1. TAS achievement 2019 ---- 99.32%
2. TAS Target 2019 TMD, GYELPOZHING Sl. No Parameter 1 Capital Works 2 Maintenance of Lines 3 Controllable Budget 4 Safety 5 Quality 6 Maintenance of Civil Infrastructures 7 Data Reporting 8 9 10
Weightage 0% 40% 10% 10% 5% 5% 5%
Physical verification of assets and inventories (fast, slow, nonmoving and obsolesce), adjustment of discrepancies on the books of accounts. Implementation of Material / Stores Management Audit issues Total
5% 15% 5% 100%
3: Evaluation criteria for Line Maintenance targets
Sl. No.
Particulars
1.
Measure footing resistance of towers using TFR test kit and take action to keep the values within limits.
Towers with high TFR to be rectified
20%
2.
Measure actual line lengths using the Transmission Offline Fault Locator kit
Lines whose measurement has not been carried out
20%
3.
Conduct thermographic imaging of conductors, insulators, clamps and connectors to prevent breakage of conductors, insulators, etc.
Critical locations
Target
Rating
10%
Sl. No.
Particulars
4.
Installation of polymer long rod insulator in one span of each voltage level
One span of each voltage level
20%
5.
Paint rusted structures with silicone based SiCoat paint.
Rusted towers
5%
6.
Conduct and submit GPS co-ordinates of towers For those towers not submitted
20%
7.
Installation of AWS
5%
3. Issue Land compensation of transmission tower - It’s under process at head office - TMD/ESSD office land registration
Target
At required locations
Rating