Man8.pdf

  • Uploaded by: Muhammad Faizal Axel
  • 0
  • 0
  • October 2019
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View Man8.pdf as PDF for free.

More details

  • Words: 116
  • Pages: 1
Checking and adjusting start of fuel delivery

Fig. 8 The light signal transmitter KDEP 1601 (Fig.) is energized by its own power supply.

8 3393 b. Sleeve

ø15 ø12 ø9

Fig. 9

13

If a light signal transmitter is not available, good measurement results can also be achieved with a plug-in sleeve. The sleeve is to be made of aluminium or steel

15

30

29

Set engine to start of delivery as described above. Insert the sleeve into the governor housing up to the stop. The start of delivery is set exactly when the pointer for start of delivery is in the centre of the 3 mm bore in the sleeve.

ø3 9 2259

25

ø11

More Documents from "Muhammad Faizal Axel"

Man7.pdf
October 2019 6
Man8.pdf
October 2019 16
Man10.pdf
October 2019 12
Man9.pdf
October 2019 8