Date : 01.03.2007
All Figure In DZ
Month : February'2007 Style No.
GG
Total Order Qty
G.Union
1615
5G
700
208
94
02
G.Union
7609
5G
1000
542
901
03
G.Union
7600
5G
1000
1000
707
04
G.Union
1612
5G
300
0
42
3000
1750
1743
SL
Buyer
01
Sub Total (5GG)
Production Target Achive
08
Quelle
8711
7G
525
275
273
09
Quelle
8706
7G
150
150
154
Remarks
10
G.Union
7604
7G
700
83
109
11
G.Union
7605
7G
1000
375
332
12
G.Union
7606
7G
700
700
574
12
G.Union
7603
7G
700
700
134
13
G.Union
1613
7G
300
0
7
Sub Total (7GG)
4075
2283
1583
Grand Total
7075
4033
3326
Production Details
Date : 01.02.2007
All Figure In DZ
Month : January'2007 Style No.
GG
Total Order Qty
550/477
5G
100
100
106
Quelle
7692
5G
333
258
256
03
Quelle
3212
5G
333
0
11
04
Quelle
3812
5G
100
100
104
05
G.Union
7615
5G
700
700
614
06
G.Union
7609
5G
1000
0
109
07
G.Union
7600
5G
1000
0
56
3567
1158
1256
SL
Buyer
01
N.Mann
02
Sub Total (5GG)
Production Target Achive
08
Quelle
8711
7G
833
525
245
09
Quelle
7452
7G
133
0
57
10
Quelle
3252
7G
267
0
73
11
Quelle
8706
7G
150
150
0
12
G.Union
7604
7G
700
333
605
13
G.Union
7605
7G
1000
1000
683
Sub Total (7GG)
3083
2008
1663
Grand Total
6650
3167
2919
Remarks
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Shipment Details Date : 01.07.2008
All Figure In DZ
Month : June' 2008 SL 01 02 03 04 05 06 07 08 09 10 11 12
Buyer
Style/P.O No
GG
RC-45 Li & Fung RC-45 Li & Fung 4000/CS-9659 G. Union 4000/CS-9659 G. Union 9L446 G.Gold 3504 Sears 3517 Sears Sub Total (5GG) 9L524 G.Gold 11447 Eurofrente G.Gold 4004/CS-898 Sears 3527 3528 Sears Sub Total (7GG)
5G 5G 5G 5G 5G 5G 5G 7G 7G 7G 7G 7G
Grand Total (5+7) GG
Total Order Qty
542 257 467 2931 283 1100 500 166 126 2175
Shipped Qty 23 140 500 500 529 255 297 2243 136 1100 400 110 84 1830
Short/Over Shipped Qty Partial Partial Partial Balance Qty -14 -2 Partial -16
5106
4073
-16
665 1000
Partial Partial 0
Ship Date 6-Jan 18-Jun 18-Jun 19-Jun 18-Jun 26-Jun 26-Jun
Remarks
Quality Problem
6-Jun 10-Jun 22-Jun 26-Jun 26-Jun
Month : May' 2008 SL 01 02 03 04 05 06 07
Buyer
Style/P.O No
LM-869 Branex LM-870 Branex LM-871 Branex LM-874 Branex Sub Total (5GG) 11447 Eurofrente 11447 Eurofrente K-Mart 9L440 Sub Total (7GG)
Grand Total (5+7) GG
______________________ Production-Co-Ordinator
GG 5G 5G 5G 5G 7G 7G 7G
Total Order Qty 133 133 133 133 533
Short/Over Shipped Qty
2092 6242
Shipped Qty 133 131 133 134 532 2500 550 2083 5133
6775
5664
-10
4150
__________________ Finishing-In-Charge
0 Partial Balance Qty -10 -10
Ship Date 27-May 27-May 27-May 27-May
Remarks
20-May 30-May 31-May
________________ Knitting-In-Charge
______________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Shipment Details Date : 03.05.2008
All Figure In DZ
Month : April' 2008 SL
Buyer
Style/P.O No
GG
Total Order Qty
Shipped Qty
Short/Over Shipped Qty
Ship Date
Remarks
7374
5G
269
92
Partial
17-Apr
Ttl Qty 3900 Pcs 3226 Pcs GKL 674 Pcs G.S.G.L-1
500
424
Partial
18-Apr
76
Balance Qty
19-Apr
01
Quelle
02
G.Union
84007/ET-8001
5G
03
G.Union
84007/ET-8001
5G
04
G.Union
1011CV/CS-8000
5G
300
300
05
G.Gold
29L275
5G
300
296
-4
21-Apr
06
Quelle
7374
5G
102
Balance Qty
24-Apr
07
Quelle
3835
5G
355
-2
24-Apr
Emb Problem
08
Quelle
7374
5G
65
-10
30-Apr
Knitting Qty. Can Not done For Yarn Problem
1726
1710
-16
Sub Total (5GG) 09
Quelle
10 11
357
21-Apr
3423
7G
83
83
10-Apr
G.Union
4010/CS-8003/1
7G
1000
1000
13-Apr
G.Union
84016/ET-8037
7G
500
500
18-Apr
Quality Problem
Sub Total (7GG)
1583
1583
0
Grand Total (5+7) GG
3309
3293
-16
______________________ Production-Co-Ordinator
__________________ Finishing-In-Charge
________________ Knitting-In-Charge
______________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Shipment Details Date : 01.04.2008
All Figure In DZ
Month : March' 2008 Style/P.O No
GG
Total Order Qty
Shipped Qty
Short/Over Shipped Qty
Ship Date
G.Union
8400/ET-9659
5G
500
424
Partial
5-Mar
02
G.Union
4000GT/CS-9659
5G
300
300
03
G.Union
8400/ET-9659
5G
0
76
04
G.Union
84006/ET-8000
5G
500
500
10-Mar
05
G.Union
4016/CS-8037
5G
1000
1000
25-Mar
06
N.Mann
500/477
5G
133
135
07
Atlantic
14256
5G
182
183
29-Mar
08
G.Union
3805/CK-8013
5G
300
300
31-Mar
2915
2918
2
SL
Buyer
01
Sub Total (5GG)
10-Mar Balance Qty
2
10-Mar
27-Mar
09
G.Union
84005/ET-6840
7G
500
424
Partial
5-Mar
10
G.Union
4004/CS-898
7G
700
400
Partial
10-Mar
Remarks
11
G.Union
84004/ET-898
7G
300
200
12
G.Union
4005GT/CS-6840
7G
300
300
13
G.Union
84005/ET-6840
7G
0
76
Balance Qty
10-Mar
14
G.Union
4004/CS-898
7G
0
300
Balance Qty
10-Mar
15
G.Union
84004/ET-898
7G
0
100
Balance Qty
10-Mar
16
G.Union
4036GT/ CS-8034
7G
300
300
24-Mar
17
G.Union
4036 P/ CS-8034
7G
500
500
25-Mar
18
G.Union
4036 Line CS-8034
7G
200
200
25-Mar
19
Branex
LBW-9060
7G
283
284
1
Sub Total (7GG)
3083
3084
1
Grand Total (5+7) GG
5998
6002
3
______________________ Production-Co-Ordinator
__________________ Finishing-In-Charge
Partial
10-Mar 10-Mar
31-Mar
________________ Knitting-In-Charge
______________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Shipment Details All Figure In DZ
Date : 01.03.2008
Month : February' 2008 Style/P.O No
GG
Total Order Qty
Shipped Qty
Short/Over Shipped Qty
Ship Date
Atlantic
15684
5G
617
167
Partial
20-Feb
02
G.Union
4006/CS-8000
5G
500
432
Partial
23-Feb
03
Atlantic
15684
5G
450
451
1
24-Feb
04
G.Union
4000/CS9659
5G
700
700
0
25-Feb
05
G.Union
4006/CS-8000
5G
500
68
Balance Qty
26-Feb
06
G.Union
4006/CS-8000
5G
58
35
0
Recvd from Orchid Swt.Knitting & Linking Proces
07
Atlantic
19056
5G
25
13
0
Rcvd From GSGL-1 Knitting
2850
1866
1
SL
Buyer
01
Sub Total (5GG) 08
Branex
LM-861
7G
267
266
0
7-Feb
09
Branex
LM-863
7G
83
82
-1
7-Feb
10
G.Gold
9L-119/2770
7G
750
750
0
9-Feb
11
G.Gold
9L-120/2772
7G
600
600
0
11-Feb
12
Branex
LM-862
7G
167
166
0
14-Feb
13
G.Union
4005/CS-6840
7G
400
400
0
25-Feb
14
Zara
5747/001
12G
48
48
0
15-Feb
Sub Total (7GG)
2315
2313
-1
Grand Total (5+7) GG
5165
4178
0
Remarks
Assortment Problem
______________________ Production-Co-Ordinator
__________________ Finishing-In-Charge
________________ Knitting-In-Charge
______________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Shipment Details Date : 01.02.2008
All Figure In DZ
Month : January' 2008 SL
Buyer
01
N.Mann
Style/P.O No
GG
Total Order Qty
Shipped Qty
Short/Over Shipped Qty
Ship Date
8912
5G
133
134
1
24-Jan
133
134
1
Sub Total (5GG) 07
Quelle
8832
5G
500
515
15
10-Jan
08
Quelle
8824
7G
258
259
1
10-Jan
09
Quelle
8703
7G
333
336
3
24-Jan
10
Zara
5747/521
12G
18
18
0
3-Jan
11
Zara
5747/522
12G
83
83
0
18-Jan
Remarks
12
Safara
816/8007
12G
182
182
0
Sub Total (7GG)
1375
1393
18
Grand Total (5+7) GG
1508
1527
19
______________________ Production-Co-Ordinator
__________________ Finishing-In-Charge
28-Jan
________________ Knitting-In-Charge
______________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Shipment Details Date : 02.12.2007
All Figure In DZ
Month : November' 2007 SL
Buyer
Style/P.O No
GG
Total
Shipped
Short/Over
Ship
Remarks
SL
Buyer
Style/P.O No
GG
Order Qty
Qty
Shipped Qty
Date
01
Quelle
3835
5G
275
276
1
22-Nov
01
Eurofrente
10764
5G
143
143
0
29-Nov
02
Eurofrente
10877
5G
208
208
0
29-Nov
626
627
1
Sub Total (5GG) 03
Les. Line
5870
7G
441
441
0
3-Nov
04
Les. Line
5872
7G
483
483
0
13-Nov
05
Les. Line
5868
7G
119
119
0
13-Nov
06
Quelle
8820
7G
542
542
0
22-Nov
07
G.Gold
012630
7G
500
498
-2
29-Nov
08
Cellio
V-Stripe
12G
83
33
Partial
6-Nov
Sub Total (7GG)
2168
2116
-2
Grand Total (5+7) GG
2794
2743
-1
______________________ Production-Co-Ordinator
__________________ Finishing-In-Charge
________________ Knitting-In-Charge
Remarks
______________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Shipment Details Date : 03.10.2007
All Figure In DZ
Month : October' 2007 SL
Buyer
Style/P.O No
GG
Total Order Qty
Shipped Qty
Short Shipped Qty
Ship Date
01
Sfera
0766/8021
5G
161
140
0
20-Oct
01
Sfera
0766/8021
5G
161
21
0
23-Oct
02
N.Mann
017/531
5G
200
200
0
4-Oct
361
221
0
Sub Total (5GG) 03
Quelle
8824
7G
350
357
7
10-Oct
04
Quelle
8703
7G
138
137
-1
10-Oct
05
Quelle
3512
7G
250
251
1
25-Oct
06
Quelle
8703
7G
267
271
4
31-Oct
07
Quelle
3204
7G
142
142
0
31-Oct
08
Les. Line
18902
7G
407
407
0
11-Oct
09
G.Union
7603
7G
334
334
0
31-Oct
Sub Total (7GG)
1888
1899
11
Grand Total (5+7) GG
2249
2120
11
Remarks
______________________ Production-Co-Ordinator
__________________ Finishing-In-Charge
________________ Knitting-In-Charge
______________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Shipment Details Date : 02.10.2007
All Figure In DZ
Month : September' 2007 SL
Buyer
01
G. Gold
02
Quelle
Style/P.O No
GG
Total Order Qty
Shipped Qty
Short Shipped Qty
Ship Date
19H987
5G
258
176
Partial
2-Aug
3835
5G
150
146
-4
26-Sep
408
322
-4
Sub Total (5GG) 03
Quelle
8821
7G
1200
68
Prtial
6-Sep
04
Seras
3549
7G
250
125
Partial
7-Sep
05
Zara
5747/296
7G
206
46
Nill
1-Sep
06
Zara
5747/296
7G
160
27
Partial
7-Sep
07
Zara
5747/296
7G
160
133
12-Sep
Remarks
1752
08
Quelle
8821
7G
373
381
0
13-Sep
09
Quelle
8703
7G
192
196
0
13-Sep
10
Quelle
3885
7G
67
67
11
Quelle
8824
7G
583
567
-16
14-Sep
12
Quelle
8711
7G
342
329
-13
26-Sep
13
Quelle
8711
7G
133
134
0
26-Sep
14
Quelle
3885
7G
133
131
-2
26-Sep
3799
2204
-31
Sub Total (7GG)
13-Sep
15
Zara
5747/260
7G
954
236
Partial
20-Sep
Rcvd. From Dhaka
16
Zara
5747/260
7G
954
233
Partial
23-Sep
Rcvd. From Dhaka
17
Zara
5747/260
7G
954
321
Partial
23-Sep
Rcvd. From Dhaka
Sub Total (12GG)
2862
790
0
Grand Total (5+7+12) GG
7069
3316
-35
______________________ Production-Co-Ordinator
__________________ Finishing-In-Charge
________________ Knitting-In-Charge
______________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Shipment Details Date : 01.09.2007
All Figure In DZ
Month : August' 2007
SL
Buyer
Style/P.O No
GG
Total Order Qty
Shipped Qty
Short Shipped Qty
Ship Date
01
G.Gold
19H542
5G
459
461
02
G.Gold
19H542/12228
5G
696
657
Partial
19-Aug
03
G.Gold
19H542/12228
5G
696
39
Partial
27-Aug
1851
1157
0
Sub Total (5GG) 12
Les.Line
14
12-Aug
47902W
7G
639
626
-13
13-Aug
Sears
3547
7G
333
335
0
16-Aug
15
Zara
5747/246 36362
7G
375
375
0
18-Aug
16
Zara
5747/246 36361
7G
458
458
0
18-Aug
Sub Total (7GG)
1805
1794
-13
Grand Total (5+7) GG
3656
2951
-13
Remarks
______________________ Production-Co-Ordinator
__________________ Finishing-In-Charge
________________ Knitting-In-Charge
______________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Shipment Details Date : 05.08.2007
All Figure In DZ
Month : July' 2007 SL
Buyer
Style/P.O No
GG
Total Order Qty
Shipped Qty
Short Shipped Qty
Ship Date
1537
5G
292
292
0
4-Jul
01
Sears
02
N.Mann
138/751
5G
42
42
0
6-Jul
03
N.Mann
327/052
5G
42
43
0
6-Jul
04
Tiara
4H215/28875
5G
162
162
0
8-Jul
05
Tiara
4H215/28803
5G
338
338
0
8-Jul
06
Quelle
3835
5G
200
192
8
13-Jul
07
Sears
1504
5G
167
165
2
18-Jul
08
Sears
1513
5G
233
231
2
18-Jul
09
K-Mart
9H049/12186
5G
1564
780
Partial
22-Jul
Remarks
10
K-Mart
9H049/12186
5G
1564
784
Partial
29-Jul
11
Sears
1500
5G
50
50
0
29-Jul
12
Sears
1537
5G
83
84
0
29-Jul
4736
3162
12
Sub Total (5GG) 12
Quelle
8820
7G
879
872
7
6-Jul
14
Sears
1535
7G
167
167
0
8-Jul
15
Sears
3543
7G
309
309
0
11-Jul
16
Sears
3544
7G
317
318
0
12-Jul
17
Quelle
8820
7G
510
496
14
12-Jul
18
Quelle
8820
7G
283
293
0
27-Jul
19
Quelle
3885
7G
333
330
3
27-Jul
20
Quelle
8703
7G
225
231
0
27-Jul
3024
3016
24
108
108
0
Sub Total (12GG)
108
108
0
Grand Total (5+7+12) GG
7868
6286
36
Sub Total (7GG) 21
Eurofrente
______________________ Production-Co-Ordinator
10610
12G
__________________ Finishing-In-Charge
31-Jul
________________ Knitting-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
______________ Plant-In-Charge
Shipment Details Date : 01.07.2007
All Figure In DZ
Month : June'2007 Style/P.O No
GG
Total Order Qty
Shipped Qty
Short Shipped Qty
Ship Date
8480
5G
1000
1000
0
12-Jun
Tiara
4H215/28813
5G
408
408
0
23-Jun
Tiara
4H215/28802
5G
100
100
0
23-Jun
1508
1508
0
SL
Buyer
01
G.Union
02 03
Sub Total (5GG) 04
G.Union
1603
7G
300
300
0
2-Jun
05
Sears
3542
7G
123
124
0
12-Jun
06
Sears
3544
7G
214
215
0
12-Jun
07
Quelle
2479
7G
142
145
0
14-Jun
08
Quelle
3204
7G
667
661
7
14-Jun
09
Quelle
8820
7G
2500
1621
Partial
28-Jun
10
Quelle
3885
7G
133
134
0
28-Jun
Sub Total (7GG)
4079
3200
7
Grand Total
5587
4708
7
Remarks
hipment Target Status SL
Buyer
01 02 03 04 05 Total
Style/P.O No
GG
Total Order Qty
Shipment Target Actual Revised
Remarks
______________________ Production-Co-Ordinator
__________________ Finishing-In-Charge
________________ Knitting-In-Charge
______________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Shipment Details Date : 01.06.2007
All Figure In DZ
Month : May'2007 Style/P.O No
GG
Total Order Qty
Shipped Qty
Short Shipped Qty
Ship Date
N.Mann
138/751
5G
42
42
0
9-May
02
N.Mann
327/052
5G
42
42
0
9-May
03
Sears
VLF7-1500
5G
188
188
0
15-May
04
Quelle
3212
5G
333
329
4
29-May
05
Sears
VLF7-1500
5G
50
50
0
31-May
655
651
4
SL
Buyer
01
Sub Total (5GG) 06
Tiara
4H216/28658
7G
500
500
0
7-May
07
Quelle
2479
7G
141
142
0
9-May
08
Eurofrente
10394
7G
800
800
0
22-May
09
Tiara
4H216/28659
7G
500
498
2
21-May
10
Eurofrente
10394
7G
423
423
0
31-May
Sub Total (7GG)
2364
2363
0
Grand Total
3019
3014
4
Remarks
504
Quality Problem
Quality Problem
hipment Target Status SL
Buyer
Style/P.O No
GG
Total Order Qty
Shipment Target Actual Revised
Remarks
01 02 03 04 05 Total
______________________ Production-Co-Ordinator
__________________ Finishing-In-Charge
________________ Knitting-In-Charge
______________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Shipment Details Date : 01.05.2007
All Figure In DZ
Month : April'2007 Style/P.O No
GG
Total Order Qty
Shipped Qty
N.Mann
138/751
5G
83
83
5-Apr
02
N.Mann
327/052
5G
83
83
5-Apr
03
Quelle
3733
5G
333
333
12-Apr
SL
Buyer
01
Short Shipped Qty
Ship Date
Remarks
04
Quelle
3835
5G
208
202
6
12-Apr
05
Quelle
3915
5G
133
134
0
18-Apr
03
G.Union
17200
5G
500
500
22-Apr
04
Sears
VLF7-1500
5G
568
569
28-Apr
1908
1904
Sub Total (5GG)
Embd. Problem
6
06
G.Union
7613
7G
500
500
9-Apr
07
G.Union
1603
7G
300
300
9-Apr
07
G.Union
1604
7G
300
300
22-Apr
08
Quelle
3885
7G
333
331
09
Quelle
8711
7G
367
369
Sub Total (7GG)
1800
1800
2
Grand Total
3708
3704
8
2
12-Apr
Print Problem
27-Apr
hipment Target Status SL
Buyer
Style/P.O No
GG
Total Order Qty
Shipment Target Actual Revised
Remarks
01 02 03 04 05 Total
______________________ Production-Co-Ordinator
__________________ Finishing-In-Charge
________________ Knitting-In-Charge
______________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Shipment Details Date : 01.04.2007
All Figure In DZ
Month : March'2007 Style/P.O No
GG
Total Order Qty
Shipped Qty
Short Shipped Qty
Ship Date
G.Union
7609
5G
1000
1000
0
1-Mar
02
G.Union
7615
5G
700
168
Partial
11-Mar
03
G.Union
7600
5G
1000
168
Partial
11-Mar
04
G.Union
7600
5G
832
832
Partial
16-Mar
05
G.Union
17201
5G
500
500
0
31-Mar
4032
2668
0
SL
Buyer
01
Sub Total (5GG) 06
G.Union
7606
7G
700
168
Partial
11-Mar
07
G.Union
7603
7G
700
168
Partial
13-Mar
08
G.Union
7606
7G
532
532
0
16-Mar
09
G.Union
7603
7G
532
532
0
29-Mar
10
G.Union
1613
7G
300
300
0
29-Mar
Sub Total (7GG)
2764
1700
0
Grand Total
6796
4368
0
Remarks
hipment Target Status SL 01 02 03
Buyer
Style/P.O No
GG
Total Order Qty
Shipment Target Actual Revised
Remarks
04 05 06 07 08 Total
____________ Prepared By
________________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Shipment Details Date : 01.04.2007
All Figure In DZ
Month : March' 2007 SL
Buyer
Style/P.O No
GG
Total Order Qty
Shipped Qty
01
N.Mann
550/477
5G
100
103
02
G.Union
7615
5G
700
532
Partial
800
635
0
Sub Total (5GG)
Short Shipped Qty
Ship Date
Remarks
1-Feb 28-Feb
03
Quelle
8706
7G
833
818
-15
1-Feb
Due To Printing Problem
04
Quelle
8711
7G
525
502
-23
22-Feb
Due To Yarn Dying Problem
05
Quelle
8706
7G
150
151
0
22-Feb
06
G.Union
7604
7G
700
700
0
21-Feb
07
G.Union
7605
7G
1000
1000
0
21-Feb
Sub Total (7GG)
3208
3171
-38
Grand Total
4008
3806
-38
hipment Target Status SL
Buyer
Style/P.O No
GG
Total Order Qty
Shipment Target Actual Revised
Remarks
01 02 03 04 05 06 07 08 Total
____________ Prepared By
________________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Shipment Details Date : 01.03.2007
All Figure In DZ
Month : February' 2007 SL
Buyer
Style/P.O No
GG
Total Order Qty
Shipped Qty
Short Shipped Qty
Ship Date
Remarks
01
N.Mann
550/477
5G
100
103
02
G.Union
7615
5G
700
532
Partial
800
635
0
Sub Total (5GG)
1-Feb 28-Feb
03
Quelle
8706
7G
833
818
-15
1-Feb
Due To Printing Problem
04
Quelle
8711
7G
525
502
-23
22-Feb
Due To Yarn Dying Problem
05
Quelle
8706
7G
150
151
0
22-Feb
06
G.Union
7604
7G
700
700
0
21-Feb
07
G.Union
7605
7G
1000
1000
0
21-Feb
Sub Total (7GG)
3208
3171
-38
Grand Total
4008
3806
-38
hipment Target Status SL
Buyer
Style/P.O No
GG
Total Order Qty
Shipment Target Actual Revised
Remarks
01 02 03 04 05 06 07 08 Total
____________
________________
Prepared By
Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Shipment Details Date : 01.02.2007
All Figure In DZ
Month : January' 2007 SL
Buyer
Style/P.O No
GG
Total Order Qty
Shipped Qty
Short Shipped Qty
Ship Date
01
Quelle
3212
5G
333
328
-5
11-Jan
02
Quelle
7692
5G
333
322
-11
18-Jan
03
Quelle
3812
5G
100
100
0
25-Jan
766
750
-16
Sub Total (5GG) 05
Quelle
3252
7G
267
265
-2
11-Jan
06
Quelle
7452
7G
133
134
0
25-Jan
Sub Total (7GG)
400
399
-2
Grand Total
1166
1149
-18
07
7G
08
7G
09
7G
Remarks
hipment Target Status SL 01 02 03
Buyer
Style/P.O No
GG
Total Order Qty
Shipment Target Actual Revised
Remarks
04 05 06 07 08 Total
____________ Prepared By
________________________ Production-Co-Ordinator
________________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Shipment Details Date : 06.01.2007
All Figure In DZ
Month : December' 2006 SL
Buyer
Style/P.O No
GG
Total Order Qty
Shipped Qty
Short Shipped Qty
Ship Date
01
N.Mann
550/477
5G
100
101
0
20-Dec
100
101
0
212
202
11
02
5G
03
5G
04
5G
05
5G Sub Total (5GG)
05
Quelle
8703
7G
6-Dec
Remarks
Quality Problem
06
Quelle
8711
7G
833
781
52
Sub Total (7GG)
1045
983
63
Grand Total
1145
1084
63
07
7G
08
7G
09
7G
10
7G
11
7G
12
7G
28-Dec Due To Over Weight
hipment Target Status SL
Buyer
Style/P.O No
GG
Total Order Qty
Shipment Target Actual Revised
Remarks
01 02 03 Total
____________ Prepared By
________________________ Production-Co-Ordinator
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
________________ Plant-In-Charge
Shipment Details Date : 02.12.2006
All Figure In DZ
Month : November' 2006 SL
Buyer
Style/P.O No
GG
Total Order Qty
Shipped Qty
Short Shipped Qty
Ship Date
01
N.Mann
550/477
5G
83
83
0
9-Nov
02
Eurofrente
09769
5G
487
487
0
16-Nov
03
Eurofrente
09770
5G
150
150
0
16-Nov
04
Eurofrente
09750
5G
521
513
8
18-Nov
05
Quelle
3795
5G
125
75
Partial
30-Nov
1366
1308
8
Sub Total (5GG)
Remarks
05
Quelle
7392
7G
210
190
20
2-Nov
06
Quelle
7452
7G
175
165
Partial
9-Nov
07
Quelle
3955
7G
183
83
100
9-Nov
08
Quelle
3792
7G
58
59
0
9-Nov
09
Quelle
7452
7G
275
246
29
23-Nov
10
Quelle
7392
7G
58
62
0
23-Nov
11
Quelle
8703
7G
2083
1871
Partial
30-Nov
12
Leasure Line
17908
7G
63
23
Partial
5-Nov Rcvd. From Savar Swtr.
3105
2699
149
102
7
Partial
Sub Total (7GG)
102
7
Grand Total
4573
4014
Sub Total (12GG) 15
Zara
5747/260
12G
100 DZ Stock Lot
9-Nov
157
hipment Target Status SL 01 02 03
Buyer
Style/P.O No
GG
Total Order Qty
Shipment Target Actual Revised
Remarks
Total
____________ Prepared By
________________________ Production-Co-Ordinator
________________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Shipment Details Date : 01.11.2006
All Figure In DZ
Month : October' 2006 SL
Buyer
Style/P.O No
GG
Total Order Qty
Shipped Qty
Short Shipped Qty
01
G.Gold
1D159
3G
42
13
Partial
21-OctRcvd From SAVAR Swtr.
42
13
Sub Total (1.5GG)
Ship Date
02
G.Gold
1D158/10251
5G
546
216
Partial
2-Oct
03
G.Gold
1D158/10251
5G
268
200
Partial
10-Oct
04
G.Gold
1D158/10251
5G
130
36
Partial
11-Oct
05
G.Gold
1D158/10249
5G
100
98
2
1044
550
2
Sub Total (5GG)
Remarks
11-Oct Assortment Problem
06
Sears
VSL7-1500
7G
200
200
0
1-Oct
07
Sears
TSF6-3534
7G
124
123
1
12-Oct
08
Quelle
3732
7G
367
132
Partial
5-Oct
09
Quelle
3905
7G
200
73
Partial
5-Oct
10
Quelle
3732
7G
234
100
Partial
6-Oct
11
Quelle
3905
7G
127
29
Partial
6-Oct
12
Quelle
7294
7G
208
74
Partial
6-Oct
13
Quelle
8609
7G
433
124
Partial
12-Oct
14
Quelle
3732
7G
134
122
13
12-Oct
Printing Problem
15
Quelle
3905
7G
98
87
11
12-Oct
Quality Problem
16
Quelle
3792
7G
408
129
Partial
12-Oct
17
Quelle
7294
7G
134
119
15
13-Oct Quality & Printing Problem
18
Quelle
8609
7G
309
303
6
19-Oct Yarn Shading Problem
19
Quelle
3792
7G
344
345
20
Quelle
7392
7G
250
40
Partial
21-Oct
21
Leasure Line
17908
7G
185
34
Partial
20-OctRcvd From SAVAR Swtr.
22
Leasure Line
17908
7G
185
17
Partial
21-OctRcvd From SAVAR Swtr.
Sub Total (7GG)
3940
2051
46
Grand Total
5026
2614
48
19-Oct
hipment Target Status SL
Buyer
Style/P.O No
GG
Total Order Qty
Shipment Target Actual Revised
Remarks
01 02 Total
____________ Prepared By
________________________ Production-Co-Ordinator
________________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Shipment Details Date : 03.10.2006
All Figure In DZ
Month : September' 2006
SL
Buyer
Style/P.O No
GG
Total Order Qty
Shipped Qty
Short Shipped Qty
Ship Date
Remarks
01
Zara
5747/703
1.5G
409
134
0
19-Sep
Savar Sweater
02
Zara
5747/703
1.5G
132
46
Partial
25-Sep
Savar Sweater
541
180
Sub Total (1.5GG) 03
G.Gold
21D050CT/10074
5G
330
330
0
5-Sep
04
G.Gold
21D050CT/10075
5G
220
220
0
5-Sep
05
Rajan
MK-413609
5G
400
400
0
6-Sep
06
Rajan
MK-413612
5G
400
400
0
6-Sep
07
Rajan
MK-413608
5G
300
300
0
6-Sep
08
Sears
TSF6-3540
5G
200
201
0
11-Sep
09
Sears
TSF6-3542
5G
217
216
1
13-Sep
10
Bay-City
303696/30
5G
161
56
Partial
18-Sep
11
G.Gold
1D158/010251
5G
1380
834
Partial
30-Sep
3608
2957
1
Sub Total (5GG) 12
Quelle
3575
7G
150
147
3
8-Sep
13
Quelle
8602
7G
233
46
Partial
8-Sep
14
Rajan
LK-41CROP
7G
300
104
Partial
11-Sep
15
Quelle
8602
7G
187
181
6
15-Sep
16
Quelle
8609
7G
408
274
Partial
15-Sep
17
Quelle
8609
7G
135
130
5
21-Sep
16
Quelle
8602
7G
208
213
0
28-Sep
17
Sears
3534
7G
157
158
0
28-Sep
Sub Total (7GG)
1778
1253
14
Grand Total
5927
4390
15
Savar Sweater
Savar Sweater
hipment Target Status SL
Buyer
01 02 Total
Style/P.O No
GG
Total Order Qty
Shipment Target Actual Revised
Remarks
____________ Prepared By
________________________ Production-Co-Ordinator
________________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Shipment Details Date : 01.08.2006
All Figure In DZ
Month : July' 2006 SL
Buyer
Style/P.O No
GG
Total Order Qty
Shipped Qty
01
Tiara
4D-769
3G
400
160
400
160
Sub Total (3GG)
Short Shipped Qty
Ship Date
Remarks
3-Jul
OSL
02
Quelle
8614
5G
1008
540
Partial
7-Jul
03
Quelle
8614
5G
1680
469
Partial
13-Jul
04
Quelle
3795
5G
125
89
Partial
13-Jul
05
Quelle
3795
5G
36
37
0
20-Jul
06
Quelle
3595
5G
167
157
10
20-Jul
07
Quelle
8614
5G
1213
612
Partial
21-Jul
08
Quelle
8614
5G
600
589
11
28-Jul
09
Sears
60252-C
5G
432
415
17
16-Jul
5261
2908
38
Sub Total (5GG) 10
M.Hidary
FGB06821
7G
42
17
0
3-Jul
11
Sears
3534
7G
667
667
0
10-Jul
12
Sears
3536
7G
417
228
Partial
16-Jul
13
Sears
1502
7G
237
234
3
26-Jul
14
Sears
1504
7G
399
172
Partial
27-Jul
15
Quelle
8602
7G
152
124
Partial
13-Jul
16
Quelle
8602
7G
293
142
Partial
7-Jul
OSL
17
Quelle
3094
7G
500
112
Partial
21-Jul
18
Quelle
3094
7G
388
271
Partial
28-Jul
19
Quelle
3142
7G
67
66
1
20-Jul
20
Wehmeyer
WR-08
7G
200
135
Partial
13-Jul
21
Wehmeyer
WR-08
7G
65
63
2
20-Jul
22
N.Mann
017/477
7G
146
83
Partial
28-Jul
Sub Total (7GG)
3573
2314
6
Grand Total
9234
5382
44
hipment Target Status SL
Buyer
Style/P.O No
GG
Total Order Qty
Shipment Target Actual Revised
Remarks
01 02 03 Total
____________ Prepared By
________________________ Production-Co-Ordinator
________________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Shipment Details Date : 01.07.2006
All Figure In DZ
Month : June' 2006 SL
Buyer
Style/P.O No
GG
Total Order Qty
Shipped Qty
Short Shipped Qty
Ship Date
01
Quelle
8614
5G
1675
1253
Partial
1-Jun
02
Eurofrente
09181
5G
186
186
0
9-Jun
03
Eurofrente
09182
5G
113
107
6
9-Jun
Remarks
04
Quelle
8614
5G
422
418
4
9-Jun
05
Quelle
3023
5G
150
142
8
15-Jun
06
Quelle
3033
5G
150
140
10
15-Jun
07
Quelle
7214
5G
150
141
9
15-Jun
08
Sears
60252-C
5G
432
416
16
18-Jun
09
Quelle
8614
5G
2021
337
Partial
22-Jun
10
Quelle
3795
5G
175
165
10
22-Jun
11
Quelle
8614
5G
2021
676
Partial
29-Jun
7495
3981
63
Sub Total (5GG) 01
Quelle
2667
7G
267
40
Partial
1-Jun
02
Sears
3533
7G
500
492
8
8-Jun
03
N.Mann
017/531
7G
271
263
7
9-Jun
04
N.Mann
017/477
7G
146
140
6
9-Jun
05
Sears
1500
7G
35
35
0
12-Jun
06
Sears
3531
7G
625
619
6
15-Jun
07
Sears
3534
7G
237
232
5
18-Jun
08
Sears
3532
7G
334
332
1
22-Jun
09
Quelle
3732
7G
167
155
12
22-Jun
10
Eurofrente
09447
7G
460
460
0
26-Jun
11
Quelle
8602
7G
658
365
Partial
29-Jun
Sub Total (7GG)
3700
3133
45
Grand Total
11195
7114
108
3252
hipment Target Status SL
Buyer
01 02 03 Total
Style/P.O No
GG
Total Order Qty
Shipment Target Actual Revised
Remarks
____________ Prepared By
________________________ Production-Co-Ordinator
________________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Shipment Details Date : 02.06.2006
All Figure In DZ
Month : May' 2006 SL
Buyer
Style/P.O No
GG
Total Order Qty
Shipped Qty
Short Shipped Qty
Ship Date
01
Scope
13463
5G
40
40
0
2-May
02
N.Mann
550/477
5G
67
67
0
4-May
03
G.Union
S-372
5G
100
98
2
7-May
04
G.Union
S-373
5G
100
100
0
7-May
05
Rajan
MK-413315
5G
300
294
6
8-May
06
Sears
1500
5G
666
670
0
17-May
07
N.Mann
550/477
5G
75
76
0
25-May
1348
1345
8
Sub Total (5GG) 01
Quelle
2627
7G
200
200
0
10-May
02
Quelle
2611
7G
200
202
0
10-May
03
Quelle
3295
7G
183
179
4
11-May
04
Quelle
2620
7G
233
231
2
11-May
05
Quelle
3792
7G
166
166
0
17-May
06
Quelle
2619
7G
233
229
4
17-May
07
Quelle
8602
7G
325
324
1
17-May
08
Quelle
2615
7G
292
289
3
19-May
09
Quelle
2667
7G
267
230
Partial
25-May
10
Quelle
2479
7G
200
202
0
25-May
11
Quelle
2670
7G
333
337
0
25-May
12
Eurofrente
09447
7G
900
500
Partial
27-May
13
G.Union
CS-3029
7G
350
350
0
31-May
Remarks
14
G.Union
ET-6030
7G
104
104
Partial
Sub Total (7GG)
3986
3543
14
Grand Total
5334
4888
22
31-May
hipment Target Status SL
Buyer
Style/P.O No
GG
Total Order Qty
Shipment Target Actual Revised
Remarks
01 02 03 04 05 Total
____________ Prepared By
________________________ Production-Co-Ordinator
________________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Shipment Details Date : 02.05.2006
All Figure In DZ
Month : April' 2006 SL
Buyer
Style/P.O No
GG
Total Order Qty
Shipped Qty
Short Shipped Qty
Ship Date
01
Quelle
7214
5G
150
147
3
27-Apr
02
Quelle
3033
5G
150
150
0
27-Apr
03
Quelle
3023
5G
150
151
0
27-Apr
04
Scope
13463
5G
200
201
0
30-Apr
05
Scope
13465
5G
200
200
0
30-Apr
Remarks
Sub Total (5GG)
850
849
3
01
G.Union
8497
7G
188
188
0
3-Apr
02
G.Union
L-444
7G
300
299
1
10-Apr
03
Quelle
3732
7G
133
134
0
19-Apr
04
Quelle
3792
7G
167
167
0
27-Apr
05
Quelle
3792(B)
7G
342
339
3
27-Apr
Sub Total (7GG)
1130
1127
4
Grand Total
1980
1976
7
hipment Target Status SL
Buyer
Style/P.O No
GG
Total Order Qty
Shipment Target Actual Revised
Remarks
01 02 03 04 05 Total
____________ Prepared By
________________________ Production-Co-Ordinator
________________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Shipment Details Date : 02.04.2006
All Figure In DZ
Month : March' 2006 SL
Buyer
Style/P.O No
GG
Total Order Qty
Shipped Qty
Short Shipped Qty
Ship Date
01
Zara
5747/541
7G
201
201
0
7-Mar
02
Zara
5747/541
7G
100
100
0
9-Mar
03
Zara
5747/541
7G
241
241
0
16-Mar
542
542
0
Sub Total (5GG) 01
N.Mann
429/546
7G
308
311
0
2-Mar
02
Eurofrente
08997
7G
50
50
0
2-Mar
03
Quelle
3732
7G
192
192
0
16-Mar
04
Quelle
8602
7G
700
701
0
29-Mar
Sub Total (7GG)
1250
1254
0
Grand Total
1792
1796
0
Remarks
hipment Target Status SL 01
Buyer
Style/P.O No
GG
Total Order Qty
Shipment Target Actual Revised
Remarks
02 03 04 05 Total
____________ Prepared By
________________________ Production-Co-Ordinator
________________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Shipment Details Date : 01.03.2006
All Figure In DZ
Month : February' 2006 SL
Buyer
Style/P.O No
GG
01
5G
02
5G
Sub Total (5GG)
Total Order Qty
Shipped Qty
Short Shipped Qty
0
0
0
Ship Date
Remarks
01
Quelle
8609
7G
900
852
48
3-Feb Yarn & Shading Problem
02
Quelle
7382
7G
100
93
7
8-Feb
03
Quelle
3732
7G
67
67
0
8-Feb
Printing Problem
04
Quelle
8609
7G
708
709
1
17-Feb
05
Eurofrente
08997
7G
90
40
Partial
25-Feb
Sub Total (7GG)
1865
1761
56
Grand Total
1865
1761
56
hipment Target Status SL
Buyer
Style/P.O No
GG
Total Order Qty
Shipment Target Actual Revised
Remarks
01 02 03 04 05 Total
____________ Prepared By
________________________ Production-Co-Ordinator
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
________________ Plant-In-Charge
Shipment Details Date : 01.02.2006
All Figure In DZ
Month : January' 2006 SL
Buyer
Style/P.O No
GG
Total Order Qty
Shipped Qty
Short Shipped Qty
Ship Date
01
Zara
5747/504
5G
321
316
5
9-Jan
321
316
5
02
Remarks
5G
Sub Total (5GG) 05
Quelle
8603(B)
7G
650
636
14
5-Jan
Shading Problem
06
Quelle
7382
7G
100
99
1
5-Jan
Assortment Problem
07
Quelle
3732
7G
67
67
0
5-Jan
08
Quelle
8609
7G
600
600
0
25-Jan
Sub Total (7GG)
1417
1402
15
Grand Total
1738
1718
20
hipment Target Status SL
Buyer
01 02 03 04 05 Total
Style/P.O No
GG
Total Order Qty
Shipment Target Actual Revised
Remarks
____________ Prepared By
________________________ Production-Co-Ordinator
________________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Shipment Details Date : 01.12.2005
All Figure In DZ
Month : December' 2005 SL
Buyer
Style/P.O No
GG
Total Order Qty
Shipped Qty
Short Shipped Qty
Ship Date
01
Zara
574/600
5G
596
596
0
1-Dec
02
Putteman
RH3335TG
5G
100
100
0
12-Dec
696
696
0
Sub Total (5GG) 05
Sears
2486
7G
406
406
0
1-Dec
06
N.Mann
317/349
7G
708
700
8
8-Dec
07
Quelle
8602
7G
833
844
0
15-Dec
08
Quelle
8603
7G
1250
1250
0
29-Dec
3197
3200
8
Sub Total (7GG)
Remarks
Grand Total
3893
3896
8
hipment Target Status SL
Buyer
Style/P.O No
GG
Total Order Qty
Shipment Target Actual Revised
Remarks
01 02 03 04 05 Total
____________ Prepared By
________________________ Production-Co-Ordinator
________________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Shipment Details Date : 01.12.2005
All Figure In DZ
Month : November ' 2005 SL
Buyer
Style/P.O No
GG
Total Order Qty
Shipped Qty
Short Shipped Qty
Ship Date
01
Eurofrente
9029
5G
16
16
0
7-Nov
02
5G
Remarks
03
5G
04
5G
05
5G
06
5G
Sub Total (5GG)
16
16
0
05
Quelle
8602
7G
1333
1333
0
2-Nov
06
Bay-City
451
7G
1800
830
Partial
15-Nov
07
Bay-City
451
7G
1800
75
Partial
16-Nov
08
Bay-City
451
7G
1800
395
Partial
17-Nov
09
Bay-City
451
7G
1800
265
Partial
18-Nov
10
Quelle
8602
7G
1000
993
7
24-Nov
11
Bay-City
451
7G
35
35
12
Sears
07MCS6-2472
7G
267
267
0
Sub Total (7GG)
9835
4193
7
Grand Total
9851
4209
7
13
26-Nov 27-Nov
7G
hipment Target Status SL
Buyer
Style/P.O No
GG
Total Order Qty
Shipment Target Actual Revised
Remarks
01 02 03 04 05 Total
____________
________________________
________________
Prepared By
Production-Co-Ordinator
Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Shipment Details Date : 01.11.2005
All Figure In DZ
Month : October ' 2005 SL
Buyer
Style/P.O No
GG
Total Order Qty
Shipped Qty
Short Shipped Qty
Ship Date
01
Sears
1539
5G
153
155
0
10-Oct
02
Sears
1538
5G
112
113
0
10-Oct
03
Sears
1537
5G
99
99
0
10-Oct
04
Sears
1536
5G
137
137
0
10-Oct
05
Eurofrente
09209
5G
140
140
0
23-Oct
06
Eurofrente
08206
5G
360
360
0
23-Oct
1001
1004
0
Sub Total (5GG) 05
Bay-City
452
7G
1625
1625
0
1-Oct
06
Wal Mart
9106
7G
333
33
0
10-Oct
07
Wal Mart
9106
7G
333
100
0
10-Oct
08
Bay-City
449
7G
758
758
0
17-Oct
Sub Total (7GG)
3049
2516
0
Grand Total
4050
3520
0
09
7G
10
7G
11
7G
12
7G
13
7G
Remarks
hipment Target Status SL
Buyer
Style/P.O No
GG
Total Order Qty
Shipment Target Actual Revised
Remarks
01 02 03 04 05 Total
____________ Prepared By
________________________ Production-Co-Ordinator
________________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Shipment Details Date : 01.10.2005
All Figure In DZ
Month : September' 2005 SL
Buyer
Style/P.O No
GG
Total Order Qty
Shipped Qty
Short Shipped Qty
Ship Date
Remarks
01
Sears
1516
5G
194
193
1
1-Sep
Process Loss
02
Sears
1514
5G
382
382
0
1-Sep
03
G.Gold
7358
5G
300
300
0
6-Sep
04
Bay-City
452
5G
1625
0
0
29-Sep
2501
875
1
Sub Total (5GG) 05
Quelle
7610(B)
7G
917
860
Partial
1-Sep
06
Quelle
7610
7G
57
57
0
8-Sep
07
Quelle
7610
7G
63
63
0
8-Sep
08
Quelle
7610
7G
250
251
0
8-Sep
09
Rajan
W515043
7G
268
266
2
22-Sep
Process Loss
10
Rajan
W515029
7G
216
212
4
22-Sep
Process Loss
11
Rajan
W515028
7G
133
129
4
22-Sep
Process Loss
12
Rajan
W515078-L
7G
13
12
1
22-Sep
Process Loss
13
Quelle
3575
7G
133
64
Partial
22-Sep
2050
1914
11
42
0
Sub Total (7GG) 17
Zara
5747/800
1.5G
10-Sep
18
Sub Total (1.5G)
0
42
0
Grand Total
4551
2831
12
19 20
hipment Target Status SL
Buyer
Style/P.O No
GG
Total Order Qty
Shipment Target Actual Revised
Remarks
01 02 03 04 05 Total
____________ Prepared By
________________________ Production-Co-Ordinator
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
________________ Plant-In-Charge
Shipment Details Date : 02.08.2005
All Figure In DZ
Month : August' 2005 SL
Buyer
Style/P.O No
GG
Total Order Qty
Shipped Qty
01
Sears
3515
5G
750
752
02
Rajan
MK-412651
5G
200
190
03
Sears
3534
5G
517
518
04
Sears
1516
5G
362
167
Partial
1829
1627
10
Sub Total (5GG) 05
G.Gold
27750
7G
50
18
06
Rajan
MK-412655
7G
200
198
07
Rajan
MK-412960
7G
250
08
Rajan
W-515048
7G
09
Rajan
W-515043
10
Quelle
11
Short Shipped Qty
Ship Date
Remarks
1-Aug 10
9-Aug
Process Loss
29-Aug 29-Aug
2-Aug
GSGL-1
2
6-Aug
Process Loss
248
2
6-Aug
Process Loss
200
194
6
11-Aug
Process Loss
7G
222
218
4
11-Aug
Process Loss
7824
7G
67
66
1
11-Aug
Process Loss
Zara
5747/830
7G
271
248
23
11-Aug Assortment Problem
12
Zara
5747/830
7G
271
4
13
Rajan
MK-516086
7G
226
223
14
Rajan
MK-516076
7G
66
66
17-Aug
15
Sears
TSF5-3530
7G
500
504
21-Aug
16
Quelle
7610
7G
1000
1003
25-Aug
Sub Total (7GG)
3323
2990
41
Grand Total
5152
4617
51
13-Aug Shiped From Orchid 3
17 18
7G
19
7G
20
7G
hipment Target Status
17-Aug
Process Loss
SL
Buyer
Style/P.O No
GG
Total Order Qty
Shipment Target Actual Revised
Remarks
01 02 03 04 05 Total
____________ Prepared By
________________________ Production-Co-Ordinator
________________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Shipment Details Date : 02.08.2005
All Figure In DZ
Month : July' 2005 SL
Buyer
Style/P.O No
GG
Total Order Qty
Shipped Qty
Short Shipped Qty
Ship Date
Remarks
01
Sears
1311
5G
228
226
2
4-Jul
Process Loss
02
Sears
3516
5G
501
495
6
10-Jul
Process Loss
03
Sears
1330
5G
175
179
0
17-Jul
04
Bernardi
237/W
5G
180
180
0
31-Jul
1084
1080
8
Sub Total (5GG) 05
G.Gold
27822
7G
250
140
Partial
5-Jul
06
Sears
1304
7G
322
323
0
7-Jul
07
G.Gold
27822
7G
250
110
Partial
10-Jul
08
Bernardi
05/C-46W
7G
363
83
Partial
15-Jul
09
Bay-City
162979
7G
1000
500
Partial
17-Jul
10
Bay-City
162989
7G
750
413
Partial
17-Jul
11
G.Gold
17653/8039
7G
200
196
4
17-Jul
12
Bay-City
162979
7G
501
200
Partial
18-Jul
13
Bay-City
162989
7G
338
150
Partial
18-Jul
14
Bay-City
162979
7G
250
250
0
20-Jul
15
Bay-City
162989
7G
188
188
0
20-Jul
16
Rajan
MK-412654
7G
200
140
60
20-Jul Applique Dyeing Quality Rejec
17
G.Gold
17653/8040
7G
418
330
88
23-Jul
18
G.Gold
17653/8041
7G
300
130
Partial
24-Jul
19
G.Gold
17653/8041
7G
300
150
Partial
26-Jul
20
Bernardi
05/C-46W
7G
280
280
0
31-Jul
Sub Total (7GG)
5910
3583
152
Grand Total
6994
4663
160
Fack Fur Short.
hipment Target Status SL
Buyer
Style/P.O No
GG
Total Order Qty
Shipment Target Actual Revised
Remarks
01 02 03 04 05 Total
____________ Prepared By
________________________ Production-Co-Ordinator
GLOBAL KNIT-WEAR LTD
________________ Plant-In-Charge
269 DEWAN HAT CHITTAGONG
Shipment Details Date : 02.07.2005
All Figure In DZ
Month : June' 2005 SL
Buyer
Style/P.O No
GG
Total Order Qty
Shipped Qty
Short Shipped Qty
Ship Date
01
Sears
1309
5G
272
273
0
4-Jun
02
Sears
50108
5G
594
585
9
26-Jun
03
Sears
3531
5G
500
486
14
26-Jun
04
Sears
1307
5G
276
274
2
14-Jun
05
G.Gold
7548
5G
100
94
6
28-Jun
1742
1712
31
Sub Total (5GG) 04
Sears
1304
7G
260
260
0
4-Jun
05
Bay-City
366/367
7G
2643
1280
Partial
9-Jun
06
Sears
1310
7G
342
338
2
12-Jun
07
Quelle
2479
7G
217
218
0
15-Jun
08
Quelle
2480
7G
167
167
0
15-Jun
09
Quelle
2481
7G
183
181
2
15-Jun
10
Bay-City
366/367
7G
2560
1264
Partial
15-Jun
11
Quelle
2482
7G
167
158
9
30-Jun
12
Quelle
2485
7G
167
159
8
30-Jun
13
Quelle
2486
7G
167
164
3
30-Jun
Sub Total (7GG)
6873
4189
24
Grand Total
8615
5901
55
Remarks
hipment Target Status SL 01 02
Buyer
Style/P.O No
GG
Total Order Qty
Shipment Target Actual Revised
Remarks
03 04 05 06 07 Total
____________ Prepared By
________________________ Production-Co-Ordinator
________________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Shipment Details Date : 02.06.2005
All Figure In DZ
Month : May' 2005 SL
Buyer
Style/P.O No
GG
Total Order Qty
Shipped Qty
Short Shipped Qty
Ship Date
01
Rajan
MK-412692
5G
200
200
0.00
15-May
02
G.Gold
007999
5G
500
400
Partial
15-May
03
Eurofrente
08206
5G
119
120
18-May
04
Eurofrente
08207
5G
219
220
18-May
05
Wehemer
WR-01
5G
427
427
25-May
1465
1367
0.00
5G
Sub Total (5GG) 08
Rajan
MK-413066
7G
200
200
0
15-May
09
Rajan
Mk-412727
7G
300
260
Partial
15-May
10
Rajan
MK-412727
7G
40
36
4
16-May
11
Rajan
MK-413076
7G
300
298
2
16-May
Remarks
Sub Total (7GG)
840
794
6
Grand Total
2305
2161
6
hipment Target Status SL
Buyer
Style/P.O No
GG
Total Order Qty
Shipment Target Actual Revised
Remarks
01 02 03 04 05 06 07 Total
____________ Prepared By
________________________ Production-Co-Ordinator
________________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Shipment Details Date : 02.05.2005
All Figure In DZ
Month : April' 2005
SL
Buyer
Style/P.O No
GG
Total Order Qty
Shipped Qty
Short Shipped Qty
Ship Date
01
Bay-City
370
5G
567
567
0.00
24-Apr
02
Sears
1307
5G
271
269
2
28-Apr P.Loss & Quality Rejection
03
Sears
1308
5G
140
138
2
28-Apr P.Loss & Quality Rejection
978
974
4.00
04
5G
05
5G
06
5G
Remarks
07 Sub Total (5GG) 08
Bay-City
380-44/49
7G
2086.5
1043
Partial
6-Apr
09
Bay-City
380-44/49
7G
1044
446
Partial
11-Apr
10
Bay-City
380-44/49
7G
599
599
Partial
21-Apr
11
Quelle
7824
7G
67
62
5
28-Apr
12
Scope
58417
7G
138
138
28-Apr
13
Scope
58413
7G
138
138
28-Apr
14
Scope
58415
7G
138
138
28-Apr
15
Scope
59403
7G
138
138
28-Apr
Sub Total (7GG)
4348.5
2702
5
Grand Total
5326.5
3676
9
Printing Problem
16 17 18
hipment Target Status SL 01 02 03 04 05 06
Buyer
Style/P.O No
GG
Total Order Qty
Shipment Target Actual Revised
Remarks
07 Total
____________ Prepared By
________________________ Production-Co-Ordinator
________________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Shipment Details Date : 01.04.2005
All Figure In DZ
Month : March' 2005 SL
Buyer
Style/P.O No
GG
Total Order Qty
Shipped Qty
Short Shipped Qty
Ship Date
01
G.Union
C-603
5G
300
300
12-Mar
02
G.Union
C-603 B
5G
125
125
12-Mar
425
425
03 04 05 06 07 Sub Total (5GG)
0
08
N.Mann
115/149
7G
356.25
356.92
10-Mar
09
G.Union
38497
7G
225
225
12-Mar
10
Casabawa
Dec 04-A
7G
220
220
22-Mar
11
Casabawa
Dec 04-B
7G
176.67
176.67
22-Mar
12
Bay-City
380-44/49
7G
2917.5
831
13
N.Mann
115/827
7G
152.92
155.17
30-Mar
14
G.Union
6596
7G
350
350
31-Mar
15
G.Union
38497
7G
350
350
31-Mar
Partial
30-Mar
Remarks
16 17 18 Sub Total (7GG)
4748.34
2665
0
Grand Total
5173.34
3090
0
hipment Target Status SL
Buyer
Style/P.O No
GG
Total Order Qty
Shipment Target Actual Revised
Remarks
01 02 03 04 05 06 07 Total
____________ Prepared By
________________________ Production-Co-Ordinator
________________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Shipment Details Date : 02.02.2005
All Figure In DZ
Month :January'2005 SL 01 02
Buyer
Style/P.O No
GG
Total Order Qty
Shipped Qty
Short Shipped Qty
Ship Date
Remarks
03 04 05 06 07 Sub Total (5GG) 08
0
0
0
500
501
0
Sub Total (7GG)
500
501
0
Grand Total
500
501
0
N.Mann
115/827
7G
09
7G
10
7G
11
7G
12
7G
13
7G
14
7G
15
7G
17-Jan
16 17 18
hipment Target Status SL
Buyer
Style/P.O No
GG
Total Order Qty
Shipment Target Actual Revised
Remarks
01 02 03 04 05 06 07 Total
____________
________________________
________________
Prepared By
Production-Co-Ordinator
Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Shipment Details Date : 02.01.2005
All Figure In DZ
Month :December'2004 SL
Buyer
Style/P.O No
GG
Total Order Qty
Shipped Qty
Short Shipped Qty
0
0
0
Ship Date
01 02 03 04 05 06 07 Sub Total (5GG) 08
Sears
2298
7G
433.33
419.83
13.5
5-Dec
09
N.Mann
115/149
7G
1250
1241.83
8.17
9-Dec
10
Karstadt
K-03
7G
417
342
75
9-Dec
11
Seras
2300
7G
400
400.17
0
28-Dec
12
Zara
5747/001
7G
1566.7
1567
0
30-Dec
Sub Total (7GG)
4067.03
3970.83
96.67
Grand Total
4067.03
3970.83
96.67
13
7G
14
7G
15
7G
16 17 18
Remarks
hipment Target Status SL
Buyer
Style/P.O No
GG
Total Order Qty
Shipment Target Actual Revised
Remarks
01 02 03 04 05 06 07 Total
____________ Prepared By
________________________ Production-Co-Ordinator
________________ Plant-In-Charge
GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG
Shipment Details Date : 01.12.2004
All Figure In DZ
Month :November'2004 SL
Buyer
Style/P.O No
GG
Total Order Qty
Shipped Qty
Short Shipped Qty
Ship Date
01
Eufrenty
08206
7G
250
244
6
11-Nov
02
Eufrenty
08207
7G
167
164.5
2.5
11-Nov
03
Eufrenty
08231
7G
78.5
78.42
0
11-Nov
495.5
486.92
8.5
04 05 06 07 Sub Total (5GG) 08
N.Mann
115/509
7G
132.92
133.17
0
4-Nov
09
N.Mann
115/667
7G
125
127.17
0
10-Nov
10
Hong Song
YS-14214
7G
1179
1162
17
12-Nov
11
Quelle
3532
7G
33.33
33.33
0
11-Nov
Remarks
12
Karstadt
K-03
7G
417
4.5
Partial
13
Casabawa
Nob-10 B
7G
83.33
92
14
Hong Song
WS-14212
7G
332
320
12
15
Hong Song
YS-14213-S
7G
604
599.17
4.83
Sub Total (7GG)
2906.58
2471.34
33.83
Grand Total
3402.08
2958.26
42.33
27-Nov 27-Nov 29-Nov
16 17 18
hipment Target Status SL
Buyer
Style/P.O No
GG
Total Order Qty
Shipment Target Actual Revised
Remarks
01 02 03 04 05 06 07 Total
____________ Prepared By
________________________ Production-Co-Ordinator
________________ Plant-In-Charge
58 7980 8038
Problem
Weight
var Swtr.
900
996
VAR Swtr.
Problem
ng Problem
Problem
VAR Swtr.
VAR Swtr.
5688
10008
g Problem
Problem
Problem Orchid
Quality Rejec
y Rejection
y Rejection