Project : 2E1 & 2E2, Bkt Rimau Subject : Summary Of Retaining Wall - 2E1 Breakdown Detail Of Retaining Wall Length Length after Width ddt r.c stiffener (m) (m) (m) 24.50
22.40
0.85
Date prepared : 13/7/01
Excavation (m3)
50mm bed blinding (m2)
39.15
20.83
Total Breakdown Detail Of R.C.Stiffener Length Width Height (m) (m) (m) 0.30
0.30
1.60
39.15
Qty (nr)
230mm thk conc. BRC A7 in in wall base wall base (m3) (m2) 4.79
20.83
Concrete (m3)
20.83 4.79
Fwk (m2)
20.83
Rebar (kg)
Fwk to side of wall base (m2)
340mm thk bwk (m2)
450mm thk bwk (m2)
11.27
20.16
15.68
11.27
Plastering (m2)
7
1.01
13.44
67.04
3.36
Total
1.01
13.44
67.04
3.36
20.16
15.68
75mm dia weep- Plastering hole at 3m c/c (nr) (m2) 7.47
43.46 7.47
43.46