GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Monthly Production Report Month : August' 2008

Working Days

:

24 Days Out Of 31 Days.

Working Hours

:

192 Hours

General Overtime

:

96 Hours

Actual Working Hours

:

288 Hours

Power Failure

:

156.33 Hours

Number Of Total Machine

:

547 Nos.(Knitting 5G & 7G With All Other Machine)

Number Of Machine Use

:

543 Nos.

PRODUCTION

ADMINSTRATIVE

TOTAL

A) At The beginning Of Month

:

764

44

808

B) New Recruit

:

38

0

38

C) Separated during the Month

:

35

0

35

Total at the close of Month (A+B- C)

:

767

44

811

Approved Manpower

:

869 Nos

Avarage Attendance

Present

93.50%

Absent

6.50%

Hours

Hours

Hours

A) Requisition Over Time

:

50045

1492

51537

B) General Over Time

:

14820

2414

17234

C) Total Over Time (A+B)

:

64865

3906

68771

D) Over Time Amount

:

772542

46520

819063

Factory Closed On

:

01) 05 Fri Day

01) 02 Holy Day

__________________ Personnel-In-Charge

________________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Monthly Production Report Month : July' 2008

Working Days

:

27 Days Out Of 31 Days.

Working Hours

:

216 Hours

General Overtime

:

108 Hours

Actual Working Hours

:

324 Hours

Power Failure

:

149.18 Hours

Number Of Total Machine

:

547 Nos.(Knitting 5G & 7G With All Other Machine)

Number Of Machine Use

:

541 Nos.

PRODUCTION

ADMINSTRATIVE

TOTAL

A) At The beginning Of Month

:

757

44

801

B) New Recruit

:

42

0

42

C) Separated during the Month

:

35

0

35

Total at the close of Month (A+B- C)

:

764

44

808

Approved Manpower

:

869 Nos

Avarage Attendance

Present

93.55%

Absent

6.45%

Hours

Hours

Hours

A) Requisition Over Time

:

33680

1144

34824

B) General Over Time

:

14734

2432

17166

C) Total Over Time (A+B)

:

48414

3576

51990

D) Over Time Amount

:

576611

42590

619201

Factory Closed On

:

01) 04 Fri Day

__________________ Personnel-In-Charge

________________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Monthly Production Report Month : June' 2008

Working Days

:

27 Days Out Of 31 Days.

Working Hours

:

208 Hours

General Overtime

:

104 Hours

Actual Working Hours

:

312 Hours

Power Failure

:

199.18 Hours

Number Of Total Machine

:

547 Nos.(Knitting 5G & 7G With All Other Machine)

Number Of Machine Use

:

541 Nos.

PRODUCTION

ADMINSTRATIVE

TOTAL

A) At The beginning Of Month

:

755

44

799

B) New Recruit

:

30

0

30

C) Separated during the Month

:

28

0

28

Total at the close of Month (A+B- C)

:

757

44

801

Approved Manpower

:

869 Nos

Avarage Attendance

Present

91.03%

Absent

8.97%

Hours

Hours

Hours

A) Requisition Over Time

:

29831

1020

30851

B) General Over Time

:

13034

2664

15698

C) Total Over Time (A+B)

:

42865

3684

46549

D) Over Time Amount

:

510522

43876

554399

Factory Closed On

:

01) 04 Fri Day

__________________ Personnel-In-Charge

________________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Monthly Production Report Month : May' 2008

Working Days

:

26 Days Out Of 31 Days.

Working Hours

:

208 Hours

General Overtime

:

104 Hours

Actual Working Hours

:

312 Hours

Power Failure

:

188.47 Hours

Number Of Total Machine

:

547 Nos.(Knitting 5G & 7G With All Other Machine)

Number Of Machine Use

:

541 Nos.

PRODUCTION

ADMINSTRATIVE

TOTAL

A) At The beginning Of Month

:

748

44

792

B) New Recruit

:

44

0

44

C) Separated during the Month

:

37

0

37

Total at the close of Month (A+B- C)

:

755

44

799

Approved Manpower

:

869 Nos

Avarage Attendance

Present

92.84%

Absent

7.16%

Hours

Hours

Hours

A) Requisition Over Time

:

22739

719

23458

B) General Over Time

:

13907

2602

16509

C) Total Over Time (A+B)

:

36646

3321

39967

D) Over Time Amount

:

436454

39553

476007

Factory Closed On

:

01) 04 Fri Day (Now In Wednes Day) 02) 1 Day 1st May

__________________ Personnel-In-Charge

________________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Monthly Production Report Month : April' 2008

Working Days

:

24 Days Out Of 30 Days.

Working Hours

:

192 Hours

General Overtime

:

96 Hours

Actual Working Hours

:

288 Hours

Power Failure

:

169.50 Hours

Number Of Total Machine

:

547 Nos.(Knitting 5G & 7G With All Other Machine)

Number Of Machine Use

:

541 Nos.

PRODUCTION

ADMINSTRATIVE

TOTAL

A) At The beginning Of Month

:

744

44

788

B) New Recruit

:

43

0

43

C) Separated during the Month

:

39

0

39

Total at the close of Month (A+B- C)

:

748

44

792

Approved Manpower

:

869 Nos

Avarage Attendance

Present

93.31%

Absent

6.69%

Hours

Hours

Hours

A) Requisition Over Time

:

27935

851

28786

B) General Over Time

:

13809

2346

16155

C) Total Over Time (A+B)

:

41744

3197

44941

D) Over Time Amount

:

497171

38076

535247

Factory Closed On

:

01) 05 Fri Day (Now In Wednes Day) 02) 01 Day For 1st Boishak.

__________________ Personnel-In-Charge

________________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD

269 DEWAN HAT CHITTAGONG

Monthly Production Report Month : March' 2008

Working Days

:

26 Days Out Of 31 Days.

Working Hours

:

208 Hours

General Overtime

:

104 Hours

Actual Working Hours

:

312 Hours

Power Failure

:

73.55 Hours

Number Of Total Machine

:

547 Nos.(Knitting 5G & 7G With All Other Machine)

Number Of Machine Use

:

541 Nos.

PRODUCTION

ADMINSTRATIVE

TOTAL

A) At The beginning Of Month

:

733

44

777

B) New Recruit

:

31

0

31

C) Separated during the Month

:

20

0

20

Total at the close of Month (A+B- C)

:

744

44

788

Approved Manpower

:

869 Nos

Avarage Attendance

Present

93.92%

Absent

6.08%

Hours

Hours

Hours

A) Requisition Over Time

:

25147

672

25819

B) General Over Time

:

13857

2099

15956

C) Total Over Time (A+B)

:

39004

2771

41775

D) Over Time Amount

:

464538

33003

497540

Factory Closed On

:

01) 04 Fri Day (Now In Wednes Day) 02) 01 Day For Melad-Un-Nabi.

__________________ Personnel-In-Charge

________________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Monthly Production Report Month : February' 2008

Working Days

:

24 Days Out Of 29 Days.

Working Hours

:

192 Hours

General Overtime

:

96 Hours

Actual Working Hours

:

288 Hours

Power Failure

:

60.45 Hours

Number Of Total Machine

:

547 Nos.(Knitting 5G & 7G With All Other Machine)

Number Of Machine Use

:

541 Nos.

PRODUCTION

ADMINSTRATIVE

TOTAL

A) At The beginning Of Month

:

729

44

773

B) New Recruit

:

49

0

49

C) Separated during the Month

:

45

0

45

Total at the close of Month (A+B- C)

:

733

44

777

Approved Manpower

:

869 Nos

Avarage Attendance

Present

95.09%

Absent

4.91%

Hours

Hours

Hours

A) Requisition Over Time

:

26280

690

26970

B) General Over Time

:

12050

2076

14126

C) Total Over Time (A+B)

:

38330

2766

41096

D) Over Time Amount

:

456510

32943

489453

Factory Closed On

:

01) 04 Fri Day (Now In Wednes Day) 02) 01 Day For 21st February .

__________________ Personnel-In-Charge

________________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Monthly Production Report

Month : January' 2008

Working Days

:

26 Days Out Of 31 Days.

Working Hours

:

208 Hours

General Overtime

:

104 Hours

Actual Working Hours

:

312 Hours

Power Failure

:

73.00 Hours

Number Of Total Machine

:

547 Nos.(Knitting 5G & 7G With All Other Machine)

Number Of Machine Use

:

536 Nos.

PRODUCTION

ADMINSTRATIVE

TOTAL

A) At The beginning Of Month

:

726

44

770

B) New Recruit

:

49

0

49

C) Separated during the Month

:

46

0

46

Total at the close of Month (A+B- C)

:

729

44

773

Approved Manpower

:

869 Nos

Avarage Attendance

Present

94.67%

Absent

5.33%

Hours

Hours

Hours

A) Requisition Over Time

:

13100

423

13523

B) General Over Time

:

9439

2191

11630

C) Total Over Time (A+B)

:

22539

2614

25153

D) Over Time Amount

:

268439

31133

299572

Factory Closed On

:

01) 05 Fri Day (Now In Wednes Day)

__________________ Personnel-In-Charge

________________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Monthly Production Report Month : December' 2007

Working Days

:

22 Days Out Of 31 Days.

Working Hours

:

176 Hours

General Overtime

:

88 Hours

Actual Working Hours

:

264 Hours

Power Failure

:

39.55 Hours

Number Of Total Machine

:

547 Nos.(Knitting 5G & 7G With All Other Machine)

Number Of Machine Use

:

534 Nos.

PRODUCTION

ADMINSTRATIVE

TOTAL

A) At The beginning Of Month

:

687

44

731

B) New Recruit

:

31

1

32

C) Separated during the Month

:

32

1

33

Total at the close of Month (A+B- C)

:

686

44

730

Approved Manpower

:

869 Nos

Avarage Attendance

Present

89.55%

Absent

10.45%

Hours

Hours

Hours

A) Requisition Over Time

:

8532

394

8926

B) General Over Time

:

7230

2244

9474

C) Total Over Time (A+B)

:

15762

2638

18400

D) Over Time Amount

:

154152

25800

219144

Factory Closed On

:

01) 05 Holy Day During Eid-Ul-Azha 02) 04 Fri Day (Now In Wednes Day)

__________________ Personnel-In-Charge

________________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Monthly Production Report Month : November' 2007

Working Days

:

26 Days Out Of 30 Days.

Working Hours

:

208 Hours

General Overtime

:

104 Hours

Actual Working Hours

:

312 Hours

Power Failure

:

82.07 Hours

Number Of Total Machine

:

547 Nos.(Knitting 5G & 7G With All Other Machine)

Number Of Machine Use

:

527 Nos.

PRODUCTION

ADMINSTRATIVE

TOTAL

A) At The beginning Of Month

:

677

45

722

B) New Recruit

:

25

1

26

C) Separated during the Month

:

15

2

17

Total at the close of Month (A+B- C)

:

687

44

731

Approved Manpower

:

869 Nos

Avarage Attendance

Present

93.78%

Absent

6.22%

Hours

Hours

Hours

A) Requisition Over Time

:

13246

772

14018

B) General Over Time

:

7893

1980

9873

C) Total Over Time (A+B)

:

21139

2752

23891

D) Over Time Amount

:

206739

26915

233654

Factory Closed On

:

02) 04 Fri Day (Now In Wednes Day)

__________________ Personnel-In-Charge

________________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Monthly Production Report Month : October' 2007

Working Days

:

22 Days Out Of 31 Days.

Working Hours

:

176 Hours

General Overtime

:

88 Hours

Actual Working Hours

:

264 Hours

Power Failure

:

62.35 Hours

Number Of Total Machine

:

547 Nos.(Knitting 5G & 7G With All Other Machine)

Number Of Machine Use

:

527 Nos.

PRODUCTION

ADMINSTRATIVE

TOTAL

A) At The beginning Of Month

:

702

45

747

B) New Recruit

:

9

0

9

C) Separated during the Month

:

34

0

34

Total at the close of Month (A+B- C)

:

677

45

722

Approved Manpower

:

869 Nos

Avarage Attendance

Present

85.15%

Absent

14.85%

Hours

Hours

Hours

A) Requisition Over Time

:

8063

457

8520

B) General Over Time

:

3651

2405

6056

C) Total Over Time (A+B)

:

11714

2862

14576

D) Over Time Amount

:

114563

27990

142553

Factory Closed On

:

01) 06 Holy Day During Eid-Ul-Fitre 02) 03 Fri Day (Now In Wednes Day)

__________________ Personnel-In-Charge

________________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Monthly Production Report Month : September' 2007

Working Days

:

27 Days Out Of 30 Days (Including Extra Working Day For Khatoni)

Working Hours

:

216 Hours

General Overtime

:

108 Hours

Actual Working Hours

:

324 Hours

Power Failure

:

82.40 Hours

Number Of Total Machine

:

547 Nos.(Knitting 5G & 7G With All Other Machine)

Number Of Machine Use

:

527 Nos.

PRODUCTION

ADMINSTRATIVE

TOTAL

A) At The beginning Of Month

:

702

45

747

B) New Recruit

:

10

0

10

C) Separated during the Month

:

10

0

10

Total at the close of Month (A+B- C)

:

702

45

747

Approved Manpower

:

869 Nos

Avarage Attendance

Present

91.10%

Absent

8.90%

Hours

Hours

Hours

A) Requisition Over Time

:

20253

474

20727

B) General Over Time

:

7385

2254

9639

C) Total Over Time (A+B)

:

27638

2728

30366

D) Over Time Amount

:

270300

26680

296979

Factory Closed On

:

01) 03 Fri Day (Now Wednes Day)

__________________ Personnel-In-Charge

________________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Monthly Production Report Month : August' 2007

Working Days

:

25 Days Out Of 31 Days

Working Hours

:

200 Hours

General Overtime

:

100 Hours

Actual Working Hours

:

300 Hours

Power Failure

:

47.50 Hours

Number Of Total Machine

:

547 Nos.(Knitting 5G & 7G With All Other Machine)

Number Of Machine Use

:

527 Nos.

PRODUCTION

ADMINSTRATIVE

TOTAL

A) At The beginning Of Month

:

703

45

748

B) New Recruit

:

2

0

2

C) Separated during the Month

:

3

0

3

Total at the close of Month (A+B- C)

:

702

45

747

Approved Manpower

:

869 Nos

Avarage Attendance

Present

91.10%

Absent

8.90%

Hours

Hours

Hours

A) Requisition Over Time

:

9082

160

9242

B) General Over Time

:

5610

2390

8000

C) Total Over Time (A+B)

:

14692

2550

17242

D) Over Time Amount

:

143688

24939

168627

Factory Closed On

:

01) 05 Fri Day (Now Wednes Day) 02) 01 Holy Day For Shob-E-Borat

__________________ Personnel-In-Charge

________________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Monthly Production Report Month : July' 2007

Working Days

:

27 Days Out Of 31 Days

Working Hours

:

216 Hours

General Overtime

:

108 Hours

Actual Working Hours

:

324 Hours

Power Failure

:

114.50 Hours

Number Of Total Machine

:

547 Nos.(Knitting 5G & 7G With All Other Machine)

Number Of Machine Use

:

527 Nos.

PRODUCTION

ADMINSTRATIVE

TOTAL

A) At The beginning Of Month

:

708

45

753

B) New Recruit

:

29

0

29

C) Separated during the Month

:

34

0

34

Total at the close of Month (A+B- C)

:

703

45

748

Approved Manpower

:

869 Nos

Avarage Attendance

Present

90.64%

Absent

9.36%

Hours

Hours

Hours

A) Requisition Over Time

:

16996

360

17356

B) General Over Time

:

32909

3059

35968

C) Total Over Time (A+B)

:

49905

3419

53324

D) Over Time Amount

:

488071

33438

521509

Factory Closed On

:

01) 04 Fri Day Now (Wednes Day)

_________________ Personnel-In-Charge

________________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Monthly Production Report Month : June'2007

Working Days

:

26 Days Out Of 30 Days

Working Hours

:

208 Hours

General Overtime

:

104 Hours

Actual Working Hours

:

312 Hours

Power Failure

:

87.50 Hours

Number Of Total Machine

:

549 Nos.(Knitting 5G & 7G With All Other Machine)

Number Of Machine Use

:

537 Nos.

PRODUCTION

ADMINSTRATIVE

TOTAL

A) At The beginning Of Month

:

700

45

745

B) New Recruit

:

41

0

41

C) Separated during the Month

:

33

0

33

Total at the close of Month (A+B- C)

:

708

45

753

Approved Manpower

:

869 Nos

Avarage Attendance

Present

90.90%

Absent

9.10%

Hours

Hours

Hours

A) Requisition Over Time

:

4455

415

4870

B) General Over Time

:

35364

2332

37696

C) Total Over Time (A+B)

:

39819

2747

42566

D) Over Time Amount

:

389430

26866

416295

Factory Closed On

:

01) 04 Fri Day Now (Wednes Day)

_________________ Personnel-In-Charge

________________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Monthly Production Report Month : May'2007

Working Days

:

25 Days Out Of 31 Days

Working Hours

:

200 Hours

General Overtime

:

100 Hours

Actual Working Hours

:

300 Hours

Power Failure

:

81.00 Hours

Number Of Total Machine

:

549 Nos.(Knitting 5G & 7G With All Other Machine)

Number Of Machine Use

:

537 Nos.

PRODUCTION

ADMINSTRATIVE

TOTAL

A) At The beginning Of Month

:

708

45

753

B) New Recruit

:

41

0

41

C) Separated during the Month

:

30

0

30

Total at the close of Month (A+B- C)

:

719

45

764

Approved Manpower

:

869 Nos

Avarage Attendance

Present

90.90%

Hours

Absent

Hours

9.10%

Hours

A) Requisition Over Time

:

0

B) General Over Time

:

0

C) Total Over Time (A+B)

:

0

0

0

D) Over Time Amount

:

0

0

0

Factory Closed On

:

01) 05 Fri Day 02) 01 Holi Day (May Day)

_________________ Personnel-In-Charge

________________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Monthly Production Report Month : April'2007

Working Days

:

25 Days Out Of 30 Days

Working Hours

:

200 Hours

General Overtime

:

100 Hours

Power Failure

:

55.35 Hours

Actual Working Hours

:

300 Hours

Number Of Total Machine

:

549 Nos.(Knitting 5G & 7G With All Other Machine)

Number Of Machine Use

:

537 Nos.

PRODUCTION

ADMINSTRATIVE

TOTAL

A) At The beginning Of Month

:

750

42

792

B) New Recruit

:

27

0

27

C) Separated during the Month

:

20

0

20

Total at the close of Month (A+B- C)

:

757

42

799

Approved Manpower

:

869 Nos

Avarage Attendance

Present

91.65%

Absent

8.35%

Hours

Hours

Hours

A) Requisition Over Time

:

8096

490

8586

B) General Over Time

:

33800

2609

36409

C) Total Over Time (A+B)

:

41896

3099

44995

D) Over Time Amount

:

409743

30308

440051

Factory Closed On

:

01) 04 Fri Day 02) 01 Holi Day

_________________ Personnel-In-Charge

________________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Monthly Production Report Month : April'2007

Working Days

:

25 Days Out Of 30 Days

Working Hours

:

200 Hours

General Overtime

:

100 Hours

Power Failure

:

55.35 Hours

Actual Working Hours

:

300 Hours

Number Of Total Machine

:

549 Nos.(Knitting 5G & 7G With All Other Machine)

Number Of Machine Use

:

537 Nos.

PRODUCTION

ADMINSTRATIVE

TOTAL

A) At The beginning Of Month

:

750

42

792

B) New Recruit

:

27

0

27

C) Separated during the Month

:

20

0

20

Total at the close of Month (A+B- C)

:

757

42

799

Approved Manpower

:

869 Nos

Avarage Attendance

Present

91.65%

Absent

8.35%

Hours

Hours

Hours

A) Requisition Over Time

:

8096

490

8586

B) General Over Time

:

33800

2609

36409

C) Total Over Time (A+B)

:

41896

3099

44995

D) Over Time Amount

:

409743

30308

440051

Factory Closed On

:

01) 04 Fri Day 02) 01 Holi Day

_________________ Personnel-In-Charge

________________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Monthly Production Report Month : March'2007

Working Days

:

27 Days Out Of 31 Days

Working Hours

:

216 Hours

General Overtime

:

104 Hours

Power Failure

:

27.45 Hours (Without Generator from 17.03.07 to 31.03.07)

Actual Working Hours

:

324 Hours

Number Of Total Machine

:

549 Nos.(Knitting 5G & 7G With All Outher Machine)

Number Of Machine Use

:

537 Nos.

PRODUCTION

ADMINSTRATIVE

TOTAL

A) At The beginning Of Month

:

753

42

795

B) New Recruit

:

34

0

34

C) Separated during the Month

:

30

0

30

Total at the close of Month (A+B- C)

:

757

42

799

Avarage Attendance

Present

88.70%

Absent

11.30%

Hours

Hours

Hours

A) Requisition Over Time

:

6732

609

7341

B) General Over Time

:

30936

1971

32907

C) Total Over Time (A+B)

:

37668

2580

40248

D) Over Time Amount

:

368393

25232

393625

Factory Closed On

:

01) 03 fridays (02 Fridays adjust with 02 exsisting festivalholidy for Eid-ul-azha, i.e general workingdays) 02) 01 Holi Day

_________________ Personnel-In-Charge

________________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Monthly Production Report Month : February'2007

Working Days

:

23 Days Out Of 28 Days

Working Hours

:

224 Hours

General Overtime

:

112 Hours

Power Failure

:

147.41 Hours (Without Generator)

Actual Working Hours

:

336 Hours

Number Of Total Machine

:

549 Nos.(Knitting 5G & 7G With All Outher Machine)

Number Of Machine Use

:

537 Nos.

PRODUCTION

ADMINSTRATIVE

TOTAL

A) At The beginning Of Month

:

708

40

748

B) New Recruit

:

41

0

41

C) Separated during the Month

:

29

0

29

Total at the close of Month (A+B- C)

:

720

40

760

Avarage Attendance

Present

89.73%

Absent

10.27%

Hours

Hours

Hours

A) Requisition Over Time

:

7566

848

8414

B) General Over Time

:

26853

1787

28640

C) Total Over Time (A+B)

:

34419

2635

37054

D) Over Time Amount

:

336618

25770

362388

Factory Closed On

:

01) 04 Fri Day 02) 01 Holy Day (Mother Language Day).

_________________ Personnel-In-Charge

________________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Monthly Production Report Month : January'2007

Working Days

:

23 Days Out Of 31 Days

Working Hours

:

184 Hours

General Overtime

:

92 Hours

Power Failure

:

110.34 Hours (Without Generator)

Actual Working Hours

:

276 Hours

Number Of Total Machine

:

549 Nos.(Knitting 5G & 7G With All Outher Machine)

Number Of Machine Use

:

537 Nos.

PRODUCTION

ADMINSTRATIVE

TOTAL

A) At The beginning Of Month

:

689

40

729

B) New Recruit

:

57

0

57

C) Separated during the Month

:

38

0

38

Total at the close of Month (A+B- C)

:

708

40

748

Avarage Attendance

Present

88.00%

Absent

12.00%

Hours

Hours

Hours

A) Requisition Over Time

:

20099

848

20947

B) General Over Time

:

14722

1385

16107

C) Total Over Time (A+B)

:

34821

2233

37054

D) Over Time Amount

:

340549

21839

362388

Factory Closed On

:

01) 04 Fri Day 02) 04 Holy Day (For Eid-Ul-Azha)

_________________ Personnel-In-Charge

________________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Monthly Production Report Month : December'2006

Working Days

:

24 Days Out Of 31 Days

Working Hours

:

192 Hours

General Overtime

:

96 Hours

Power Failure

:

81.53 Hours (Without Generator)

Actual Working Hours

:

288 Hours

Number Of Total Machine

:

549 Nos.(Knitting 5G & 7G With All Outher Machine)

Number Of Machine Use

:

543 Nos.

PRODUCTION

ADMINSTRATIVE

TOTAL

A) At The beginning Of Month

:

762

40

802

B) New Recruit

:

0

0

0

C) Separated during the Month

:

20

0

20

Total at the close of Month (A+B- C)

:

742

40

782

Avarage Attendance

Present

81.96%

Absent

18.04%

Hours

Hours

Hours

A) Requisition Over Time

:

965

122

1087

B) General Over Time

:

3726

1800

5526

C) Total Over Time (A+B)

:

4691

1922

6613

D) Over Time Amount

:

45878

18797

64675

Factory Closed On

:

01) 03 Fri Day 02) 04 Holy Day

______________ Personnel-In-Charge

________________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Monthly Production Report Month : November'2006

Working Days

:

26 Days Out Of 30 Days

Working Hours

:

208 Hours

General Overtime

:

104 Hours

Power Failure

:

117.05 Hours (Without Generator)

Actual Working Hours

:

312 Hours

Number Of Total Machine

:

543 Nos.(Knitting 5G & 7G With All Outher Machine)

Number Of Machine Use

:

531 Nos.

PRODUCTION

ADMINSTRATIVE

TOTAL

A) At The beginning Of Month

:

771

45

816

B) New Recruit

:

1

0

1

C) Separated during the Month

:

10

0

10

Total at the close of Month (A+B- C)

:

762

45

807

Avarage Attendance

Present

84.08%

Absent

15.92%

Hours

Hours

Hours

A) Requisition Over Time

:

20665

289

20954

B) General Over Time

:

18691

2046

20737

C) Total Over Time (A+B)

:

39356

2335

41691

D) Over Time Amount

:

384902

22836

407738

Factory Closed On

:

01) 04 Fri Day

______________ Personnel-In-Charge

________________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Monthly Production Report Month :

'2006

Working Days

:

Days Out Of

Working Hours

:

Hours

General Overtime

:

Power Failure

:

Actual Working Hours

:

Number Of Total Machine

:

Number Of Machine Use

:

Days

Hours Hours (Without Generator) Hours Nos.(Knitting 5G & 7G With All Outher Machine) Nos.

PRODUCTION

A) At The beginning Of Month

:

B) New Recruit

:

C) Separated during the Month

:

Total at the close of Month (A+B- C)

:

Avarage Attendance

ADMINSTRATIVE

Present

Hours A) Requisition Over Time

:

B) General Over Time

:

C) Total Over Time (A+B)

:

D) Over Time Amount

:

Factory Closed On

:

TOTAL

Absent

Hours

Hours

01) 02)

____________________ Personnel-In-Charge

_________________ Executive (A/C)

________________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Monthly Production Report Month : October'2006

Working Days

:

23 Days Out Of 31 Days

Working Hours

:

184 Hours

General Overtime

:

92 Hours

Power Failure

:

37.33 Hours (Without Generator)

Actual Working Hours

:

276 Hours

Number Of Total Machine

:

543 Nos.(Knitting 5G & 7G With All Outher Machine)

Number Of Machine Use

:

531 Nos.

PRODUCTION

ADMINSTRATIVE

TOTAL

A) At The beginning Of Month

:

774

45

819

B) New Recruit

:

12

0

12

C) Separated during the Month

:

15

0

15

Total at the close of Month (A+B- C)

:

771

45

816

Avarage Attendance

Present

86.50%

Absent

13.50%

Hours

Hours

Hours

A) Requisition Over Time

:

9657

470

10127

B) General Over Time

:

27506

2420

29926

C) Total Over Time (A+B)

:

37163

2890

40053

D) Over Time Amount

:

363454

28264

391718

Factory Closed On

:

01) 04 Fri Day 02) 04 Holy Day

______________ Pre pared By

________________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Monthly Production Report Month : September'2006

Working Days

:

24 Days Out Of 30 Days

Working Hours

:

192 Hours

General Overtime

:

96 Hours

Power Failure

:

108.05 Hours (Without Generator)

Actual Working Hours

:

288 Hours

Number Of Total Machine

:

543 Nos.(Knitting 5G & 7G With All Outher Machine)

Number Of Machine Use

:

531 Nos.

PRODUCTION

ADMINSTRATIVE

TOTAL

A) At The beginning Of Month

:

794

45

839

B) New Recruit

:

0

0

0

C) Separated during the Month

:

20

0

20

Total at the close of Month (A+B- C)

:

774

45

819

Avarage Attendance

Present

89.15%

Absent

10.85%

Hours

Hours

Hours

A) Requisition Over Time

:

38366

1003

39369

B) General Over Time

:

25080

2645

27725

C) Total Over Time (A+B)

:

63446

3648

67094

D) Over Time Amount

:

620502

35677

656179

Factory Closed On

:

01) 05 Fri Day 02) 01 Holy Day

______________ Pre pared By

________________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Monthly Production Report Month : August'2006

Working Days

:

26 Days Out Of 31 Days

Working Hours

:

208 Hours

General Overtime

:

104 Hours

Power Failure

:

90.46 Hours (Without Generator)

Actual Working Hours

:

312 Hours

Number Of Total Machine

:

543 Nos.(Knitting 5G & 7G With All Outher Machine)

Number Of Machine Use

:

531 Nos.

PRODUCTION

ADMINSTRATIVE

TOTAL

A) At The beginning Of Month

:

788

45

833

B) New Recruit

:

30

0

30

C) Separated during the Month

:

24

0

24

Total at the close of Month (A+B- C) :

794

45

839

Avarage Attendance

Present

92.79%

Absent

7.21%

Hours

Hours

Hours

A) Requisition Over Time

:

44665

0

44665

B) General Over Time

:

30179

1810

31989

C) Total Over Time (A+B)

:

74844

1810

76654

D) Over Time Amount

:

731974

17702

749676

Factory Closed On

:

01) 04 Fri Day 02) 01 Holy Day

______________ Pre pared By

________________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Monthly Production Report Month : July'2006

Working Days

:

27 Days Out Of 31 Days

Working Hours

:

216 Hours

General Overtime

:

108 Hours

Power Failure

:

84.37 Hours (Without Generator)

Actual Working Hours

:

324 Hours

Number Of Total Machine

:

557 Nos.(Knitting 5G & 7G With All Outher Machine)

Number Of Machine Use

:

543 Nos.

PRODUCTION

ADMINSTRATIVE

TOTAL

A) At The beginning Of Month

:

751

43

794

B) New Recruit

:

25

0

25

C) Separated during the Month

:

12

0

12

Total at the close of Month (A+B- C) :

764

43

807

Avarage Attendance

Present

91.13%

Absent

8.87%

Hours

Hours

Hours

A) Requisition Over Time

:

42701

0

42701

B) General Over Time

:

25595

3647

29242

C) Total Over Time (A+B) D) Over Time Amount

:

68296

3647

71943

:

667935

35668

703603

Factory Closed On

:

1) 04 Fri Day

______________ Pre pared By

________________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Monthly Production Report Month : June'2006

Working Days

:

25 Days Out Of 30 Days

Working Hours

:

200 Hours

General Overtime

:

100 Hours

Power Failure

:

66.55 Hours (Without Generator)

Actual Working Hours

:

300 Hours

Number Of Total Machine

:

570 Nos.(Knitting 5G & 7G With All Outher Machine)

Number Of Machine Use

:

543 Nos.

PRODUCTION

ADMINSTRATIVE

TOTAL

A) At The beginning Of Month

:

721

42

763

B) New Recruit

:

35

0

35

C) Separated during the Month

:

5

0

5

751

42

793

Total at the close of Month (A+B- C) :

Avarage Attendance

Present

92.12%

Absent

7.88%

Hours

Hours

Hours

A) Requisition Over Time

:

40227

0

40227

B) General Over Time

:

16312

1407

17719

C) Total Over Time (A+B) D) Over Time Amount

:

56539

1407

57946

:

452312.00

11256.00

566711.88

Factory Closed On

:

1) 05 Fri Day

______________ Pre pared By

________________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Monthly Production Report Month : May'2006

Working Days

:

26 Days Out Of 31 Days

Working Hours

:

208 Hours

General Overtime

:

104 Hours

Power Failure

:

118.5 Hours (Without Generator)

Actual Working Hours

:

312 Hours

Number Of Total Machine

:

570 Nos.(Knitting 5G & 7G With All Outher Machine)

Number Of Machine Use

:

543 Nos.

PRODUCTION

ADMINSTRATIVE

TOTAL

A) At The beginning Of Month

:

701

42

743

B) New Recruit

:

25

0

25

C) Separated during the Month

:

5

0

5

Total at the close of Month (A+B- C) :

Avarage Attendance

721

Present

42

91.13%

Absent

763

8.87%

Hours

Hours

Hours

A) Requisition Over Time

:

24975

0

24975

B) General Over Time

:

14109

3213

17322

C) Total Over Time (A+B) D) Over Time Amount

:

39084

3213

42297

:

312672.00

25704.00

338376.00

Factory Closed On

:

1) 04 Fri Day 2) 1 HolyDay( May Day)

______________ Pre pared By

________________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Monthly Production Report Month : April'2006

Working Days

:

25 Days Out Of 30 Days

Working Hours

:

200 Hours

General Overtime

:

100 Hours

Power Failure

:

61.49 Hours (Without Generator)

Actual Working Hours

:

300 Hours

Number Of Total Machine

:

570 Nos.(Knitting 5G & 7G With All Outher Machine)

Number Of Machine Use

:

543 Nos.

PRODUCTION

ADMINSTRATIVE

TOTAL

A) At The beginning Of Month

:

713

42

755

B) New Recruit

:

22

0

22

C) Separated during the Month

:

34

0

34

Total at the close of Month (A+B- C) :

Avarage Attendance

701

Present

42

90.12%

Absent

743

9.88%

Hours

Hours

Hours

A) Requisition Over Time

:

12895

0

12895

B) General Over Time

:

11981

2769

14750

C) Total Over Time (A+B) D) Over Time Amount

:

24876

2769

27645

:

199008.00

22152.00

221160.00

Factory Closed On

:

1) 04 Fri Day 2) 1 HolyDay( Eid-E-Miladunnabi)

______________ Pre pared By

________________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Monthly Production Report Month : March'2006

Working Days

:

25 Days Out Of 31 Days

Working Hours

:

200 Hours

General Overtime

:

100 Hours

Power Failure

:

38.12 Hours (Without Generator)

Actual Working Hours

:

300 Hours

Number Of Total Machine

:

570 Nos.(Knitting 5G & 7G With All Outher Machine)

Number Of Machine Use

:

543 Nos.

PRODUCTION

ADMINSTRATIVE

TOTAL

A) At The beginning Of Month

:

709

42

751

B) New Recruit

:

24

0

24

C) Separated during the Month

:

20

0

20

Total at the close of Month (A+B- C) :

Avarage Attendance

713

Present

42

89.61%

Absent

755

10.39%

Hours

Hours

Hours

A) Requisition Over Time

:

12667

0

12667

B) General Over Time

:

12003

2720

14723

C) Total Over Time (A+B) D) Over Time Amount

:

24670

2720

27390

:

197360.00

21760.00

219120.00

Factory Closed On

:

1) 5 Fri Day 2) 1 HolyDay( Independent Day)

______________ Pre pared By

________________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Monthly Production Report Month : February'2006

Working Days

:

23 Days Out Of 28 Days

Working Hours

:

184 Hours

General Overtime

:

92 Hours

Power Failure

:

32.37 Hours (Without Generator)

Actual Working Hours

:

276 Hours

Number Of Total Machine

:

570 Nos.(Knitting 5G & 7G With All Outher Machine)

Number Of Machine Use

:

558 Nos.

PRODUCTION

ADMINSTRATIVE

TOTAL

A) At The beginning Of Month

:

749

49

798

B) New Recruit

:

0

0

0

C) Separated during the Month

:

40

0

40

Total at the close of Month (A+B- C) :

Avarage Attendance

709

Present

49

91.21%

Absent

758

8.79%

Hours

Hours

Hours

A) Requisition Over Time

:

10517

0

10517

B) General Over Time

:

11789

2372

14161

C) Total Over Time (A+B) D) Over Time Amount

:

22306

2372

24678

:

178448.00

18976.00

197424.00

Factory Closed On

:

1) 4 Fri Day 2) 1 HolyDay( Mother Language Day)

______________ Pre pared By

________________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Monthly Production Report Month : January'2006

Working Days

:

23 Days Out Of 31 Days

Working Hours

:

184 Hours

General Overtime

:

92 Hours

Power Failure

:

22.38 Hours (Without Generator)

Actual Working Hours

:

276 Hours

Number Of Total Machine

:

570 Nos.(Knitting 5G & 7G With All Outher Machine)

Number Of Machine Use

:

558 Nos.

PRODUCTION

ADMINSTRATIVE

TOTAL

A) At The beginning Of Month

:

787

49

836

B) New Recruit

:

2

0

2

C) Separated during the Month

:

40

0

40

Total at the close of Month (A+B- C) :

Avarage Attendance

749

Present

49

88.00%

Absent

798

12.00%

Hours

Hours

Hours

A) Requisition Over Time

:

4832

0

4832

B) General Over Time

:

6454

2543

8997

C) Total Over Time (A+B) D) Over Time Amount

:

11286

2543

13829

:

90288.00

20344.00

110632.00

Factory Closed On

:

1) 2 Fri Day 2) 6 HolyDay( Eid Ul Azha)

______________ Pre pared By

________________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Monthly Production Report Month : December' 2005

Working Days

:

31 Days Out Of 26 Days

Working Hours

:

208 Hours

General Overtime

:

104 Hours

Power Failure

:

23.22 Hours (Without Generator)

Actual Working Hours

:

312 Hours

Number Of Total Machine

:

570 Nos.(Knitting 5G & 7G With All Outher Machine)

Number Of Machine Use

:

558 Nos.

PRODUCTION

ADMINSTRATIVE

TOTAL

A) At The beginning Of Month

:

798

49

847

B) New Recruit

:

4

0

4

C) Separated during the Month

:

15

0

15

Total at the close of Month (A+B- C) :

Avarage Attendance

787

Present

49

93.00%

Absent

836

7.00%

Hours

Hours

Hours

A) Requisition Over Time

:

7347

0

7347

B) General Over Time

:

30401

2733

33134

C) Total Over Time (A+B) D) Over Time Amount

:

37748

2733

40481

:

301984.00

21864.00

323848.00

Factory Closed On

:

1) 5 Fri Day 2) 3)

______________ Pre pared By

________________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Monthly Production Report Month : November' 2005

Working Days

:

30 Days Out Of 22 Days

Working Hours

:

176 Hours

General Overtime

:

88 Hours

Power Failure

:

17.45 Hours (Without Generator)

Actual Working Hours

:

264 Hours

Number Of Total Machine

:

570 Nos.(Knitting 5G & 7G With All Outher Machine)

Number Of Machine Use

:

558 Nos.

PRODUCTION

ADMINSTRATIVE

TOTAL

A) At The beginning Of Month

:

795

49

844

B) New Recruit

:

20

0

20

C) Separated during the Month

:

17

0

17

Total at the close of Month (A+B- C) :

Avarage Attendance

798

Present

49

87.15%

Absent

847

12.85%

Hours

Hours

Hours

A) Requisition Over Time

:

9512

0

9512

B) General Over Time

:

32160

2959

35119

C) Total Over Time (A+B) D) Over Time Amount

:

41672

2959

44631

:

333376.00

23672.00

357048.00

Factory Closed On

:

1) 4 Fri Day 2) 4 Holy Day 3)

______________ Pre pared By

________________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Monthly Production Report Month : October' 2005

Working Days

:

25 Days Out Of 31 Days

Working Hours

:

200 Hours

General Overtime

:

100 Hours

Power Failure

:

39.13 Hours (Without Generator)

Actual Working Hours

:

300 Hours

Number Of Total Machine

:

572 Nos.(Knitting 5G & 7G With All Outher Machine)

Number Of Machine Use

:

569 Nos.

PRODUCTION

ADMINSTRATIVE

TOTAL

A) At The beginning Of Month

:

781

45

826

B) New Recruit

:

1

0

1

C) Separated during the Month

:

24

0

24

Total at the close of Month (A+B- C) :

Avarage Attendance

758

Present

45

90.00%

Absent

803

10.00%

Hours

Hours

Hours

A) Requisition Over Time

:

0

0

0

B) General Over Time

:

52428

4075

56503

C) Total Over Time (A+B) D) Over Time Amount

:

52428

4075

56503

:

419424.00

32600.00

452024.00

Factory Closed On

:

1) 4 Fri Day 2) 2 Holy Day 3) 4)

______________ Pre pared By

________________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Monthly Production Report Month : July ' 2005

Working Days

:

31 Days Out Of 26 Days

Working Hours

:

208 Hours

General Overtime

:

104 Hours

Power Failure

:

50.08 Hours (Without Generator)

Actual Working Hours

:

312 Hours

Number Of Total Machine

:

572 Nos.(Knitting 5G & 7G With All Outher Machine)

Number Of Machine Use

:

569 Nos.

PRODUCTION

ADMINSTRATIVE

TOTAL

A) At The beginning Of Month

:

827

45

872

B) New Recruit

:

5

0

5

C) Separated during the Month

:

17

0

17

Total at the close of Month (A+B- C) :

Avarage Attendance

815

Present

45

89.46%

Absent

860

10.54%

Hours

Hours

Hours

A) Requisition Over Time

:

14019

0

14019

B) General Over Time

:

3861

47174

51035

C) Total Over Time (A+B) D) Over Time Amount

:

17880

47174

65054

:

143040.00

377392.00

520432.00

Factory Closed On

:

1) 5 Fri Day 2) 3) 4)

______________ Pre pared By

________________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Monthly Production Report Month : June ' 2005

Working Days

:

30 Days Out Of 19 Days

Working Hours

:

152 Hours

General Overtime

:

76 Hours

Power Failure

:

35.13 Hours (Without Generator)

Actual Working Hours

:

300 Hours

Number Of Total Machine

:

572 Nos.(Knitting 5G & 7G With All Outher Machine)

Number Of Machine Use

:

569 Nos.

PRODUCTION

ADMINSTRATIVE

TOTAL

A) At The beginning Of Month

:

882

45

927

B) New Recruit

:

7

0

7

C) Separated during the Month

:

62

0

62

Total at the close of Month (A+B- C) :

Avarage Attendance

827

Present

45

89.46%

Absent

872

10.54%

Hours

Hours

Hours

A) Requisition Over Time

:

1817

0

1817

B) General Over Time

:

29031

3370

32401

C) Total Over Time (A+B) D) Over Time Amount

:

30848

3370

34218

:

246784.00

26960.00

273744.00

Factory Closed On

:

1) 4 Fri Day 2) 7 Days Strike 3) 4)

______________ Pre pared By

________________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Monthly Production Report Month : May' 2005

Working Days

:

31 Days Out Of 25 Days

Working Hours

:

200 Hours

General Overtime

:

100 Hours

Power Failure

:

48.18 Hours (Without Generator)

Actual Working Hours

:

300 Hours

Number Of Total Machine

:

572 Nos.(Knitting 5G & 7G With All Outher Machine)

Number Of Machine Use

:

569 Nos.

PRODUCTION

ADMINSTRATIVE

TOTAL

A) At The beginning Of Month

:

832

45

877

B) New Recruit

:

34

0

34

C) Separated during the Month

:

29

0

29

Total at the close of Month (A+B- C) :

Avarage Attendance

837

Present

45

92.61%

Absent

882

7.39%

Hours

Hours

Hours

A) Requisition Over Time

:

3632

0

3632

B) General Over Time

:

38325

3713

42038

C) Total Over Time (A+B) D) Over Time Amount

:

41957

3713

45670

:

335656.00

29704.00

365360.00

Factory Closed On

:

1) 4 Fri Day 2) 2 Holy Day 3) 4)

______________ Pre pared By

________________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Monthly Production Report Month : April' 2005

Working Days

:

30 Days Out Of 24 Days

Working Hours

:

192 Hours

General Overtime

:

96 Hours

Power Failure

:

31.5 Hours (Without Generator)

Actual Working Hours

:

288 Hours

Number Of Total Machine

:

572 Nos.(Knitting 5G & 7G With All Outher Machine)

Number Of Machine Use

:

569 Nos.

PRODUCTION

ADMINSTRATIVE

TOTAL

A) At The beginning Of Month

:

815

45

860

B) New Recruit

:

29

0

29

C) Separated during the Month

:

12

0

12

Total at the close of Month (A+B- C) :

Avarage Attendance

832

Present

45

90.14%

Absent

877

9.86%

Hours

Hours

Hours

A) Requisition Over Time

:

1130

0

1130

B) General Over Time

:

33021

3427

36448

C) Total Over Time (A+B) D) Over Time Amount

:

34151

3427

37578

:

273208.00

27416.00

300624.00

Factory Closed On

:

1) 5 Fri Day 2) 1 Holy Day 3) 4)

______________ Pre pared By

________________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Monthly Production Report Month : March' 2005

Working Days

:

31 Days Out Of 26 Days

Working Hours

:

208 Hours

General Overtime

:

104 Hours

Power Failure

:

2 Hours (Without Generator)

Actual Working Hours

:

312 Hours

Number Of Total Machine

:

572 Nos.(Knitting 5G & 7G With All Outher Machine)

Number Of Machine Use

:

769 Nos.

PRODUCTION

ADMINSTRATIVE

TOTAL

A) At The beginning Of Month

:

735

45

B) New Recruit

:

69

0

69

C) Separated during the Month

:

34

0

34

Total at the close of Month (A+B- C) :

Avarage Attendance

770

Present

45

93.00%

Absent

35

7.00%

Hours

Hours

Hours

A) Requisition Over Time

:

14669

0

14669

B) General Over Time

:

17210

3394

20604

C) Total Over Time (A+B) D) Over Time Amount

:

31879

3394

35273

:

255032.00

27152.00

282184.00

Factory Closed On

:

1) 4 Fri Day 2) 1 Holy Day 3) 4)

______________ Pre pared By

________________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Monthly Production Report Month : February'2005

Working Days

:

22 Days Out Of 28 Days

Working Hours

:

176 Hours

General Overtime

:

88 Hours

Power Failure

:

2 Hours (Without Generator)

Actual Working Hours

:

264 Hours

Number Of Total Machine

:

571 Nos.(Knitting 5G & 7G With All Outher Machine)

Number Of Machine Use

:

560 Nos.

PRODUCTION

ADMINSTRATIVE

TOTAL

A) At The beginning Of Month

:

755

45

825

B) New Recruit

:

4

0

4

C) Separated during the Month

:

24

0

24

Total at the close of Month (A+B- C) :

Avarage Attendance

735

Present

45

91.00%

Absent

805

9.00%

Hours

Hours

Hours

A) Requisition Over Time

:

4684

0

4684

B) General Over Time

:

5884

2386

8270

C) Total Over Time (A+B) D) Over Time Amount

:

10568

2386

12954

:

84544.00

19088.00

103632.00

Factory Closed On

:

1) 4 Fri Day 2) 1 Holy Day 3) 1 Special Holy Day 4)

______________ Pre pared By

_______________________ Production-Co-Ordinator

________________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Monthly Production Report Month :January'2005

Working Days

:

20 Days Out Of 31 Days

Working Hours

:

160 Hours

General Overtime

:

80 Hours

Power Failure

:

2 Hours (Without Generator)

Actual Working Hours

:

240 Hours

Number Of Total Machine

:

571 Nos.(Knitting 5G & 7G With All Outher Machine)

Number Of Machine Use

:

560 Nos.

PRODUCTION

ADMINSTRATIVE

TOTAL

A) At The beginning Of Month

:

765

45

825

B) New Recruit

:

2

0

2

C) Separated during the Month

:

12

0

12

Total at the close of Month (A+B- C) :

Avarage Attendance

755

Present

45

86.00%

Absent

815

14.00%

Hours

Hours

Hours

A) Requisition Over Time

:

2022

0

2022

B) General Over Time

:

2120

2943

5063

C) Total Over Time (A+B) D) Over Time Amount

:

4142

2943

7085

:

33136.00

23544.00

56680.00

Factory Closed On

:

1) 4 Fri Day 2) 5 Holy Day 3) 4)

______________ Pre pared By

_______________________ Production-Co-Ordinator

________________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Monthly Production Report Month :December'2004

Working Days

:

31 Days Out Of 25 Days

Working Hours

:

200 Hours

General Overtime

:

100 Hours

Power Failure

:

2 Hours (Without Generator)

Actual Working Hours

:

300 Hours

Number Of Total Machine

:

571 Nos.(Knitting 5G & 7G With All Outher Machine)

Number Of Machine Use

:

560 Nos.

PRODUCTION

ADMINSTRATIVE

TOTAL

A) At The beginning Of Month

:

765

45

810

B) New Recruit

:

7

0

7

C) Separated during the Month

:

10

0

10

Total at the close of Month (A+B- C) :

Avarage Attendance

762

Present

45

90.00%

Absent

807

10.00%

Hours

Hours

Hours

A) Requisition Over Time

:

16491

0

16491

B) General Over Time

:

17201

3248

20449

C) Total Over Time (A+B) D) Over Time Amount

:

33692

3248

36940

:

269536.00

25984.00

295520.00

Factory Closed On

:

1) 5 Fri Day 2) 1 Holy Day 3) 4)

______________ Pre pared By

_______________________ Production-Co-Ordinator

________________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Monthly Production Report Month :November'2004

Working Days

:

30 Days Out Of 22 Days

Working Hours

:

176 Hours

General Overtime

:

88 Hours

Power Failure

:

2 Hours (Without Generator)

Actual Working Hours

:

262 Hours

Number Of Total Machine

:

571 Nos.(Knitting 5G & 7G With All Outher Machine)

Number Of Machine Use

:

560 Nos.

PRODUCTION

ADMINSTRATIVE

TOTAL

A) At The beginning Of Month

:

799

45

844

B) New Recruit

:

0

0

0

C) Separated during the Month

:

34

0

34

Total at the close of Month (A+B- C) :

Avarage Attendance

765

Present

45

88.00%

Absent

810

12.00%

Hours

Hours

Hours

A) Requisition Over Time

:

28230

0

28230

B) General Over Time

:

9712

3758

13470

C) Total Over Time (A+B) D) Over Time Amount

:

37942

3758

41700

:

303536.00

30064.00

333600.00

Factory Closed On

:

1) 4 Fri Day 2) 4 Holy Day 3) 4)

______________ Pre pared By

_______________________ Production-Co-Ordinator

________________ Plant-In-Charge

90 Start 1250 Ltr Disel

1713635184 Babul

24 to 31 New Eng.

19/20

1 to 22 Old Engine

8/9

90 Start 1250 Ltr Disel

1713635184 Babul

24 to 31 New Eng.

19/20

1 to 22 Old Engine

8/9

90 Start 1250 Ltr Disel

1713635184 Babul

24 to 31 New Eng.

19/20

1 to 22 Old Engine

8/9

90 Start 1250 Ltr Disel

1713635184 Babul

24 to 31 New Eng.

19/20

1 to 22 Old Engine

8/9

90 Start 1250 Ltr Disel

1713635184 Babul

24 to 31 New Eng.

19/20

1 to 22 Old Engine

8/9

90 Start 1250 Ltr Disel

1713635184 Babul

24 to 31 New Eng.

19/20

1 to 22 Old Engine

8/9

90 Start 1250 Ltr Disel

1713635184 Babul

24 to 31 New Eng.

19/20

1 to 22 Old Engine

8/9

90 Start 1250 Ltr Disel

1713635184 Babul

24 to 31 New Eng.

19/20

1 to 22 Old Engine

8/9

90 Start 1250 Ltr Disel

1713635184 Babul

24 to 31 New Eng.

19/20

1 to 22 Old Engine

8/9

90 Start 1250 Ltr Disel

1713635184 Babul

24 to 31 New Eng.

19/20

1 to 22 Old Engine

8/9

90 Start 1250 Ltr Disel

1713635184 Babul

24 to 31 New Eng.

19/20

1 to 22 Old Engine

8/9

r Khatoni)

90 Start 1250 Ltr Disel

1713635184 Babul

24 to 31 New Eng.

19/20

1 to 22 Old Engine

8/9

90 Start 1250 Ltr Disel

1713635184 Babul

24 to 31 New Eng.

19/20

1 to 22 Old Engine

8/9

90 Start 1250 Ltr Disel

1713635184 Babul

24 to 31 New Eng.

19/20

1 to 22 Old Engine

8/9

90 Start 1250 Ltr Disel

1713635184 Babul

24 to 31 New Eng.

19/20

1 to 22 Old Engine

8/9

90 Start 1250 Ltr Disel

1713635184 Babul

24 to 31 New Eng.

19/20

1 to 22 Old Engine

8/9

90 Start 1250 Ltr Disel

1713635184 Babul

1 to 22 Old Engine

8/9

24 to 31 New Eng.

19/20

90 Start 1250 Ltr Disel

1 to 22 Old Engine

8/9

24 to 31 New Eng.

19/20

1 to 22 Old Engine

8/9

1713635184 Babul

90 Start 1250 Ltr Disel

24 to 31 New Eng.

19/20

1 to 22 Old Engine

8/9

24 to 31 New Eng.

19/20

1713635184 Babul

90 Start 1250 Ltr Disel

1713635184 Babul

90 Start 1250 Ltr Disel

1 to 22 Old Engine

8/9

24 to 31 New Eng.

19/20

832

832

832

832

832

832

832

832

832

832

832

832

832

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Production Details

Date : 01.09.2008

All Figure In DZ

Month : August'2008 SL

Buyer

Style No.

P.O No.

0006

GG

Total Order Qty

Production Target Achive

5G

890

200

383

5G

430

430

131

01

Sage

03

G.Gold

9L-397

04

G.Gold

9L-432

5G

246

0

13

05

Sears

TSF8-3540

5G

334

334

334

06

Sears

VLF8-1513

5G

375

375

385

07

Sears

3517

5G

65

0

48

08

Quelle

3835

5G

83

83

85

09

Quelle

8105

5G

83

0

120

2506

1422

1500

50

50

67

83

83

117

117

71

71

0

13158

Sub Total (5GG) 09

Eurofrente

11533

10

Eurofrente

11544

11

Eurofrente

11225

7G

12

Eurofrente

11532

7G

13

Eurofrente

11529

7G

83

83

87

14

K-Mart

9L-592

13750

7G

586

375

483

15

K-Mart

9L-592

13945

7G

841

841

630

15

K-Mart

9L-592

13949

7G

2026

0

44

16

G.Gold

9L-708

14278

7G

1400

1150

1400

17

G.Gold

9L-708

13807

7G

700

350

69

18

Sears

7G

109

109

111

Sub Total (7GG)

6066

3229

3092

Grand Total

8573

4651

4592

7G 7G

NJF8-3508

Remarks

83 119

Production Target Status SL

Buyer

Style/P.O No

Item

GG

Total Order Qty

Production Target Achive

Remarks

01 02 03

Total

______________________ Production-Co-Ordinator

0

__________________ Finishing-In-Charge

0

0

________________ Knitting-In-Charge

______________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Production Details

Date : 01.08.2008

All Figure In DZ

Month : July'2008 GG

Total Order Qty

MT-8016

5G

150

33

43

Sears

TCF8-4579

5G

291

291

302

03

Sage

06/NI/NJ/AL

5G

1442

1442

765

04

Sears

NJF8-3517

5G

65

48

22

05

G.Gold

5G

246

246

234

06

Sears

NJF8-3517

5G

467

45

07

Sage

0008

507224

5G

394

350

08

G.Union

84000

ET-9659

5G

257

1

SL

Buyer

Style No.

01

G.Union

02

9L432

P.O No.

13273

Sub Total (5GG)

Production Target Achive

3312

2060

1762

200

167

181

2026

1584

200

200

200

200

205

09

G.Union

MT-8212-B

10

G.Gold

9L 592

11

Sears

TSF8-3527

7G

12

Sears

TSF8-3528

7G

13

G.Gold

9L 708

7G

3009

500

1196

14

G.Gold

9L592

7G

586

586

112

15

G.Union

84004/ET-898

7G

700

0

3

16

Eurofrente

11530

7G

38

38

17

Eurofrente

11531

7G

50

50

18

Eurofrente

11528

7G

71

71

Sub Total (7GG)

7079

3395

3529

Grand Total

10391

5456

5290

7G 13749

13750

7G

Remarks

1631 202

Production Target Status SL

Buyer

Style/P.O No

Item

GG

Total Order Qty

Production Target Achive

Remarks

01 02 03

Total

______________________ Production-Co-Ordinator

0

__________________ Finishing-In-Charge

0

0

________________ Knitting-In-Charge

______________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Production Details

Date : 01.07.2008

All Figure In DZ

Month : June'2008 SL

Buyer

Style No.

P.O No.

GG

Total Order Qty

Production Target Achive

01

Sears

NJF8-3504

5G

257

82

88

02

Sears

NJF8-3517

5G

467

467

481

03

Sears

VLF8-1513

5G

375

375

0

04

Sears

VLF8-1508

5G

150

150

0

05

Sears

NJF-3505

5G

319

167

0

06

Li & Fung

RC-45

5G

721

437

378

07

G.Union

MT-8016 BL

5G

150

150

113

08

G.Union

4000

CS-9659

5G

1000

09

G.Union

ET-9659

5G

Sub Total (5GG)

4 242

3439

1828

1305

166

166

168

10

Sears

TSF8-3527

11

Sears

TSF8-3528

7G

126

126

12

G.Union

4004/CS-898

7G

1200

199

13

G.Union

84004/ET-898

7G

700

700

680

14

G.Union

MT-898BL

7G

200

200

24

15

G.Gold

9L 708

7G

8831

1000

1242

16

G.Gold

9L592

7G

2026

833

360

17

Eurofrente

11447

7G

4150

7G

MT-8212

13749

Remarks

130 229

3

Sub Total (7GG)

17399

3224

2835

Grand Total

20837

5052

4141

Production Target Status SL

Buyer

Style/P.O No

Item

GG

Total Order Qty

Production Target Achive

01

Remarks

0

02 03

Total

______________________ Production-Co-Ordinator

0.00

__________________ Finishing-In-Charge

0.00

0

________________ Knitting-In-Charge

______________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Production Details

Date : 01.06.2008

All Figure In DZ

Month : May'2008 Style No.

P.O No.

GG

Total Order Qty

G.Union

1011CV

CS-8000

5G

150

33

49

02

G.Gold

9L446

13346

5G

543

543

547

03

Li & Fung

RC-45

5G

1221

333

284

04

Sears

NJF8-3505

5G

319

319

05

Sears

VLF8-1513

5G

375

375

06

Sears

NJF8-3517

5G

467

467

07

Sears

NJF8-3504

5G

08

G.Union

SL

Buyer

01

4000

CS-9659

5G

Sub Total (5GG)

Production Target Achive

175 1000

123

4075

2071

1178

2092

1208

1275

7G

4150

1333

7G

1200

533

Sub Total (7GG)

7442

3075

3616

Grand Total

11517

5146

4794

09

K-Mart

9L440

10

Eirpfremte

11447

11

G.Union

4004

13116

CS-898

7G

Remarks

1341 1001

Production Target Status SL

Buyer

Style/P.O No

Item

GG

Total Order Qty

Production Target Achive

01

Remarks

0

02 03

Total

______________________ Production-Co-Ordinator

0.00

__________________ Finishing-In-Charge

0.00

0

________________ Knitting-In-Charge

______________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Production Details

Date : 01.05.2008

All Figure In DZ

Month : April'2008 Style No.

P.O No.

GG

Total Order Qty

G.Union

84007

ET-8001

5G

500

80

166

02

G.Gold

29L275

5G

300

133

162

03

Quelle

7374

5G

217

175

235

04

Quelle

3835

5G

357

265

251

05

G.Union

4000

5G

1000

583

888

06

Li & Fung

RC

5G

1221

638

07

Branex

LM-870

5G

133

8

08

G.Gold

9L446

13346

5G

2808

1

09

G.Union

1011CV

CS-8000

5G

300

48

10

G.Union

1011CV

CS-8000

5G

150

107

SL

Buyer

01

CS-9659

Sub Total (5GG) 11

Eurofrente

11447

ET-898

12

G.Union

8401

ET-8037

13

G.Union

4010

CS-8003-1

14

G.Gold

9L440

13116

Production Target Achive

6986

1874

1867

7G

4150

2867

1908

7G

500

333

292

7G

1000

6

2092

830

Sub Total (7GG)

7742

3200

3036

Grand Total

14728

5074

4903

Remarks

Production Target Status SL

Buyer

Style/P.O No

Item

GG

Total Order Qty

Production Target Achive

01

Remarks

0

02 03

Total

______________________ Production-Co-Ordinator

0.00

__________________ Finishing-In-Charge

0.00

0

________________ Knitting-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

______________ Plant-In-Charge

Production Details

Date : 01.04.2008

All Figure In DZ

Month : March'2008 Style No.

P.O No.

GG

Total Order Qty

G.Union

4016

CS-8037

5G

1000

417

455

02

Atlantic

14256

5G

182

182

191

03

N.Mann

550/477

5G

133

117

118

04

G.Gold

29L275

5G

300

300

139

05

Branex

LM-869

5G

133

133

135

06

Branex

LM-870

5G

133

133

126

07

Branex

LM-871

5G

133

133

134

08

Branex

LM-874

5G

133

133

135

09

G.Union

87007

ET-8001

5G

500

500

344

10

G.Union

3805

CK-8013

5G

300

300

307

11

G.Union

84006

ET-8000

5G

500

31

12

G.Union

1011CV

CS-8000

5G

300

152

13

Quelle

7374

5G

2600

25

14

Quelle

3835

5G

357

110

SL

Buyer

01

Sub Total (5GG)

Production Target Achive

6705

2348

2401

15

G.Union

84004

ET-898

7G

300

113

123

16

G.Union

4036

CS-8034

7G

1000

333

341

17

G.Union

4010

CS-8003-1

7G

1000

1000

1005

18

Quelle

3423

7G

83

83

85

19

Eurofrente

11447

7G

4150

1567

938

20

G.Union

4005

CS-6840

7G

700

2

21

G.Union

84016

ET-8037

7G

500

214

Sub Total (7GG)

7733

3096

2707

Grand Total

14438

5444

5108

Remarks

Production Target Status SL

Buyer

Style/P.O No

Item

GG

Total Order Qty

Production Target Achive

01

Remarks

0

02 03

Total

______________________ Production-Co-Ordinator

0.00

__________________ Finishing-In-Charge

0.00

0

________________ Knitting-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

______________ Plant-In-Charge

Production Details

Date : 01.03.2008

All Figure In DZ

Month : February'2008 Style No.

P.O No.

GG

Total Order Qty

G.Union

84006

ET-8000

5G

500

392

379

02

G.Union

84000

ET-9659

5G

500

83

86

03

G.Union

4016

CS-8037

5G

1000

0

554

04

G.Union

1011CV

CS-8000

5G

300

250

105

05

Atlantic

15684

5G

617

617

623

06

Atlantic

19056

5G

25

0

26

07

N.Mann

550/477

5G

133

0

17

3075

1342

1790

7G

600

150

177

7G

750

237

150

7G

283

242

252

7G

500

105

115

7G

700

75

112

7G

700

450

526

7G

300

300

182

7G

1000

1000

668

Sub Total (7GG)

4833

2559

2180

Grand Total

7909

3901

3970

SL

Buyer

01

Sub Total (5GG) 08

Global Gold

9 L 120

12770

09

Global Gold

9 l 119

12772

10

Branex

11

G.Union

84005

ET- 6840

12

G.Union

4005

CS-6840

13

G.Union

4004

CS-898

14

G.Union

84004

ET-898

15

G.Union

4036

CS-8034

LBW 9060

Production Target Achive

Remarks

Recvd From GSGL-1

Production Target Status SL

Buyer

Style/P.O No

Item

GG

Total Order Qty

Production Target Achive

01

Remarks

0

02 03

Total

______________________ Production-Co-Ordinator

0.00

__________________ Finishing-In-Charge

0.00

0

________________ Knitting-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

______________ Plant-In-Charge

Production Details

Date : 01.02.2008

All Figure In DZ

Month : January'2008 GG

Total Order Qty

5G

133

133

139

CS-9659

5G

1000

125

146

4006

CS-8000

5G

500

500

565

G.Union

8400

ET-8000

5G

500

500

99

G.Union

84000

ET-9659

5G

500

500

422

2633

1758

1371

7G

167

167

169

7G

83

83

84

7G

267

267

271

7G

283

283

39

7G

750

750

513

7G

600

600

442

7G

700

255

179

7G

500

483

377

7G

300

133

247

Sub Total (7GG)

3650

3022

2322

Grand Total

6283

4780

3693

SL

Buyer

Style No.

01

N.Mann

550/477

02

G.Union

4000

03

G.Union

04 05

P.O No.

Sub Total (5GG) 08

Branex

LM-862

09

Branex

LM-863

10

Branex

LM-861

11

Branex

LBW 9060

12

Global Gold

9 L 119

12772

13

Global Gold

9 l 120

12770

14

G.Union

4005

CS-6840

15

G.Union

84005

ET- 6840

16

G.Union

84004

ET-898

Production Target Achive

Remarks

Production Target Status SL

Buyer

Style/P.O No

Item

GG

Total Order Qty

Production Target Achive

01

Remarks

0

02 03

Total

______________________ Production-Co-Ordinator

0.00

__________________ Finishing-In-Charge

0.00

0

________________ Knitting-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

______________ Plant-In-Charge

Production Details

Date : 01.01.2008

All Figure In DZ

Month : December'2007 SL

Buyer

GG

Total Order Qty

8912

5G

542

58

50

5G

125

125

128

Style No.

P.O No.

Production Target Achive

01

Quelle

02

N.Mann

550/477

03

G.Gold

9 J020

12714

5G

110

110

112

04

G.Gold

9 J020

12716

5G

24

24

27

05

G.Gold

9 J020

12685

5G

280

280

287

06

G.Union

4000

CS-9659

5G

1000

1000

871

07

Atlantic

19056

5G

230

0

20

2311

1597

1494

7G

667

250

286

7G

708

150

115

7

258

258

261

500

500

587

333

333

349

167

167

0

83

83

0

267

267

0

700

0

445

0

0

17

Sub Total (7GG)

3683

2008

2060

Grand Total

5994

3606

3554

Sub Total (5GG) 08

Quelle

4000

09

Quelle

8832

10

Quelle

8824

11

Quelle

8832

12

Quelle

8703

13

Branex

LM-862

14

Branex

LM-863

15

Branex

LM-861

16

G.Union

4005

CS-6840

17

G.Union

84005

ET-6840

Remarks

Production Target Status SL

Buyer

Style/P.O No

Item

GG

Total Order Qty

Production Target Achive

01

Remarks

0

02 03

Total

______________________ Production-Co-Ordinator

0.00

__________________ Finishing-In-Charge

0.00

0

________________ Knitting-In-Charge

GLOBAL KNIT-WEAR LTD

______________ Plant-In-Charge

269 DEWAN HAT CHITTAGONG

Production Details

Date : 01.12.2007

All Figure In DZ

Month : November'2007 GG

Total Order Qty

10764

5G

143

0

2

Eurofrente

10877

5G

208

0

7

03

Quelle

3835

5G

275

275

265

04

Quelle

8912

5G

542

542

501

1168

817

775

7G

1042

1042

1064

7G

708

417

536

7G

667

667

401

7G

542

542

527

7G

125

0

12

7G

500

250

303

7G

241

0

107

7G

334

0

1

7G

500

500

468

Sub Total (7GG)

4658

3417

3419

Grand Total

5826

4233

4194

SL

Buyer

Style No.

01

Eurofrente

02

P.O No.

Sub Total (5GG) 05

Quelle

8832

06

Quelle

8832-B

07

Quelle

4000

08

Quelle

8820

09

Les. Line

5868

10

Les. Line

5872

11

Les. Line

5870

12

G.Union

7603

13

G.Gold

012630

Production Target Achive

Remarks

Production Target Status SL

Buyer

Style/P.O No

Item

GG

Total Order Qty

Production Target Achive

01

Remarks

0

02 03

Total

______________________ Production-Co-Ordinator

0.00

__________________ Finishing-In-Charge

0.00

0

________________ Knitting-In-Charge

______________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Production Details

Date : 03.11.2007

All Figure In DZ

Month : October'2007 GG

Total Order Qty

10764

5G

143

117

125

Eurofrente

10877

5G

208

117

115

03

Quelle

3835

5G

275

0

13

04

Sfera

0766/8021

5G

161

0

18

787

233

271

7G

250

250

259

7G

542

0

27

7G

142

142

144

7G

267

267

275

7G

500

500

183

7G

457

457

431

7G

334

334

195

7G

500

500

37

Sub Total (7GG)

2991

2449

1551

Grand Total

3778

2683

1822

SL

Buyer

Style No.

01

Eurofrente

02

P.O No.

Sub Total (5GG) 05

Quelle

3512

06

Quelle

8820

07

Quelle

3204

08

Quelle

8703

09

Les. Line

5872

10

Les. Line

5870

11

G.Union

7603

12

G.Gold

9H269/12630

Production Target Achive

Remarks

Production Target Status SL

Buyer

Style/P.O No

Item

GG

Total Order Qty

Production Target Achive

01

Remarks

0

02 03

Total

______________________ Production-Co-Ordinator

0.00

__________________ Finishing-In-Charge

0.00

0

________________ Knitting-In-Charge

______________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Production Details

Date : 02.10.2007

All Figure In DZ

Month : September'2007 GG

Total Order Qty

10764

5G

143

143

19

Eurofrente

10877

5G

208

208

101

03

Quelle

3835

5G

150

150

154

04

Sfera

0766/8021

5G

161

164

148

662

665

422

SL

Buyer

Style No.

01

Eurofrente

02

P.O No.

Sub Total (5GG)

Production Target Achive

05

Quelle

8711

7G

133

67

70

06

Quelle

8711-B

7G

342

342

346

07

Quelle

8824

7G

583

483

501

08

Quelle

8824-B

7G

350

350

361

09

Quelle

8821

7G

373

343

397

10

Quelle

3885

7G

133

0

8

11

Quelle

8703

7G

133

133

140

12

Les. Line

18902

7G

412

412

413

13

Les. Line

5870

7G

457

0

18

14

G.Union

7603

7G

334

0

144

15

N.Mann

017/531

7G

200

200

206

Sub Total (7GG)

3451

2330

2603

Grand Total

4113

2996

3025

Remarks

Production Target Status SL

Buyer

Style/P.O No

Item

GG

Total Order Qty

Production Target Achive

01

Remarks

0

02 03

Total

______________________ Production-Co-Ordinator

0.00

__________________ Finishing-In-Charge

0.00

0

________________ Knitting-In-Charge

______________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Production Details

Date : 01.09.2007

All Figure In DZ

Month : August'2007 SL

Buyer

Style No.

P.O No.

GG

Total Order Qty

Production Target Achive

01

Quelle

3835

5G

67

67

69

02

G.Gold

19H987

5G

250

83

87

03

G.Gold

19H542

12229

5G

662

0

41

04

G.Gold

19H542

12227

5G

80

0

27

05

G.Gold

19H542

12228

5G

696

696

625

1755

846

849

Sub Total (5GG) 06

Sears

3547

7G

333

167

173

07

Quelle

8711

7G

133

0

67

08

Quelle

8824

7G

583

583

97

09

Quelle

8821

7G

1200

1200

57

10

Quelle

3885

7G

133

0

130

11

Quelle

8703

7G

192

192

167

12

L.Line

47902

7G

639

0

41

13

Zara

5747/246

7G

833

833

817

14

Zara

5747/296

7G

206

206

209

Sub Total (7GG)

4253

3181

1758

Grand Total

6007

4027

2607

Remarks

Production Target Status SL

Buyer

Style/P.O No

Item

GG

Total Order Qty

Production Target Achive

01

Remarks

0

02 03

Total

______________________ Production-Co-Ordinator

0.00

__________________ Finishing-In-Charge

0.00

0

________________ Knitting-In-Charge

______________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Production Details

Date : 05.08.2007

All Figure In DZ

Month : July'2007 SL

Buyer

GG

Total Order Qty

3835

5G

200

200

202

Style No.

P.O No.

Production Target Achive

01

Quelle

02

Tiara

4H215

5G

162

0

75

03

K-Mart

9H049

5G

1564

1500

1550

04

Sears

1504

5G

167

0

1

05

Sears

1513

5G

233

0

15

06

G.Gold

19H542

12229

5G

379

379

343

07

G.Gold

19H542

12227

5G

80

80

54

08

G.Gold

19H542

12228

5G

696

160

82

3481

2319

2322

Sub Total (5GG) 09

Sears

1535

7G

167

0

1

10

Sears

3544

7G

317

303

310

11

Sears

3547

7G

333

333

170

12

Quelle

8820

7G

443

443

762

13

Quelle

3885

7G

333

333

345

14

Quelle

8703

7G

225

225

236

15

Les. Line

47902

7G

639

622

630

16

Zara

5747/246

7G

458

0

19

Sub Total (7GG)

2915

2260

2473

Grand Total

6396

4579

4795

Remarks

Production Target Status SL

Buyer

Style/P.O No

Item

GG

Total Order Qty

Production Target Achive

01

Remarks

0

02 03

Total

______________________ Production-Co-Ordinator

0.00

__________________ Finishing-In-Charge

0.00

0

________________ Knitting-In-Charge

______________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Production Details

Date : 01.07.2007

All Figure In DZ

Month : June'2007 SL

Buyer

Style No.

P.O No.

GG

Total Order Qty

Production Target Achive

01 N.Mann

138/751

5G

42

42

44

02 N.Mann

327/052

5G

42

42

41

03 G.Union

8480

5G

1000

0

51

04 Tiara

4H215

5G

1006

767

724

05 Sears

1537

5G

375

0

121

06 Sears

1504

5G

167

167

170

07 Sears

1513

5G

233

233

223

9H 049

5G

1564

897

37

4428

2148

1411

08 G.Gold(K-Mart)

Sub Total (5GG) 09

Sears

3543

7G

309

200

232

10

Sears

1535

7G

167

167

171

11

Sears

3544

7G

317

0

13

12

Quelle

3204

7G

667

125

160

13

Quelle

8820

7G

3010

3010

2317

14

Quelle

3885

7G

133

133

138

Sub Total (7GG)

4602

3635

3031

Grand Total

9030

5783

4442

Remarks

Production Target Status SL

Buyer

Style/P.O No

Item

GG

Total Order Qty

Production Target Achive

01

Remarks

0

02 03

Total

______________________ Production-Co-Ordinator

0.00

__________________ Finishing-In-Charge

0.00

0

________________ Knitting-In-Charge

GLOBAL KNIT-WEAR LTD

______________ Plant-In-Charge

269 DEWAN HAT CHITTAGONG

Production Details

Date : 01.06.2007

All Figure In DZ

Month : May'2007 SL

Buyer

Style No.

P.O No.

GG

Total Order Qty

Production Target Achive

01 Quelle

3212

5G

333

225

233

02 Great Union

8480

5G

1000

933

899

03 Tiara

4H215/28813

5G

408

0

232

04 Sears

VLF7-1537

5G

292

292

263

05 Sears

VLF7-1500

5G

99

0

75

06 Sears

VLF7-1513

5G

233

233

0

07 N.Mann

138/751

5G

42

42

0

08 N.Mann

327/052

5G

42

42

0

2449

1767

1702

Sub Total (5GG) 09

Sears

TSF7-3542

7G

123

98

110

10

Sears

TSF7-3543

7G

309

309

84

11

Sears

TSF7-3544

7G

214

214

219

12

Sears

VLF7-1535

7G

167

167

0

13

Quelle

2479

7G

142

100

109

14

Quelle

3204

7G

667

667

525

15

Great Union

1603

7G

300

300

307

16

Tiara

4H216/28659

7G

500

333

381

17

Eurofrente

10394

7G

1223

917

959

Sub Total (7GG)

3643

3103

2694

Grand Total

6092

4871

4396

Remarks

Production Target Status SL

Buyer

Style/P.O No

Item

GG

Total Order Qty

Production Target Achive

01

Remarks

0

02 03

Total

______________________ Production-Co-Ordinator

0.00

__________________ Finishing-In-Charge

0.00

0

________________ Knitting-In-Charge

GLOBAL KNIT-WEAR LTD

______________ Plant-In-Charge

269 DEWAN HAT CHITTAGONG

Production Details

Date : 01.05.2007

All Figure In DZ

Month : April'2007 SL

Buyer

Style No.

P.O No.

GG

Total Order Qty

Production Target Achive

01 Quelle

3733

5G

333

333

245

02 Quelle

3885

5G

208

208

206

03 Quelle

3915

5G

133

133

136

04 Quelle

3212

5G

333

0

103

05 N.Mann

138/751

5G

83

83

62

06 N.Mann

327/052

5G

83

83

45

07 Sears

VLF7-1500

5G

568

568

580

08 Sears

VLF7-1500-B

5G

188

188

192

09 Sears

VLF7-1500-C

5G

50

50

34

10 Sears

VLF7-1504/44

5G

83

83

0

11 Sears

VLF7-1513/50

5G

117

117

0

12 G.Union

17200

5G

500

0

34

13 G.Union

8480

5G

1000

0

61

3680

1847

1698

Sub Total (5GG) 14

G.Union

1604

7G

300

167

231

15

Quelle

3885

7G

333

333

322

16

Quelle

8711

7G

367

367

373

17

Quelle

2479

7G

142

142

146

18

Quelle

2479-B

7G

142

0

38

19

Tiara

28658

7G

500

500

505

20

Tiara

28659

7G

500

500

126

21

Eurofrente

10394

7G

1223

0

277

22

Sears

TSF6-3542

7G

123

123

20

23

Sears

TSF6-3544

7G

214

214

0

Sub Total (7GG)

3842

2344

2038

Grand Total

7522

4191

3736

Remarks

Production Target Status SL

Buyer

Style/P.O No

Item

GG

Total Order Qty

Production Target Achive

01

Remarks

0

02 03

Total

______________________ Production-Co-Ordinator

0.00

__________________ Finishing-In-Charge

0.00

0

________________ Knitting-In-Charge

______________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Production Details

Date : 01.04.2007

All Figure In DZ

Month : March'2007 GG

Total Order Qty

1612

5G

300

300

259

G.Union

17200

5G

500

500

474

03

G.Union

17201

5G

500

500

507

04

G.Union

7600

5G

1000

208

255

05

N.Mann

327/052

5G

83

83

86

06

N.Mann

138/751

5G

83

83

74

05

Quelle

3733

5G

333

333

57

06

Quelle

3835

5G

208

0

40

3008

2008

1752

SL

Buyer

01

G.Union

02

Style No.

P.O No.

Sub Total (5GG)

Production Target Achive

08

G.Union

7606

7G

700

0

134

09

G.Union

7603

7G

700

533

575

10

G.Union

7613

7G

500

500

510

11

G.Union

1613

7G

300

300

299

12

G.Union

1603

7G

300

300

306

12

G.Union

1604

7G

300

300

81

13

Quelle

3885

7G

333

333

23

14

Eurofrente

10394(EX-09447)

7G

527

527

0

Sub Total (7GG)

3660

2794

1928

Grand Total

6668

4802

3680

Remarks

Production Target Status SL

Buyer

Style/P.O No

Item

GG

Total Order Qty

Production Target Achive

01

0

02 03

Total

0.00

0.00

0

Remarks

_____________ Prepared By

________________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Production Details

Date : 01.03.2007

All Figure In DZ

Month : February'2007 GG

Total Order Qty

1615

5G

700

208

94

G.Union

7609

5G

1000

542

901

03

G.Union

7600

5G

1000

1000

707

04

G.Union

1612

5G

300

0

42

3000

1750

1743

SL

Buyer

01

G.Union

02

Style No.

P.O No.

Sub Total (5GG)

Production Target Achive

08

Quelle

8711

7G

525

275

273

09

Quelle

8706

7G

150

150

154

10

G.Union

7604

7G

700

83

109

11

G.Union

7605

7G

1000

375

332

12

G.Union

7606

7G

700

700

574

12

G.Union

7603

7G

700

700

134

13

G.Union

1613

7G

300

0

7

Sub Total (7GG)

4075

2283

1583

Grand Total

7075

4033

3326

Remarks

Production Target Status SL

Buyer

Style/P.O No

Item

GG

Total Order Qty

Production Target Achive

01

0

02 03

Total

0.00

0.00

0

Remarks

_____________ Prepared By

________________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Production Details

Date : 01.02.2007

All Figure In DZ

Month : January'2007 GG

Total Order Qty

550/477

5G

100

100

106

Quelle

7692

5G

333

258

256

03

Quelle

3212

5G

333

0

11

04

Quelle

3812

5G

100

100

104

05

G.Union

7615

5G

700

700

614

06

G.Union

7609

5G

1000

0

109

07

G.Union

7600

5G

1000

0

56

3567

1158

1256

SL

Buyer

01

N.Mann

02

Style No.

P.O No.

Sub Total (5GG)

Production Target Achive

08

Quelle

8711

7G

833

525

245

09

Quelle

7452

7G

133

0

57

10

Quelle

3252

7G

267

0

73

11

Quelle

8706

7G

150

150

0

12

G.Union

7604

7G

700

333

605

13

G.Union

7605

7G

1000

1000

683

Sub Total (7GG)

3083

2008

1663

Grand Total

6650

3167

2919

Remarks

Production Target Status SL 01

Buyer

Style/P.O No

Item

GG

Total Order Qty

Production Target Achive 0

Remarks

02 03

Total

0.00

_____________ Prepared By

0.00

0

________________________ Production-Co-Ordinator

________________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Production Details

Date : 06.01.2007

All Figure In DZ

Month : December '2006 GG

Total Order Qty

550/477

5G

100

58

10

Quelle

3212

5G

333

333

323

Quelle

7692

5G

333

333

71

767

725

404

SL

Buyer

01

N.Mann

02 03

Style No.

P.O No.

04

Production Target Achive

Remarks

5G Sub Total (5GG)

05

Quelle

8711

7G

833

833

742

06

Quelle

8706

7G

833

833

849

07

Quelle

3252

7G

267

267

196

08

Quelle

7452

7G

133

133

80

Sub Total (7GG)

2067

2067

1867

Grand Total

2833

2792

2271

Production Target Status SL

Buyer

Style/P.O No

Item

GG

Total Order Qty

Production Target Achive

Remarks

01

0

02 03

Total

0.00

_____________ Prepared By

0.00

0

________________________ Production-Co-Ordinator

________________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Production Details

Date : 02.12.2006

All Figure In DZ

Month : November '2006 GG

Total Order Qty

09750

5G

521

202

224

Eurofrente

09770

5G

150

133

147

03

Quelle

3795

5G

125

125

127

04

N.Mann

550/477

5G

100

0

95

896

460

592

SL

Buyer

Style No.

01

Eurofrente

02

P.O No.

Sub Total (5GG)

Production Target Achive

05

Quelle

7452(B)

7G

88

0

31

06

Quelle

7452(C)

7G

175

175

77

07

Quelle

7452(D)

7G

100

16

113

08

Quelle

8703

7G

2083

2083

2114

Sub Total (7GG)

2446

2274

2335

Grand Total

3343

2734

2928

Remarks

Production Target Status SL

Buyer

Style/P.O No

Item

GG

Total

Production

Remarks

SL

Buyer

Style/P.O No

Item

GG

Order Qty

Target

01

Remarks

Achive 0

02 03

Total

0.00

_____________ Prepared By

0.00

0

________________________ Production-Co-Ordinator

________________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Production Details

Date :

All Figure In DZ

Month : SL

Buyer

Style No.

Sub Total (5GG)

P.O No.

GG

Total Order Qty

0

Production Target Achive

0

0

Remarks

Sub Total (7GG) Grand Total

Production Target Status SL

Buyer

Style/P.O No

Item

GG

Total Order Qty

Production Target Achive

01

Remarks

0

02 03

Total

_____________ Prepared By

________________________ Production-Co-Ordinator

________________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Production Details

Date : 01.11.2006

All Figure In DZ

Month : October '2006 GG

Total Order Qty

550/477

5G

83

83

35

Eurofrente

09769

5G

487

487

435

03

Eurofrente

09750

5G

521

521

319

04

Eurofrente 09770 Sub Total (5GG)

5G

150 1242

150 1242

9 798

13

Sears

3534

7G

124

0

38

14

Quelle

8609

7G

433

250

346

15

Quelle

3905

7G

98

0

31

16

Quelle

7294

7G

134

83

93

17

Quelle

3955

7G

154

83

188

18

Quelle

3792

7G

471

408

270

22

Quelle

3792(B)

7G

321

125

122

23

Quelle

7392

7G

250

250

253

24

Quelle

7392(B)

7G

58

0

60

SL

Buyer

01

N.Mann

02

Style No.

P.O No.

Production Target Achive

Remarks

19

Quelle

7452

7G

87

87

91

25

Quelle

7452(B)

7G

88

88

77

20

Quelle

7452(C)

7G

175

175

73

21

Quelle

7G

100 2494

100 1650

5 1647

3735

2892

2445

7452(D) Sub Total (7GG) Grand Total

Production Target Status SL

Buyer

Style/P.O No

Item

GG

Total Order Qty

Production Target Achive

01

Remarks

0

02 03

Total

0.00

_____________ Prepared By

0.00

0

________________________ Production-Co-Ordinator

________________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Production Details

Date : 03.10.2006

All Figure In DZ

Month : September '2006 SL

Buyer

Style No.

P.O No.

GG

Total Order Qty

Production Target Achive

01

G.Gold

21D050CT

010075

5G

220

83

56

02

G.Gold

1D158

010251

5G

1380

1005

1228

03

G.Gold

1D158

010249

5G

783

783

101

04

N.Mann

550/477

5G

83

0

43

05

Sears

3542

5G

217

217

150

06

Eurofrente 9769 Sub Total (5GG)

5G

487 3170

0 2088

54 1632

13

Rajan

MK-413608

7G

400

0

39

14

Sears

TSF6-3534

7G

158

158

160

15

Sears

TSF6-3534

7G

124

124

92

16

Sears

VLS7-1500

7G

200

200

205

17

Tiara

44D788RS

7G

500

0

92

18

Quelle

3575

7G

150

83

84

Remarks

22

Quelle

8609

7G

408

181

216

23

Quelle

8609(B)

7G

433

433

94

24

Quelle

8602

7G

233

208

186

19

Quelle

8602(B)

7G

208

0

213

25

Quelle

3732

7G

367

367

375

20

Quelle

3905

7G

200

200

173

21

Quelle

7G

208 3590

208 2163

119 2048

6760

4251

3680

7294 Sub Total (7GG) Grand Total

Production Target Status SL

Buyer

Style/P.O No

Item

GG

Total Order Qty

Production Target Achive

01

Remarks

0

02 03

Total

0.00

_____________ Prepared By

0.00

0

________________________ Production-Co-Ordinator

________________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Production Details

Date : 01.09.2006

All Figure In DZ

Month : August '2006 SL

Buyer

Style No.

P.O No.

GG

Total Order Qty

Production Target Achive

10

G.Gold

21D050CT

010074

5G

330

330

333

11

G.Gold

21D050CT

010075

5G

220

220

168

12

G.Gold

1D158

010251

5G

1380

167

96

05

N.Mann

550/477

5G

127

127

129

06

Quelle

3795

5G

250

133

138

07

Quelle

7214

5G

238

0

71

08

Quelle

3023

5G

104

104

96

09

Quelle

3033

5G

108

108

77

01

Sears

3537

5G

500

500

444

02

Sears

3538

5G

144

167

144

03

Sears

1500

5G

151

151

158

04

Sears

5G

200 3752

210 2217

204 2058

13

Quelle

8609

7G

333

208

285

14

Quelle

3792

7G

167

0

153

3540 Sub Total (5GG)

Remarks

15

Quelle

2670

7G

167

167

172

16

Quelle

3575

7G

150

150

71

17

Quelle

8602

7G

233

233

51

18

Quelle

8609

7G

408

0

5

22

Rajan

MK-413609

7G

400

400

406

23

Rajan

MK-413612

7G

400

400

408

24

Rajan

MK-413608

7G

300

300

268

19

Sears

1511

7G

125

0

102

25

Tiara

44D788RS

7G

500

500

111

20

W.Smith

611166

7G

410

410

415

21

W.Smith

7G

410 4002

410 3177

422 2869

7754

5394

4927

611165 Sub Total (7GG) Grand Total

Production Target Status SL

Buyer

Style/P.O No

Item

GG

Total Order Qty

Production Target Achive

01

Remarks

0

02 03

Total

0.00

_____________ Prepared By

0.00

0

________________________ Production-Co-Ordinator

________________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Production Details

Date : 01.08.2006

All Figure In DZ

Month : July '2006 SL

Buyer

GG

Total Order Qty

60252-C

5G

432

83

60

Style/P.O No

Item

Production Target Achive

01

Sears

02

Quelle

3537

5G

500

167

60

03

Quelle

3795

5G

125

125

130

04

Quelle

3795 B

5G

250

250

251

05

Quelle

3595

5G

167

0

82

06

Quelle

8614

5G

1008

1879

1972

07

Quelle

7214

5G

238

238

171

08

Quelle

3023

5G

104

104

11

09

Quelle

5G

108 2931

108 2954

35 2772

10

Quelle

8602

7G

293

83

206

11

Quelle

3094

7G

500

417

460

3033 Sub Total (5GG)

Remarks

12

Quelle

8609

7G

333

333

54

13

Quelle

3792

7G

167

167

16

14

Quelle

3142

7G

67

67

67

15

Sears

1504

7G

224

399

404

16

Sears

1502

7G

237

237

139

17

Sears

3536

7G

417

333

397

18

Sears

3534

7G

667

0

201

19

Sears

1511

7G

158

158

54

20

N.Mann

017/477

7G

146

146

153

21

Wehmeyer

WR-08

7G

200

100

123

Sub Total (7GG)

3408

2440

2274

Grand Total

6340

5394

5046

7G 7G

60552 Production Target Status SL

Buyer

Style/P.O No

Item

GG

Total Order Qty

Production Target Achive

01

Remarks

0

02 03

Total

0.00

_____________ Prepared By

0.00

0

________________________ Production-Co-Ordinator

________________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Production Details

Date : 01.07.2006

All Figure In DZ

Month : June '2006 SL

Buyer

Style/P.O No

Item

GG

Total Order Qty

Production Target Achive

01

Sears

1500

5G

35

35

36

02

Sears

60252-C

5G

432

432

435

03

Sears

60252-C(B)

5G

432

167

350

04

Quelle

3595

5G

167

167

89

05

Quelle

3795

5G

175

300

180

06

Quelle

8614

5G

1675

250

277

07

Quelle

8614(B)

5G

2021

1010

1276

4935

2360

2643

05

Sub Total (5GG)

5G

06

N.Mann

017/531

7G

271

79

93

07

N.Mann

017/477

7G

146

83

92

Remarks

08

Sears

3531

7G

625

442

455

09

Sears

3532

7G

334

334

332

10

Sears

3534

7G

237

237

242

11

Sears

3534(B)

7G

667

375

472

01

Sears

3536

7G

417

0

24

12

Eurofrente

09447

7G

460

0

25

12

Quelle

3732

7G

167

167

171

12

Quelle

8602

7G

658

658

463

13

Quelle

3094

7G

500

233

52

13

Wehmeyer

WR-08

7G

200

0

80

Sub Total (7GG)

4680

2608

2501

Grand Total

9615

4967

5144

13

7G

13

7G

Production Target Status SL

Buyer

Style/P.O No

Item

GG

Total Order Qty

Production Target Achive

01

Remarks

0

02 03

Total

0.00

_____________ Prepared By

0.00

0

________________________ Production-Co-Ordinator

________________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Production Details

Date : 01.07.2006

All Figure In DZ

Month : June '2006 SL

Buyer

Style/P.O No

Item

GG

Total Order Qty

Production Target Achive

01

Sears

1500

5G

35

35

36

02

Sears

60252-C

5G

432

432

435

03

Sears

60252-C(B)

5G

432

167

350

04

Quelle

3595

5G

167

167

89

05

Quelle

3795

5G

175

300

180

06

Quelle

8614

5G

1675

250

277

07

Quelle

8614(B)

5G

2021

1010

1276

4935

2360

2643

05

Sub Total (5GG)

5G

06

N.Mann

017/531

7G

271

79

93

07

N.Mann

017/477

7G

146

83

92

Remarks

08

Sears

3531

7G

625

442

455

09

Sears

3532

7G

334

334

332

10

Sears

3534

7G

237

237

242

11

Sears

3534(B)

7G

667

375

472

01

Sears

3536

7G

417

0

24

12

Eurofrente

09447

7G

460

0

25

12

Quelle

3732

7G

167

167

171

12

Quelle

8602

7G

658

658

463

13

Quelle

3094

7G

500

233

52

13

Wehmeyer

WR-08

7G

200

0

80

Sub Total (7GG)

4680

2608

2501

Grand Total

9615

4967

5144

13

7G

13

7G

Production Target Status SL

Buyer

Style/P.O No

Item

GG

Total Order Qty

Production Target Achive

01

Remarks

0

02 03

Total

0.00

_____________ Prepared By

0.00

0

________________________ Production-Co-Ordinator

________________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Production Details

Date : 02.06.2006

All Figure In DZ

Month : May '2006 SL

Buyer

Style/P.O No

Item

GG

Total Order Qty

Production Target Achive

01

Quelle

7214

5G

150

0

154

02

Quelle

8614

5G

1675

258

1410

03

Sears

1500

5G

666

0

65

04

N.Mann

550/477

5G

75

75

15

05

G.Union

5G

100 2666

0 333

61 1705

06

Quelle

2619

7G

233

0

25

07

Quelle

3295

7G

183

0

113

08

Quelle

2615

7G

292

0

279

09

Quelle

2479

7G

200

200

205

10

Quelle

2670

7G

333

333

342

S-373 Sub Total (5GG)

Remarks

11

Quelle

2667

7G

267

133

276

01

Eurofrente

09447

7G

960

0

73

12

Sears

3531

7G

625

625

174

12

Sears

3532

7G

334

334

7

12

Sears

3533

7G

500

0

126

13

N.Mann

017/531

7G

271

271

188

13

N.Mann

017/477

7G

146

146

63

13

G.Union

3029

7G

350

350

360

13

G.Union

7G

104 4798

104 2496

108 2339

7464

2829

4044

6030 Sub Total (7GG) Grand Total

Production Target Status SL

Buyer

Style/P.O No

Item

GG

Total Order Qty

Production Target Achive

01

Remarks

0

02 03 04 05 06

Total

0.00

_____________ Prepared By

0.00

0

________________________ Production-Co-Ordinator

________________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Production Details

Date : 02.05.2006

All Figure In DZ

Month : April '2006 SL

Buyer

Style/P.O No

Item

GG

Total Order Qty

Production Target Achive

01

Quelle

3023

5G

150

150

150

02

Quelle

3033

5G

150

150

155

03

Quelle

3795

5G

342

342

76

04

Scope

13463

5G

40

0

42

05

N.Mann

550/477

5G

67

67

69

06

N.Mann

550/477(B)

5G

75

0

65

07

G.Union

S-372

5G

100

100

87

08

G.Union

S-373

5G

100

100

57

09

Eurofrente

09029

5G

113

25

68

10

Eurofrente

08206

5G

186

100

96

11

Sears

1500

5G

666

666

618

Remarks

Sub Total (5GG)

1988

1699

1483

01

Eurofrente

09447

7G

960

0

4

02

Quelle

2620

7G

233

0

143

03

Quelle

8602

7G

325

0

306

04

Quelle

2619

7G

233

233

214

05

Quelle

3792

7G

167

167

137

06

Quelle

3792(B)

7G

166

166

171

07

Quelle

2627

7G

200

200

206

08

Quelle

3295

7G

183

0

72

09

Quelle

2611

7G

200

200

206

10

Quelle

2615

7G

292

292

24

11

Quelle

2479

7G

200

0

6

12

Sears

3533

7G

500

500

378

13

Rajan

7G

300 3960

0 1758

11 1878

5948

3458

3361

MK-413315 Sub Total (7GG) Grand Total

Production Target Status SL

Buyer

Style/P.O No

Item

GG

Total Order Qty

Production Target Achive

01

Remarks

0

02 03 04 05 06

Total

0.00

_____________ Prepared By

0.00

0

________________________ Production-Co-Ordinator

________________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Production Details

Date : 02.04.2006

All Figure In DZ

Month : March '2006 SL

Buyer

Style/P.O No

Item

GG

Total Order Qty

Production Target Achive

01

Scope

13463

5G

200

117

87

02

Scope

13465

5G

200

200

202

03

Zara

5747/541

5G

301

233

332

04

Quelle

3023

5G

150

150

153

05

Quelle

3033

5G

150

0

152

06

Quelle

3795

5G

342

0

271

07

Quelle

7214

5G

150

150

152

Remarks

08

Eurofrente

09209

5G

113

0

45

09

Eurofrente

08206

5G

186

186

94

1791

1036

1488

Sub Total (5GG) 01

Quelle

2620

7G

233

0

94

02

Quelle

8602

7G

325

0

35

03

Quelle

3732

7G

133

133

137

04

Quelle

3792

7G

167

333

39

05

Eurofrente

09447

7G

960

960

870

06

Rajan

MK-413315

7G

300

300

298

07

G.Union

L-444

7G

300

217

145

08

G.Union

8497

7G

188

188

157

Sub Total (7GG)

2607

2131

1775

Grand Total

4398

3167

3263

Production Target Status SL

Buyer

Style/P.O No

Item

GG

Total Order Qty

Production Target Achive

01

Remarks

0

02 03 04 05 06

Total

0.00

_____________ Prepared By

0.00

0

________________________ Production-Co-Ordinator

________________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Production Details

Date : 01.03.2006

All Figure In DZ

Month : February '2006 SL

Buyer

Style/P.O No

Item

GG

Total Order Qty

Production Target Achive

01

Scope

13463

5G

200

200

117

02

Scope

13465

5G

200

200

0

03

Zara

5747/541

5G

321

333

205

04

Zara

5747/541 (B)

100

0

13

Remarks

Sub Total (5GG)

821

733

335

01

Quelle

8609

7G

900

0

99

02

Quelle

8609(B)

7G

708

708

620

03

Quelle

7382

7G

100

58

60

04

Quelle

3732

7G

192

192

196

05

Quelle

8602

7G

700

700

706

06

Eurofrente

08997

7G

90

90

94

07

N.Mann

429/546

7G

308

308

321

08

G.Union

L-444

7G

300

300

162

09

G.Union

8497

7G

188

0

35

Sub Total (7GG)

3486

2357

2293

Grand Total

4307

3090

2628

Production Target Status SL

Buyer

Style/P.O No

Item

GG

Total Order Qty

Production Target Achive

01

Remarks

0

02 03 04 05 06

Total

0.00

_____________ Prepared By

0.00

0

________________________ Production-Co-Ordinator

________________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Production Details

Date : 01.02.2006

All Figure In DZ

Month : January '2006 SL 01 02

Buyer Zara

Style/P.O No 5747/504

Item

GG

Total Order Qty

5G

321

Production Target Achive 100

57

Remarks

Sub Total (5GG)

321

100

57

03

Quelle

8603

7G

1250

0

31

04

Quelle

8609

7G

1708

1708

1202

05

Quelle

3732

7G

67

67

80

06

Quelle

7382

7G

100

100

39

Sub Total (7GG)

3125

1875

1352

Grand Total

3446

1975

1409

Production Target Status SL

Buyer

Style/P.O No

Item

GG

Total Order Qty

Production Target Achive

01

Remarks

0

02 03 04 05 06

Total

0.00

_____________ Prepared By

0.00

0

________________________ Production-Co-Ordinator

________________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Production Details

Date : 01.12.2006

All Figure In DZ

Month : December '2005 SL 01 02

Buyer Zara

Style/P.O No 5747/504

Item

GG

Total Order Qty

5G

321

Production Target Achive 513

266

Remarks

Sub Total (5GG) 03

N.Mann

04

321

513

266

317/349

7G

708

388

Quelle

8602

7G

833

833

855

05

Quelle

8603

7G

1250

1250

1254

06

Quelle

8609

7G

600

417

65

07

Quelle

8603 (B)

7G

650

650

627

08

Quelle

7382

7G

100

100

105

09

Quelle

3732

7G

67

67

62

Sub Total (7GG)

4208

3317

3355

Grand Total

4529

3829

3622

Production Target Status SL

Buyer

Style/P.O No

Item

GG

Total Order Qty

Production Target Achive

01

Remarks

0

02 03 04 05 06

Total

0.00

_____________ Prepared By

0.00

0

________________________ Production-Co-Ordinator

________________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Production Details

Date : 01.12.2005

All Figure In DZ

Month : November '2005 SL 01 02 03 04 05

Buyer Zara

Style/P.O No 5747/600

Item

GG

Total Order Qty

5G

406

Production Target Achive 406

319

Remarks

06

Sub Total (5GG)

406

406

319

07

Quelle

8602

7G

10000

10000

784

08

Bay-City

451

7G

1600

0

379

09

Sears

07MCS6-2486

7G

596

596

607

10

Sears

07MCS6-2472

7G

267

267

271

11

N.Mann

317/349

7G

708

708

324

12

Quelle

8602 (B)

7G

833

417

11

Sub Total (7GG)

14004

11988

2375

Grand Total

14410

12394

2694

Production Target Status SL

Buyer

Style/P.O No

Item

GG

Total Order Qty

Production Target Achive

01

Remarks

0

02 03 04 05 06

Total

0.00

_____________ Prepared By

0.00

0

________________________ Production-Co-Ordinator

________________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Production Details

Date : 01.11.2005

All Figure In DZ

Month : October '2005 GG

Total Order Qty

08206

5G

360

0

5

Eurofrent

09209

5G

16

0

18

03

Sears

1539

5G

153

0

20

04

Sears

1538

5G

112

0

23

SL

Buyer

Style/P.O No

01

Eurofrent

02

Item

Production Target Achive

Remarks

05

Sears

1537

5G

99

99

64

06

Sears

1536

5G

137

137

140

876

235

270

Sub Total (5GG) 07

Bay-City

451

7G

1800

1610

1189

08

Bay-City

449

7G

758

454

474

09

Dynesty

9106

7G

333

0

56

10

Quelle

8602

7G

1333

1333

1342

11

Quelle

8602(B)

7G

1000

417

241

12

Sears

07MCS6-2472R

7G

267

267

Sub Total (7GG)

5492

4081

3302

Grand Total

6368

4316

3572

Production Target Status SL

Buyer

Style/P.O No

Item

GG

Total Order Qty

Production Target Achive

01

Remarks

0

02 03 04 05 06

Total

0.00

_____________ Prepared By

0.00

0

________________________ Production-Co-Ordinator

________________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Production Details

Date : 01.10.2005

All Figure In DZ

Month : September '2005 GG

Total Order Qty

452

5G

1625

1208

1157

Eurofrente

09029

5G

140

140

140

Eurofrente

08206

5G

360

360

360

SL

Buyer

01

Bay-City

02 03

Style/P.O No

Item

Production Target Achive

Remarks

04

Sears

1539

5G

153

0

136

05

Sears

1538

5G

112

0

93

06

Sears

1537

5G

99

0

36

07

Sears

1531

5G

175

175

0

08

Sears

1536

5G

137

137

0

2800

2020

1922

09

Sub Total (5GG)

09

Quelle

7610

7G

313

135

135

10

Quelle

7610(C)

7G

63

92

92

10

Rajan

515043

7G

268

250

191

11

Rajan

516078

7G

13

13

11

12

Rajan

515029

7G

216

216

210

13

Rajan

515028

7G

216

216

140

14

Bay-City

451

7G

1800

417

199

15

Bay-City

449

7G

758

758

289

16

Dynesty

9106

7G

300

0

198

Sub Total (7GG)

3946

2097

1465

Grand Total

6746

4117

3386

17

7G

18

7G 7G

Production Target Status SL

Buyer

Style/P.O No

Item

GG

Total Order Qty

Production Target Achive

01

Remarks

0

02 03 04 05 06

Total

0.00

_____________ Prepared By

0.00

0

________________________ Production-Co-Ordinator

________________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Production Details

Date : 02.09.2005

All Figure In DZ

Month : August '2005 SL

Buyer

Style/P.O No

Item

GG

Total Order Qty

Production Target Achive

01

Sears

1514

5G

382

108

101

02

Sears

1516

5G

362

0

8

Remarks

03

Sears

3530

5G

500

350

358

04

Sears

3534

5G

517

517

524

05

G.Gold

7358

5G

300

300

308

06

Bay-City

452

5G

1625

500

486

3685

1775

1785

07

5G

08

5G

09

5G

Sub Total (5GG)

09

Rajan

515043

7G

222

0

9

10

Rajan

516086

7G

226

0

41

10

Rajan

516076

7G

66

0

41

11

Rajan

515043

7G

268

0

78

12

Rajan

516078

7G

13

0

2

13

Rajan

515029

7G

216

0

4

14

Quelle

7610

7G

1000

1000

917

15

Quelle

7610(B)

7G

917

917

917

16

Quelle

7610(C)

7G

313

313

142

Sub Total (7GG)

3240

2229

2151

Grand Total

6925

4004

3936

17

7G

18

7G 7G

Production Target Status SL

Buyer

Style/P.O No

Item

GG

Total Order Qty

Production Target Achive

01

Remarks

0

02 03 04 05 06

Total

0.00

_____________ Prepared By

0.00

0

________________________ Production-Co-Ordinator

________________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Production Details

Date : 01.08.2005

All Figure In DZ

Month : July '2005 SL 01

Buyer Sears

Style/P.O No 1514

Item

GG

Total Order Qty

5G

382

Production Target Achive 333

216

Remarks

02

Sears

1516

5G

362

0

59

03

Sears

3516

5G

501

0

4

04

Sears

1330

5G

175

125

126

05

Sears

3530

5G

500

125

147

06

Sears

3515

5G

750

750

759

07

Rajan

MK-412651

5G

200

0

8

07

Rajan

MK-413162

5G

200

200

4

07

Bernardi

237-W

5G

180

180

191

08

Zara

5G

271 3520

0 1713

254 1768

09

Rajan

MK-412960

7G

250

125

98

10

Rajan

MK-515048

7G

200

200

201

10

Rajan

MK-516086

7G

226

227

186

11

Rajan

MK-515043

7G

222

222

214

12

Rajan

MK-516076

7G

66

79

26

13

Bay-City

162979

7G

1000

167

139

14

Bay-City

162989

7G

750

333

288

15

Bernardi

46-C

7G

280

233

264

16

Quelle

7824

7G

67

67

70

17

Quelle

7610

7G

1000

0

115

Sub Total (7GG)

4060

1653

1601

Grand Total

7580

3366

3369

5747/830 Sub Total (5GG)

18

7G 7G

Production Target Status SL

Buyer

Style/P.O No

Item

GG

Total Order Qty

Production Target Achive

01

Remarks

0

02 03 04 05 06

Total

0.00

_____________ Prepared By

0.00

0

________________________ Production-Co-Ordinator

________________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Production Details

Date : 01.06.2005

All Figure In DZ

Month : June '2005 SL

Buyer

Style/P.O No

Item

GG

Total

Production

Remarks

SL

Buyer

Style/P.O No

Item

GG

Order Qty

Target

Achive

01

Sears

1516

5G

362

362

220

02

Sears

1514

5G

382

382

70

03

Sears

3531

5G

500

500

448

04

Sears

3516

5G

501

501

267

05

Sears

1311

5G

228

228

160

06

Sears

1330

5G

175

175

54

07

Rajan

412651

5G

200

200

85

08

G.Gold

5G

100 2447

100 2447

18 1323

09

Rajan

412960

7G

250

250.00

127

10

G.Gold

8151

7G

250

250.00

116

10

Quelle

2480

7G

166.67

166.67

31

11

Quelle

2481

7G

183.33

183.33

36

12

Quelle

2486

7G

166.67

166.67

142

13

Quelle

2485

7G

166.67

166.67

168

14

Bay-City

162979

7G

750.00

750.00

159

15

Bay-City

192689

7G

562.50

562.50

344

16

Sears

1304

7G

321.58

321.58

212

17

Sears

1310

7G

342.42

342.42

163

18

Bernardi

46-C

7G

363.33

363.33

110

Sub Total (7GG)

3523

3523

1608

Grand Total

5970

5970

2931

7548 Sub Total (5GG)

Remarks

7G

Production Target Status SL

Buyer

Style/P.O No

Item

GG

Total Order Qty

Production Target Achive

Remarks

01 02 03 04 05 06

Total

0.00

_____________ Prepared By

0.00

0

________________________ Production-Co-Ordinator

________________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Production Details

Date : 01.06.2005

All Figure In DZ

Month : May'2005 SL

Buyer

Style/P.O No

Item

GG

Total

Production

Remarks

SL

Buyer

Style/P.O No

01

Whemeyer

WR-1

02

Sears

03

Item

GG

Order Qty

Target

Achive

5G

427

427

437

50108-C

5G

594

594

585

Sears

1309

5G

272

272

276

04

Sears

1516

5G

362

237

79

05

Sears

3531

5G

500

500

62

06

Rajan

MK-412651 Sub Total (5GG)

5G

200 2355

200 2230

67 1506

09

Rajan

MK-412654

7G

200

0.00

18

10

Rajan

MK-412960

7G

250.00

0.00

26

11

Rajan

MK-412727

7G

300.00

300.00

190

12

Rajan

MK-412655

7G

200.00

200.00

158

13

Quelle

2479

7G

216.67

163.58

152

14

Quelle

2480

7G

166.67

79.58

78

15

Quelle

2481

7G

183.33

183.33

151

16

Bay-City

162979

7G

750.00

750.00

706

17

Bay-City

162989

7G

562.50

562.50

132

18

Sears

1304

7G

260.33

260.33

264

19

Sears

1304-B

7G

321.58

321.58

119

20

Sears

1310

7G

342.42

342.42

184

21

G.Gold

08151

7G

250.00

250.00

143

Sub Total (7GG)

4004

3413

2321

Grand Total

6358

5643

3827

22

Remarks

7G 7G

Production Target Status SL

Buyer

Style/P.O No

Item

GG

Total Order Qty

Production Target Achive

Remarks

01 02 03 04 05 06

_____________ Prepared By

Total

0.00

0.00

________________________ Production-Co-Ordinator

0

________________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Production Details All Figure In DZ

Date : 01.05.2005

Month :April'2005 GG

Total Order Qty

08207

5G

119

119

41

08206

5G

219

219

153

MK-412892

5G

200

200

205

007999

5G

500

500

516

Sears

1308

5G

140

140

143

06

Sears

1307

5G

271

271

274

07

Sears

5G

276 1724

276 1724

284 1616

08

Quelle

7824

7G

66.75

66.75

52

09

Rajan

MK-412654

7G

200

200.00

117

10

Rajan

MK-413066

7G

200.00

200.00

203

11

Rajan

MK-413076

7G

300.00

300.00

301

12

G.Gold

17653(8040)

7G

418.00

418.00

116

13

G.Gold

17653(8041)

7G

300.00

300.00

307

14

G.Gold

17653(8039)

7G

200

200.00

204

15

Scope

58417

7G

138

138.00

120

16

Scope

58413

7G

138

138.00

116

17

Scope

58415

7G

138

138.00

140

18

Scope

58403

7G

138

138.00

140

19

Quelle

2480

7G

166.67

166.67

87

20

Quelle

2479

7G

216.67

216.67

43

21

Rajan

MK-412727

7G

300.00

300.00

114

22

Rajan

MK-412655

7G

200.00

200.00

37

Sub Total (7GG)

3120

3120

2099

Grand Total

4844

4844

3715

SL

Buyer

Style/P.O No

01

Eurofrente

02

Eurofrente

03

Rajan

04

G.Gold

05

Item

1307-B Sub Total (5GG)

Production Target Achive

Remarks

7G

Production Target Status SL

Buyer

Style/P.O No

Item

GG

Total Order Qty

Production Target Achive

Remarks

01 02 03 04 05 06

_____________ Prepared By

Total

0.00

0.00

________________________ Production-Co-Ordinator

0

________________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Production Details

Date : 01.04.2005

All Figure In DZ

Month :March'2005 Style/P.O No

Item

GG

Total Order Qty

Production Target Achive

SL

Buyer

01

Bay-City

16-A

5G

566.67

566.67

571.00

02

Eurofrente

08207

5G

118.5

118.5

82.08

03

Eurofrente

08206

5G

219

219

71.58

904.17

904.17

724.67

Remarks

04 05 06 07

Sub Total (5GG)

08

Bay-City

5D-366

7G

960.00

250.00

245.58

09

Bay-City

380-44/49

7G

2917.5

2833.33

2833.00

10

N.Mann

115/149

7G

356.25

183.33

191.50

11

N.Mann

115/827

7G

152.92

152.92

159.67

12

Quelle

7824

7G

66.75

66.75

16.33

13

Rajan

MK-41654

7G

200.00

200.00

74.25

14

G.Gold

17653

7G

418

418

310.58

15

Scope

58417

7G

138

16

Scope

7G

138 5347.42

4104.33

24.42 3875.00

6251.58

5008.50

4599.67

58413 Sub Total (7GG) Grand Total

19.67

Production Target Status SL

Buyer

Style/P.O No

Item

GG

Total Order Qty

Production Target Achive

Remarks

01 02 03 04 05 06

_____________ Prepared By

Total

0.00

0.00

________________________ Production-Co-Ordinator

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Production Details

0

________________ Plant-In-Charge

Date : 02.03.2005

All Figure In DZ

Month :February'2005 SL

Buyer

Style/P.O No

Item

GG

Total Order Qty

Production Target Achive

01

Scope

58423

5G

250

0

7.00

02

G.Union

C-603

5G

300

300

302.33

03

G.Union

C-603/B

5G

125

125

127.83

675

425

437.17

Remarks

04 05 06 07

Sub Total (5GG)

08

Scope

58417

7G

300.00

0.00

2.67

09

Bay-City

5-E

7G

960

960.00

965.92

10

Bay-City

5-D

7G

1600.00

1600.00

1379.83

11

Bay-City

380-44/49

7G

2917.50

0.00

99.33

12

N.Mann

115/149

7G

356.25

356.25

175.75

Sub Total (7GG)

6133.75

2916.25

2623.50

Grand Total

6808.75

3341.25

3060.67

13

7G

14 15 16 17

Reason For Short Fall Production Target Status SL

Buyer

Style/P.O No

Item

GG

Total Order Qty

Production Target Achive

Remarks

01 02 03 04 05 06 07

_____________ Prepared By

Total

0.00

0.00

________________________ Production-Co-Ordinator

0

________________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Production Details All Figure In DZ

Date : 01.12.2004

Month :November'2004 SL

Buyer

Style/P.O No

01

Eurofrenty

08231

Item

GG 5G

Total Order Qty

Production Target Achive

78.5

78.5

42.33

78.5

78.5

42.33

Remarks

02 03 04 05 06 07

Sub Total (5GG)

08

Hong-Song

YS-14214-S

7G

1179

1179

65.58

09

Hong-Song

WS-14212-S

7G

332

332

288.75

10

Sears

CTS5-2298 R

7G

433.33

433.33

353.75

11

Karstadt

K-03

7G

417.00

417.00

371.33

12

N.Mann

115/667

7G

125.00

125.00

129.17

13

N.Mann

115/149

7G

1250.00

1250.00

664.17

Sub Total (7GG)

3736.33

3736.33

1872.75

Grand Total

3814.83

3814.83

1915.08

14 15 16 17

Reason For Short Fall Production Target Status SL

Buyer

Style/P.O No

Item

GG

Total Order Qty

Production Target Achive

01 Eurofrenty

78.50

78.50

42.33

02 HongSong

1511.00

1511.00

354.33

03 Sears

433.33

433.33

353.75

04 Karstadt

417.00

417.00

371.33

05 N.Mann

1375.00

1375.00

793.33

3814.83

3814.83

1915.07

Remarks

06 07

_____________ Prepared By

Total

________________________ Production-Co-Ordinator

________________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Shipment Details Date : 01.09.2008

All Figure In DZ

Month : August' 2008 SL

Buyer

Style/P.O No

GG

Total Order Qty

Shipped Qty

Short/Over Shipped Qty

Ship Date

01

Sears

3517

5G

63

64

1

6-Aug

02

Sears

3517-B

5G

65

65

0

6-Aug

03

G.Gold

9L-432

5G

245

233

-12

7-Aug

04

Sage

0008

5G

394

394

0

9-Aug

05

Sage

0006

5G

890

403

Balance Qty

12-Aug

06

Sears

3540

5G

334

215

Partial

27-Aug

07

Quelle

3835

5G

83

82

-1

28-Aug

08

Sears

1513

5G

375

375

2449

1831

-12

Sub Total (5GG)

30-Aug

09

K-Mart

9L-592/13749

7G

2026

888

Partial

6-Aug

10

K-Mart

9L-592/13749

7G

-

123

Partial

7-Aug

11

G.Gold

9L-708/14279

7G

1400

1370

Partial

26-Aug

12

K-Mart

9L-592/13749

7G

-

42

Partial

21-Aug

13

G.Gold

9L-708/14278

7G

1400

249

Partial

28-Aug

14

G.Gold

9L-708/13807

7G

700

153

Partial

28-Aug

15

Sears

3508

7G

109

105

-4

28-Aug

16

K-Mart

9L-592/13750

7G

586

586

17

Eurofrente

11225

7G

117

50

Partial

Sub Total (7GG)

6338

3566

-4

Grand Total (5+7) GG

8787

5397

-16

______________________ Production-Co-Ordinator

__________________ Finishing-In-Charge

Remarks

20-Aug 14-Aug

________________ Knitting-In-Charge

GLOBAL KNIT-WEAR LTD

______________ Plant-In-Charge

269 DEWAN HAT CHITTAGONG

Shipment Details Date : 01.08.2008

All Figure In DZ

Month : July' 2008 Style/P.O No

GG

Total Order Qty

Shipped Qty

1011CV/ CS-8000

5G

150

150

Li & Fung

RC-45

5G

503

400

Parctial

4-Jul

03

Li & Fung

RC-45

5G

84

-18

6-Jul

04

G.Union

8212/MT-8016

5G

150

150

05

Sage

0008

5G

394

59

Parctial

21-Jul

06

Sears

TSF8-4579

5G

290

297

7

23-Jul

07

Sage

06/NI/NJ/AL

5G

890

247

Parctial

30-Jul

2377

1388

-11

SL

Buyer

01

G.Union

02

Sub Total (5GG)

Short/Over Shipped Qty

Ship Date 3-Jul

G. Union

84004

7G

700

700

09

G. Union

4004/CS-898

7G

700

690

-10

4-Jul

10

Sears

3527

7G

54

54

0

6-Jul

11

Sears

3528

7G

126

42

Blance Qty

6-Jul

12

G. Union

8212

7G

200

200

13

Sears

3527

7G

200

109

14

G.Gold

9L708

7G

3009

209

15

G.Gold

9L 592/ 13749

7G

2026

935

Partial

30-Jul

16

Sears

TSF8-3528

7G

200

203

3

30-Jul

17

Sears

TSF8-3527

7G

90

Blance Qty

31-Jul

18

Sefra

8306

12G

3-Jul Assortment Problem

17-Jul Partial

23-Jul 27-Jul

784

392

Sub Total (7GG)

7999

3623

-7

Grand Total (5+7) GG

10376

5011

-19

__________________ Finishing-In-Charge

Quality & Assort. Problem

17-Jul

08

______________________ Production-Co-Ordinator

Remarks

24-Jul

________________ Knitting-In-Charge

Rcvc From CSL Stitchitn To Export

______________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Shipment Details Date : 01.07.2008

All Figure In DZ

Month : June' 2008 SL

Buyer

Style/P.O No

GG

Total Order Qty

Shipped Qty

Short/Over Shipped Qty

Ship Date

01

Li & Fung

RC-45

5G

665

23

Partial

6-Jan

02

Li & Fung

RC-45

5G

140

Partial

18-Jun

03

G. Union

4000/CS-9659

5G

1000

500

Partial

18-Jun

04

G.Gold

9L446

5G

542

529

-14

18-Jun

05

G. Union

4000/CS-9659

5G

500

Balance Qty

19-Jun

06

Sears

3504

5G

257

255

-2

26-Jun

07

Sears

3517

5G

467

297

Partial

26-Jun

2931

2243

-16

Sub Total (5GG) 08

G.Gold

9L524

7G

283

136

6-Jun

09

Eurofrente

11447

7G

1100

1100

10-Jun

10

G.Gold

4004/CS-898

7G

500

400

22-Jun

11

Sears

3527

7G

166

110

Partial

26-Jun

12

Sears

3528

7G

126

84

Partial

26-Jun

Sub Total (7GG)

2175

1830

0

Grand Total (5+7) GG

5106

4073

-16

______________________ Production-Co-Ordinator

__________________ Finishing-In-Charge

________________ Knitting-In-Charge

Remarks

Quality & Assortment Problem

Quality Problem

Rcvd from CSL For Linking to Poly

Shipped Swt. Complex

______________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Shipment Details Date : 01.06.2008

All Figure In DZ

Month : May' 2008 SL

Buyer

Style/P.O No

GG

Total Order Qty

Shipped Qty

Short/Over Shipped Qty

Ship Date

01

Branex

LM-869

5G

133

133

27-May

02

Branex

LM-870

5G

133

131

27-May

03

Branex

LM-871

5G

133

133

27-May

04

Branex

LM-874

5G

133

134

27-May

533

532

0

4150

2500

Partial

20-May

550

Balance Qty

30-May

2092

2083

-10

31-May

Sub Total (7GG)

6242

5133

-10

Grand Total (5+7) GG

6775

5664

-10

Sub Total (5GG) 05

Eurofrente

11447

7G

06

Eurofrente

11447

7G

07

K-Mart

9L440

7G

______________________ Production-Co-Ordinator

__________________ Finishing-In-Charge

________________ Knitting-In-Charge

Remarks

______________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Shipment Details Date : 03.05.2008

All Figure In DZ

Month : April' 2008 SL

Buyer

Style/P.O No

GG

Total Order Qty

Shipped Qty

Short/Over Shipped Qty

Ship Date

Remarks

7374

5G

269

92

Partial

17-Apr

Ttl Qty 3900 Pcs 3226 Pcs GKL 674 Pcs G.S.G.L-1

500

424

Partial

18-Apr

76

Balance Qty

19-Apr

01

Quelle

02

G.Union

84007/ET-8001

5G

03

G.Union

84007/ET-8001

5G

04

G.Union

1011CV/CS-8000

5G

300

300

05

G.Gold

29L275

5G

300

296

-4

21-Apr

06

Quelle

7374

5G

102

Balance Qty

24-Apr

07

Quelle

3835

5G

355

-2

24-Apr

Emb Problem

08

Quelle

7374

5G

65

-10

30-Apr

Knitting Qty. Can Not done For Yarn Problem

1726

1710

-16

Sub Total (5GG) 09

Quelle

10 11

357

21-Apr

3423

7G

83

83

10-Apr

G.Union

4010/CS-8003/1

7G

1000

1000

13-Apr

G.Union

84016/ET-8037

7G

500

500

18-Apr

Sub Total (7GG)

1583

1583

0

Grand Total (5+7) GG

3309

3293

-16

______________________ Production-Co-Ordinator

__________________ Finishing-In-Charge

________________ Knitting-In-Charge

Quality Problem

______________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Shipment Details Date : 01.04.2008

All Figure In DZ

Month : March' 2008 Style/P.O No

GG

Total Order Qty

Shipped Qty

Short/Over Shipped Qty

Ship Date

G.Union

8400/ET-9659

5G

500

424

Partial

5-Mar

02

G.Union

4000GT/CS-9659

5G

300

300

03

G.Union

8400/ET-9659

5G

0

76

04

G.Union

84006/ET-8000

5G

500

500

10-Mar

05

G.Union

4016/CS-8037

5G

1000

1000

25-Mar

06

N.Mann

500/477

5G

133

135

07

Atlantic

14256

5G

182

183

29-Mar

08

G.Union

3805/CK-8013

5G

300

300

31-Mar

2915

2918

2

SL

Buyer

01

Sub Total (5GG)

10-Mar Balance Qty

2

10-Mar

27-Mar

09

G.Union

84005/ET-6840

7G

500

424

Partial

5-Mar

10

G.Union

4004/CS-898

7G

700

400

Partial

10-Mar

11

G.Union

84004/ET-898

7G

300

200

Partial

10-Mar

12

G.Union

4005GT/CS-6840

7G

300

300

13

G.Union

84005/ET-6840

7G

0

76

Balance Qty

10-Mar

14

G.Union

4004/CS-898

7G

0

300

Balance Qty

10-Mar

15

G.Union

84004/ET-898

7G

0

100

Balance Qty

10-Mar

16

G.Union

4036GT/ CS-8034

7G

300

300

24-Mar

17

G.Union

4036 P/ CS-8034

7G

500

500

25-Mar

18

G.Union

4036 Line CS-8034

7G

200

200

25-Mar

19

Branex

LBW-9060

7G

283

284

1

Sub Total (7GG)

3083

3084

1

Grand Total (5+7) GG

5998

6002

3

______________________ Production-Co-Ordinator

__________________ Finishing-In-Charge

Remarks

10-Mar

31-Mar

________________ Knitting-In-Charge

______________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Shipment Details Date : 01.03.2008

All Figure In DZ

Month : February' 2008 Style/P.O No

GG

Total Order Qty

Shipped Qty

Short/Over Shipped Qty

Ship Date

Atlantic

15684

5G

617

167

Partial

20-Feb

02

G.Union

4006/CS-8000

5G

500

432

Partial

23-Feb

03

Atlantic

15684

5G

450

451

1

24-Feb

04

G.Union

4000/CS9659

5G

700

700

0

25-Feb

05

G.Union

4006/CS-8000

5G

500

68

Balance Qty

26-Feb

06

G.Union

4006/CS-8000

5G

58

35

0

Recvd from Orchid Swt.Knitting & Linking Proces

07

Atlantic

19056

5G

25

13

0

Rcvd From GSGL-1 Knitting

2850

1866

1

SL

Buyer

01

Sub Total (5GG) 08

Branex

LM-861

7G

267

266

0

7-Feb

09

Branex

LM-863

7G

83

82

-1

7-Feb

10

G.Gold

9L-119/2770

7G

750

750

0

9-Feb

11

G.Gold

9L-120/2772

7G

600

600

0

11-Feb

12

Branex

LM-862

7G

167

166

0

14-Feb

13

G.Union

4005/CS-6840

7G

400

400

0

25-Feb

14

Zara

5747/001

12G

48

48

0

15-Feb

Sub Total (7GG)

2315

2313

-1

Grand Total (5+7) GG

5165

4178

0

______________________ Production-Co-Ordinator

__________________ Finishing-In-Charge

________________ Knitting-In-Charge

Remarks

Assortment Problem

______________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Shipment Details Date : 01.02.2008

All Figure In DZ

Month : January' 2008 SL

Buyer

01

N.Mann

Style/P.O No

GG

Total Order Qty

Shipped Qty

Short/Over Shipped Qty

Ship Date

8912

5G

133

134

1

24-Jan

133

134

1

Sub Total (5GG) 07

Quelle

8832

5G

500

515

15

10-Jan

08

Quelle

8824

7G

258

259

1

10-Jan

09

Quelle

8703

7G

333

336

3

24-Jan

10

Zara

5747/521

12G

18

18

0

3-Jan

11

Zara

5747/522

12G

83

83

0

18-Jan

12

Safara

816/8007

12G

182

182

0

28-Jan

Sub Total (7GG)

1375

1393

18

Grand Total (5+7) GG

1508

1527

19

______________________ Production-Co-Ordinator

__________________ Finishing-In-Charge

________________ Knitting-In-Charge

Remarks

______________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Shipment Details Date : 02.12.2007

All Figure In DZ

Month : November' 2007 SL

Buyer

Style/P.O No

GG

Total Order Qty

Shipped Qty

Short/Over Shipped Qty

Ship Date

01

Quelle

3835

5G

275

276

1

22-Nov

01

Eurofrente

10764

5G

143

143

0

29-Nov

02

Eurofrente

10877

5G

208

208

0

29-Nov

626

627

1

Sub Total (5GG) 03

Les. Line

5870

7G

441

441

0

3-Nov

04

Les. Line

5872

7G

483

483

0

13-Nov

05

Les. Line

5868

7G

119

119

0

13-Nov

06

Quelle

8820

7G

542

542

0

22-Nov

07

G.Gold

012630

7G

500

498

-2

29-Nov

08

Cellio

V-Stripe

12G

83

33

Partial

6-Nov

Sub Total (7GG)

2168

2116

-2

Grand Total (5+7) GG

2794

2743

-1

______________________ Production-Co-Ordinator

__________________ Finishing-In-Charge

________________ Knitting-In-Charge

Remarks

______________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Shipment Details Date : 03.10.2007

All Figure In DZ

Month : October' 2007 SL

Buyer

Style/P.O No

GG

Total Order Qty

Shipped Qty

Short Shipped Qty

Ship Date

01

Sfera

0766/8021

5G

161

140

0

20-Oct

01

Sfera

0766/8021

5G

161

21

0

23-Oct

02

N.Mann

017/531

5G

200

200

0

4-Oct

361

221

0

Sub Total (5GG) 03

Quelle

8824

7G

350

357

7

10-Oct

04

Quelle

8703

7G

138

137

-1

10-Oct

05

Quelle

3512

7G

250

251

1

25-Oct

06

Quelle

8703

7G

267

271

4

31-Oct

07

Quelle

3204

7G

142

142

0

31-Oct

08

Les. Line

18902

7G

407

407

0

11-Oct

09

G.Union

7603

7G

334

334

0

31-Oct

Sub Total (7GG)

1888

1899

11

Grand Total (5+7) GG

2249

2120

11

______________________ Production-Co-Ordinator

__________________ Finishing-In-Charge

________________ Knitting-In-Charge

Remarks

______________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Shipment Details Date : 02.10.2007

All Figure In DZ

Month : September' 2007 SL

Buyer

01

G. Gold

02

Quelle

Style/P.O No

GG

Total Order Qty

Shipped Qty

Short Shipped Qty

Ship Date

19H987

5G

258

176

Partial

2-Aug

3835

5G

150

146

-4

26-Sep

408

322

-4

Sub Total (5GG) 03

Quelle

8821

7G

1200

68

Prtial

6-Sep

04

Seras

3549

7G

250

125

Partial

7-Sep

05

Zara

5747/296

7G

206

46

Nill

1-Sep

06

Zara

5747/296

7G

160

27

Partial

7-Sep

07

Zara

5747/296

7G

160

133

08

Quelle

8821

7G

373

381

0

13-Sep

09

Quelle

8703

7G

192

196

0

13-Sep

10

Quelle

3885

7G

67

67

11

Quelle

8824

7G

583

567

-16

14-Sep

12

Quelle

8711

7G

342

329

-13

26-Sep

13

Quelle

8711

7G

133

134

0

26-Sep

14

Quelle

3885

7G

133

131

-2

26-Sep

3799

2204

-31

Sub Total (7GG)

Remarks

1752

12-Sep

13-Sep

15

Zara

5747/260

7G

954

236

Partial

20-Sep

Rcvd. From Dhaka

16

Zara

5747/260

7G

954

233

Partial

23-Sep

Rcvd. From Dhaka

17

Zara

5747/260

7G

954

321

Partial

23-Sep

Rcvd. From Dhaka

Sub Total (12GG)

2862

790

0

Grand Total (5+7+12) GG

7069

3316

-35

______________________ Production-Co-Ordinator

__________________ Finishing-In-Charge

________________ Knitting-In-Charge

______________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Shipment Details Date : 01.09.2007

All Figure In DZ

Month : August' 2007

SL

Buyer

Style/P.O No

GG

Total Order Qty

Shipped Qty

Short Shipped Qty

Ship Date

01

G.Gold

19H542

5G

459

461

02

G.Gold

19H542/12228

5G

696

657

Partial

19-Aug

03

G.Gold

19H542/12228

5G

696

39

Partial

27-Aug

1851

1157

0

Sub Total (5GG) 12

Les.Line

14

12-Aug

47902W

7G

639

626

-13

13-Aug

Sears

3547

7G

333

335

0

16-Aug

15

Zara

5747/246 36362

7G

375

375

0

18-Aug

16

Zara

5747/246 36361

7G

458

458

0

18-Aug

Sub Total (7GG)

1805

1794

-13

Grand Total (5+7) GG

3656

2951

-13

Remarks

______________________ Production-Co-Ordinator

__________________ Finishing-In-Charge

________________ Knitting-In-Charge

______________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Shipment Details Date : 05.08.2007

All Figure In DZ

Month : July' 2007 SL

Buyer

Style/P.O No

GG

Total Order Qty

Shipped Qty

Short Shipped Qty

Ship Date

1537

5G

292

292

0

4-Jul

01

Sears

02

N.Mann

138/751

5G

42

42

0

6-Jul

03

N.Mann

327/052

5G

42

43

0

6-Jul

04

Tiara

4H215/28875

5G

162

162

0

8-Jul

05

Tiara

4H215/28803

5G

338

338

0

8-Jul

06

Quelle

3835

5G

200

192

8

13-Jul

07

Sears

1504

5G

167

165

2

18-Jul

08

Sears

1513

5G

233

231

2

18-Jul

09

K-Mart

9H049/12186

5G

1564

780

Partial

22-Jul

10

K-Mart

9H049/12186

5G

1564

784

Partial

29-Jul

11

Sears

1500

5G

50

50

0

29-Jul

12

Sears

1537

5G

83

84

0

29-Jul

4736

3162

12

Sub Total (5GG) 12

Quelle

8820

7G

879

872

7

6-Jul

14

Sears

1535

7G

167

167

0

8-Jul

15

Sears

3543

7G

309

309

0

11-Jul

16

Sears

3544

7G

317

318

0

12-Jul

17

Quelle

8820

7G

510

496

14

12-Jul

18

Quelle

8820

7G

283

293

0

27-Jul

19

Quelle

3885

7G

333

330

3

27-Jul

20

Quelle

8703

7G

225

231

0

27-Jul

Remarks

Sub Total (7GG)

3024

3016

24

108

108

0

Sub Total (12GG)

108

108

0

Grand Total (5+7+12) GG

7868

6286

36

21

Eurofrente

10610

______________________ Production-Co-Ordinator

12G

__________________ Finishing-In-Charge

31-Jul

________________ Knitting-In-Charge

______________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Shipment Details Date : 01.07.2007

All Figure In DZ

Month : June'2007 Style/P.O No

GG

Total Order Qty

Shipped Qty

Short Shipped Qty

Ship Date

8480

5G

1000

1000

0

12-Jun

Tiara

4H215/28813

5G

408

408

0

23-Jun

Tiara

4H215/28802

5G

100

100

0

23-Jun

1508

1508

0

SL

Buyer

01

G.Union

02 03

Sub Total (5GG) 04

G.Union

1603

7G

300

300

0

2-Jun

05

Sears

3542

7G

123

124

0

12-Jun

06

Sears

3544

7G

214

215

0

12-Jun

07

Quelle

2479

7G

142

145

0

14-Jun

08

Quelle

3204

7G

667

661

7

14-Jun

09

Quelle

8820

7G

2500

1621

Partial

28-Jun

10

Quelle

3885

7G

133

134

0

28-Jun

Sub Total (7GG)

4079

3200

7

Grand Total

5587

4708

7

Remarks

Shipment Target Status SL 01 02

Buyer

Style/P.O No

GG

Total Order Qty

Shipment Target Actual Revised

Remarks

03 04 05 Total

______________________ Production-Co-Ordinator

__________________ Finishing-In-Charge

________________ Knitting-In-Charge

______________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Shipment Details Date : 01.06.2007

All Figure In DZ

Month : May'2007 Style/P.O No

GG

Total Order Qty

Shipped Qty

Short Shipped Qty

Ship Date

N.Mann

138/751

5G

42

42

0

9-May

02

N.Mann

327/052

5G

42

42

0

9-May

03

Sears

VLF7-1500

5G

188

188

0

15-May

04

Quelle

3212

5G

333

329

4

29-May

05

Sears

VLF7-1500

5G

50

50

0

31-May

655

651

4

SL

Buyer

01

Sub Total (5GG) 06

Tiara

4H216/28658

7G

500

500

0

7-May

07

Quelle

2479

7G

141

142

0

9-May

08

Eurofrente

10394

7G

800

800

0

22-May

09

Tiara

4H216/28659

7G

500

498

2

21-May

10

Eurofrente

10394

7G

423

423

0

31-May

Sub Total (7GG)

2364

2363

0

Grand Total

3019

3014

4

Remarks

504

Quality Problem

Quality Problem

Shipment Target Status SL 01 02

Buyer

Style/P.O No

GG

Total Order Qty

Shipment Target Actual Revised

Remarks

03 04 05 Total

______________________ Production-Co-Ordinator

__________________ Finishing-In-Charge

________________ Knitting-In-Charge

______________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Shipment Details Date : 01.05.2007

All Figure In DZ

Month : April'2007 Style/P.O No

GG

Total Order Qty

Shipped Qty

N.Mann

138/751

5G

83

83

5-Apr

02

N.Mann

327/052

5G

83

83

5-Apr

03

Quelle

3733

5G

333

333

12-Apr

04

Quelle

3835

5G

208

202

6

12-Apr

05

Quelle

3915

5G

133

134

0

18-Apr

03

G.Union

17200

5G

500

500

22-Apr

04

Sears

VLF7-1500

5G

568

569

28-Apr

1908

1904

SL

Buyer

01

Sub Total (5GG)

Short Shipped Qty

Ship Date

Remarks

Embd. Problem

6

06

G.Union

7613

7G

500

500

9-Apr

07

G.Union

1603

7G

300

300

9-Apr

07

G.Union

1604

7G

300

300

22-Apr

08

Quelle

3885

7G

333

331

09

Quelle

8711

7G

367

369

Sub Total (7GG)

1800

1800

2

Grand Total

3708

3704

8

2

12-Apr

Print Problem

27-Apr

Shipment Target Status SL

Buyer

Style/P.O No

GG

Total

Shipment Target

Remarks

SL

Buyer

Style/P.O No

GG

Order Qty

Actual

Remarks

Revised

01 02 03 04 05 Total

______________________ Production-Co-Ordinator

__________________ Finishing-In-Charge

________________ Knitting-In-Charge

______________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Shipment Details Date : 01.04.2007

All Figure In DZ

Month : March'2007 Style/P.O No

GG

Total Order Qty

Shipped Qty

Short Shipped Qty

Ship Date

G.Union

7609

5G

1000

1000

0

1-Mar

02

G.Union

7615

5G

700

168

Partial

11-Mar

03

G.Union

7600

5G

1000

168

Partial

11-Mar

04

G.Union

7600

5G

832

832

Partial

16-Mar

05

G.Union

17201

5G

500

500

0

31-Mar

4032

2668

0

SL

Buyer

01

Sub Total (5GG) 06

G.Union

7606

7G

700

168

Partial

11-Mar

07

G.Union

7603

7G

700

168

Partial

13-Mar

08

G.Union

7606

7G

532

532

0

16-Mar

09

G.Union

7603

7G

532

532

0

29-Mar

10

G.Union

1613

7G

300

300

0

29-Mar

Sub Total (7GG)

2764

1700

0

Grand Total

6796

4368

0

Remarks

Shipment Target Status SL 01

Buyer

Style/P.O No

GG

Total Order Qty

Shipment Target Actual Revised

Remarks

02 03 04 05 06 07 08 Total

____________ Prepared By

________________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Shipment Details Date : 01.04.2007

All Figure In DZ

Month : March' 2007 SL

Buyer

Style/P.O No

GG

Total Order Qty

Shipped Qty

01

N.Mann

550/477

5G

100

103

02

G.Union

7615

5G

700

532

Partial

800

635

0

Sub Total (5GG)

Short Shipped Qty

Ship Date

Remarks

1-Feb 28-Feb

03

Quelle

8706

7G

833

818

-15

1-Feb

Due To Printing Problem

04

Quelle

8711

7G

525

502

-23

22-Feb

Due To Yarn Dying Problem

05

Quelle

8706

7G

150

151

0

22-Feb

06

G.Union

7604

7G

700

700

0

21-Feb

07

G.Union

7605

7G

1000

1000

0

21-Feb

Sub Total (7GG)

3208

3171

-38

Grand Total

4008

3806

-38

Shipment Target Status SL 01 02 03 04

Buyer

Style/P.O No

GG

Total Order Qty

Shipment Target Actual Revised

Remarks

05 06 07 08 Total

____________ Prepared By

________________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Shipment Details Date : 01.03.2007

All Figure In DZ

Month : February' 2007 SL

Buyer

Style/P.O No

GG

Total Order Qty

Shipped Qty

01

N.Mann

550/477

5G

100

103

02

G.Union

7615

5G

700

532

Partial

800

635

0

Sub Total (5GG)

Short Shipped Qty

Ship Date

Remarks

1-Feb 28-Feb

03

Quelle

8706

7G

833

818

-15

1-Feb

Due To Printing Problem

04

Quelle

8711

7G

525

502

-23

22-Feb

Due To Yarn Dying Problem

05

Quelle

8706

7G

150

151

0

22-Feb

06

G.Union

7604

7G

700

700

0

21-Feb

07

G.Union

7605

7G

1000

1000

0

21-Feb

Sub Total (7GG)

3208

3171

-38

Grand Total

4008

3806

-38

Shipment Target Status SL 01 02 03 04

Buyer

Style/P.O No

GG

Total Order Qty

Shipment Target Actual Revised

Remarks

05 06 07 08 Total

____________ Prepared By

________________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Shipment Details Date : 01.02.2007

All Figure In DZ

Month : January' 2007 SL

Buyer

Style/P.O No

GG

Total Order Qty

Shipped Qty

Short Shipped Qty

Ship Date

01

Quelle

3212

5G

333

328

-5

11-Jan

02

Quelle

7692

5G

333

322

-11

18-Jan

03

Quelle

3812

5G

100

100

0

25-Jan

766

750

-16

Sub Total (5GG) 05

Quelle

3252

7G

267

265

-2

11-Jan

06

Quelle

7452

7G

133

134

0

25-Jan

Sub Total (7GG)

400

399

-2

Grand Total

1166

1149

-18

07

7G

08

7G

09

7G

Remarks

Shipment Target Status SL 01 02 03 04

Buyer

Style/P.O No

GG

Total Order Qty

Shipment Target Actual Revised

Remarks

05 06 07 08 Total

____________ Prepared By

________________________ Production-Co-Ordinator

________________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Shipment Details Date : 06.01.2007

All Figure In DZ

Month : December' 2006 SL

Buyer

Style/P.O No

GG

Total Order Qty

Shipped Qty

Short Shipped Qty

Ship Date

01

N.Mann

550/477

5G

100

101

0

20-Dec

100

101

0

02

5G

03

5G

04

5G

05

5G Sub Total (5GG)

Remarks

05

Quelle

8703

7G

212

202

11

6-Dec

Quality Problem

06

Quelle

8711

7G

833

781

52

28-Dec

Due To Over Weight

Sub Total (7GG)

1045

983

63

Grand Total

1145

1084

63

07

7G

08

7G

09

7G

10

7G

11

7G

12

7G

Shipment Target Status SL

Buyer

Style/P.O No

GG

Total

Shipment Target

Remarks

SL

Buyer

Style/P.O No

GG

Order Qty

Actual

Remarks

Revised

01 02 03 Total

____________ Prepared By

________________________ Production-Co-Ordinator

________________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Shipment Details Date : 02.12.2006

All Figure In DZ

Month : November' 2006 SL

Buyer

Style/P.O No

GG

Total Order Qty

Shipped Qty

Short Shipped Qty

Ship Date

01

N.Mann

550/477

5G

83

83

0

9-Nov

02

Eurofrente

09769

5G

487

487

0

16-Nov

03

Eurofrente

09770

5G

150

150

0

16-Nov

04

Eurofrente

09750

5G

521

513

8

18-Nov

05

Quelle

3795

5G

125

75

Partial

30-Nov

1366

1308

8

Sub Total (5GG) 05

Quelle

7392

7G

210

190

20

2-Nov

06

Quelle

7452

7G

175

165

Partial

9-Nov

07

Quelle

3955

7G

183

83

100

9-Nov

08

Quelle

3792

7G

58

59

0

9-Nov

09

Quelle

7452

7G

275

246

29

23-Nov

10

Quelle

7392

7G

58

62

0

23-Nov

11

Quelle

8703

7G

2083

1871

Partial

30-Nov

12

Leasure Line

17908

7G

63

23

Partial

5-Nov

3105

2699

149

102

7

Partial

Sub Total (7GG)

102

7

Grand Total

4573

4014

Sub Total (12GG) 15

Zara

5747/260

12G

157

9-Nov

Remarks

100 DZ Stock Lot

Rcvd. From Savar Swtr.

Shipment Target Status SL

Buyer

Style/P.O No

GG

Total Order Qty

Shipment Target Actual Revised

Remarks

01 02 03 Total

____________ Prepared By

________________________ Production-Co-Ordinator

________________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Shipment Details Date : 01.11.2006

All Figure In DZ

Month : October' 2006 SL

Buyer

Style/P.O No

GG

Total Order Qty

Shipped Qty

Short Shipped Qty

01

G.Gold

1D159

3G

42

13

Partial

21-Oct Rcvd From SAVAR Swtr.

42

13

Sub Total (1.5GG)

Ship Date

02

G.Gold

1D158/10251

5G

546

216

Partial

2-Oct

03

G.Gold

1D158/10251

5G

268

200

Partial

10-Oct

04

G.Gold

1D158/10251

5G

130

36

Partial

11-Oct

05

G.Gold

1D158/10249

5G

100

98

2

11-Oct

1044

550

2

Sub Total (5GG)

Remarks

Assortment Problem

06

Sears

VSL7-1500

7G

200

200

0

1-Oct

07

Sears

TSF6-3534

7G

124

123

1

12-Oct

08

Quelle

3732

7G

367

132

Partial

5-Oct

09

Quelle

3905

7G

200

73

Partial

5-Oct

10

Quelle

3732

7G

234

100

Partial

6-Oct

11

Quelle

3905

7G

127

29

Partial

6-Oct

12

Quelle

7294

7G

208

74

Partial

6-Oct

13

Quelle

8609

7G

433

124

Partial

12-Oct

14

Quelle

3732

7G

134

122

13

12-Oct

Printing Problem

15

Quelle

3905

7G

98

87

11

12-Oct

Quality Problem

16

Quelle

3792

7G

408

129

Partial

12-Oct

17

Quelle

7294

7G

134

119

15

13-Oct Quality & Printing Problem

18

Quelle

8609

7G

309

303

6

19-Oct

Yarn Shading Problem

19

Quelle

3792

7G

344

345

19-Oct

20

Quelle

7392

7G

250

40

Partial

21-Oct

21

Leasure Line

17908

7G

185

34

Partial

20-Oct Rcvd From SAVAR Swtr.

22

Leasure Line

17908

7G

185

17

Partial

21-Oct Rcvd From SAVAR Swtr.

Sub Total (7GG)

3940

2051

46

Grand Total

5026

2614

48

Shipment Target Status SL

Buyer

Style/P.O No

GG

Total Order Qty

Shipment Target Actual Revised

Remarks

01 02 Total

____________ Prepared By

________________________ Production-Co-Ordinator

________________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Shipment Details Date : 03.10.2006

All Figure In DZ

Month : September' 2006 SL

Buyer

Style/P.O No

GG

Total Order Qty

Shipped Qty

Short Shipped Qty

Ship Date

Remarks

01

Zara

5747/703

1.5G

409

134

0

19-Sep

Savar Sweater

02

Zara

5747/703

1.5G

132

46

Partial

25-Sep

Savar Sweater

541

180

Sub Total (1.5GG) 03

G.Gold

21D050CT/10074

5G

330

330

0

5-Sep

04

G.Gold

21D050CT/10075

5G

220

220

0

5-Sep

05

Rajan

MK-413609

5G

400

400

0

6-Sep

06

Rajan

MK-413612

5G

400

400

0

6-Sep

07

Rajan

MK-413608

5G

300

300

0

6-Sep

08

Sears

TSF6-3540

5G

200

201

0

11-Sep

09

Sears

TSF6-3542

5G

217

216

1

13-Sep

10

Bay-City

303696/30

5G

161

56

Partial

18-Sep

11

G.Gold

1D158/010251

5G

1380

834

Partial

30-Sep

3608

2957

1

Sub Total (5GG) 12

Quelle

3575

7G

150

147

3

8-Sep

13

Quelle

8602

7G

233

46

Partial

8-Sep

14

Rajan

LK-41CROP

7G

300

104

Partial

11-Sep

15

Quelle

8602

7G

187

181

6

15-Sep

Savar Sweater

Savar Sweater

16

Quelle

8609

7G

408

274

Partial

15-Sep

17

Quelle

8609

7G

135

130

5

21-Sep

16

Quelle

8602

7G

208

213

0

28-Sep

17

Sears

3534

7G

157

158

0

28-Sep

Sub Total (7GG)

1778

1253

14

Grand Total

5927

4390

15

Shipment Target Status SL

Buyer

Style/P.O No

GG

Total Order Qty

Shipment Target Actual Revised

Remarks

01 02 Total

____________ Prepared By

________________________ Production-Co-Ordinator

________________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Shipment Details Date : 01.08.2006

All Figure In DZ

Month : July' 2006 SL

Buyer

Style/P.O No

GG

Total Order Qty

Shipped Qty

01

Tiara

4D-769

3G

400

160

400

160

Sub Total (3GG)

Short Shipped Qty

Ship Date

Remarks

3-Jul

OSL

02

Quelle

8614

5G

1008

540

Partial

7-Jul

03

Quelle

8614

5G

1680

469

Partial

13-Jul

04

Quelle

3795

5G

125

89

Partial

13-Jul

05

Quelle

3795

5G

36

37

0

20-Jul

06

Quelle

3595

5G

167

157

10

20-Jul

07

Quelle

8614

5G

1213

612

Partial

21-Jul

08

Quelle

8614

5G

600

589

11

28-Jul

09

Sears

60252-C

5G

432

415

17

16-Jul

5261

2908

38

Sub Total (5GG) 10

M.Hidary

FGB06821

7G

42

17

0

3-Jul

11

Sears

3534

7G

667

667

0

10-Jul

12

Sears

3536

7G

417

228

Partial

16-Jul

13

Sears

1502

7G

237

234

3

26-Jul

14

Sears

1504

7G

399

172

Partial

27-Jul

15

Quelle

8602

7G

152

124

Partial

13-Jul

OSL

16

Quelle

8602

7G

293

142

Partial

7-Jul

17

Quelle

3094

7G

500

112

Partial

21-Jul

18

Quelle

3094

7G

388

271

Partial

28-Jul

19

Quelle

3142

7G

67

66

1

20-Jul

20

Wehmeyer

WR-08

7G

200

135

Partial

13-Jul

21

Wehmeyer

WR-08

7G

65

63

2

20-Jul

22

N.Mann

017/477

7G

146

83

Partial

28-Jul

Sub Total (7GG)

3573

2314

6

Grand Total

9234

5382

44

Shipment Target Status SL

Buyer

Style/P.O No

GG

Total Order Qty

Shipment Target Actual Revised

Remarks

01 02 03 Total

____________ Prepared By

________________________ Production-Co-Ordinator

________________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Shipment Details Date : 01.07.2006

All Figure In DZ

Month : June' 2006 SL

Buyer

Style/P.O No

GG

Total Order Qty

Shipped Qty

Short Shipped Qty

Ship Date

01

Quelle

8614

5G

1675

1253

Partial

1-Jun

02

Eurofrente

09181

5G

186

186

0

9-Jun

03

Eurofrente

09182

5G

113

107

6

9-Jun

04

Quelle

8614

5G

422

418

4

9-Jun

05

Quelle

3023

5G

150

142

8

15-Jun

06

Quelle

3033

5G

150

140

10

15-Jun

07

Quelle

7214

5G

150

141

9

15-Jun

08

Sears

60252-C

5G

432

416

16

18-Jun

09

Quelle

8614

5G

2021

337

Partial

22-Jun

10

Quelle

3795

5G

175

165

10

22-Jun

11

Quelle

8614

5G

2021

676

Partial

29-Jun

7495

3981

63

Sub Total (5GG) 01

Quelle

2667

7G

267

40

Partial

1-Jun

02

Sears

3533

7G

500

492

8

8-Jun

Remarks

03

N.Mann

017/531

7G

271

263

7

9-Jun

04

N.Mann

017/477

7G

146

140

6

9-Jun

05

Sears

1500

7G

35

35

0

12-Jun

06

Sears

3531

7G

625

619

6

15-Jun

07

Sears

3534

7G

237

232

5

18-Jun

08

Sears

3532

7G

334

332

1

22-Jun

09

Quelle

3732

7G

167

155

12

22-Jun

10

Eurofrente

09447

7G

460

460

0

26-Jun

11

Quelle

8602

7G

658

365

Partial

29-Jun

Sub Total (7GG)

3700

3133

45

Grand Total

11195

7114

108

3252

Shipment Target Status SL

Buyer

Style/P.O No

GG

Total Order Qty

Shipment Target Actual Revised

Remarks

01 02 03 Total

____________ Prepared By

________________________ Production-Co-Ordinator

________________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Shipment Details Date : 02.06.2006

All Figure In DZ

Month : May' 2006 SL

Buyer

Style/P.O No

GG

Total Order Qty

Shipped Qty

Short Shipped Qty

Ship Date

01

Scope

13463

5G

40

40

0

2-May

02

N.Mann

550/477

5G

67

67

0

4-May

03

G.Union

S-372

5G

100

98

2

7-May

04

G.Union

S-373

5G

100

100

0

7-May

05

Rajan

MK-413315

5G

300

294

6

8-May

06

Sears

1500

5G

666

670

0

17-May

07

N.Mann

550/477

5G

75

76

0

25-May

1348

1345

8

Sub Total (5GG) 01

Quelle

2627

7G

200

200

0

10-May

02

Quelle

2611

7G

200

202

0

10-May

03

Quelle

3295

7G

183

179

4

11-May

04

Quelle

2620

7G

233

231

2

11-May

Remarks

05

Quelle

3792

7G

166

166

0

17-May

06

Quelle

2619

7G

233

229

4

17-May

07

Quelle

8602

7G

325

324

1

17-May

08

Quelle

2615

7G

292

289

3

19-May

09

Quelle

2667

7G

267

230

Partial

25-May

10

Quelle

2479

7G

200

202

0

25-May

11

Quelle

2670

7G

333

337

0

25-May

12

Eurofrente

09447

7G

900

500

Partial

27-May

13

G.Union

CS-3029

7G

350

350

0

31-May

14

G.Union

ET-6030

7G

104

104

Partial

31-May

Sub Total (7GG)

3986

3543

14

Grand Total

5334

4888

22

Shipment Target Status SL

Buyer

Style/P.O No

GG

Total Order Qty

Shipment Target Actual Revised

Remarks

01 02 03 04 05 Total

____________ Prepared By

________________________ Production-Co-Ordinator

________________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Shipment Details Date : 02.05.2006

All Figure In DZ

Month : April' 2006 SL

Buyer

Style/P.O No

GG

Total Order Qty

Shipped Qty

Short Shipped Qty

Ship Date

01

Quelle

7214

5G

150

147

3

27-Apr

02

Quelle

3033

5G

150

150

0

27-Apr

03

Quelle

3023

5G

150

151

0

27-Apr

04

Scope

13463

5G

200

201

0

30-Apr

05

Scope

13465

5G

200

200

0

30-Apr

850

849

3

Sub Total (5GG) 01

G.Union

8497

7G

188

188

0

3-Apr

02

G.Union

L-444

7G

300

299

1

10-Apr

Remarks

03

Quelle

3732

7G

133

134

0

19-Apr

04

Quelle

3792

7G

167

167

0

27-Apr

05

Quelle

3792(B)

7G

342

339

3

27-Apr

Sub Total (7GG)

1130

1127

4

Grand Total

1980

1976

7

Shipment Target Status SL

Buyer

Style/P.O No

GG

Total Order Qty

Shipment Target Actual Revised

Remarks

01 02 03 04 05 Total

____________ Prepared By

________________________ Production-Co-Ordinator

________________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Shipment Details Date : 02.04.2006

All Figure In DZ

Month : March' 2006 SL

Buyer

Style/P.O No

GG

Total Order Qty

Shipped Qty

Short Shipped Qty

Ship Date

01

Zara

5747/541

7G

201

201

0

7-Mar

02

Zara

5747/541

7G

100

100

0

9-Mar

03

Zara

5747/541

7G

241

241

0

16-Mar

542

542

0

Sub Total (5GG)

Remarks

01

N.Mann

429/546

7G

308

311

0

2-Mar

02

Eurofrente

08997

7G

50

50

0

2-Mar

03

Quelle

3732

7G

192

192

0

16-Mar

04

Quelle

8602

7G

700

701

0

29-Mar

Sub Total (7GG)

1250

1254

0

Grand Total

1792

1796

0

Shipment Target Status SL

Buyer

Style/P.O No

GG

Total Order Qty

Shipment Target Actual Revised

Remarks

01 02 03 04 05 Total

____________ Prepared By

________________________ Production-Co-Ordinator

________________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Shipment Details Date : 01.03.2006

All Figure In DZ

Month : February' 2006 SL

Buyer

Style/P.O No

GG

01

5G

02

5G

Total Order Qty

Shipped Qty

Short Shipped Qty

Ship Date

Remarks

Sub Total (5GG)

0

0

0

01

Quelle

8609

7G

900

852

48

3-Feb Yarn & Shading Problem

02

Quelle

7382

7G

100

93

7

8-Feb

03

Quelle

3732

7G

67

67

0

8-Feb

04

Quelle

8609

7G

708

709

1

17-Feb

05

Eurofrente

08997

7G

90

40

Partial

25-Feb

Sub Total (7GG)

1865

1761

56

Grand Total

1865

1761

56

Printing Problem

Shipment Target Status SL

Buyer

Style/P.O No

GG

Total Order Qty

Shipment Target Actual Revised

Remarks

01 02 03 04 05 Total

____________ Prepared By

________________________ Production-Co-Ordinator

________________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Shipment Details Date : 01.02.2006

All Figure In DZ

Month : January' 2006 SL

Buyer

Style/P.O No

GG

Total Order Qty

Shipped Qty

Short Shipped Qty

Ship Date

01

Zara

5747/504

5G

321

316

5

9-Jan

02

5G

Remarks

Sub Total (5GG)

321

316

5

05

Quelle

8603(B)

7G

650

636

14

5-Jan

Shading Problem

06

Quelle

7382

7G

100

99

1

5-Jan

Assortment Problem

07

Quelle

3732

7G

67

67

0

5-Jan

08

Quelle

8609

7G

600

600

0

25-Jan

Sub Total (7GG)

1417

1402

15

Grand Total

1738

1718

20

Shipment Target Status SL

Buyer

Style/P.O No

GG

Total Order Qty

Shipment Target Actual Revised

Remarks

01 02 03 04 05 Total

____________ Prepared By

________________________ Production-Co-Ordinator

________________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Shipment Details Date : 01.12.2005

All Figure In DZ

Month : December' 2005 SL

Buyer

Style/P.O No

GG

Total Order Qty

Shipped Qty

Short Shipped Qty

Ship Date

01

Zara

574/600

5G

596

596

0

1-Dec

02

Putteman

RH3335TG

5G

100

100

0

12-Dec

Remarks

Sub Total (5GG)

696

696

0

05

Sears

2486

7G

406

406

0

1-Dec

06

N.Mann

317/349

7G

708

700

8

8-Dec

07

Quelle

8602

7G

833

844

0

15-Dec

08

Quelle

8603

7G

1250

1250

0

29-Dec

Sub Total (7GG)

3197

3200

8

Grand Total

3893

3896

8

Shipment Target Status SL

Buyer

Style/P.O No

GG

Total Order Qty

Shipment Target Actual Revised

Remarks

01 02 03 04 05 Total

____________ Prepared By

________________________ Production-Co-Ordinator

________________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Shipment Details Date : 01.12.2005

All Figure In DZ

Month : November ' 2005 SL

Buyer

Style/P.O No

GG

Total Order Qty

Shipped Qty

Short Shipped Qty

Ship Date

01

Eurofrente

9029

5G

16

16

0

7-Nov

02

5G

Remarks

03

5G

04

5G

05

5G

06

5G

Sub Total (5GG)

16

16

0

05

Quelle

8602

7G

1333

1333

0

2-Nov

06

Bay-City

451

7G

1800

830

Partial

15-Nov

07

Bay-City

451

7G

1800

75

Partial

16-Nov

08

Bay-City

451

7G

1800

395

Partial

17-Nov

09

Bay-City

451

7G

1800

265

Partial

18-Nov

10

Quelle

8602

7G

1000

993

7

24-Nov

11

Bay-City

451

7G

35

35

12

Sears

07MCS6-2472

7G

267

267

0

Sub Total (7GG)

9835

4193

7

Grand Total

9851

4209

7

13

26-Nov 27-Nov

7G

Shipment Target Status SL

Buyer

Style/P.O No

GG

Total Order Qty

Shipment Target Actual Revised

Remarks

01 02 03 04 05 Total

____________ Prepared By

________________________ Production-Co-Ordinator

________________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Shipment Details Date : 01.11.2005

All Figure In DZ

Month : October ' 2005 SL

Buyer

Style/P.O No

GG

Total Order Qty

Shipped Qty

Short Shipped Qty

Ship Date

01

Sears

1539

5G

153

155

0

10-Oct

02

Sears

1538

5G

112

113

0

10-Oct

Remarks

03

Sears

1537

5G

99

99

0

10-Oct

04

Sears

1536

5G

137

137

0

10-Oct

05

Eurofrente

09209

5G

140

140

0

23-Oct

06

Eurofrente

08206

5G

360

360

0

23-Oct

1001

1004

0

Sub Total (5GG) 05

Bay-City

452

7G

1625

1625

0

1-Oct

06

Wal Mart

9106

7G

333

33

0

10-Oct

07

Wal Mart

9106

7G

333

100

0

10-Oct

08

Bay-City

449

7G

758

758

0

17-Oct

Sub Total (7GG)

3049

2516

0

Grand Total

4050

3520

0

09

7G

10

7G

11

7G

12

7G

13

7G

Shipment Target Status SL

Buyer

Style/P.O No

GG

Total Order Qty

Shipment Target Actual Revised

Remarks

01 02 03 04 05 Total

____________ Prepared By

________________________ Production-Co-Ordinator

________________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Shipment Details Date : 01.10.2005

All Figure In DZ

Month : September' 2005 SL

Buyer

Style/P.O No

GG

Total Order Qty

Shipped Qty

Short Shipped Qty

Ship Date

Remarks

01

Sears

1516

5G

194

193

1

1-Sep

Process Loss

02

Sears

1514

5G

382

382

0

1-Sep

03

G.Gold

7358

5G

300

300

0

6-Sep

04

Bay-City

452

5G

1625

0

0

29-Sep

2501

875

1

Sub Total (5GG) 05

Quelle

7610(B)

7G

917

860

Partial

1-Sep

06

Quelle

7610

7G

57

57

0

8-Sep

07

Quelle

7610

7G

63

63

0

8-Sep

08

Quelle

7610

7G

250

251

0

8-Sep

09

Rajan

W515043

7G

268

266

2

22-Sep

Process Loss

10

Rajan

W515029

7G

216

212

4

22-Sep

Process Loss

11

Rajan

W515028

7G

133

129

4

22-Sep

Process Loss

12

Rajan

W515078-L

7G

13

12

1

22-Sep

Process Loss

13

Quelle

3575

7G

133

64

Partial

22-Sep

2050

1914

11

42

0

Sub Total (7GG) 17

Zara

5747/800

1.5G

10-Sep

18

Sub Total (1.5G)

0

42

0

Grand Total

4551

2831

12

19 20

Shipment Target Status SL

Buyer

Style/P.O No

GG

Total Order Qty

Shipment Target Actual Revised

Remarks

01 02 03 04 05 Total

____________ Prepared By

________________________ Production-Co-Ordinator

________________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Shipment Details Date : 02.08.2005

All Figure In DZ

Month : August' 2005 SL

Buyer

Style/P.O No

GG

Total Order Qty

Shipped Qty

01

Sears

3515

5G

750

752

02

Rajan

MK-412651

5G

200

190

Short Shipped Qty

Ship Date

Remarks

1-Aug 10

9-Aug

Process Loss

03

Sears

3534

5G

517

518

04

Sears

1516

5G

362

167

Partial

1829

1627

10

Sub Total (5GG) 05

G.Gold

27750

7G

50

18

06

Rajan

MK-412655

7G

200

198

07

Rajan

MK-412960

7G

250

08

Rajan

W-515048

7G

09

Rajan

W-515043

10

Quelle

11

29-Aug 29-Aug

2-Aug

GSGL-1

2

6-Aug

Process Loss

248

2

6-Aug

Process Loss

200

194

6

11-Aug

Process Loss

7G

222

218

4

11-Aug

Process Loss

7824

7G

67

66

1

11-Aug

Process Loss

Zara

5747/830

7G

271

248

23

11-Aug

Assortment Problem

12

Zara

5747/830

7G

271

4

13-Aug

Shiped From Orchid

13

Rajan

MK-516086

7G

226

223

17-Aug

Process Loss

14

Rajan

MK-516076

7G

66

66

17-Aug

15

Sears

TSF5-3530

7G

500

504

21-Aug

16

Quelle

7610

7G

1000

1003

25-Aug

Sub Total (7GG)

3323

2990

41

Grand Total

5152

4617

51

3

17 18

7G

19

7G

20

7G

Shipment Target Status SL

Buyer

Style/P.O No

GG

Total Order Qty

Shipment Target Actual Revised

Remarks

01 02 03 04 05 Total

____________ Prepared By

________________________ Production-Co-Ordinator

________________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Shipment Details Date : 02.08.2005

All Figure In DZ

Month : July' 2005

SL

Buyer

Style/P.O No

GG

Total Order Qty

Shipped Qty

Short Shipped Qty

Ship Date

Remarks

01

Sears

1311

5G

228

226

2

4-Jul

Process Loss

02

Sears

3516

5G

501

495

6

10-Jul

Process Loss

03

Sears

1330

5G

175

179

0

17-Jul

04

Bernardi

237/W

5G

180

180

0

31-Jul

1084

1080

8

Sub Total (5GG) 05

G.Gold

27822

7G

250

140

Partial

5-Jul

06

Sears

1304

7G

322

323

0

7-Jul

07

G.Gold

27822

7G

250

110

Partial

10-Jul

08

Bernardi

05/C-46W

7G

363

83

Partial

15-Jul

09

Bay-City

162979

7G

1000

500

Partial

17-Jul

10

Bay-City

162989

7G

750

413

Partial

17-Jul

11

G.Gold

17653/8039

7G

200

196

4

17-Jul

12

Bay-City

162979

7G

501

200

Partial

18-Jul

13

Bay-City

162989

7G

338

150

Partial

18-Jul

14

Bay-City

162979

7G

250

250

0

20-Jul

15

Bay-City

162989

7G

188

188

0

20-Jul

16

Rajan

MK-412654

7G

200

140

60

20-JulApplique Dyeing Quality Rejec

17

G.Gold

17653/8040

7G

418

330

88

23-Jul

18

G.Gold

17653/8041

7G

300

130

Partial

24-Jul

19

G.Gold

17653/8041

7G

300

150

Partial

26-Jul

20

Bernardi

05/C-46W

7G

280

280

0

31-Jul

Sub Total (7GG)

5910

3583

152

Grand Total

6994

4663

160

Fack Fur Short.

Shipment Target Status SL

Buyer

Style/P.O No

GG

Total Order Qty

Shipment Target Actual Revised

Remarks

01 02 03 04 05 Total

____________ Prepared By

________________________ Production-Co-Ordinator

________________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Shipment Details Date : 02.07.2005

All Figure In DZ

Month : June' 2005 SL

Buyer

Style/P.O No

GG

Total Order Qty

Shipped Qty

Short Shipped Qty

Ship Date

01

Sears

1309

5G

272

273

0

4-Jun

02

Sears

50108

5G

594

585

9

26-Jun

03

Sears

3531

5G

500

486

14

26-Jun

04

Sears

1307

5G

276

274

2

14-Jun

05

G.Gold

7548

5G

100

94

6

28-Jun

1742

1712

31

Sub Total (5GG) 04

Sears

1304

7G

260

260

0

4-Jun

05

Bay-City

366/367

7G

2643

1280

Partial

9-Jun

06

Sears

1310

7G

342

338

2

12-Jun

07

Quelle

2479

7G

217

218

0

15-Jun

08

Quelle

2480

7G

167

167

0

15-Jun

09

Quelle

2481

7G

183

181

2

15-Jun

10

Bay-City

366/367

7G

2560

1264

Partial

15-Jun

11

Quelle

2482

7G

167

158

9

30-Jun

12

Quelle

2485

7G

167

159

8

30-Jun

13

Quelle

2486

7G

167

164

3

30-Jun

Sub Total (7GG)

6873

4189

24

Grand Total

8615

5901

55

Remarks

Shipment Target Status SL

Buyer

Style/P.O No

GG

Total Order Qty

Shipment Target Actual Revised

Remarks

01 02 03 04 05 06 07 Total

____________ Prepared By

________________________ Production-Co-Ordinator

________________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Shipment Details Date : 02.06.2005

All Figure In DZ

Month : May' 2005 SL

Buyer

Style/P.O No

GG

Total Order Qty

Shipped Qty

Short Shipped Qty

Ship Date

01

Rajan

MK-412692

5G

200

200

0.00

15-May

02

G.Gold

007999

5G

500

400

Partial

15-May

03

Eurofrente

08206

5G

119

120

18-May

04

Eurofrente

08207

5G

219

220

18-May

05

Wehemer

WR-01

5G

427

427

25-May

1465

1367

0.00

Remarks

5G

Sub Total (5GG) 08

Rajan

MK-413066

7G

200

200

0

15-May

09

Rajan

Mk-412727

7G

300

260

Partial

15-May

10

Rajan

MK-412727

7G

40

36

4

16-May

11

Rajan

MK-413076

7G

300

298

2

16-May

Sub Total (7GG)

840

794

6

Grand Total

2305

2161

6

Shipment Target Status SL

Buyer

Style/P.O No

GG

Total Order Qty

Shipment Target Actual Revised

Remarks

01 02 03 04 05 06 07 Total

____________ Prepared By

________________________ Production-Co-Ordinator

________________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Shipment Details Date : 02.05.2005

All Figure In DZ

Month : April' 2005 SL

Buyer

Style/P.O No

GG

Total Order Qty

Shipped Qty

Short Shipped Qty

Ship Date

01

Bay-City

370

5G

567

567

0.00

24-Apr

02

Sears

1307

5G

271

269

2

28-Apr P.Loss & Quality Rejection

03

Sears

1308

5G

140

138

2

28-Apr P.Loss & Quality Rejection

978

974

4.00

04

5G

05

5G

06

5G

Remarks

07 Sub Total (5GG) 08

Bay-City

380-44/49

7G

2086.5

1043

Partial

6-Apr

09

Bay-City

380-44/49

7G

1044

446

Partial

11-Apr

10

Bay-City

380-44/49

7G

599

599

Partial

21-Apr

11

Quelle

7824

7G

67

62

5

28-Apr

12

Scope

58417

7G

138

138

28-Apr

13

Scope

58413

7G

138

138

28-Apr

14

Scope

58415

7G

138

138

28-Apr

15

Scope

59403

7G

138

138

28-Apr

Sub Total (7GG)

4348.5

2702

5

Grand Total

5326.5

3676

9

Printing Problem

16 17 18

Shipment Target Status SL

Buyer

01 02 03 04 05 06 07 Total

Style/P.O No

GG

Total Order Qty

Shipment Target Actual Revised

Remarks

____________ Prepared By

________________________ Production-Co-Ordinator

________________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Shipment Details Date : 01.04.2005

All Figure In DZ

Month : March' 2005 SL

Buyer

Style/P.O No

GG

Total Order Qty

Shipped Qty

Short Shipped Qty

Ship Date

01

G.Union

C-603

5G

300

300

12-Mar

02

G.Union

C-603 B

5G

125

125

12-Mar

425

425

Remarks

03 04 05 06 07 Sub Total (5GG)

0

08

N.Mann

115/149

7G

356.25

356.92

10-Mar

09

G.Union

38497

7G

225

225

12-Mar

10

Casabawa

Dec 04-A

7G

220

220

22-Mar

11

Casabawa

Dec 04-B

7G

176.67

176.67

22-Mar

12

Bay-City

380-44/49

7G

2917.5

831

13

N.Mann

115/827

7G

152.92

155.17

30-Mar

14

G.Union

6596

7G

350

350

31-Mar

15

G.Union

38497

7G

350

350

31-Mar

Sub Total (7GG)

4748.34

2665

0

Grand Total

5173.34

3090

0

Partial

30-Mar

16 17 18

Shipment Target Status SL

Buyer

01 02 03 04 05 06 07 Total

Style/P.O No

GG

Total Order Qty

Shipment Target Actual Revised

Remarks

____________ Prepared By

________________________ Production-Co-Ordinator

________________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Shipment Details Date : 02.02.2005

All Figure In DZ

Month :January'2005 SL

Total Order Qty

Shipped Qty

Short Shipped Qty

0

0

0

500

501

0

Sub Total (7GG)

500

501

0

Grand Total

500

501

0

Buyer

Style/P.O No

GG

Ship Date

Remarks

01 02 03 04 05 06 07 Sub Total (5GG) 08

N.Mann

115/827

7G

09

7G

10

7G

11

7G

12

7G

13

7G

14

7G

15

7G

17-Jan

16 17 18

Shipment Target Status SL 01 02 03 04 05 06 07

Buyer

Style/P.O No

GG

Total Order Qty

Shipment Target Actual Revised

Remarks

Total

____________ Prepared By

________________________ Production-Co-Ordinator

________________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Shipment Details Date : 02.01.2005

All Figure In DZ

Month :December'2004 SL

Buyer

Style/P.O No

GG

Total Order Qty

Shipped Qty

Short Shipped Qty

0

0

0

Ship Date

Remarks

01 02 03 04 05 06 07 Sub Total (5GG) 08

Sears

2298

7G

433.33

419.83

13.5

5-Dec

09

N.Mann

115/149

7G

1250

1241.83

8.17

9-Dec

10

Karstadt

K-03

7G

417

342

75

9-Dec

11

Seras

2300

7G

400

400.17

0

28-Dec

12

Zara

5747/001

7G

1566.7

1567

0

30-Dec

Sub Total (7GG)

4067.03

3970.83

96.67

Grand Total

4067.03

3970.83

96.67

13

7G

14

7G

15

7G

16 17 18

Shipment Target Status SL 01 02 03 04 05 06 07

Buyer

Style/P.O No

GG

Total Order Qty

Shipment Target Actual Revised

Remarks

Total

____________ Prepared By

________________________ Production-Co-Ordinator

________________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Shipment Details Date : 01.12.2004

All Figure In DZ

Month :November'2004 SL

Buyer

Style/P.O No

GG

Total Order Qty

Shipped Qty

Short Shipped Qty

Ship Date

01

Eufrenty

08206

7G

250

244

6

11-Nov

02

Eufrenty

08207

7G

167

164.5

2.5

11-Nov

03

Eufrenty

08231

7G

78.5

78.42

0

11-Nov

495.5

486.92

8.5

Remarks

04 05 06 07 Sub Total (5GG) 08

N.Mann

115/509

7G

132.92

133.17

0

4-Nov

09

N.Mann

115/667

7G

125

127.17

0

10-Nov

10

Hong Song

YS-14214

7G

1179

1162

17

12-Nov

11

Quelle

3532

7G

33.33

33.33

0

11-Nov

12

Karstadt

K-03

7G

417

4.5

Partial

27-Nov

13

Casabawa

Nob-10 B

7G

83.33

92

14

Hong Song

WS-14212

7G

332

320

12

15

Hong Song

YS-14213-S

7G

604

599.17

4.83

Sub Total (7GG)

2906.58

2471.34

33.83

Grand Total

3402.08

2958.26

42.33

27-Nov 29-Nov

16 17 18

Shipment Target Status SL

Buyer

01 02 03 04 05 06 07 Total

Style/P.O No

GG

Total Order Qty

Shipment Target Actual Revised

Remarks

____________ Prepared By

________________________ Production-Co-Ordinator

________________ Plant-In-Charge

2395

var Swtr.

900

996

VAR Swtr.

ng Problem

Problem

5688

VAR Swtr.

VAR Swtr.

10008

g Problem

Quality Rejec

y Rejection

y Rejection

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Short Shipment (If Any)

Date : 01.09.2008

All Figure In DZ

Month : August' 2008 SL 01

Buyer G.Gold

Style/P.O No GG 9L-432

5G

245

233

-12

245

233

-12

109

105

-4

Total (7GG)

109

105

-4

Grand Total (5GG&7GG)

354

338

-16

Total (5GG) 02

Total Shipped Short Order Qty Qty Shipped Qty

Sears

3508

7G

Reason For Short Shipped Assortment Problem

Assortment Problem

Statement Of Shortage in Importer Consignment : Description Of Itme

Qty As Per PI

______________________ Production-Co-Ordinator

Qty As Per Invoice

__________________ Finishing-In-Charge

Qty Received

________________ Knitting-In-Charge

Remarks

______________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Short Shipment (If Any)

Date : 01.08.2008

All Figure In DZ

Month : July' 2008 SL

Buyer

01

Li & Fung

Style/P.O No GG RC-45

5G

Total (5GG) 02

G.Union

03

Sears

Total Shipped Short Order Qty Qty Shipped Qty 503

484

-18

503

484.17

-18

4004/CS898

7G

700

690

-10

3527

7G

54

54

0

Total (7GG)

754

744

-10

Grand Total (5GG&7GG)

1257

1228

-28

Reason For Short Shipped Quality & Assort. Problem

Assortment Problem

Statement Of Shortage in Importer Consignment : Description Of Itme

Qty As Per PI

______________________ Production-Co-Ordinator

Qty As Per Invoice

__________________ Finishing-In-Charge

Qty Received

________________ Knitting-In-Charge

Remarks

______________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Short Shipment (If Any)

Date : 01.07.2008

All Figure In DZ

Month : June' 2008 SL

Buyer

01

G.Gold

02

Sears

Style/P.O No GG

Total Shipped Short Order Qty Qty Shipped Qty

Reason For Short Shipped

9L446

5G

542

529

-14

Quality & Assortment Problem

3504

5G

257

255

-2

Quality Problem

Total (5GG)

799

783.42

-16

Total (7GG)

0

0

0

Grand Total (5GG&7GG)

799

783

-16

Statement Of Shortage in Importer Consignment : Description Of Itme

Qty As Per PI

______________________ Production-Co-Ordinator

Qty As Per Invoice

__________________ Finishing-In-Charge

Qty Received

________________ Knitting-In-Charge

Remarks

______________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Short Shipment (If Any)

Date : 01.06.2008

All Figure In DZ

Month : May' 2008 SL

Buyer

Style/P.O No GG

Total Shipped Short Order Qty Qty Shipped Qty

Reason For Short Shipped

01

Total (5GG) 01

0

0

0

2092

2083

-10

Total (7GG)

2092

2083

-10

Grand Total (5GG&7GG)

2092

2083

-10

K-Mart

9L440

7G

Quality Problem

Statement Of Shortage in Importer Consignment : Description Of Itme

Qty As Per PI

______________________ Production-Co-Ordinator

Qty As Per Invoice

__________________ Finishing-In-Charge

Qty Received

________________ Knitting-In-Charge

Remarks

______________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Short Shipment (If Any)

Date : 03.05.2008

All Figure In DZ

Month : April' 2007 SL

Buyer

Style/P.O No GG

Total Shipped Short Order Qty Qty Shipped Qty

Reason For Short Shipped

01

G.Gold

29L275

5G

300

296

-4

Quality Problem

02

Quelle

3835

5G

357

355

-2

Emb Problem

03

Quelle

7374

5G

269

259

-10

Knitting Qty. Can Not done For Yarn Problem

926

910

-16

2092

2083

-10

Total (7GG)

2092

2083

-10

Grand Total (5GG&7GG)

3018

2993

-25

Total (5GG) K-Mart

9L440

7G

Quality Problem

Statement Of Shortage in Importer Consignment : Description Of Itme

Qty As Per PI

______________________ Production-Co-Ordinator

Qty As Per Invoice

__________________ Finishing-In-Charge

Qty Received

________________ Knitting-In-Charge

Remarks

______________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Short Shipment (If Any)

Date : 01.01.2008

All Figure In DZ

Month : December' 2007 SL

Buyer

Style/P.O No GG

01

5G

02

5G Total (5GG)

01

Total Shipped Short Order Qty Qty Shipped Qty Nill 0

0

0

667

648

-19

Total (7GG)

667

648

-19

Grand Total (5GG&7GG)

667

648

-19

Quelle

4000

7G

02

7G

03

7G

Reason For Short Shipped

Short For Twist Problem

Statement Of Shortage in Importer Consignment : Description Of Itme

Qty As Per PI

______________________ Production-Co-Ordinator

Qty As Per Invoice

__________________ Finishing-In-Charge

Qty Received

________________ Knitting-In-Charge

Remarks

______________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Short Shipment (If Any)

Date : 03.11.2007

All Figure In DZ

Month : October' 2007 SL

Buyer

Style/P.O No GG

01

5G

02

5G Total (5GG)

Total Shipped Short Order Qty Qty Shipped Qty

0

0

0

Total (7GG)

0

0

0

Grand Total (5GG&7GG)

0

0

0

01

7G

02

7G

03

7G

Reason For Short Shipped

Statement Of Shortage in Importer Consignment : Description Of Itme

Qty As Per PI

______________________ Production-Co-Ordinator

Qty As Per Invoice

__________________ Finishing-In-Charge

Qty Received

________________ Knitting-In-Charge

Remarks

______________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Short Shipment (If Any)

Date : 02.10.2007

All Figure In DZ

Month : September' 2007 SL 01

Buyer Quelle

Style/P.O No GG 3835

02

5G

Total Shipped Short Order Qty Qty Shipped Qty 150

146

4

150

146

4

Reason For Short Shipped Short For Embd. Problem.

5G Total (5GG)

01

Quelle

8824

7G

583

567

16

Short For Printing Problem.

02

Quelle

8711

7G

342

329

13

Short For Shading Problem

03

Quelle

3885

7G

133

131

2

Short For Printing Problem.

Total (7GG)

1058

1027

31

Grand Total (5GG&7GG)

1208

1173

35

Statement Of Shortage in Importer Consignment : Description Of Itme

Qty As Per PI

______________________ Production-Co-Ordinator

Qty As Per Invoice

__________________ Finishing-In-Charge

Qty Received

________________ Knitting-In-Charge

Remarks

______________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Short Shipment (If Any)

Date : 01.09.2007

All Figure In DZ

Month : August' 2007 SL

Buyer

Style/P.O No GG

01

5G

02

5G

02

5G Total (5GG)

01

Total Shipped Short Order Qty Qty Shipped Qty

0

0

0

639

626

-13

Total (7GG)

639

626

-13

Grand Total (5GG&7GG)

639

626

-13

Les. Line

47902W

7G

02

7G

03

7G

Reason For Short Shipped

For Quality & Assortment Problem

Statement Of Shortage in Importer Consignment : Description Of Itme

Qty As Per PI

______________________ Production-Co-Ordinator

Qty As Per Invoice

__________________ Finishing-In-Charge

Qty Received

________________ Knitting-In-Charge

Remarks

______________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Short Shipment (If Any)

Date : 05.08.2007

All Figure In DZ

Month : July' 2007 SL

Buyer

Style/P.O No GG

Total Shipped Short Order Qty Qty Shipped Qty

Reason For Short Shipped

01

Quelle

3835

5G

200

192

8

Embd. & Quality Problem

02

Sears

1504

5G

167

165

2

Process Loss

02

Sears

1513

5G

233

231

2

Quality Problem

600

588

12

Total (5GG) 01

Quelle

8820

7G

510

496

14

Printing & Yarn Shahding Problem

02

Quelle

3885

7G

333

329

3

Printing Problem

03

Quelle

8820

7G

879

872

7

Printing & Yarn Shahding Problem

Total (7GG)

1722

1697

24

Grand Total (5GG&7GG)

2322

2285

36

Statement Of Shortage in Importer Consignment : Description Of Itme

Qty As Per PI

______________________ Production-Co-Ordinator

Qty As Per Invoice

__________________ Finishing-In-Charge

Qty Received

________________ Knitting-In-Charge

Remarks

______________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Short Shipment (If Any)

Date : 01.07.2007

All Figure In DZ

Month : June,2007 SL

Buyer

Style/P.O No GG

01

5G

02

5G Total (5GG)

01

Total Shipped Short Order Qty Qty Shipped Qty

0

0

0

667

661

6

Total (7GG)

667

661

6

Grand Total (5GG&7GG)

667

661

6

Quelle

3204

02

7G

Reason For Short Shipped

Shading & Quality Problem

7G

Statement Of Shortage in Importer Consignment : Description Of Itme

Qty As Per PI

______________________ Production-Co-Ordinator

Qty As Per Invoice

__________________ Finishing-In-Charge

Qty Received

________________ Knitting-In-Charge

Remarks

______________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Short Shipment (If Any)

Date : 01.06.2007

All Figure In DZ

Month : May,2007 SL 01

Buyer Quelle

Style/P.O No GG 3212

333

329

4

333

329

4

500

498

2

Total (7GG)

500

498

2

Grand Total (5GG&7GG)

833

827

6

02

5G

Reason For Short Shipped Quality Problem

5G Total (5GG)

01

Total Shipped Short Order Qty Qty Shipped Qty

Tiara

2H216/28659

02

7G

Shading & Quality Problem

7G

Statement Of Shortage in Importer Consignment : Description Of Itme

Qty As Per PI

______________________ Production-Co-Ordinator

Qty As Per Invoice

__________________ Finishing-In-Charge

Qty Received

________________ Knitting-In-Charge

Remarks

______________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Short Shipment (If Any)

Date : 01.05.2007

All Figure In DZ

Month : April,2007 SL 01

Buyer Quelle

Style/P.O No GG 3835

208

202

6

208

202

6

333

331

2

Total (7GG)

333

331

2

Grand Total (5GG&7GG)

541

533

8

02

5G

Reason For Short Shipped Embd. Problem

5G Total (5GG)

01

Total Shipped Short Order Qty Qty Shipped Qty

Quelle

3885

02

7G

Printing Problem

7G

Statement Of Shortage in Importer Consignment : Description Of Itme

Qty As Per PI

______________________ Production-Co-Ordinator

Qty As Per Invoice

__________________ Finishing-In-Charge

Qty Received

________________ Knitting-In-Charge

Remarks

______________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Short Shipment (If Any)

Date : 01.04.2007

All Figure In DZ

Month : March,2007 SL

Buyer

Style/P.O No GG

01

Total Shipped Short Order Qty Qty Shipped Qty

Reason For Short Shipped

5G

02

Nill

5G

Total (5GG)

0

0

0

Total (7GG)

0

0

0

Grand Total (5GG&7GG)

0

0

0

01

7G

02

Nill

7G

Statement Of Shortage in Importer Consignment : Description Of Itme

____________ Prepared By

Qty As Per PI

Qty As Per Invoice

Qty Received

Remarks

________________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Short Shipment (If Any)

Date : 01.03.2007

All Figure In DZ

Month : February,2007 SL

Buyer

Style/P.O No GG

01

5G

02

5G Total (5GG)

Total Shipped Short Order Qty Qty Shipped Qty

0

0

0

Reason For Short Shipped

01

Quelle

8706

7G

833

818

-15

Due To Printing Problem

02

Quelle

8711

7G

525

502

-23

Due To Yarn Dying Problem

Total (7GG)

1358

1320

-38

Grand Total (5GG&7GG)

1358

1320

-38

Statement Of Shortage in Importer Consignment : Description Of Itme

____________ Prepared By

Qty As Per PI

Qty As Per Invoice

Qty Received

Remarks

________________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Short Shipment (If Any)

Date : 01.02.2007

All Figure In DZ

Month : January,2007 SL

Buyer

Style/P.O No GG

Total Shipped Short Order Qty Qty Shipped Qty

Reason For Short Shipped

01

Quelle

3212

5G

333

328

5

Over Weight

02

Quelle

7692

5G

333

322

11

Over Weight

666

650

16

267

265

2

Total (7GG)

267

265

2

Grand Total (5GG&7GG)

933

915

18

Total (5GG) 01

Quelle

3252

7G

Quality Problem

Statement Of Shortage in Importer Consignment : Description Of Itme

____________ Prepared By

Qty As Per PI

Qty As Per Invoice

_________________________ Production-Co-Ordinator

Qty Received

Remarks

________________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Short Shipment (If Any)

Date : 06.01.2007

All Figure In DZ

Month : December,2006 SL

Buyer

Style/P.O No GG

01

Total Shipped Short Order Qty Qty Shipped Qty

Reason For Short Shipped

5G

Total (5GG)

0

0

0

01 Quelle

8703

7G

212

202

11

Quality Problem

02 Quelle

8711

7G

833

781

52

Due To Over Weight

Total (7GG)

1045

983

63

Grand Total (5GG&7GG)

1045

983

63

03

Statement Of Shortage in Importer Consignment : Description Of Itme

____________ Prepared By

Qty As Per PI

Qty As Per Invoice

_________________________ Production-Co-Ordinator

Qty Received

Remarks

________________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Short Shipment (If Any)

Date : 02.12.2006

All Figure In DZ

Month : November,2006 SL

Buyer

01 Eurofrente

Style/P.O No GG 09750

5G

Total (5GG)

Total Shipped Short Order Qty Qty Shipped Qty 521

513

8

521

513

8

Reason For Short Shipped Process Loss.

01 Quelle

7392

7G

210

190

20

Quality Problem.

02 Quelle

3955

7G

183

83

100

Stock Lot.

03 Quelle

7452

7G

275

246

29

Embd. Problem.

Total (7GG)

668

519

149

Grand Total (5GG&7GG)

1189

1032

157

Statement Of Shortage in Importer Consignment : Description Of Itme

____________ Prepared By

Qty As Per PI

Qty As Per Invoice

_________________________ Production-Co-Ordinator

Qty Received

Remarks

________________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Short Shipment (If Any)

Date :

All Figure In DZ

Month : SL

Buyer

Style/P.O No GG

Total Shipped Short Order Qty Qty Shipped Qty

Reason For Short Shipped

Total (5GG)

Total (7GG) Grand Total (5GG&7GG)

Statement Of Shortage in Importer Consignment : Description Of Itme

____________ Prepared By

Qty As Per PI

Qty As Per Invoice

_________________________ Production-Co-Ordinator

Qty Received

Remarks

________________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Short Shipment (If Any)

Date : 01.11.2006

All Figure In DZ

Month : October,2006 SL

Buyer

01 G.Gold

Style/P.O No GG 1D158/10249

5G

Total (5GG)

Total Shipped Short Order Qty Qty Shipped Qty 100

98

2

100

98

2

Reason For Short Shipped Assortment Problem

01 Quelle

3732

7G

134

122

13

Printing Problem

02 Quelle

3905

7G

98

87

11

Quality Problem

03 Quelle

7294

7G

134

119

15

Quality & Printing Problem

04 Quelle

8609

7G

309

303

6

Yarn Shading Problem

TSF6-3534

7G

124

123

1

Assortment Problem

Total (7GG)

799

754

46

Grand Total (5GG&7GG)

899

852

48

05 Sears 06

Statement Of Shortage in Importer Consignment : Description Of Itme

____________ Prepared By

Qty As Per PI

Qty As Per Invoice

_________________________ Production-Co-Ordinator

Qty Received

Remarks

________________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Short Shipment (If Any)

Date : 01.10.2006

All Figure In DZ

Month : September,2006 SL

Buyer

01 Sears

Style/P.O No GG TSF6-3542

5G

Total (5GG)

Total Shipped Short Order Qty Qty Shipped Qty 217

216

1

217

216

1

Reason For Short Shipped Quality Problem.

01 Quelle

3575

7G

150

147

3

Precess Loss

02 Quelle

8602

7G

187

181

6

Due To Yarn Shading.

03 Quelle

8609

7G

135

130

5

Quality Problem.

Total (7GG)

472

458

14

Grand Total (5GG&7GG)

689

674

15

Statement Of Shortage in Importer Consignment : Description Of Itme

____________ Prepared By

Qty As Per PI

Qty As Per Invoice

_________________________ Production-Co-Ordinator

Qty Received

Remarks

________________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Short Shipment (If Any)

Date : 01.09.2006

All Figure In DZ

Month : August,2006 SL

Buyer

Style/P.O No GG

Total Shipped Short Order Qty Qty Shipped Qty

01 Quelle

3033

5G

108

107

1

02 Quelle

7214

5G

238

234

4

03 Sears

3538

5G

144

142

2

490

483

7

Reason For Short Shipped

Due To Quality Problem

04 Total (5GG) 01 N.Mann

017/477

7G

63

62

1

02 Quelle

3795

7G

250

248

2

03 Quelle

8609

7G

246

241

5

04 Quelle

2670

7G

167

166

1

05 Sears

3536

7G

188

179

9

Process Loss

06 Sears

1511

7G

158

149

9

Process Loss/Shading Problem

07 W.Smith

611166

7G

410

406

4

Assortment Problem.

08 W.Smith

611165

7G

410

409

1

Total (7GG)

1892

1860

32

Grand Total (5GG&7GG)

2382

2343

39

Yarn Shading Problem

Statement Of Shortage in Importer Consignment : Description Of Itme

____________

Qty As Per PI

Qty As Per Invoice

_________________________

Qty Received

Remarks

________________

Prepared By

Production-Co-Ordinator

Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Short Shipment (If Any)

Date : 01.08.2006

All Figure In DZ

Month : July,2006 SL

Buyer

01 Sears

Style/P.O No GG

Total Shipped Short Order Qty Qty Shipped Qty

Reason For Short Shipped

60252-C

5G

432

415

17

Due To Worng Yarn Reqr. Prob.

02 Quelle

3595

5G

167

157

10

Quality With Print Problrm.

03 Quelle

8614

5G

600

589

11

Quality Problrm.

1199

1161

38

Total (5GG) 01 Quelle

3142

7G

67

66

1

WR-08

7G

65

63

2

1502

7G

237

234

3

Total (7GG)

369

363

6

Grand Total (5GG&7GG)

1568

1524

44

02 Wehmeyer 03 Sears

Quality Problem

Statement Of Shortage in Importer Consignment : Description Of Itme

____________

Qty As Per PI

Qty As Per Invoice

_________________________

Qty Received

Remarks

________________

Prepared By

Production-Co-Ordinator

Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Short Shipment (If Any)

Date : 01.07.2006

All Figure In DZ

Month : June,2006 SL

Buyer

Style/P.O No GG

Total Shipped Short Order Qty Qty Shipped Qty

01 Eurofrenty

09182

5G

113

107

6

02 Quelle

8614

5G

422

418

4

03 Quelle

3023

5G

150

142

8

04 Quelle

3033

5G

150

140

10

05 Quelle

7214

5G

150

141

9

06 Quelle

3795

5G

175

165

10

60252-C

5G

432

416

16

1592

1529

63

07 Sears

Total (5GG) 01 Sears

3533

7G

500

492

8

02 N.Mann

017/531

7G

271

263

7

03 N.Mann

017/477

7G

146

140

6

04 Sears

3531

7G

625

619

6

05 Sears

3534

7G

237

232

5

05 Sears

3532

7G

334

332

1

05 Quelle

3732

7G

167

155

12

Total (7GG)

2280

2233

45

Grand Total (5GG&7GG)

3872

3762

108

Reason For Short Shipped

Assortment Problem.

Statement Of Shortage in Importer Consignment : Description Of Itme

Qty As Per PI

Qty As Per Invoice

Qty Received

Remarks

____________ Prepared By

_________________________ Production-Co-Ordinator

________________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Short Shipment (If Any)

Date : 02.06.2006

All Figure In DZ

Month : April,2006 SL

Buyer

01 G.Union 02 Rajan

Style/P.O No GG

Total Shipped Short Order Qty Qty Shipped Qty

Reason For Short Shipped

S-372

5G

100

98

2

Assortment Problem.

MK-413315

5G

300

394

6

Assortment Problem.

400

492

8

Total (5GG) 01 Quelle

3295

7G

183

179

4

02 Quelle

2620

7G

233

231

2

03 Quelle

2619

7G

233

229

4

04 Quelle

8602

7G

325

324

1

05 Quelle

2615

7G

292

289

3

Total (7GG)

1266

1252

14

Grand Total (5GG&7GG)

1666

1744

22

Yarn Problem

Statement Of Shortage in Importer Consignment : Description Of Itme

Qty As Per PI

Qty As Per Invoice

Qty Received

Remarks

____________ Prepared By

_________________________ Production-Co-Ordinator

________________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Short Shipment (If Any)

Date : 02.05.2006

All Figure In DZ

Month : April,2006 SL

Buyer

01 Quelle

Style/P.O No GG 7214

5G

Total Shipped Short Order Qty Qty Shipped Qty 150

147

3

150

147

3

Reason For Short Shipped Process Loss

02

Total (5GG) 01 G.Union

L-444

7G

300

299

1

3792(B)

7G

342

339

3

Total (7GG)

642

638

4

Grand Total (5GG&7GG)

792

785

7

02 Quelle

Process Loss

Statement Of Shortage in Importer Consignment : Description Of Itme

Qty As Per PI

Qty As Per Invoice

Qty Received

Remarks

____________ Prepared By

_________________________ Production-Co-Ordinator

________________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Short Shipment (If Any) All Figure In DZ

Date : 01.04.2006

Month : March,2006 SL

Buyer

Style/P.O No GG

01

Total Shipped Short Order Qty Qty Shipped Qty

Reason For Short Shipped

5G

02

Total (5GG)

0

0

0

01 Quelle

8609

7G

900

852

48

Yarn & Shading Problem

02 Quelle

7382

7G

100

93

7

Printing Problem

Total (7GG)

1000

945

55

Grand Total (5GG&7GG)

1000

945

55

Statement Of Shortage in Importer Consignment :

Description Of Itme

Qty As Per PI

____________ Prepared By

Qty As Per Invoice

Qty Received

_________________________ Production-Co-Ordinator

Remarks

________________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Short Shipment (If Any) All Figure In DZ

Date : 01.03.2006

Month : February,2006 SL

Buyer

Style/P.O No GG

01

Total Shipped Short Order Qty Qty Shipped Qty

Reason For Short Shipped

5G

02

Total (5GG)

0

0

0

01 Quelle

8609

7G

900

852

48

Yarn & Shading Problem

02 Quelle

7382

7G

100

93

7

Printing Problem

1000

945

55

Total (7GG)

Grand Total (5GG&7GG)

1000

945

55

Statement Of Shortage in Importer Consignment : Description Of Itme

Qty As Per PI

____________ Prepared By

Qty As Per Invoice

Qty Received

_________________________ Production-Co-Ordinator

Remarks

________________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Short Shipment (If Any) All Figure In DZ

Date : 01.02.2006

Month : January,2006 SL

Buyer

01 Zara

Style/P.O No GG 5747/504

5G

Total Shipped Short Order Qty Qty Shipped Qty 321

316

5

321

316

5

Reason For Short Shipped

02

Total (5GG) 03 Quelle

8603 (B)

7G

650

636

14

Shading Problem

04 Quelle

7382

7G

100

99

1

Assortment Problem

05

Total (7GG)

750

735

15

Grand Total (5GG&7GG)

1071

1051

20

Statement Of Shortage in Importer Consignment : Description Of Itme

____________ Prepared By

Qty As Per PI

Qty As Per Invoice

Qty Received

_________________________ Production-Co-Ordinator

Remarks

________________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Short Shipment (If Any) All Figure In DZ

Date : 01.01.2006

Month : December,2005 SL 01 02

Buyer

Style/P.O No GG 5G

Total Shipped Short Order Qty Qty Shipped Qty

Reason For Short Shipped

Total (5GG)

0

0

0

708

700

8

Total (7GG)

708

700

8

Grand Total (5GG&7GG)

708

700

8

03 N.Mann

317/349

7G

Yarn Problem

04 05

Statement Of Shortage in Importer Consignment : Description Of Itme

____________ Prepared By

Qty As Per PI

Qty As Per Invoice

Qty Received

_________________________ Production-Co-Ordinator

Remarks

________________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Short Shipment (If Any) All Figure In DZ

Date : 01.11.2005

Month : November,2005 SL 01

Buyer

Style/P.O No GG 5G

Total Shipped Short Order Qty Qty Shipped Qty

Reason For Short Shipped

02

Total (5GG)

0

0

0

1000

993

7

Total (7GG)

1000

993

7

Grand Total (5GG&7GG)

1000

993

7

03 Quelle

8602

7G

Assortment Problem

04 05

Statement Of Shortage in Importer Consignment : Description Of Itme

Qty As Per PI

____________ Prepared By

Qty As Per Invoice

Qty Received

_________________________ Production-Co-Ordinator

Remarks

________________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Short Shipment (If Any) All Figure In DZ

Date : 01.10.2005

Month : September,2005 SL

Buyer

01 Sears 02

Style/P.O No GG 1516

5G 5G

Total Shipped Short Order Qty Qty Shipped Qty 194

193

1

Reason For Short Shipped Process Loss

Total (5GG)

194

193

1

03 Rajan

W515043

7G

268

266

2

Process Loss

04 Rajan

W515029

7G

216

212

4

Process Loss

05 Rajan

W-515028

7G

133

129

4

Process Loss

06 Rajan

W-515078-L

7G

12

13

1

Process Loss

Total (7GG)

629

620

11

Grand Total (5GG&7GG)

823

813

12

Statement Of Shortage in Importer Consignment : Description Of Itme

____________ Prepared By

Qty As Per PI

Qty As Per Invoice

Qty Received

_________________________ Production-Co-Ordinator

Remarks

________________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Short Shipment (If Any) All Figure In DZ

Date : 02.09.2005

Month : August,2005 SL

Buyer

Style/P.O No GG

Total Shipped Short Order Qty Qty Shipped Qty

Reason For Short Shipped

01 Rajan

MK-412651

02

5G

200

190

10

200

190

10

Process Loss

5G

Total (5GG) 03 Rajan

MK-412655

7G

200

198

2

Process Loss

04 Rajan

MK-412960

7G

250

248

2

Process Loss

05 Rajan

W-515048

7G

200

194

6

Process Loss

06 Rajan

W-515043

7G

222

218

4

Process Loss

07 Quelle

7824

7G

67

66

1

Process Loss

08 Zara

5747/830

7G

271

248

23

Assortment Problem

09 Rajan

MK-516076

7G

226

223

3

Process Loss

Total (7GG)

1436

1395

41

Grand Total (5GG&7GG)

1636

1585

51

10

7G

Statement Of Shortage in Importer Consignment : Description Of Itme

____________ Prepared By

Qty As Per PI

Qty As Per Invoice

Qty Received

_________________________ Production-Co-Ordinator

Remarks

________________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Short Shipment (If Any) All Figure In DZ

Month : July,2005

Date : 02.08.2005

SL

Buyer

Style/P.O No GG

Total Shipped Short Order Qty Qty Shipped Qty

Reason For Short Shipped

01 Sears

1311

5G

228

226

2

Process Loss

02 Sears

3516

5G

501

495

6

Process Loss

729

721

8

03

5G

04

5G Total (5GG)

03 G.Gold

17653/8039

7G

200

193

4

Process Loss

04 Rajan

MK-412654

7G

200

140

60

Applique Dyeing Quality Rejection

05 G.Gold

17653/8040

7G

418

330

88

Fack Fur Short

Total (7GG)

818

663

152

Grand Total (5GG&7GG)

1547

1384

160

06

7G

07

7G

Statement Of Shortage in Importer Consignment : Description Of Itme

____________ Prepared By

Qty As Per PI

Qty As Per Invoice

Qty Received

_________________________ Production-Co-Ordinator

Remarks

________________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Short Shipment (If Any) All Figure In DZ

Date : 01.06.2005

Month : June,2005 SL

Buyer

Style/P.O No GG

Total Shipped Short Order Qty Qty Shipped Qty

Reason For Short Shipped

01 Sears

50108

5G

594

585

9

Yarn Problem

02 Sears

3531

5G

500

486

14

Process Loss

03 Sears

1307

5G

276

274

2

Process Loss

04 G.Gold

7548

5G

100

94

6

Process Loss

1469.83

1439

31

Total (5GG) 03 Sears

1310

7G

342

338

2

Process Loss

04 Quelle

2481

7G

183

181

2

Quality Problem

05 Quelle

2482

7G

167

158

9

Knitting Short

06 Quelle

2485

7G

167

159

8

Process Loss

07 Quelle

2486

7G

167

164

3

Quality Problem

Total (7GG)

1026

1000

24

Grand Total (5GG&7GG)

2495.83

2439

55

Statement Of Shortage in Importer Consignment : Description Of Itme

____________ Prepared By

Qty As Per PI

Qty As Per Invoice

Qty Received

_________________________ Production-Co-Ordinator

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Short Shipment (If Any)

Remarks

________________ Plant-In-Charge

Date : 01.06.2005

All Figure In DZ

Month : May,2005 SL

Buyer

Style/P.O No GG

01

5G

02

5G Total (5GG)

Total Shipped Short Order Qty Qty Shipped Qty

0

0

0

Reason For Short Shipped

03 Rajan

MK-412727

7G

40

36

4

Process Loss

04 Rajan

MK-413076

7G

300

298

2

Process Loss

Total (7GG)

340

334

6

Grand Total (5GG&7GG)

340

334

6

05 06 07

Statement Of Shortage in Importer Consignment : Description Of Itme

____________ Prepared By

Qty As Per PI

Qty As Per Invoice

Qty Received

_________________________ Production-Co-Ordinator

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Remarks

________________ Plant-In-Charge

Short Shipment (If Any)

Date : 02.05.2005

All Figure In DZ

Month : April,2005 SL

Buyer

Style/P.O No GG

Total Shipped Short Order Qty Qty Shipped Qty

Reason For Short Shipped

01 Sears

1307

5G

271

269

2

P.Loss & Quality Rejection

02 Sears

1308

5G

140

138

2

P.Loss & Quality Rejection

411

407

4

67

62

5

Total (7GG)

67

62

5

Grand Total (5GG&7GG)

478

469

9

Total (5GG) 03 Quelle

7824

04

7G

Printing Problem

7G

05 06 07

Statement Of Shortage in Importer Consignment : Description Of Itme

____________ Prepared By

Qty As Per PI

Qty As Per Invoice

_________________________ Production-Co-Ordinator

Qty Received

Remarks

________________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Short Shipment (If Any)

Date : 02.01.2005

All Figure In DZ

Month : December,2004 SL

Buyer

Style/P.O No GG

01 Sears

Total Shipped Short Order Qty Qty Shipped Qty

2298

7G

433.33

419.83

13.5

02 N.Mann

115/149

7G

1250

1241.83

8.17

03 Karstadt

K-03

7G

417

342

75

2100.33

2003.66

96.67

Reason For Short Shipped

04 05 06 07 08 09 10 11 12 13 14 Grand Total

Statement Of Shortage in Importer Consignment : Description Of Itme

Qty As Per PI

Qty As Per Invoice

Qty Received

Remarks

____________ Prepared By

_________________________ Production-Co-Ordinator

________________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Short Shipment (If Any) All Figure In DZ

Date : 01.12.2004

Month :November,2004 SL

Buyer

Style/P.O No GG

Total Shipped Short Order Qty Qty Shipped Qty

01 Eufrenty

08206

5G

250

244

6

02 Eufrenty

08207

5G

167

164.5

2.5

03 Hong Song

YS-14214-S

7G

1179

1162

17

04 Hong Song

WS-14212-S

7G

332

320

12

05 Hong Song

YS-14213-S

7G

604

599.17

4.83

2532

2489.67

42.33

06 07 08 09 10 11 12 13 14 Grand Total

Reason For Short Shipped

Statement Of Shortage in Importer Consignment : Description Of Itme

____________ Prepared By

Qty As Per PI

Qty As Per Invoice

_________________________ Production-Co-Ordinator

Qty Received

Remarks

________________ Plant-In-Charge

rtment Problem

hading Problem

Yarn Reqr. Prob.

ng Quality Rejection

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Date : 01.09.2008

MONTHLY Q.C REPORT SUMMARY FOR THE MONTH OF AUGUST' 2008

Position

Internal

External

Aql

2.5

2.5

TTL Inspection

TTL Passed

TTL Re-Check

% Of Error

12

12

Nill

6.5%

6

6

Nill

5.63%

Remarks

% Error = (TTL Major Defect / Inspected Qty X 100)

_______________ Prepared By

_______________ Q.A.D In-Charge

_______________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

MONTHLY Q.C REPORT SUMMARY FOR THE MONTH OF JULY' 2008

Date : 01.08.2008

Position

Internal

External

Aql

2.5

2.5

TTL Inspection

TTL Passed

TTL Re-Check

% Of Error

3

3

Nill

5.9%

16

14

2

6.05%

Remarks

Sears Style #3528, Recheck Due to Measurement Discrepecny Style-3527 Recheck Due to Tack Massing.

% Error = (TTL Major Defect / Inspected Qty X 100)

_______________ Prepared By

_______________ Q.A.D In-Charge

_______________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Date : 01.07.2008

MONTHLY Q.C REPORT SUMMARY FOR THE MONTH OF JUNE' 2008

Position

Internal

Aql

2.5

TTL Inspection

TTL Passed

TTL Re-Check

% Of Error

2

2

Nill

5%

Remarks

External

2.5

12

10

2

6.34%

Sears Style #3528,3504 Recheck Due to Measurement Discrepecny

% Error = (TTL Major Defect / Inspected Qty X 100)

_______________ Prepared By

_______________ Q.A.D In-Charge

_______________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Date : 01.07.2008

MONTHLY Q.C REPORT SUMMARY FOR THE MONTH OF JUNE'2008

Position

Internal

External

Aql

2.5

2.5

TTL Inspection

TTL Passed

TTL Re-Check

% Of Error

2

2

Nill

5%

12

10

2

6.34%

% Error = (TTL Major Defect / Inspected Qty X 100)

Remarks

Sears Style #3528,3504 Recheck Due to Measurement Discrepecny

_______________ Prepared By

_______________ Q.A.D In-Charge

_______________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Date : 01.06.2008

MONTHLY Q.C REPORT SUMMARY FOR THE MONTH OF MAY'2008

Position

Aql

TTL Inspection

TTL Passed

TTL Re-Check

% Of Error

Internal

2.5

2

2

Nill

4.66

External

4

3

3

Nill

4.80%

% Error = (TTL Major Defect / Inspected Qty X 100)

Remarks

_______________ Prepared By

_______________ Q.A.D In-Charge

_______________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Date : 01.05.2008

MONTHLY Q.C REPORT SUMMARY FOR THE MONTH OF APRIL'2008

Position

Aql

Internal

2.5

External

4

TTL Inspection

TTL Passed

TTL Re-Check

% Of Error

Nill

Nill

Nill

Nill

13

13

Nill

4.67%

% Error = (TTL Major Defect / Inspected Qty X 100)

Remarks

_______________ Prepared By

_______________ Q.A.D In-Charge

_______________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Date : 01.04.2008

MONTHLY Q.C REPORT SUMMARY FOR THE MONTH OF MARCH'2008

Position

Aql

Internal

2.5

External

4

TTL Inspection

TTL Passed

TTL Re-Check

% Of Error

Nill

Nill

Nill

Nill

19

19

Nill

6.73%

Remarks

% Error = (TTL Major Defect / Inspected Qty X 100)

_______________ Prepared By

_______________ Q.A.D In-Charge

_______________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Date : 01.03.2008

MONTHLY Q.C REPORT SUMMARY FOR THE MONTH OF FEBRUARY'2008

Position

Aql

TTL Inspection

TTL Passed

TTL Re-Check

% Of Error

Internal

0

0

0

0

0.00%

External

4

9

9

0

6.21%

Remarks

9L 119 & 9L 120 Inspection Report not Recvd From Buyer

% Error = (TTL Major Defect / Inspected Qty X 100)

_______________ Prepared By

_______________ Q.A.D In-Charge

_______________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

MONTHLY Q.C REPORT SUMMARY FOR THE MONTH OF JANUARY'2008

Date : 01.02.2008

Position

Aql

TTL Inspection

TTL Passed

TTL Re-Check

% Of Error

Internal

2.5

3

3

0

5.67%

External

2.5

5

5

0

3.68%

Remarks

% Error = (TTL Major Defect / Inspected Qty X 100)

_______________ Prepared By

_______________ Q.A.D In-Charge

_______________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Date : 01.01.2008

MONTHLY Q.C REPORT SUMMARY FOR THE MONTH OF DECEMBER'2007

Position

Aql

TTL Inspection

TTL Passed

TTL Re-Check

% Of Error

Internal

2.5

3

2

1

6.25%

External

2.5

12

9

3

4.62%

Remarks # 9J020 Due to side Seam Shape poor St# 4000 Due to Twist Problem. St# 8832, Due to Dirty Problem

% Error = (TTL Major Defect / Inspected Qty X 100)

_______________ Prepared By

_______________ Q.A.D In-Charge

_______________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Date : 01.12.2007

MONTHLY Q.C REPORT SUMMARY FOR THE MONTH OF NOVEMBER'2007

Position

Aql

TTL Inspection

TTL Passed

TTL Re-Check

% Of Error

Internal

2.5

4

2

2

7.50%

External

2.5

5

5

Nill

2.73%

% Error = (TTL Major Defect / Inspected Qty X 100)

Remarks # 10764 & 10877, Eurofrente, recheck due to dirt, ndl drop, pocket joining, problem.

_______________ Prepared By

_______________ Q.A.D In-Charge

_______________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Date : 03.11.2007

MONTHLY Q.C REPORT SUMMARY FOR THE MONTH OF OCTOBER'2007

Position

Aql

TTL Inspection

TTL Passed

TTL Re-Check

% Of Error

Remarks

Internal

2.5

2

1

1

7.50%

# 0766/8021, Sfera recheck due to NDL drop & assortment problem.

External

2.5

10

9

1

4.13%

St # 18902 recheck due to Neck shapepoor & bottom sweep minus.

% Error = (TTL Major Defect / Inspected Qty X 100)

_______________ Prepared By

_______________ Q.A.D In-Charge

_______________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Date : 02.09.2007

MONTHLY Q.C REPORT SUMMARY FOR THE MONTH OF SEP'2007

Position

Aql

TTL Inspection

TTL Passed

TTL Re-Check

% Of Error

Remarks

Internal

2.5

7

6

1

8.00%

St #19H987, Recheck Due to Dirty, Hood & Bottom Rolled,EMB Thick & Thin .

External

2.5

11

10

1

3.55%

St # 3885 Olive Color Recheck Due to uneven Dyeing Problem.

% Error = (TTL Major Defect / Inspected Qty X 100)

_______________ Prepared By

_______________ Q.A.D In-Charge

_______________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Date : 01.07.2007

MONTHLY Q.C REPORT SUMMARY FOR THE MONTH OF JUNE '2007

TTL Inspection

TTL Passed

TTL Re-Check

% Of Error

Internal

2

2

Nill

4.29%

External

10

10

Nill

5.44%

Position

Remarks

% Error = (TTL Major Defect / Inspected Qty X 100)

_______________ Prepared By

_______________ Q.A.D In-Charge

_______________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Date : 01.06.2007

MONTHLY Q.C REPORT SUMMARY FOR THE MONTH OF MAY '2007

TTL Inspection

TTL Passed

TTL Re-Check

% Of Error

Internal

4

4

0

4.79%

External

6

6

0

3.45%

Position

Remarks

% Error = (TTL Major Defect / Inspected Qty X 100)

_______________ Prepared By

_______________ Q.A.D In-Charge

_______________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Date : 01.05.2007

MONTHLY Q.C REPORT SUMMARY FOR THE MONTH OF APRIL '2007

Position

TTL Inspection

TTL Passed

% Of Error

Remarks

2

4.21%

327/052 Recheck Due To Iron,Trimining & Hole Problem

Nill

Internal External

TTL Re-Check

15

13

% Error = (TTL Major Defect / Inspected Qty X 100)

_______________ Prepared By

_______________ Q.A.D In-Charge

_______________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Date : 01.04.2007

MONTHLY Q.C REPORT SUMMARY FOR THE MONTH OF MARCH '2007

TTL Inspection

TTL Passed

TTL Re-Check

% Of Error

Internal

9

9

0

4.79%

External

Nill

Nill

Nill

0.00%

Position

Remarks

% Error = (TTL Major Defect / Inspected Qty X 100)

_______________ Prepared By

_______________ Q.A.D In-Charge

_______________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Date : 01.03.2007

MONTHLY Q.C REPORT SUMMARY FOR THE MONTH OF FEBRUARY '2007

Position Internal External

TTL Inspection Nill 12

TTL Passed 0 10

TTL Re-Check 0 2

% Of Error 0.00% 4.03%

Remarks # 8706 Recheck Due To Uneven deying,Dirty,Knot Etc #8711 Recheck Due To Yarn deying Prob.,Ring Mark Etc

% Error = (TTL Major Defect / Inspected Qty X 100) Note :

_______________ Prepared By

Buyer : Great Union # 7615 Final Inspection report did not found from Buyer/Inspector.

_______________ Q.A.D In-Charge

_______________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Date : 01.02.2007

MONTHLY Q.C REPORT SUMMARY FOR THE MONTH OF JANUARY '2007

Position Internal External

TTL Inspection 0 8

TTL Passed 0 8

TTL Re-Check 0 0

% Of Error 0.00% 3.45%

Remarks

% Error = (TTL Major Defect / Inspected Qty X 100)

_______________ Prepared By

_______________ Q.A.D In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

_______________ Plant-In-Charge

Date : 06.01.2007

MONTHLY Q.C REPORT SUMMARY FOR THE MONTH OF DECEMBER '2006

Position Internal External

TTL Inspection 0 8

TTL Passed 0 8

TTL Re-Check 0 0

% Of Error 0.00% 3.45%

Remarks

% Error = (TTL Major Defect / Inspected Qty X 100)

_______________ Prepared By

_______________ Q.A.D In-Charge

_______________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

MONTHLY Q.C REPORT SUMMARY FOR THE MONTH OF NOVEMBER '2006

Date : 02.12.2006

Position

TTL Inspection

TTL Passed

TTL Re-Check

% Of Error

Internal

6

4

2

4.46%

External

13

13

0

3.40%

Remarks 01. St:# 09769 For ArmHole(-) tendency,Nk Seam (1x1) Open. 02. St:# 09750 Pocket Link Open,Mest. Problem.

% Error = (TTL Major Defect / Inspected Qty X 100)

_______________ Prepared By

_______________ Q.A.D In-Charge

_______________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

MONTHLY Q.C REPORT SUMMARY FOR THE MONTH OF

Date :

Position

TTL Inspection

TTL Passed

TTL Re-Check

% Of Error

Remarks

% Error = (TTL Major Defect / Inspected Qty X 100)

_______________ Prepared By

_______________ Q.A.D In-Charge

_______________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Date : 03.11.2006

MONTHLY Q.C REPORT SUMMARY FOR THE MONTH OF OCTOBER '2006

Position Internal

TTL Inspection 3

TTL Passed 3

TTL Re-Check Nill

% Of Error 5.86%

Remarks

External

22

19

3

4.04%

St:# 7294 For Hole,Oil Mark St:# 3955 For Poor Neck Shape.

% Error = (TTL Major Defect / Inspected Qty X 100)

_______________ Prepared By

_______________ Q.A.D In-Charge

_______________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Date : 03.10.2006

MONTHLY Q.C REPORT SUMMARY FOR THE MONTH OF SEPTEMBER '2006

Position Internal

TTL Inspection 10

TTL Passed 9

TTL Re-Check 1

% Of Error 3.93%

Remarks St:# MK-413612 For NDL Drop

External

14

13

1

5.06%

St:# 8602 For Hole,Linking Defect, Knot, Chest Stripe Un-even.

% Error = (TTL Major Defect / Inspected Qty X 100)

_______________ Prepared By

_______________ Q.A.D In-Charge

_______________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

MONTHLY Q.C REPORT SUMMARY FOR THE MONTH OF August '2006

Date : 01.09.2006

Internal

TTL Inspection 4

TTL Passed 4

TTL Re-Check Nill

% Of Error 5.09%

External

25

23

2

5.09%

Position

Remarks Recheck : # 7214(Quelle)

% Error = (TTL Major Defect / Inspected Qty X 100)

_______________ Prepared By

_______________ Q.A.D In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

_______________ Plant-In-Charge

Date : 01.08.2006

MONTHLY Q.C REPORT SUMMARY FOR THE MONTH OF July '2006

Internal

TTL Inspection 2

TTL Passed 2

TTL Re-Check Nill

% Of Error 5.36%

External

36

34

2

5.02%

Position

Remarks Recheck : # 3795 # 3595(Quelle)

% Error = (TTL Major Defect / Inspected Qty X 100)

_______________ Prepared By

_______________ Q.A.D In-Charge

_______________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Date : 01.07.2006

MONTHLY Q.C REPORT SUMMARY FOR THE MONTH OF June '2006

Internal

TTL Inspection 3

TTL Passed 3

TTL Re-Check Nill

% Of Error 3.60%

External

42

40

2

4.73%

Position

Remarks Recheck : #3023(Quelle) #3534(Sears)

% Error = (TTL Major Defect / Inspected Qty X 100)

_______________ Prepared By

_______________ Q.A.D In-Charge

_______________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Date : 02.05.2006

MONTHLY Q.C REPORT SUMMARY FOR THE MONTH OF April '2006

Internal

Nill

TTL Inspection 0

External

2.5

18

Position

A.Q.L

No Of Recheck Nill

% Of Error 0.00%

2

4.57%

Remarks Note : 01

% Error = (TTL Major Defect / Inspected Qty X 100)

Note : 01

:

_______________ Prepared By

Style No # 8497,#13463,#13465 Inspection Is Ok But Inspection Report Is Not Rcvd. From Buyer/ Marchandiser.

_______________ Q.A.D In-Charge

_______________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Date : 02.04.2006

MONTHLY Q.C REPORT SUMMARY FOR THE MONTH OF March '2006

Internal

2.5

TTL Inspection 5

External

2.5

6

Position

A.Q.L

No Of Recheck Nill

% Of Error 4.14%

Nill

3.50%

Remarks

% Error = (TTL Major Defect / Inspected Qty X 100)

_______________ Prepared By

_______________ Q.A.D In-Charge

_______________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Date : 01.03.2006

MONTHLY Q.C REPORT SUMMARY FOR THE MONTH OF February '2006

Internal

2.5

TTL Inspection 1

External

2.5

7

Position

A.Q.L

No Of Recheck Nill

% Of Error 6

Nill

3.77

Remarks

% Error = (TTL Major Defect / Inspected Qty X 100)

_______________ Prepared By

_______________ Q.A.D In-Charge

_______________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Date : 02.09.2005

MONTHLY Q.C REPORT SUMMARY FOR THE MONTH OF August '2005

Position Internal External

A.Q.L 2.5 2.5/4

TTL Inspection 9 5

No Of Recheck 1 2

% Of Error 5.23 4.77

Remarks

% Error = (TTL Major Defect / Inspected Qty X 100)

_______________ Prepared By

_______________ Q.A.D In-Charge

_______________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Date : 01.08.2005

MONTHLY Q.C REPORT SUMMARY FOR THE MONTH OF July '2005

Position Internal External

A.Q.L 2.5 4

TTL Inspection 6 10

No Of Recheak 2 2

% Of Error 4.26 4.7

Remarks

% Error = (TTL Major Defect / Inspected Qty X 100)

_______________ Prepared By

_______________ Q.A.D In-Charge

_______________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Date : 02.06.2005

MONTHLY Q.C REPORT SUMMARY FOR THE MONTH OF May '2005

Position Internal External

A.Q.L 2.5 4

TTL Inspection 3 5

No Of Recheak 2 Nill

% Of Error 3.78 4.82

Remarks Eurofrente

% Error = (TTL Major Defect / Inspected Qty X 100)

_______________ Prepared By

_______________ Q.A.D In-Charge

_______________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Date : 01.05.2005

MONTHLY Q.C REPORT SUMMARY FOR THE MONTH OF April '2005

Position Internal External

A.Q.L 0 2.5

TTL Inspection 0 9

No Of Recheak 0 1

% Of Error 0 4

Remarks

% Error = (TTL Major Defect / Inspected Qty X 100)

_______________ Prepared By

_______________ Q.A.D In-Charge

_______________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Date : 01.05.2005

MONTHLY Q.C REPORT SUMMARY FOR THE MONTH OF April '2005

Position Internal External

A.Q.L 0 2.5

TTL Inspection 0 9

No Of Recheak 0 1

% Of Error 0 4

Remarks

% Error = (TTL Major Defect / Inspected Qty X 100)

_______________ Prepared By

_______________ Q.A.D In-Charge

_______________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Date : 02.04.2005

MONTHLY Q.C REPORT SUMMARY FOR THE MONTH OF February '2005

Position Internal External External

A.Q.L 2.5 4 2.5

TTL Inspection 1 4 4

No Of Recheak Nil Nil Nil

% Of Error 4 4.58 2.66

Remarks Left Over

% Error = (TTL Major Defect / Inspected Qty X 100)

_______________ Prepared By

_______________ Q.A.D In-Charge

_______________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Date : 02.02.2005

MONTHLY Q.C REPORT SUMMARY FOR THE MONTH OF February '2005

Position Internal External

A.Q.L Nill 4

TTL Inspection Nill 2

No Of Recheak Nil Nil

% Of Error Nill 5.23

Remarks

% Error = (TTL Major Defect / Inspected Qty X 100)

_______________ Prepared By

_______________ Q.A.D In-Charge

_______________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Date : 02.02.2005

MONTHLY Q.C REPORT SUMMARY FOR THE MONTH OF January '2005

Position Internal External

A.Q.L 2.5 2.5

TTL Inspection 1 1

No Of Recheak Nil Nil

% Of Error 4 2.85

Remarks

% Error = (TTL Major Defect / Inspected Qty X 100)

_______________ Prepared By

_______________ Q.A.D In-Charge

_______________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Date : 02.01.2005

MONTHLY Q.C REPORT SUMMARY FOR THE MONTH OF December '2004

Position Internal External

A.Q.L 2.5 2.5

TTL

No Of

% Of

Inspection 1 5

Recheak Nil Nil

Error 3.17 2.8

Remarks

% Error = (TTL Major Defect / Inspected Qty X 100)

_______________ Prepared By

_______________ Q.A.D In-Charge

_______________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Date :01.12.2004

MONTHLY Q.C REPORT SUMMARY FOR THE MONTH OF November'2004

Position Internal External

A.Q.L Nil Nil

TTL Inspection 4 7

No Of Recheak Nil 5

% Of Error 6.26 3.28

Remarks 01 Stock Lot In Casabawa

% Error = (TTL Major Defect / Inspected Qty X 100)

_______________ Prepared By

_______________ Q.A.D In-Charge

_______________ Plant-In-Charge

nspector.

vd. From

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Date : 01.09.2008

Factory Wise Total Machine Status For The Month Of August' 08 SL

Description Of Machine

No Of Total M/C

No Of M/C In Use

01

Knitting 5G

140

140

02

Knitting 7G

210

204

03

Auto Placket Machine

3

3

04

Winding Machine

8

8

05

Flat Linking Machine

9

9

06

Dial Linking Machine

84

84

07

Flat Lock Machine

3

3

08

Over Lock Machine

2

2

09

Interlock Machine

3

3

10

Button Hole Machine

5

5

11

Button Attached Machine

3

3

12

Sewing Machine

20

20

13

Label Cutter Machine

1

1

14

Boilar Machine

1

1

15

Washing Machine

3

3

16

Water Separator

2

2

17

Dryer Machine

4

4

18

Iron Machine

13

13

19

Generator

1

1

20

Water Pump

5

5

21

Glass Table (1st Insp.)

13

13

22

Glass Lamp (Final)

3

3

23

Bengin Gun

2

2

24

Welding

1

1

25

Blouer Machine

1

1

26

Dril Machine

2

2

27

Grinding Machine

2

2

28

Wood Cutter Machine

1

1

29

Vacuam Cleaner

1

1

30

Computer

1

1

31

IPS

2

2

549

543

Total

Stock In Hand

Remarks

6

6

______________________

__________________

________________

Production-Co-Ordinator

Finishing-In-Charge

Knitting-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

______________ Plant-In-Charge

Date : 01.08.2008

Factory Wise Total Machine Status For The Month Of July' 08 SL

Description Of Machine

No Of Total M/C

No Of M/C In Use

01

Knitting 5G

140

140

02

Knitting 7G

210

204

03

Auto Placket Machine

3

3

04

Winding Machine

8

8

05

Flat Linking Machine

9

9

06

Dial Linking Machine

84

84

07

Flat Lock Machine

3

3

08

Over Lock Machine

2

2

09

Interlock Machine

3

3

10

Button Hole Machine

4

4

11

Button Attached Machine

2

2

12

Sewing Machine

20

20

13

Label Cutter Machine

1

1

14

Boilar Machine

1

1

15

Washing Machine

3

3

16

Water Separator

2

2

17

Dryer Machine

4

4

18

Iron Machine

13

13

19

Generator

1

1

20

Water Pump

5

5

21

Glass Table (1st Insp.)

13

13

22

Glass Lamp (Final)

3

3

23

Bengin Gun

2

2

24

Welding

1

1

25

Blouer Machine

1

1

26

Dril Machine

2

2

27

Grinding Machine

2

2

28

Wood Cutter Machine

1

1

29

Vacuam Cleaner

1

1

30

Computer

1

1

31

IPS

2

2

547

541

Total

Stock In Hand

Remarks

6

6

______________________

__________________

________________

Production-Co-Ordinator

Finishing-In-Charge

Knitting-In-Charge

______________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Factory Wise Total Machine Status

Date : 01.07.2008

For The Month Of June' 08 SL

Description Of Machine

No Of Total M/C

No Of M/C In Use

01

Knitting 5G

140

140

02

Knitting 7G

210

204

03

Auto Placket Machine

3

3

04

Winding Machine

8

8

05

Flat Linking Machine

9

9

06

Dial Linking Machine

84

84

07

Flat Lock Machine

3

3

08

Over Lock Machine

2

2

09

Interlock Machine

3

3

10

Button Hole Machine

4

4

11

Button Attached Machine

2

2

12

Sewing Machine

20

20

13

Label Cutter Machine

1

1

14

Boilar Machine

1

1

15

Washing Machine

3

3

16

Water Separator

2

2

17

Dryer Machine

4

4

18

Iron Machine

13

13

19

Generator

1

1

20

Water Pump

5

5

21

Glass Table (1st Insp.)

13

13

22

Glass Lamp (Final)

3

3

23

Bengin Gun

2

2

24

Welding

1

1

25

Blouer Machine

1

1

26

Dril Machine

2

2

27

Grinding Machine

2

2

28

Wood Cutter Machine

1

1

29

Vacuam Cleaner

1

1

30

Computer

1

1

31

IPS

2

2

547

541

Total

Stock In Hand

Remarks

6

6

______________________

__________________

________________

Production-Co-Ordinator

Finishing-In-Charge

Knitting-In-Charge

______________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Date : 01.06.2008

Factory Wise Total Machine Status For The Month Of May' 08 SL

Description Of Machine

No Of

No Of M/C

Stock In Hand

Remarks

SL

Description Of Machine

Total M/C

In Use

01

Knitting 5G

140

140

02

Knitting 7G

210

204

03

Auto Placket Machine

3

3

04

Winding Machine

8

8

05

Flat Linking Machine

9

9

06

Dial Linking Machine

84

84

07

Flat Lock Machine

3

3

08

Over Lock Machine

2

2

09

Interlock Machine

3

3

10

Button Hole Machine

4

4

11

Button Attached Machine

2

2

12

Sewing Machine

20

20

13

Label Cutter Machine

1

1

14

Boilar Machine

1

1

15

Washing Machine

3

3

16

Water Separator

2

2

17

Dryer Machine

4

4

18

Iron Machine

13

13

19

Generator

1

1

20

Water Pump

5

5

21

Glass Table (1st Insp.)

13

13

22

Glass Lamp (Final)

3

3

23

Bengin Gun

2

2

24

Welding

1

1

25

Blouer Machine

1

1

26

Dril Machine

2

2

27

Grinding Machine

2

2

28

Wood Cutter Machine

1

1

29

Vacuam Cleaner

1

1

30

Computer

1

1

31

IPS

2

2

547

541

Total

Stock In Hand

Remarks

6

6

______________________

__________________

________________

Production-Co-Ordinator

Finishing-In-Charge

Knitting-In-Charge

______________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Date : 01.05.2008

Factory Wise Total Machine Status For The Month Of April' 08 SL 01

Description Of Machine Knitting 5G

No Of Total M/C

No Of M/C In Use

140

140

Stock In Hand

Remarks

210

204

Auto Placket Machine

3

3

04

Winding Machine

8

8

05

Flat Linking Machine

9

9

06

Dial Linking Machine

84

84

07

Flat Lock Machine

3

3

08

Over Lock Machine

2

2

09

Interlock Machine

3

3

10

Button Hole Machine

4

4

11

Button Attached Machine

2

2

12

Sewing Machine

20

20

13

Label Cutter Machine

1

1

14

Boilar Machine

1

1

15

Washing Machine

3

3

16

Water Separator

2

2

17

Dryer Machine

4

4

18

Iron Machine

13

13

19

Generator

1

1

20

Water Pump

5

5

21

Glass Table (1st Insp.)

13

13

22

Glass Lamp (Final)

3

3

23

Bengin Gun

2

2

24

Welding

1

1

25

Blouer Machine

1

1

26

Dril Machine

2

2

27

Grinding Machine

2

2

28

Wood Cutter Machine

1

1

29

Vacuam Cleaner

1

1

30

Computer

1

1

31

IPS

2

2

547

541

02

Knitting 7G

03

Total

6

6

______________________

__________________

________________

Production-Co-Ordinator

Finishing-In-Charge

Knitting-In-Charge

______________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Date : 01.04.2008

Factory Wise Total Machine Status For The Month Of March' 08 SL

Description Of Machine

No Of Total M/C

No Of M/C In Use

01

Knitting 5G

140

140

02

Knitting 7G

210

204

03

Auto Placket Machine

3

3

Stock In Hand

6

Remarks

04

Winding Machine

8

8

05

Flat Linking Machine

9

9

06

Dial Linking Machine

84

84

07

Flat Lock Machine

3

3

08

Over Lock Machine

2

2

09

Interlock Machine

3

3

10

Button Hole Machine

4

4

11

Button Attached Machine

2

2

12

Sewing Machine

20

20

13

Label Cutter Machine

1

1

14

Boilar Machine

1

1

15

Washing Machine

3

3

16

Water Separator

2

2

17

Dryer Machine

4

4

18

Iron Machine

13

13

19

Generator

1

1

20

Water Pump

5

5

21

Glass Table (1st Insp.)

13

13

22

Glass Lamp (Final)

3

3

23

Bengin Gun

2

2

24

Welding

1

1

25

Blouer Machine

1

1

26

Dril Machine

2

2

27

Grinding Machine

2

2

28

Wood Cutter Machine

1

1

29

Vacuam Cleaner

1

1

30

Computer

1

1

31

IPS

2

2

547

541

Total

6

______________________

__________________

________________

Production-Co-Ordinator

Finishing-In-Charge

Knitting-In-Charge

______________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Date : 01.03.2008

Factory Wise Total Machine Status For The Month Of February' 08 SL

Description Of Machine

No Of Total M/C

No Of M/C In Use

01

Knitting 5G

140

140

02

Knitting 7G

210

204

03

Auto Placket Machine

3

3

04

Winding Machine

8

8

Stock In Hand

6

Remarks

05

Flat Linking Machine

9

9

06

Dial Linking Machine

84

84

07

Flat Lock Machine

3

3

08

Over Lock Machine

2

2

09

Interlock Machine

3

3

10

Button Hole Machine

4

4

11

Button Attached Machine

2

2

12

Sewing Machine

20

20

13

Label Cutter Machine

1

1

14

Boilar Machine

1

1

15

Washing Machine

3

3

16

Water Separator

2

2

17

Dryer Machine

4

4

18

Iron Machine

13

13

19

Generator

1

1

20

Water Pump

5

5

21

Glass Table (1st Insp.)

13

13

22

Glass Lamp (Final)

3

3

23

Bengin Gun

2

2

24

Welding

1

1

25

Blouer Machine

1

1

26

Dril Machine

2

2

27

Grinding Machine

2

2

28

Wood Cutter Machine

1

1

29

Vacuam Cleaner

1

1

30

Computer

1

1

31

IPS

2

2

547

541

Total

6

______________________

__________________

________________

Production-Co-Ordinator

Finishing-In-Charge

Knitting-In-Charge

______________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Date : 01.02.2008

Factory Wise Total Machine Status For The Month Of January' 08 SL

Description Of Machine

No Of Total M/C

No Of M/C In Use

Stock In Hand

01

Knitting 5G

140

136

4

02

Knitting 7G

210

204

6

03

Auto Placket Machine

3

3

04

Winding Machine

8

8

05

Flat Linking Machine

9

9

Remarks

06

Dial Linking Machine

84

84

07

Flat Lock Machine

3

3

08

Over Lock Machine

2

2

09

Interlock Machine

3

3

10

Button Hole Machine

4

3

11

Button Attached Machine

2

2

12

Sewing Machine

20

20

13

Label Cutter Machine

1

1

14

Boilar Machine

1

1

15

Washing Machine

3

3

16

Water Separator

2

2

17

Dryer Machine

4

4

18

Iron Machine

13

13

19

Generator

1

1

20

Water Pump

5

5

21

Glass Table (1st Insp.)

13

13

22

Glass Lamp (Final)

3

3

23

Bengin Gun

2

2

24

Welding

1

1

25

Blouer Machine

1

1

26

Dril Machine

2

2

27

Grinding Machine

2

2

28

Wood Cutter Machine

1

1

29

Vacuam Cleaner

1

1

30

Computer

1

1

31

IPS

2

2

547

536

Total

1

11

______________________

__________________

________________

Production-Co-Ordinator

Finishing-In-Charge

Knitting-In-Charge

______________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Date : 01.01.2008

Factory Wise Total Machine Status For The Month Of December' 07 SL

Description Of Machine

No Of Total M/C

No Of M/C In Use

Stock In Hand

01

Knitting 5G

140

136

4

02

Knitting 7G

210

204

6

03

Auto Placket Machine

3

3

04

Winding Machine

8

8

05

Flat Linking Machine

9

9

Remarks

06

Dial Linking Machine

84

84

07

Flat Lock Machine

3

2

08

Over Lock Machine

2

2

09

Interlock Machine

3

3

10

Button Hole Machine

4

3

11

Button Attached Machine

2

2

12

Sewing Machine

20

19

13

Label Cutter Machine

1

1

14

Boilar Machine

1

1

15

Washing Machine

3

3

16

Water Separator

2

2

17

Dryer Machine

4

4

18

Iron Machine

13

13

19

Generator

1

1

20

Water Pump

5

5

21

Glass Table (1st Insp.)

13

13

22

Glass Lamp (Final)

3

3

23

Bengin Gun

2

2

24

Welding

1

1

25

Blouer Machine

1

1

26

Dril Machine

2

2

27

Grinding Machine

2

2

28

Wood Cutter Machine

1

1

29

Vacuam Cleaner

1

1

30

Computer

1

1

31

IPS

2

2

547

534

Total

1

1 1

13

______________________

__________________

________________

Production-Co-Ordinator

Finishing-In-Charge

Knitting-In-Charge

______________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Date : 02.12.2007

Factory Wise Total Machine Status For The Month Of November' 07 SL

Description Of Machine

No Of Total M/C

No Of M/C In Use

Stock In Hand

01

Knitting 5G

140

135

5

02

Knitting 7G

210

200

10

03

Auto Placket Machine

3

3

04

Winding Machine

8

8

05

Flat Linking Machine

9

9

Remarks

06

Dial Linking Machine

84

84

07

Flat Lock Machine

3

2

08

Over Lock Machine

2

2

09

Interlock Machine

3

3

10

Button Hole Machine

4

3

11

Button Attached Machine

2

2

12

Sewing Machine

20

19

13

Label Cutter Machine

1

1

14

Boilar Machine

1

1

15

Washing Machine

3

3

16

Water Separator

2

2

17

Dryer Machine

4

4

18

Iron Machine

13

13

19

Generator

1

1

20

Water Pump

5

3

21

Glass Table (1st Insp.)

13

13

22

Glass Lamp (Final)

3

3

23

Bengin Gun

2

2

24

Welding

1

1

25

Blouer Machine

1

1

26

Dril Machine

2

2

27

Grinding Machine

2

2

28

Wood Cutter Machine

1

1

29

Vacuam Cleaner

1

1

30

Computer

1

1

31

IPS

2

2

547

527

Total

1

1 1

2

20

______________________

__________________

________________

Production-Co-Ordinator

Finishing-In-Charge

Knitting-In-Charge

______________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Date : 03.11.2007

Factory Wise Total Machine Status For The Month Of October' 07 SL

Description Of Machine

No Of Total M/C

No Of M/C In Use

Stock In Hand

01

Knitting 5G

140

135

5

02

Knitting 7G

210

200

10

03

Auto Placket Machine

3

3

04

Winding Machine

8

8

05

Flat Linking Machine

9

9

Remarks

06

Dial Linking Machine

84

84

07

Flat Lock Machine

3

2

08

Over Lock Machine

2

2

09

Interlock Machine

3

3

10

Button Hole Machine

4

3

11

Button Attached Machine

2

2

12

Sewing Machine

20

19

13

Label Cutter Machine

1

1

14

Boilar Machine

1

1

15

Washing Machine

3

3

16

Water Separator

2

2

17

Dryer Machine

4

4

18

Iron Machine

13

13

19

Generator

1

1

20

Water Pump

5

3

21

Glass Table (1st Insp.)

13

13

22

Glass Lamp (Final)

3

3

23

Bengin Gun

2

2

24

Welding

1

1

25

Blouer Machine

1

1

26

Dril Machine

2

2

27

Grinding Machine

2

2

28

Wood Cutter Machine

1

1

29

Vacuam Cleaner

1

1

30

Computer

1

1

31

IPS

2

2

547

527

Total

1

1 1

2

20

______________________

__________________

________________

Production-Co-Ordinator

Finishing-In-Charge

Knitting-In-Charge

______________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Date : 01.09.2007

Factory Wise Total Machine Status For The Month Of August' 07 SL

Description Of Machine

No Of Total M/C

No Of M/C In Use

Stock In Hand

01

Knitting 5G

140

135

5

02

Knitting 7G

210

200

10

03

Auto Placket Machine

3

3

04

Winding Machine

8

8

05

Flat Linking Machine

9

9

Remarks

06

Dial Linking Machine

84

84

07

Flat Lock Machine

3

2

08

Over Lock Machine

2

2

09

Interlock Machine

3

3

10

Button Hole Machine

4

3

11

Button Attached Machine

2

2

12

Sewing Machine

20

19

13

Label Cutter Machine

1

1

14

Boilar Machine

1

1

15

Washing Machine

3

3

16

Water Separator

2

2

17

Dryer Machine

4

4

18

Iron Machine

13

13

19

Generator

1

1

20

Water Pump

5

3

21

Glass Table (1st Insp.)

13

13

22

Glass Lamp (Final)

3

3

23

Bengin Gun

2

2

24

Welding

1

1

25

Blouer Machine

1

1

26

Dril Machine

2

2

27

Grinding Machine

2

2

28

Wood Cutter Machine

1

1

29

Vacuam Cleaner

1

1

30

Computer

1

1

31

IPS

2

2

547

527

Total

1

1 1

2

20

______________________

__________________

________________

Production-Co-Ordinator

Finishing-In-Charge

Knitting-In-Charge

______________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Date : 05.08.2007

Factory Wise Total Machine Status For The Month Of July' 07 SL

Description Of Machine

No Of Total M/C

No Of M/C In Use

Stock In Hand

01

Knitting 5G

140

135

5

02

Knitting 7G

210

200

10

03

Auto Placket Machine

3

3

04

Winding Machine

8

8

05

Flat Linking Machine

9

9

06

Dial Linking Machine

84

84

07

Flat Lock Machine

3

2

08

Over Lock Machine

2

2

1

Remarks

09

Interlock Machine

3

3

10

Button Hole Machine

4

3

11

Button Attached Machine

2

2

12

Sewing Machine

20

19

13

Label Cutter Machine

1

1

14

Boilar Machine

1

1

15

Washing Machine

3

3

16

Water Separator

2

2

17

Dryer Machine

4

4

18

Iron Machine

13

13

19

Generator

1

1

20

Water Pump

5

3

21

Glass Table (1st Insp.)

13

13

22

Glass Lamp (Final)

3

3

23

Bengin Gun

2

2

24

Welding

1

1

25

Blouer Machine

1

1

26

Dril Machine

2

2

27

Grinding Machine

2

2

28

Wood Cutter Machine

1

1

29

Vacuam Cleaner

1

1

30

Computer

31

IPS

1 2

1 2

547

527

Total

1 1

2

20

______________________

__________________

________________

Production-Co-Ordinator

Finishing-In-Charge

Knitting-In-Charge

______________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Date : 01.07.2007

Factory Wise Total Machine Status For The Month Of June'07 SL

Description Of Machine

No Of Total M/C

No Of M/C In Use

No Of Total Idle Machine

01

Knitting 5G

140

140

02

Knitting 7G

212

212

03

Auto Placket Machine

3

3

04

Winding Machine

8

8

05

Flat Linking Machine

14

14

06

Dial Linking Machine

84

84

07

Flat Lock Machine

4

0

4

08

Over Lock Machine

4

2

2

Remarks

Savar + AMGL For Repair

09

Interlock Machine

3

3

10

Button Hole Machine

3

0

3

11

Button Attached Machine

2

0

2

12

Sewing Machine

18

18

13

Label Cutter Machine

1

1

14

Boilar Machine

1

1

15

Washing Machine

3

3

16

Water Separator

2

2

17

Dryer Machine

4

4

18

Iron Machine

13

13

19

Generator

1

1

20

Water Pump

3

2

21

Glass Table (1st Insp.)

13

13

22

Glass Lamp (Final)

3

3

23

Bengin Gun

2

2

24

Welding

1

1

25

Blouer Machine

1

1

26

Dril Machine

2

2

27

Grinding Machine

2

2

28

Wood Cutter Machine

1

1

29

Vacuam Cleaner

1

1

549

537

Total

1

12

______________________

__________________

________________

Production-Co-Ordinator

Finishing-In-Charge

Knitting-In-Charge

______________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Date : 01.05.2007

Factory Wise Total Machine Status For The Month Of April'07 SL

Description Of Machine

No Of Total M/C

No Of M/C In Use

No Of Total Idle Machine

01

Knitting 5G

140

140

02

Knitting 7G

212

212

03

Auto Placket Machine

3

3

04

Winding Machine

8

8

05

Flat Linking Machine

14

14

06

Dial Linking Machine

84

84

07

Flat Lock Machine

4

0

4

08

Over Lock Machine

4

2

2

09

Interlock Machine

3

3

10

Button Hole Machine

3

0

3

Remarks

Savar + AMGL For Repair

11

Button Attached Machine

2

0

12

Sewing Machine

18

18

13

Label Cutter Machine

1

1

14

Boilar Machine

1

1

15

Washing Machine

3

3

16

Water Separator

2

2

17

Dryer Machine

4

4

18

Iron Machine

13

13

19

Generator

1

1

20

Water Pump

3

2

21

Glass Table (1st Insp.)

13

13

22

Glass Lamp (Final)

3

3

23

Bengin Gun

2

2

24

Welding

1

1

25

Blouer Machine

1

1

26

Dril Machine

2

2

27

Grinding Machine

2

2

28

Wood Cutter Machine

1

1

29

Vacuam Cleaner

1

1

549

537

Total

2

1

12

______________________

__________________

________________

Production-Co-Ordinator

Finishing-In-Charge

Knitting-In-Charge

______________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Date : 01.04.2007

Factory Wise Total Machine Status For The Month Of March'07 SL

Description Of Machine

No Of Total M/C

No Of M/C In Use

No Of Total Idle Machine

01

Knitting 5G

140

140

02

Knitting 7G

212

212

03

Auto Placket Machine

3

3

04

Winding Machine

8

8

05

Flat Linking Machine

14

14

06

Dial Linking Machine

84

84

07

Flat Lock Machine

4

0

4

08

Over Lock Machine

4

2

2

09

Interlock Machine

3

3

10

Button Hole Machine

3

0

3

11

Button Attached Machine

2

0

2

12

Sewing Machine

18

18

Remarks

Savar + AMGL For Repair

13

Label Cutter Machine

1

1

14

Boilar Machine

1

1

15

Washing Machine

3

3

16

Water Separator

2

2

17

Dryer Machine

4

4

18

Iron Machine

13

13

19

Generator

1

1

20

Water Pump

3

2

21

Glass Table (1st Insp.)

13

13

22

Glass Lamp (Final)

3

3

23

Bengin Gun

2

2

24

Welding

1

1

25

Blouer Machine

1

1

26

Dril Machine

2

2

27

Grinding Machine

2

2

28

Wood Cutter Machine

1

1

29

Vacuam Cleaner

1

1

549

537

Total

1

12

___________

________________

Prepared By

Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Date : 01.01.2007

Factory Wise Total Machine Status For The Month Of January'07 SL

Description Of Machine

No Of Total M/C

No Of M/C In Use

No Of Total Idle Machine

01

Knitting 5G

140

140

02

Knitting 7G

212

212

03

Auto Placket Machine

3

3

04

Winding Machine

8

8

05

Flat Linking Machine

14

14

06

Dial Linking Machine

84

84

07

Flat Lock Machine

4

0

4

08

Over Lock Machine

4

2

2

09

Interlock Machine

3

3

10

Button Hole Machine

3

0

3

11

Button Attached Machine

2

0

2

12

Sewing Machine

18

18

13

Label Cutter Machine

1

1

Remarks

Savar + AMGL For Repair

14

Boilar Machine

1

1

15

Washing Machine

3

3

16

Water Separator

2

2

17

Dryer Machine

4

4

18

Iron Machine

13

13

19

Generator

1

1

20

Water Pump

3

2

21

Glass Table (1st Insp.)

13

13

22

Glass Lamp (Final)

3

3

23

Bengin Gun

2

2

24

Welding

1

1

25

Blouer Machine

1

1

26

Dril Machine

2

2

27

Grinding Machine

2

2

28

Wood Cutter Machine

1

1

29

Vacuam Cleaner

1

1

549

537

Total

1

12

___________

________________________

________________

Prepared By

Production-Co-Ordinator

Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Date : 01.12.2006

Factory Wise Total Machine Status For The Month Of November'06 SL

Description Of Machine

No Of Total M/C

No Of M/C In Use

No Of Total Idle Machine

01

Knitting 5G

112

112

02

Knitting 7G

240

240

03

Auto Placket Machine

3

3

04

Winding Machine

8

8

05

Flat Linking Machine

14

14

06

Dial Linking Machine

84

84

07

Flat Lock Machine

4

0

4

08

Over Lock Machine

4

2

2

09

Interlock Machine

3

3

10

Button Hole Machine

3

0

3

11

Button Attached Machine

2

0

2

12

Sewing Machine

18

18

13

Label Cutter Machine

1

1

14

Boilar Machine

1

1

Remarks

Savar + AMGL For Repair

15

Washing Machine

3

3

16

Water Separator

2

2

17

Dryer Machine

4

4

18

Iron Machine

13

13

19

Generator

1

1

20

Water Pump

3

2

21

Glass Table (1st Insp.)

13

13

22

Glass Lamp (Final)

3

3

23

Bengin Gun

2

2

24

Welding

1

1

25

Blouer Machine

1

1

26

Dril Machine

2

2

27

Grinding Machine

2

2

28

Wood Cutter Machine

1

1

29

Vacuam Cleaner

1

1

549

537

Total

1

12

___________

________________________

________________

Prepared By

Production-Co-Ordinator

Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Date : 01.11.2006

Factory Wise Total Machine Status For The Month Of October'06 SL

Description Of Machine

No Of Total M/C

No Of M/C In Use

No Of Total Idle Machine

01

Knitting 5G

112

112

02

Knitting 7G

240

240

03

Auto Placket Machine

3

3

04

Winding Machine

8

8

05

Flat Linking Machine

20

20

06

Dial Linking Machine

72

72

07

Flat Lock Machine

4

0

4

08

Over Lock Machine

4

2

2

09

Interlock Machine

3

3

10

Button Hole Machine

3

0

3

11

Button Attached Machine

2

0

2

12

Sewing Machine

18

18

13

Label Cutter Machine

1

1

14

Boilar Machine

1

1

15

Washing Machine

3

3

Remarks

Savar + AMGL For Repair

16

Water Separator

2

2

17

Dryer Machine

4

4

18

Iron Machine

13

13

19

Generator

1

1

20

Water Pump

3

2

21

Glass Table (1st Insp.)

13

13

22

Glass Lamp (Final)

3

3

23

Bengin Gun

2

2

24

Welding

1

1

25

Blouer Machine

1

1

26

Dril Machine

2

2

27

Grinding Machine

2

2

28

Wood Cutter Machine

1

1

29

Vacuam Cleaner

1

1

543

531

Total

1

12

___________

________________________

________________

Prepared By

Production-Co-Ordinator

Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Date : 03.10.2006

Factory Wise Total Machine Status For The Month Of September'06 SL

Description Of Machine

No Of Total M/C

No Of M/C In Use

No Of Total Idle Machine

01

Knitting 5G

112

112

02

Knitting 7G

240

240

03

Auto Placket Machine

3

3

04

Winding Machine

8

8

05

Flat Linking Machine

20

20

06

Dial Linking Machine

72

72

07

Flat Lock Machine

4

0

4

08

Over Lock Machine

4

2

2

09

Interlock Machine

3

3

10

Button Hole Machine

3

0

3

11

Button Attached Machine

2

0

2

12

Sewing Machine

18

18

13

Label Cutter Machine

1

1

14

Boilar Machine

1

1

15

Washing Machine

3

3

16

Water Separator

2

2

Remarks

Savar + AMGL For Repair

17

Dryer Machine

4

4

18

Iron Machine

13

13

19

Generator

1

1

20

Water Pump

3

2

21

Glass Table (1st Insp.)

13

13

22

Glass Lamp (Final)

3

3

23

Bengin Gun

2

2

24

Welding

1

1

25

Blouer Machine

1

1

26

Dril Machine

2

2

27

Grinding Machine

2

2

28

Wood Cutter Machine

1

1

29

Vacuam Cleaner

1

1

543

531

Total

1

12

___________

________________________

________________

Prepared By

Production-Co-Ordinator

Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Date : 01.03.2006

Factory Wise Total Machine Status For The Month Of February'06 SL

Description Of Machine

No Of Total M/C

No Of M/C In Use

No Of Total Idle Machine

01

Knitting 5G

51

51

02

Knitting 7G

301

289

03

Auto Placket Machine

3

3

04

Winding Machine

8

8

05

Flat Linking Machine

50

35

06

Dial Linking Machine

65

65

07

Flat Lock Machine

4

08

Over Lock Machine

4

4

09

Interlock Machine

2

2

10

Twist Machine

1

1

11

Button Hole Machine

3

3

12

Button Attached Machine

4

4

13

Sewing Machine

18

18

14

Label Cutter Machine

1

1

15

Boilar Machine

1

1

16

Washing Machine

3

3

4

Remarks

17

Water Separator

2

2

18

Dryer Machine

4

4

19

Iron Machine

14

14

20

Generator

1

1

21

Water Pump

5

5

22

Glass Table

13

13

23

Glass Lamp

3

3

24

Bengin Gun

2

2

25

Welding

1

1

26

Blouer Machine

1

1

27

Dril Machine

2

2

28

Grinding Machine

2

2

29

Wood Cutter Machine

1

1

570

531

Total

12

___________

________________________

________________

Prepared By

Production-Co-Ordinator

Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Date : 02.06.2005

Factory Wise Total Machine Status For The Month Of May '05 SL

Description Of Machine

No Of Total M/C

No Of M/C In Use

01

Knitting 5G

51

51

02

Knitting 7G

301

301

03

Auto Placket Machine

3

3

04

Winding Machine

8

8

05

Flat Linking Machine

50

50

06

Dial Linking Machine

65

65

07

Super Dial Machine

2

2

08

Flat Lock Machine

4

4

09

Over Lock Machine

4

4

10

Interlock Machine

2

2

11

Twist Machine

1

1

12

Button Hole Machine

3

3

13

Button Attached Machine

4

4

14

Sewing Machine

18

18

No Of Total Idle Machine

Remarks

15

Label Cutter Machine

1

1

16

Boilar Machine

1

1

17

Washing Machine

3

3

18

Water Separator

2

2

19

Dryer Machine

4

3

20

Iron Machine

14

14

21

Generator

1

1

22

Water Pump

5

5

23

Glass Table

13

13

24

Glass Lamp

3

2

1

25

Bengin Gun

2

1

1

26

Welding

1

1

27

Blouer Machine

1

1

28

Dril Machine

2

2

29

Grinding Machine

2

2

30

Wood Cutter Machine

1

1

572

569

Total

1

3

___________

________________

Prepared By

Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Date : 01.05.2005

Factory Wise Total Machine Status For The Month Of April'05 SL

Description Of Machine

No Of Total M/C

No Of M/C In Use

01

Knitting 5G

51

51

02

Knitting 7G

301

301

03

Auto Placket Machine

3

3

04

Winding Machine

8

8

05

Flat Linking Machine

50

50

06

Dial Linking Machine

65

65

07

Super Dial Machine

2

2

08

Flat Lock Machine

4

4

09

Over Lock Machine

4

4

10

Interlock Machine

2

2

11

Twist Machine

1

1

12

Button Hole Machine

3

3

13

Button Attached Machine

4

4

14

Sewing Machine

18

18

15

Label Cutter Machine

1

1

16

Boilar Machine

1

1

No Of Total Idle Machine

Remarks

17

Washing Machine

3

3

18

Water Separator

2

2

19

Dryer Machine

4

3

20

Iron Machine

14

14

21

Generator

1

1

22

Water Pump

5

5

23

Glass Table

13

13

24

Glass Lamp

3

2

1

25

Bengin Gun

2

1

1

26

Welding

1

1

27

Blouer Machine

1

1

28

Dril Machine

2

2

29

Grinding Machine

2

2

30

Wood Cutter Machine

1

1

572

569

Total

1

3

___________

________________

Prepared By

Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Date : 02.03.2005

Factory Wise Total Machine Status For The Month Of February'05 SL

Description Of Machine

No Of Total M/C

No Of M/C In Use

01

Knitting 5G

51

51

02

Knitting 7G

301

301

03

Auto Placket Machine

3

3

04

Winding Machine

8

8

05

Flat Linking Machine

50

50

06

Dial Linking Machine

65

65

07

Super Dial Machine

2

2

08

Flat Lock Machine

4

4

09

Over Lock Machine

4

4

10

Interlock Machine

2

2

11

Twist Machine

1

1

12

Button Hole Machine

3

3

13

Button Attached Machine

4

4

14

Sewing Machine

18

18

15

Label Cutter Machine

1

1

16

Boilar Machine

1

1

17

Washing Machine

3

3

18

Water Separator

2

2

No Of Total Idle Machine

Remarks

19

Dryer Machine

4

3

20

Iron Machine

14

14

21

Generator

1

1

22

Water Pump

5

5

23

Glass Table

13

13

24

Glass Lamp

3

2

1

25

Bengin Gun

2

1

1

26

Welding

1

1

27

Blouer Machine

1

1

28

Dril Machine

2

2

29

Grinding Machine

2

2

30

Wood Cutter Machine

1

1

572

569

Total

1

3

___________

________________

Prepared By

Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Date : 02.02.2005

Factory Wise Total Machine Status For The Month Of January'05 SL

Description Of Machine

No Of M/C In Use

01 Knitting 5G

151

02 Knitting 7G

201

03 Auto Placket Machine

2

04 Winding Machine

8

05 Flat Linking Machine

50

06 Dial Linking Machine

65

07 Super Dial Machine

3

08 Flat Lock Machine

4

09 Over Lock Machine

4

10 Interlock Machine

2

11 Twist Machine

1

12 Button Hole Machine

3

13 Button Attached Machine

4

14 Sewing Machine

15

15 Label Cutter Machine

1

16 Boilar Machine

1

No Of Total Idle Machine

1 1

Remarks

17 Washing Machine

3

18 Water Separator

2

19 Dryer Machine

3

20 Iron Machine

14

21 Generator

1

22 Water Pump

5

23 Glass Table

13

24 Glass Lamp

2

1

25 Bengin Gun

1

1

26 Welder

1

27 Blouer Machine

1

28 Dril Machine

2

29 Grinding Machine

2

30 Wood Cutter Machine

1

Total

___________ Prepared By

566

1

5

________________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Date : 01.09.2008

All Figure In DZ Buyer Wise Production & Export Summarry For The Month Of August'08 SL

Buyer

Gauge

Product.In.Dz

Export In Dz.

01

Sage

5G

384

797

02

G.Gold

5G

144

233

03

Sears

5G

767

719

04

Quelle

5G

205

82

1500

1831

Total 5GG 05

Eurofrente

7G

356

50

06

K-Mart

7G

1139

1639

07

G.Gold

7G

1469

1772

08

Sears

7G

108

105

Total 7GG

3072

3566

Grand Total (5G+7G)

4572

5397

______________________ Production-Co-Ordinator

__________________ Finishing-In-Charge

________________ Knitting-In-Charge

Remarks

______________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Date : 01.08.2008

All Figure In DZ Buyer Wise Production & Export Summarry For The Month Of July'08

SL

Buyer

Gauge

Product.In.Dz

Export In Dz.

01

G.Union

5G

44

300

02

G.Gold

5G

234

0

03

Sage

5G

1115

306

04

Sears

5G

369

297

05

Li & Fung

5G

0

484

1762

1388

Total 5GG 05

G.Gold

7G

2938

1144

06

G.Union

7G

184

1590

07

Seara

7G

407

497

08

Safra

12G

0

392

Total 7GG

3529

3623

Grand Total (5G+7G)

5290

5011

______________________ Production-Co-Ordinator

__________________ Finishing-In-Charge

________________ Knitting-In-Charge

Remarks

______________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Date : 01.07.2008

All Figure In DZ Buyer Wise Production & Export Summarry For The Month Of June'08 SL

Buyer

Gauge

Product.In.Dz

Export In Dz.

Remarks

01

Sears

5G

569

552

02

Li& Fung

5G

378

163

03

G.Union

5G

359

1000

04

G.Gold

5G

529

Total 5GG

1305

2243

05

G.Gold

7G

1601

536

06

Sears

7G

298

194

07

Eurofrente

7G

3

1100

08

G.Union

7G

933

Total 7GG

2835

1830

Grand Total (5G+7G)

4141

4073

______________________ Production-Co-Ordinator

__________________ Finishing-In-Charge

________________ Knitting-In-Charge

______________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Date : 01.06.2008

All Figure In DZ Buyer Wise Production & Export Summarry For The Month Of May'08 SL 01

Buyer G.Union

Gauge

Product.In.Dz

5G

172

Export In Dz.

Remarks

02

Sears

5G

175

03

G.Gold

5G

547

04

Li& Fung

5G

284

05

Branex

5G

532

Total 5GG

1178

532

06

G.Union

7G

1001

07

K-Mart

7G

1275

2083

08

Eurofrente

7G

1341

3050

Total 7GG

3616

5133

Grand Total (5G+7G)

4794

5664

______________________ Production-Co-Ordinator

__________________ Finishing-In-Charge

________________ Knitting-In-Charge

______________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Date : 02.05.2008

All Figure In DZ Buyer Wise Production & Export Summarry For The Month Of April'08 SL

Buyer

Gauge

Product.In.Dz

Export In Dz.

01

G.Union

5G

1209

800

02

Quelle

5G

486

614

Remarks

03

G.Gold

5G

164

296

04

Branex

5G

8

0

1867

1710

Total 5GG 05

G.Union

7G

298

1500

06

G.Gold

7G

830

0

07

Eurofrente

7G

1908

0

08

Quelle

7G

0

83

Total 7GG

3036

1583

Grand Total (5G+7G)

4903

3293

______________________ Production-Co-Ordinator

__________________ Finishing-In-Charge

________________ Knitting-In-Charge

______________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Date : 01.04.2008

All Figure In DZ Buyer Wise Production & Export Summarry For The Month Of March'08 SL

Buyer

Gauge

Product.In.Dz

Export In Dz.

01

G.Union

5G

1288

2600

02

Branex

5G

530

0

03

Quelle

5G

135

0

04

N.Mann

5G

118

135

Remarks

05

Atlantic

5G

191

06

G.Gold

5G

139

Total 5GG

183

2401

2918

07

G.Union

7G

1684

2800

08

Quelle

7G

85

0

09

Eurofrente

7G

938

0

10

Branex

7G

0

284

Total 7GG

2707

3084

Grand Total (5G+7G)

5108

6002

______________________ Production-Co-Ordinator

__________________ Finishing-In-Charge

________________ Knitting-In-Charge

______________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Date : 01.03.2008

All Figure In DZ Buyer Wise Production & Export Summarry For The Month Of February'08 SL

Buyer

Gauge

Product.In.Dz

Export In Dz.

01

Atlantic

5G

649

631

02

G.Union

5G

1123

1235

03

N.Mann

5G

17

0

1790

1866

Total 5GG

Remarks

04

G.Gold

7G

327

1350

05

Branex

7G

252

514

06

G.Union

7G

1602

400

07

Zara

12G

0

48

Total 7GG

2180

2312

Grand Total (5G+7G)

3970

4178

______________________ Production-Co-Ordinator

__________________ Finishing-In-Charge

________________ Knitting-In-Charge

Recvd From Swt.Complex

______________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Date : 01.02.2008

All Figure In DZ Buyer Wise Production & Export Summarry For The Month Of January'08 SL

Buyer

Gauge

Product.In.Dz

Export In Dz.

01

N.Mann

5G

139

134

02

G.Union

5G

1232

0

1371

134

955

0

Total 5GG 03

G.Gold

7G

Remarks

04

Branex

7G

564

0

05

G.Union

7G

803

0

06

Quelle

7G

0

1110

07

Zara

12G

0

101

Recvd From Swt.Complex

08

Sfara

12G

0

182

Recvd From Swt.Complex

Total 7GG

2323

1393

Grand Total (5G+7G)

3693

1527

______________________ Production-Co-Ordinator

__________________ Finishing-In-Charge

________________ Knitting-In-Charge

______________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Date : 01.01.2008

All Figure In DZ Buyer Wise Production & Export Summarry For The Month Of December'07 SL

Buyer

Gauge

Product.In.Dz

Export In Dz.

01

G.Gold

5G

425

414

02

Quelle

5G

50

619

03

Atlantic

5G

20

0

Remarks

04

N.Mann

5G

128

126

05

G.Union

5G

871

0

1494

1159 2372

Total 5GG 06

Quelle

7G

1598

07

G.Union

7G

462

08

G.Gold

7G

0

49

Total 7GG

2060

2421

Grand Total (5G+7G)

3554

3580

______________________ Production-Co-Ordinator

__________________ Finishing-In-Charge

________________ Knitting-In-Charge

______________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Date : 02.12.2007

All Figure In DZ Buyer Wise Production & Export Summarry For The Month Of November'07 SL

Buyer

Gauge

Product.In.Dz

Export In Dz.

01

Eurofrente

5G

9

351

02

Quelle

5G

766

276

775

627

2529

542

Total 5GG 05

Quelle

7G

Remarks

06

Les. Line

7G

422

1043

07

G.Union

7G

1

0

08

G.Gold

7G

468

498

09

Cellio

12G

0

33

Total 7GG

3420

2116

Grand Total (5G+7G)

4195

2743

______________________ Production-Co-Ordinator

__________________ Finishing-In-Charge

________________ Knitting-In-Charge

______________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Date : 03.11.2007

All Figure In DZ Buyer Wise Production & Export Summarry For The Month Of October'07 SL

Buyer

Gauge

Product.In.Dz

Export In Dz.

01

Eurofrente

5G

240

0

02

Quelle

5G

13

0

03

Sfera

5G

18

161

04

N.Mann

5G

0

200

271

361

Total 5GG

Remarks

05

Quelle

7G

705

1158

06

Les. Line

7G

614

407

07

G.Union

7G

195

334

08

G.Gold

7G

37

0

09

7G

10

7G Total 7GG

1551

1899

Grand Total (5G+7G)

1822

2260

______________________ Production-Co-Ordinator

__________________ Finishing-In-Charge

________________ Knitting-In-Charge

______________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Date : 02.10.2007

All Figure In DZ Buyer Wise Production & Export Summarry For The Month Of September'07 SL

Buyer

Gauge

Product.In.Dz

Export In Dz.

01

Eurofrente

5G

120

0

02

Quelle

5G

154

146

03

G.Gold

5G

0

176

04

Sfera

5G

148

0

422

322

1823

1873

Total 5GG 05

Quelle

7G

Remarks

06

Less. Line

7G

431

0

07

G.Union

7G

144

0

08

N.Mann

7G

206

0

09

Zara

7G

0

206

10

Sears

7G

0

125

2604

2204

0

790

Total 7GG 11

Zara

12G Total 7GG

0

790

Grand Total (5G+7G+12)

3026

3316

______________________ Production-Co-Ordinator

__________________ Finishing-In-Charge

________________ Knitting-In-Charge

______________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Date : 01.09.2007

All Figure In DZ Buyer Wise Production & Export Summarry For The Month Of August'07 SL

Buyer

Gauge

Product.In.Dz

Export In Dz.

01

Quelle

5G

69

0

02

G.Gold

5G

780

1157

849

1157

173

335

Total 5GG 07

Sears

7G

Remarks

08

Quelle

7G

518

0

09

Les. Line

7G

41

626

10

Zara

7G

1026

833

Total 7GG

1758

1794

Grand Total (5G & 7G)

2607

2951

______________________ Production-Co-Ordinator

__________________ Finishing-In-Charge

________________ Knitting-In-Charge

______________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Date : 05.08.2007

All Figure In DZ Buyer Wise Production & Export Summarry For The Month Of July'07 SL

Buyer

Gauge

Product.In.Dz

Export In Dz.

01

Quelle

5G

202

192

02

Tiara

5G

75

500

03

K-Mart

5G

1550

1564

04

Sears

5G

16

822

05

G.Gold

5G

479

0

Remarks

06

N.Mann

5G

Total 5GG

0

85

2322

3163

07

Sears

7G

481

794

08

Quelle

7G

1343

2222

09

Les. Line

7G

630

0

10

Zara

7G

19

0

2473

3016

0

108

Total 7GG 11

Eurofrente

7G

Total 12GG

0

108

Grand Total (5G & 7G)

4795

6287

______________________ Production-Co-Ordinator

__________________ Finishing-In-Charge

________________ Knitting-In-Charge

______________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Date : 01.07.2007

All Figure In DZ Buyer Wise Production & Export Summarry For The Month Of June'07 SL

Buyer

Gauge

Product.In.Dz

Export In Dz.

01

N.Mann

5G

85

0

02

G.Union

5G

51

1000

03

Tiara

5G

724

508

04

Sears

5G

514

0

05

G.Gold (K-Mart)

5G

37

0

1411

1508

Total 5GG

Remarks

05

Sears

7G

416

339

06

Quelle

7G

2615

2561

07

G.Union

7G

0

300

Total 7GG

3031

3200

Grand Total (5G & 7G)

4442

4708

______________________ Production-Co-Ordinator

__________________ Finishing-In-Charge

________________ Knitting-In-Charge

______________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Date : 01.07.2007

All Figure In DZ Buyer Wise Production & Export Summarry For The Month Of June'07 SL

Buyer

Gauge

Product.In.Dz

Export In Dz.

01

N.Mann

5G

85

0

02

G.Union

5G

51

1000

03

Tiara

5G

724

508

04

Sears

5G

514

0

05

G.Gold (K-Mart)

5G

37

0

1411

1508

Total 5GG 05

Sears

7G

416

339

06

Quelle

7G

2615

2561

Remarks

07

G.Union

0

300

Total 7GG

3031

3200

Grand Total (5G & 7G)

4442

4708

______________________ Production-Co-Ordinator

7G

__________________ Finishing-In-Charge

________________ Knitting-In-Charge

______________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Date : 01.06.2007

All Figure In DZ Buyer Wise Production & Export Summarry For The Month Of May'07 SL

Buyer

Gauge

Product.In.Dz

Export In Dz.

01

Quelle

5G

233

329

02

G.Union

5G

899

0

03

Tiara

5G

232

0

04

Sears

5G

338

238

05

N.Mann

5G

0

84

1702

651

Total 5GG 04

Sears

7G

413

0

05

Quelle

7G

634

142

06

G.Union

7G

307

0

Remarks

07

Tiara

7G

381

998

08

Eurofrente Total 7GG

7G

959 2694

1223 2363

4396

3014

Grand Total (5G & 7G)

______________________ Production-Co-Ordinator

__________________ Finishing-In-Charge

________________ Knitting-In-Charge

______________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Date : 01.05.2007

All Figure In DZ Buyer Wise Production & Export Summarry For The Month Of April'07 SL 01 02 03 03

Buyer Quelle N.Mann Sears G.Union Total 5GG

Gauge 5G 5G 5G 5G

Product.In.Dz 690 107 806 95 1698

Export In Dz. 669 166 569 500 1904

04

G.Union

7G

231

1100

05 06 07 08

Quelle Tiara Eurofrente Sears Total 7GG

7G 7G 7G 7G

880 630 277 20 2038

700 0 0 0 1800

3736

3704

Grand Total (5G & 7G)

Remarks

______________________ Production-Co-Ordinator

__________________ Finishing-In-Charge

________________ Knitting-In-Charge

______________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Date : 01.04.2007

All Figure In DZ Buyer Wise Production & Export Summarry For The Month Of March'07 SL 01

Buyer G.Union

02 03 04 05

Gauge 5G

Product.In.Dz 1495

Export In Dz. 2668

N.Mann

5G

160

0

Quelle Total 5GG G.Union Quelle Total 7GG

5G

97 1752.00 1905 23 1928.00

0 2668.00 1700 0 1700.00

3680

4368

7G 7G

Grand Total (5G & 7G)

Remarks

____________ Prepared By

________________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Date : 01.03.2007

All Figure In DZ Buyer Wise Production & Export Summarry For The Month Of February'07 SL 01

Buyer G.Union

Gauge 5G

Product.In.Dz 1743

Export In Dz. 532

02

N.Mann

5G

0

103

04 05

Total 5GG Quelle G.Union Total 7GG

7G 7G

1743.00 426 1157 1583.00

635.00 1471 1700 3171.00

3326

3806

Grand Total (5G & 7G)

____________ Prepared By

Remarks

________________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Date : 01.02.2007

All Figure In DZ Buyer Wise Production & Export Summarry For The Month Of January'07 SL 01

Buyer N.Mann

02 03 04 05

Gauge 5G

Product.In.Dz 106

Export In Dz. 0

Quelle

5G

371

750

G.Union Total 5GG Quelle G.Union Total 7GG

5G

779 1256.00 375 1288 1663.00

0 750.00 399 0 399.00

2919

1149

7G 7G

Grand Total (5G & 7G)

____________ Prepared By

_______________________ Production-Co-Ordinator

Remarks

________________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Date : 02.12.2006

All Figure In DZ Buyer Wise Production & Export Summarry For The Month Of November'06 SL 01 02 03 04 05

Buyer Eurofrente Quelle N.Mann Total 5GG Quelle Leasure Line

Gauge

Product.In.Dz

Export In Dz.

5G 5G 5G

370 127 95 592.00 2335 0

1150 75 83 1308.00 2676 23

2335.00

2699.00

7G 7G

Total 7GG 06

7G

Zara

0

7

Total 12GG

0

7

Grand Total(1.5G,5G&7G)

2927

4014

____________ Prepared By

_______________________ Production-Co-Ordinator

Remarks

________________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Date :

All Figure In DZ Buyer Wise Production & Export Summarry For The Month Of SL 01

Buyer

Gauge

Product.In.Dz

Export In Dz.

Remarks

Total 1.5GG

Total 5GG

Total 7GG

Grand Total(1.5G,5G&7G)

____________ Prepared By

_______________________ Production-Co-Ordinator

________________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Date : 01.11.2006

All Figure In DZ Buyer Wise Production & Export Summarry For The Month Of October'06 SL 01

Buyer G.Gold

Gauge 3G

Product.In.Dz 0

Export In Dz. 13

02

Total 1.5GG N.Mann

5G

0.00 35

13.00 0

03

Eurofrente

5G

763

0

03

G.Gold

5G

0

550

798.00

550.00

Total 5GG 08 08

Sears

7G

Quelle

7G

38

323

1609

1728

Total 7GG

1647

2051

Grand Total(1.5G,5G&7G)

2445

2614

____________ Prepared By

_______________________ Production-Co-Ordinator

Remarks

________________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Date : 03.10.2006

All Figure In DZ Buyer Wise Production & Export Summarry For The Month Of September'06 SL 01 02

Buyer Zara Total 1.5GG G.Gold

03

N.Mann

5G

43

0

04 05 06 07

5G 5G 5G 5G

08

Sears Eurofrente Bay-City Rajan Total 5GG Rajan

7G

150 54 0 0 1632.00 39

417 0 56 1100 2957.00 104

08

Sears

7G

457

158

92

0

1460

991

Total 7GG

2048

1253

Grand Total(1.5G,5G&7G)

3680

4390

09 10

5G

Product.In.Dz 0 0.00 1385

Export In Dz. 180 180.00 1384

7G

Tiara Quelle

____________ Prepared By

Gauge 1.5 G

7G

_______________________ Production-Co-Ordinator

Remarks

________________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Date : 01.09.2006

All Figure In DZ Buyer Wise Production & Export Summarry For The Month Of August'06 SL 01 02

Buyer G.Gold N.Mann

Gauge 5G 5G

Product.In.Dz 597 129

Export In Dz. 0 128

03

Quelle

5G

581

5G 5G

04 05 06

Sears Rajan Total 5GG Quelle Rajan Sears

7G 7G 7G

382 950 0 2058.00 737 1082 102

04 04

795.00 60.00 1564.00 1015 317 552

07

Tiara

7G

111

0

837 0

815 62

Total 5GG

2869

2761

Grand Total(5G&7G)

4927

4325

08

W.Smith N.Mann

____________ Prepared By

7G 7G

_______________________ Production-Co-Ordinator

Remarks

________________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Date : 01.08.2006

All Figure In DZ Buyer Wise Production & Export Summarry For The Month Of July'06 SL 01

Tiara

Buyer

02

Sears

03

Gauge 3G 5G

Product.In.Dz 0 0.00 120

Export In Dz. 160 160.00 415

Quelle

5G

2652

2493

04 05 06

Total 5GG Quelle Sears N.Mann

7G 7G 7G

2772.00 803 1195 153

2908.00 715 1318 83

07

Wehmeyer

7G

123

198

Total 5GG

2274

2314

Grand Total(5G&7G)

5046

5382

Total 3GG

Remarks

7G

____________ Prepared By

_______________________ Production-Co-Ordinator

________________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Date : 01.07.2006

All Figure In DZ Buyer Wise Production & Export Summarry For The Month Of June'06 SL 01 02 03 04

Buyer Quelle Sears N.Mann G.Union

Gauge 5G 5G 5G 5G

Product.In.Dz 1822 821 0 0

Export In Dz. 3272 416 0 0.00

05

Rajan

5G

0

06

Eurofrente

5G

0 0

293.00

07 08 09

Total 5GG Eurofrente Quelle Sears

7G 7G 7G

2643.00 25 686 1525

3981.00 460 560 1710

10

N.Mann

7G

185

403

11

Wehmeyer

7G

80

Total 5GG

2501

3133

Grand Total(5G&7G)

5144

7114

____________ Prepared By

Remarks

_______________________ Production-Co-Ordinator

________________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Date : 02.06.2006

All Figure In DZ Buyer Wise Production & Export Summarry For The Month Of May'06 SL 01 02 03 04

Buyer Quelle Sears N.Mann G.Union

Gauge 5G 5G 5G 5G

Product.In.Dz 1564 65 15 61

Export In Dz. 0 670 143 198.00

05

Rajan

5G

294

06

Scope

5G

0 0

40.00

07 08 09

Total 5GG Eurofrente Quelle Sears

7G 7G 7G

1705.00 73 1240 307

1345.00 500 2589 0

10

N.Mann

7G

251

0

468

454

Total 5GG

2339

3543

Grand Total(5G&7G)

4044

4888

11

G.Union

____________ Prepared By

7G

_______________________ Production-Co-Ordinator

Remarks

________________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Date : 01.03.2006

All Figure In DZ Buyer Wise Production & Export Summarry For The Month Of February'06 SL 01 02

Scope Zara

Buyer

Gauge 5G 5G

Product.In.Dz 117 218

Export In Dz.

03 04 05

Total 5GG Quelle Eurofrente N.Mann

7G 7G 7G

335.00 1681 94 321

0.00 1721 40

06

G.Union

7G

197

Total 5GG

2293

1761

Grand Total(5G&7G)

2628

1761

____________ Prepared By

_______________________ Production-Co-Ordinator

Remarks

________________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Date : 01.02.2006

All Figure In DZ Buyer Wise Production & Export Summarry For The Month Of January'06 SL 01

Zara

Buyer

Gauge 5G

Product.In.Dz 57

Export In Dz. 316

02

Total 5GG Quelle

7G

57.00 1352

316.00 1402

Total 5GG

1352

1402

Grand Total(5G&7G)

1409

1718

____________ Prepared By

_______________________ Production-Co-Ordinator

Remarks

________________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Date : 01.11.2005

All Figure In DZ Buyer Wise Production & Export Summarry For The Month Of October'05 SL 01

Buyer Eurofrente

02

Sears

Gauge 5G

Product.In.Dz 23

Export In Dz. 500

5G

247

504.00

270.00

1004.00

Total 5GG 06

Bay-City

7G

1663

2383.00

07

Dynasty

7G

56

133

08

Quelle

7G

1583

09 10 11

Total 5GG

3302.00

2516.00

Grand Total(5G&7G)

3572.00

3520.00

Remarks

____________ Prepared By

_______________________ Production-Co-Ordinator

________________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Date : 01.12.2005

All Figure In DZ Buyer Wise Production & Export Summarry For The Month Of November'05 SL 01

Zara

Buyer

02

Eurofrente

Gauge 5G

Product.In.Dz 319

Export In Dz.

5G

0

16.00

319.00

16.00

795

2326

379

1600

878

267

Total 5GG 06 07 08 09

Quelle Bay-City

7G 7G 7G

Sears N.Mann

7G

324

10 11

Total 5GG

2375

4193.00

Grand Total(5G&7G)

2694

4209.00

Remarks

____________ Prepared By

_______________________ Production-Co-Ordinator

________________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Date : 01.11.2005

All Figure In DZ Buyer Wise Production & Export Summarry For The Month Of October'05 SL 01

Buyer Eurofrente

02

Sears

Gauge 5G

Product.In.Dz 23

Export In Dz. 500

5G

247

504.00

270.00

1004.00

Total 5GG 06

Bay-City

7G

1663

2383.00

07

Dynasty

7G

56

133

08

Quelle

7G

1583

09 10 11

Total 5GG

3302.00

2516.00

Grand Total(5G&7G)

3572.00

3520.00

Remarks

____________ Prepared By

_______________________ Production-Co-Ordinator

________________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Date : 01.10.2005

All Figure In DZ Buyer Wise Production & Export Summarry For The Month Of September'05 SL

Buyer

Gauge

Product.In.Dz

Export In Dz. 575

01

Sears

5G

265

02 03 04 05 06

Bay-City Eurofrente G.Gold

5G 5G 5G

1157 500

Total 5GG

300.00

1922.00

875.00

06

Quelle

7G

227

1295.00

07

Rajan

7G

552

619

08

Bay-City

7G

488

09

Dynasty

7G

198

10

Zara

1.5 G

42

11

Total 5GG

1465.00

1956.00

Grand Total(5G&7G)

3387.00

2831.00

Remarks

____________ Prepared By

_______________________ Production-Co-Ordinator

________________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Date : 02.09.2005

All Figure In DZ Buyer Wise Production & Export Summarry For The Month Of August'05 SL

Buyer

Gauge

Product.In.Dz

Export In Dz.

01

Sears

5G

991

1437

02 03 04 05 06

G.Gold Bay-City Rajan

5G 5G 5G

308 486 0

190.00

1785.00

1627.00

Total 5GG 06

Rajan

7G

175

1147.00

07

Quelle

7G

1976

1069

08

G.Gold

7G

0

18.00

09

Zara

7G

0

252.00

10

Sears

7G

0

504

Total 5GG

2151.00

2990.00

Grand Total(5G&7G)

3936.00

4617.00

11

Remarks

____________ Prepared By

_______________________ Production-Co-Ordinator

________________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Date : 02.08.2005

All Figure In DZ Buyer Wise Production & Export Summarry For The Month Of July'05

SL 01 02 03 04 05

Buyer Sears Rajan Bernardi Zara

Gauge 5G 5G 5G 5G

Product.In.Dz 1311 12 191 254

Export In Dz. 900

1768.00

1080.00

Remarks

180

06 Total 5GG 06

Rajan

7G

725

140.00

07

Bay-City

7G

427

1701

08

Bernardi

7G

264

363.00

09

Quelle

7G

185

10

G.Gold

7G

1056

11

Sears

7G

323

Total 5GG

1601.00

3583.00

Grand Total(5G&7G)

3369.00

4663.00

____________ Prepared By

_______________________ Production-Co-Ordinator

________________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Date : 01.06.2005

All Figure In DZ Buyer Wise Production & Export Summarry For The Month Of May '05 SL 01 02 03 04 05 06

Buyer Whemeyer Sears Rajan Eurofrente G.Gold

Gauge 5G 5G 5G 5G 5G

Product.In.Dz 437 1002 67

Export In Dz. 427.00

1367.00 794.00

06 07 08 09

Total 5GG Rajan Quelle Bay-City Sears

7G 7G 7G 7G

1506.00 392 381 838 567

10

G.Gold

7G

143

Remarks

200 340.00 400.00

Total 5GG

2321.00

794.00

Grand Total(5G&7G)

3827.00

2161.00

____________

_______________________

________________

Prepared By

Production-Co-Ordinator

Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Date : 02.05.2005

All Figure In DZ Buyer Wise Production & Export Summarry For The Month Of April '05 SL 01 02 03 04 05 06 07 08 09

Buyer Eurofrente Rajan G.Gold Sears Bay-City Total 5GG Quelle Rajan G.Gold Scope

10

Bay-City

Gauge 5G 5G 5G 5G 5G

Export In Dz.

7G 7G 7G 7G

Product.In.Dz 194.00 205.00 516.00 701.00 0.00 1616.00 182.00 772.00 628.00 516.00

7G

0

2088

Total 5GG

2098.00

2702.00

Grand Total(5G&7G)

3714.00

3676.00

Remarks

407.00 567.00 974.00 62.00 552.00

____________

_______________________

________________

Prepared By

Production-Co-Ordinator

Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Date : 02.03.2005

All Figure In DZ Buyer Wise Production & Export Summarry For The Month Of February'05 SL 01 02 03 04 05 06 07 08

Buyer Scope G.Union Scope Bay-City N.Mann Casabawa

Total

Gauge 5G 5G 7G 7G 7G 7G 7G

Product.In.Dz 7.00 430.16 2.67 2445.08 175.75

Export In Dz. 252.00

3060.66

783.5

300.00 64.83 166.67

Remarks

____________

_______________________

________________

Prepared By

Production-Co-Ordinator

Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Date :02.02.2005

All Figure In DZ Buyer Wise Production & Export Summarry For The Month Of January'05 SL 01 02 03 04 05 06 07

Buyer Scope G.Union N.Mann Scope

Gauge 5G 7G 7G 7G 7G 7G 7G

Product.In.Dz 249.50 832.34 516.67 301.92

Export In Dz. 501.00

Remarks

08

Total

____________ Prepared By

1900.43

_______________________ Production-Co-Ordinator

501

________________ Plant-In-Charge

Rajan

MK-412692 5G 200

200

Rajan

MK-413066 7G 200

200

Rajan

Mk-412727 7G 300

260

Rajan

Mk-412727 7G 300

260

Rajan

MK-412692 5G 200

200

Rajan

MK-413066 7G 200

200

Rajan

Mk-412727 7G 300

260

Rajan

Mk-412727 7G 300

260

Rajan

MK-412692 5G 200

200

Rajan

MK-413066 7G 200

200

Rajan

Mk-412727 7G 300

260

Rajan

Mk-412727 7G 300

260

Rajan

MK-412692 5G 200

200

Rajan

MK-413066 7G 200

200

Rajan

Mk-412727 7G 300

260

Rajan

Mk-412727 7G 300

260

Rajan

Mk-412727 7G 300

260

Rajan

MK-412692 5G 200

200

Rajan

MK-413066 7G 200

200

Rajan

Mk-412727 7G 300

260

Rajan

Mk-412727 7G 300

260

Rajan

Mk-412727 7G 300

260

Rajan

MK-412692 5G 200

200

Rajan

MK-413066 7G 200

200

Rajan

Mk-412727 7G 300

260

Rajan

Mk-412727 7G 300

260

Rajan

Mk-412727 7G 300

260

Rajan

MK-412692 5G 200

200

Rajan

MK-413066 7G 200

200

Rajan

Mk-412727 7G 300

260

Rajan

Mk-412727 7G 300

260

Rajan

Mk-412727 7G 300

260

Rajan

Mk-412727 7G 300

260

Rajan

Mk-412727 7G 300

260

Rajan

MK-412692 5G 200

200

Rajan

MK-413066 7G 200

200

Rajan

Mk-412727 7G 300

260

Rajan

Mk-412727 7G 300

260

Rajan

Mk-412727 7G 300

260

Rajan

Mk-412727 7G 300

260

Rajan

Mk-412727 7G 300

260

Rajan

MK-412692 5G 200

200

Rajan

MK-413066 7G 200

200

Rajan

Mk-412727 7G 300

260

Rajan

Mk-412727 7G 300

260

Rajan

MK-412692 5G 200

200

Rajan

MK-412692 5G 200

200

Rajan

MK-413066 7G 200

200

Rajan

Mk-412727 7G 300

260

Rajan

Mk-412727 7G 300

260

Rajan

Mk-412727 7G 300

260

Rajan

Mk-412727 7G 300

260

Rajan

MK-412692 5G 200

200

Rajan

MK-412692 5G 200

200

Rajan

MK-412692 5G 200

200

G.Gold

007999

5G 500

400

Rajan

MK-413066 7G 200

200

Rajan

Mk-412727 7G 300

260

Rajan

Mk-412727 7G 300

260

Rajan

Mk-412727 7G 300

260

Rajan

Mk-412727 7G 300

260

Rajan

Mk-412727 7G 300

260

Rajan

MK-412692 5G 200

200

Rajan

MK-412692 5G 200

200

Rajan

MK-412692 5G 200

200

G.Gold

Rajan

007999

5G 500

400

MK-413066 7G 200

200

Rajan

Mk-412727 7G 300

260

Rajan

Mk-412727 7G 300

260

Rajan

Mk-412727 7G 300

260

Rajan

Mk-412727 7G 300

260

Rajan

Mk-412727 7G 300

260

Rajan

Mk-412727 7G 300

260

Rajan

MK-412692 5G 200

200

G.Gold

Rajan

007999

5G 500

400

MK-413066 7G 200

200

Rajan

Mk-412727 7G 300

260

Rajan

Mk-412727 7G 300

260

Rajan

Mk-412727 7G 300

260

Rajan

MK-412692 5G 200

200

G.Gold

007999

5G 500

400

G.Gold

007999

5G 500

400

G.Gold

007999

5G 500

400

G.Gold

007999

5G 500

400

G.Gold

007999

5G 500

400

Rajan

MK-413066 7G 200

200

Rajan

Mk-412727 7G 300

260

Rajan

Mk-412727 7G 300

260

Rajan

Mk-412727 7G 300

260

Rajan

Mk-412727 7G 300

260

Rajan

MK-412692 5G 200

200

G.Gold

007999

5G 500

400

G.Gold

007999

5G 500

400

G.Gold

007999

5G 500

400

G.Gold

007999

5G 500

400

Rajan

MK-413066 7G 200

200

Rajan

Mk-412727 7G 300

260

Rajan

Mk-412727 7G 300

260

Rajan

MK-412692 5G 200

200

G.Gold

007999

5G 500

400

G.Gold

007999

5G 500

400

G.Gold

007999

5G 500

400

G.Gold

007999

5G 500

400

Rajan

MK-413066 7G 200

200

Rajan

Mk-412727 7G 300

260

Rajan

MK-413066 7G 200

200

Rajan

Mk-412727 7G 300

260

Rajan

MK-413066 7G 200

200

Rajan

MK-412692 5G 200

200

G.Gold

007999

5G 500

400

G.Gold

007999

5G 500

400

G.Gold

007999

5G 500

400

Rajan

MK-413066 7G 200

200

Rajan

Mk-412727 7G 300

260

Rajan

MK-413066 7G 200

200

Rajan

Mk-412727 7G 300

260

Rajan

MK-413066 7G 200

200

Rajan

MK-412692 5G 200

200

G.Gold

007999

5G 500

400

G.Gold

007999

5G 500

400

Rajan

MK-413066 7G 200

200

Rajan

Mk-412727 7G 300

260

Rajan

MK-412692 5G 200

200

G.Gold

007999

5G 500

400

G.Gold

007999

5G 500

400

Rajan

MK-413066 7G 200

200

Rajan

Mk-412727 7G 300

260

Rajan

MK-412692 5G 200

200

G.Gold

007999

5G 500

400

G.Gold

007999

5G 500

400

Rajan

MK-413066 7G 200

200

Rajan

Mk-412727 7G 300

260

Rajan

MK-412692 5G 200

200

G.Gold

007999

5G 500

400

G.Gold

007999

5G 500

400

Rajan

MK-413066 7G 200

200

Rajan

Mk-412727 7G 300

260

Rajan

Mk-412727 7G 300

260

Rajan

MK-412692 5G 200

200

G.Gold

007999

5G 500

400

G.Gold

007999

5G 500

400

G.Gold

007999

5G 500

400

G.Gold

007999

5G 500

400

Rajan

MK-413066 7G 200

200

Rajan

Mk-412727 7G 300

260

Rajan

MK-412727 7G

40

36

Rajan

MK-413076 7G 300

298

Rajan

MK-412692 5G 200

200

G.Gold

007999

5G 500

400

G.Gold

007999

5G 500

400

G.Gold

007999

5G 500

400

G.Gold

007999

5G 500

400

Rajan

MK-413066 7G 200

200

Rajan

Mk-412727 7G 300

260

Rajan

MK-412727 7G

40

36

Rajan

MK-413076 7G 300

298

Rajan

MK-412692 5G 200

200

G.Gold

007999

5G 500

400

Eurofrente

08206

5G 119

120

Rajan

MK-413066 7G 200

200

Rajan

Mk-412727 7G 300

260

Rajan

MK-412727 7G

40

36

Rajan

MK-413076 7G 300

298

Rajan

MK-412692 5G 200

200

G.Gold

007999

5G 500

400

Eurofrente

08206

5G 119

120

Rajan

MK-413066 7G 200

200

Rajan

Mk-412727 7G 300

260

Rajan

MK-412727 7G

40

36

Rajan

MK-413076 7G 300

298

Rajan

MK-412692 5G 200

200

Rajan

MK-412692 5G 200

200

G.Gold

007999

5G 500

400

Eurofrente

08206

5G 119

120

Rajan

MK-413066 7G 200

200

Rajan

Mk-412727 7G 300

260

Rajan

MK-412727 7G

40

36

Rajan

MK-413076 7G 300

298

Rajan

MK-412692 5G 200

200

G.Gold

007999

5G 500

400

Eurofrente

08206

5G 119

120

Wehemer

WR-01

5G 427

427

Eurofrente

08206

5G 119

120

Wehemer

WR-01

5G 427

427

Rajan

MK-413066 7G 200

200

Rajan

Mk-412727 7G 300

260

Rajan

MK-412727 7G

40

36

Rajan

MK-413076 7G 300

298

Rajan

MK-412692 5G 200

200

G.Gold

007999

5G 500

400

Eurofrente

08206

5G 119

120

Wehemer

WR-01

5G 427

427

Eurofrente

08206

5G 119

120

Wehemer

WR-01

5G 427

427

Rajan

MK-413066 7G 200

200

Rajan

Mk-412727 7G 300

260

Rajan

MK-412727 7G

40

36

Rajan

MK-413076 7G 300

298

Rajan

MK-412692 5G 200

200

G.Gold

007999

5G 500

400

Eurofrente

08206

5G 119

120

Wehemer

WR-01

5G 427

427

Rajan

MK-413066 7G 200

200

Rajan

Mk-412727 7G 300

260

Rajan

MK-412727 7G

40

36

Rajan

MK-413076 7G 300

298

Rajan

MK-412692 5G 200

200

G.Gold

007999

5G 500

400

Eurofrente

08206

5G 119

120

Wehemer

WR-01

5G 427

427

Rajan

MK-413066 7G 200

200

Rajan

Mk-412727 7G 300

260

Rajan

MK-412727 7G

40

36

Rajan

MK-413076 7G 300

298

Rajan

MK-412692 5G 200

200

G.Gold

007999

5G 500

400

Eurofrente

08206

5G 119

120

Eurofrente

08207

5G 219

220

Eurofrente

08207

5G 219

220

Wehemer

WR-01

5G 427

427

Rajan

MK-413066 7G 200

200

Rajan

Mk-412727 7G 300

260

Rajan

MK-412727 7G

40

36

Rajan

MK-413076 7G 300

298

Rajan

MK-412692 5G 200

200

G.Gold

007999

5G 500

400

Eurofrente

08206

5G 119

120

Eurofrente

08207

5G 219

220

Eurofrente

08207

5G 219

220

Wehemer

WR-01

5G 427

427

Rajan

MK-413066 7G 200

200

Rajan

Mk-412727 7G 300

260

Rajan

MK-412727 7G

40

36

Rajan

MK-413076 7G 300

298

Rajan

MK-412692 5G 200

200

G.Gold

007999

5G 500

400

Eurofrente

08206

5G 119

120

Eurofrente

08207

5G 219

220

Eurofrente

08207

5G 219

220

Wehemer

WR-01

5G 427

427

Rajan

MK-413066 7G 200

200

Rajan

Mk-412727 7G 300

260

Rajan

MK-412727 7G

40

36

Rajan

MK-413076 7G 300

298

Rajan

MK-412692 5G 200

200

G.Gold

007999

5G 500

400

Eurofrente

08206

5G 119

120

Eurofrente

08207

5G 219

220

Wehemer

WR-01

5G 427

427

Rajan

MK-413066 7G 200

200

Rajan

Mk-412727 7G 300

260

Rajan

MK-412727 7G

40

36

Rajan

MK-413076 7G 300

298

Rajan

MK-412692 5G 200

200

G.Gold

007999

5G 500

400

Eurofrente

08206

5G 119

120

Eurofrente

08207

5G 219

220

Wehemer

WR-01

5G 427

427

Rajan

MK-413066 7G 200

200

Rajan

Mk-412727 7G 300

260

Rajan

MK-412727 7G

40

36

Rajan

MK-413076 7G 300

298

Rajan

MK-412692 5G 200

200

G.Gold

007999

5G 500

400

Eurofrente

08206

5G 119

120

Eurofrente

08207

5G 219

220

Wehemer

WR-01

5G 427

427

Rajan

MK-413066 7G 200

200

Rajan

Mk-412727 7G 300

260

Rajan

MK-412727 7G

40

36

Rajan

MK-413076 7G 300

298

Rajan

MK-412692 5G 200

200

G.Gold

007999

5G 500

400

Eurofrente

08206

5G 119

120

Eurofrente

08207

5G 219

220

Wehemer

WR-01

5G 427

427

Rajan

MK-413066 7G 200

200

Rajan

Mk-412727 7G 300

260

Rajan

MK-412727 7G

40

36

Rajan

MK-413076 7G 300

298

GLOBAL KNITWEAR LTD 269 DEWAN HAT CHITTAGONG

Date : 01.09.2008

Needle Consumption Report For The Month Of August' 2008 Sl 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58

Types Of Needle DB X 1-2 DB X 1-2 DB X 1-2 DB X 1-2 DB X 1-2 DB X 1KM DP X 5 DP X 5 DP X 5 DP X 5 DP X 5 DP X 5 DP X 5 BB DC X 27 DC X 27 DC X 27 DC X 27 DC X 27 TV X 7 TV X 7 TV X 7 TV X 7 TV X 7 TQ X 7 TQ X 1 UO X 113 UO X 113 UO X 113 UO X 113 UY X 1 UY X 14 TO X 7 TO X 7 TO X 7 TO X 7 TO X 7 DM X 13 DM X 13 DM X 13 10" KNIFE 8" KNIFE A BELT 1/2" KNIFE USSUE (7G) 7G KNITTING NEEDLE 5G KNITTING NEEDLE 12G KNITTING NEEDLE 3G KNITTING NEEDLE PYC - 22 PYE - 23 PYC - 21 PAY - 7 PAY - 4 PAY - 23 HARA DOMI HARACHI 7G HARACHI 5G

# # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # #

This Month Consumption 11 Pkt 12 14 Pkt 16 6 Pkt 18 9 11 12 14 Pkt 16 2 Pkt 17 Pkt 21 22 21 Pkt 11 12 14 16 2 Pkt 18 Pkt 11 12 14 16 Pkt 18 16 8 Pkt 16 Pkt 11 12 14 10 16 Pkt 10 Pkt 18 11 12 14 16 18 16/18 14 16/18

532 396

6

Pcs 13800 Pcs 8200 Pcs Pcs Pcs Pkt Pkt 1 Pkt 2 Pkt Pkt Pkt Pcs 300 Pcs 100 Pcs

Total Consumption Pkt Pkt 45 Pkt

Pkt 13 Pkt Pkt

Pkt

16 Pkt Pkt

Pkt 10 Pkt 39 Pkt

4 Pkt Pkt

114600 55200

15 11

2500 700

Pcs Pcs Pcs Pcs Pcs Pkt Pkt Pkt Pkt Pkt Pkt Pcs Pcs Pcs

Remarks

______________________ Production-Co-Ordinator

________________ Plant-In-Charge

GLOBAL KNITWEAR LTD 269 DEWAN HAT CHITTAGONG

Date : 01.08.2008

Needle Consumption Report For The Month Of July' 2008 Sl 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58

Types Of Needle DB X 1-2 DB X 1-2 DB X 1-2 DB X 1-2 DB X 1-2 DB X 1KM DP X 5 DP X 5 DP X 5 DP X 5 DP X 5 DP X 5 DP X 5 BB DC X 27 DC X 27 DC X 27 DC X 27 DC X 27 TV X 7 TV X 7 TV X 7 TV X 7 TV X 7 TQ X 7 TQ X 1 UO X 113 UO X 113 UO X 113 UO X 113 UY X 1 UY X 14 TO X 7 TO X 7 TO X 7 TO X 7 TO X 7 DM X 13 DM X 13 DM X 13 10" KNIFE 8" KNIFE A BELT 1/2" KNIFE USSUE (7G) 7G KNITTING NEEDLE 5G KNITTING NEEDLE 12G KNITTING NEEDLE 3G KNITTING NEEDLE PYC - 22 PYE - 23 PYC - 21 PAY - 7 PAY - 4 PAY - 23 HARA DOMI HARACHI 7G HARACHI 5G

# # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # #

11 12 14 16 18 9 11 12 14 16 17 21 22 21 11 12 14 16 18 11 12 14 16 18 16 16 11 12 14 10 16 10 18 11 12 14 16 18 16/18 14 16/18

532 396

6

This Month Consumption Pkt

Total Consumption Pkt

Pkt 6 Pkt

Pkt 39 Pkt

Pkt 4 Pkt Pkt

Pkt 11 Pkt Pkt

Pkt

Pkt

2 Pkt Pkt

14 Pkt Pkt

Pkt

Pkt

Pkt 4 Pkt

2 Pkt 39 Pkt

Pkt Pkt

4 Pkt Pkt

Pcs 17000 Pcs 6000 Pcs Pcs Pcs Pkt Pkt 2 Pkt 2 Pkt Pkt Pkt Pcs Pcs Pcs

Pcs Pcs Pcs Pcs Pcs Pkt Pkt Pkt Pkt Pkt Pkt Pcs Pcs Pcs

100800 47000

14 9

2200 600

Remarks

______________________ Production-Co-Ordinator

________________ Plant-In-Charge

GLOBAL KNITWEAR LTD 269 DEWAN HAT CHITTAGONG

Date : 01.07.2008

Needle Consumption Report For The Month Of June' 2008 Sl 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58

Types Of Needle DB X 1-2 DB X 1-2 DB X 1-2 DB X 1-2 DB X 1-2 DB X 1KM DP X 5 DP X 5 DP X 5 DP X 5 DP X 5 DP X 5 DP X 5 BB DC X 27 DC X 27 DC X 27 DC X 27 DC X 27 TV X 7 TV X 7 TV X 7 TV X 7 TV X 7 TQ X 7 TQ X 1 UO X 113 UO X 113 UO X 113 UO X 113 UY X 1 UY X 14 TO X 7 TO X 7 TO X 7 TO X 7 TO X 7 DM X 13 DM X 13 DM X 13 10" KNIFE 8" KNIFE A BELT 1/2" KNIFE USSUE (7G) 7G KNITTING NEEDLE 5G KNITTING NEEDLE 12G KNITTING NEEDLE 3G KNITTING NEEDLE PYC - 22 PYE - 23 PYC - 21 PAY - 7 PAY - 4 PAY - 23 HARA DOMI HARACHI 7G HARACHI 5G

# # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # #

11 12 14 16 18 9 11 12 14 16 17 21 22 21 11 12 14 16 18 11 12 14 16 18 16 16 11 12 14 10 16 10 18 11 12 14 16 18 16/18 14 16/18

532 396

6

This Month Consumption Pkt

Total Consumption Pkt

Pkt 9 Pkt

Pkt 33 Pkt

Pkt 2 Pkt Pkt

Pkt 7 Pkt Pkt

Pkt

Pkt

2 Pkt Pkt

12 Pkt Pkt

Pkt

Pkt

Pkt 5 Pkt

2 Pkt 35 Pkt

Pkt Pkt

4 Pkt Pkt

Pcs 15400 Pcs 6400 Pcs Pcs Pcs Pkt Pkt 2 Pkt 1 Pkt Pkt Pkt Pcs 200 Pcs 200 Pcs

Pcs Pcs Pcs Pcs Pcs Pkt Pkt Pkt Pkt Pkt Pkt Pcs Pcs Pcs

83800 41000

12 7

2200 600

Remarks

______________________ Production-Co-Ordinator

________________ Plant-In-Charge

GLOBAL KNITWEAR LTD 269 DEWAN HAT CHITTAGONG

Date : 01.06.2008

Needle Consumption Report For The Month Of May' 2008 Sl 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56

Types Of Needle DB X 1-2 DB X 1-2 DB X 1-2 DB X 1-2 DB X 1-2 DB X 1KM DP X 5 DP X 5 DP X 5 DP X 5 DP X 5 DP X 5 DP X 5 BB DC X 27 DC X 27 DC X 27 DC X 27 DC X 27 TV X 7 TV X 7 TV X 7 TV X 7 TV X 7 TQ X 7 TQ X 1 UO X 113 UO X 113 UO X 113 UO X 113 UY X 1 UY X 14 TO X 7 TO X 7 TO X 7 TO X 7 TO X 7 DM X 13 DM X 13 DM X 13 10" KNIFE 8" KNIFE A BELT 1/2" KNIFE USSUE (7G) 7G KNITTING NEEDLE 5G KNITTING NEEDLE 12G KNITTING NEEDLE 3G KNITTING NEEDLE PYC - 22 PYE - 23 PYC - 21 PAY - 7 PAY - 4 PAY - 23 HARA DOMI

# # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # #

11 12 14 16 18 9 11 12 14 16 17 21 22 21 11 12 14 16 18 11 12 14 16 18 16 16 11 12 14 10 16 10 18 11 12 14 16 18 16/18 14 16/18

532 396

6

This Month Consumption Pkt

Total Consumption Pkt

Pkt 5 Pkt

Pkt 24 Pkt

Pkt 2 Pkt Pkt

Pkt 5 Pkt Pkt

Pkt

Pkt

2 Pkt Pkt

10 Pkt Pkt

Pkt

Pkt

Pkt 11 Pkt

2 Pkt 30 Pkt

Pkt Pkt

4 Pkt Pkt

Pcs 14600 Pcs 3400 Pcs Pcs Pcs Pkt Pkt 2 Pkt 1 Pkt Pkt Pkt Pcs

Pcs 68400 Pcs 34600 Pcs Pcs Pcs Pkt Pkt 10 Pkt 6 Pkt Pkt Pkt Pcs

Remarks

57 HARACHI 7G 58 HARACHI 5G

# #

200 Pcs 100 Pcs

2000 Pcs 400 Pcs

______________________ Production-Co-Ordinator

________________ Plant-In-Charge

GLOBAL KNITWEAR LTD 269 DEWAN HAT CHITTAGONG

Date : 01.05.2008

Needle Consumption Report For The Month Of April' 2008 Sl 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56

Types Of Needle DB X 1-2 DB X 1-2 DB X 1-2 DB X 1-2 DB X 1-2 DB X 1KM DP X 5 DP X 5 DP X 5 DP X 5 DP X 5 DP X 5 DP X 5 BB DC X 27 DC X 27 DC X 27 DC X 27 DC X 27 TV X 7 TV X 7 TV X 7 TV X 7 TV X 7 TQ X 7 TQ X 1 UO X 113 UO X 113 UO X 113 UO X 113 UY X 1 UY X 14 TO X 7 TO X 7 TO X 7 TO X 7 TO X 7 DM X 13 DM X 13 DM X 13 10" KNIFE 8" KNIFE A BELT 1/2" KNIFE USSUE (7G) 7G KNITTING NEEDLE 5G KNITTING NEEDLE 12G KNITTING NEEDLE 3G KNITTING NEEDLE PYC - 22 PYE - 23 PYC - 21 PAY - 7 PAY - 4 PAY - 23 HARA DOMI

# # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # #

11 12 14 16 18 9 11 12 14 16 17 21 22 21 11 12 14 16 18 11 12 14 16 18 16 16 11 12 14 10 16 10 18 11 12 14 16 18 16/18 14 16/18

532 396

6

This Month Consumption Pkt

Total Consumption Pkt

Pkt 5 Pkt

Pkt 19 Pkt

Pkt Pkt Pkt

Pkt 3 Pkt Pkt

Pkt

Pkt

2 Pkt Pkt

8 Pkt Pkt

Pkt

Pkt

Pkt 4 Pkt

2 Pkt 19 Pkt

2 Pkt Pkt

4 Pkt Pkt

Pcs 13000 Pcs 8600 Pcs Pcs Pcs Pkt Pkt 2 Pkt 1 Pkt Pkt Pkt Pcs

Pcs 53800 Pcs 31200 Pcs Pcs Pcs Pkt Pkt 8 Pkt 5 Pkt Pkt Pkt Pcs

Remarks

57 HARACHI 7G 58 HARACHI 5G

# #

600 Pcs 200 Pcs

1800 Pcs 300 Pcs

______________________ Production-Co-Ordinator

________________ Plant-In-Charge

GLOBAL KNITWEAR LTD 269 DEWAN HAT CHITTAGONG

Date : 01.04.2008

Needle Consumption Report For The Month Of March' 2008 Sl 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54

Types Of Needle DB X 1-2 DB X 1-2 DB X 1-2 DB X 1-2 DB X 1-2 DB X 1KM DP X 5 DP X 5 DP X 5 DP X 5 DP X 5 DP X 5 DP X 5 BB DC X 27 DC X 27 DC X 27 DC X 27 DC X 27 TV X 7 TV X 7 TV X 7 TV X 7 TV X 7 TQ X 7 TQ X 1 UO X 113 UO X 113 UO X 113 UO X 113 UY X 1 UY X 14 TO X 7 TO X 7 TO X 7 TO X 7 TO X 7 DM X 13 DM X 13 DM X 13 10" KNIFE 8" KNIFE A BELT 1/2" KNIFE USSUE (7G) 7G KNITTING NEEDLE 5G KNITTING NEEDLE 12G KNITTING NEEDLE 3G KNITTING NEEDLE PYC - 22 PYE - 23 PYC - 21 PAY - 7 PAY - 4

# # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # #

This Month Consumption 11 Pkt 12 14 Pkt 16 2 Pkt 18 9 11 12 14 Pkt 16 Pkt 17 Pkt 21 22 21 Pkt 11 12 14 16 2 Pkt 18 Pkt 11 12 14 16 Pkt 18 16 Pkt 16 Pkt 11 12 14 10 16 Pkt 10 Pkt 18 11 12 14 16 18 16/18 14 16/18

532 396

6

Pcs 11600 Pcs 11200 Pcs Pcs Pcs Pkt Pkt Pkt 2 Pkt Pkt

Total Consumption Pkt Pkt 14 Pkt

Pkt 3 Pkt Pkt

Pkt

6 Pkt Pkt

Pkt 2 Pkt 15 Pkt

2 Pkt Pkt

40800 22600

6 4

Pcs Pcs Pcs Pcs Pcs Pkt Pkt Pkt Pkt Pkt

Remarks

55 56 57 58

PAY - 23 HARA DOMI HARACHI 7G HARACHI 5G

# # # #

Pkt Pcs 500 Pcs 100 Pcs

Pkt Pcs 1200 Pcs 100 Pcs

______________________ Production-Co-Ordinator

________________ Plant-In-Charge

GLOBAL KNITWEAR LTD 269 DEWAN HAT CHITTAGONG

Date : 01.03.2008

Needle Consumption Report For The Month Of February' 2008 Sl 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53

Types Of Needle DB X 1-2 DB X 1-2 DB X 1-2 DB X 1-2 DB X 1-2 DB X 1KM DP X 5 DP X 5 DP X 5 DP X 5 DP X 5 DP X 5 DP X 5 BB DC X 27 DC X 27 DC X 27 DC X 27 DC X 27 TV X 7 TV X 7 TV X 7 TV X 7 TV X 7 TQ X 7 TQ X 1 UO X 113 UO X 113 UO X 113 UO X 113 UY X 1 UY X 14 TO X 7 TO X 7 TO X 7 TO X 7 TO X 7 DM X 13 DM X 13 DM X 13 10" KNIFE 8" KNIFE A BELT 1/2" KNIFE USSUE (7G) 7G KNITTING NEEDLE 5G KNITTING NEEDLE 12G KNITTING NEEDLE 3G KNITTING NEEDLE PYC - 22 PYE - 23 PYC - 21 PAY - 7

# # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # #

This Month Consumption 11 Pkt 12 14 Pkt 16 8 Pkt 18 9 11 12 14 Pkt 16 Pkt 17 Pkt 21 22 21 Pkt 11 12 14 16 2 Pkt 18 Pkt 11 12 14 16 Pkt 18 16 Pkt 16 7 Pkt 11 12 14 10 16 Pkt 10 Pkt 18 11 12 14 16 18 16/18 14 16/18

532 396

Pcs 13400 Pcs 6800 Pcs Pcs Pcs Pkt Pkt 2 Pkt 7 Pkt

Total Consumption Pkt Pkt 12 Pkt

Pkt 3 Pkt Pkt

Pkt

4 Pkt Pkt

Pkt 2 Pkt 15 Pkt

2 Pkt Pkt

Pcs 29200 Pcs 11400 Pcs Pcs Pcs Pkt Pkt 6 Pkt 2 Pkt

Remarks

54 55 56 57 58

PAY - 4 PAY - 23 HARA DOMI HARACHI 7G HARACHI 5G

# # # # #

6

Pkt Pkt Pcs 100 Pcs Pcs

Pkt Pkt Pcs 700 Pcs Pcs

______________________ Production-Co-Ordinator

________________ Plant-In-Charge

GLOBAL KNITWEAR LTD 269 DEWAN HAT CHITTAGONG

Date : 01.02.2008

Needle Consumption Report For The Month Of January' 2008 Sl 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52

Types Of Needle DB X 1-2 DB X 1-2 DB X 1-2 DB X 1-2 DB X 1-2 DB X 1KM DP X 5 DP X 5 DP X 5 DP X 5 DP X 5 DP X 5 DP X 5 BB DC X 27 DC X 27 DC X 27 DC X 27 DC X 27 TV X 7 TV X 7 TV X 7 TV X 7 TV X 7 TQ X 7 TQ X 1 UO X 113 UO X 113 UO X 113 UO X 113 UY X 1 UY X 14 TO X 7 TO X 7 TO X 7 TO X 7 TO X 7 DM X 13 DM X 13 DM X 13 10" KNIFE 8" KNIFE A BELT 1/2" KNIFE USSUE (7G) 7G KNITTING NEEDLE 5G KNITTING NEEDLE 12G KNITTING NEEDLE 3G KNITTING NEEDLE PYC - 22 PYE - 23 PYC - 21

# # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # #

11 12 14 16 18 9 11 12 14 16 17 21 22 21 11 12 14 16 18 11 12 14 16 18 16 16 11 12 14 10 16 10 18 11 12 14 16 18 16/18 14 16/18

532 396

This Month Consumption Pkt

Total Consumption Pkt

Pkt 4 Pkt

Pkt 4 Pkt

Pkt 3 Pkt Pkt

Pkt 3 Pkt Pkt

Pkt

Pkt

2 Pkt Pkt

2 Pkt Pkt

Pkt

Pkt

2 Pkt 8 Pkt

2 Pkt 8 Pkt

2 Pkt Pkt

2 Pkt Pkt

Pcs 15800 Pcs 4600 Pcs Pcs Pcs Pkt Pkt 4 Pkt

Pcs 15800 Pcs 4600 Pcs Pcs Pcs Pkt Pkt 4 Pkt

Remarks

53 54 55 56 57 58

PAY - 7 PAY - 4 PAY - 23 HARA DOMI HARACHI 7G HARACHI 5G

# # # # # #

6

1 Pkt Pkt Pkt Pcs 600 Pcs Pcs

1 Pkt Pkt Pkt Pcs 600 Pcs Pcs

______________________ Production-Co-Ordinator

________________ Plant-In-Charge

GLOBAL KNITWEAR LTD 269 DEWAN HAT CHITTAGONG

Date : 01.01.2008

Needle Consumption Report For The Month Of December' 2007 Sl 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49

Types Of Needle DB X 1-2 DB X 1-2 DB X 1-2 DB X 1-2 DB X 1-2 DB X 1KM DP X 5 DP X 5 DP X 5 DP X 5 DP X 5 DP X 5 DP X 5 BB DC X 27 DC X 27 DC X 27 DC X 27 DC X 27 TV X 7 TV X 7 TV X 7 TV X 7 TV X 7 TQ X 7 UO X 113 UO X 113 UO X 113 UO X 113 UY X 1 UY X 14 TO X 7 TO X 7 TO X 7 TO X 7 TO X 7 DM X 13 DM X 13 DM X 13 10" KNIFE 8" KNIFE A BELT 1/2" KNIFE USSUE (7G) 7G KNITTING NEEDLE 5G KNITTING NEEDLE 12G KNITTING NEEDLE 3G KNITTING NEEDLE PYC - 22

# # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # #

This Month Consumption 11 Pkt 12 14 Pkt 16 8 Pkt 18 9 11 12 14 Pkt 16 2 Pkt 17 Pkt 21 22 21 Pkt 11 12 14 16 2 Pkt 18 Pkt 11 12 14 16 Pkt 18 16 1 Pkt 11 12 14 10 16 Pkt 10 Pkt 18 11 12 14 16 18 16/18 14 16/18

532 396

Pcs 12400 Pcs 4800 Pcs Pcs Pcs Pkt

Total Consumption Pkt Pkt 66 Pkt

Pkt 16 Pkt 2 Pkt

Pkt

13 Pkt 6 Pkt

2 Pkt 16 Pkt

8 Pkt 2 Pkt

10 153600 77800 430 200

Pcs Pcs Pcs Pcs Pcs Pkt

Remarks

50 51 52 53 54 55 56 57

PYE - 23 PYC - 21 PAY - 7 PAY - 4 PAY - 23 HARA DOMI HARACHI 7G HARACHI 5G

# # # # # # # #

6

Pkt 1 Pkt Pkt Pkt Pkt Pcs 0 Pcs 200 Pcs

3 12 26 3 500 1900 1300

Pkt Pkt Pkt Pkt Pkt Pcs Pcs Pcs

______________________ Production-Co-Ordinator

________________ Plant-In-Charge

GLOBAL KNITWEAR LTD 269 DEWAN HAT CHITTAGONG

Date : 02.12.2007

Needle Consumption Report For The Month Of November' 2007 Sl 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47

Types Of Needle DB X 1-2 DB X 1-2 DB X 1-2 DB X 1-2 DB X 1-2 DB X 1KM DP X 5 DP X 5 DP X 5 DP X 5 DP X 5 DP X 5 DP X 5 BB DC X 27 DC X 27 DC X 27 DC X 27 DC X 27 TV X 7 TV X 7 TV X 7 TV X 7 TV X 7 TQ X 7 UO X 113 UO X 113 UO X 113 UO X 113 UY X 1 UY X 14 TO X 7 TO X 7 TO X 7 TO X 7 TO X 7 DM X 13 DM X 13 DM X 13 10" KNIFE 8" KNIFE A BELT 1/2" KNIFE USSUE (7G) 7G KNITTING NEEDLE 5G KNITTING NEEDLE 12G KNITTING NEEDLE

# # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # #

This Month Consumption 11 Pkt 12 14 Pkt 16 6 Pkt 18 9 11 12 14 Pkt 16 Pkt 17 Pkt 21 22 21 Pkt 11 12 14 16 3 Pkt 18 Pkt 11 12 14 16 Pkt 18 16 2 Pkt 11 12 14 10 16 Pkt 10 Pkt 18 11 12 14 16 18 16/18 14 16/18

532 396

Pcs 18700 Pcs 1600 Pcs Pcs

Total Consumption Pkt Pkt 58 Pkt

Pkt 14 Pkt 2 Pkt

Pkt

11 Pkt 6 Pkt

2 Pkt 15 Pkt

8 Pkt 2 Pkt

10 141200 73000 430

Pcs Pcs Pcs Pcs

Remarks

48 49 50 51 52 53 54 55 56 57

3G KNITTING NEEDLE PYC - 22 PYE - 23 PYC - 21 PAY - 7 PAY - 4 PAY - 23 HARA DOMI HARACHI 7G HARACHI 5G

# # # # # # # # # #

6

Pcs Pkt Pkt Pkt 2 Pkt Pkt Pkt Pcs 500 Pcs Pcs

200 Pcs Pkt Pkt 2 Pkt 12 Pkt 26 Pkt 3 Pkt 500 Pcs 1900 Pcs 1100 Pcs

______________________ Production-Co-Ordinator

________________ Plant-In-Charge

GLOBAL KNITWEAR LTD 269 DEWAN HAT CHITTAGONG

Date : 02.10.2007

Needle Consumption Report For The Month Of September' 2007 Sl 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45

Types Of Needle DB X 1-2 DB X 1-2 DB X 1-2 DB X 1-2 DB X 1-2 DB X 1KM DP X 5 DP X 5 DP X 5 DP X 5 DP X 5 DP X 5 DP X 5 BB DC X 27 DC X 27 DC X 27 DC X 27 DC X 27 TV X 7 TV X 7 TV X 7 TV X 7 TV X 7 TQ X 7 UO X 113 UO X 113 UO X 113 UO X 113 UY X 1 UY X 14 TO X 7 TO X 7 TO X 7 TO X 7 TO X 7 DM X 13 DM X 13 DM X 13 10" KNIFE 8" KNIFE A BELT 1/2" KNIFE USSUE (7G) 7G KNITTING NEEDLE

# # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # #

11 12 14 16 18 9 11 12 14 16 17 21 22 21 11 12 14 16 18 11 12 14 16 18 16 11 12 14 10 16 10 18 11 12 14 16 18 16/18 14 16/18

532

This Month Consumption Pkt

Total Consumption Pkt

Pkt 7 Pkt

Pkt 52 Pkt

Pkt 4 Pkt Pkt

Pkt 14 Pkt 2 Pkt

Pkt

Pkt

2 Pkt Pkt

8 Pkt 6 Pkt

Pkt

2 Pkt

2 Pkt

13 Pkt

Pkt Pkt

8 Pkt 2 Pkt

Pcs 14800 Pcs

10 Pcs 122500 Pcs

Remarks

46 47 48 49 50 51 52 53 54 55 56 57

5G KNITTING NEEDLE 12G KNITTING NEEDLE 3G KNITTING NEEDLE PYC - 22 PYE - 23 PYC - 21 PAY - 7 PAY - 4 PAY - 23 HARA DOMI HARACHI 7G HARACHI 5G

# # # # # # # # # # # #

396

6

3000 Pcs 30 Pcs Pcs Pkt Pkt Pkt Pkt 1 Pkt Pkt Pcs 400 Pcs 100 Pcs

71400 Pcs 430 Pcs 200 Pcs Pkt Pkt 2 Pkt 10 Pkt 26 Pkt 3 Pkt 500 Pcs 1400 Pcs 1100 Pcs

______________________ Production-Co-Ordinator

________________ Plant-In-Charge

GLOBAL KNITWEAR LTD 269 DEWAN HAT CHITTAGONG

Date : 01.09.2007

Needle Consumption Report For The Month Of August' 2007 Sl 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43

Types Of Needle DB X 1-2 DB X 1-2 DB X 1-2 DB X 1-2 DB X 1-2 DB X 1KM DP X 5 DP X 5 DP X 5 DP X 5 DP X 5 DP X 5 DP X 5 BB DC X 27 DC X 27 DC X 27 DC X 27 DC X 27 TV X 7 TV X 7 TV X 7 TV X 7 TV X 7 TQ X 7 UO X 113 UO X 113 UO X 113 UO X 113 UY X 1 UY X 14 TO X 7 TO X 7 TO X 7 TO X 7 TO X 7 DM X 13 DM X 13 DM X 13 10" KNIFE 8" KNIFE A BELT 1/2" KNIFE

# # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # #

This Month Consumption 11 Pkt 12 14 Pkt 16 8 Pkt 18 9 11 12 14 Pkt 16 Pkt 17 Pkt 21 22 21 Pkt 11 12 14 16 Pkt 18 2 Pkt 11 12 14 16 Pkt 18 16 Pkt 11 12 14 10 16 Pkt 10 Pkt 18 11 12 14 16 18 16/18 14 16/18

Total Consumption Pkt Pkt 45 Pkt

Pkt 10 Pkt 2 Pkt

Pkt

6 Pkt 6 Pkt

2 Pkt 11 Pkt

8 Pkt 2 Pkt

Remarks

44 45 46 47 48 49 50 51 52 53 54 55 56 57

USSUE (7G) 7G KNITTING NEEDLE 5G KNITTING NEEDLE 12G KNITTING NEEDLE 3G KNITTING NEEDLE PYC - 22 PYE - 23 PYC - 21 PAY - 7 PAY - 4 PAY - 23 HARA DOMI HARACHI 7G HARACHI 5G

# # # # # # # # # # # # # #

532 396

6

Pcs 9600 Pcs 2200 Pcs Pcs Pcs Pkt Pkt 2 Pkt Pkt 18 Pkt Pkt Pcs 200 Pcs Pcs

10 107700 68400 400 200

2 10 25 3 500 1000 1000

Pcs Pcs Pcs Pcs Pcs Pkt Pkt Pkt Pkt Pkt Pkt Pcs Pcs Pcs

______________________ Production-Co-Ordinator

________________ Plant-In-Charge

GLOBAL KNITWEAR LTD 269 DEWAN HAT CHITTAGONG

Date : 05.08.2007

Needle Consumption Report For The Month Of July' 2007 Sl 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41

Types Of Needle DB X 1-2 DB X 1-2 DB X 1-2 DB X 1-2 DB X 1-2 DB X 1KM DP X 5 DP X 5 DP X 5 DP X 5 DP X 5 DP X 5 DP X 5 BB DC X 27 DC X 27 DC X 27 DC X 27 DC X 27 TV X 7 TV X 7 TV X 7 TV X 7 TV X 7 TQ X 7 UO X 113 UO X 113 UO X 113 UO X 113 UY X 1 UY X 14 TO X 7 TO X 7 TO X 7 TO X 7 TO X 7 DM X 13 DM X 13 DM X 13 10" KNIFE 8" KNIFE

# # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # #

This Month Consumption 11 Pkt 12 14 Pkt 16 8 Pkt 18 9 11 12 14 Pkt 16 2 Pkt 17 Pkt 21 22 21 Pkt 11 12 14 16 2 Pkt 18 Pkt 11 12 14 16 Pkt 18 16 2 Pkt 11 12 14 10 16 5 Pkt 10 Pkt 18 11 12 14 16 18 16/18 14 16/18

Total Consumption Pkt Pkt 37 Pkt

Pkt 10 Pkt 2 Pkt

Pkt

6 Pkt 4 Pkt

2 Pkt 11 Pkt

8 Pkt 2 Pkt

Remarks

42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57

A BELT 1/2" KNIFE USSUE (7G) 7G KNITTING NEEDLE 5G KNITTING NEEDLE 12G KNITTING NEEDLE 3G KNITTING NEEDLE PYC - 22 PYE - 23 PYC - 21 PAY - 7 PAY - 4 PAY - 23 HARA DOMI HARACHI 7G HARACHI 5G

# # # # # # # # # # # # # # # #

532 396

6

Pcs 25100 Pcs 12200 Pcs Pcs Pcs Pkt Pkt Pkt 9 Pkt Pkt Pkt Pcs 200 Pcs Pcs

10 98100 66200 400 200

10 7 3 500 800 1000

Pcs Pcs Pcs Pcs Pcs Pkt Pkt Pkt Pkt Pkt Pkt Pcs Pcs Pcs

______________________ Production-Co-Ordinator

________________ Plant-In-Charge

GLOBAL KNITWEAR LTD 269 DEWAN HAT CHITTAGONG

Date : 01.07.2007

Needle Consumption Report For The Month Of June' 2007 Sl 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39

Types Of Needle DB X 1-2 DB X 1-2 DB X 1-2 DB X 1-2 DB X 1-2 DB X 1KM DP X 5 DP X 5 DP X 5 DP X 5 DP X 5 DP X 5 DP X 5 BB DC X 27 DC X 27 DC X 27 DC X 27 DC X 27 TV X 7 TV X 7 TV X 7 TV X 7 TV X 7 TQ X 7 UO X 113 UO X 113 UO X 113 UO X 113 UY X 1 UY X 14 TO X 7 TO X 7 TO X 7 TO X 7 TO X 7 DM X 13 DM X 13 DM X 13

# # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # #

This Month Consumption 11 Pkt 12 14 Pkt 16 4 Pkt 18 9 11 12 14 Pkt 16 2 Pkt 17 Pkt 21 22 21 Pkt 11 12 14 16 2 Pkt 18 Pkt 11 12 14 16 Pkt 18 16 2 Pkt 11 12 14 10 16 Pkt 10 Pkt 18 11 12 14 16 18 16/18 14

Total Consumption Pkt Pkt 29 Pkt

Pkt 8 Pkt 2 Pkt

Pkt

4 Pkt 4 Pkt

2 Pkt 9 Pkt

3 Pkt 2 Pkt

Remarks

40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57

10" KNIFE 8" KNIFE A BELT 1/2" KNIFE USSUE (7G) 7G KNITTING NEEDLE 5G KNITTING NEEDLE 12G KNITTING NEEDLE 3G KNITTING NEEDLE PYC - 22 PYE - 23 PYC - 21 PAY - 7 PAY - 4 PAY - 23 HARA DOMI HARACHI 7G HARACHI 5G

# # # # # # # # # # # # # # # # # #

16/18

532 396

6

Pcs 14000 Pcs 7000 Pcs Pcs Pcs Pkt Pkt Pkt Pkt 3 Pkt Pkt Pcs 300 Pcs 200 Pcs

10 73000 54000 400 200

1 7 3 500 600 1000

Pcs Pcs Pcs Pcs Pcs Pkt Pkt Pkt Pkt Pkt Pkt Pcs Pcs Pcs

______________________ Production-Co-Ordinator

________________ Plant-In-Charge

GLOBAL KNITWEAR LTD 269 DEWAN HAT CHITTAGONG

Date : 01.06.2007

Needle Consumption Report For The Month Of May' 2007 Sl 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37

Types Of Needle DB X 1-2 DB X 1-2 DB X 1-2 DB X 1-2 DB X 1-2 DB X 1KM DP X 5 DP X 5 DP X 5 DP X 5 DP X 5 DP X 5 DP X 5 BB DC X 27 DC X 27 DC X 27 DC X 27 DC X 27 TV X 7 TV X 7 TV X 7 TV X 7 TV X 7 TQ X 7 UO X 113 UO X 113 UO X 113 UO X 113 UY X 1 UY X 14 TO X 7 TO X 7 TO X 7 TO X 7 TO X 7 DM X 13

# # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # #

This Month Consumption 11 Pkt 12 14 Pkt 16 7 Pkt 18 9 11 12 14 Pkt 16 Pkt 17 Pkt 21 22 21 Pkt 11 12 14 16 2 Pkt 18 Pkt 11 12 14 16 Pkt 18 16 Pkt 11 12 14 10 16 Pkt 10 Pkt 18 11 12 14 16 18

Total Consumption Pkt Pkt 25 Pkt

Pkt 6 Pkt 2 Pkt

Pkt

2 Pkt 4 Pkt

2 Pkt 7 Pkt

3 Pkt 2 Pkt

Remarks

38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57

DM X 13 DM X 13 10" KNIFE 8" KNIFE A BELT 1/2" KNIFE USSUE (7G) 7G KNITTING NEEDLE 5G KNITTING NEEDLE 12G KNITTING NEEDLE 3G KNITTING NEEDLE PYC - 22 PYE - 23 PYC - 21 PAY - 7 PAY - 4 PAY - 23 HARA DOMI HARACHI 7G HARACHI 5G

# # # # # # # # # # # # # # # # # # # #

16/18 14 16/18

532 396

6

Pcs 14200 Pcs 10400 Pcs Pcs Pcs Pkt Pkt Pkt Pkt 1 Pkt Pkt Pcs Pcs 200 Pcs

10 59000 47000 400 200

1 4 3 500 300 800

Pcs Pcs Pcs Pcs Pcs Pkt Pkt Pkt Pkt Pkt Pkt Pcs Pcs Pcs

______________________ Production-Co-Ordinator

________________ Plant-In-Charge

GLOBAL KNITWEAR LTD 269 DEWAN HAT CHITTAGONG

Date : 01.05.2007

Needle Consumption Report For The Month Of April' 2007 Sl 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35

Types Of Needle DB X 1-2 DB X 1-2 DB X 1-2 DB X 1-2 DB X 1-2 DB X 1KM DP X 5 DP X 5 DP X 5 DP X 5 DP X 5 DP X 5 DP X 5 BB DC X 27 DC X 27 DC X 27 DC X 27 DC X 27 TV X 7 TV X 7 TV X 7 TV X 7 TV X 7 TQ X 7 UO X 113 UO X 113 UO X 113 UO X 113 UY X 1 UY X 14 TO X 7 TO X 7 TO X 7 TO X 7

# # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # #

This Month Consumption 11 Pkt 12 14 Pkt 16 4 Pkt 18 9 11 12 14 Pkt 16 Pkt 17 Pkt 21 22 21 Pkt 11 12 14 16 18 Pkt 11 12 14 16 Pkt 18 16 Pkt 11 12 14 10 16 Pkt 10 Pkt 18 11 12 14

Total Consumption Pkt Pkt 18 Pkt

Pkt 6 Pkt 2 Pkt

Pkt

4 Pkt

2 Pkt 7 Pkt

3 Pkt 2 Pkt

Remarks

36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57

TO X 7 DM X 13 DM X 13 DM X 13 10" KNIFE 8" KNIFE A BELT 1/2" KNIFE USSUE (7G) 7G KNITTING NEEDLE 5G KNITTING NEEDLE 12G KNITTING NEEDLE 3G KNITTING NEEDLE PYC - 22 PYE - 23 PYC - 21 PAY - 7 PAY - 4 PAY - 23 HARA DOMI HARACHI 7G HARACHI 5G

# # # # # # # # # # # # # # # # # # # # # #

16 18 16/18 14 16/18

532 396

6

Pcs 11400 Pcs 9200 Pcs Pcs Pcs Pkt Pkt Pkt 1 Pkt Pkt Pkt 500 Pcs 100 Pcs 200 Pcs

10 44800 36600 400 200

1 3 3 500 300 600

Pcs Pcs Pcs Pcs Pcs Pkt Pkt Pkt Pkt Pkt Pkt Pcs Pcs Pcs

______________________ Production-Co-Ordinator

________________ Plant-In-Charge

GLOBAL KNITWEAR LTD 269 DEWAN HAT CHITTAGONG

Date : 01.04.2007

Needle Consumption Report For The Month Of March' 2007 Sl

Types Of Needle

This Month Consumption Pkt

Total Consumption

01 DB X 1-2

#

11

Pkt

02 DB X 1-2

#

12

03 DB X 1-2

#

14

Pkt

Pkt

04 DB X 1-2

#

16

8 Pkt

14 Pkt

05 DB X 1-2

#

18

06 DB X 1KM

#

9

07 DP X 5

#

11

08 DP X 5

#

12

09 DP X 5

#

14

Pkt

Pkt

10 DP X 5

#

16

2 Pkt

6 Pkt

11 DP X 5

#

17

2 Pkt

2 Pkt

12 DP X 5

#

21

13 DP X 5

#

22

14 BB

#

21

Pkt

Pkt

15 DC X 27

#

11

16 DC X 27

#

12

17 DC X 27

#

14

18 DC X 27

#

16

19 DC X 27

#

18

Pkt

4 Pkt

20 TV X 7

#

11

21 TV X 7

#

12

22 TV X 7

#

14

23 TV X 7

#

16

Pkt

2 Pkt

24 TV X 7

#

18

25 TQ X 7

#

16

5 Pkt

7 Pkt

26 UO X 113

#

11

27 UO X 113

#

12

28 UO X 113

#

14

29 UO X 113

#

10

30 UY X 1

#

16

3 Pkt

3 Pkt

31 UY X 14

#

10

2 Pkt

2 Pkt

Remarks

32 TO X 7

#

18

33 TO X 7

#

11

34 TO X 7

#

12

35 TO X 7

#

14

36 TO X 7

#

16

37 DM X 13

#

18

38 DM X 13

#

39 DM X 13

#

40 10" KNIFE

#

41 8" KNIFE

#

42 A BELT

#

43 1/2" KNIFE

#

44 USSUE (7G)

#

45 7G KNITTING NEEDLE

#

46 5G KNITTING NEEDLE

#

47 12G KNITTING NEEDLE

16/18 14 16/18

10 Pcs

10 Pcs

532

10100 Pcs

33400 Pcs

396

10500 Pcs

27400 Pcs

#

200 Pcs

400 Pcs

48 3G KNITTING NEEDLE

#

200 Pcs

200 Pcs

49 PYC - 22

#

Pkt

Pkt

50 PYE - 23

#

Pkt

Pkt

51 PYC - 21

#

Pkt

Pkt

52 PAY - 7

#

Pkt

Pkt

53 54 55 56

# # # #

PAY - 4 PAY - 23 HARACHI 7G HARACHI 5G

6

1 Pkt 3 Pkt 100 Pcs 100 Pcs

3 3 200 400

Pkt Pkt Pcs Pcs

______________ Prepared By

________________ Plant-In-Charge

GLOBAL KNITWEAR LTD 269 DEWAN HAT CHITTAGONG

Date : 01.03.2007

Needle Consumption Report For The Month Of February' 2007 Sl

Types Of Needle

This Month Consumption Pkt

Total Consumption

01 DB X 1-2

#

11

Pkt

02 DB X 1-2

#

12

03 DB X 1-2

#

14

Pkt

Pkt

04 DB X 1-2

#

16

Pkt

6 Pkt

05 DB X 1-2

#

18

06 DB X 1KM

#

9

07 DP X 5

#

11

08 DP X 5

#

12

09 DP X 5

#

14

Pkt

Pkt

10 DP X 5

#

16

4 Pkt

4 Pkt

11 DP X 5

#

18

12 DP X 5

#

21

13 DP X 5

#

22

14 BB

#

21

Pkt

Pkt

15 DC X 27

#

11

16 DC X 27

#

12

17 DC X 27

#

14

18 DC X 27

#

16

19 DC X 27

#

18

2 Pkt

4 Pkt

20 TV X 7

#

11

21 TV X 7

#

12

22 TV X 7

#

14

23 TV X 7

#

16

2 Pkt

2 Pkt

24 TV X 7

#

18

25 TQ X 7

#

16

2 Pkt

2 Pkt

26 UO X 113

#

11

Remarks

27 UO X 113

#

12

28 UO X 113

#

14

29 UO X 113

#

10

30 UY X 14

#

10

31 TO X 7

#

18

32 TO X 7

#

11

33 TO X 7

#

12

34 TO X 7

#

14

35 TO X 7

#

16

36 DM X 13

#

18

37 DM X 13

#

38 DM X 13

#

39 10" KNIFE

#

40 8" KNIFE

#

41 A BELT

#

42 1/2" KNIFE

#

43 7G KNITTING NEEDLE

#

44 5G KNITTING NEEDLE

#

44 12G KNITTING NEEDLE

Pkt

Pkt

532

13100 Pcs

23300 Pcs

396

6600 Pcs

16900 Pcs

#

Pcs

200 Pcs

45 PYC - 22

#

Pkt

Pkt

46 PYE - 23

#

Pkt

Pkt

47 PYC - 21

#

Pkt

Pkt

48 PAY - 7

#

Pkt

Pkt

49 50 51 52

# # # #

Pkt Pkt Pcs 100 Pcs

2 Pkt Pkt 100 Pcs 300 Pcs

PAY - 4 PAY - 23 HARACHI 7G HARACHI 5G

16/18 14 16/18

6

______________ Prepared By

________________ Plant-In-Charge

GLOBAL KNITWEAR LTD 269 DEWAN HAT CHITTAGONG

Date : 01.02.2007

Needle Consumption Report For The Month Of January' 2007 Sl

Types Of Needle

This Month Consumption Pkt

Total Consumption

01 DB X 1-2

#

11

Pkt

02 DB X 1-2

#

12

03 DB X 1-2

#

14

Pkt

Pkt

04 DB X 1-2

#

16

6 Pkt

6 Pkt

05 DB X 1-2

#

18

06 DB X 1KM

#

9

07 DP X 5

#

11

08 DP X 5

#

12

09 DP X 5

#

14

Pkt

Pkt

10 DP X 5

#

16

11 DP X 5

#

18

12 DP X 5

#

21

13 DP X 5

#

22

14 BB

#

21

Pkt

Pkt

15 DC X 27

#

11

16 DC X 27

#

12

17 DC X 27

#

14

18 DC X 27

#

16

19 DC X 27

#

18

2 Pkt

2 Pkt

20 TV X 7

#

11

21 TV X 7

#

12

22 TV X 7

#

14

23 TV X 7

#

16

24 TV X 7

#

18

Remarks

25 TQ X 7

#

16

Pkt

Pkt

26 UO X 113

#

11

27 UO X 113

#

12

28 UO X 113

#

14

29 UO X 113

#

10

30 UY X 14

#

10

Pkt

Pkt

31 TO X 7

#

18

32 TO X 7

#

11

33 TO X 7

#

12

34 TO X 7

#

14

35 TO X 7

#

16

36 DM X 13

#

18

37 DM X 13

#

38 DM X 13

#

39 10" KNIFE

#

40 8" KNIFE

#

41 A BELT

#

42 1/2" KNIFE

#

43 7G KNITTING NEEDLE

#

532

10200 Pcs

10200 Pcs

44 5G KNITTING NEEDLE

#

396

10300 Pcs

10300 Pcs

44 12G KNITTING NEEDLE

#

200 Pcs

200 Pcs

45 PYC - 22

#

Pkt

Pkt

46 PYE - 23

#

Pkt

Pkt

47 PYC - 21

#

Pkt

Pkt

48 PAY - 7

#

Pkt

Pkt

49 50 51 52

# # # #

2 Pkt Pkt 100 Pcs 200 Pcs

2 Pkt Pkt 100 Pcs 200 Pcs

PAY - 4 PAY - 23 HARACHI 7G HARACHI 5G

16/18 14 16/18

6

______________ Prepared By

________________ Plant-In-Charge

GLOBAL KNITWEAR LTD 269 DEWAN HAT CHITTAGONG

Date : 06.01.2007

Needle Consumption Report For The Month Of December' 2006 Sl

Types Of Needle

This Month Consumption Pkt

Total Consumption

01 DB X 1-2

#

11

3 Pkt

02 DB X 1-2

#

12

03 DB X 1-2

#

14

Pkt

Pkt

04 DB X 1-2

#

16

7 Pkt

249 Pkt

05 DB X 1-2

#

18

06 DB X 1KM

#

9

07 DP X 5

#

11

08 DP X 5

#

12

09 DP X 5

#

14

Pkt

17 Pkt

10 DP X 5

#

16

11 DP X 5

#

18

12 DP X 5

#

21

13 DP X 5

#

22

14 BB

#

21

Pkt

Pkt

15 DC X 27

#

11

16 DC X 27

#

12

17 DC X 27

#

14

18 DC X 27

#

16

19 DC X 27

#

18

Pkt

54 Pkt

20 TV X 7

#

11

21 TV X 7

#

12

22 TV X 7

#

14

Remarks

23 TV X 7

#

16

24 TV X 7

#

18

25 TQ X 7

#

16

26 UO X 113

#

11

27 UO X 113

#

12

28 UO X 113

#

14

29 UO X 113

#

10

30 UY X 14

#

10

31 TO X 7

#

18

32 TO X 7

#

11

33 TO X 7

#

12

34 TO X 7

#

14

35 TO X 7

#

16

36 DM X 13

#

18

37 DM X 13

#

38 DM X 13

#

39 10" KNIFE

#

40 8" KNIFE

#

41 A BELT

#

42 1/2" KNIFE

#

43 7G KNITTING NEEDLE

#

44 5G KNITTING NEEDLE

Pkt

17 Pkt

Pkt

1 Pkt

532

9800 Pcs

177600 Pcs

#

396

5500 Pcs

73100 Pcs

44 5G KNITTING NEEDLE

#

494

Pcs

Pcs

45 PYC - 22

#

Pkt

Pkt

46 PYE - 23

#

Pkt

27 Pkt

47 PYC - 21

#

Pkt

Pkt

48 PAY - 7

#

1 Pkt

15 Pkt

49 50 51 52

# # # #

Pkt Pkt Pcs 100 Pcs

3 Pkt Pkt 6800 Pcs 700 Pcs

PAY - 4 PAY - 23 HARACHI 7G HARACHI 5G

16/18 14 16/18

6

______________ Prepared By

________________ Plant-In-Charge

GLOBAL KNITWEAR LTD 269 DEWAN HAT CHITTAGONG

Date : 02.12.2006

Needle Consumption Report For The Month Of November' 2006 Sl

Types Of Needle

This Month Consumption Pkt

Total Consumption

01 DB X 1-2

#

11

3 Pkt

02 DB X 1-2

#

12

03 DB X 1-2

#

14

Pkt

Pkt

04 DB X 1-2

#

16

22 Pkt

242 Pkt

05 DB X 1-2

#

18

06 DB X 1KM

#

9

07 DP X 5

#

11

08 DP X 5

#

12

09 DP X 5

#

14

Pkt

17 Pkt

10 DP X 5

#

16

11 DP X 5

#

18

12 DP X 5

#

21

13 DP X 5

#

22

14 BB

#

21

Pkt

Pkt

15 DC X 27

#

11

16 DC X 27

#

12

17 DC X 27

#

14

18 DC X 27

#

16

19 DC X 27

#

18

2 Pkt

54 Pkt

20 TV X 7

#

11

Remarks

21 TV X 7

#

12

22 TV X 7

#

14

23 TV X 7

#

16

24 TV X 7

#

18

25 TQ X 7

#

16

26 UO X 113

#

11

27 UO X 113

#

12

28 UO X 113

#

14

29 UO X 113

#

10

30 UY X 14

#

10

31 TO X 7

#

18

32 TO X 7

#

11

33 TO X 7

#

12

34 TO X 7

#

14

35 TO X 7

#

16

36 DM X 13

#

18

37 DM X 13

#

38 DM X 13

#

39 10" KNIFE

#

40 8" KNIFE

#

41 A BELT

#

42 1/2" KNIFE

#

43 7G KNITTING NEEDLE

#

44 5G KNITTING NEEDLE

Pkt

17 Pkt

Pkt

1 Pkt

532

13200 Pcs

167800 Pcs

#

396

1000 Pcs

67600 Pcs

44 5G KNITTING NEEDLE

#

494

Pcs

Pcs

45 PYC - 22

#

Pkt

Pkt

46 PYE - 23

#

1 Pkt

27 Pkt

47 PYC - 21

#

Pkt

Pkt

48 PAY - 7

#

2 Pkt

14 Pkt

49 50 51 52

# # # #

Pkt Pkt 300 Pcs Pcs

3 Pkt Pkt 6800 Pcs 600 Pcs

PAY - 4 PAY - 23 HARACHI 7G HARACHI 5G

16/18 14 16/18

6

______________ Prepared By

________________ Plant-In-Charge

GLOBAL KNITWEAR LTD 269 DEWAN HAT CHITTAGONG

Date : 01.11.2006

Needle Consumption Report For The Month Of October' 2006 Sl

Types Of Needle

This Month Consumption Pkt

Total Consumption

01 DB X 1-2

#

11

3 Pkt

02 DB X 1-2

#

12

03 DB X 1-2

#

14

Pkt

Pkt

04 DB X 1-2

#

16

27 Pkt

220 Pkt

05 DB X 1-2

#

18

06 DB X 1KM

#

9

07 DP X 5

#

11

08 DP X 5

#

12

09 DP X 5

#

14

Pkt

17 Pkt

10 DP X 5

#

16

11 DP X 5

#

18

12 DP X 5

#

21

13 DP X 5

#

22

14 BB

#

21

Pkt

Pkt

15 DC X 27

#

11

16 DC X 27

#

12

17 DC X 27

#

14

18 DC X 27

#

16

Remarks

19 DC X 27

#

18

Pkt

52 Pkt

20 TV X 7

#

11

21 TV X 7

#

12

22 TV X 7

#

14

23 TV X 7

#

16

24 TV X 7

#

18

25 TQ X 7

#

16

Pkt

17 Pkt

26 UO X 113

#

11

27 UO X 113

#

12

28 UO X 113

#

14

29 UO X 113

#

10

30 UY X 14

#

10

Pkt

1 Pkt

31 TO X 7

#

18

32 TO X 7

#

11

33 TO X 7

#

12

34 TO X 7

#

14

35 TO X 7

#

16

36 DM X 13

#

18

37 DM X 13

#

38 DM X 13

#

39 10" KNIFE

#

40 8" KNIFE

#

41 A BELT

#

42 1/2" KNIFE

#

43 7G KNITTING NEEDLE

#

532

16000 Pcs

154600 Pcs

44 5G KNITTING NEEDLE

#

396

2400 Pcs

66600 Pcs

44 5G KNITTING NEEDLE

#

494

Pcs

Pcs

45 PYC - 22

#

Pkt

Pkt

46 PYE - 23

#

2 Pkt

26 Pkt

47 PYC - 21

#

Pkt

Pkt

48 PAY - 7

#

Pkt

12 Pkt

49 50 51 52

# # # #

Pkt Pkt 200 Pcs Pcs

3 Pkt Pkt 6500 Pcs 600 Pcs

PAY - 4 PAY - 23 HARACHI 7G HARACHI 5G

16/18 14 16/18

6

______________ Prepared By

________________ Plant-In-Charge

GLOBAL KNITWEAR LTD 269 DEWAN HAT CHITTAGONG

Date : 03.10.2006

Needle Consumption Report For The Month Of September' 2006 Sl

Types Of Needle

This Month Consumption 2

Pkt

Total Consumption

01 DB X 1-2

#

11

3 Pkt

02 DB X 1-2

#

12

03 DB X 1-2

#

14

Pkt

Pkt

04 DB X 1-2

#

16

19 Pkt

193 Pkt

05 DB X 1-2

#

18

06 DB X 1KM

#

9

07 DP X 5

#

11

08 DP X 5

#

12

09 DP X 5

#

14

Pkt

17 Pkt

10 DP X 5

#

16

11 DP X 5

#

18

12 DP X 5

#

21

13 DP X 5

#

22

14 BB

#

21

Pkt

Pkt

15 DC X 27

#

11

16 DC X 27

#

12

Remarks

17 DC X 27

#

14

18 DC X 27

#

16

19 DC X 27

#

18

20 TV X 7

#

11

21 TV X 7

#

12

22 TV X 7

#

14

23 TV X 7

#

16

24 TV X 7

#

18

25 TQ X 7

#

16

26 UO X 113

#

11

27 UO X 113

#

12

28 UO X 113

#

14

29 UO X 113

#

10

30 UY X 14

#

10

31 TO X 7

#

18

32 TO X 7

#

11

33 TO X 7

#

12

34 TO X 7

#

14

35 TO X 7

#

16

36 DM X 13

#

18

37 DM X 13

#

38 DM X 13

#

39 10" KNIFE

#

40 8" KNIFE

#

41 A BELT

#

42 1/2" KNIFE

#

43 7G KNITTING NEEDLE

#

44 5G KNITTING NEEDLE

2 Pkt

52 Pkt

Pkt

17 Pkt

Pkt

1 Pkt

532

17000 Pcs

138600 Pcs

#

396

8400 Pcs

64200 Pcs

44 5G KNITTING NEEDLE

#

494

Pcs

Pcs

45 PYC - 22

#

Pkt

Pkt

46 PYE - 23

#

2 Pkt

24 Pkt

47 PYC - 21

#

Pkt

Pkt

48 PAY - 7

#

2 Pkt

12 Pkt

49 50 51 52

# # # #

Pkt Pkt 300 Pcs Pcs

3 Pkt Pkt 6300 Pcs 600 Pcs

PAY - 4 PAY - 23 HARACHI 7G HARACHI 5G

16/18 14 16/18

6

______________ Prepared By

________________ Plant-In-Charge

GLOBAL KNITWEAR LTD 269 DEWAN HAT CHITTAGONG

Date : 01.09.2006

Needle Consumption Report For The Month Of August' 2006 Sl 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15

Types Of Needle DB X 1-2 DB X 1-2 DB X 1-2 DB X 1-2 DB X 1-2 DB X 1KM DP X 5 DP X 5 DP X 5 DP X 5 DP X 5 DP X 5 DP X 5 BB DC X 27

# # # # # # # # # # # # # # #

This Month Consumption 11 1 Pkt 12 14 Pkt 16 20 Pkt 18 9 11 12 14 1 Pkt 16 18 21 22 21 Pkt 11

Total Consumption 1 Pkt Pkt 174 Pkt

17 Pkt

Pkt

Remarks

16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 44 45 46 47 48 49 50 51 52

DC X 27 DC X 27 DC X 27 DC X 27 TV X 7 TV X 7 TV X 7 TV X 7 TV X 7 TQ X 7 UO X 113 UO X 113 UO X 113 UO X 113 UY X 14 TO X 7 TO X 7 TO X 7 TO X 7 TO X 7 DM X 13 DM X 13 DM X 13 10" KNIFE 8" KNIFE A BELT 1/2" KNIFE 7G KNITTING NEEDLE 5G KNITTING NEEDLE 5G KNITTING NEEDLE PYC - 22 PYE - 23 PYC - 21 PAY - 7 PAY - 4 PAY - 23 HARACHI 7G HARACHI 5G

# # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # #

12 14 16 18 11 12 14 16 18 16 11 12 14 10 10 18 11 12 14 16 18 16/18 14 16/18

532 396 494

6

1 Pkt

50 Pkt

Pkt

17 Pkt

Pkt

1 Pkt

25800 Pcs 9800 Pcs Pcs Pkt 3 Pkt Pkt 3 Pkt Pkt Pkt 100 Pcs 200 Pcs

121600 Pcs 55800 Pcs Pcs Pkt 22 Pkt Pkt 10 Pkt 3 Pkt Pkt 6000 Pcs 600 Pcs

______________ Prepared By

________________ Plant-In-Charge

GLOBAL KNITWEAR LTD 269 DEWAN HAT CHITTAGONG

Date : 01.08.2006

Needle Consumption Report For The Month Of July' 2006 Sl 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16

Types Of Needle DB X 1-2 DB X 1-2 DB X 1-2 DB X 1-2 DB X 1-2 DB X 1KM DP X 5 DP X 5 DP X 5 DP X 5 DP X 5 DP X 5 DP X 5 BB DC X 27 DC X 27

# # # # # # # # # # # # # # # #

This Month Consumption 11 Pkt 12 14 Pkt 16 32 Pkt 18 9 11 12 14 Pkt 16 18 21 22 21 Pkt 11 12

Total Consumption Pkt Pkt 154 Pkt

16 Pkt

Pkt

Remarks

17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 44 45 46 47 48 49 50 51 52

DC X 27 DC X 27 DC X 27 TV X 7 TV X 7 TV X 7 TV X 7 TV X 7 TQ X 7 UO X 113 UO X 113 UO X 113 UO X 113 UY X 14 TO X 7 TO X 7 TO X 7 TO X 7 TO X 7 DM X 13 DM X 13 DM X 13 10" KNIFE 8" KNIFE A BELT 1/2" KNIFE 7G KNITTING NEEDLE 5G KNITTING NEEDLE 5G KNITTING NEEDLE PYC - 22 PYE - 23 PYC - 21 PAY - 7 PAY - 4 PAY - 23 HARACHI 7G HARACHI 5G

# # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # #

14 16 18 11 12 14 16 18 16 11 12 14 10 10 18 11 12 14 16 18 16/18 14 16/18

532 396 494

6

18 Pkt

49 Pkt

Pkt

17 Pkt

Pkt

1 Pkt

25400 Pcs 13200 Pcs Pcs Pkt 2 Pkt Pkt 4 Pkt Pkt Pkt 200 Pcs 100 Pcs

95800 Pcs 46000 Pcs Pcs Pkt 19 Pkt Pkt 7 Pkt 3 Pkt Pkt 5900 Pcs 400 Pcs

______________ Prepared By

________________ Plant-In-Charge

GLOBAL KNITWEAR LTD 269 DEWAN HAT CHITTAGONG

Date : 02.06.2006

Needle Consumption Report For The Month Of June' 2006 Sl

Types Of Needle

This Month Consumption Pkt

Total Consumption

01 DB X 1-2

#

11

Pkt

02 DB X 1-2

#

12

03 DB X 1-2

#

14

Pkt

Pkt

04 DB X 1-2

#

16

33 Pkt

122 Pkt

05 DB X 1-2

#

18

06 DB X 1KM

#

9

07 DP X 5

#

11

08 DP X 5

#

12

09 DP X 5

#

14

3 Pkt

16 Pkt

10 DP X 5

#

16

11 DP X 5

#

18

12 DP X 5

#

21

13 DP X 5

#

22

14 BB

#

21

Pkt

Pkt

15 DC X 27

#

11

16 DC X 27

#

12

17 DC X 27

#

14

Remarks

18 DC X 27

#

16

19 DC X 27

#

18

20 TV X 7

#

11

21 TV X 7

#

12

22 TV X 7

#

14

23 TV X 7

#

16

24 TV X 7

#

18

25 TQ X 7

#

16

26 UO X 113

#

11

27 UO X 113

#

12

28 UO X 113

#

14

29 UO X 113

#

10

30 UY X 14

#

10

31 TO X 7

#

18

32 TO X 7

#

11

33 TO X 7

#

12

34 TO X 7

#

14

35 TO X 7

#

16

36 DM X 13

#

18

37 DM X 13

#

38 DM X 13

#

39 10" KNIFE

#

40 8" KNIFE

#

41 A BELT

#

42 1/2" KNIFE

#

43 7G KNITTING NEEDLE

#

44 5G KNITTING NEEDLE

9 Pkt

31 Pkt

3 Pkt

17 Pkt

1 Pkt

1 Pkt

532

13200 Pcs

70400 Pcs

#

396

11200 Pcs

32800 Pcs

44 5G KNITTING NEEDLE

#

494

Pcs

Pcs

45 PYC - 22

#

Pkt

Pkt

46 PYE - 23

#

5 Pkt

17 Pkt

47 PYC - 21

#

Pkt

Pkt

48 49 50 51 52

# # # # #

Pkt 2 Pkt Pkt 100 Pcs Pcs

3 Pkt 3 Pkt Pkt 5700 Pcs 300 Pcs

PAY - 7 PAY - 4 PAY - 23 HARACHI 7G HARACHI 5G

16/18 14 16/18

6

______________ Prepared By

________________ Plant-In-Charge

GLOBAL KNITWEAR LTD 269 DEWAN HAT CHITTAGONG

Date : 02.06.2006

Needle Consumption Report For The Month Of May' 2006 Sl

Types Of Needle

This Month Consumption Pkt

Total Consumption

01 DB X 1-2

#

11

Pkt

02 DB X 1-2

#

12

03 DB X 1-2

#

14

Pkt

Pkt

04 DB X 1-2

#

16

28 Pkt

89 Pkt

05 DB X 1-2

#

18

06 DB X 1KM

#

9

07 DP X 5

#

11

08 DP X 5

#

12

09 DP X 5

#

14

1 Pkt

13 Pkt

10 DP X 5

#

16

11 DP X 5

#

18

12 DP X 5

#

21

13 DP X 5

#

22

14 BB

#

21

Pkt

Pkt

15 DC X 27

#

11

16 DC X 27

#

12

Remarks

17 DC X 27

#

14

18 DC X 27

#

16

19 DC X 27

#

18

20 TV X 7

#

11

21 TV X 7

#

12

22 TV X 7

#

14

23 TV X 7

#

16

24 TV X 7

#

18

25 TQ X 7

#

16

26 UO X 113

#

11

27 UO X 113

#

12

28 UO X 113

#

14

29 UO X 113

#

10

30 UY X 14

#

10

31 TO X 7

#

18

32 TO X 7

#

11

33 TO X 7

#

12

34 TO X 7

#

14

35 TO X 7

#

16

36 DM X 13

#

18

37 DM X 13

#

38 DM X 13

#

39 10" KNIFE

#

40 8" KNIFE

#

41 A BELT

#

42 1/2" KNIFE

#

43 7G KNITTING NEEDLE

#

44 5G KNITTING NEEDLE

8 Pkt

22 Pkt

2 Pkt

14 Pkt

Pkt

Pkt

532

19000 Pcs

57200 Pcs

#

396

7000 Pcs

21600 Pcs

44 5G KNITTING NEEDLE

#

494

Pcs

Pcs

45 PYC - 22

#

Pkt

Pkt

46 PYE - 23

#

5 Pkt

12 Pkt

47 PYC - 21

#

Pkt

Pkt

48 PAY - 7

#

1 Pkt

3 Pkt

49 50 51 52

# # # #

Pkt Pkt Pcs Pcs

1 Pkt Pkt 5600 Pcs 300 Pcs

PAY - 4 PAY - 23 HARACHI 7G HARACHI 5G

16/18 14 16/18

6

______________ Prepared By

________________ Plant-In-Charge

GLOBAL KNITWEAR LTD 269 DEWAN HAT CHITTAGONG

Date : 02.05.2006

Needle Consumption Report For The Month Of April' 2006 Sl

Types Of Needle

This Month Consumption Pkt

Total Consumption

01 DB X 1-2

#

11

Pkt

02 DB X 1-2

#

12

03 DB X 1-2

#

14

Pkt

Pkt

04 DB X 1-2

#

16

27 Pkt

61 Pkt

05 DB X 1-2

#

18

06 DB X 1KM

#

9

07 DP X 5

#

11

08 DP X 5

#

12

09 DP X 5

#

14

2 Pkt

12 Pkt

10 DP X 5

#

16

11 DP X 5

#

18

12 DP X 5

#

21

13 DP X 5

#

22

14 BB

#

21

Pkt

Pkt

Remarks

15 DC X 27

#

11

16 DC X 27

#

12

17 DC X 27

#

14

18 DC X 27

#

16

19 DC X 27

#

18

20 TV X 7

#

11

21 TV X 7

#

12

22 TV X 7

#

14

23 TV X 7

#

16

24 TV X 7

#

18

25 TQ X 7

#

16

26 UO X 113

#

11

27 UO X 113

#

12

28 UO X 113

#

14

29 UO X 113

#

10

30 UY X 14

#

10

31 TO X 7

#

18

32 TO X 7

#

11

33 TO X 7

#

12

34 TO X 7

#

14

35 TO X 7

#

16

36 DM X 13

#

18

37 DM X 13

#

38 DM X 13

#

39 10" KNIFE

#

40 8" KNIFE

#

41 A BELT

#

42 1/2" KNIFE

#

43 7G KNITTING NEEDLE

#

44 5G KNITTING NEEDLE

6 Pkt

14 Pkt

4 Pkt

12 Pkt

Pkt

Pkt

532

15400 Pcs

38200 Pcs

#

396

7600 Pcs

14600 Pcs

44 5G KNITTING NEEDLE

#

494

Pcs

Pcs

45 PYC - 22

#

Pkt

Pkt

46 PYE - 23

#

4 Pkt

7 Pkt

47 PYC - 21

#

Pkt

Pkt

48 PAY - 7

#

2 Pkt

2 Pkt

49 50 51 52

# # # #

Pkt Pkt 400 Pcs 300 Pcs

1 Pkt Pkt 5600 Pcs 300 Pcs

PAY - 4 PAY - 23 HARACHI 7G HARACHI 5G

16/18 14 16/18

6

______________ Prepared By

________________ Plant-In-Charge

GLOBAL KNITWEAR LTD 269 DEWAN HAT CHITTAGONG

Date : 01.02.2006

Needle Consumption Report For The Month Of January 2006 Sl

Types Of Needle

This Month Consumption Pkt

Total Consumption

01 DB X 1-2

#

11

Pkt

02 DB X 1-2

#

12

03 DB X 1-2

#

14

Pkt

Pkt

04 DB X 1-2

#

16

12 Pkt

12 Pkt

05 DB X 1-2

#

18

06 DB X 1KM

#

9

07 DP X 5

#

11

08 DP X 5

#

12

09 DP X 5

#

14

Pkt

Pkt

10 DP X 5

#

16

11 DP X 5

#

18

12 DP X 5

#

21

Remarks

13 DP X 5

#

22

14 BB

#

21

15 DC X 27

#

11

16 DC X 27

#

12

17 DC X 27

#

14

18 DC X 27

#

16

19 DC X 27

#

18

20 TV X 7

#

11

21 TV X 7

#

12

22 TV X 7

#

14

23 TV X 7

#

16

24 TV X 7

#

18

25 TQ X 7

#

16

26 UO X 113

#

11

27 UO X 113

#

12

28 UO X 113

#

14

29 UO X 113

#

10

30 UY X 14

#

10

31 TO X 7

#

18

32 TO X 7

#

11

33 TO X 7

#

12

34 TO X 7

#

14

35 TO X 7

#

16

36 DM X 13

#

18

37 DM X 13

#

38 DM X 13

#

39 10" KNIFE

#

40 8" KNIFE

#

41 A BELT

#

42 1/2" KNIFE

#

43 7G KNITTING NEEDLE

#

44 5G KNITTING NEEDLE

Pkt

Pkt

4 Pkt

4 Pkt

Pkt

Pkt

Pkt

Pkt

532

12000 Pcs

12000 Pcs

#

396

400 Pcs

400 Pcs

44 5G KNITTING NEEDLE

#

494

Pcs

Pcs

45 PYC - 22

#

Pkt

Pkt

46 PYE - 23

#

2 Pkt

2 Pkt

47 PYC - 21

#

Pkt

Pkt

48 PAY - 6

#

Pkt

Pkt

49 50 51 52

# # # #

Pkt Pkt 5200 Pcs Pcs

Pkt Pkt 5200 Pcs Pcs

PAY - 4 PAY - 23 HARACHI 7G HARACHI 5G

16/18 14 16/18

6

______________ Prepared By

________________ Plant-In-Charge

GLOBAL KNITWEAR LTD 269 DEWAN HAT CHITTAGONG

Date : 01.11.2005

Needle Consumption Report For The Month Of October 2005 Sl

Types Of Needle

This Month Consumption 1

Pkt

Total Consumption

01 DB X 1-2

#

11

2 Pkt

02 DB X 1-2

#

12

03 DB X 1-2

#

14

Pkt

Pkt

04 DB X 1-2

#

16

18 Pkt

146 Pkt

05 DB X 1-2

#

18

06 DB X 1KM

#

9

07 DP X 5

#

11

08 DP X 5

#

12

09 DP X 5

#

14

5 Pkt

26 Pkt

10 DP X 5

#

16

Remarks

11 DP X 5

#

18

12 DP X 5

#

21

13 DP X 5

#

22

14 BB

#

21

15 DC X 27

#

11

16 DC X 27

#

12

17 DC X 27

#

14

18 DC X 27

#

16

19 DC X 27

#

18

20 TV X 7

#

11

21 TV X 7

#

12

22 TV X 7

#

14

23 TV X 7

#

16

24 TV X 7

#

18

25 TQ X 7

#

16

26 UO X 113

#

11

27 UO X 113

#

12

28 UO X 113

#

14

29 UO X 113

#

10

30 UY X 14

#

10

31 TO X 7

#

18

32 TO X 7

#

11

33 TO X 7

#

12

34 TO X 7

#

14

35 TO X 7

#

16

36 DM X 13

#

18

37 DM X 13

#

38 DM X 13

#

39 10" KNIFE

#

40 8" KNIFE

#

41 A BELT

#

42 1/2" KNIFE

#

43 7G KNITTING NEEDLE

#

44 5G KNITTING NEEDLE

Pkt

3 Pkt

6 Pkt

51 Pkt

4 Pkt

20 Pkt

Pkt

Pkt

532

11900 Pcs

109500 Pcs

#

396

1600 Pcs

47000 Pcs

44 5G KNITTING NEEDLE

#

494

Pcs

Pcs

45 PYC - 22

#

Pkt

Pkt

46 PYE - 23

#

4 Pkt

56 Pkt

47 PYC - 21

#

Pkt

Pkt

48 PAY - 6

#

1 Pkt

10 Pkt

49 50 51 52

# # # #

Pkt Pkt 500 Pcs Pcs

Pkt Pkt 2600 Pcs 1500 Pcs

PAY - 6 PAY - 23 HARACHI 7G HARACHI 5G

16/18 14 16/18

______________ Prepared By

________________ Plant-In-Charge

GLOBAL KNITWEAR LTD 269 DEWAN HAT CHITTAGONG

Date : 02.09.2005

Needle Consumption Report For The Month Of August 2005 Sl

Types Of Needle

This Month Consumption Pkt

Total Consumption

01 DB X 1-2

#

11

1 Pkt

02 DB X 1-2

#

12

03 DB X 1-2

#

14

Pkt

Pkt

04 DB X 1-2

#

16

23 Pkt

114 Pkt

05 DB X 1-2

#

18

06 DB X 1KM

#

9

07 DP X 5

#

11

08 DP X 5

#

12

Remarks

09 DP X 5

#

14

1 Pkt

17 Pkt

10 DP X 5

#

16

11 DP X 5

#

18

12 DP X 5

#

21

13 DP X 5

#

22

14 BB

#

21

Pkt

3 Pkt

15 DC X 27

#

11

16 DC X 27

#

12

17 DC X 27

#

14

18 DC X 27

#

16

19 DC X 27

#

18

9 Pkt

38 Pkt

20 TV X 7

#

11

21 TV X 7

#

12

22 TV X 7

#

14

23 TV X 7

#

16

24 TV X 7

#

18

25 TQ X 7

#

16

26 UO X 113

#

11

1 Pkt

13 Pkt

27 UO X 113

#

12

28 UO X 113

#

14

29 UO X 113

#

10

30 UY X 14

#

10

Pkt

Pkt

31 TO X 7

#

18

32 TO X 7

#

11

33 TO X 7

#

12

34 TO X 7

#

14

35 TO X 7

#

16

36 DM X 13

#

18

37 DM X 13

#

38 DM X 13

#

39 10" KNIFE

#

40 8" KNIFE

#

41 A BELT

#

42 1/2" KNIFE

#

43 7G KNITTING NEEDLE

#

532

6800 Pcs

83800 Pcs

44 5G KNITTING NEEDLE

#

396

7400 Pcs

38600 Pcs

44 5G KNITTING NEEDLE

#

494

Pcs

Pcs

45 PYC - 22

#

Pkt

Pkt

46 PYE - 23

#

8 Pkt

45 Pkt

47 PYC - 21

#

Pkt

Pkt

48 PAY - 6

#

2 Pkt

7 Pkt

49 50 51 52

# # # #

Pkt Pkt 200 Pcs 200 Pcs

Pkt Pkt 1000 Pcs 1100 Pcs

PAY - 6 PAY - 23 HARACHI 7G HARACHI 5G

16/18 14 16/18

______________ Prepared By

________________ Plant-In-Charge

GLOBAL KNITWEAR LTD 269 DEWAN HAT CHITTAGONG

Date : 02.08.2005

Needle Consumption Report For The Month Of June 2005 Sl

Types Of Needle

This Month Consumption 1

Pkt

Total Consumption

01 DB X 1-2

#

11

1 Pkt

02 DB X 1-2

#

12

03 DB X 1-2

#

14

Pkt

Pkt

04 DB X 1-2

#

16

16 Pkt

91 Pkt

05 DB X 1-2

#

18

06 DB X 1KM

#

9

Remarks

07 DP X 5

#

11

08 DP X 5

#

12

09 DP X 5

#

14

10 DP X 5

#

16

11 DP X 5

#

18

12 DP X 5

#

21

13 DP X 5

#

22

14 BB

#

21

15 DC X 27

#

11

16 DC X 27

#

12

17 DC X 27

#

14

18 DC X 27

#

16

19 DC X 27

#

18

20 TV X 7

#

11

21 TV X 7

#

12

22 TV X 7

#

14

23 TV X 7

#

16

24 TV X 7

#

18

25 TQ X 7

#

16

26 UO X 113

#

11

27 UO X 113

#

12

28 UO X 113

#

14

29 UO X 113

#

10

30 UY X 14

#

10

31 TO X 7

#

18

32 TO X 7

#

11

33 TO X 7

#

12

34 TO X 7

#

14

35 TO X 7

#

16

36 DM X 13

#

18

37 DM X 13

#

38 DM X 13

#

39 10" KNIFE

#

40 8" KNIFE

#

41 A BELT

#

42 1/2" KNIFE

#

43 7G KNITTING NEEDLE

#

44 5G KNITTING NEEDLE

Pkt

16 Pkt

Pkt

3 Pkt

12 Pkt

29 Pkt

Pkt

12 Pkt

Pkt

Pkt

532

8400 Pcs

77000 Pcs

#

396

7400 Pcs

31200 Pcs

44 5G KNITTING NEEDLE

#

494

Pcs

Pcs

45 PYC - 22

#

Pkt

Pkt

46 PYE - 23

#

11 Pkt

37 Pkt

47 PYC - 21

#

Pkt

Pkt

48 PAY - 6

#

1 Pkt

5 Pkt

49 50 51 52

# # # #

Pkt Pkt 300 Pcs 300 Pcs

Pkt Pkt 800 Pcs 900 Pcs

PAY - 6 PAY - 23 HARACHI 7G HARACHI 5G

16/18 14 16/18

______________ Prepared By

________________ Plant-In-Charge

GLOBAL KNITWEAR LTD 269 DEWAN HAT CHITTAGONG

Date : 02.06.2005

Needle Consumption Report For The Month Of May 2005 Sl

Types Of Needle

This Month Consumption Pkt

Total Consumption

01 DB X 1-2

#

11

Pkt

02 DB X 1-2

#

12

03 DB X 1-2

#

14

Pkt

Pkt

04 DB X 1-2

#

16

15 Pkt

47 Pkt

Remarks

05 DB X 1-2

#

18

06 DB X 1KM

#

9

07 DP X 5

#

11

08 DP X 5

#

12

09 DP X 5

#

14

10 DP X 5

#

16

11 DP X 5

#

18

12 DP X 5

#

21

13 DP X 5

#

22

14 BB

#

21

15 DC X 27

#

11

16 DC X 27

#

12

17 DC X 27

#

14

18 DC X 27

#

16

19 DC X 27

#

18

20 TV X 7

#

11

21 TV X 7

#

12

22 TV X 7

#

14

23 TV X 7

#

16

24 TV X 7

#

18

25 TQ X 7

#

16

26 UO X 113

#

11

27 UO X 113

#

12

28 UO X 113

#

14

29 UO X 113

#

10

30 UY X 14

#

10

31 TO X 7

#

18

32 TO X 7

#

11

33 TO X 7

#

12

34 TO X 7

#

14

35 TO X 7

#

16

36 DM X 13

#

18

37 DM X 13

#

38 DM X 13

#

39 10" KNIFE

#

40 8" KNIFE

#

41 A BELT

#

42 1/2" KNIFE

#

43 7G KNITTING NEEDLE

#

44 5G KNITTING NEEDLE

4 Pkt

16 Pkt

1 Pkt

3 Pkt

4 Pkt

12 Pkt

3 Pkt

11 Pkt

Pkt

Pkt

532

15000 Pcs

53000 Pcs

#

396

8800 Pcs

15000 Pcs

44 5G KNITTING NEEDLE

#

494

Pcs

Pcs

45 PYC - 22

#

Pkt

Pkt

46 PYE - 23

#

8 Pkt

19 Pkt

47 PYC - 21

#

Pkt

Pkt

48 PAY - 6

#

Pkt

2 Pkt

49 50 51 52

# # # #

Pkt Pkt 100 Pcs 200 Pcs

Pkt Pkt 300 Pcs 400 Pcs

PAY - 6 PAY - 23 HARACHI 7G HARACHI 5G

16/18 14 16/18

______________ Prepared By

________________ Plant-In-Charge

GLOBAL KNITWEAR LTD 269 DEWAN HAT CHITTAGONG

Date : 01.05.2005

Needle Consumption Report For The Month Of April 2005 Sl

Types Of Needle

This Month Consumption

01 DB X 1-2

#

11

02 DB X 1-2

#

12

Pkt

Total Consumption Pkt

Remarks

03 DB X 1-2

#

14

Pkt

Pkt

04 DB X 1-2

#

16

15 Pkt

32 Pkt

05 DB X 1-2

#

18

06 DB X 1KM

#

9

07 DP X 5

#

11

08 DP X 5

#

12

09 DP X 5

#

14

3 Pkt

12 Pkt

10 DP X 5

#

16

11 DP X 5

#

18

12 DP X 5

#

21

13 DP X 5

#

22

14 BB

#

21

Pkt

2 Pkt

15 DC X 27

#

11

16 DC X 27

#

12

17 DC X 27

#

14

18 DC X 27

#

16

19 DC X 27

#

18

2 Pkt

8 Pkt

20 TV X 7

#

11

21 TV X 7

#

12

22 TV X 7

#

14

23 TV X 7

#

16

24 TV X 7

#

18

25 TQ X 7

#

16

5 Pkt

8 Pkt

26 UO X 113

#

11

27 UO X 113

#

12

28 UO X 113

#

14

29 UO X 113

#

10

30 UY X 14

#

10

Pkt

Pkt

31 TO X 7

#

18

32 TO X 7

#

11

33 TO X 7

#

12

34 TO X 7

#

14

35 TO X 7

#

16

36 DM X 13

#

18

37 DM X 13

#

38 DM X 13

#

39 10" KNIFE

#

40 8" KNIFE

#

41 A BELT

#

42 1/2" KNIFE

#

43 7G KNITTING NEEDLE

#

532

14000 Pcs

35000 Pcs

44 5G KNITTING NEEDLE

#

396

5200 Pcs

8000 Pcs

44 5G KNITTING NEEDLE

#

494

Pcs

Pcs

45 PYC - 22

#

Pkt

Pkt

46 PYE - 23

#

4 Pkt

11 Pkt

47 PYC - 21

#

Pkt

Pkt

48 PAY - 6

#

1 Pkt

2 Pkt

49 50 51 52

# # # #

Pkt Pkt 100 Pcs 200 Pcs

Pkt Pkt 200 Pcs 200 Pcs

PAY - 6 PAY - 23 HARACHI 7G HARACHI 5G

16/18 14 16/18

______________ Prepared By

________________ Plant-In-Charge

GLOBAL KNITWEAR LTD 269 DEWAN HAT CHITTAGONG

Date : 02.03.2005

Needle Consumption Report For The Month Of February 2005 Sl

Types Of Needle

This Month Consumption

Total Consumption

Remarks

01 DB X 1-2

#

11

02 DB X 1-2

#

12

03 DB X 1-2

#

14

Pkt

Pkt

04 DB X 1-2

#

16

5 Pkt

17 Pkt

05 DB X 1-2

#

18

06 DB X 1KM

#

9

07 DP X 5

#

11

08 DP X 5

#

12

09 DP X 5

#

14

9 Pkt

9 Pkt

10 DP X 5

#

16

11 DP X 5

#

18

12 DP X 5

#

21

13 DP X 5

#

22

14 BB

#

21

2 Pkt

2 Pkt

15 DC X 27

#

11

16 DC X 27

#

12

17 DC X 27

#

14

18 DC X 27

#

16

19 DC X 27

#

18

4 Pkt

6 Pkt

20 TV X 7

#

11

21 TV X 7

#

12

22 TV X 7

#

14

23 TV X 7

#

16

24 TV X 7

#

18

25 TQ X 7

#

16

3 Pkt

3 Pkt

26 UO X 113

#

11

27 UO X 113

#

12

28 UO X 113

#

14

29 UO X 113

#

10

30 UY X 14

#

10

Pkt

Pkt

31 TO X 7

#

18

32 TO X 7

#

11

33 TO X 7

#

12

34 TO X 7

#

14

35 TO X 7

#

16

36 DM X 13

#

18

37 DM X 13

#

38 DM X 13

#

39 10" KNIFE

#

40 8" KNIFE

#

41 A BELT

#

42 1/2" KNIFE

#

43 7G KNITTING NEEDLE

#

532

11000 Pcs

21000 Pcs

44 5G KNITTING NEEDLE

#

396

2000 Pcs

2800 Pcs

44 5G KNITTING NEEDLE

#

494

Pcs

Pcs

45 PYC - 22

#

Pkt

Pkt

46 PYE - 23

#

3 Pkt

7 Pkt

47 PYC - 21

#

Pkt

Pkt

48 PAY - 6

#

Pkt

1 Pkt

49 50 51 52

# # # #

Pkt Pkt Pcs Pcs

Pkt Pkt 100 Pcs Pcs

PAY - 6 PAY - 23 HARACHI 7G HARACHI 5G

Pkt

Pkt

16/18 14 16/18

______________ Prepared By

________________ Plant-In-Charge

GLOBAL KNITWEAR LTD 269 DEWAN HAT CHITTAGONG

Needle Consumption Report For The Month Of January 2005

Date : 02.03.2005

Sl

Types Of Needle

This Month Consumption

Total Consumption

01 DB X 1-2

#

11

02 DB X 1-2

#

12

03 DB X 1-2

#

14

Pkt

Pkt

04 DB X 1-2

#

16

12 Pkt

12 Pkt

05 DB X 1-2

#

18

06 DB X 1KM

#

9

07 DP X 5

#

11

08 DP X 5

#

12

09 DP X 5

#

14

Pkt

Pkt

10 DP X 5

#

16

11 DP X 5

#

18

12 DP X 5

#

21

13 DP X 5

#

22

14 BB

#

21

Pkt

Pkt

15 DC X 27

#

11

16 DC X 27

#

12

17 DC X 27

#

14

18 DC X 27

#

16

19 DC X 27

#

18

2 Pkt

2 Pkt

20 TV X 7

#

11

21 TV X 7

#

12

22 TV X 7

#

14

23 TV X 7

#

16

24 TV X 7

#

18

25 TQ X 7

#

16

Pkt

Pkt

26 UO X 113

#

11

27 UO X 113

#

12

28 UO X 113

#

14

29 UO X 113

#

10

30 UY X 14

#

10

Pkt

Pkt

31 TO X 7

#

18

32 TO X 7

#

11

33 TO X 7

#

12

34 TO X 7

#

14

35 TO X 7

#

16

36 DM X 13

#

18

37 DM X 13

#

38 DM X 13

#

39 10" KNIFE

#

40 8" KNIFE

#

41 A BELT

#

42 1/2" KNIFE

#

43 7G KNITTING NEEDLE

#

532

10000 Pcs

10000 Pcs

44 5G KNITTING NEEDLE

#

396

800 Pcs

800 Pcs

44 5G KNITTING NEEDLE

#

494

Pcs

Pcs

45 PYC - 22

#

Pkt

Pkt

46 PYE - 23

#

2 Pkt

2 Pkt

47 PYC - 21

#

Pkt

Pkt

48 PAY - 6

#

1 Pkt

1 Pkt

49 50 51 52

# # # #

Pkt Pkt 100 Pcs Pcs

Pkt Pkt 100 Pcs Pcs

PAY - 6 PAY - 23 HARACHI 7G HARACHI 5G

Pkt

Remarks

Pkt

16/18 14 16/18

______________ Prepared By

________________ Plant-In-Charge

GLOBAL KNITWEAR LTD 269 DEWAN HAT CHITTAGONG

Date : 02.01.2005

Needle Consumption Report For The Month Of January 2005 Sl

Types Of Needle

Total Consumption

01 DB X 1-2

#

11

02 DB X 1-2

#

12

03 DB X 1-2

#

14

Pkt

195 Pkt

04 DB X 1-2

#

16

12 Pkt

21 Pkt

05 DB X 1-2

#

18

06 DB X 1KM

#

9

07 DP X 5

#

11

08 DP X 5

#

12

09 DP X 5

#

14

Pkt

19 Pkt

10 DP X 5

#

16

11 DP X 5

#

18

12 DP X 5

#

21

13 DP X 5

#

22

14 BB

#

21

Pkt

8 Pkt

15 DC X 27

#

11

16 DC X 27

#

12

17 DC X 27

#

14

18 DC X 27

#

16

19 DC X 27

#

18

2 Pkt

47 Pkt

20 TV X 7

#

11

21 TV X 7

#

12

22 TV X 7

#

14

23 TV X 7

#

16

24 TV X 7

#

18

25 TQ X 7

#

16

Pkt

20 Pkt

26 UO X 113

#

11

27 UO X 113

#

12

28 UO X 113

#

14

29 UO X 113

#

10

30 UY X 14

#

10

Pkt

3 Pkt

31 TO X 7

#

18

32 TO X 7

#

11

33 TO X 7

#

12

34 TO X 7

#

14

35 TO X 7

#

16

36 DM X 13

#

18

37 DM X 13

#

38 DM X 13

#

39 10" KNIFE

#

40 8" KNIFE

#

41 A BELT

#

42 1/2" KNIFE

#

43 7G KNITTING NEEDLE

#

532

10000 Pcs

222000 Pcs

44 5G KNITTING NEEDLE

#

396

800 Pcs

81000 Pcs

44 5G KNITTING NEEDLE

#

494

Pcs

Pcs

45 PYC - 22

#

Pkt

3 Pkt

46 PYE - 23

#

2 Pkt

50 Pkt

47 PYC - 21

#

Pkt

Pkt

48 PAY - 6

#

Pkt

6 Pkt

49 50 51 52

# # # #

1 Pkt Pkt 100 Pcs Pcs

PAY - 6 PAY - 23 HARACHI 7G HARACHI 5G

Pkt

Remarks

7 Pkt

16/18 14 16/18

______________ Prepared By

19 8 4700 1800

Pkt Pkt Pcs Pcs ________________ Plant-In-Charge

GLOBAL KNITWEAR LTD

269 DEWAN HAT CHITTAGONG

Date : 02.01.2005

Needle Consumption Report For The Month Of December 2004 Sl

Types Of Needle

Total Consumption

01 DB X 1-2

#

11

02 DB X 1-2

#

12

03 DB X 1-2

#

14

Pkt

195 Pkt

04 DB X 1-2

#

16

4 Pkt

9 Pkt

05 DB X 1-2

#

18

06 DB X 1KM

#

9

07 DP X 5

#

11

08 DP X 5

#

12

09 DP X 5

#

14

Pkt

19 Pkt

10 DP X 5

#

16

11 DP X 5

#

18

12 DP X 5

#

21

13 DP X 5

#

22

14 BB

#

21

Pkt

8 Pkt

15 DC X 27

#

11

16 DC X 27

#

12

17 DC X 27

#

14

18 DC X 27

#

16

19 DC X 27

#

18

1 Pkt

45 Pkt

20 TV X 7

#

11

21 TV X 7

#

12

22 TV X 7

#

14

23 TV X 7

#

16

24 TV X 7

#

18

25 TQ X 7

#

16

Pkt

20 Pkt

26 UO X 113

#

11

27 UO X 113

#

12

28 UO X 113

#

14

29 UO X 113

#

10

30 UY X 14

#

10

Pkt

3 Pkt

31 TO X 7

#

18

32 TO X 7

#

11

33 TO X 7

#

12

34 TO X 7

#

14

35 TO X 7

#

16

36 DM X 13

#

18

37 DM X 13

#

38 DM X 13

#

39 10" KNIFE

#

40 8" KNIFE

#

41 A BELT

#

42 1/2" KNIFE

#

43 7G KNITTING NEEDLE

#

532

14400 Pcs

212000 Pcs

44 5G KNITTING NEEDLE

#

396

Pcs

80200 Pcs

44 5G KNITTING NEEDLE

#

494

Pcs

Pcs

45 PYC - 22

#

Pkt

3 Pkt

46 PYE - 23

#

3 Pkt

48 Pkt

47 PYC - 21

#

Pkt

Pkt

48 PAY - 6

#

Pkt

6 Pkt

49 50 51 52

# # # #

1 Pkt Pkt 200 Pcs Pcs

PAY - 6 PAY - 23 HARACHI 7G HARACHI 5G

______________

Pkt

Remarks

7 Pkt

16/18 14 16/18

18 8 4600 1800

Pkt Pkt Pcs Pcs ________________

Prepared By

Plant-In-Charge

GLOBAL KNITWEAR LTD 269 DEWAN HAT CHITTAGONG

Date : 01.12.2004

Needle Consumption Report For The Month Of November 2004 Sl 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 44 45 46 47 48 49 50 51 52

Types Of Needle DB X 1-2 DB X 1-2 DB X 1-2 DB X 1-2 DB X 1-2 DB X 1KM DP X 5 DP X 5 DP X 5 DP X 5 DP X 5 DP X 5 DP X 5 BB DC X 27 DC X 27 DC X 27 DC X 27 DC X 27 TV X 7 TV X 7 TV X 7 TV X 7 TV X 7 TQ X 7 UO X 113 UO X 113 UO X 113 UO X 113 UY X 14 TO X 7 TO X 7 TO X 7 TO X 7 TO X 7 DM X 13 DM X 13 DM X 13 10" KNIFE 8" KNIFE A BELT 1/2" KNIFE 7G KNITTING NEEDLE 5G KNITTING NEEDLE 5G KNITTING NEEDLE PYC - 22 PYE - 23 PYC - 21 PAY - 6 PAY - 6 PAY - 23 HARACHI 7G HARACHI 5G

______________ Prepared By

# # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # #

11 12 14 16 18 9 11 12 14 16 18 21 22 21 11 12 14 16 18 11 12 14 16 18 16 11 12 14 10 10 18 11 12 14 16 18 16/18 14 16/18

532 396 494

Pkt

Total Consumption 7 Pkt

Pkt 5 Pkt

195 Pkt 5 Pkt

Pkt

19 Pkt

Pkt

8 Pkt

Pkt

44 Pkt

Pkt

20 Pkt

Pkt

3 Pkt

19800 Pcs 200 Pcs Pcs Pkt 2 Pkt Pkt 1 Pkt Pkt Pkt 200 Pcs Pcs

197600 Pcs 80200 Pcs Pcs 3 Pkt 45 Pkt Pkt 6 Pkt 17 Pkt 8 Pkt 4400 Pcs 1800 Pcs

Remarks

________________ Plant-In-Charge

GLOBAL KNITWEAR LTD 269 DEWAN HAT CHITTAGONG

BUYER WISE PRODUCTION SUMMERRY For The Month Of August'08 5GG

D.T

Sage

Sage

0006

0006-B

Quelle 8105

Sears

Quelle

1513

3517

4 29 49 97 173 160 0 124 177 112 177 265 265 196 153

144 194 66 10 70 36 0 27 22 3 0 0 0 0 0 0 0 0 0 0 0 0 0 0

3540

3835

G.Gold 9L 432 9 L 397

3-Aug 4-Aug 5-Aug 6-Aug 7-Aug 8-Aug 9-Aug 10-Aug 11-Aug 12-Aug 13-Aug 14-Aug 15-Aug 16-Aug 17-Aug 18-Aug 19-Aug 20-Aug 21-Aug 22-Aug 23-Aug 24-Aug 25-Aug

586 539 331 194 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

69 552 520 0 484 552 714 60 0 0 0 0 0 0 0 0 0 0 0 0 0

48 377 144 8 0

84 116 146 118 200 200

26-Aug 27-Aug 28-Aug 29-Aug 30-Aug 31-Aug

188 313 404 344 257 271 167 167 151 140 142 96

8 5 145 198 134 110 184 226 251 233 234 217 239 239 403 253 224 146 240 250

25 118 197 204 202 0 88 80 88 15 3 0 0 0 0 0 0 0 0 0 0 0 0

9L708

9L 592 /49

599 759 813 927 708 502 0 645 468 420 597 546 546 0 427

132 137 206 52 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

3 0 8 26 38 53 49 51 20 34 0 55 64 65 61 57 66 76 76 100 117 135 103 160 160

413 484 540 602 431 769 615 615 707 1036 936 620 900 1000

27 63 63 0

5G

G.Gold

0 734 835 968 774 1070 921 0 731 857 963 310 462 514 350 297 0 427 603 720 638 548 554 482 482 738 626 647 463 600 610

1-Aug 2-Aug

Ttl

Eurofrente

9L 592 /50 9L 592 /45

469 576 592 670 696 678 0 681 519 424 284 140 61 0 0 0 0 0 0 0 0 0 0 0

10 48 158 0 166 321 290 402 549 361 553 446 446 651 407 628 487 720 700

11225

12 53 137 0 152 190 243 226 349 62 0 0 0 0 0 0 0 0 0 0 0

Sears

11529

0

11544

11533

0

126

72

79

9

101 202 135 145 103 54 51 51

36 77 102 78 56 72 68 68 184 112 67

3508

0

20 34 42 69 66 56

5 46 167 194 190 200

129 152 157 143 114 132 72 72 38

Ttl

Ttl

7G

(5G+7G)

0 1200 1472 1611 1661 1457 1317 0 1478 1177 1107 1151 1125 1094 66 737 0 1000 1205 1336 1517 1065 1580 1252 1252 1585 1601 1798 1301 1810 1900

0 1934 2307 2579 2435 2527 2238 0 2209 2034 2070 1461 1587 1608 416 1034 0 1427 1808 2056 2155 1613 2134 1734 1734 2323 2227 2445 1764 2410 2510

Total

1650

2951

1441

4621

572

3939

1020

153

1577

17924

17625

527

5790

7343

1424

1047

1001

802

1296

36855

54779

In DZ

138

246

120

385

48

328

85

13

131

1494

1469

44

483

612

119

87

83

67

108

3071

4565

____________ Prepared By

GLOBAL KNITWEAR LTD 269 DEWAN HAT CHITTAGONG

BUYER WISE PRODUCTION SUMMERRY For The Month Of July'08 5GG

D.T 1-Jul 2-Jul 3-Jul

G. Union G. Union 8210-G 8210-G

75 57 19

75 57 19

Ttl

G.Gold 84000 9L432

0006

4579

9L 592

839 1065 982

554 874 898

838 676 453 360 500 395

771 916 676 512 387 417

411 421 469 357 297 257

316 274 234 325 501 763

250 218 287 250 93 57

292 296 347 379 453 501

746 892 922 1079 1111 1115

63 0 0

259

86 70 144 0 212 198 239 204 279 267 225 449 457 539 480 481 332 271 687 824 688 804 844 834 0 860 892 1181 1215 1142 1488

688 612 557 535 727 639

1055 1164 1033 875 651 506

166 477 695

166 477 695

259

16392

14346

19567

1338

1338

13 125 3

7-Jul 8-Jul 9-Jul 10-Jul 11-Jul 12-Jul 13-Jul 14-Jul 15-Jul

37 71 82 119 51

37 71 82 119 51

16-Jul 17-Jul 18-Jul 19-Jul 20-Jul 21-Jul 22-Jul 23-Jul 24-Jul

2 9 45 84 51 115 96 118 140 141 135 105 132 161 190 178 187 181

65 405 517 473 626 657 653

199 176 153 105 66 36

661 716 1028 1110 1076 1193

2805

9180

209 198 237 195 234 183 137 263 279 302 289 340 197 101 150 146 25

25-Jul 26-Jul 27-Jul 28-Jul 29-Jul 30-Jul 31-Jul Total

511

511

14

3623

Sears

9L708

11

6-Jul

G. Union

5G

3517-B

4-Jul 5-Jul

G.Gold 9L592b

9L592b

ET-898 MT-8212 MT-8212

33 4 0

37

193 314 367

193 314 367

302 288 274 290 135 12

302 288 274 290 135 12

2175

2175

3527

82 209 236 203 234 237

0

2419

Ttl

Ttl

7G

(5G+7G)

1812 2571 2614 0 2295 2377 1913 1655 1391 1073 0 977 913 990 932 891 1077 0 1101 1188 1269 1458 1564 1616 0 1743 1776 1590 1742 2332 2535

1898 2641 2758 0 2507 2575 2152 1859 1670 1340 225 1426 1370 1529 1412 1372 1409 271 1788 2012 1957 2262 2408 2450 0 2603 2668 2771 2957 3474 4023

43395

59787

In DZ

43

43

1

234

765

302

22

1366

1196

1631

112

112

3

181

181

0

202

3616

4982

Ttl

Ttl

8212

7G

(5G+7G)

8 30 254

5 413 718 786 872 0 1130 1215 1141 957 619 883 416 970 1153 1193 1109 1355 1064 0 1215 1395 1512 1681 1955 2142 0 2250 2276 2377

13 793 1360 1483 1555 58 1741 1923 1784 1635 1342 1641 573 1729 1917 2130 1847 1961 1651 0 1501 1693 1804 1907 2027 2198 0 2300 2310 2692

____________ Prepared By

GLOBAL KNITWEAR LTD 269 DEWAN HAT CHITTAGONG

BUYER WISE PRODUCTION SUMMERRY For The Month Of June'08 5GG

D.T 1-Jun 2-Jun 3-Jun 4-Jun 5-Jun

Sears 3504

Sears 3504

3517

8 183 230 294 200

8 183 230 294 200

16 96 130 207

125 12 5

125 12 5

6-Jun 7-Jun 8-Jun 9-Jun 10-Jun 11-Jun 12-Jun

239 429 407 423 429 491

13-Jun 14-Jun 15-Jun 16-Jun 17-Jun 18-Jun 19-Jun

500 489 592 572 336 167

LI& Fung G.Union 8016 CS-9659 RC-45

181 316 273 276 58 247 267 231 255 294 267 157 259 275 345 166 270 303

64

20-Jun 21-Jun

41

22-Jun 23-Jun 24-Jun 25-Jun 26-Jun

85 13

160 285 292 226 72 56

27-Jun 28-Jun 29-Jun 30-Jun

8 195

50 26 120

53

Ttl

G.Gold

5G

9L708

8 380 642 697 683 58 611 708 643 678 723 758 157 759 764 937 738 606 587 0 286 298 292 226 72 56 0 50 34 315

5 241 422 445 507

Sears 9L 592

3527

3528

3528

ET-898

172 296 341 365

653 670 589 423 355 233 237 252 246 197 337 401

477 545 545 481

7 53 158 228 196 324 285 369 289 97 1

53 136 110 131 214 199 202 314 187

53 136 110 131 214 199 202 314 187

3

15

15

150 147 188 180 219 293 288

727 727 862 1002 1106 1022

18 221 612 842

455 668 632 458 237 278

1100 1112 1027

779 866 981

363 268 115

0

1-Jul

0

0

Total

1057

1057

5767

0

4538

1351

53

12766

14898

4319

2010

1561

1561

8161

292

32802

45568

In DZ

88

88

481

0

378

113

4

1064

1242

360

168

130

130

680

24

2734

3797

Ttl

Ttl

7G

(5G+7G)

0 839 1003 1143 582 53 0 1433 1205 1285 1300 1337 1479

0 863 1034 1153 592 53 0 1562 1329 1411 1575 1886 1949

1405 1425 1463 1433 1419 1375 911 1585 1609 2020 1797 2146 2216 0

1810 1661 1583 1579 1592 1541 1031 1740 1763 2197 2050 2426 2467 171

____________ Prepared By

GLOBAL KNITWEAR LTD 269 DEWAN HAT CHITTAGONG

BUYER WISE PRODUCTION SUMMERRY For The Month Of May'08 5GG

D.T

G.Union G.Union ET-8000 ET-8000 CS-9659 CS-8000

Branex

LI& Fung RC-45

3

3-May 4-May 5-May

41 30 21 21 51 50 63 76 97 146 173 166 120 155 154 177 253 280 251 171

405 236 120 146 173 166 120 155 154 177 253 280 251 171

21 31 10 10

6-May 7-May 8-May 9-May 10-May 11-May 12-May 13-May

88 94 105 227 299 310

27 199 110

5G

0 24 31 10 10 0 0 129 124 126 275 549 470

1-May 2-May

Ttl

G.Union ET-898

4010

G.Gold CS-898

CS-898

9L440

839 1003 1143 552 53

15

15

128 105 130 147 179 224

128 105 130 147 179 224

1177 995 1025 1006 979 1031

221 342 242 293 339 425 319 686 748 971 891 1071 1108

221 342 242 293 339 425 319 686 748 971 891 1071 1108

963 741 979 847 741 525 273 213 113 78 15 4

3423

14-May 15-May 16-May 17-May 18-May 19-May 20-May 21-May 22-May 23-May 24-May 25-May 26-May 27-May 28-May

231 96 23

111 64

29-May 30-May 31-May

330 295 284

330 295 284

1087 1152 1185

1087 1152 1185

2174 2304 2370

2504 2599 2654

Total

0

0

1476

583

0

0

3405

5464

0

0

12008

12008

15295

0

39311

44775

In DZ

0

0

123

49

0

0

284

455

0

0

1001

1001

1275

0

3276

3731

Ttl

Ttl

7G

(5G+7G)

41 7 26 0 0 0 0 0 0 0 0 0 0 0 91 0 160 320 459 588 572 700 0 796 1008 1072

41 7 26 0 0 0 100 247 0 393 576 701 885 36 1004 56 1058 1181 1444 1576 1687 1543 0 1428 1338 1394

____________ Prepared By

GLOBAL KNITWEAR LTD 269 DEWAN HAT CHITTAGONG

BUYER WISE PRODUCTION SUMMERRY For The Month Of April'08 5GG

D.T

G.Union G.Union ET-8000 ET-8000 CS-9659 CS-8000

Branex CS-8000

1-Apr 2-Apr 3-Apr 4-Apr 5-Apr 6-Apr 7-Apr 8-Apr

100 247

9-Apr 10-Apr 11-Apr 12-Apr 13-Apr

371 532 669 819

14-Apr 15-Apr

827

16-Apr 17-Apr 18-Apr 19-Apr 20-Apr 21-Apr 22-Apr

826 790 896 988 1109 843

22 44 32 66 36 86 56 72 71 89 6

23-Apr 24-Apr 25-Apr 26-Apr

632 258 236

72 86

N.Mann 550/477

Ttl 5G

0 0 0 0 0 0 100 247 0 393 576 701 885 36 913 56 898 861 985 988 1115 843 0 632 330 322

G.Union ET-898

4010

G.Gold CS-6840 CS-6840

9L440

41 7 26

91 160 320 459 588 572 700 796 1008 1072

3423

148 255 108 5

27-Apr 28-Apr 29-Apr 30-Apr

129 341 379 275

277 596 487 280 0

1-May

1154 1028 1176 841

1154 1028 1176 841 0

1431 1624 1663 1121 0

Total

0

0

10659

580

1282

0

0

12521

0

74

0

0

9965

0

10039

22560

In DZ

0

0

888

48

107

0

0

1043

0

6

0

0

830

0

837

1880

Ttl

Ttl

7G

(5G+7G)

675 843 958 880 672 969 1218 1384 1133 1115 998 0 890 978 978 899 737 479 360 509 0 519 414 216

1054 1269 1242 1135 977 1356 1482 1715 1518 1442 1428 0 1213 1615 1854 1907 1682 1444 904 1287 0 929 542 319

____________ Prepared By

GLOBAL KNITWEAR LTD 269 DEWAN HAT CHITTAGONG

BUYER WISE PRODUCTION SUMMERRY For The Month Of March'08 5GG

D.T 1-Mar 2-Mar 3-Mar 4-Mar 5-Mar 6-Mar

G.Union G.Union ET-8000 ET-8000 CK-8013 CS-8000

11 10 9 23 117 197

11 10 9 23 117 197

325 341 158 60 8

7-Mar

45

8 35 24 81

91 263 345 466 541 577 376 555

97 125 195 158 100 71 12 22

8-Mar 9-Mar 10-Mar 11-Mar

Branex N.Mann LM-874 LM-869 550/477

43 75 73 108 115 107 143 185 197 188 158

44 64 65 83 121 138 153 115 146

12-Mar 13-Mar 14-Mar 15-Mar 16-Mar 17-Mar 18-Mar 19-Mar 20-Mar

103 72 121 149 70 49 10

10 175 212 235 234 268 146 201

12 17 66

106 18 5

21-Mar 22-Mar 23-Mar 24-Mar

292 93 32

22 2 3

Ttl

G.Union

5G

ET-898

379 426 284 255 305 387 264 331 385 327 430 0 323 637 876 1008 945 965 544 778 0 410 128 103

321 405 360 321 60 5

4010

Quelle CS-6840 CS-6840

22 11 161 387 664 1021 968 1056 969

22

CS-8034

3423

354 394 598 548 451 577 554 363 165 59 29

890 978 978 899 679 381 291 388

58 98 69 121

393 301 103

126 113 113

25

25-Mar

4

29 0 12 0 0 0 0

26-Mar

12

27-Mar 28-Mar 29-Mar 30-Mar 31-Mar

60

100 121 66 35

160 0 232 160 122 76 108

189 0 244 160 122 76 108

111 94 87 76 108

Total

367

367

3688

1820

1623

1614

1419

10531

1472

12054

22

22

4092

1020

18682

29213

In DZ

31

31

307

152

135

135

118

878

123

1005

2

2

341

85

1557

2434

Ttl

Ttl

____________ Prepared By

GLOBAL KNITWEAR LTD 269 DEWAN HAT CHITTAGONG

BUYER WISE PRODUCTION SUMMERRY For The Month Of February'08 5GG D.T 1-Feb 2-Feb 3-Feb 4-Feb 5-Feb

G.Union G.Union ET-8000 ET-8000 ET-9659

182 324 259 317 355

182 324 259 317 355

196 236 116 50 67

304 314 323 292 287 254 81 111 132 114 139 177 135 19

304 314 323 292 287 254 81 111 132 114 139 177 135 19

47 115 86 40 31 25 6

99

99

6-Feb 7-Feb 8-Feb 9-Feb 10-Feb 11-Feb 12-Feb 13-Feb 14-Feb 15-Feb 16-Feb 17-Feb 18-Feb 19-Feb 20-Feb 21-Feb 22-Feb

5 5 6

N.Mann

Ttl

550/477 5G 378 560 375 367 422 0 351 429 409 332 318 279 87 111 137 119 145 177 135 19 0 99

G.Union ET-898

CS-6840 CS-6840 ET6840 CS-898

141 186 380 208 80

141 186 380 208 80

60 270

165 172 185 197 370

20 3

20 3

251 139 173 175 124 134

346 388 350 312 372 372

320

320

7

6 5 10 37 58 95 91

74

379 379 463 455 452

325

7G (5G+7G) 447 825 544 1104 945 1320 673 1040 800 1222 0 0 637 988 533 962 523 932 487 819 496 814 512 791 0 87 652 763 389 526 416 535 521 666 550 727 543 678 0 19 0 0 399 498

23-Feb 24-Feb 25-Feb

58 95 76

58 95 76 41

26-Feb 27-Feb

83 216 295 413

45

420 168 25 13

503 384 320 471 0 390 405 0 0

561 479 396 512 0 470 594 0 0

24 77

24 77

Total

4548

4548

1031

209

5788

2178

1338

1338

1378

6308

12540

18328

In DZ

379

379

86

17

482

182

112

112

115

526

1045

1527

Ttl

Ttl

28-Feb 29-Feb

56 112

58 95 76 41 0 80 189 0 0

1-Mar 2-Mar

390 405

____________ Prepared By

GLOBAL KNITWEAR LTD 269 DEWAN HAT CHITTAGONG

BUYER WISE PRODUCTION SUMMERRY For The Month Of January'08 5GG D.T

N.Mann N.Mann 550/477 550/477

Ttl CS-8000

1-Dec 2-Dec 3-Dec 4-Dec 5-Dec 6-Dec 7-Dec 8-Dec

136 141 240 210

136 141 240 210

187 186 177 215 124 51 0

187 186 177 215 124 51 0

0 80 178 236 286 261 306

9-Dec 10-Dec 11-Dec 12-Dec 13-Dec 14-Dec 15-Dec 16-Dec 17-Dec 18-Dec 19-Dec 20-Dec

245 276 311 288 324 319 0 397 344 379 384

5G 0 0 80 178 372 427 501 516 0 432 462 488 503 448 370 0 397 344 379 384

9060

G.Union CS-6840 CS-6840 ET6840 CS-898

401 0 470 220 25 9

3 5

401 0 470 220 25 9

3 5

171 0 525 719 855 731 559 526 306 108 29

3 131 295 388

7G (5G+7G) 973 973 0 0 1465 1545 1159 1337 905 1277 749 1176 559 1060 526 1042 0 0 306 738 108 570 35 523 10 513 0 448 0 370 0 0 3 400 131 475 295 674 388 772

21-Dec 22-Dec

0

0

23-Dec 24-Dec 25-Dec 26-Dec 27-Dec 28-Dec

333 398 0 388 434 369 207 39

333 398 0 388 434 369 207 39 0 0 0

9 59 0 53 31 36 60 61 52 43 65

27 89 115 146 171 183 96 183

27 89 115 146 171 183 96 183

29-Dec 30-Dec 31-Dec

400 376 393 242 106 114 148 152 101 118

409 435 0 500 451 372 466 551 570 336 549

742 833 0 888 885 741 673 590 570 336 549

Total

1667

1667

0

6782

8449

469

2143

2143

4529

2967

12251

20700

In DZ

139

139

0

565

704

39

179

179

377

247

1021

1725

Ttl

Ttl

____________ Prepared By

GLOBAL KNITWEAR LTD 269 DEWAN HAT CHITTAGONG

BUYER WISE PRODUCTION SUMMERRY For The Month Of December'07 5GG D.T 12714

G.Gould 12714 12685

N.Ma 550/477

1-Dec 2-Dec 3-Dec 4-Dec

8 15 190

8 15 190

232 203 126 37 162 122 249

232 203 126 37 162 122 249

3 94

5-Dec 6-Dec 7-Dec 8-Dec 9-Dec 10-Dec 11-Dec 12-Dec 13-Dec 14-Dec 15-Dec 16-Dec 17-Dec 18-Dec

267 328 531 549 401 609 600 60

63 126 257 504 496 84

Ttl 5G 0 8 18 284 0 499 531 657 586 626 857 1106 564 496 84 0 0 0

G.U 8824

G.U

G.Union CS-6840 CS-6840 ET6840 7603

151 204 425 311 305 345 271 400 241 292 104 37 8 36

90 174 301 257 313 661

90 174 301 257 313 661

7G (5G+7G) 151 151 204 212 425 443 311 595 0 0 305 804 345 876 271 928 400 986 241 867 292 1149 104 1210 217 781 356 852 638 722 514 514 626 626 1322 1322

0 0 0 0 0 0 0 0 0 0 0 0 0

19-Dec 20-Dec 21-Dec 22-Dec 23-Dec 24-Dec 25-Dec 26-Dec 27-Dec 28-Dec 29-Dec 30-Dec 31-Dec

254 530 474 901 1385

254 530 474 901 1385

34 64 111

0 0 0 0 0 0 0 0 508 1060 982 1866 2881

0 0 0 0 0 0 0 0 508 1060 982 1866 2881

Total

1344

1344

3442

1530

6316

3130

5340

5340

209

0

14019

20335

In DZ

112

112

287

128

526

261

445

445

17

0

1168

1695

Ttl

Ttl

5868

L. Line G.Union 5868 5872 7603

____________ Prepared By

GLOBAL KNITWEAR LTD 269 DEWAN HAT CHITTAGONG

BUYER WISE PRODUCTION SUMMERRY For The Month Of November'07 5GG D.T 10764 1-Nov 2-Nov 3-Nov 4-Nov 5-Nov 6-Nov 7-Nov 8-Nov 9-Nov 10-Nov 11-Nov 12-Nov 13-Nov 14-Nov 15-Nov 16-Nov

16 6

Eurofrente 10764 10877

16 6

Sfera

Ttl 5G 16 6 0 0 0 0 0 0 0 0 0 0 0 0 0 0

8824

550 623 748 906 758 30 12 9 144

144

11

7G (5G+7G) 561 577 623 629 748 748 906 906 758 758 30 30 0 0 12 12 9 9 288 288 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 78 0 0 0 0

17-Nov 18-Nov 19-Nov 20-Nov 21-Nov 22-Nov 23-Nov 24-Nov 25-Nov 26-Nov

78

27-Nov 28-Nov 29-Nov 30-Nov

15

0 0 0 0 0 0 0 0 0 0 0 0 0 15 0

0 0 0 0 0 0 0 0 0 0 78 0 0 15 0

Total

22

22

78

0

100

15

144

144

3636

11

3950

4050

In DZ

2

2

7

0

8

1

12

12

303

1

329

338

Ttl

Ttl

____________ Prepared By

GLOBAL KNITWEAR LTD 269 DEWAN HAT CHITTAGONG

BUYER WISE PRODUCTION SUMMERRY For The Month Of Oct'07 5GG D.T 10764 1-Oct 2-Oct

Eurofrente 10764 10877

5 13

5 13

63 83

24 35 48 63 41 64 15 61

24 35 48 63 41 64 15 61

113 128 166 139 139 111 61 79

3-Oct 4-Oct 5-Oct 6-Oct 7-Oct 8-Oct 9-Oct 10-Oct 11-Oct 12-Oct 13-Oct

Sfera 0766/8021

125 94

Ttl 5G 193 190 0 137 163 214 202 180 175 76 140 0 0

8703

8703

L. Line G.Union 5872 7603

194 126

12 65 74 70 133

12 65 74 70 133

109 156 104 157 187 149 67 122

7G (5G+7G) 194 387 126 316 0 0 109 246 156 319 104 318 181 383 317 497 297 472 207 283 388 528 0 0 0 0

0 0 0 0 27 66 76 0 135 131 0 221 150 0 183 164 115 160

14-Oct 15-Oct 16-Oct 17-Oct 18-Oct 19-Oct 20-Oct

8 33 45

8 33 45

19 33 31

82 88

82 88

53 43

174 129

174 129

47 21

178 144 101 152

178 144 101 152

5 20 14 8

1503 125

1503 125

1376 115

21-Oct 22-Oct 23-Oct 24-Oct 25-Oct 26-Oct 27-Oct 28-Oct 29-Oct 30-Oct 31-Oct Total In DZ

219 18

3098 258

73 171 202 128 143 350

73 171 202 128 143 350

992 744

992 744

125

102

145

145

416 658 649 349

135

0 0 0 0 191 394 488 299 352 864 0 2111 1768 0 518 658 649 774

3302 275

3302 275

2197 183

2344 195

11145 929

14243 1187

Ttl

Ttl

8703

L. Line 47902

7G 0

(5G+7G) 0

45 52 84 43 66 164 127 155

0 0 0 0 218 460 564 299 487 995 0 2332 1918 0 701 822 764 934

____________ Prepared By

GLOBAL KNITWEAR LTD 269 DEWAN HAT CHITTAGONG

BUYER WISE PRODUCTION SUMMERRY For The Month Of AUGUST '07 5GG D.T

Quelle 3835

Sears 1504

Ttl

1-Aug

5G 0

2-Aug

0

50

50

50

3-Aug

0

12

12

12

4-Aug

0

5

5

5

5-Aug

0

0

0

6-Aug

0

0

0

7-Aug

0

0

0

8-Aug

0

0

0

9-Aug

0

0

0

3835

8703

10-Aug

0

0

0

11-Aug

0

0

0

12-Aug

0

0

0

13-Aug

0

0

0

14-Aug

0

54

54

15-Aug

0

0

0

16-Aug

0

190

190

380

380

17-Aug

0

771

771

1542

1542

18-Aug

0

837

837

1674

1674

19-Aug

0

427

427

20-Aug

0

136

136

272

272

21-Aug

0

39

39

78

78

22-Aug

0

0

0

23-Aug

0

0

0

27

27

427

24-Aug

111

111

111

0

111

25-Aug

306

306

306

0

306

26-Aug

230

230

230

0

230

27-Aug

181

181

181

0

181

28-Aug

0

0

0

29-Aug

0

0

0

30-Aug

0

0

0

31-Aug

0

0

0

4494 375

5322 444

Ttl

Ttl

7G 0 0

(5G+7G) 217 257

0

335

Total In DZ

828 69

828 69

0 0

0 0

828 69

2000 167

2000 167

494 41

8703

Leas Line 47902

____________ Prepared By

GLOBAL KNITWEAR LTD 269 DEWAN HAT CHITTAGONG

BUYER WISE PRODUCTION SUMMERRY For The Month Of July '07 5GG D.T 3835

Quelle 3835

2-Jul

205 257

205 257

3-Jul

335

335

1-Jul

Sears 1504

12

Ttl 5G 217 257 335

8703

4-Jul

315

315

315

0

315

5-Jul

367

367

367

0

367

6-Jul

361

361

361

0

361

7-Jul

374

374

374

0

374

8-Jul

214

214

214

0

214

9-Jul

0

7

7

7

10-Jul

0

24

24

24

11-Jul

0

0

0

0

12-Jul

0

90

90

90

13-Jul

0

174

174

174

14-Jul

0

284

284

284

15-Jul

0

31

31

334

396

396

16-Jul

0

215

215

365

795

795

17-Jul

0

202

202

249

653

653

18-Jul

0

191

191

410

792

792

19-Jul

0

191

191

410

792

792

20-Jul

0

219

219

431

869

869

21-Jul

0

596

596

422

1614

1614

22-Jul

0

692

692

443

1827

1827

23-Jul

0

492

492

456

1440

1440

24-Jul

0

533

533

533

25-Jul

0

0

0

26-Jul

0

562

562

562

27-Jul

0

430

430

430

28-Jul

0

465

465

465

29-Jul

0

468

468

468

30-Jul

0

489

489

489

31-Jul

0

508

508

508

Total

2428

2428

0

12

2440

2829

2829

7554

13212

15652

In DZ

202

202

0

1

203

236

236

630

1101

1304

____________ Prepared By

GLOBAL KNITWEAR LTD 269 DEWAN HAT CHITTAGONG

BUYER WISE PRODUCTION SUMMERRY

For The Month Of June '07 5GG D.T 138/751

N.Mann 138/751 327/052

3-Jun

Ttl

51 112

78 132 123

5G 78 183 235

1-Jun 2-Jun

Sears 1537

3544

3544

Ttl

Ttl

7G 0 0 0

(5G+7G) 78 183 235

4-Jun

16

16

136

149

301

0

301

5-Jun

14

14

134

147

295

0

295

0

0

0

137

196

0

196

137

169

0

169

134

191

0

191

155

216

0

216

0

0

0

59

0

59

0

0

0

6-Jun 7-Jun

12

12

8-Jun

32

32

9-Jun

47

47

10-Jun

61

61

47 10

11-Jun 12-Jun

24

24

35

13-Jun 14-Jun

41

41

95

136

0

136

15-Jun

35

35

83

118

0

118

16-Jun

48

48

41

89

0

89

17-Jun

51

51

51

0

51

18-Jun

29

29

29

0

29

19-Jun

23

23

23

0

23

20-Jun

12

12

12

0

12

21-Jun

10

10

10

0

10

22-Jun

5

5

5

0

5

23-Jun

11

11

11

0

11

24-Jun

9

9

9

0

9

25-Jun

4

4

4

0

4

26-Jun

0

0

0

27-Jun

0

0

0

28-Jun

0

0

0

29-Jun

0

17

17

34

34

46

143

143

286

332

0

0

320

2786

30-Jun

46

46

0 Total

530

530

490

1446

2466

160

160

0

In DZ

44

44

41

121

206

13

13

0

27

232

Ttl

Ttl

____________ Prepared By

GLOBAL KNITWEAR LTD 269 DEWAN HAT CHITTAGONG

BUYER WISE PRODUCTION SUMMERRY For The Month Of May '07 5GG D.T

Quelle 3212

Quelle 3212

G.U 8480

Ttl 1500

May Day

1-May

5G 0 536 760 0

G.U 1603

G.U 1603

Euro 10394

106 51

106 51

293 418

137 291

5-May

58

58

407

263

728

405

405

1133

6-May

200

200

423

97

720

373

373

1093

7-May

201

201

354

40

595

384

384

979

8-May

158

158

460

30

648

429

429

1077

9-May

138

138

412

38

588

408

408

996

10-May

258

258

379

637

436

436

1073

0

0

2-May 3-May 4-May

349 361

7G (5G+7G) 0 0 349 885 361 1121 0 0

0

11-May 12-May

132

132

429

561

491

491

1052

13-May

249

249

377

626

535

535

1161

14-May

246

246

274

520

543

543

1063

15-May

263

263

305

568

630

630

1198

0

0

0

16-May 17-May

249

249

394

643

630

630

1273

18-May

132

132

267

399

617

617

1016

19-May

188

188

286

474

704

704

1178

20-May

90

90

358

448

165

165

616

946

1394

21-May

54

54

357

411

298

298

607

1203

1614

22-May

15

15

470

485

462

462

484

1408

1893

0

0

0

23-May 24-May

2

2

527

529

505

505

361

1371

1900

25-May

4

4

524

528

604

604

368

1576

2104

596

596

647

647

457

1751

2347

26-May

27-May

626

626

646

646

464

1756

2382

28-May

570

570

354

354

482

1190

1760

29-May

556

556

376

376

932

0

0

0

731

0

731

30-May

731

31-May Total

2794

2794

10793

896

14483

3681

3681

11510

18872

33355

In DZ

233

233

899

75

1207

307

307

959

1573

2780

Quelle 3885

Quelle 3885

Ttl

Ttl

231 661 870 964

231 661 870 964

690

690

____________ Prepared By

GLOBAL KNITWEAR LTD 269 DEWAN HAT CHITTAGONG

BUYER WISE PRODUCTION SUMMERRY For The Month Of April '07 5GG D.T

Ttl

Quelle 3733

Quelle 3733

3835

4-Apr

150 367 409 415

150 367 409 415

66 168 400 568

5G 216 535 809 983

5-Apr

428

428

397

825

1-Apr 2-Apr 3-Apr

3212

8711

33

0

6-Apr

7G (5G+7G) 462 678 1322 1857 1740 2549 1928 2911 1413

2238

0

0

7-Apr

371

371

405

776

306

306

370

982

1758

8-Apr

360

360

378

738

138

138

709

985

1723

9-Apr

311

311

88

399

704

704

1103

10-Apr

124

124

124

773

773

897

11-Apr

8

8

8

616

628

636

6

6

12-Apr

0

530

530

530

13-Apr

0

182

182

182

14-Apr

0

0

0

15-Apr

0

204

204

204

16-Apr

0

164

164

164

17-Apr

0

137

137

137

18-Apr

0

17

17

17

19-Apr

0

34

34

34

20-Apr

0

0

0

21-Apr

0

7

7

22-Apr

0

0

0

23-Apr

0

0

0

7

24-Apr

51

51

0

51

25-Apr

120

120

0

120

26-Apr

205

205

0

205

0

0

0

27-Apr 28-Apr

251

251

0

251

29-Apr

239

239

0

239

30-Apr

369

369

0

369

0

0

0

Total

2943

2943

2470

1235

6648

3866

3866

4480

12212

18860

In DZ

245

245

206

103

554

322

322

373

1018

1572

Ttl

Ttl

56 40

7G 15 0 56 40

(5G+7G) 508 0 665 774

____________ Prepared By

GLOBAL KNITWEAR LTD 269 DEWAN HAT CHITTAGONG

BUYER WISE PRODUCTION SUMMERRY For The Month Of March '07 5GG D.T

Ttl

G.Uni 1612

G.Uni 1612

493

493

4-Mar

609 734

609 734

5G 493 0 609 734

5-Mar

730

730

730

113

113

843

6-Mar

243

243

243

166

166

409

7-Mar

74

74

74

159

159

233

8-Mar

111

111

111

164

164

275

0

0

232

232

351

1-Mar

17200

2-Mar 3-Mar

7613

7613

1613

15

0

9-Mar 10-Mar

102

102

17

119

11-Mar

8

8

120

128

48

48

215

311

439

267

267

61

61

304

426

693

12-Mar

372

379

62

62

251

375

754

14-Mar

185

185

35

35

212

282

467

15-Mar

426

426

90

90

269

449

875

0

0

13-Mar

7

7

0

16-Mar 17-Mar

408

408

98

98

338

534

942

18-Mar

359

359

108

108

235

451

810

19-Mar

391

391

138

138

255

531

922

20-Mar

467

467

218

218

299

735

1202

21-Mar

326

326

268

268

243

779

1105

22-Mar

455

455

301

301

27

629

1084

23-Mar

154

154

252

252

504

658

24-Mar

349

349

562

562

1124

1473

25-Mar

368

368

585

585

1170

1538

0

0

0

26-Mar 27-Mar

309

309

627

627

1254

1563

28-Mar

236

236

816

816

1632

1868

29-Mar

258

258

760

760

1520

1778

30-Mar

67

67

571

571

1142

1209

31-Mar

155

155

523

523

1046

1201

Total

3111

3111

5689

8800

6123

6123

3593

15839

24639

In DZ

259

259

474

733

510

510

299

1320

2053

Ttl

Ttl

____________ Prepared By

GLOBAL KNITWEAR LTD 269 DEWAN HAT CHITTAGONG

BUYER WISE PRODUCTION SUMMERRY For The Month Of February '07 5GG D.T

Ttl

G.Uni 7615

G.Uni 7615

181 Fri 275 257

288

4-Feb

181 Fri 275 257

279 220

5G 469 0 554 477

5-Feb

169

169

312

481

1-Feb 2-Feb 3-Feb

7609

G.Union G.Union 7604 7604

189

189

238

189 236

189 236

369 241

7G (5G+7G) 616 1085 0 0 747 1301 713 1190

157

157

280

594

7605

1075

6-Feb

101

101

452

553

198

198

337

733

1286

7-Feb

73

73

417

490

154

154

383

691

1181

8-Feb

67

67

481

548

130

130

402

662

1210

9-Feb

Fri

Fri

0

0

310

338

741

0

10-Feb

403

403

11-Feb

492

492

358

358

850

12-Feb

528

528

266

266

794

13-Feb

523

523

354

354

877

14-Feb

541

541

357

357

898

15-Feb

598

598

0

598

0

0

0

106

633

16-Feb

Fri

Fri

14

17-Feb

527

527

18-Feb

627

627

0

627

19-Feb

637

637

0

637

20-Feb

543

543

69

612

0

0

0

704

0

704

0

0

0

21-Feb

Fri

Fri 704

22-Feb 23-Feb

Fri

Fri

43

14

43

20

69

24-Feb

597

597

0

597

25-Feb

632

632

0

632

26-Feb

602

602

0

602

27-Feb

404

404

0

404

0

0

0

0

0

0

0

0

0

0

0

0

28-Feb

Total

1123

1123

10807

11930

1310

1310

3984

6604

18534

In DZ

94

94

901

994

109

109

332

550

1545

____________ Prepared By

GLOBAL KNITWEAR LTD 269 DEWAN HAT CHITTAGONG

BUYER WISE PRODUCTION SUMMERRY For The Month Of January '07

5GG D.T

Quelle 7692

Quelle 7692

Ttl

G.Union 7604

Ttl

Ttl

7G 0 0 0 0

(5G+7G) 0 0 0 0

4-Jan

5G 0 0 0 0

5-Jan

0

0

0

3212

1-Jan 2-Jan 3-Jan

8711

8711

6-Jan

125

125

15

140

0

140

7-Jan

286

286

49

335

0

335

8-Jan

398

398

55

453

9

9

462

9-Jan

431

431

18

449

47

47

496

10-Jan

536

536

536

173

173

709

11-Jan

383

383

383

251

251

634

12-Jan

Fri

Fri

0

0

0

13-Jan

417

417

417

345

345

762

14-Jan

269

269

269

401

401

670

15-Jan

158

158

158

449

449

607

16-Jan

67

67

67

76

76

526

678

745

17-Jan

0

74

74

491

639

639

18-Jan

0

53

53

256

362

362

0

0

19-Jan

Fri

Fri

0

20-Jan

0

170

170

625

965

965

21-Jan

0

147

147

335

629

629

22-Jan

0

198

198

434

830

830

23-Jan

0

160

160

352

672

672

24-Jan

0

265

265

353

883

883

25-Jan

0

326

326

459

1111

1111

0

0

26-Jan

Fri

Fri

0

27-Jan

0

319

319

496

1134

1134

28-Jan

0

224

224

245

693

693

29-Jan

0

229

229

278

736

736

30-Jan

0

220

220

327

767

767

31-Jan

0

482

482

411

1375

1375

Total

3070

3070

137

3207

2943

2943

7263

13149

16356

In DZ

256

256

11

267

245

245

605

1096

1363

____________ Prepared By

148 25

239 269 260 376 311 385

939

362 374 375 382 530 505 272 454 342 183

5 25 15 3

3554

148 25

239 269 260 376 311 385

939

362 374 375 382 530 505 272 454 342 183

5 25 15 3

3554

148 25

939

239 269 260 376 311 385 362 374 375 382 530 505 272 454 342 183

5 25 15 3

3554

148 25

939

239 269 260 376 311 385 362 374 375 382 530 505 272 454 342 183

5 25 15 3

3554

148 25

939

239 269 260 376 311 385 362 374 375 382 530 505 272 454 342 183

5 25 15 3

3554

148 25

939

239 269 260 376 311 385 362 374 375 382 530 505 272 454 342 183

5 25

15 3

3554

148 25

7G)

939

239 269 260 376 311 385 362 374 375 382 530 505 272 454 342 183

5 25 15 3

3554

148 25

7G)

939

239 269 260 376 311 385 362 374 375 382 530 505 272 454 342 183

5 25 15 3

3554

148 25

7G)

939

239 269 260 376 311 385 362 374 375 382 530 505 272 454 342 183

5 25 15 3

3554

148 25

7G)

939

239 269 260 376 311 385 362 374 375 382 530 505 272 454

342 183

5 25 15 3

148 25

7G)

939

5 25 15 3

148 25

7G)

939

7G)

5 25 15 3

148 25

939

5 25 15 3

148 25

7G)

939

5 25 15 3

7G)

148 25

939

7G)

5 25 15 3

148 25

939

7G)

5 25 15 3

148 25

939

7G)

5 25 15 3

148 25

939

5 25 15 3

7G)

148 25

939

5 25 15 3

Required Manpower Status. Date : 31.07.2007

SL

Section

Required Manpower

01

Winding

35

02

Knitting

365

03

1st Inspection

30

04

Linking

145

05

Stitching & Trimmining

50

06

Mending & Final

50

07

Wash & Iron

35

08

Label

30

09

Folding & Packing

20

10

Quality & Checker

30

11

Store

8

12

Maintainance

8

13

Cleaner

12

14

Security

14

15

D.G.M, Executive, Staff

18

Total Required Manpower

850

____________ Prepared By

Remarks

________________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Shipment Details Of Sears Order Up To 19th August 2006 All Figure In DZ

Date : 19.08.2006

Style/P.O No

GG

Total Order Qty

Shipped Qty

Short Shipped Qty

Ship Date

01 Sears

60252-C

5G

432

416

-16

18-Jun

02 Sears

1500

5G

666

670

4

17-May

03 Sears

1500

7G

35

35

0

12-Jun

04 Sears

3538

5G

144

142

-2

17-Aug

05 Sears

60252-C

5G

432

415

-17

16-Jul

1709

1678

-31

SL

Buyer

Sub Total (5GG) 06 Sears

3533

7G

500

492

-8

8-Jun

07 Sears

3531

7G

625

619

-6

15-Jun

08 Sears

3534

7G

237

232

-5

18-Jun

09 Sears

3532

7G

334

332

-2

22-Jun

10 Sears

1511

7G

158

149

-9

13-Aug

11 Sears

3534

7G

667

667

0

10-Jul

12 Sears

3536

7G

417

407

-10

16-Jul

13 Sears

1502

7G

237

234

-3

26-Jul

14 Sears

1504

7G

399

396

-3

27-Jul

Sub Total (7GG)

3574

3528

-46

Total

5283

5206

-77

____________ Prepared By

Remarks

________________ Plant-In-Charge

Production Details

Date : 01.01.2008

All Figure In DZ

Month : December'2007 SL

Buyer

Style No.

GG

Total Order Qty

Production Target Achive

8912

5G

542

58

50

01

Quelle

02

N.Mann

550/477

5G

125

125

128

03

G.Gold

9 J 020/12714

5G

110

110

112

04

G.Gold

9 J 020/12716

5G

24

24

27

05

G.Gold

9 J 020/12685

5G

280

280

287

06

G.Union

4000/CS-9659

5G

1000

1000

871

07

Atlantic

19056

5G

19

0

20

2100

1597

1494

Sub Total (5GG) 08

Quelle

4000

7G

667

250

286

09

Quelle

8832

7G

708

150

115

10

Quelle

8824

7G

258

258

261

11

Quelle

8832

7G

500

500

587

12

Quelle

8703

7G

333

333

349

13

Branex

LM-862

7G

167

167

0

14

Branex

LM-863

7G

83

83

0

15

Branex

LM-861

7G

267

267

0

16

G.Union

CS-6840

7G

700

700

445

17

G.Union

ET-6840

7G

Remarks

17

Sub Total (7GG)

3683

2708

2060

Grand Total

5783

4306

3554 Date : 02.10.2007

All Figure In DZ

Month : September'2007 SL

Buyer

Style No.

GG

Total Order Qty

01

Eurofrente

10764

5G

143

143

19

02

Eurofrente

10877

5G

208

208

101

03

Quelle

3835

5G

150

150

154

04

Sfera

0766/8021

5G

161

164

148

662

665

422

Sub Total (5GG)

Production Target Achive

05

Quelle

8711

7G

133

67

70

06

Quelle

8711-B

7G

342

342

346

07

Quelle

8824

7G

583

483

501

08

Quelle

8824-B

7G

350

350

361

09

Quelle

8821

7G

373

343

397

10

Quelle

3885

7G

133

0

8

11

Quelle

8703

7G

133

133

140

12

Les. Line

18902

7G

412

412

413

13

Les. Line

5870

7G

457

0

18

14

G.Union

7603

7G

334

0

144

15

N.Mann

017/531

7G

200

200

206

Sub Total (7GG)

3451

2330

2603

Grand Total

4113

2996

3025

Production Details All Figure In DZ

Remarks

Date : 01.09.2007

Month : August'2007 SL

Buyer

Style No.

GG

Total Order Qty

Production Target Achive

Remarks

01

Quelle

3835

5G

67

67

69

02

G.Gold

19H987

5G

250

83

87

03

G.Gold

19H542

5G

662

0

41

04

G.Gold

19H542

5G

80

0

27

05

G.Gold

19H542

5G

696

696

625

1755

846

849

Sub Total (5GG) 06

Sears

3547

7G

333

167

173

07

Quelle

8711

7G

133

0

67

08

Quelle

8824

7G

583

583

97

09

Quelle

8821

7G

1200

1200

57

10

Quelle

3885

7G

133

0

130

11

Quelle

8703

7G

192

192

167

12

L.Line

47902

7G

639

0

41

13

Zara

5747/246

7G

833

833

817

14

Zara

5747/296

7G

206

206

209

Sub Total (7GG)

4253

3181

1758

Grand Total

6007

4027

2607

Production Details

Date : 05.08.2007

All Figure In DZ

Month : July'2007 SL

Buyer

Style No.

GG

Total Order Qty

Production Target Achive

3835

5G

200

200

202

01

Quelle

02

Tiara

4H215

5G

162

0

75

03

K-Mart

9H049

5G

1564

1500

1550

04

Sears

1504

5G

167

0

1

05

Sears

1513

5G

233

0

15

06

G.Gold

19H542

5G

379

379

343

07

G.Gold

19H542

5G

80

80

54

08

G.Gold

19H542

5G

696

160

82

3481

2319

2322

Sub Total (5GG) 09

Sears

1535

7G

167

0

1

10

Sears

3544

7G

317

303

310

11

Sears

3547

7G

333

333

170

12

Quelle

8820

7G

443

443

762

13

Quelle

3885

7G

333

333

345

14

Quelle

8703

7G

225

225

236

15

Les. Line

47902

7G

639

622

630

16

Zara

5747/246

7G

458

0

19

Sub Total (7GG)

2915

2260

2473

Grand Total

6396

4579

4795

Production Details

Remarks

Date : 01.07.2007

All Figure In DZ

Month : June'2007 Style No.

GG

Total Order Qty

01 N.Mann

138/751

5G

42

42

44

02 N.Mann

327/052

5G

42

42

41

03 G.Union

8480

5G

1000

0

51

04 Tiara

4H215

5G

1006

767

724

05 Sears

1537

5G

375

0

121

06 Sears

1504

5G

167

167

170

07 Sears

1513

5G

233

233

223

SL

Buyer

Production Target Achive

Remarks

08 G.Gold(K-Mart)

9H 049

5G

Sub Total (5GG)

1564

897

37

4428

2148

1411

09

Sears

3543

7G

309

200

232

10

Sears

1535

7G

167

167

171

11

Sears

3544

7G

317

0

13

12

Quelle

3204

7G

667

125

160

13

Quelle

8820

7G

3010

3010

2317

14

Quelle

3885

7G

133

133

138

Sub Total (7GG)

4602

3635

3031

Grand Total

9030

5783

4442

Production Details

Date : 01.06.2007

All Figure In DZ

Month : May'2007 Style No.

GG

Total Order Qty

01 Quelle

3212

5G

333

225

233

02 Great Union

8480

5G

1000

933

899

03 Tiara

4H215/28813

5G

408

0

232

04 Sears

VLF7-1537

5G

292

292

263

05 Sears

VLF7-1500

5G

99

0

75

06 Sears

VLF7-1513

5G

233

233

0

07 N.Mann

138/751

5G

42

42

0

08 N.Mann

327/052

5G

42

42

0

2449

1767

1702

SL

Buyer

Sub Total (5GG)

Production Target Achive

09

Sears

TSF7-3542

7G

123

98

110

10

Sears

TSF7-3543

7G

309

309

84

11

Sears

TSF7-3544

7G

214

214

219

12

Sears

VLF7-1535

7G

167

167

0

13

Quelle

2479

7G

142

100

109

14

Quelle

3204

7G

667

667

525

15

Great Union

1603

7G

300

300

307

16

Tiara

4H216/28659

7G

500

333

381

17

Eurofrente

10394

7G

1223

917

959

Sub Total (7GG)

3643

3103

2694

Grand Total

6092

4871

4396

Production Details

Remarks

Date : 01.05.2007

All Figure In DZ

Month : April'2007 Style No.

GG

Total Order Qty

01 Quelle

3733

5G

333

333

245

02 Quelle

3885

5G

208

208

206

03 Quelle

3915

5G

133

133

136

04 Quelle

3212

5G

333

0

103

05 N.Mann

138/751

5G

83

83

62

06 N.Mann

327/052

5G

83

83

45

07 Sears

VLF7-1500

5G

568

568

580

08 Sears

VLF7-1500-B

5G

188

188

192

09 Sears

VLF7-1500-C

5G

50

50

34

10 Sears

VLF7-1504/44 5G

83

83

0

11 Sears

VLF7-1513/50 5G

117

117

0

SL

Buyer

Production Target Achive

Remarks

12 G.Union

17200

5G

500

0

34

13 G.Union

8480

5G

1000

0

61

3680

1847

1698

Sub Total (5GG) 14

G.Union

1604

7G

300

167

231

15

Quelle

3885

7G

333

333

322

16

Quelle

8711

7G

367

367

373

17

Quelle

2479

7G

142

142

146

18

Quelle

2479-B

7G

142

0

38

19

Tiara

28658

7G

500

500

505

20

Tiara

28659

7G

500

500

126

21

Eurofrente

10394

7G

1223

0

277

22

Sears

TSF6-3542

7G

123

123

20

23

Sears

TSF6-3544

7G

214

214

0

Sub Total (7GG)

3842

2344

2038

Grand Total

7522

4191

3736

Production Details

Date : 01.04.2007

All Figure In DZ

Month : March'2007 Style No.

GG

Total Order Qty

G.Union

1612

5G

300

300

259

02

G.Union

17200

5G

500

500

474

03

G.Union

17201

5G

500

500

507

04

G.Union

7600

5G

1000

208

255

05

N.Mann

327/052

5G

83

83

86

06

N.Mann

138/751

5G

83

83

74

05

Quelle

3733

5G

333

333

57

06

Quelle

3835

5G

208

0

40

3008

2008

1752

SL

Buyer

01

Sub Total (5GG)

Production Target Achive

08

G.Union

7606

7G

700

0

134

09

G.Union

7603

7G

700

533

575

10

G.Union

7613

7G

500

500

510

11

G.Union

1613

7G

300

300

299

12

G.Union

1603

7G

300

300

306

12

G.Union

1604

7G

300

300

81

13

Quelle

3885

7G

333

333

23

14

Eurofrente

10394(EX-09447) 7G

527

527

0

Sub Total (7GG)

3660

2794

1928

Grand Total

6668

4802

3680

Production Details

Remarks

Date : 01.03.2007

All Figure In DZ

Month : February'2007 Style No.

GG

Total Order Qty

G.Union

1615

5G

700

208

94

02

G.Union

7609

5G

1000

542

901

03

G.Union

7600

5G

1000

1000

707

04

G.Union

1612

5G

300

0

42

3000

1750

1743

SL

Buyer

01

Sub Total (5GG)

Production Target Achive

08

Quelle

8711

7G

525

275

273

09

Quelle

8706

7G

150

150

154

Remarks

10

G.Union

7604

7G

700

83

109

11

G.Union

7605

7G

1000

375

332

12

G.Union

7606

7G

700

700

574

12

G.Union

7603

7G

700

700

134

13

G.Union

1613

7G

300

0

7

Sub Total (7GG)

4075

2283

1583

Grand Total

7075

4033

3326

Production Details

Date : 01.02.2007

All Figure In DZ

Month : January'2007 Style No.

GG

Total Order Qty

550/477

5G

100

100

106

Quelle

7692

5G

333

258

256

03

Quelle

3212

5G

333

0

11

04

Quelle

3812

5G

100

100

104

05

G.Union

7615

5G

700

700

614

06

G.Union

7609

5G

1000

0

109

07

G.Union

7600

5G

1000

0

56

3567

1158

1256

SL

Buyer

01

N.Mann

02

Sub Total (5GG)

Production Target Achive

08

Quelle

8711

7G

833

525

245

09

Quelle

7452

7G

133

0

57

10

Quelle

3252

7G

267

0

73

11

Quelle

8706

7G

150

150

0

12

G.Union

7604

7G

700

333

605

13

G.Union

7605

7G

1000

1000

683

Sub Total (7GG)

3083

2008

1663

Grand Total

6650

3167

2919

Remarks

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Shipment Details Date : 01.07.2008

All Figure In DZ

Month : June' 2008 SL 01 02 03 04 05 06 07 08 09 10 11 12

Buyer

Style/P.O No

GG

RC-45 Li & Fung RC-45 Li & Fung 4000/CS-9659 G. Union 4000/CS-9659 G. Union 9L446 G.Gold 3504 Sears 3517 Sears Sub Total (5GG) 9L524 G.Gold 11447 Eurofrente G.Gold 4004/CS-898 Sears 3527 3528 Sears Sub Total (7GG)

5G 5G 5G 5G 5G 5G 5G 7G 7G 7G 7G 7G

Grand Total (5+7) GG

Total Order Qty

542 257 467 2931 283 1100 500 166 126 2175

Shipped Qty 23 140 500 500 529 255 297 2243 136 1100 400 110 84 1830

Short/Over Shipped Qty Partial Partial Partial Balance Qty -14 -2 Partial -16

5106

4073

-16

665 1000

Partial Partial 0

Ship Date 6-Jan 18-Jun 18-Jun 19-Jun 18-Jun 26-Jun 26-Jun

Remarks

Quality Problem

6-Jun 10-Jun 22-Jun 26-Jun 26-Jun

Month : May' 2008 SL 01 02 03 04 05 06 07

Buyer

Style/P.O No

LM-869 Branex LM-870 Branex LM-871 Branex LM-874 Branex Sub Total (5GG) 11447 Eurofrente 11447 Eurofrente K-Mart 9L440 Sub Total (7GG)

Grand Total (5+7) GG

______________________ Production-Co-Ordinator

GG 5G 5G 5G 5G 7G 7G 7G

Total Order Qty 133 133 133 133 533

Short/Over Shipped Qty

2092 6242

Shipped Qty 133 131 133 134 532 2500 550 2083 5133

6775

5664

-10

4150

__________________ Finishing-In-Charge

0 Partial Balance Qty -10 -10

Ship Date 27-May 27-May 27-May 27-May

Remarks

20-May 30-May 31-May

________________ Knitting-In-Charge

______________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Shipment Details Date : 03.05.2008

All Figure In DZ

Month : April' 2008 SL

Buyer

Style/P.O No

GG

Total Order Qty

Shipped Qty

Short/Over Shipped Qty

Ship Date

Remarks

7374

5G

269

92

Partial

17-Apr

Ttl Qty 3900 Pcs 3226 Pcs GKL 674 Pcs G.S.G.L-1

500

424

Partial

18-Apr

76

Balance Qty

19-Apr

01

Quelle

02

G.Union

84007/ET-8001

5G

03

G.Union

84007/ET-8001

5G

04

G.Union

1011CV/CS-8000

5G

300

300

05

G.Gold

29L275

5G

300

296

-4

21-Apr

06

Quelle

7374

5G

102

Balance Qty

24-Apr

07

Quelle

3835

5G

355

-2

24-Apr

Emb Problem

08

Quelle

7374

5G

65

-10

30-Apr

Knitting Qty. Can Not done For Yarn Problem

1726

1710

-16

Sub Total (5GG) 09

Quelle

10 11

357

21-Apr

3423

7G

83

83

10-Apr

G.Union

4010/CS-8003/1

7G

1000

1000

13-Apr

G.Union

84016/ET-8037

7G

500

500

18-Apr

Quality Problem

Sub Total (7GG)

1583

1583

0

Grand Total (5+7) GG

3309

3293

-16

______________________ Production-Co-Ordinator

__________________ Finishing-In-Charge

________________ Knitting-In-Charge

______________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Shipment Details Date : 01.04.2008

All Figure In DZ

Month : March' 2008 Style/P.O No

GG

Total Order Qty

Shipped Qty

Short/Over Shipped Qty

Ship Date

G.Union

8400/ET-9659

5G

500

424

Partial

5-Mar

02

G.Union

4000GT/CS-9659

5G

300

300

03

G.Union

8400/ET-9659

5G

0

76

04

G.Union

84006/ET-8000

5G

500

500

10-Mar

05

G.Union

4016/CS-8037

5G

1000

1000

25-Mar

06

N.Mann

500/477

5G

133

135

07

Atlantic

14256

5G

182

183

29-Mar

08

G.Union

3805/CK-8013

5G

300

300

31-Mar

2915

2918

2

SL

Buyer

01

Sub Total (5GG)

10-Mar Balance Qty

2

10-Mar

27-Mar

09

G.Union

84005/ET-6840

7G

500

424

Partial

5-Mar

10

G.Union

4004/CS-898

7G

700

400

Partial

10-Mar

Remarks

11

G.Union

84004/ET-898

7G

300

200

12

G.Union

4005GT/CS-6840

7G

300

300

13

G.Union

84005/ET-6840

7G

0

76

Balance Qty

10-Mar

14

G.Union

4004/CS-898

7G

0

300

Balance Qty

10-Mar

15

G.Union

84004/ET-898

7G

0

100

Balance Qty

10-Mar

16

G.Union

4036GT/ CS-8034

7G

300

300

24-Mar

17

G.Union

4036 P/ CS-8034

7G

500

500

25-Mar

18

G.Union

4036 Line CS-8034

7G

200

200

25-Mar

19

Branex

LBW-9060

7G

283

284

1

Sub Total (7GG)

3083

3084

1

Grand Total (5+7) GG

5998

6002

3

______________________ Production-Co-Ordinator

__________________ Finishing-In-Charge

Partial

10-Mar 10-Mar

31-Mar

________________ Knitting-In-Charge

______________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Shipment Details All Figure In DZ

Date : 01.03.2008

Month : February' 2008 Style/P.O No

GG

Total Order Qty

Shipped Qty

Short/Over Shipped Qty

Ship Date

Atlantic

15684

5G

617

167

Partial

20-Feb

02

G.Union

4006/CS-8000

5G

500

432

Partial

23-Feb

03

Atlantic

15684

5G

450

451

1

24-Feb

04

G.Union

4000/CS9659

5G

700

700

0

25-Feb

05

G.Union

4006/CS-8000

5G

500

68

Balance Qty

26-Feb

06

G.Union

4006/CS-8000

5G

58

35

0

Recvd from Orchid Swt.Knitting & Linking Proces

07

Atlantic

19056

5G

25

13

0

Rcvd From GSGL-1 Knitting

2850

1866

1

SL

Buyer

01

Sub Total (5GG) 08

Branex

LM-861

7G

267

266

0

7-Feb

09

Branex

LM-863

7G

83

82

-1

7-Feb

10

G.Gold

9L-119/2770

7G

750

750

0

9-Feb

11

G.Gold

9L-120/2772

7G

600

600

0

11-Feb

12

Branex

LM-862

7G

167

166

0

14-Feb

13

G.Union

4005/CS-6840

7G

400

400

0

25-Feb

14

Zara

5747/001

12G

48

48

0

15-Feb

Sub Total (7GG)

2315

2313

-1

Grand Total (5+7) GG

5165

4178

0

Remarks

Assortment Problem

______________________ Production-Co-Ordinator

__________________ Finishing-In-Charge

________________ Knitting-In-Charge

______________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Shipment Details Date : 01.02.2008

All Figure In DZ

Month : January' 2008 SL

Buyer

01

N.Mann

Style/P.O No

GG

Total Order Qty

Shipped Qty

Short/Over Shipped Qty

Ship Date

8912

5G

133

134

1

24-Jan

133

134

1

Sub Total (5GG) 07

Quelle

8832

5G

500

515

15

10-Jan

08

Quelle

8824

7G

258

259

1

10-Jan

09

Quelle

8703

7G

333

336

3

24-Jan

10

Zara

5747/521

12G

18

18

0

3-Jan

11

Zara

5747/522

12G

83

83

0

18-Jan

Remarks

12

Safara

816/8007

12G

182

182

0

Sub Total (7GG)

1375

1393

18

Grand Total (5+7) GG

1508

1527

19

______________________ Production-Co-Ordinator

__________________ Finishing-In-Charge

28-Jan

________________ Knitting-In-Charge

______________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Shipment Details Date : 02.12.2007

All Figure In DZ

Month : November' 2007 SL

Buyer

Style/P.O No

GG

Total

Shipped

Short/Over

Ship

Remarks

SL

Buyer

Style/P.O No

GG

Order Qty

Qty

Shipped Qty

Date

01

Quelle

3835

5G

275

276

1

22-Nov

01

Eurofrente

10764

5G

143

143

0

29-Nov

02

Eurofrente

10877

5G

208

208

0

29-Nov

626

627

1

Sub Total (5GG) 03

Les. Line

5870

7G

441

441

0

3-Nov

04

Les. Line

5872

7G

483

483

0

13-Nov

05

Les. Line

5868

7G

119

119

0

13-Nov

06

Quelle

8820

7G

542

542

0

22-Nov

07

G.Gold

012630

7G

500

498

-2

29-Nov

08

Cellio

V-Stripe

12G

83

33

Partial

6-Nov

Sub Total (7GG)

2168

2116

-2

Grand Total (5+7) GG

2794

2743

-1

______________________ Production-Co-Ordinator

__________________ Finishing-In-Charge

________________ Knitting-In-Charge

Remarks

______________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Shipment Details Date : 03.10.2007

All Figure In DZ

Month : October' 2007 SL

Buyer

Style/P.O No

GG

Total Order Qty

Shipped Qty

Short Shipped Qty

Ship Date

01

Sfera

0766/8021

5G

161

140

0

20-Oct

01

Sfera

0766/8021

5G

161

21

0

23-Oct

02

N.Mann

017/531

5G

200

200

0

4-Oct

361

221

0

Sub Total (5GG) 03

Quelle

8824

7G

350

357

7

10-Oct

04

Quelle

8703

7G

138

137

-1

10-Oct

05

Quelle

3512

7G

250

251

1

25-Oct

06

Quelle

8703

7G

267

271

4

31-Oct

07

Quelle

3204

7G

142

142

0

31-Oct

08

Les. Line

18902

7G

407

407

0

11-Oct

09

G.Union

7603

7G

334

334

0

31-Oct

Sub Total (7GG)

1888

1899

11

Grand Total (5+7) GG

2249

2120

11

Remarks

______________________ Production-Co-Ordinator

__________________ Finishing-In-Charge

________________ Knitting-In-Charge

______________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Shipment Details Date : 02.10.2007

All Figure In DZ

Month : September' 2007 SL

Buyer

01

G. Gold

02

Quelle

Style/P.O No

GG

Total Order Qty

Shipped Qty

Short Shipped Qty

Ship Date

19H987

5G

258

176

Partial

2-Aug

3835

5G

150

146

-4

26-Sep

408

322

-4

Sub Total (5GG) 03

Quelle

8821

7G

1200

68

Prtial

6-Sep

04

Seras

3549

7G

250

125

Partial

7-Sep

05

Zara

5747/296

7G

206

46

Nill

1-Sep

06

Zara

5747/296

7G

160

27

Partial

7-Sep

07

Zara

5747/296

7G

160

133

12-Sep

Remarks

1752

08

Quelle

8821

7G

373

381

0

13-Sep

09

Quelle

8703

7G

192

196

0

13-Sep

10

Quelle

3885

7G

67

67

11

Quelle

8824

7G

583

567

-16

14-Sep

12

Quelle

8711

7G

342

329

-13

26-Sep

13

Quelle

8711

7G

133

134

0

26-Sep

14

Quelle

3885

7G

133

131

-2

26-Sep

3799

2204

-31

Sub Total (7GG)

13-Sep

15

Zara

5747/260

7G

954

236

Partial

20-Sep

Rcvd. From Dhaka

16

Zara

5747/260

7G

954

233

Partial

23-Sep

Rcvd. From Dhaka

17

Zara

5747/260

7G

954

321

Partial

23-Sep

Rcvd. From Dhaka

Sub Total (12GG)

2862

790

0

Grand Total (5+7+12) GG

7069

3316

-35

______________________ Production-Co-Ordinator

__________________ Finishing-In-Charge

________________ Knitting-In-Charge

______________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Shipment Details Date : 01.09.2007

All Figure In DZ

Month : August' 2007

SL

Buyer

Style/P.O No

GG

Total Order Qty

Shipped Qty

Short Shipped Qty

Ship Date

01

G.Gold

19H542

5G

459

461

02

G.Gold

19H542/12228

5G

696

657

Partial

19-Aug

03

G.Gold

19H542/12228

5G

696

39

Partial

27-Aug

1851

1157

0

Sub Total (5GG) 12

Les.Line

14

12-Aug

47902W

7G

639

626

-13

13-Aug

Sears

3547

7G

333

335

0

16-Aug

15

Zara

5747/246 36362

7G

375

375

0

18-Aug

16

Zara

5747/246 36361

7G

458

458

0

18-Aug

Sub Total (7GG)

1805

1794

-13

Grand Total (5+7) GG

3656

2951

-13

Remarks

______________________ Production-Co-Ordinator

__________________ Finishing-In-Charge

________________ Knitting-In-Charge

______________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Shipment Details Date : 05.08.2007

All Figure In DZ

Month : July' 2007 SL

Buyer

Style/P.O No

GG

Total Order Qty

Shipped Qty

Short Shipped Qty

Ship Date

1537

5G

292

292

0

4-Jul

01

Sears

02

N.Mann

138/751

5G

42

42

0

6-Jul

03

N.Mann

327/052

5G

42

43

0

6-Jul

04

Tiara

4H215/28875

5G

162

162

0

8-Jul

05

Tiara

4H215/28803

5G

338

338

0

8-Jul

06

Quelle

3835

5G

200

192

8

13-Jul

07

Sears

1504

5G

167

165

2

18-Jul

08

Sears

1513

5G

233

231

2

18-Jul

09

K-Mart

9H049/12186

5G

1564

780

Partial

22-Jul

Remarks

10

K-Mart

9H049/12186

5G

1564

784

Partial

29-Jul

11

Sears

1500

5G

50

50

0

29-Jul

12

Sears

1537

5G

83

84

0

29-Jul

4736

3162

12

Sub Total (5GG) 12

Quelle

8820

7G

879

872

7

6-Jul

14

Sears

1535

7G

167

167

0

8-Jul

15

Sears

3543

7G

309

309

0

11-Jul

16

Sears

3544

7G

317

318

0

12-Jul

17

Quelle

8820

7G

510

496

14

12-Jul

18

Quelle

8820

7G

283

293

0

27-Jul

19

Quelle

3885

7G

333

330

3

27-Jul

20

Quelle

8703

7G

225

231

0

27-Jul

3024

3016

24

108

108

0

Sub Total (12GG)

108

108

0

Grand Total (5+7+12) GG

7868

6286

36

Sub Total (7GG) 21

Eurofrente

______________________ Production-Co-Ordinator

10610

12G

__________________ Finishing-In-Charge

31-Jul

________________ Knitting-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

______________ Plant-In-Charge

Shipment Details Date : 01.07.2007

All Figure In DZ

Month : June'2007 Style/P.O No

GG

Total Order Qty

Shipped Qty

Short Shipped Qty

Ship Date

8480

5G

1000

1000

0

12-Jun

Tiara

4H215/28813

5G

408

408

0

23-Jun

Tiara

4H215/28802

5G

100

100

0

23-Jun

1508

1508

0

SL

Buyer

01

G.Union

02 03

Sub Total (5GG) 04

G.Union

1603

7G

300

300

0

2-Jun

05

Sears

3542

7G

123

124

0

12-Jun

06

Sears

3544

7G

214

215

0

12-Jun

07

Quelle

2479

7G

142

145

0

14-Jun

08

Quelle

3204

7G

667

661

7

14-Jun

09

Quelle

8820

7G

2500

1621

Partial

28-Jun

10

Quelle

3885

7G

133

134

0

28-Jun

Sub Total (7GG)

4079

3200

7

Grand Total

5587

4708

7

Remarks

hipment Target Status SL

Buyer

01 02 03 04 05 Total

Style/P.O No

GG

Total Order Qty

Shipment Target Actual Revised

Remarks

______________________ Production-Co-Ordinator

__________________ Finishing-In-Charge

________________ Knitting-In-Charge

______________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Shipment Details Date : 01.06.2007

All Figure In DZ

Month : May'2007 Style/P.O No

GG

Total Order Qty

Shipped Qty

Short Shipped Qty

Ship Date

N.Mann

138/751

5G

42

42

0

9-May

02

N.Mann

327/052

5G

42

42

0

9-May

03

Sears

VLF7-1500

5G

188

188

0

15-May

04

Quelle

3212

5G

333

329

4

29-May

05

Sears

VLF7-1500

5G

50

50

0

31-May

655

651

4

SL

Buyer

01

Sub Total (5GG) 06

Tiara

4H216/28658

7G

500

500

0

7-May

07

Quelle

2479

7G

141

142

0

9-May

08

Eurofrente

10394

7G

800

800

0

22-May

09

Tiara

4H216/28659

7G

500

498

2

21-May

10

Eurofrente

10394

7G

423

423

0

31-May

Sub Total (7GG)

2364

2363

0

Grand Total

3019

3014

4

Remarks

504

Quality Problem

Quality Problem

hipment Target Status SL

Buyer

Style/P.O No

GG

Total Order Qty

Shipment Target Actual Revised

Remarks

01 02 03 04 05 Total

______________________ Production-Co-Ordinator

__________________ Finishing-In-Charge

________________ Knitting-In-Charge

______________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Shipment Details Date : 01.05.2007

All Figure In DZ

Month : April'2007 Style/P.O No

GG

Total Order Qty

Shipped Qty

N.Mann

138/751

5G

83

83

5-Apr

02

N.Mann

327/052

5G

83

83

5-Apr

03

Quelle

3733

5G

333

333

12-Apr

SL

Buyer

01

Short Shipped Qty

Ship Date

Remarks

04

Quelle

3835

5G

208

202

6

12-Apr

05

Quelle

3915

5G

133

134

0

18-Apr

03

G.Union

17200

5G

500

500

22-Apr

04

Sears

VLF7-1500

5G

568

569

28-Apr

1908

1904

Sub Total (5GG)

Embd. Problem

6

06

G.Union

7613

7G

500

500

9-Apr

07

G.Union

1603

7G

300

300

9-Apr

07

G.Union

1604

7G

300

300

22-Apr

08

Quelle

3885

7G

333

331

09

Quelle

8711

7G

367

369

Sub Total (7GG)

1800

1800

2

Grand Total

3708

3704

8

2

12-Apr

Print Problem

27-Apr

hipment Target Status SL

Buyer

Style/P.O No

GG

Total Order Qty

Shipment Target Actual Revised

Remarks

01 02 03 04 05 Total

______________________ Production-Co-Ordinator

__________________ Finishing-In-Charge

________________ Knitting-In-Charge

______________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Shipment Details Date : 01.04.2007

All Figure In DZ

Month : March'2007 Style/P.O No

GG

Total Order Qty

Shipped Qty

Short Shipped Qty

Ship Date

G.Union

7609

5G

1000

1000

0

1-Mar

02

G.Union

7615

5G

700

168

Partial

11-Mar

03

G.Union

7600

5G

1000

168

Partial

11-Mar

04

G.Union

7600

5G

832

832

Partial

16-Mar

05

G.Union

17201

5G

500

500

0

31-Mar

4032

2668

0

SL

Buyer

01

Sub Total (5GG) 06

G.Union

7606

7G

700

168

Partial

11-Mar

07

G.Union

7603

7G

700

168

Partial

13-Mar

08

G.Union

7606

7G

532

532

0

16-Mar

09

G.Union

7603

7G

532

532

0

29-Mar

10

G.Union

1613

7G

300

300

0

29-Mar

Sub Total (7GG)

2764

1700

0

Grand Total

6796

4368

0

Remarks

hipment Target Status SL 01 02 03

Buyer

Style/P.O No

GG

Total Order Qty

Shipment Target Actual Revised

Remarks

04 05 06 07 08 Total

____________ Prepared By

________________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Shipment Details Date : 01.04.2007

All Figure In DZ

Month : March' 2007 SL

Buyer

Style/P.O No

GG

Total Order Qty

Shipped Qty

01

N.Mann

550/477

5G

100

103

02

G.Union

7615

5G

700

532

Partial

800

635

0

Sub Total (5GG)

Short Shipped Qty

Ship Date

Remarks

1-Feb 28-Feb

03

Quelle

8706

7G

833

818

-15

1-Feb

Due To Printing Problem

04

Quelle

8711

7G

525

502

-23

22-Feb

Due To Yarn Dying Problem

05

Quelle

8706

7G

150

151

0

22-Feb

06

G.Union

7604

7G

700

700

0

21-Feb

07

G.Union

7605

7G

1000

1000

0

21-Feb

Sub Total (7GG)

3208

3171

-38

Grand Total

4008

3806

-38

hipment Target Status SL

Buyer

Style/P.O No

GG

Total Order Qty

Shipment Target Actual Revised

Remarks

01 02 03 04 05 06 07 08 Total

____________ Prepared By

________________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Shipment Details Date : 01.03.2007

All Figure In DZ

Month : February' 2007 SL

Buyer

Style/P.O No

GG

Total Order Qty

Shipped Qty

Short Shipped Qty

Ship Date

Remarks

01

N.Mann

550/477

5G

100

103

02

G.Union

7615

5G

700

532

Partial

800

635

0

Sub Total (5GG)

1-Feb 28-Feb

03

Quelle

8706

7G

833

818

-15

1-Feb

Due To Printing Problem

04

Quelle

8711

7G

525

502

-23

22-Feb

Due To Yarn Dying Problem

05

Quelle

8706

7G

150

151

0

22-Feb

06

G.Union

7604

7G

700

700

0

21-Feb

07

G.Union

7605

7G

1000

1000

0

21-Feb

Sub Total (7GG)

3208

3171

-38

Grand Total

4008

3806

-38

hipment Target Status SL

Buyer

Style/P.O No

GG

Total Order Qty

Shipment Target Actual Revised

Remarks

01 02 03 04 05 06 07 08 Total

____________

________________

Prepared By

Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Shipment Details Date : 01.02.2007

All Figure In DZ

Month : January' 2007 SL

Buyer

Style/P.O No

GG

Total Order Qty

Shipped Qty

Short Shipped Qty

Ship Date

01

Quelle

3212

5G

333

328

-5

11-Jan

02

Quelle

7692

5G

333

322

-11

18-Jan

03

Quelle

3812

5G

100

100

0

25-Jan

766

750

-16

Sub Total (5GG) 05

Quelle

3252

7G

267

265

-2

11-Jan

06

Quelle

7452

7G

133

134

0

25-Jan

Sub Total (7GG)

400

399

-2

Grand Total

1166

1149

-18

07

7G

08

7G

09

7G

Remarks

hipment Target Status SL 01 02 03

Buyer

Style/P.O No

GG

Total Order Qty

Shipment Target Actual Revised

Remarks

04 05 06 07 08 Total

____________ Prepared By

________________________ Production-Co-Ordinator

________________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Shipment Details Date : 06.01.2007

All Figure In DZ

Month : December' 2006 SL

Buyer

Style/P.O No

GG

Total Order Qty

Shipped Qty

Short Shipped Qty

Ship Date

01

N.Mann

550/477

5G

100

101

0

20-Dec

100

101

0

212

202

11

02

5G

03

5G

04

5G

05

5G Sub Total (5GG)

05

Quelle

8703

7G

6-Dec

Remarks

Quality Problem

06

Quelle

8711

7G

833

781

52

Sub Total (7GG)

1045

983

63

Grand Total

1145

1084

63

07

7G

08

7G

09

7G

10

7G

11

7G

12

7G

28-Dec Due To Over Weight

hipment Target Status SL

Buyer

Style/P.O No

GG

Total Order Qty

Shipment Target Actual Revised

Remarks

01 02 03 Total

____________ Prepared By

________________________ Production-Co-Ordinator

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

________________ Plant-In-Charge

Shipment Details Date : 02.12.2006

All Figure In DZ

Month : November' 2006 SL

Buyer

Style/P.O No

GG

Total Order Qty

Shipped Qty

Short Shipped Qty

Ship Date

01

N.Mann

550/477

5G

83

83

0

9-Nov

02

Eurofrente

09769

5G

487

487

0

16-Nov

03

Eurofrente

09770

5G

150

150

0

16-Nov

04

Eurofrente

09750

5G

521

513

8

18-Nov

05

Quelle

3795

5G

125

75

Partial

30-Nov

1366

1308

8

Sub Total (5GG)

Remarks

05

Quelle

7392

7G

210

190

20

2-Nov

06

Quelle

7452

7G

175

165

Partial

9-Nov

07

Quelle

3955

7G

183

83

100

9-Nov

08

Quelle

3792

7G

58

59

0

9-Nov

09

Quelle

7452

7G

275

246

29

23-Nov

10

Quelle

7392

7G

58

62

0

23-Nov

11

Quelle

8703

7G

2083

1871

Partial

30-Nov

12

Leasure Line

17908

7G

63

23

Partial

5-Nov Rcvd. From Savar Swtr.

3105

2699

149

102

7

Partial

Sub Total (7GG)

102

7

Grand Total

4573

4014

Sub Total (12GG) 15

Zara

5747/260

12G

100 DZ Stock Lot

9-Nov

157

hipment Target Status SL 01 02 03

Buyer

Style/P.O No

GG

Total Order Qty

Shipment Target Actual Revised

Remarks

Total

____________ Prepared By

________________________ Production-Co-Ordinator

________________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Shipment Details Date : 01.11.2006

All Figure In DZ

Month : October' 2006 SL

Buyer

Style/P.O No

GG

Total Order Qty

Shipped Qty

Short Shipped Qty

01

G.Gold

1D159

3G

42

13

Partial

21-OctRcvd From SAVAR Swtr.

42

13

Sub Total (1.5GG)

Ship Date

02

G.Gold

1D158/10251

5G

546

216

Partial

2-Oct

03

G.Gold

1D158/10251

5G

268

200

Partial

10-Oct

04

G.Gold

1D158/10251

5G

130

36

Partial

11-Oct

05

G.Gold

1D158/10249

5G

100

98

2

1044

550

2

Sub Total (5GG)

Remarks

11-Oct Assortment Problem

06

Sears

VSL7-1500

7G

200

200

0

1-Oct

07

Sears

TSF6-3534

7G

124

123

1

12-Oct

08

Quelle

3732

7G

367

132

Partial

5-Oct

09

Quelle

3905

7G

200

73

Partial

5-Oct

10

Quelle

3732

7G

234

100

Partial

6-Oct

11

Quelle

3905

7G

127

29

Partial

6-Oct

12

Quelle

7294

7G

208

74

Partial

6-Oct

13

Quelle

8609

7G

433

124

Partial

12-Oct

14

Quelle

3732

7G

134

122

13

12-Oct

Printing Problem

15

Quelle

3905

7G

98

87

11

12-Oct

Quality Problem

16

Quelle

3792

7G

408

129

Partial

12-Oct

17

Quelle

7294

7G

134

119

15

13-Oct Quality & Printing Problem

18

Quelle

8609

7G

309

303

6

19-Oct Yarn Shading Problem

19

Quelle

3792

7G

344

345

20

Quelle

7392

7G

250

40

Partial

21-Oct

21

Leasure Line

17908

7G

185

34

Partial

20-OctRcvd From SAVAR Swtr.

22

Leasure Line

17908

7G

185

17

Partial

21-OctRcvd From SAVAR Swtr.

Sub Total (7GG)

3940

2051

46

Grand Total

5026

2614

48

19-Oct

hipment Target Status SL

Buyer

Style/P.O No

GG

Total Order Qty

Shipment Target Actual Revised

Remarks

01 02 Total

____________ Prepared By

________________________ Production-Co-Ordinator

________________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Shipment Details Date : 03.10.2006

All Figure In DZ

Month : September' 2006

SL

Buyer

Style/P.O No

GG

Total Order Qty

Shipped Qty

Short Shipped Qty

Ship Date

Remarks

01

Zara

5747/703

1.5G

409

134

0

19-Sep

Savar Sweater

02

Zara

5747/703

1.5G

132

46

Partial

25-Sep

Savar Sweater

541

180

Sub Total (1.5GG) 03

G.Gold

21D050CT/10074

5G

330

330

0

5-Sep

04

G.Gold

21D050CT/10075

5G

220

220

0

5-Sep

05

Rajan

MK-413609

5G

400

400

0

6-Sep

06

Rajan

MK-413612

5G

400

400

0

6-Sep

07

Rajan

MK-413608

5G

300

300

0

6-Sep

08

Sears

TSF6-3540

5G

200

201

0

11-Sep

09

Sears

TSF6-3542

5G

217

216

1

13-Sep

10

Bay-City

303696/30

5G

161

56

Partial

18-Sep

11

G.Gold

1D158/010251

5G

1380

834

Partial

30-Sep

3608

2957

1

Sub Total (5GG) 12

Quelle

3575

7G

150

147

3

8-Sep

13

Quelle

8602

7G

233

46

Partial

8-Sep

14

Rajan

LK-41CROP

7G

300

104

Partial

11-Sep

15

Quelle

8602

7G

187

181

6

15-Sep

16

Quelle

8609

7G

408

274

Partial

15-Sep

17

Quelle

8609

7G

135

130

5

21-Sep

16

Quelle

8602

7G

208

213

0

28-Sep

17

Sears

3534

7G

157

158

0

28-Sep

Sub Total (7GG)

1778

1253

14

Grand Total

5927

4390

15

Savar Sweater

Savar Sweater

hipment Target Status SL

Buyer

01 02 Total

Style/P.O No

GG

Total Order Qty

Shipment Target Actual Revised

Remarks

____________ Prepared By

________________________ Production-Co-Ordinator

________________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Shipment Details Date : 01.08.2006

All Figure In DZ

Month : July' 2006 SL

Buyer

Style/P.O No

GG

Total Order Qty

Shipped Qty

01

Tiara

4D-769

3G

400

160

400

160

Sub Total (3GG)

Short Shipped Qty

Ship Date

Remarks

3-Jul

OSL

02

Quelle

8614

5G

1008

540

Partial

7-Jul

03

Quelle

8614

5G

1680

469

Partial

13-Jul

04

Quelle

3795

5G

125

89

Partial

13-Jul

05

Quelle

3795

5G

36

37

0

20-Jul

06

Quelle

3595

5G

167

157

10

20-Jul

07

Quelle

8614

5G

1213

612

Partial

21-Jul

08

Quelle

8614

5G

600

589

11

28-Jul

09

Sears

60252-C

5G

432

415

17

16-Jul

5261

2908

38

Sub Total (5GG) 10

M.Hidary

FGB06821

7G

42

17

0

3-Jul

11

Sears

3534

7G

667

667

0

10-Jul

12

Sears

3536

7G

417

228

Partial

16-Jul

13

Sears

1502

7G

237

234

3

26-Jul

14

Sears

1504

7G

399

172

Partial

27-Jul

15

Quelle

8602

7G

152

124

Partial

13-Jul

16

Quelle

8602

7G

293

142

Partial

7-Jul

OSL

17

Quelle

3094

7G

500

112

Partial

21-Jul

18

Quelle

3094

7G

388

271

Partial

28-Jul

19

Quelle

3142

7G

67

66

1

20-Jul

20

Wehmeyer

WR-08

7G

200

135

Partial

13-Jul

21

Wehmeyer

WR-08

7G

65

63

2

20-Jul

22

N.Mann

017/477

7G

146

83

Partial

28-Jul

Sub Total (7GG)

3573

2314

6

Grand Total

9234

5382

44

hipment Target Status SL

Buyer

Style/P.O No

GG

Total Order Qty

Shipment Target Actual Revised

Remarks

01 02 03 Total

____________ Prepared By

________________________ Production-Co-Ordinator

________________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Shipment Details Date : 01.07.2006

All Figure In DZ

Month : June' 2006 SL

Buyer

Style/P.O No

GG

Total Order Qty

Shipped Qty

Short Shipped Qty

Ship Date

01

Quelle

8614

5G

1675

1253

Partial

1-Jun

02

Eurofrente

09181

5G

186

186

0

9-Jun

03

Eurofrente

09182

5G

113

107

6

9-Jun

Remarks

04

Quelle

8614

5G

422

418

4

9-Jun

05

Quelle

3023

5G

150

142

8

15-Jun

06

Quelle

3033

5G

150

140

10

15-Jun

07

Quelle

7214

5G

150

141

9

15-Jun

08

Sears

60252-C

5G

432

416

16

18-Jun

09

Quelle

8614

5G

2021

337

Partial

22-Jun

10

Quelle

3795

5G

175

165

10

22-Jun

11

Quelle

8614

5G

2021

676

Partial

29-Jun

7495

3981

63

Sub Total (5GG) 01

Quelle

2667

7G

267

40

Partial

1-Jun

02

Sears

3533

7G

500

492

8

8-Jun

03

N.Mann

017/531

7G

271

263

7

9-Jun

04

N.Mann

017/477

7G

146

140

6

9-Jun

05

Sears

1500

7G

35

35

0

12-Jun

06

Sears

3531

7G

625

619

6

15-Jun

07

Sears

3534

7G

237

232

5

18-Jun

08

Sears

3532

7G

334

332

1

22-Jun

09

Quelle

3732

7G

167

155

12

22-Jun

10

Eurofrente

09447

7G

460

460

0

26-Jun

11

Quelle

8602

7G

658

365

Partial

29-Jun

Sub Total (7GG)

3700

3133

45

Grand Total

11195

7114

108

3252

hipment Target Status SL

Buyer

01 02 03 Total

Style/P.O No

GG

Total Order Qty

Shipment Target Actual Revised

Remarks

____________ Prepared By

________________________ Production-Co-Ordinator

________________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Shipment Details Date : 02.06.2006

All Figure In DZ

Month : May' 2006 SL

Buyer

Style/P.O No

GG

Total Order Qty

Shipped Qty

Short Shipped Qty

Ship Date

01

Scope

13463

5G

40

40

0

2-May

02

N.Mann

550/477

5G

67

67

0

4-May

03

G.Union

S-372

5G

100

98

2

7-May

04

G.Union

S-373

5G

100

100

0

7-May

05

Rajan

MK-413315

5G

300

294

6

8-May

06

Sears

1500

5G

666

670

0

17-May

07

N.Mann

550/477

5G

75

76

0

25-May

1348

1345

8

Sub Total (5GG) 01

Quelle

2627

7G

200

200

0

10-May

02

Quelle

2611

7G

200

202

0

10-May

03

Quelle

3295

7G

183

179

4

11-May

04

Quelle

2620

7G

233

231

2

11-May

05

Quelle

3792

7G

166

166

0

17-May

06

Quelle

2619

7G

233

229

4

17-May

07

Quelle

8602

7G

325

324

1

17-May

08

Quelle

2615

7G

292

289

3

19-May

09

Quelle

2667

7G

267

230

Partial

25-May

10

Quelle

2479

7G

200

202

0

25-May

11

Quelle

2670

7G

333

337

0

25-May

12

Eurofrente

09447

7G

900

500

Partial

27-May

13

G.Union

CS-3029

7G

350

350

0

31-May

Remarks

14

G.Union

ET-6030

7G

104

104

Partial

Sub Total (7GG)

3986

3543

14

Grand Total

5334

4888

22

31-May

hipment Target Status SL

Buyer

Style/P.O No

GG

Total Order Qty

Shipment Target Actual Revised

Remarks

01 02 03 04 05 Total

____________ Prepared By

________________________ Production-Co-Ordinator

________________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Shipment Details Date : 02.05.2006

All Figure In DZ

Month : April' 2006 SL

Buyer

Style/P.O No

GG

Total Order Qty

Shipped Qty

Short Shipped Qty

Ship Date

01

Quelle

7214

5G

150

147

3

27-Apr

02

Quelle

3033

5G

150

150

0

27-Apr

03

Quelle

3023

5G

150

151

0

27-Apr

04

Scope

13463

5G

200

201

0

30-Apr

05

Scope

13465

5G

200

200

0

30-Apr

Remarks

Sub Total (5GG)

850

849

3

01

G.Union

8497

7G

188

188

0

3-Apr

02

G.Union

L-444

7G

300

299

1

10-Apr

03

Quelle

3732

7G

133

134

0

19-Apr

04

Quelle

3792

7G

167

167

0

27-Apr

05

Quelle

3792(B)

7G

342

339

3

27-Apr

Sub Total (7GG)

1130

1127

4

Grand Total

1980

1976

7

hipment Target Status SL

Buyer

Style/P.O No

GG

Total Order Qty

Shipment Target Actual Revised

Remarks

01 02 03 04 05 Total

____________ Prepared By

________________________ Production-Co-Ordinator

________________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Shipment Details Date : 02.04.2006

All Figure In DZ

Month : March' 2006 SL

Buyer

Style/P.O No

GG

Total Order Qty

Shipped Qty

Short Shipped Qty

Ship Date

01

Zara

5747/541

7G

201

201

0

7-Mar

02

Zara

5747/541

7G

100

100

0

9-Mar

03

Zara

5747/541

7G

241

241

0

16-Mar

542

542

0

Sub Total (5GG) 01

N.Mann

429/546

7G

308

311

0

2-Mar

02

Eurofrente

08997

7G

50

50

0

2-Mar

03

Quelle

3732

7G

192

192

0

16-Mar

04

Quelle

8602

7G

700

701

0

29-Mar

Sub Total (7GG)

1250

1254

0

Grand Total

1792

1796

0

Remarks

hipment Target Status SL 01

Buyer

Style/P.O No

GG

Total Order Qty

Shipment Target Actual Revised

Remarks

02 03 04 05 Total

____________ Prepared By

________________________ Production-Co-Ordinator

________________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Shipment Details Date : 01.03.2006

All Figure In DZ

Month : February' 2006 SL

Buyer

Style/P.O No

GG

01

5G

02

5G

Sub Total (5GG)

Total Order Qty

Shipped Qty

Short Shipped Qty

0

0

0

Ship Date

Remarks

01

Quelle

8609

7G

900

852

48

3-Feb Yarn & Shading Problem

02

Quelle

7382

7G

100

93

7

8-Feb

03

Quelle

3732

7G

67

67

0

8-Feb

Printing Problem

04

Quelle

8609

7G

708

709

1

17-Feb

05

Eurofrente

08997

7G

90

40

Partial

25-Feb

Sub Total (7GG)

1865

1761

56

Grand Total

1865

1761

56

hipment Target Status SL

Buyer

Style/P.O No

GG

Total Order Qty

Shipment Target Actual Revised

Remarks

01 02 03 04 05 Total

____________ Prepared By

________________________ Production-Co-Ordinator

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

________________ Plant-In-Charge

Shipment Details Date : 01.02.2006

All Figure In DZ

Month : January' 2006 SL

Buyer

Style/P.O No

GG

Total Order Qty

Shipped Qty

Short Shipped Qty

Ship Date

01

Zara

5747/504

5G

321

316

5

9-Jan

321

316

5

02

Remarks

5G

Sub Total (5GG) 05

Quelle

8603(B)

7G

650

636

14

5-Jan

Shading Problem

06

Quelle

7382

7G

100

99

1

5-Jan

Assortment Problem

07

Quelle

3732

7G

67

67

0

5-Jan

08

Quelle

8609

7G

600

600

0

25-Jan

Sub Total (7GG)

1417

1402

15

Grand Total

1738

1718

20

hipment Target Status SL

Buyer

01 02 03 04 05 Total

Style/P.O No

GG

Total Order Qty

Shipment Target Actual Revised

Remarks

____________ Prepared By

________________________ Production-Co-Ordinator

________________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Shipment Details Date : 01.12.2005

All Figure In DZ

Month : December' 2005 SL

Buyer

Style/P.O No

GG

Total Order Qty

Shipped Qty

Short Shipped Qty

Ship Date

01

Zara

574/600

5G

596

596

0

1-Dec

02

Putteman

RH3335TG

5G

100

100

0

12-Dec

696

696

0

Sub Total (5GG) 05

Sears

2486

7G

406

406

0

1-Dec

06

N.Mann

317/349

7G

708

700

8

8-Dec

07

Quelle

8602

7G

833

844

0

15-Dec

08

Quelle

8603

7G

1250

1250

0

29-Dec

3197

3200

8

Sub Total (7GG)

Remarks

Grand Total

3893

3896

8

hipment Target Status SL

Buyer

Style/P.O No

GG

Total Order Qty

Shipment Target Actual Revised

Remarks

01 02 03 04 05 Total

____________ Prepared By

________________________ Production-Co-Ordinator

________________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Shipment Details Date : 01.12.2005

All Figure In DZ

Month : November ' 2005 SL

Buyer

Style/P.O No

GG

Total Order Qty

Shipped Qty

Short Shipped Qty

Ship Date

01

Eurofrente

9029

5G

16

16

0

7-Nov

02

5G

Remarks

03

5G

04

5G

05

5G

06

5G

Sub Total (5GG)

16

16

0

05

Quelle

8602

7G

1333

1333

0

2-Nov

06

Bay-City

451

7G

1800

830

Partial

15-Nov

07

Bay-City

451

7G

1800

75

Partial

16-Nov

08

Bay-City

451

7G

1800

395

Partial

17-Nov

09

Bay-City

451

7G

1800

265

Partial

18-Nov

10

Quelle

8602

7G

1000

993

7

24-Nov

11

Bay-City

451

7G

35

35

12

Sears

07MCS6-2472

7G

267

267

0

Sub Total (7GG)

9835

4193

7

Grand Total

9851

4209

7

13

26-Nov 27-Nov

7G

hipment Target Status SL

Buyer

Style/P.O No

GG

Total Order Qty

Shipment Target Actual Revised

Remarks

01 02 03 04 05 Total

____________

________________________

________________

Prepared By

Production-Co-Ordinator

Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Shipment Details Date : 01.11.2005

All Figure In DZ

Month : October ' 2005 SL

Buyer

Style/P.O No

GG

Total Order Qty

Shipped Qty

Short Shipped Qty

Ship Date

01

Sears

1539

5G

153

155

0

10-Oct

02

Sears

1538

5G

112

113

0

10-Oct

03

Sears

1537

5G

99

99

0

10-Oct

04

Sears

1536

5G

137

137

0

10-Oct

05

Eurofrente

09209

5G

140

140

0

23-Oct

06

Eurofrente

08206

5G

360

360

0

23-Oct

1001

1004

0

Sub Total (5GG) 05

Bay-City

452

7G

1625

1625

0

1-Oct

06

Wal Mart

9106

7G

333

33

0

10-Oct

07

Wal Mart

9106

7G

333

100

0

10-Oct

08

Bay-City

449

7G

758

758

0

17-Oct

Sub Total (7GG)

3049

2516

0

Grand Total

4050

3520

0

09

7G

10

7G

11

7G

12

7G

13

7G

Remarks

hipment Target Status SL

Buyer

Style/P.O No

GG

Total Order Qty

Shipment Target Actual Revised

Remarks

01 02 03 04 05 Total

____________ Prepared By

________________________ Production-Co-Ordinator

________________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Shipment Details Date : 01.10.2005

All Figure In DZ

Month : September' 2005 SL

Buyer

Style/P.O No

GG

Total Order Qty

Shipped Qty

Short Shipped Qty

Ship Date

Remarks

01

Sears

1516

5G

194

193

1

1-Sep

Process Loss

02

Sears

1514

5G

382

382

0

1-Sep

03

G.Gold

7358

5G

300

300

0

6-Sep

04

Bay-City

452

5G

1625

0

0

29-Sep

2501

875

1

Sub Total (5GG) 05

Quelle

7610(B)

7G

917

860

Partial

1-Sep

06

Quelle

7610

7G

57

57

0

8-Sep

07

Quelle

7610

7G

63

63

0

8-Sep

08

Quelle

7610

7G

250

251

0

8-Sep

09

Rajan

W515043

7G

268

266

2

22-Sep

Process Loss

10

Rajan

W515029

7G

216

212

4

22-Sep

Process Loss

11

Rajan

W515028

7G

133

129

4

22-Sep

Process Loss

12

Rajan

W515078-L

7G

13

12

1

22-Sep

Process Loss

13

Quelle

3575

7G

133

64

Partial

22-Sep

2050

1914

11

42

0

Sub Total (7GG) 17

Zara

5747/800

1.5G

10-Sep

18

Sub Total (1.5G)

0

42

0

Grand Total

4551

2831

12

19 20

hipment Target Status SL

Buyer

Style/P.O No

GG

Total Order Qty

Shipment Target Actual Revised

Remarks

01 02 03 04 05 Total

____________ Prepared By

________________________ Production-Co-Ordinator

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

________________ Plant-In-Charge

Shipment Details Date : 02.08.2005

All Figure In DZ

Month : August' 2005 SL

Buyer

Style/P.O No

GG

Total Order Qty

Shipped Qty

01

Sears

3515

5G

750

752

02

Rajan

MK-412651

5G

200

190

03

Sears

3534

5G

517

518

04

Sears

1516

5G

362

167

Partial

1829

1627

10

Sub Total (5GG) 05

G.Gold

27750

7G

50

18

06

Rajan

MK-412655

7G

200

198

07

Rajan

MK-412960

7G

250

08

Rajan

W-515048

7G

09

Rajan

W-515043

10

Quelle

11

Short Shipped Qty

Ship Date

Remarks

1-Aug 10

9-Aug

Process Loss

29-Aug 29-Aug

2-Aug

GSGL-1

2

6-Aug

Process Loss

248

2

6-Aug

Process Loss

200

194

6

11-Aug

Process Loss

7G

222

218

4

11-Aug

Process Loss

7824

7G

67

66

1

11-Aug

Process Loss

Zara

5747/830

7G

271

248

23

11-Aug Assortment Problem

12

Zara

5747/830

7G

271

4

13

Rajan

MK-516086

7G

226

223

14

Rajan

MK-516076

7G

66

66

17-Aug

15

Sears

TSF5-3530

7G

500

504

21-Aug

16

Quelle

7610

7G

1000

1003

25-Aug

Sub Total (7GG)

3323

2990

41

Grand Total

5152

4617

51

13-Aug Shiped From Orchid 3

17 18

7G

19

7G

20

7G

hipment Target Status

17-Aug

Process Loss

SL

Buyer

Style/P.O No

GG

Total Order Qty

Shipment Target Actual Revised

Remarks

01 02 03 04 05 Total

____________ Prepared By

________________________ Production-Co-Ordinator

________________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Shipment Details Date : 02.08.2005

All Figure In DZ

Month : July' 2005 SL

Buyer

Style/P.O No

GG

Total Order Qty

Shipped Qty

Short Shipped Qty

Ship Date

Remarks

01

Sears

1311

5G

228

226

2

4-Jul

Process Loss

02

Sears

3516

5G

501

495

6

10-Jul

Process Loss

03

Sears

1330

5G

175

179

0

17-Jul

04

Bernardi

237/W

5G

180

180

0

31-Jul

1084

1080

8

Sub Total (5GG) 05

G.Gold

27822

7G

250

140

Partial

5-Jul

06

Sears

1304

7G

322

323

0

7-Jul

07

G.Gold

27822

7G

250

110

Partial

10-Jul

08

Bernardi

05/C-46W

7G

363

83

Partial

15-Jul

09

Bay-City

162979

7G

1000

500

Partial

17-Jul

10

Bay-City

162989

7G

750

413

Partial

17-Jul

11

G.Gold

17653/8039

7G

200

196

4

17-Jul

12

Bay-City

162979

7G

501

200

Partial

18-Jul

13

Bay-City

162989

7G

338

150

Partial

18-Jul

14

Bay-City

162979

7G

250

250

0

20-Jul

15

Bay-City

162989

7G

188

188

0

20-Jul

16

Rajan

MK-412654

7G

200

140

60

20-Jul Applique Dyeing Quality Rejec

17

G.Gold

17653/8040

7G

418

330

88

23-Jul

18

G.Gold

17653/8041

7G

300

130

Partial

24-Jul

19

G.Gold

17653/8041

7G

300

150

Partial

26-Jul

20

Bernardi

05/C-46W

7G

280

280

0

31-Jul

Sub Total (7GG)

5910

3583

152

Grand Total

6994

4663

160

Fack Fur Short.

hipment Target Status SL

Buyer

Style/P.O No

GG

Total Order Qty

Shipment Target Actual Revised

Remarks

01 02 03 04 05 Total

____________ Prepared By

________________________ Production-Co-Ordinator

GLOBAL KNIT-WEAR LTD

________________ Plant-In-Charge

269 DEWAN HAT CHITTAGONG

Shipment Details Date : 02.07.2005

All Figure In DZ

Month : June' 2005 SL

Buyer

Style/P.O No

GG

Total Order Qty

Shipped Qty

Short Shipped Qty

Ship Date

01

Sears

1309

5G

272

273

0

4-Jun

02

Sears

50108

5G

594

585

9

26-Jun

03

Sears

3531

5G

500

486

14

26-Jun

04

Sears

1307

5G

276

274

2

14-Jun

05

G.Gold

7548

5G

100

94

6

28-Jun

1742

1712

31

Sub Total (5GG) 04

Sears

1304

7G

260

260

0

4-Jun

05

Bay-City

366/367

7G

2643

1280

Partial

9-Jun

06

Sears

1310

7G

342

338

2

12-Jun

07

Quelle

2479

7G

217

218

0

15-Jun

08

Quelle

2480

7G

167

167

0

15-Jun

09

Quelle

2481

7G

183

181

2

15-Jun

10

Bay-City

366/367

7G

2560

1264

Partial

15-Jun

11

Quelle

2482

7G

167

158

9

30-Jun

12

Quelle

2485

7G

167

159

8

30-Jun

13

Quelle

2486

7G

167

164

3

30-Jun

Sub Total (7GG)

6873

4189

24

Grand Total

8615

5901

55

Remarks

hipment Target Status SL 01 02

Buyer

Style/P.O No

GG

Total Order Qty

Shipment Target Actual Revised

Remarks

03 04 05 06 07 Total

____________ Prepared By

________________________ Production-Co-Ordinator

________________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Shipment Details Date : 02.06.2005

All Figure In DZ

Month : May' 2005 SL

Buyer

Style/P.O No

GG

Total Order Qty

Shipped Qty

Short Shipped Qty

Ship Date

01

Rajan

MK-412692

5G

200

200

0.00

15-May

02

G.Gold

007999

5G

500

400

Partial

15-May

03

Eurofrente

08206

5G

119

120

18-May

04

Eurofrente

08207

5G

219

220

18-May

05

Wehemer

WR-01

5G

427

427

25-May

1465

1367

0.00

5G

Sub Total (5GG) 08

Rajan

MK-413066

7G

200

200

0

15-May

09

Rajan

Mk-412727

7G

300

260

Partial

15-May

10

Rajan

MK-412727

7G

40

36

4

16-May

11

Rajan

MK-413076

7G

300

298

2

16-May

Remarks

Sub Total (7GG)

840

794

6

Grand Total

2305

2161

6

hipment Target Status SL

Buyer

Style/P.O No

GG

Total Order Qty

Shipment Target Actual Revised

Remarks

01 02 03 04 05 06 07 Total

____________ Prepared By

________________________ Production-Co-Ordinator

________________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Shipment Details Date : 02.05.2005

All Figure In DZ

Month : April' 2005

SL

Buyer

Style/P.O No

GG

Total Order Qty

Shipped Qty

Short Shipped Qty

Ship Date

01

Bay-City

370

5G

567

567

0.00

24-Apr

02

Sears

1307

5G

271

269

2

28-Apr P.Loss & Quality Rejection

03

Sears

1308

5G

140

138

2

28-Apr P.Loss & Quality Rejection

978

974

4.00

04

5G

05

5G

06

5G

Remarks

07 Sub Total (5GG) 08

Bay-City

380-44/49

7G

2086.5

1043

Partial

6-Apr

09

Bay-City

380-44/49

7G

1044

446

Partial

11-Apr

10

Bay-City

380-44/49

7G

599

599

Partial

21-Apr

11

Quelle

7824

7G

67

62

5

28-Apr

12

Scope

58417

7G

138

138

28-Apr

13

Scope

58413

7G

138

138

28-Apr

14

Scope

58415

7G

138

138

28-Apr

15

Scope

59403

7G

138

138

28-Apr

Sub Total (7GG)

4348.5

2702

5

Grand Total

5326.5

3676

9

Printing Problem

16 17 18

hipment Target Status SL 01 02 03 04 05 06

Buyer

Style/P.O No

GG

Total Order Qty

Shipment Target Actual Revised

Remarks

07 Total

____________ Prepared By

________________________ Production-Co-Ordinator

________________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Shipment Details Date : 01.04.2005

All Figure In DZ

Month : March' 2005 SL

Buyer

Style/P.O No

GG

Total Order Qty

Shipped Qty

Short Shipped Qty

Ship Date

01

G.Union

C-603

5G

300

300

12-Mar

02

G.Union

C-603 B

5G

125

125

12-Mar

425

425

03 04 05 06 07 Sub Total (5GG)

0

08

N.Mann

115/149

7G

356.25

356.92

10-Mar

09

G.Union

38497

7G

225

225

12-Mar

10

Casabawa

Dec 04-A

7G

220

220

22-Mar

11

Casabawa

Dec 04-B

7G

176.67

176.67

22-Mar

12

Bay-City

380-44/49

7G

2917.5

831

13

N.Mann

115/827

7G

152.92

155.17

30-Mar

14

G.Union

6596

7G

350

350

31-Mar

15

G.Union

38497

7G

350

350

31-Mar

Partial

30-Mar

Remarks

16 17 18 Sub Total (7GG)

4748.34

2665

0

Grand Total

5173.34

3090

0

hipment Target Status SL

Buyer

Style/P.O No

GG

Total Order Qty

Shipment Target Actual Revised

Remarks

01 02 03 04 05 06 07 Total

____________ Prepared By

________________________ Production-Co-Ordinator

________________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Shipment Details Date : 02.02.2005

All Figure In DZ

Month :January'2005 SL 01 02

Buyer

Style/P.O No

GG

Total Order Qty

Shipped Qty

Short Shipped Qty

Ship Date

Remarks

03 04 05 06 07 Sub Total (5GG) 08

0

0

0

500

501

0

Sub Total (7GG)

500

501

0

Grand Total

500

501

0

N.Mann

115/827

7G

09

7G

10

7G

11

7G

12

7G

13

7G

14

7G

15

7G

17-Jan

16 17 18

hipment Target Status SL

Buyer

Style/P.O No

GG

Total Order Qty

Shipment Target Actual Revised

Remarks

01 02 03 04 05 06 07 Total

____________

________________________

________________

Prepared By

Production-Co-Ordinator

Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Shipment Details Date : 02.01.2005

All Figure In DZ

Month :December'2004 SL

Buyer

Style/P.O No

GG

Total Order Qty

Shipped Qty

Short Shipped Qty

0

0

0

Ship Date

01 02 03 04 05 06 07 Sub Total (5GG) 08

Sears

2298

7G

433.33

419.83

13.5

5-Dec

09

N.Mann

115/149

7G

1250

1241.83

8.17

9-Dec

10

Karstadt

K-03

7G

417

342

75

9-Dec

11

Seras

2300

7G

400

400.17

0

28-Dec

12

Zara

5747/001

7G

1566.7

1567

0

30-Dec

Sub Total (7GG)

4067.03

3970.83

96.67

Grand Total

4067.03

3970.83

96.67

13

7G

14

7G

15

7G

16 17 18

Remarks

hipment Target Status SL

Buyer

Style/P.O No

GG

Total Order Qty

Shipment Target Actual Revised

Remarks

01 02 03 04 05 06 07 Total

____________ Prepared By

________________________ Production-Co-Ordinator

________________ Plant-In-Charge

GLOBAL KNIT-WEAR LTD 269 DEWAN HAT CHITTAGONG

Shipment Details Date : 01.12.2004

All Figure In DZ

Month :November'2004 SL

Buyer

Style/P.O No

GG

Total Order Qty

Shipped Qty

Short Shipped Qty

Ship Date

01

Eufrenty

08206

7G

250

244

6

11-Nov

02

Eufrenty

08207

7G

167

164.5

2.5

11-Nov

03

Eufrenty

08231

7G

78.5

78.42

0

11-Nov

495.5

486.92

8.5

04 05 06 07 Sub Total (5GG) 08

N.Mann

115/509

7G

132.92

133.17

0

4-Nov

09

N.Mann

115/667

7G

125

127.17

0

10-Nov

10

Hong Song

YS-14214

7G

1179

1162

17

12-Nov

11

Quelle

3532

7G

33.33

33.33

0

11-Nov

Remarks

12

Karstadt

K-03

7G

417

4.5

Partial

13

Casabawa

Nob-10 B

7G

83.33

92

14

Hong Song

WS-14212

7G

332

320

12

15

Hong Song

YS-14213-S

7G

604

599.17

4.83

Sub Total (7GG)

2906.58

2471.34

33.83

Grand Total

3402.08

2958.26

42.33

27-Nov 27-Nov 29-Nov

16 17 18

hipment Target Status SL

Buyer

Style/P.O No

GG

Total Order Qty

Shipment Target Actual Revised

Remarks

01 02 03 04 05 06 07 Total

____________ Prepared By

________________________ Production-Co-Ordinator

________________ Plant-In-Charge

58 7980 8038

Problem

Weight

var Swtr.

900

996

VAR Swtr.

Problem

ng Problem

Problem

VAR Swtr.

VAR Swtr.

5688

10008

g Problem

Problem

Problem Orchid

Quality Rejec

y Rejection

y Rejection

Related Documents

Monthly Production Report
November 2019 45
Production Report
November 2019 50
Monthly Uptime Report
November 2019 19
Monthly Report Oct
May 2020 9
Monthly Report Feb
May 2020 15
Monthly Report Rewa
April 2020 3