Mohammad Ali Cv

  • Uploaded by: Mohammad Ali
  • 0
  • 0
  • May 2020
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View Mohammad Ali Cv as PDF for free.

More details

  • Words: 3,743
  • Pages: 8
CURRICULUM VITAE OF

MOHAMMAD ALI Phones: +880-1730022323 and +880-1819129852 (Bangladesh). Emails: [email protected] and [email protected] (private and preferred), Skype: md_ali_881 SUMMARY OF QUALIFICATIONS: Having about 12 years of working in WaSH sector for different context like development, DRR, resilience and emergency at different positions ranging from field level to managerial positions. My key areas of expertise include but not limited within project cycle management, and budget management, logistics and administration, HR and grants, and relationship with donors and stakeholders. I have managed multinational, multicultural and multifunctional teams of different sizes. I believe in participatory approach in team’s work and provide necessary guidance and assistances to the team to achieve team and organizational goals and objectives. Also have ability to demonstrate of strategic thinking and operational planning in any context. I have good understanding and capacity to introduce information technology in different kind of program in an innovative way. Currently I am focusing private sector engagement; promoting market based and cash programming which is considered as a new dimension of humanitarian program. Also networking with educational institution for research and collaborative work.

Being engaged in the environment of Humanitarian Sector I would like to devote myself in discharging responsibilities to be a successful personality through hard work, dedication and sense of humanity in me. EDUCATION AND RELEVANT TRAINING:  PGD in Disaster Management Institute of Disaster Management and Vulnerability Studies (IDMVS), University of Dhaka, in 2015



Masters in Public Health (MPH) (Major in environmental and occupational health and safety) State University of Bangladesh, Dhaka in 2014



Master of Science in Environmental Engineering Department of Civil Engineering Bangladesh University of Engineering and Technology (BUET), Dhaka, Bangladesh, in 2012



Bachelor of Science in Civil and Environmental Engineering Department of Civil and Environmental Engineering (CEE) Shah Jalal University of Science & Technology (SUST), Sylhet, Bangladesh, in 2004.



Higher Diploma in Computer Science & Engineering National Youth Development & Self employment Academy (NYDSA), Dhaka, in 1998

Major Trainings ReceivedToT on Sphere (version in 2012) Jointly Sphere Bangladesh Community and IFRC in Cox’s Bazaar, Bangladesh.

Cash Transfer Programming- Level 2 ECHO, Dhaka, 29 Nov. – 03 Dec. 2015

Management & Leadership Skills Development Programme Context, Jointly organized by Oxfam, Stat Network, MzN, UKAID; May 2015 -Jan.2016

Evaluation in Humanitarian Settings UNICEF, 2015 (online course certificate)

Cash Transfer Programming IFRC, 2015, (online course certificate)

Cash Transfer Programme, Level 2 CWG, 29 Nov.-03 Dec. 2015

Mohammad Ali’s CV

1

WASH and Market Training Oxfam, Khulna, 5-11 December 2014

Pre-crises Market Mapping and Analysis (PCMMA) CWG, 06-15 Dec. 2015

More Than Just a Roof Global Shelter Cluster, 2015 (online course certificate)

Sphere Handbook in Action Sphere, 2015, (online course certificate)

Technical Project Management for WASH Emergencies (online course certificate) ECB (Emergency Capacity Building) & Oxfam, August 2012

EMPact – Emergency Management Programme Oxfam, Bangkok, Nairobi and Senegal 2012-2013

GIS and GPS Training Logistic Cluster, WFP, Dhaka, 1-4 July 2013

‘HELIOS’ Supply Chain Management Oxfam, Dhaka, May 2013

Humanitarian Logistics and Risk Management, Oxfam Humanitarian Capacity Building, 9-13 June, 2013

Partnership and Logistics Learning (PALL) Oxfam, 27 February – 1st March, 2012, Dhaka, Bangladesh.

ToT on Wash in Emergencies Bangladesh WASH Cluster, Conduct by: RedR India, 4 - 7 July, 2011, Dhaka, Bangladesh

Earthquake Safety Construction Techniques Sylhet City Corporation and NARRI Consortium, BNUS-BUET 29 - 31 December, 2011

Climate Change Diplomacy (online course certificate) DiploFoundation, Malta, November 15 to December 14, 2009

Becoming an e-tutor UNITER and United Nation University, 3 – 7 August 2009, New Delhi

Governance in Urban Sanitation (E-Learning Course) UNITER and UN-ESCAP, 23 March to 15 May 2009

Sector Governance in Urban Sanitation (E-Learning Course) InWEnt Germany & World Bank Institute September 29 - November 30, 2008

Disaster Risk Reduction, Vulnerability, Analysis and Disaster Management Organized by: Concern Universal & YPSA, March 3-6, 2008

GIS & Remote Sensing Khulna University Conducted by: ERDAS India Private limited & ESRI,19-29 August 2004

Statistical Package for Social Science (SPSS) Society for Advance Health Learning, 2 June to 2 July 2005

Renewable Energy Technology- short course Center for Energy Studies – BUET & GTZ, 17-20 December 2006

GIS401: Introduction to GIS (Internet-based University Course) Dept. of Physical Geography & Ecosystems Analysis, and GIS Centre, LUND University, Sweden January – December 2005

Water and Environmental Sanitation (Advance Training Course) Institutional Development Services Linkage (IDSL), May 20-25, 2007

Capacity Building for Enhancing Local Participation in Water Supply and Sanitation Interventions in Poor Urban Area International Training Network Center (ITN), BUET, 9-10 December 2007

Mohammad Ali’s CV

2

Local Entrepreneurs Training on Composting, Eco-Toilet and Bio-gas Plant Dhaka Ahsania Mission & WSP-World Bank, 28 March – 31 April 2009

The operation of the Wegtech Potatest Kit for Bacteriological Analysis by Membrane Technique & PhysicoChemical Analysis Wagtech International, 15-16 November 2008

MAJOR TRAININGS FACILITATED1. WASH in Emergency. Batch #3, Oxfam OHCB project 2. Local Resource Training on Improved and Sustainable Sanitation Technologies 3. ToT on Water Safety Plan (WSP) and Hygiene. 4. Local Resource Training on Improve Sanitation Technologies. 5. Local Entrepreneur Participation in Sustainable Sanitation Technology Improvement. 6. ToT for Disaster Friendly Water & Sanitation. 7. Training workshop on UP lead Disaster Friendly Water & Sanitation. 8. WASH Hardware Support 9. Water Supply & Waste Management 10. Advance Training on Water & Environmental Sanitation 11. TOT on Hygiene Promotion & Water Supply Technology 12. TOT on Hygiene Promotion & Tube well caretaker 13. Humanitarian principles and standards PROFESSIONAL HISTORY: Public Health Engineer Coordinator | Oxfam GB, Bangladesh | June 2015 to date (16MM+) Public Health Engineer | Oxfam GB | Jan 11- May 15 (53 MM) This position under humanitarian department and meant for providing efficient and effective technical support for emergency response, resilience program and capacity building. Works in collaboration with the country logistic, finance and advocacy teams and contributes with inputs from his skill sets and experience. Proving overall leadership and management to a Public Health Engineer field in different project location. Technical supervise: • Promoting market-based responses to emergencies through WASH market mapping and analysis – funded by OFDA/USAID. • Resilient WASH (Water Sanitation and Hygiene) program in Bangladesh – funded by Oxfam Australia and Thankyouwater. • Urban Resilience Bangladesh- funded by Pioneer • Improving the demand for, access to, and utilization of improved WASH facilities and services using the School Led Total Sanitation approach as part of the Rural Water Supply, Sanitation and Hygiene in Difficult and Hard-to-Reach Areas of Bangladesh – funded by UNICEF Bangladesh • Arsenic Rehabilitation Program of GoB UNICEF Project • Early Recovery Project : Flood 2014 – funded by ECHO • Emergency UDL - WASH Innovation project 11 – funded by Oxfam • Solar Operated Water Supply System in Arsenic and Saline prone area – funded by GDS Trust project • Resilience through Economic Empowerment, Climate Adaptation, Leadership and Learning- Scale up and Extension (REE-CALL SUE) project – CFW and WaSH component – funded by DFID. • Solar Operated Water Supply System in Saline prone area, Dacope – funded by SOJ • WASH Innovation-13-14: Community based water system in saline affected coastal district- funded by Oxfam • WASH innovation learning in combination with local practice - funded by Oxfam • Oxfam Humanitarian Capacity Building (OHCB) Project – Contingency Stock, Interactive Learning Portal and Conduct WASH in Emergency – multi affiliate • Alia extension project - ECHO Funded project • Alia Rehabilitation Project - UNICEF Funded project • Emergency Aid in Favour of Communities Affected by Floods and Water-logging in Bangladesh- funded by ECHO • Flood Resistant Shelter for South-West Region of Bangladesh (FRESH) -12,000 family shelters along with toilets. funded by DFID • Resilience through Economic Empowerment, Climate Adaptation, Leadership and Learning (REE-CALL) - CFW and WASH intervention. Networking: Mohammad Ali’s CV

3

• •

Actively involved in all Join Need Assessment, Cluster Need Assessment Actively involved with WASH and Shelter Cluster

Innovation and Knowledge Management: • Smart Information Management System (SIMS) for Humanitarian Projects is one innovation • Oxfam Humanitarian Learning Portal is one initiative Job Summary: • Support partners for selecting best and competitive vendors in order to purchase quality materials required for the implementation of project activities. • Support partners to adapt and construct the watsan facilities following agreed design, drawing, BoQs etc. If necessary evelop further design, drawing, BoQs etc. • Taking own initiative for assess capacity building needs of project staff of partners, organize and facilitate need based training with necessary support of PHE and PHP coordinators. • Support partners’ staff to monitor the construction of watsan facilities and water quality testing. • Responsible for continuous monitoring the consistency of the project plans and objectives with existing polices e.g. on gender, the less-abled, marginalized etc. • Responsible to ensure that the work aims to meet Minimum Standards and adheres to Oxfam’s Ways of Working (best practice) protocols and mandatory requirement of WASH. • In coordination with partners’ project staff produce/ update survey and monitoring formats and guide partners to use effectively. • Establish effective coordination with local DPHE, LGIs, UN agencies, WASH cluster, local and international NGOs through partners. • Responsible to monitor, document, analyse and preparation of reports including assessment like rapid and in-depth. Team Leader Public Health Engineer | Oxfam GB, Nepal | June- August 2015 (3MM) This position is meant for providing efficient and effective technical support to response program in Shindupalchak one of the badly affected area of Nepal Earthquake. Here he just not only ensure the first phase emergency response (WASH NFI, Shelter kit) distribution and fixing water supply system and maintain collaboration and coordination with local government and clusters but ensure accurate judgment in using Oxfam Minimum Standard. He works in collaboration with the programme and senior leadership teams and contributes with inputs from his skill sets and experience. Proving overall leadership and management to a team of 3 in Oxfam and 4 in partner level public health engineer. Reason for leaving- it was three months deployment at Nepal Earthquake Response Project Coordinator | Japan International Cooperation Agency (JICA)| Jan 11- May 15 (18MM) This position main role was to provides strategic and operational support to the Project for “Strengthening of Solid Waste Management in Dhaka” following the Clean Dhaka Master Plan for Solid Waste Management. • • • • • • • • • • •

Develop new waste collection system in the selected wards and introduce compactor to counterpart and community people. Assist in implementing Ward Based Approach (WBAs) in different wards to improve the waste management system. Develop project implementation plan with team and support the project staff to cope with any change management. Ensure an enabling environment to perform their job at highest possible standard by providing logistics, vehicles and other materials. Update the project team on new approaches/ policies/ interventions. Make correspondence at various levels independently and maintain regular coordination liaison, networking and advocacy with counterpart and stakeholders. Provide capacity enhancement support to the Counter Part (DCC Consrevency Inspector) of the project through Organize event like open discussion, orientation, workshop, seminar, training and exposures. Prepare activities report and other documents with team as required. Develop training manual and IEC materials. Event management and reporting.

Reason for leaving- project phasing out and end of contract Project Engineer | Dhaka Ahsania Mission | November 10-May 11 (36 MM) This position was under the WASH program of DAM and provide technical support for field operation, capacity building and proposal development. Maintain collaboration with WASH sector.

Mohammad Ali’s CV

4

Technical supervise: • Scaling up and Sustainability of Total Sanitation in Bangladesh(SSTSB)- Funded by WSP-World Bank • Vulnerability Mapping and WatSan Component (VMWC) Project- Funded by Concern Universal, CORDAID, European Commission • Disaster Risk Reduction through WatSan - Funded by Concern Universal, Irish Aid • Decentralized Total Sanitation Project (Dishari) - Funded by WSP – World Bank, Plan Bangladesh, WaterAid Bangladesh Job Summary: • Provide technical support to find out the technological options for respective remote location considering geographical and social aspects. • Explore to develop more durable latrine options and action for filling up latrine. • Develop skill of entrepreneurs for providing better service in WatSan. • Assist to develop multi indicator monitoring system and provide follow-up support to monitor the field progress as per developed tools. • Develop staff and stakeholders skill in relation with technological aspects on WatSan. • Event management and reporting. • Develop details tender document for hardware construction • Develop details GIS based vulnerability Map of project area. • Facilitate water point data collection and carryout water quality test. • Provide technical support to UP in design, estimate, tendering and supervision of hardware construction activities in relation to community schem. • Field implementation Sanitation Information System (SIS) - WatSan Monitoring by using GIS Innovate sustainable latrine model • Program support in Planning, Implementation, Budgeting, Monitoring and Evaluation; Methodology development and analytical studies related to implementation of projects; • Effectively network and work in collaboration with a range of partners like local/line government departments, NGO Coalition, media, community based organizations, NGOs, donor agencies; • Project documentation and reporting (organizational like monthly, quarterly, annual, reviews, business plan and donor); • Develop new project proposals and ideas for submission to donor; Reason for leaving: Supporting project partner (WSP-World Bank) phase out. Research Assistant | Institute of Water and Flood Management (IWFM)-BUET | September 09November 10 This position was to assist research team leader “Estimation of potato yield in and around Munshigonj using Remote Sensing Sensing NDVI data” under Institute of Water and Flood Management (IWFM), Bangladesh University of Engineering & Technology (BUET), Dhaka, Bangladesh. GPS Survey, Satellite Image Processing & Analysis, Data Analysis, GIS mapping & Analysis, Report Writing was main responsibility. Reason for leaving: 6 months contract basis and end of the assignment. Program Assistant | Japan International Cooperation Agency (JICA) | July 09-April 10 This position was one the expert team member JICA Study Team to develop “Clean Dhaka Master Plan 2015”- solid waste management for the Dhaka city corporation. • Organize seminar and conference. • Networking between different City Corporation • Assist in capacity building of conservency inspector of DCC. Program Organizing • Admistrative work, documentation and coordination with study team • Communicating and work with counterpart DCC and NGOs. • Correspondents with the JICA HQ, Japanese Media Delegates • Provide support in GIS and other research work Reason for leaving: 6 months contract basis and Phase out. Environmental & Safety Inspector| Abdul Monem Ltd. – Rupali Traders JV| Jan08-June 08 (3MM) It was a project under Water Development Board project titled Jamuna – Meghna River Erosion Mitigation Project (JMREM P), PIRDP, Contract Package No.JMREMP/P4/2005 – funded by ADB • Regular monitoring environmental parameters and labour safety

Mohammad Ali’s CV

5

• •

Providing training to staff and worker Preparing monthly environmental compliance report for ADB, BWDB and NHC consultant.

Reason for leaving: under three month contract. LANGUAGE:  Bengali as mother tongue.  Fluent in English. IT SKILLS:  Applications Software : MS Office Suit and Outlook.  Project Management Software: People Soft and HELIOS.  Engineering Software : AutoCAD, Lindo  Photo editing Software : Photoshop, Illustrator  GIS & RS Software : Arcview 3.2, ArcGIS 9.X, ERDAS Imagine, ENVI  Computer Hardware : Computer Assembling and Trouble shooting. PROFESSIONAL MEMBERSHIP:  Member of Institute of Engineer, Bangladesh (IEB); M-23803 (www.iebbd.org) TRAVELS IN PROFESSIONAL CONNECTION:  India, Nepal, Thailand, Kenya and Senegal. PUBLICATION: a. Disaster Friendly Water and Sanitation Technologies – An Introduction, August 2009 b. Sanitation Catalogue for Rural Community, March 2010 (include different option for latrine, solid waste and liquid waste management, latrine for different hydro geological area, emergency latrine option):Published by DAM, WSPWorld Bank for Bangladesh Government c. Rural Sanitation Engineer Training Manual (review): Published by DAM, WSP-World Bank, Plan BD, WAB; 2007. d. Participatory Solid Waste Management – Training Manual, November 2008, Published by JICA and Dhaka City Corporation e. Training Manual for the Improvement of Service of PCSP (Primary Collection Service Provider), March 2010, Published by JICA and Dhaka City Corporation f. Construction Manual of Solar Operated Pond Sand Filter (PSF) g. Operation and Maintenance manual of Solar Operated Minipiped Water Supply System h. Construction and Operation- Maintenance manual of Arsenic Iron Removal Plant (AIRP) i. Construction and Operation- Maintenance manual of Slow Sand Filter (SSF) j. Water Quality Testing Field Guideline Manual MANUAL/ MODULE: a. b. c. d. e. f. g. h. i. j. k. l. m. n. o. p. q. r.

Construction Manual of low cost Resilient Sanitation Option Construction Manual of Tubewell with Resilient Platform Option Operation and Maintenance manual of Solar Operated Minipiped Water Supply System Training Manual: Water and Environmental Sanitation Upazill based Waste Management System (Solid waste and wastewater management for pari-urban and rural area) Sanitation options for Char (island) (installation guide for different model ). Module: Caretaker Training on Operation and Maintenance (#6 and Deepset hand tubewell and latrine). Need Assessment on Disaster Friendly WatSan Facilities Training on Water Safety Plan Construction and user manual of Bio-gas plant (bangla) Manual on preparation of compost fertilizer from waste. (bangla) Ecological Sanitation Concept Manual. (bangla) Health Care Waste Management Manual. (bangla) Household based waste management and composting. (bangla) Environment Friendly Waste Management System. (bangla) Training Manual on Community Mobilization focused on Disaster friendly Water & Sanitation Rain water harvesting construction handbook (draft) Bio-gas plant construction and user manual (bangla)

Mohammad Ali’s CV

6

CONSULTANCY WORK: GIS Specialist “Updating Natural Resource Inventory of St. Martin’s Island” under the project BGD/99/G31- Coastal and Wetland Biodiversity Management Project, Implementation of Biodiversity Conservation Management Plan of St. Martin’s Island ECA, submitted to Department of Environment & UNDP. Team Leader of Initial Environmental Examination (IEE) & Environmental Impact Assessment (EIA) a) Norban Comtex Ltd., Sarabo, Kashimpur Union, Gazipur (Near DEPZ-Saver) b) Grameen Healthcare Services Ltd. - Grameen Green Children Eye Hospital, Bogra. c) Grameen Healthcare Services Ltd. – Second Grameen Eye Hospital, Borishal. d) EURO Battary Ltd. Team Leader of Initial Environmental Examination (IEE) & Environmental Management Plan (EMP) a) Grameen Veolia Water Ltd.- Goalmary Surface Water Treatment Plant Technical Evaluator "Humanitarian Assistance for Community Based Disaster Preparedness South Bangladesh, Khulna District", implementing organizations Prodipan and Nabolok. RESEARCH EXPERIENCES: • “Functionality analysis of EcoSan latrines in rural areas of Bangladesh based on environment and health aspects” - The thesis in partial fulfillment of the degree of M.Sc. in Environmental Engineering, BUET • “Status of Blood Pressure Among The Population in Selected Saline Prone Area of Bangladesh”- The thesis in partial fulfillment of the degree of Masters in Public Health, SUB • ‘Application of GIS in Solid Waste Management in Dhaka City Corporation’ submitted to Department of Civil Engineering, BUET. • “Feasibility Study of Micro-Credit Supporting to Primary Solid Waste Collection Service Provider” – jointly done by TMSS & JICA Study Team and submitted to Dhaka City Corporation. • Estimation of potato yield in and around Munshigonj using remote sensing NDVI data, a research project of Institute of Water and Flood Management (IWFM), Bangladesh University of Engineering & Technology (BUET). • Under Graduate Thesis on “River System & Flow Routing of North East Region of Bangladesh”, Under supervision of Chowdhury,Reazul Kabir, Lecturer, Department of Civil and Environmental Engineering , Shahjalal University of Science and Technology, Sylhet, and co-supervision of Late Hasan Ali , GIS specialist, Center for Environmental and Geographical Information Services (CEGIS), Dhaka, Bangladesh. • “Cyclone, a Natural Disaster : Its Risk and Vulnerability in the Coast of Bangladesh” organized by the Department of Civil and Environmental Engineering of Shah Jalal University of Science and Technology, Sylhet, Bangladesh. • “Water Supply and Low Cost Sanitation Technologies in Rural Bangladesh” was conducted by the Department of Civil and Environmental Engineering of Shahjalal University of Science and Technology, Sylhet, Bangladesh. • “A Study on Health Care Waste Management System in Sylhet City Corporation”, presented in Health Care Waste Management Workshop; funded by WHO- Healthy City Program & Center for Environment and Human Development(CEHD). NATIONAL & INTERNATIONAL CONFERENCE PUBLICATION: A. Estimation of Potato Yield and Around Munshigonj Using Remote Sensing and GIS Techniques. International Conference on Water & Flood Management. Institute of Water and Flood Management (IWFM), BUET March 12-14, 2007, Dhaka, Bangladesh. B. Use of GIS for Logistics Management and Spatial Planning for Solid Waste Management: A Case Study for Dhaka City Corporation. Strategies for Waste Management, 8th Asian Academic Network for Environmental Safety and Waste Management., Department of Chemistry & Center with Potential for Excellence in Environmental Science, Anna University., December 10-13, 2006, Chennai, India. C. Environmental Pollution from Oil Refinery Industry. 3 rd Indian Conference on Quality, Environment, Energy and Safety Management System And 1 St National Conference On Business Excellence., Jadavpur University, Kolkata, India., February 5-7, 2004 at Jadavpur University, Kolkata, India. Mohammad Ali’s CV

7

D. Health Care Waste Management In Bangladesh: A Sustainable Guideline. International Conference On Environment & Development Institute Of Social Studies, Kolkata, India. February 3-7, 2004 at Science City, Kolkata, India. E.

Rainwater Harvesting: Comparison Between Existing Techniques And Its Modification. International Seminar on Architecture Overcoming Constrains., Department of Architecture, BUET, Dhaka, Bangladesh. Date / Venue: June 11-13, 2003 at BUET, Dhaka, Bangladesh

F.

Guidelines On Sustainable Health Care Waste Management In Bangladesh National Conference on Advances in Environmental Science and Engineering Indian Institute of Technology ,IIT-Bombay, India, December 8-9, 2003, IIT-Bombay, India http://www.cese.iitb.ac.in/conference/listofpapers.htm

G. Forecasting Water Level of the Jhalukhali river of Shunamganj by Distributed Flood Routing International Conference on Applied Mathematics & Mathematical Physic-2005, Department of Mathematics, SUST, Sylhet, Bangladesh., January 4-7, 2005, SUST & Leading University, Sylhet, Bangladesh.

PERSONAL INFORMATION:

National ID No : Father’s Name : Mother’s Name : Present Address: Permanent Address: Cell Date of Birth Nationality Religion Marital Status

: : : : :

2690246977100 Rustum Ali Akand Prof. Momtaz Begum House # 60, Flat # A5, Road # 26 (old) 15A (new), Dhanmondi R/A, Dhaka-1209, Bangladesh. House # 05 Shubastu Shapnil ,(3th floor), Flat #3C,Road#15(new),Dhanmondi,Dhaka-1209,Bangladesh. +88-01819129852 01 April 1978 Bangladeshi (By Birth) Muslim (Sunni) Single

REFERENCES:

Murshida Akhter | Humanitarian Program Manager | Oxfam | Email:[email protected] | Mobile: +8801730725672 Humayun Kabir | WASH Advisor | Save the Children-Yemen (now working from Amman) Email: [email protected] | Phone:+962-798242695 Dr. M.H. Faruquee | Assistant Professor | Department of Occupational and Environmental Health | Bangladesh University of Health Sciences | Email: [email protected] | Phone: +88- 01190405772 Kaiser Rejve | Humanitarian Programme Manager (HPM) | Oxfam in Vanuatu | Email : [email protected] | Phone : +6787104418 I, Mohammad Ali, do solemnly declare that the information provided above are entirely true. Signed: ______________________

Dated: 21 December 2015

Mohammad Ali’s CV

8

Related Documents

Mohammad Ali Cv
May 2020 10
Ali Cv
November 2019 5
Mohammad Hajjaj Cv
April 2020 9
Mubashir Ali Cv
November 2019 6
Ali Omar Cv
November 2019 7

More Documents from ""