List Of Past Pole)

  • Uploaded by: Kyle Schwartz
  • 0
  • 0
  • July 2020
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View List Of Past Pole) as PDF for free.

More details

  • Words: 461
  • Pages: 2
ANAND INDUSTRIAL ENTERPRISES (POLE DIVISION), FAIZABAD LIST OF PAST SUPPLIES & ORDER IN HAND 06.11.2008

-------------------------------------------------------------------------------------------------------------------------------------------------------------------------Sl. Complete postal address Order No. Quantity Supply Balance Period No. including designation of and date ordered of the authority placing order. (Nos.) (Nos.) (Nos.) supply --------------------------------------------------------------------------------------------------------------------------------------------------------------------------(a) (b) (c) (d) (e) (f) (g) --------------------------------------------------------------------------------------------------------------------------------------------------------------------------1. Dy.General Manager, 3109/Steel Cell-1/ 22,500 22,500 - Under delivery ESPC-III,UPPCL, Lko. PCC Poles/84-85/dt.31.01.85 schedule 2. do 1969/Steel Cell-3/ 21,000 21,000 PCC Poles/86-87/dt.3.9.86 3. do 1138/Steel Cell-3/ 5,000 5,000 PCC Poles/85-86/dt.22.6.87 4. do 1165/Steel Cell-5/ 15,000 15,000 PCC Poles/87-88/dt.27.7.88 5. do 780& 1856/Steel Cell-7/ 14,300 14,300 PCC Poles/88-89/dt.17.5.89 & 16.12.91. 6. do 529/Steel Cell-9/PCC Poles/ 8,200 8,200 91-92/dt.25.05.93 7. do 870/Steel Cell-11/ 8,800 8,800 PCC Poles/95-96/dt.16.11.95 8. do 749/Steel Cell-13/PCC Poles/ 11,000 11,000 96-97/dt.28.06.97 7,000 7,000 9. do 71/ESPC-3017/PCC Poles/ 10,000 10,000 dt.04.01.99 4,500 4,500 1,450 1,450 10. do 2511/ESPC-III/ 24,000 24,000 EE-II/3008/99-00/ PCC Poles(AIE)/31.08.00 2,400 2,400 11. do 3643/ESPC-III/ 8,000 8,000 EE-I/3032/2001-02/ 500 500 PCC POLES(AIE)/29.07.02 12. Ramjee Power RPC/AIE/03/1014 3,500 3,300 Construction (P) Ltd. dt.03.12.2003 Kumar Nivas, Ranchi 13. Dy.General Manager, 352-ESPC-II/VBK-472/04 3,200 3,200 ESPC-II,UPPCL, Lko. Dt.10.02.2005 Contd….2

(2) -------------------------------------------------------------------------------------------------------------------------------------------------------------------------Sl. Complete postal address Order No. Quantity Supply Balance Period No. including designation of and date ordered of the authority placing order. (Nos.) (Nos.) (Nos.) supply ---------------------------------------------------------------------------------------------------------------------------------------------------------------------(a) (b) (c) (d) (e) (f) (g) --------------------------------------------------------------------------------------------------------------------------------------------------------------------------14. M/s.Kalpatru Power Transmission Ltd. 8.5 Mtr. 2,181 2,181 Gandhi Nagar 15. M/s.Nagarjuna Construction Co.Ltd.,Hyderabad 8.5 Mtr. 1,665(180Kg) 1,665 9.0 Mtr. 1,519(300Kg) 1,519 9.0 Mtr. 1,665(300Kg) 1,665 9.0 Mtr. 204(400Kg) 204 16. M/s.Vijai Elecrtricals, Hyderabad 8.5 Mtr. 1,684(200Kg) 1,684 17. M/s.Jyoti Structure Ltd. 8.5 Mtr. 1,425(200Kg) 1,425 18. M/s.ICOMM Tele Ltd., Hyderabad 8.5 Mtr. 820(200Kg) 820 9.0 Mtr. 24(200Kg) 24 19. M/s.S.T. Electricals Pvt. Ltd., Lucknow 8.5 Mtr. 1,500 1,775 9.0 Mtr. 30 30 20. M/s.IVRCL Infrastructures & Project Ltd., Hyderabad 8.5 Mtr. 500 500 21. M/s.Utility Engery Tech, Lucknow 8.5 Mtr.15,000 15,000 9.0 Mtr. 3,266 3,266 22. M/s.Subash Project & Marketing Ltd., Kolkata 8.0 Mtr. 4,163 4,163 8.0 Mtr. 1,440 1,440 23. M/s.ABB Ltd., Lucknow 8.5 Mtr. 255 255 24. M/s.SPIC – SMO 8.5 Mtr. 990 990 25. M/s.ECI Engineering & Co., Hyderabad 8.5 Mtr. 300 300 26. Purvanchal Vidyut Vitran Nigam Ltd., Varanasi 8.5 Mtr. 1,980 1,980 27. M/s.ATSL 8.5 Mtr. 7,500 7,500 28. M/s.IVRCL 8.0 Mtr. 755 755 29. M/s.IVRCL 8.0 Mtr. 5,000 5,000 30. M/s.IVRCL 8.5 Mtr. 1,395 1,395 31. M/s.IVRCL 8.5 Mtr. 600 600 32. M/s.NCCL 8.0 Mtr. 835 835 33. M/s.KESCO, Kanpur 8.5 Mtr. 125 125 34. M/s.KESCO, Kanpur 8.5 Mtr. 500 500 35. M/s.KESCO, Kanpur 8.5 Mtr. 1,500 1,500 36. DVVNL, Agra 8.5 Mtr. 1,480 1,480 37. MVVNL, Lucknow 8.5 Mtr. 500 500 38. MVVNL, Lucknow 8.5 Mtr. 1,000 1,000 39. DVVNL, Agra 8.5 Mtr. 3,000 3,000 40. M/s.IVRCL 8.0 Mtr. 2,550 1,500 1,050 ------------------------------------------------------------------------------------------------------------------------------------------------------------------------For ANAND INDUSTRIAL ENTERPRISES (POLE DIVISION) AUTHORISED SIGNATORY

Related Documents

List Of Past Pole)
July 2020 6
U-pole Price List
May 2020 9
Guest List Past Prez
November 2019 9
Past Tense Verb List
December 2019 28
4 Pole
November 2019 31
Nilavu Pole....
June 2020 25

More Documents from ""

Annexure - A2
July 2020 5
List Of Past Pole)
July 2020 6
Tender Form
July 2020 5
Section Iii(g)
July 2020 7
Profile (pole)
July 2020 24