Basis of Design Report
REVISION 10 10/07/08
Index* - Basis of Design Report - Revision 10 Section 1 Section 2A Section 2B Section 3 Section 4A Section 4B Section 5 Section 6 Section 7 Section 7A Section 7B Section 7C Section 7D Section 7E Section 7F Section 7G Section 7H
General Data………………………………………………………...….1 North Corridor………………………………………………………...35 North Corridor/Intermodal Terminal……………………….......…82 East End Corridor……………………………………………….….114 Southeast Corridor………………………………………………....159 Southeast Corridor (Downtown)…………………………………221 Uptown Corridor…………………………………………………....266 Standard Data…………………………………………………….....319 Appendices…………………………………………………………..327 Appendix A - Design Principles - Utilities………………...……330 Appendix B - Specifications…………………………………..….332 Appendix C - Requested Design Variances………………..…..349 Appendix D - Requests for Information……………………..….355 Appendix E - City of Houston/METRO Consent Agreement..366 Appendix F - S&I Facilities Equipment List……………………405 Appendix G - METRO Directives…………………………………407 Appendix H - Allowance Items……………………………………412
*This page has been added by METRO Document Control for navigational purposes