CHECKLIST FOR PANEL ERECTION & COMMISSIONING PANEL NAME:
DATE:
PROJECT: SITE: AGENCY: Sr. no. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
Description Panel Erected on Foundation/Floor/Wall mounting. Any damage to the Panel & it's component observed/Physical inspection Panel Assembled in aligned & level position
Status Yes/No Yes/No Yes/No
The panels checked for correct vertical position. The switchboard panels tack welded / bolted at suitable intervals at base channel, only after all adjoining shipping sections are bolted to each other
Yes/No
Check tightness of each terminal in the panel Panel and Machinery is cleaned from dust by air blower & and checked for any fouling of hardware in chamber. IR values checked & recorded Check ability to access to every equipment terminal is easy Check AC source and AC loops Check all MCB ratings as per approved drawing Earthing of Panel Board given & Connected to Earth Grid Check AC socket and check ferrules for the cables Check cable into panel are properly sealed or glanded and terminated on suitable terminals on the panel Check color coding of incomer cable is marked Spare Cable Entry holes covered Cable tag is provided for all cables on Incoming /In and Out of Building/Bending of cables
Yes/No Yes/No > 500 M Ohm Ok/Not Ok Ok/Not Ok Ok/Not Ok Yes/No Yes/No Yes/No Yes/No Yes/No Yes/No
Remark
17 18
Check the feeder name is marked on MCC panel Checkdoor limit switch is working properly
For Akhsar Elec Infra PVT LTD
For INEOS STYROLUTION IND LTD
Remarks
Yes/ No Yes/ No