Mobile Number Portability Contact Center Training
CS Standardization Team (QAST) Customer Services
Agenda What is MNP Basic Architecture Commonly Used Terms MNP Process Flow Activity Flow
CS Standardization (QAST) Customer Services
Slide 2
What is MNP? MNP – Mobile Number Portability is defined as: Ability of a cellular mobile service user to change his/her subscription to another cellular network operator while retaining his/her original directory number (including the Network Dialing Code/Operator prefix.
CS Standardization (QAST) Customer Services
Slide 3
Commonly Used Terms Donor: Existing Service provider who is providing service to the customer. Recipient: Service Provider where the customer wants to move for services. Port In: Process of activating a subscriber on the recipient’s network Port Out: Process of deactivating a subscriber from the donor's network
cont’d… CS Standardization (QAST) Customer Services
Slide 4
cont’d… Commonly Used Terms Snapback: Process of returning a mobile number to the original service provider (owner network) after deactivation on Recipient network. Porting St: A field in CRM (ePOINT) defining the status of Porting Activity at each phase.
CS Standardization (QAST) Customer Services
Slide 5
Basic Architecture PMD Mobilink
Ufone
NPG
NPG
Telenor
NPC
NPG
Paktel NPG
NPC: Number Portability Clearing House
Warid NPG
InstaPhone
NPG:
NPG
Number Portability Gateway
PMD: Pakistan MNP Database CS Standardization (QAST) Customer Services
Slide 6
Donor NPG
Donor
NPC
Recipient NPG
Recipient
PORT OUT
PORT IN
Donor will receive Port OUT from NPC via it’s NPG
Customer Walks In
Donor will carry out internal checks & update status
Post / Pre
Accept
Number will be Deactivated.
Hold
Reason for Hold will be updated .
Reject
Reason for Reject will be updated .
Postpaid Requirement - Security Deposit - CSAF - Port In Request Form - CNIC - Letterhead Request for Company Accounts Pre-paid Requirement - CSAF - Port In Request Form - CNIC
CSR will give SIM to customer & provide MNP Due Date
CSR will enter data in SYSTEM with SUSPENDED status. NOTE: Mobilink’s Port Out Checks Post-paid - Customer’s credit limit will be reduced to 60% of deposit. - In case of IR access level will be changed to ISD . - If customer does not have deposit customer will need to pay deposit. Prepaid
CSR will then run PORT IN script in e-POINT
Recipient's NPG will request NPC to update all operators.
ePOINT will send Port IN request to NPC via NPG All responses from NPC will be updated in ePOINT
Post-paid - Restoration Activities will be triggered Pre-paid - Number will be created on switch & IN then restoration will be triggered
Accept
Post-paid & Pre-paid - Mobilink will inform customer of reason for HOLD & revise the Due Date.
Hold
Post-paid & Pre-paid - Mobilink will inform customer of reason for REJECT.
Reject
CS Standardization (QAST) Customer Services
Slide 7
Mobile Number Portability: Basic Process Flow Point of Sale 1. Customer walks in to SC, FC 2. Requests Port IN Postpaid Case - Security Deposit - CSAF - Port In Request Form - CNIC - Letterhead Request for Company Accounts - Enter sale in Efics and GTI with suspended status - Number active in HLR/ Geneva/ePoint Prepaid Case - CSAF - Port In Request Form - CNIC - Enter sale in Efics with suspended status 3. CSR will issue SIM to customer and provide MNP due date 4. Run PORT IN Script in Point
Recipient CRM Sub St: Suspended Porting St: PORTING IN initiated Disconnect Reason: PORTED IN Activity St: Planned Sub St: Suspended Porting St: PORTING IN NPR Ack Disconnect Reason: PORTED IN Activity St: Planned
Recipient NPG NPR
NPC
Donor NPG
NPR
Donor CRM PORT OUT activity created automatically Sub St: Active Porting St: PORT OUT initiated Disconnect Reason: Activity St: Planned
NPR Ack
1. If IR, access level changed to ISD 2. CNC checks customer details Sub St: Suspended Porting St: PORTING IN Accepted Disconnect Reason: PORTED IN Activity St: Planned
NP Accept
NP Accept
Sub St: Active Porting St: PORTED IN Activity St: Complete
Yes
Sub St: Active Porting St: PORT OUT Accepted Disconnect Reason: Activity St: Planned NP Execute NP Execute
NP Ready NP Ready
1. Deactivate in Billing System/HLR/IN 2. Number is D-Tagged Sub St: Deactivated Porting St: PORT OUT Deactivate Disconnect Reason: PORTED OUT Activity St: Planned Sub St: Deactivated Porting St: PORT OUT Waiting for NP RFS Disconnect Reason: PORTED OUT Activity St: Planned
1. Restoration activity created automatically 2. Number Restored in Switch Sub St: Active Porting St: PORTING IN Send NP RFS Disconnect Reason: Activity St: Planned
Credit Limit decreased to 60% of Deposit Incase of Insufficient Deposit
Sub St: Suspended Porting St: PORTING IN Waiting for NP Ready Disconnect Reason: PORTED IN Activity St: Planned Sub St: Suspended Porting St: PORTING IN NP Ready Received Disconnect Reason: PORTED IN Activity St: Planned
Incase of Reject/Hold
Incase of Accept
Incase of Prepaid, Number is created on IN and Switch with suspended status Sub St: Suspended Porting St: PORTING IN Sales Activated Disconnect Reason: PORTED IN Activity St: Planned
Donor MNP Team
NP RFS
NP Activated Status
NP RFS Broadcast (To all operators) NP Activated
Sub St: Deactivated Porting St: PORTED OUT Completed Disconnect Reason: PORTED OUT Activity St: Complete
Call back for settlement of Reject/ Hold reason
Ask customer to make required deposit
Questions?
CS Standardization (QAST) Customer Services
Slide 9
Thank You
CS Standardization (QAST) Customer Services
Slide 10