MIKTMV HnutVGf meeting Discussing abfdgdfb (3) Calculatggggget an7KTMd drawings of weir were discussed, and get the conclusion after discussing with that the stilling basin should also be calculatcsacsacsacsacsacsacsaed and give desiglkjrhtn of reinforcement, and after excavation, if rock SJNR4 is good, this cafdbbbbn be delete, it ilius determined on site. Designers should moKTM Vdify drawings to get apprhtedzhtdzfshbove.Xsacx (4) Calculfdfdfdfdfdfdfdation model of fhauxiliary powerhouse and drawings of columnsV , walls aERFQWnd foun7JYNT Vdation were dishbdffffffffffffffcussed. ers should 7TJNmodify drawings to get approve. (5)Calculation
of
model
of
pow;ll.knerhouse
was
discussed.
D7YTJNesigner should mNHEFFFFFFFFFFJNe model and the calculation sheet to get approve. The dra JNYGwings can be divided into.,JN m., 2 parts, but calculation sheet should be only one for easy rebfdbfNBRFFFFFFVXS . ouiUJN l should also be mentioned in drawings.iul (6)Calculation sheet and drawings of sJNG urg0IUUUUUUUUe tank, vertical shaft and inc e/.,/.,mail. dhf should modify drawings to get approve. (7)Drawings of penstock, anchor block and bhfddgdvcfgnryn is discussed, and
designer
should
moUJGGGGGGGGGGGGNH;O;O;O;O;O;O;O;O
together UHJNwith