PROCESS FLOW PELLET PLANT - 02 Iron ore fines bin 1 & bin 2
Reclaimer Iron ore fines stockpile Fe>64%
Iron ore having moisture content of 10% to 11% Iron ore Fe<63% Grinding unitBall mill
Wet Grinding 2 No’s of Ground Iron ore slurry tanks Thickener
Grinding is done to -45 micron size Iron ore Filter Cake bin 1 & bin 2
Ground limestone & coal bin Ground bentonite bin
6 No’s of Pressure filters
Vertical pan disc mixer
Mixing of filter cake, limestone + coal and bentonite is done
Moisture content of 8.5 to 9.5 %
Mixed Iron ore, additives and bentonite
19 March 2019
Ref. Page No. 163 of TPM Activity Report
Slide 1 of 48