Meeting Minutes - 14th Aug 2006

  • November 2019
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View Meeting Minutes - 14th Aug 2006 as PDF for free.

More details

  • Words: 527
  • Pages: 3
System Engineering 2 – Tutorial Class: Monday 5~7pm 14th-08-06 Present: McGlasson, Pillay, Tivari, Guo Zhou, Vu, D’sa, Shingadia, Kafle, Kong, Wong, Koh, Yang. Chairperson: T Ferris. Secretary: Vu. Tam Ha. Current Business: Students: 1. System ( from System team) • Shall meet CASA/FAA “Flight System” requirement as documented in AS… • Shall have produce for management of flight trips  Time/date  Staff/fight crew list  Passenger list  Fuel load • Shall produce for spacecraft maintenance  Engine/ proposition system  Navigation system  Avionic system  Spacecraft integrity inspection • Shall have commerce/ marketing department  Processing booking  Advertising  Legal and convenient representation  Legal document 2. Technical ( from Technical team) • Ground Terminal shall be monitoring the launch • Ground Terminal shall be capable aborting the launch • GT shall be monitoring the weather condition area of no less than 25 km • GT shall be able to monitor air traffic condition • Communication  Radar  GPS  Trajectory 3. Non-technical ( from non-technical team) • Cost ( 145.000.000 dollars) per passenger per flight • Age limit • Fitness/health level • Location

• Insurance • Passenger training • Transport to/from centre • Financially optimised flight • Ground support • Environmental friendly • Parking • Customer support: hotel, amenities • Comfortable 4. Safety ( from safety team) • Shall have emergency landing system • Shall have backup system in case of emergency • Shall have training for staff and passengers • Shall have communication capability in case of emergency • Shall have alternative emergency exit • Launching and landing site should be 20 km away from residential and agricultural area • Shall have safety equipped on board ( first aid kit, oxygen tank, fire extinguisher, space suit, life jacket) T. Ferris: 1. Verify CASA/FAA ‘Flight System” requirement specification 2. Requirement: the system shall produce a clearing air space is added to system requirements 3. Requirement: the system shall have ground station facility is added to system requirements 4. Requirement: ground terminal shall monitor the launch is to be change ground terminal shall monitor the whole flight 5. Requirement: GT shall be monitoring the weather condition area of no less than 25 km is to be change to GT shall be monitoring the weather condition area of no less than 200 km 6. Age limit is not considered as a requirement, the requirement is considered to be changed to fitness training. This will require training facility 7. Passenger training will require training facility 8. Requirement: Environmental friendly needs to be expanded to several sub requirements such as materials, emission, and hazardous level. 9. Requirement: Ground support needs to be expanded 10. Requirement: User friendly needs to be expanded 11. Requirement: System shall have back up system in case of emergency needs to be expanded 12. Requirement: launching and landing site shall have 20km away from residential and agricultural area need to be verified. Task: 1. Each group completes first draft of requirement specification respectively and send to other groups on Monday 2006-08-22.

2. Whole class analyses and discusses the documents to combine coherently to final draft which is due on Friday 2006-08-25

Related Documents

Fri 14th Aug Ratings
May 2020 14
Smm - 14th Aug 07
November 2019 9
Meeting Minutes
May 2020 24