What is “Lean Manufacturing?” • Lean manufacturing is aimed at elimination of waste • Organize processes to add value to the customer • Deliver goods “just-in-time” • Service organizations also using lean
Basic Lean Principles • Add nothing but value – Eliminate “muda” – waste
• Do it right the first time • People doing the work add value – Team oriented
• Deliver on demand – “Pull” instead of push
History of Lean • “The Machine That Changed the World” • Toyota auto manufacturing • “Value chain”
Waste Categories • • • • • • • •
Overproducing Inventory Waiting Extra Processing Correction Excess Motion Transportation Underutilized People
OVERPRODUCIN G To producer sooner, faster or in Greater quantites than customer demand.
INVENTOR Y
RAW MATERIAL WORK IN PROGRESS OR FINISHED GOODS WHICH IS NOT HAVING VALUE ADDED TO IT.
INVENTOR Y
WAITING PEPOLE OR PARTS THAT WAIT FOR A WORK CYCLE TO BE COMPLETED.
WAITING
TRANSPORTATIO N
UNNECESSARY MOVEMENT OF PEOPLE ,PARTS OR MACHINES WITHIN A PROCESS.
REWORK Non right first time ,Repetition or correction of a process.
OVER PROCESSING
Processing beyond the standard required by the customer.
8th WASTE Potential of people
Flow Process Charts for Data Recording This chart uses
This chart is of 3 types:
circles for operations
Man – Activities of operator
arrows for transports squares for inspections triangles for storage letter D for delays.
machine - Manner in which the equipment is used
Before Layout Revision Sl. No . 1
Material - the changes the material undergoes in location or condition Process
Operation
M achine
Storage
From In trolley
2
Coining
Press
Sl. No.
Operation
Machine
3
Storage + Relief Plug Assy.
Trolley
1
Storage
In trolley
4
Ball Pressing
Press
Coining
Press
Storage
On the Machine
2
5 6
Leak Check
Air Gauge
3
Bearing Pressing
Press
7
Storage
Table
4
Ball Pressing
Press
8
Poppet assembly
Table
9
Bearing Pressing
Press
10
Storage
Table
11
Thrust washer Assy.
Poka-Yoke
12
Storage
--
Total
After Layout Revision
5 6
Leak Check& Poppet Assy. Thrust washer Assy.
Total 6
6
0
1
Process
Table PokaYoke 1
5
4
Vertical lines connect these symbols in the sequence they are performed.
0
0
0
BEFORE Before Layout Revision Sl. No . 1
Operation
M achine
Storage
From In trolley
2
Coining
Press
3
Storage + Relief Plug Assy.
Trolley
4
Ball Pressing
Press
5
Storage
On the M achine
6
Leak Check
Air Gauge
7
Storage
Table
8
Poppet assembly
Table
9
Bearing Pressing
Press
10
Storage
Table
11
Thrust washer Assy.
Poka-Yoke
12
Storage
--
Total
Process
Storage Process Inspection Waiting -
6
storage operation transportation
6
0
1
4
inspection waiting
6 6 1 4
AFTER After Layout Revision Sl. No.
Operation
Machine
1
Storage
In trolley
2
Coining
Press
3
Bearing Pressing
Press
4
Ball Pressing
Press
5 6
Leak Check& Poppet Assy. Thrust washer Assy.
Total
Storage - 1 Process - 5
Process
Table PokaYoke 1
5
0
0