Marsh Pt 3 Of 3

  • November 2019
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View Marsh Pt 3 Of 3 as PDF for free.

More details

  • Words: 83
  • Pages: 1
l.

Theres*ictiqnsshallbc in effectfor at least25 yearswittl automaticrenewalperiodsthereafter. j. If ths assosiationGea,$G$ fo exi_st, all of the lot ownen,parcel olurcfisor unit ownsnsshallbejointly andseve,rally respasible for operationandmainte,nance ofthe surfacewatermanagerrrent systm facilitiesin accordance with ttrercquiremecrts of the Environme#al Resouree Permil unlessanduntil an altemateentiryassumes responsibilityasexplainedin m H.it k. For projectswhich haveon-sitewetlandmitigntionasdefinedin section1.7.24which rcquiresorqgoing monitoringandmaintenanceo tlre deslamtisnof protectivecov$nants, deedrsstrictionsCIrdeclarationof con&miniunr shallinchde a provisionrequiringtheassociationto allocate

Paget4 October19,2005 - CII,APTERTWO- PassS sufficientfurds in its budgetfor monitoringandmainteirance of the wetlandmitigationarea(s)eachyearuntil the Dis&ictdeterminesthatthe area(s)is suceessful in accordance wittr the EnvironmentalResource Permit

Related Documents

Marsh Pt 3 Of 3
November 2019 11
Marsh Pt 1 Of 3
November 2019 5
Marsh Pt 2 Of 3
November 2019 10
Pt 3
November 2019 12
Christ Myth Pt 3
December 2019 10