LAPORAN KEMAJUAN P NAMA PAKET PROP./KAB./KODYA PEKERJAAN LOKASI TAHUN ANGGARAN WAKTU PELAKSANAAN KONSULTAN PENGAWAS KONTRAKTOR PELAKSANA

: : : : : : : :

PEMBANGUNAN JEMBATAN OLI'O NUSA TENGGARA TIMUR/KUPANG PENGAWASAN TEKNIS PEMBANGUNAN JEMBATAN OLI'O KECAMATAN KUPANG TENGAH 2017 210 (DUA RATUS SEPULUH) HARI KALENDER CV. PUTRA TIMOR RAYA PT. MUTIS EKA KARYA MANDIRI

NO. MATA PEMBAYA RAN

URAIAN PEKERJAAN

SATUAN

VOLUME

HARGA SATUAN (Rp)

JUMLAH HARGA (Rp)

1

2

3

4

5

6

DIVISI 1. UMUM 1.2 Mobilisasi

Ls

1.00

67,675,000.00

67,675,000.00 67,675,000.00

M3 M3 M3

338.52 200.20 962.41

58,662.28 91,950.17 215,179.75

19,858,355.03 18,408,424.03 207,090,734.36 245,357,513.42

Liter Ton Ton Kg Kg

63.00 15.57 1.09 467.07 168.31

16,037.42 1,273,740.21 12,922,232.53 50,449.65 1,405.50

1,010,357.46 19,831,036.47 14,137,536.19 23,563,726.13 236,566.73 58,779,222.98

JUMLAH HARGA PEKERJAAN DIVISI 1. UMUM

DIVISI 3. PEKERJAAN TANAH 3.1.3 Galian Struktur dengan Kedalaman 0 - 2 meter 3.1.4 Galian Struktur dengan Kedalaman 0 - 4 meter 3.2.2 Timbunan Pilihan JUMLAH HARGA PEKERJAAN DIVISI 3. PEKERJAAN TANAH

DIVISI 6. PERKERASAN ASPAL 6.1.(2).a Lapis Perekat - Aspal Cair 6.3.4 a Lataston Lapis Pondasi (HRS-Base) Gradasi Senjang/Semi Senjang 6.3.8 .a Apal Minyak 6.3.9 Aditif Anti Pengelupasan 6.3.10 a Bahan Pengisi (Filler) Tambahan (Semen) JUMLAH HARGA PEKERJAAN DIVISI 6. PERKERASAN ASPAL

DIVISI 7. STRUKTUR 7.1.(5) Beton Mutu Sedang dengan fc'=20 MPa (K-350) 7.1.(7) Beton Mutu Sedang dengan fc'=20 MPa (K-250) 7.1.(9) Beton Siklop fc' Mpa (K-175) 7.1.(10) Beton Mutu Rendah dengan fc'=10 MPa (K-125) Fondasi Sumuran K250 - Alas + Topping (Isian Atas dan Bawah) Baja Tulangan BJ 39 Ulir (Untuk Dinding) 7.3.(1) Baja Tulangan BJ 24 Polos 7.3.(4) Baja Tulangan BJ 39 Ulir 7.9 Pasangan Batu 7.11.(6) Expansion Joint Tipe Baja bersudut (Besi Siku 7 x 7 cm) 7.12.(6) Bearing Pad (30 x 400 x 410) 7.13. Sandarang (Railing) 7.14. Papan Nama Jembatan 7.16. Pipa Cucuran Baja

M3 M3 M3 M3

193.33 450.52 52.43 20.54

1,758,170.67 1,472,273.36 844,961.36 1,033,780.02

M3 Kg Kg Kg M3 M Buah M Buah M

59.42 10,263.21 526.33 89,901.32 411.10 62.40 24.00 140.80 2.00 40.00

1,472,273.36 14,807.24 13,814.06 14,807.24 601,270.06 223,900.51 357,005.27 158,690.05 751,668.92 153,410.05

Buah M

40.00 36.00

201,712.69 709,421.05

JUMLAH HARGA PEKERJAAN DIVISI 7. STRUKTUR

DIVISI 8. PENGEMBALIAN KONDISI DAN PEKERJAAN MINOR 8.4.(5) Patok Pengarah 8.4.7 Rel Pengaman JUMLAH HARGA PEK. DIVISI 8. PENGEMBALIAN KONDISI DAN PEKERJAAN MINOR

Jumlah Harga PPN 10% Jumlah Total Harga Dibulatkan

Mengetahui, Direksi Lapangan Dinas Pekerjaan Umum dan Perumahan Rakyat

339,901,695.64 663,285,649.60 44,303,014.03 21,237,563.22 87,475,239.47 151,969,858.89 7,270,796.75 1,331,190,353.00 247,183,337.59 13,971,391.82 8,568,126.48 22,343,559.04 1,503,337.84 6,136,402.00 2,946,340,325.37

8,068,507.60 25,539,157.80 33,607,665.40 3,351,759,727.17 335,175,972.72 3,686,935,699.88 3,686,935,600.00

Disetujui Oleh ; Kontraktor Pelaksana PT. MUTIS EKA KARYA MANDIRI

Kabupaten Kupang

NASAR PAINTIK, ST NIP. 19811123 201001 1 027

IMAM BUDI CAHYONO General Superintenden / GS

MAJUAN PEKERJAAN MINGGUAN

MINGGUAN KE PERIODE REALISASI S/D MINGGU INI RENCANA MINGGU INI DEVIASI ( + / - )

BOBOT % 7

KEMAJUAN S/D MINGG LALU Volume Jumlah Harga Bobot % (Rp.) 8 9 10

2.02 2.02

0.14

0.59 0.55 6.18 7.32

84.62 50.05 -

0.03 0.59 0.42 0.70 0.01 1.75

-

PROGRESS PEKERJAAN KEMAJUAN MINGGU INI Volume Jumlah Harga Bobot % (Rp.) 11 12 13

9,667,857.14 9,667,857.14

0.29 0.29

-

4,964,002.13 4,602,106.01 9,566,108.14

0.15 0.14 0.29

-

-

-

-

-

: : : : :

-

-

-

-

-

-

10 ( S E P U L U H ) 28 Juni 2016 4.83 14.11 -9.28

% % %

KEMAJUAN S/D MINGGU INI Volume Jumlah Harga Bobot % (Rp.) 14 15 16

BOBOT PRESTASI Terhadap Pekerjaan 17

0.14

9,667,857.14 9,667,857.14

0.29 0.29

14.29

84.62 50.05 -

4,964,002.13 4,602,106.01 9,566,108.14

0.15 0.14 0.29

25.00 25.00 0.00

-

0.00 0.00 0.00 0.00 0.00

-

-

04 Juli 2016

s/d

-

-

10.14 19.79 1.32 0.63 2.61 4.53 0.22 39.72 7.37 0.42 0.26 0.67 0.04 0.18 87.90

0.24 0.76 1.00 100.00

laksana YA MANDIRI

35.00 5,990.71 -

-

51,529,567.60 88,705,910.35 140,235,477.95

159,469,443.24

1.54 2.65 4.18

-

167.54 -

-

2,480,864.22 2,480,864.22

-

-

4.76

2,480,864.22

0.07 0.07

-

35.00 -

51,529,567.60 -

1.54 -

0.00 7.77 0.00 0.00

6,158.26 -

91,186,774.57 142,716,342.17

2.72 4.26

0.00 60.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

-

0.00 0.00

-

-

0.07

161,950,307.46

4.83

4.83 Kupang, 04 Juli 2016 Dibuat Oleh : Konsultan Pengawas CV. PUTRA TIMOR RAYA

AHYONO enden / GS

Ir. HANAFI Site Engineering

Keterangan 18

%

LAPORAN KEMAJUA NAMA PAKET PROP./KAB./KODYA PEKERJAAN LOKASI TAHUN ANGGARAN WAKTU PELAKSANAAN KONSULTAN PENGAWAS KONTRAKTOR PELAKSANA

: : : : : : : :

PEMBANGUNAN JEMBATAN OLI'O NUSA TENGGARA TIMUR/KUPANG PENGAWASAN TEKNIS PEMBANGUNAN JEMBATAN OLI'O KECAMATAN KUPANG TENGAH 2017 210 (DUA RATUS SEPULUH) HARI KALENDER CV. PUTRA TIMOR RAYA PT. MUTIS EKA KARYA MANDIRI

NO. MATA PEMBAYA RAN

URAIAN PEKERJAAN

SATUAN

VOLUME

1

2

3

4

DIVISI 1. UMUM 1.2 Mobilisasi

HARGA SATUAN JUMLAH HARGA (Rp) (Rp) 5

Ls

1.00

67,675,000.00

67,675,000.00 67,675,000.00

M3 M3 M3

338.52 200.20 962.41

58,662.28 91,950.17 215,179.75

19,858,355.03 18,408,424.03 207,090,734.36 245,357,513.42

Liter Ton Ton Kg Kg

63.00 15.57 1.09 467.07 168.31

16,037.42 1,273,740.21 12,922,232.53 50,449.65 1,405.50

1,010,357.46 19,831,036.47 14,137,536.19 23,563,726.13 236,566.73 58,779,222.98

JUMLAH HARGA PEKERJAAN DIVISI 1. UMUM

DIVISI 3. PEKERJAAN TANAH 3.1.3 Galian Struktur dengan Kedalaman 0 - 2 meter 3.1.4 Galian Struktur dengan Kedalaman 0 - 4 meter 3.2.2 Timbunan Pilihan JUMLAH HARGA PEKERJAAN DIVISI 3. PEKERJAAN TANAH

DIVISI 6. PERKERASAN ASPAL 6.1.(2).a Lapis Perekat - Aspal Cair 6.3.4 a Lataston Lapis Pondasi (HRS-Base) Gradasi Senjang/Semi Senjang 6.3.8 .a Apal Minyak 6.3.9 Aditif Anti Pengelupasan 6.3.10 a Bahan Pengisi (Filler) Tambahan (Semen) JUMLAH HARGA PEKERJAAN DIVISI 6. PERKERASAN ASPAL

6

DIVISI 7. STRUKTUR 7.1.(5) Beton Mutu Sedang dengan fc'=20 MPa (K-350) 7.1.(7) Beton Mutu Sedang dengan fc'=20 MPa (K-250) 7.1.(9) Beton Siklop fc' Mpa (K-175) 7.1.(10) Beton Mutu Rendah dengan fc'=10 MPa (K-125) Fondasi Sumuran K250 - Alas + Topping (Isian Atas dan Bawah) Baja Tulangan BJ 39 Ulir (Untuk Dinding) 7.3.(1) Baja Tulangan BJ 24 Polos 7.3.(4) Baja Tulangan BJ 39 Ulir 7.9 Pasangan Batu 7.11.(6) Expansion Joint Tipe Baja bersudut (Besi Siku 7 x 7 cm) 7.12.(6) Bearing Pad (30 x 400 x 410) 7.13. Sandarang (Railing) 7.14. Papan Nama Jembatan 7.16. Pipa Cucuran Baja

M3 M3 M3 M3

193.33 450.52 52.43 20.54

1,758,170.67 1,472,273.36 844,961.36 1,033,780.02

M3 Kg Kg Kg M3 M Buah M Buah M

59.42 10,263.21 526.33 89,901.32 411.10 62.40 24.00 140.80 2.00 40.00

1,472,273.36 14,807.24 13,814.06 14,807.24 601,270.06 223,900.51 357,005.27 158,690.05 751,668.92 153,410.05

Buah M

40.00 36.00

201,712.69 709,421.05

JUMLAH HARGA PEKERJAAN DIVISI 7. STRUKTUR

DIVISI 8. PENGEMBALIAN KONDISI DAN PEKERJAAN MINOR 8.4.(5) Patok Pengarah 8.4.7 Rel Pengaman JUMLAH HARGA PEK. DIVISI 8. PENGEMBALIAN KONDISI DAN PEKERJAAN MINOR

Jumlah Harga PPN 10% Jumlah Total Harga Dibulatkan

Mengetahui, Direksi Lapangan Dinas Pekerjaan Umum dan Perumahan Rakyat

339,901,695.64 663,285,649.60 44,303,014.03 21,237,563.22 87,475,239.47 151,969,858.89 7,270,796.75 1,331,190,353.00 247,183,337.59 13,971,391.82 8,568,126.48 22,343,559.04 1,503,337.84 6,136,402.00 2,946,340,325.37

8,068,507.60 25,539,157.80 33,607,665.40 3,351,759,727.17 335,175,972.72 3,686,935,699.88 3,686,935,600.00

Disetujui Oleh ; Kontraktor Pelaksana PT. MUTIS EKA KARYA MANDIRI

Kabupaten Kupang

NASAR PAINTIK, ST NIP. 19811123 201001 1 027

IMAM BUDI CAHYONO General Superintenden / GS

N KEMAJUAN PEKERJAAN MINGGUAN

MINGGUAN KE PERIODE PROGRES S/D MINGGU INI RENCANA MINGGU INI DEVIASI ( + / - )

BOBOT % 7

0.14

0.59 0.55 6.18 7.32

84.62 50.05 -

0.03 0.59 0.42 0.70 0.01 1.75

PROGRESS PEKERJAAN KEMAJUAN MINGGU INI Volume Jumlah Harga Bobot % (Rp.) 11 12 13

KEMAJUAN S/D MINGG LALU Volume Jumlah Harga Bobot % (Rp.) 8 9 10

2.02 2.02

-

9,667,857.14 9,667,857.14

0.29 0.29

-

4,964,002.13 4,602,106.01 9,566,108.14

0.15 0.14 0.29

-

-

-

-

: : : : :

-

-

-

-

-

-

-

11 ( S E B E L A S ) 05 Juli 2016 5.87 17.79 -11.92

s/d

% % %

KEMAJUAN S/D MINGGU INI Volume Jumlah Harga Bobot % (Rp.) 14 15 16 0.14

9,667,857.14 9,667,857.14

0.29 0.29

84.62 50.05 -

4,964,002.13 4,602,106.01 9,566,108.14

0.15 0.14 0.29

-

-

-

-

Pelaksana ARYA MANDIRI

10.14 19.79 1.32 0.63 2.61 4.53 0.22 39.72 7.37 0.42 0.26 0.67 0.04 0.18 87.90

0.24 0.76 1.00 100.00

35.00 6,158.26 -

-

51,529,567.60 91,186,774.57 142,716,342.17

161,950,307.46

1.54 2.72 4.26

-

18.00 -

26,500,920.48 -

0.79 -

558.48 -

8,269,547.40 34,770,467.88

0.25 1.04

-

-

4.83

34,770,467.88

-

53.00 6,716.74 -

-

78,030,488.08 -

2.33 -

99,456,321.97 177,486,810.05

2.97 5.30

-

-

1.04

196,720,775.33

Kupang, 11 Juli 2016 Dibuat Oleh : Konsultan Pengawas CV. PUTRA TIMOR RAYA

5.87

CAHYONO ntenden / GS

Ir. HANAFI Site Engineering

11 Juli 2016

BOBOT PRESTASI Terhadap Pekerjaan 17 14.29

25.00 25.00 0.00

0.00 0.00 0.00 0.00 0.00

Keterangan 18

0.00 11.76 0.00 0.00 0.00 65.44 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00

5.87

%

LAPORAN KEMAJUAN NAMA PAKET PROP./KAB./KODYA PEKERJAAN LOKASI TAHUN ANGGARAN WAKTU PELAKSANAAN KONSULTAN PENGAWAS KONTRAKTOR PELAKSANA

: : : : : : : :

PEMBANGUNAN JEMBATAN OLI'O NUSA TENGGARA TIMUR/KUPANG PENGAWASAN TEKNIS PEMBANGUNAN JEMBATAN OLI'O KECAMATAN KUPANG TENGAH 2017 210 (DUA RATUS SEPULUH) HARI KALENDER CV. PUTRA TIMOR RAYA PT. MUTIS EKA KARYA MANDIRI

NO. MATA PEMBAYA RAN

URAIAN PEKERJAAN

SATUAN

VOLUME

HARGA SATUAN (Rp)

1

2

3

4

5

DIVISI 1. UMUM 1.2 Mobilisasi

Ls

1.00

67,675,000.00

M3 M3 M3

338.52 200.20 962.41

58,662.28 91,950.17 215,179.75

Liter Ton Ton Kg Kg

63.00 15.57 1.09 467.07 168.31

16,037.42 1,273,740.21 12,922,232.53 50,449.65 1,405.50

JUMLAH HARGA PEKERJAAN DIVISI 1. UMUM

DIVISI 3. PEKERJAAN TANAH 3.1.3 Galian Struktur dengan Kedalaman 0 - 2 meter 3.1.4 Galian Struktur dengan Kedalaman 0 - 4 meter 3.2.2 Timbunan Pilihan JUMLAH HARGA PEKERJAAN DIVISI 3. PEKERJAAN TANAH

DIVISI 6. PERKERASAN ASPAL 6.1.(2).a Lapis Perekat - Aspal Cair 6.3.4 a Lataston Lapis Pondasi (HRS-Base) Gradasi Senjang/Semi Senjang 6.3.8 .a Apal Minyak 6.3.9 Aditif Anti Pengelupasan 6.3.10 a Bahan Pengisi (Filler) Tambahan (Semen) JUMLAH HARGA PEKERJAAN DIVISI 6. PERKERASAN ASPAL

DIVISI 7. STRUKTUR 7.1.(5) Beton Mutu Sedang dengan fc'=20 MPa (K-350) 7.1.(7) Beton Mutu Sedang dengan fc'=20 MPa (K-250) 7.1.(9) Beton Siklop fc' Mpa (K-175) 7.1.(10) Beton Mutu Rendah dengan fc'=10 MPa (K-125) Fondasi Sumuran K250 - Alas + Topping (Isian Atas dan Bawah) Baja Tulangan BJ 39 Ulir (Untuk Dinding) 7.3.(1) Baja Tulangan BJ 24 Polos 7.3.(4) Baja Tulangan BJ 39 Ulir 7.9 Pasangan Batu 7.11.(6) Expansion Joint Tipe Baja bersudut (Besi Siku 7 x 7 cm) 7.12.(6) Bearing Pad (30 x 400 x 410) 7.13. Sandarang (Railing) 7.14. Papan Nama Jembatan 7.16. Pipa Cucuran Baja

M3 M3 M3 M3

193.33 450.52 52.43 20.54

1,758,170.67 1,472,273.36 844,961.36 1,033,780.02

M3 Kg Kg Kg M3 M Buah M Buah M

59.42 10,263.21 526.33 89,901.32 411.10 62.40 24.00 140.80 2.00 40.00

1,472,273.36 14,807.24 13,814.06 14,807.24 601,270.06 223,900.51 357,005.27 158,690.05 751,668.92 153,410.05

Buah M

40.00 36.00

201,712.69 709,421.05

JUMLAH HARGA PEKERJAAN DIVISI 7. STRUKTUR

DIVISI 8. PENGEMBALIAN KONDISI DAN PEKERJAAN MINOR 8.4.(5) Patok Pengarah 8.4.7 Rel Pengaman JUMLAH HARGA PEK. DIVISI 8. PENGEMBALIAN KONDISI DAN PEKERJAAN MINOR

Jumlah Harga PPN 10% Jumlah Total Harga Dibulatkan

Mengetahui, Direksi Lapangan Dinas Pekerjaan Umum dan Perumahan Rakyat

Kontraktor Pelaksana PT. MUTIS EKA KARYA MANDIR

Kabupaten Kupang

NASAR PAINTIK, ST NIP. 19811123 201001 1 027

IMAM BUDI CAHYONO General Superintenden / GS

LAPORAN KEMAJUAN PEKERJAAN MINGGUAN

MINGGUAN KE PERIODE REALISASI S/D MINGGU INI RENCANA MINGGU INI DEVIASI ( + / - )

JUMLAH HARGA (Rp) BOBOT % 6

7

KEMAJUAN S/D MINGG LALU Volume Jumlah Harga Bobot % (Rp.) 8 9 10

: : : : :

PROGRESS PEKERJAAN KEMAJUAN MINGGU INI Volume Jumlah Harga Bobot % (Rp.) 11 12 13

12 ( D U A B E L A S ) 12 Juli 2016 8.77 21.46 -12.69

KEMAJUAN S/D MINGGU INI Volume Jumlah Harga (Rp.) 14 15

67,675,000.00 67,675,000.00

2.02 2.02

0.14

9,667,857.14 9,667,857.14

0.29 0.29

0.11

7,444,250.00 7,444,250.00

0.22 0.22

0.25

17,112,107.14 17,112,107.14

19,858,355.03 18,408,424.03 207,090,734.36 245,357,513.42

0.59 0.55 6.18 7.32

84.62 50.05 -

4,964,002.13 4,602,106.01 9,566,108.14

0.15 0.14 0.29

84.63 50.05 -

4,964,295.45 4,602,106.01 9,566,401.45

0.15 0.14 0.29

169.25 100.10 -

9,928,297.58 9,204,212.02 19,132,509.60

1,010,357.46 19,831,036.47 14,137,536.19 23,563,726.13 236,566.73 58,779,222.98

0.03 0.59 0.42 0.70 0.01 1.75

-

-

-

-

-

-

-

-

339,901,695.64 663,285,649.60 44,303,014.03 21,237,563.22 87,475,239.47 151,969,858.89 7,270,796.75 1,331,190,353.00 247,183,337.59 13,971,391.82 8,568,126.48 22,343,559.04 1,503,337.84 6,136,402.00 2,946,340,325.37

10.14 19.79 1.32 0.63 2.61 4.53 0.22 39.72 7.37 0.42 0.26 0.67 0.04 0.18 87.90

8,068,507.60 25,539,157.80 33,607,665.40

0.24 0.76 1.00

3,351,759,727.17 335,175,972.72 3,686,935,699.88 3,686,935,600.00

100.00

Disetujui Oleh ; Kontraktor Pelaksana PT. MUTIS EKA KARYA MANDIRI

53.00 6,716.74 -

-

78,030,488.08 99,456,321.97 177,486,810.05

196,720,775.33

2.33 2.97 5.30

-

31.00 26.00 6.94

45,640,474.16 21,968,995.36 7,177,844.81

1.36 0.66 0.21

369.89 -

5,477,020.39 80,264,334.72

0.16 2.39

-

-

5.87

97,274,986.18

-

84.00 26.00 6.94 6,716.74 369.89 -

-

123,670,962.24 21,968,995.36 7,177,844.81 99,456,321.97 5,477,020.39 257,751,144.77

-

-

2.90

293,995,761.51

Kupang, 18 Juli 2016 Dibuat Oleh : Konsultan Pengawas CV. PUTRA TIMOR RAYA

IMAM BUDI CAHYONO General Superintenden / GS

Ir. HANAFI Site Engineering

18 Juli 2016

s/d

% % %

MINGGU INI Bobot % 16

BOBOT PRESTASI Terhadap Pekerjaan 17

0.51 0.51

25.29

0.30 0.27 0.57

50.00 50.00 0.00

-

0.00 0.00 0.00 0.00 0.00 -

Keterangan 18

Pengawas IMOR RAYA

3.69 0.66 0.21

0.00 18.65 49.59 33.80

2.97 0.16 7.69

0.00 65.44 0.00 0.41 0.00 0.00 0.00 0.00 0.00 0.00

-

0.00 0.00 -

8.77

8.77

%

LAPORAN KEMAJUAN PEKER NAMA PAKET PROP./KAB./KODYA PEKERJAAN LOKASI TAHUN ANGGARAN WAKTU PELAKSANAAN KONSULTAN PENGAWAS KONTRAKTOR PELAKSANA

: : : : : : : :

PEMBANGUNAN JEMBATAN OLI'O NUSA TENGGARA TIMUR/KUPANG PENGAWASAN TEKNIS PEMBANGUNAN JEMBATAN OLI'O KECAMATAN KUPANG TENGAH 2017 210 (DUA RATUS SEPULUH) HARI KALENDER CV. PUTRA TIMOR RAYA PT. MUTIS EKA KARYA MANDIRI

NO. MATA PEMBAYA RAN

URAIAN PEKERJAAN

SATUAN

VOLUME

HARGA SATUAN (Rp)

1

2

3

4

5

DIVISI 1. UMUM 1.2 Mobilisasi

JUMLAH HARGA PEKERJAAN DIVISI 6. PERKERASAN ASPAL

DIVISI 7. STRUKTUR

7

1.00

67,675,000.00

67,675,000.00 67,675,000.00

2.02 2.02

M3 M3 M3

338.52 200.20 962.41

58,662.28 91,950.17 215,179.75

19,858,355.03 18,408,424.03 207,090,734.36 245,357,513.42

0.59 0.55 6.18 7.32

Liter Ton Ton Kg Kg

63.00 15.57 1.09 467.07 168.31

16,037.42 1,273,740.21 12,922,232.53 50,449.65 1,405.50

1,010,357.46 19,831,036.47 14,137,536.19 23,563,726.13 236,566.73 58,779,222.98

0.03 0.59 0.42 0.70 0.01 1.75

JUMLAH HARGA PEKERJAAN DIVISI 3. PEKERJAAN TANAH

DIVISI 6. PERKERASAN ASPAL 6.1.(2).a Lapis Perekat - Aspal Cair 6.3.4 a Lataston Lapis Pondasi (HRS-Base) Gradasi Senjang/Semi Senjang 6.3.8 .a Apal Minyak 6.3.9 Aditif Anti Pengelupasan 6.3.10 a Bahan Pengisi (Filler) Tambahan (Semen)

6

Ls

JUMLAH HARGA PEKERJAAN DIVISI 1. UMUM

DIVISI 3. PEKERJAAN TANAH 3.1.3 Galian Struuktur dengan Kedalaman 0 - 2 meter 3.1.4 Galian Struuktur dengan Kedalaman 0 - 4 meter 3.2.2 Timbunan Pilihan

JUMLAH HARGA (Rp) BOBOT %

7.1.(5) Beton Mutu Sedang dengan fc'=20 MPa (K-350) 7.1.(7) Beton Mutu Sedang dengan fc'=20 MPa (K-250) 7.1.(9) Beton Siklop fc' Mpa (K-175) 7.1.(10) Beton Mutu Rendah dengan fc'=10 MPa (K-125) Fondasi Sumuran K250 - Alas + Topping (Isian Atas dan Bawah) Baja Tulangan BJ 39 Ulir (Untuk Dinding) 7.3.(1) Baja Tulangan BJ 24 Polos 7.3.(4) Baja Tulangan BJ 39 Ulir 7.9 Pasangan Batu 7.11.(6) Expansion Joint Tipe Baja bersudut (Besi Siku 7 x 7 cm) 7.12.(6) Bearing Pad (30 x 400 x 410) 7.13. Sandarang (Railing) 7.14. Papan Nama Jembatan 7.16. Pipa Cucuran Baja

M3 M3 M3 M3

193.33 450.52 52.43 20.54

1,758,170.67 1,472,273.36 844,961.36 1,033,780.02

M3 Kg Kg Kg M3 M Buah M Buah M

59.42 10,263.21 526.33 89,901.32 411.10 62.40 24.00 140.80 2.00 40.00

1,472,273.36 14,807.24 13,814.06 14,807.24 601,270.06 223,900.51 357,005.27 158,690.05 751,668.92 153,410.05

Buah M

40.00 36.00

201,712.69 709,421.05

JUMLAH HARGA PEKERJAAN DIVISI 7. STRUKTUR

DIVISI 8. PENGEMBALIAN KONDISI DAN PEKERJAAN MINOR 8.4.(5) Patok Pengarah 8.4.7 Rel Pengaman JUMLAH HARGA PEK. DIVISI 8. PENGEMBALIAN KONDISI DAN PEKERJAAN MINOR

Jumlah Harga PPN 10% Jumlah Total Harga Dibulatkan

Mengetahui, Direksi Lapangan Dinas Pekerjaan Umum dan Perumahan Rakyat Kabupaten Kupang

339,901,695.64 663,285,649.60 44,303,014.03 21,237,563.22 87,475,239.47 151,969,858.89 7,270,796.75 1,331,190,353.00 247,183,337.59 13,971,391.82 8,568,126.48 22,343,559.04 1,503,337.84 6,136,402.00 2,946,340,325.37

10.14 19.79 1.32 0.63 2.61 4.53 0.22 39.72 7.37 0.42 0.26 0.67 0.04 0.18 87.90

8,068,507.60 25,539,157.80 33,607,665.40

0.24 0.76 1.00

3,351,759,727.17 335,175,972.72 3,686,935,699.88 3,686,935,600.00

100.00

Disetujui Oleh ; Kontraktor Pelaksana PT. MUTIS EKA KARYA MANDIRI

NASAR PAINTIK, ST NIP. 19811123 201001 1 027

IMAM BUDI CAHYONO General Superintenden / GS

JUAN PEKERJAAN MINGGUAN

MINGGUAN KE PERIODE REALISASI S/D MINGGU INI RENCANA MINGGU INI DEVIASI ( + / - )

KEMAJUAN S/D MINGG LALU Volume Jumlah Harga Bobot % (Rp.) 8 9 10 0.25

169.25 100.10 -

-

17,112,107.14 17,112,107.14

0.51 0.51

9,928,297.58 9,204,212.02 19,132,509.60

0.30 0.27 0.57

-

-

PROGRESS PEKERJAAN KEMAJUAN MINGGU INI Volume Jumlah Harga Bobot % (Rp.) 11 12 13 -

70.22 -

-

: : : : :

4,119,265.30 4,119,265.30 -

-

13 ( T I G A B E L A S ) 19 Juli 2016 13.06 25.14 -12.08

-

BOBOT PRESTASI Terhadap Pekerjaan 17

0.25

17,112,107.14 17,112,107.14

0.51 0.51

25.29

239.47 100.10 -

14,047,562.88 9,204,212.02 23,251,774.90

0.42 0.27 0.69

70.74 50.00 0.00

-

0.00 0.00 0.00 0.00 0.00

-

% % %

KEMAJUAN S/D MINGGU INI Volume Jumlah Harga Bobot % (Rp.) 14 15 16

0.12 0.12

25 Juli 2016

s/d

-

-

Keterangan 18

84.00 26.00 6.94 6,716.74 369.89 -

-

123,670,962.24 21,968,995.36 7,177,844.81 99,456,321.97 5,477,020.39 257,751,144.77

293,995,761.51

3.69 0.66 0.21 2.97 0.16 7.69

-

9,431.16 -

-

139,649,428.87 139,649,428.87

-

-

8.77

143,768,694.17

4.17 4.17

-

84.00 26.00 6.94 6,716.74 9,801.05 -

-

123,670,962.24 21,968,995.36 7,177,844.81

3.69 0.66 0.21

0.00 18.65 49.59 33.80

99,456,321.97 145,126,449.26 397,400,573.64

2.97 4.33 11.86

0.00 65.44 0.00 10.90 0.00 0.00 0.00 0.00 0.00 0.00

-

-

4.29

437,764,455.68

-

0.00 0.00 -

13.06

13.06 Kupang, 25 Juli 2016 Dibuat Oleh : Konsultan Pengawas CV. PUTRA TIMOR RAYA

%

Ir.HANAFI Site Engineering

LAPORAN KEMAJUAN PEKERJA NAMA PAKET PROP./KAB./KODYA PEKERJAAN LOKASI TAHUN ANGGARAN WAKTU PELAKSANAAN KONSULTAN PENGAWAS KONTRAKTOR PELAKSANA

: : : : : : : :

PEMBANGUNAN JEMBATAN OLI'O NUSA TENGGARA TIMUR/KUPANG PENGAWASAN TEKNIS PEMBANGUNAN JEMBATAN OLI'O KECAMATAN KUPANG TENGAH 2017 210 (DUA RATUS SEPULUH) HARI KALENDER CV. PUTRA TIMOR RAYA PT. MUTIS EKA KARYA MANDIRI

NO. MATA PEMBAYA RAN

URAIAN PEKERJAAN

SATUAN

VOLUME

HARGA SATUAN (Rp)

1

2

3

4

5

DIVISI 1. UMUM 1.2 Mobilisasi

JUMLAH HARGA PEKERJAAN DIVISI 6. PERKERASAN ASPAL

DIVISI 7. STRUKTUR

7

1.00

67,675,000.00

67,675,000.00 67,675,000.00

2.02 2.02

M3 M3 M3

338.52 200.20 962.41

58,662.28 91,950.17 215,179.75

19,858,355.03 18,408,424.03 207,090,734.36 245,357,513.42

0.59 0.55 6.18 7.32

Liter Ton Ton Kg Kg

63.00 15.57 1.09 467.07 168.31

16,037.42 1,273,740.21 12,922,232.53 50,449.65 1,405.50

1,010,357.46 19,831,036.47 14,137,536.19 23,563,726.13 236,566.73 58,779,222.98

0.03 0.59 0.42 0.70 0.01 1.75

JUMLAH HARGA PEKERJAAN DIVISI 3. PEKERJAAN TANAH

DIVISI 6. PERKERASAN ASPAL 6.1.(2).a Lapis Perekat - Aspal Cair 6.3.4 a Lataston Lapis Pondasi (HRS-Base) Gradasi Senjang/Semi Senjang 6.3.8 .a Apal Minyak 6.3.9 Aditif Anti Pengelupasan 6.3.10 a Bahan Pengisi (Filler) Tambahan (Semen)

6

Ls

JUMLAH HARGA PEKERJAAN DIVISI 1. UMUM

DIVISI 3. PEKERJAAN TANAH 3.1.3 Galian Struktur dengan Kedalaman 0 - 2 meter 3.1.4 Galian Struktur dengan Kedalaman 0 - 4 meter 3.2.2 Timbunan Pilihan

JUMLAH HARGA (Rp) BOBOT %

7.1.(5) Beton Mutu Sedang dengan fc'=20 MPa (K-350) 7.1.(7) Beton Mutu Sedang dengan fc'=20 MPa (K-250) 7.1.(9) Beton Siklop fc' Mpa (K-175) 7.1.(10) Beton Mutu Rendah dengan fc'=10 MPa (K-125) Fondasi Sumuran K250 - Alas + Topping (Isian Atas dan Bawah) Baja Tulangan BJ 39 Ulir (Untuk Dinding) 7.3.(1) Baja Tulangan BJ 24 Polos 7.3.(4) Baja Tulangan BJ 39 Ulir 7.9 Pasangan Batu 7.11.(6) Expansion Joint Tipe Baja bersudut (Besi Siku 7 x 7 cm) 7.12.(6) Bearing Pad (30 x 400 x 410) 7.13. Sandarang (Railing) 7.14. Papan Nama Jembatan 7.16. Pipa Cucuran Baja

M3 M3 M3 M3

193.33 450.52 52.43 20.54

1,758,170.67 1,472,273.36 844,961.36 1,033,780.02

M3 Kg Kg Kg M3 M Buah M Buah M

59.42 10,263.21 526.33 89,901.32 411.10 62.40 24.00 140.80 2.00 40.00

1,472,273.36 14,807.24 13,814.06 14,807.24 601,270.06 223,900.51 357,005.27 158,690.05 751,668.92 153,410.05

Buah M

40.00 36.00

201,712.69 709,421.05

JUMLAH HARGA PEKERJAAN DIVISI 7. STRUKTUR

DIVISI 8. PENGEMBALIAN KONDISI DAN PEKERJAAN MINOR 8.4.(5) Patok Pengarah 8.4.7 Rel Pengaman JUMLAH HARGA PEK. DIVISI 8. PENGEMBALIAN KONDISI DAN PEKERJAAN MINOR

Jumlah Harga PPN 10% Jumlah Total Harga Dibulatkan

Mengetahui, Direksi Lapangan Dinas Pekerjaan Umum dan Perumahan Rakyat

339,901,695.64 663,285,649.60 44,303,014.03 21,237,563.22 87,475,239.47 151,969,858.89 7,270,796.75 1,331,190,353.00 247,183,337.59 13,971,391.82 8,568,126.48 22,343,559.04 1,503,337.84 6,136,402.00 2,946,340,325.37

10.14 19.79 1.32 0.63 2.61 4.53 0.22 39.72 7.37 0.42 0.26 0.67 0.04 0.18 87.90

8,068,507.60 25,539,157.80 33,607,665.40

0.24 0.76 1.00

3,351,759,727.17 335,175,972.72 3,686,935,699.88 3,686,935,600.00

100.00

Disetujui Oleh ; Kontraktor Pelaksana PT. MUTIS EKA KARYA MANDIRI

NASAR PAINTIK, ST NIP. 19811123 201001 1 027

IMAM BUDI CAHYONO General Superintenden / GS

AN PEKERJAAN MINGGUAN

MINGGUAN KE PERIODE REALISASI S/D MINGGU INI RENCANA MINGGU INI DEVIASI ( + / - )

KEMAJUAN S/D MINGG LALU Volume Jumlah Harga Bobot % (Rp.) 8 9 10

PROGRESS PEKERJAAN KEMAJUAN MINGGU INI Volume Jumlah Harga Bobot % (Rp.) 11 12 13

0.25

17,112,107.14 17,112,107.14

0.51 0.51

0.13

239.47 100.10 -

14,047,562.88 9,204,212.02 23,251,774.90

0.42 0.27 0.69

-

-

-

-

-

-

: : : : :

9,068,450.00 9,068,450.00

0.27 0.27

-

-

-

-

14 ( EMPAT BELAS ) 26 Juli 2016 18.08 28.82 -10.74

% % %

KEMAJUAN S/D MINGGU INI Volume Jumlah Harga Bobot % (Rp.) 14 15 16

BOBOT PRESTASI Terhadap Pekerjaan 17

0.39

26,180,557.14 26,180,557.14

0.78 0.78

38.69

239.47 100.10 -

14,047,562.88 9,204,212.02 23,251,774.90

0.42 0.27 0.69

70.74 50.00 0.00

-

0.00 0.00 0.00 0.00 0.00

-

01 Agustus 2016

s/d

-

-

Keterangan 18

84.00 26.00 6.94 6,716.74 9,801.05 -

-

123,670,962.24 21,968,995.36 7,177,844.81 99,456,321.97 145,126,449.26 397,400,573.64

437,764,455.68

3.69 0.66 0.21 2.97 4.33 11.86

-

76.00 -

111,892,775.36 -

3.34 -

160.00 26.00 6.94

235,563,737.60 21,968,995.36 7,177,844.81

7.03 0.66 0.21

0.00 35.51 49.59 33.80

3,187.76 -

47,201,897.77 159,094,673.13

1.41 4.75

6,716.74 12,988.80 -

99,456,321.97 192,328,347.03 556,495,246.77

2.97 5.74 16.60

0.00 65.44 0.00 14.45 0.00 0.00 0.00 0.00 0.00 0.00

-

-

13.06

168,163,123.13

-

-

-

5.02

605,927,578.81

-

0.00 0.00 -

18.08

18.08 Kupang, 01 Agustus 2016 Dibuat Oleh : Konsultan Pengawas CV. PUTRA TIMOR RAYA

%

Ir.HANAFI Site Engineering

LAPORAN KEMAJUAN PEKERJ NAMA PAKET PROP./KAB./KODYA PEKERJAAN LOKASI TAHUN ANGGARAN WAKTU PELAKSANAAN KONSULTAN PENGAWAS KONTRAKTOR PELAKSANA

: : : : : : : :

PEMBANGUNAN JEMBATAN AIR BAUN NUSA TENGGARA TIMUR/KUPANG PENGAWASAN TEKNIS PEMBANGUNAN JEMBATAN AIR BAUN KECAMATAN KUPANG TENGAH 2016 210 (DUA RATUS SEPULUH) HARI KALENDER CV. PUTRA TIMOR RAYA PT. MUTIS EKA KARYA MANDIRI

NO. MATA PEMBAYA RAN

URAIAN PEKERJAAN

SATUAN

VOLUME

HARGA SATUAN (Rp)

JUMLAH HARGA (Rp)

BOBOT %

1

2

3

4

5

6

7

DIVISI 1. UMUM 1.2 Mobilisasi

Ls

1.00

67,675,000.00

67,675,000.00 67,675,000.00

2.02 2.02

M3 M3 M3

338.52 200.20 962.41

58,662.28 91,950.17 215,179.75

19,858,355.03 18,408,424.03 207,090,734.36 245,357,513.42

0.59 0.55 6.18 7.32

Liter Ton Ton Kg Kg

63.00 15.57 1.09 467.07 168.31

16,037.42 1,273,740.21 12,922,232.53 50,449.65 1,405.50

1,010,357.46 19,831,036.47 14,137,536.19 23,563,726.13 236,566.73 58,779,222.98

0.03 0.59 0.42 0.70 0.01 1.75

JUMLAH HARGA PEKERJAAN DIVISI 1. UMUM

DIVISI 3. PEKERJAAN TANAH 3.1.3 Galian Struktur dengan Kedalaman 0 - 2 meter 3.1.4 Galian Struktur dengan Kedalaman 0 - 4 meter 3.2.2 Timbunan Pilihan JUMLAH HARGA PEKERJAAN DIVISI 3. PEKERJAAN TANAH

DIVISI 6. PERKERASAN ASPAL 6.1.(2).a Lapis Perekat - Aspal Cair 6.3.4 a Lataston Lapis Pondasi (HRS-Base) Gradasi Senjang/Semi Senjang 6.3.8 .a Apal Minyak 6.3.9 Aditif Anti Pengelupasan 6.3.10 a Bahan Pengisi (Filler) Tambahan (Semen) JUMLAH HARGA PEKERJAAN DIVISI 6. PERKERASAN ASPAL

DIVISI 7. STRUKTUR

7.1.(5) Beton Mutu Sedang dengan fc'=20 MPa (K-350) 7.1.(7) Beton Mutu Sedang dengan fc'=20 MPa (K-250) 7.1.(9) Beton Siklop fc' Mpa (K-175) 7.1.(10) Beton Mutu Rendah dengan fc'=10 MPa (K-125) Fondasi Sumuran K250 - Alas + Topping (Isian Atas dan Bawah) Baja Tulangan BJ 39 Ulir (Untuk Dinding) 7.3.(1) Baja Tulangan BJ 24 Polos 7.3.(4) Baja Tulangan BJ 39 Ulir 7.9 Pasangan Batu 7.11.(6) Expansion Joint Tipe Baja bersudut (Besi Siku 7 x 7 cm) 7.12.(6) Bearing Pad (30 x 400 x 410) 7.13. Sandarang (Railing) 7.14. Papan Nama Jembatan 7.16. Pipa Cucuran Baja

M3 M3 M3 M3

193.33 450.52 52.43 20.54

1,758,170.67 1,472,273.36 844,961.36 1,033,780.02

M3 Kg Kg Kg M3 M Buah M Buah M

59.42 10,263.21 526.33 89,901.32 411.10 62.40 24.00 140.80 2.00 40.00

1,472,273.36 14,807.24 13,814.06 14,807.24 601,270.06 223,900.51 357,005.27 158,690.05 751,668.92 153,410.05

Buah M

40.00 36.00

201,712.69 709,421.05

JUMLAH HARGA PEKERJAAN DIVISI 7. STRUKTUR

DIVISI 8. PENGEMBALIAN KONDISI DAN PEKERJAAN MINOR 8.4.(5) Patok Pengarah 8.4.7 Rel Pengaman JUMLAH HARGA PEK. DIVISI 8. PENGEMBALIAN KONDISI DAN PEKERJAAN MINOR

Jumlah Harga PPN 10% Jumlah Total Harga Dibulatkan

Mengetahui, Direksi Lapangan Dinas Pekerjaan Umum dan Perumahan Rakyat Kabupaten Kupang

339,901,695.64 663,285,649.60 44,303,014.03 21,237,563.22 87,475,239.47 151,969,858.89 7,270,796.75 1,331,190,353.00 247,183,337.59 13,971,391.82 8,568,126.48 22,343,559.04 1,503,337.84 6,136,402.00 2,946,340,325.37

10.14 19.79 1.32 0.63 2.61 4.53 0.22 39.72 7.37 0.42 0.26 0.67 0.04 0.18 87.90

8,068,507.60 25,539,157.80 33,607,665.40

0.24 0.76 1.00

3,351,759,727.17 335,175,972.72 3,686,935,699.88 3,686,935,600.00

100.00

Disetujui Oleh ; Kontraktor Pelaksana PT. MUTIS EKA KARYA MANDIRI

NASAR PAINTIK, ST NIP. 19811123 201001 1 027

IMAM BUDI CAHYONO General Superintenden / GS

AJUAN PEKERJAAN MINGGUAN

MINGGUAN KE PERIODE PROGRES S/D MINGGU INI RENCANA MINGGU INI DEVIASI ( + / - )

KEMAJUAN S/D MINGG LALU Volume Jumlah Harga Bobot % (Rp.) 8 9 10 0.39

239.47 100.10 -

-

PROGRESS PEKERJAAN KEMAJUAN MINGGU INI Volume Jumlah Harga Bobot % (Rp.) 11 12 13

26,180,557.14 26,180,557.14

0.78 0.78

-

14,047,562.88 9,204,212.02 23,251,774.90

0.42 0.27 0.69

-

-

-

-

-

: : : : :

-

-

-

-

-

-

15 ( LIMA BELAS ) 02 Agustus 2016 18.37 32.50 -14.13

% % %

KEMAJUAN S/D MINGGU INI Volume Jumlah Harga Bobot % (Rp.) 14 15 16

BOBOT PRESTASI Terhadap Pekerjaan 17

0.39

26,180,557.14 26,180,557.14

0.78 0.78

38.69

239.47 100.10 -

14,047,562.88 9,204,212.02 23,251,774.90

0.42 0.27 0.69

70.74 50.00 0.00

-

0.00 0.00 0.00 0.00 0.00

-

-

08 Agustus 2016

s/d

-

-

Keterangan 18

160.00 26.00 6.94 6,716.74 12,988.80 -

-

235,563,737.60 21,968,995.36 7,177,844.81 99,456,321.97 192,328,347.03 556,495,246.77

605,927,578.81

7.03 0.66 0.21 2.97 5.74 16.60

-

651.38 -

-

9,645,174.05 9,645,174.05

-

-

18.08

9,645,174.05

0.29 0.29

-

160.00 26.00 6.94 6,716.74 13,640.19 -

-

235,563,737.60 21,968,995.36 7,177,844.81

7.03 0.66 0.21

0.00 35.51 49.59 33.80

99,456,321.97 201,973,521.07 566,140,420.81

2.97 6.03 16.89

0.00 65.44 0.00 15.17 0.00 0.00 0.00 0.00 0.00 0.00

-

-

0.29

615,572,752.85

-

0.00 0.00 -

18.37

18.37 Kupang, 08 Agustus 2016

Dibuat Oleh : Konsultan Pengawas CV. PUTRA TIMOR RAYA

%

Ir.HANAFI Site Engineering

LAPORAN KEMAJUAN PEKERJA NAMA PAKET PROP./KAB./KODYA PEKERJAAN LOKASI TAHUN ANGGARAN WAKTU PELAKSANAAN KONSULTAN PENGAWAS KONTRAKTOR PELAKSANA

: : : : : : : :

PEMBANGUNAN JEMBATAN AIR BAUN NUSA TENGGARA TIMUR/KUPANG PENGAWASAN TEKNIS PEMBANGUNAN JEMBATAN AIR BAUN KECAMATAN KUPANG TENGAH 2016 210 (DUA RATUS SEPULUH) HARI KALENDER CV. PUTRA TIMOR RAYA PT. MUTIS EKA KARYA MANDIRI

NO. MATA PEMBAYA RAN

URAIAN PEKERJAAN

SATUAN

VOLUME

HARGA SATUAN (Rp)

1

2

3

4

5

DIVISI 1. UMUM 1.2 Mobilisasi

JUMLAH HARGA PEKERJAAN DIVISI 6. PERKERASAN ASPAL

DIVISI 7. STRUKTUR

7

1.00

67,675,000.00

67,675,000.00 67,675,000.00

2.02 2.02

M3 M3 M3

338.52 200.20 962.41

58,662.28 91,950.17 215,179.75

19,858,355.03 18,408,424.03 207,090,734.36 245,357,513.42

0.59 0.55 6.18 7.32

Liter Ton Ton Kg Kg

63.00 15.57 1.09 467.07 168.31

16,037.42 1,273,740.21 12,922,232.53 50,449.65 1,405.50

1,010,357.46 19,831,036.47 14,137,536.19 23,563,726.13 236,566.73 58,779,222.98

0.03 0.59 0.42 0.70 0.01 1.75

JUMLAH HARGA PEKERJAAN DIVISI 3. PEKERJAAN TANAH

DIVISI 6. PERKERASAN ASPAL 6.1.(2).a Lapis Perekat - Aspal Cair 6.3.4 a Lataston Lapis Pondasi (HRS-Base) Gradasi Senjang/Semi Senjang 6.3.8 .a Apal Minyak 6.3.9 Aditif Anti Pengelupasan 6.3.10 a Bahan Pengisi (Filler) Tambahan (Semen)

6

Ls

JUMLAH HARGA PEKERJAAN DIVISI 1. UMUM

DIVISI 3. PEKERJAAN TANAH 3.1.3 Galian Struktur dengan Kedalaman 0 - 2 meter 3.1.4 Galian Struktur dengan Kedalaman 0 - 4 meter 3.2.2 Timbunan Pilihan

JUMLAH HARGA BOBOT % (Rp)

7.1.(5) Beton Mutu Sedang dengan fc'=20 MPa (K-350) 7.1.(7) Beton Mutu Sedang dengan fc'=20 MPa (K-250) 7.1.(9) Beton Siklop fc' Mpa (K-175) 7.1.(10) Beton Mutu Rendah dengan fc'=10 MPa (K-125) Fondasi Sumuran K250 - Alas + Topping (Isian Atas dan Bawah) Baja Tulangan BJ 39 Ulir (Untuk Dinding) 7.3.(1) Baja Tulangan BJ 24 Polos 7.3.(4) Baja Tulangan BJ 39 Ulir 7.9 Pasangan Batu 7.11.(6) Expansion Joint Tipe Baja bersudut (Besi Siku 7 x 7 cm) 7.12.(6) Bearing Pad (30 x 400 x 410) 7.13. Sandarang (Railing) 7.14. Papan Nama Jembatan 7.16. Pipa Cucuran Baja

M3 M3 M3 M3

193.33 450.52 52.43 20.54

1,758,170.67 1,472,273.36 844,961.36 1,033,780.02

M3 Kg Kg Kg M3 M Buah M Buah M

59.42 10,263.21 526.33 89,901.32 411.10 62.40 24.00 140.80 2.00 40.00

1,472,273.36 14,807.24 13,814.06 14,807.24 601,270.06 223,900.51 357,005.27 158,690.05 751,668.92 153,410.05

Buah M

40.00 36.00

201,712.69 709,421.05

JUMLAH HARGA PEKERJAAN DIVISI 7. STRUKTUR

DIVISI 8. PENGEMBALIAN KONDISI DAN PEKERJAAN MINOR 8.4.(5) Patok Pengarah 8.4.7 Rel Pengaman JUMLAH HARGA PEK. DIVISI 8. PENGEMBALIAN KONDISI DAN PEKERJAAN MINOR

Jumlah Harga PPN 10% Jumlah Total Harga Dibulatkan

Mengetahui, Direksi Lapangan Dinas Pekerjaan Umum dan Perumahan Rakyat Kabupaten Kupang

339,901,695.64 663,285,649.60 44,303,014.03 21,237,563.22 87,475,239.47 151,969,858.89 7,270,796.75 1,331,190,353.00 247,183,337.59 13,971,391.82 8,568,126.48 22,343,559.04 1,503,337.84 6,136,402.00 2,946,340,325.37

10.14 19.79 1.32 0.63 2.61 4.53 0.22 39.72 7.37 0.42 0.26 0.67 0.04 0.18 87.90

8,068,507.60 25,539,157.80 33,607,665.40

0.24 0.76 1.00

3,351,759,727.17 335,175,972.72 3,686,935,699.88 3,686,935,600.00

100.00

Disetujui Oleh ; Kontraktor Pelaksana PT. MUTIS EKA KARYA MANDIRI

NASAR PAINTIK, ST NIP. 19811123 201001 1 027

IMAM BUDI CAHYONO General Superintenden / GS

MAJUAN PEKERJAAN MINGGUAN

MINGGUAN KE PERIODE REALISASI S/D MINGGU INI RENCANA MINGGU INI DEVIASI ( + / - )

KEMAJUAN S/D MINGG LALU Volume Jumlah Harga Bobot % (Rp.) 8 9 10 0.39

239.47 100.10 -

-

PROGRESS PEKERJAAN KEMAJUAN MINGGU INI Volume Jumlah Harga Bobot % (Rp.) 11 12 13

26,180,557.14 26,180,557.14

0.78 0.78

-

14,047,562.88 9,204,212.02 23,251,774.90

0.42 0.27 0.69

-

-

-

-

-

: : : : :

-

-

-

-

-

-

16 ( ENAM BELAS ) 09 Agustus 2016 22.85 36.18 -13.33

15 Agustus 2016

BOBOT PRESTASI Terhadap Pekerjaan 17

KEMAJUAN S/D MINGGU INI Volume Jumlah Harga Bobot % (Rp.) 14 15 16 0.39

26,180,557.14 26,180,557.14

0.78 0.78

38.69

239.47 100.10 -

14,047,562.88 9,204,212.02 23,251,774.90

0.42 0.27 0.69

70.74 50.00 0.00

-

0.00 0.00 0.00 0.00 0.00

-

-

s/d % % %

-

-

Keterangan 18

160.00 26.00 6.94 6,716.74 13,640.19 -

-

235,563,737.60 21,968,995.36 7,177,844.81 99,456,321.97 201,973,521.07 566,140,420.81

615,572,752.85

7.03 0.66 0.21 2.97 6.03 16.89

-

55.06 6.83 4,198.19 -

-

81,056,009.83 7,055,548.64 62,163,538.78 150,275,097.25

-

-

18.37

150,275,097.25

2.42 0.21 1.85 4.48

-

215.06 26.00 13.77 6,716.74 17,838.37 -

-

316,619,747.43 21,968,995.36 14,233,393.45 99,456,321.97 264,137,059.86 716,415,518.07

-

-

4.48

765,847,850.11

9.45 0.66 0.42 2.97 7.88 21.37

-

0.00 47.74 49.59 67.02 0.00 0.00 65.44 0.00 19.84 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 -

22.85

22.85 Kupang, 15 Agustus 2016

Dibuat Oleh : Konsultan Pengawas CV. PUTRA TIMOR RAYA

%

Ir.HANAFI Site Engineering

LAPORAN KEMAJUAN NAMA PAKET PROP./KAB./KODYA PEKERJAAN LOKASI TAHUN ANGGARAN WAKTU PELAKSANAAN KONSULTAN PENGAWAS KONTRAKTOR PELAKSANA

: : : : : : : :

PEMBANGUNAN JEMBATAN AIR BAUN NUSA TENGGARA TIMUR/KUPANG PENGAWASAN TEKNIS PEMBANGUNAN JEMBATAN AIR BAUN KECAMATAN KUPANG TENGAH 2016 210 (DUA RATUS SEPULUH) HARI KALENDER CV. PUTRA TIMOR RAYA PT. MUTIS EKA KARYA MANDIRI

NO. MATA PEMBAYA RAN

URAIAN PEKERJAAN

SATUAN

VOLUME

HARGA SATUAN (Rp)

JUMLAH HARGA (Rp)

1

2

3

4

5

6

DIVISI 1. UMUM 1.2 Mobilisasi

Ls

1.00

67,675,000.00

67,675,000.00 67,675,000.00

M3 M3 M3

338.52 200.20 962.41

58,662.28 91,950.17 215,179.75

19,858,355.03 18,408,424.03 207,090,734.36 245,357,513.42

Liter Ton Ton Kg Kg

63.00 15.57 1.09 467.07 168.31

16,037.42 1,273,740.21 12,922,232.53 50,449.65 1,405.50

1,010,357.46 19,831,036.47 14,137,536.19 23,563,726.13 236,566.73 58,779,222.98

JUMLAH HARGA PEKERJAAN DIVISI 1. UMUM

DIVISI 3. PEKERJAAN TANAH 3.1.3 Galian Struuktur dengan Kedalaman 0 - 2 meter 3.1.4 Galian Struuktur dengan Kedalaman 0 - 4 meter 3.2.2 Timbunan Pilihan JUMLAH HARGA PEKERJAAN DIVISI 3. PEKERJAAN TANAH

DIVISI 6. PERKERASAN ASPAL 6.1.(2).a Lapis Perekat - Aspal Cair 6.3.4 a Lataston Lapis Pondasi (HRS-Base) Gradasi Senjang/Semi Senjang 6.3.8 .a Apal Minyak 6.3.9 Aditif Anti Pengelupasan 6.3.10 a Bahan Pengisi (Filler) Tambahan (Semen) JUMLAH HARGA PEKERJAAN DIVISI 6. PERKERASAN ASPAL

DIVISI 7. STRUKTUR 7.1.(5) Beton Mutu Sedang dengan fc'=20 MPa (K-350) 7.1.(7) Beton Mutu Sedang dengan fc'=20 MPa (K-250) 7.1.(9) Beton Siklop fc' Mpa (K-175) 7.1.(10) Beton Mutu Rendah dengan fc'=10 MPa (K-125) Fondasi Sumuran K250 - Alas + Topping (Isian Atas dan Bawah) Baja Tulangan BJ 39 Ulir (Untuk Dinding) 7.3.(1) Baja Tulangan BJ 24 Polos 7.3.(4) Baja Tulangan BJ 39 Ulir 7.9 Pasangan Batu 7.11.(6) Expansion Joint Tipe Baja bersudut (Besi Siku 7 x 7 cm) 7.12.(6) Bearing Pad (30 x 400 x 410) 7.13. Sandarang (Railing) 7.14. Papan Nama Jembatan 7.16. Pipa Cucuran Baja

M3 M3 M3 M3

193.33 450.52 52.43 20.54

1,758,170.67 1,472,273.36 844,961.36 1,033,780.02

M3 Kg Kg Kg M3 M Buah M Buah M

59.42 10,263.21 526.33 89,901.32 411.10 62.40 24.00 140.80 2.00 40.00

1,472,273.36 14,807.24 13,814.06 14,807.24 601,270.06 223,900.51 357,005.27 158,690.05 751,668.92 153,410.05

Buah M

40.00 36.00

201,712.69 709,421.05

JUMLAH HARGA PEKERJAAN DIVISI 7. STRUKTUR

DIVISI 8. PENGEMBALIAN KONDISI DAN PEKERJAAN MINOR 8.4.(5) Patok Pengarah 8.4.7 Rel Pengaman JUMLAH HARGA PEK. DIVISI 8. PENGEMBALIAN KONDISI DAN PEKERJAAN MINOR

Jumlah Harga PPN 10% Jumlah Total Harga Dibulatkan

Mengetahui, Direksi Lapangan Dinas Pekerjaan Umum dan Perumahan Rakyat

339,901,695.64 663,285,649.60 44,303,014.03 21,237,563.22 87,475,239.47 151,969,858.89 7,270,796.75 1,331,190,353.00 247,183,337.59 13,971,391.82 8,568,126.48 22,343,559.04 1,503,337.84 6,136,402.00 2,946,340,325.37

8,068,507.60 25,539,157.80 33,607,665.40 3,351,759,727.17 335,175,972.72 3,686,935,699.88 3,686,935,600.00

Disetujui Oleh ; Kontraktor Pelaksana PT. MUTIS EKA KARYA MANDIRI

Kabupaten Kupang

NASAR PAINTIK, ST NIP. 19811123 201001 1 027

IMAM BUDI CAHYONO General Superintenden / GS

AN KEMAJUAN PEKERJAAN MINGGUAN

MINGGUAN KE PERIODE REALISASI S/D MINGGU INI RENCANA MINGGU INI DEVIASI ( + / - )

BOBOT % 7

: : : : :

PROGRESS PEKERJAAN KEMAJUAN MINGGU INI Volume Jumlah Harga Bobot % (Rp.) 11 12 13

KEMAJUAN S/D MINGG LALU Volume Jumlah Harga Bobot % (Rp.) 8 9 10

17 ( T U J U H B E L A S ) 16 Agustus 2016 s/d 30.29 % 39.85 % -9.57 %

KEMAJUAN S/D MINGGU INI Volume Jumlah Harga Bobot % (Rp.) 14 15 16

2.02 2.02

0.39

26,180,557.14 26,180,557.14

0.78 0.78

0.11

7,579,600.00 7,579,600.00

0.23 0.23

0.50

33,760,157.14 33,760,157.14

1.01 1.01

0.59 0.55 6.18 7.32

239.47 100.10 -

14,047,562.88 9,204,212.02 23,251,774.90

0.42 0.27 0.69

99.06 100.10 -

5,810,792.15 9,204,212.02 15,015,004.16

0.17 0.27 0.45

338.52 200.20 -

19,858,355.03 18,408,424.03 38,266,779.06

0.59 0.55 1.14

0.03 0.59 0.42 0.70 0.01 1.75

-

-

-

-

-

-

-

-

-

YA MANDIRI

10.14 19.79 1.32 0.63 2.61 4.53 0.22 39.72 7.37 0.42 0.26 0.67 0.04 0.18 87.90

0.24 0.76 1.00 100.00

215.06 26.00 13.77 6,716.74 17,838.37 -

-

316,619,747.43 21,968,995.36 14,233,393.45 99,456,321.97 264,137,059.86 716,415,518.07

765,847,850.11

9.45 0.66 0.42

50.632 -

2.97 7.88 21.37

2,201.68 8,075.97 -

-

-

74,544,144.76 32,600,804.16 119,582,786.04 226,727,734.97

-

-

22.85

249,322,339.13

2.22 0.97 3.57 6.76

-

265.69 26.00 13.77 8,918.42 25,914.34 -

-

391,163,892.20 21,968,995.36 14,233,393.45 132,057,126.13 383,719,845.90 943,143,253.04

-

-

7.44

1,015,170,189.24

7.44 0.00

11.67 0.66 0.42 3.94 11.45 28.14

30.29 30.29 30.29

Kupang, 22 Agustus 2016 Dibuat Oleh : Konsultan Pengawas CV. PUTRA TIMOR RAYA

enden / GS

Ir.HANAFI Site Engineering

22 Agustus 2016

BOBOT PRESTASI Terhadap Pekerjaan 17 49.89

100.00 100.00 0.00

0.00 0.00 0.00 0.00 0.00

Keterangan 18

0.00 58.97 49.59 67.02 0.00 86.90 0.00 28.83 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00

30.29

%

LAPORAN KEMAJUAN PE NAMA PAKET PROP./KAB./KODYA PEKERJAAN LOKASI TAHUN ANGGARAN WAKTU PELAKSANAAN KONSULTAN PENGAWAS KONTRAKTOR PELAKSANA

: : : : : : : :

PEMBANGUNAN JEMBATAN AIR BAUN NUSA TENGGARA TIMUR/KUPANG PENGAWASAN TEKNIS PEMBANGUNAN JEMBATAN AIR BAUN KECAMATAN KUPANG TENGAH 2016 210 (DUA RATUS SEPULUH) HARI KALENDER CV. PUTRA TIMOR RAYA PT. MUTIS EKA KARYA MANDIRI

NO. MATA PEMBAYA RAN

URAIAN PEKERJAAN

SATUAN

VOLUME

HARGA SATUAN (Rp)

1

2

3

4

5

DIVISI 1. UMUM 1.2 Mobilisasi

JUMLAH HARGA PEKERJAAN DIVISI 6. PERKERASAN ASPAL

7

1.00

67,675,000.00

67,675,000.00 67,675,000.00

2.02 2.02

M3 M3 M3

338.52 200.20 962.41

58,662.28 91,950.17 215,179.75

19,858,355.03 18,408,424.03 207,090,734.36 245,357,513.42

0.59 0.55 6.18 7.32

Liter Ton Ton Kg Kg

63.00 15.57 1.09 467.07 168.31

16,037.42 1,273,740.21 12,922,232.53 50,449.65 1,405.50

1,010,357.46 19,831,036.47 14,137,536.19 23,563,726.13 236,566.73 58,779,222.98

0.03 0.59 0.42 0.70 0.01 1.75

JUMLAH HARGA PEKERJAAN DIVISI 3. PEKERJAAN TANAH

DIVISI 6. PERKERASAN ASPAL 6.1.(2).a Lapis Perekat - Aspal Cair 6.3.4 a Lataston Lapis Pondasi (HRS-Base) Gradasi Senjang/Semi Senjang 6.3.8 .a Apal Minyak 6.3.9 Aditif Anti Pengelupasan 6.3.10 a Bahan Pengisi (Filler) Tambahan (Semen)

6

Ls

JUMLAH HARGA PEKERJAAN DIVISI 1. UMUM

DIVISI 3. PEKERJAAN TANAH 3.1.3 Galian Struktur dengan Kedalaman 0 - 2 meter 3.1.4 Galian Struktur dengan Kedalaman 0 - 4 meter 3.2.2 Timbunan Pilihan

JUMLAH HARGA (Rp) BOBOT %

DIVISI 7. STRUKTUR 7.1.(5) Beton Mutu Sedang dengan fc'=20 MPa (K-350) 7.1.(7) Beton Mutu Sedang dengan fc'=20 MPa (K-250) 7.1.(9) Beton Siklop fc' Mpa (K-175) 7.1.(10) Beton Mutu Rendah dengan fc'=10 MPa (K-125) Fondasi Sumuran K250 - Alas + Topping (Isian Atas dan Bawah) Baja Tulangan BJ 39 Ulir (Untuk Dinding) 7.3.(1) Baja Tulangan BJ 24 Polos 7.3.(4) Baja Tulangan BJ 39 Ulir 7.9 Pasangan Batu 7.11.(6) Expansion Joint Tipe Baja bersudut (Besi Siku 7 x 7 cm) 7.12.(6) Bearing Pad (30 x 400 x 410) 7.13. Sandarang (Railing) 7.14. Papan Nama Jembatan 7.16. Pipa Cucuran Baja

M3 M3 M3 M3

193.33 450.52 52.43 20.54

1,758,170.67 1,472,273.36 844,961.36 1,033,780.02

M3 Kg Kg Kg M3 M Buah M Buah M

59.42 10,263.21 526.33 89,901.32 411.10 62.40 24.00 140.80 2.00 40.00

1,472,273.36 14,807.24 13,814.06 14,807.24 601,270.06 223,900.51 357,005.27 158,690.05 751,668.92 153,410.05

Buah M

40.00 36.00

201,712.69 709,421.05

JUMLAH HARGA PEKERJAAN DIVISI 7. STRUKTUR

DIVISI 8. PENGEMBALIAN KONDISI DAN PEKERJAAN MINOR 8.4.(5) Patok Pengarah 8.4.7 Rel Pengaman JUMLAH HARGA PEK. DIVISI 8. PENGEMBALIAN KONDISI DAN PEKERJAAN MINOR

Jumlah Harga PPN 10% Jumlah Total Harga Dibulatkan

Mengetahui, Direksi Lapangan Dinas Pekerjaan Umum dan Perumahan Rakyat

339,901,695.64 663,285,649.60 44,303,014.03 21,237,563.22 87,475,239.47 151,969,858.89 7,270,796.75 1,331,190,353.00 247,183,337.59 13,971,391.82 8,568,126.48 22,343,559.04 1,503,337.84 6,136,402.00 2,946,340,325.37

10.14 19.79 1.32 0.63 2.61 4.53 0.22 39.72 7.37 0.42 0.26 0.67 0.04 0.18 87.90

8,068,507.60 25,539,157.80 33,607,665.40

0.24 0.76 1.00

3,351,759,727.17 335,175,972.72 3,686,935,699.88 3,686,935,600.00

100.00

Disetujui Oleh ; Kontraktor Pelaksana PT. MUTIS EKA KARYA MANDIRI

Kabupaten Kupang

NASAR PAINTIK, ST NIP. 19811123 201001 1 027

IMAM BUDI CAHYONO General Superintenden / GS

MAJUAN PEKERJAAN MINGGUAN

MINGGUAN KE PERIODE REALISASI S/D MINGGU INI RENCANA MINGGU INI DEVIASI ( + / - )

KEMAJUAN S/D MINGG LALU Volume Jumlah Harga Bobot % (Rp.) 8 9 10 0.50

338.52 200.20 -

-

PROGRESS PEKERJAAN KEMAJUAN MINGGU INI Volume Jumlah Harga Bobot % (Rp.) 11 12 13

33,760,157.14 33,760,157.14

1.01 1.01

-

19,858,355.03 18,408,424.03 38,266,779.06

0.59 0.55 1.14

-

-

-

-

-

: : : : :

-

-

-

-

-

-

18 ( DELAPAN BELAS )

23 Agustus 2016 34.08 45.99 -11.91

% % %

KEMAJUAN S/D MINGGU INI Volume Jumlah Harga Bobot % (Rp.) 14 15 16

BOBOT PRESTASI Terhadap Pekerjaan 17

0.50

33,760,157.14 33,760,157.14

1.01 1.01

49.89

338.52 200.20 -

19,858,355.03 18,408,424.03 38,266,779.06

0.59 0.55 1.14

100.00 100.00 0.00

-

0.00 0.00 0.00 0.00 0.00

-

-

29 Agustus 2016

s/d

-

-

265.69 26.00 13.77 8,918.42 25,914.34 -

-

391,163,892.20 21,968,995.36 14,233,393.45 132,057,126.13 383,719,845.90 943,143,253.04

1,015,170,189.24

11.67 0.66 0.42 3.94 11.45 28.14

-

10.56 26.43 -

15,547,206.68 22,334,018.67 -

0.46 0.67 -

276.25 52.43 13.77

406,711,098.88 44,303,014.03 14,233,393.45

12.13 1.32 0.42

0.00 61.32 100.00 67.02

59.42 123.30 -

87,475,239.47 1,825,673.46 127,182,138.28

2.61 0.05 3.79

59.42 8,918.42 26,037.64 -

87,475,239.47 132,057,126.13 385,545,519.36 1,070,325,391.32

2.61 3.94 11.50 31.93

100.00 86.90 0.00 28.96 0.00 0.00 0.00 0.00 0.00 0.00

-

-

30.29

127,182,138.28

-

-

-

3.79

1,142,352,327.52

-

0.00 0.00 -

34.08

34.08

Kupang, 29 Agustus 2016 Dibuat Oleh : Konsultan Pengawas CV. PUTRA TIMOR RAYA

Ir.HANAFI Site Engineering

Keterangan 18

%

LAPORAN KEMAJUAN NAMA PAKET PROP./KAB./KODYA PEKERJAAN LOKASI TAHUN ANGGARAN WAKTU PELAKSANAAN KONSULTAN PENGAWAS KONTRAKTOR PELAKSANA

: : : : : : : :

PEMBANGUNAN JEMBATAN AIR BAUN NUSA TENGGARA TIMUR/KUPANG PENGAWASAN TEKNIS PEMBANGUNAN JEMBATAN AIR BAUN KECAMATAN KUPANG TENGAH 2016 210 (DUA RATUS SEPULUH) HARI KALENDER CV. PUTRA TIMOR RAYA PT. MUTIS EKA KARYA MANDIRI

NO. MATA PEMBAYA RAN

URAIAN PEKERJAAN

SATUAN

VOLUME

HARGA SATUAN (Rp)

JUMLAH HARGA (Rp)

1

2

3

4

5

6

DIVISI 1. UMUM 1.2 Mobilisasi

Ls

1.00

67,675,000.00

67,675,000.00 67,675,000.00

M3 M3 M3

338.52 200.20 962.41

58,662.28 91,950.17 215,179.75

19,858,355.03 18,408,424.03 207,090,734.36 245,357,513.42

Liter Ton Ton Kg Kg

63.00 15.57 1.09 467.07 168.31

16,037.42 1,273,740.21 12,922,232.53 50,449.65 1,405.50

1,010,357.46 19,831,036.47 14,137,536.19 23,563,726.13 236,566.73 58,779,222.98

JUMLAH HARGA PEKERJAAN DIVISI 1. UMUM

DIVISI 3. PEKERJAAN TANAH 3.1.3 Galian Struktur dengan Kedalaman 0 - 2 meter 3.1.4 Galian Struktur dengan Kedalaman 0 - 4 meter 3.2.2 Timbunan Pilihan JUMLAH HARGA PEKERJAAN DIVISI 3. PEKERJAAN TANAH

DIVISI 6. PERKERASAN ASPAL 6.1.(2).a Lapis Perekat - Aspal Cair 6.3.4 a Lataston Lapis Pondasi (HRS-Base) Gradasi Senjang/Semi Senjang 6.3.8 .a Apal Minyak 6.3.9 Aditif Anti Pengelupasan 6.3.10 a Bahan Pengisi (Filler) Tambahan (Semen) JUMLAH HARGA PEKERJAAN DIVISI 6. PERKERASAN ASPAL

DIVISI 7. STRUKTUR 7.1.(5) Beton Mutu Sedang dengan fc'=20 MPa (K-350) 7.1.(7) Beton Mutu Sedang dengan fc'=20 MPa (K-250) 7.1.(9) Beton Siklop fc' Mpa (K-175) 7.1.(10) Beton Mutu Rendah dengan fc'=10 MPa (K-125) Fondasi Sumuran K250 - Alas + Topping (Isian Atas dan Bawah) Baja Tulangan BJ 39 Ulir (Untuk Dinding) 7.3.(1) Baja Tulangan BJ 24 Polos 7.3.(4) Baja Tulangan BJ 39 Ulir 7.9 Pasangan Batu 7.11.(6) Expansion Joint Tipe Baja bersudut (Besi Siku 7 x 7 cm) 7.12.(6) Bearing Pad (30 x 400 x 410) 7.13. Sandarang (Railing) 7.14. Papan Nama Jembatan 7.16. Pipa Cucuran Baja

M3 M3 M3 M3

193.33 450.52 52.43 20.54

1,758,170.67 1,472,273.36 844,961.36 1,033,780.02

M3 Kg Kg Kg M3 M Buah M Buah M

59.42 10,263.21 526.33 89,901.32 411.10 62.40 24.00 140.80 2.00 40.00

1,472,273.36 14,807.24 13,814.06 14,807.24 601,270.06 223,900.51 357,005.27 158,690.05 751,668.92 153,410.05

Buah M

40.00 36.00

201,712.69 709,421.05

JUMLAH HARGA PEKERJAAN DIVISI 7. STRUKTUR

DIVISI 8. PENGEMBALIAN KONDISI DAN PEKERJAAN MINOR 8.4.(5) Patok Pengarah 8.4.7 Rel Pengaman JUMLAH HARGA PEK. DIVISI 8. PENGEMBALIAN KONDISI DAN PEKERJAAN MINOR

Jumlah Harga PPN 10% Jumlah Total Harga Dibulatkan

Mengetahui, Direksi Lapangan Dinas Pekerjaan Umum dan Perumahan Rakyat

339,901,695.64 663,285,649.60 44,303,014.03 21,237,563.22 87,475,239.47 151,969,858.89 7,270,796.75 1,331,190,353.00 247,183,337.59 13,971,391.82 8,568,126.48 22,343,559.04 1,503,337.84 6,136,402.00 2,946,340,325.37

8,068,507.60 25,539,157.80 33,607,665.40 3,351,759,727.17 335,175,972.72 3,686,935,699.88 3,686,935,600.00

Disetujui Oleh ; Kontraktor Pelaksana PT. MUTIS EKA KARYA MANDIRI

Kabupaten Kupang

NASAR PAINTIK, ST NIP. 19811123 201001 1 027

IMAM BUDI CAHYONO General Superintenden / GS

ORAN KEMAJUAN PEKERJAAN MINGGUAN

MINGGUAN KE PERIODE PROGRES S/D MINGGU INI RENCANA MINGGU INI DEVIASI ( + / - )

BOBOT % 7

KEMAJUAN S/D MINGG LALU Volume Jumlah Harga Bobot % (Rp.) 8 9 10

2.02 2.02

0.50

0.59 0.55 6.18 7.32

338.52 200.20 -

0.03 0.59 0.42 0.70 0.01 1.75

-

PROGRESS PEKERJAAN KEMAJUAN MINGGU INI Volume Jumlah Harga Bobot % (Rp.) 11 12 13

33,760,157.14 33,760,157.14

1.01 1.01

-

19,858,355.03 18,408,424.03 38,266,779.06

0.59 0.55 1.14

-

-

-

-

-

: : : : :

-

-

-

-

-

-

19 ( SEMBILAN BELAS )

30 Agustus 2016 35.84 52.13 -16.28

% % %

KEMAJUAN S/D MINGGU INI Volume Jumlah Harga Bobot % (Rp.) 14 15 16 0.50

33,760,157.14 33,760,157.14

1.01 1.01

338.52 200.20 -

19,858,355.03 18,408,424.03 38,266,779.06

0.59 0.55 1.14

-

-

s/d

-

-

10.14 19.79 1.32 0.63 2.61 4.53 0.22 39.72 7.37 0.42 0.26 0.67 0.04 0.18 87.90

0.24 0.76 1.00 100.00

or Pelaksana A KARYA MANDIRI

276.25 52.43 13.77 59.42 8,918.42 26,037.64 -

-

406,711,098.88 44,303,014.03 14,233,393.45 87,475,239.47 132,057,126.13 385,545,519.36 1,070,325,391.32

1,142,352,327.52

12.13 1.32 0.42 2.61 3.94 11.50 31.93

-

40.03 -

-

58,938,047.15 58,938,047.15

-

-

34.08

58,938,047.15

1.76 1.76

-

316.28 52.43 13.77 59.42 8,918.42 26,037.64 -

-

465,649,146.03 44,303,014.03 14,233,393.45 87,475,239.47 132,057,126.13 385,545,519.36 1,129,263,438.46

-

-

1.76

1,201,290,374.67

Kupang, 05 September 2016

Dibuat Oleh : Konsultan Pengawas CV. PUTRA TIMOR RAYA

13.89 1.32 0.42 2.61 3.94 11.50 33.69

35.84

DI CAHYONO erintenden / GS

Ir.HANAFI Site Engineering

05 September 2016

BOBOT PRESTASI Terhadap Pekerjaan 17 49.89

100.00 100.00 0.00

0.00 0.00 0.00 0.00 0.00

Keterangan 18

0.00 70.20 100.00 67.02 100.00 86.90 0.00 28.96 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00

35.84

%

LAPORAN KEMAJUAN PE NAMA PAKET PROP./KAB./KODYA PEKERJAAN LOKASI TAHUN ANGGARAN WAKTU PELAKSANAAN KONSULTAN PENGAWAS KONTRAKTOR PELAKSANA

: : : : : : : :

PEMBANGUNAN JEMBATAN AIR BAUN NUSA TENGGARA TIMUR/KUPANG PENGAWASAN TEKNIS PEMBANGUNAN JEMBATAN AIR BAUN KECAMATAN KUPANG TENGAH 2016 210 (DUA RATUS SEPULUH) HARI KALENDER CV. PUTRA TIMOR RAYA PT. MUTIS EKA KARYA MANDIRI

NO. MATA PEMBAYA RAN

URAIAN PEKERJAAN

SATUAN

VOLUME

HARGA SATUAN (Rp)

JUMLAH HARGA (Rp)

1

2

3

4

5

6

DIVISI 1. UMUM 1.2 Mobilisasi

Ls

1.00

67,675,000.00

67,675,000.00 67,675,000.00

M3 M3 M3

338.52 200.20 962.41

58,662.28 91,950.17 215,179.75

19,858,355.03 18,408,424.03 207,090,734.36 245,357,513.42

Liter Ton Ton Kg Kg

63.00 15.57 1.09 467.07 168.31

16,037.42 1,273,740.21 12,922,232.53 50,449.65 1,405.50

1,010,357.46 19,831,036.47 14,137,536.19 23,563,726.13 236,566.73 58,779,222.98

JUMLAH HARGA PEKERJAAN DIVISI 1. UMUM

DIVISI 3. PEKERJAAN TANAH 3.1.3 Galian Struktur dengan Kedalaman 0 - 2 meter 3.1.4 Galian Struktur dengan Kedalaman 0 - 4 meter 3.2.2 Timbunan Pilihan JUMLAH HARGA PEKERJAAN DIVISI 3. PEKERJAAN TANAH

DIVISI 6. PERKERASAN ASPAL 6.1.(2).a Lapis Perekat - Aspal Cair 6.3.4 a Lataston Lapis Pondasi (HRS-Base) Gradasi Senjang/Semi Senjang 6.3.8 .a Apal Minyak 6.3.9 Aditif Anti Pengelupasan 6.3.10 a Bahan Pengisi (Filler) Tambahan (Semen) JUMLAH HARGA PEKERJAAN DIVISI 6. PERKERASAN ASPAL

DIVISI 7. STRUKTUR 7.1.(5) Beton Mutu Sedang dengan fc'=20 MPa (K-350) 7.1.(7) Beton Mutu Sedang dengan fc'=20 MPa (K-250) 7.1.(9) Beton Siklop fc' Mpa (K-175) 7.1.(10) Beton Mutu Rendah dengan fc'=10 MPa (K-125) Fondasi Sumuran K250 - Alas + Topping (Isian Atas dan Bawah) Baja Tulangan BJ 39 Ulir (Untuk Dinding) 7.3.(1) Baja Tulangan BJ 24 Polos 7.3.(4) Baja Tulangan BJ 39 Ulir 7.9 Pasangan Batu 7.11.(6) Expansion Joint Tipe Baja bersudut (Besi Siku 7 x 7 cm) 7.12.(6) Bearing Pad (30 x 400 x 410) 7.13. Sandarang (Railing) 7.14. Papan Nama Jembatan 7.16. Pipa Cucuran Baja

M3 M3 M3 M3

193.33 450.52 52.43 20.54

1,758,170.67 1,472,273.36 844,961.36 1,033,780.02

M3 Kg Kg Kg M3 M Buah M Buah M

59.42 10,263.21 526.33 89,901.32 411.10 62.40 24.00 140.80 2.00 40.00

1,472,273.36 14,807.24 13,814.06 14,807.24 601,270.06 223,900.51 357,005.27 158,690.05 751,668.92 153,410.05

Buah M

40.00 36.00

201,712.69 709,421.05

JUMLAH HARGA PEKERJAAN DIVISI 7. STRUKTUR

DIVISI 8. PENGEMBALIAN KONDISI DAN PEKERJAAN MINOR 8.4.(5) Patok Pengarah 8.4.7 Rel Pengaman JUMLAH HARGA PEK. DIVISI 8. PENGEMBALIAN KONDISI DAN PEKERJAAN MINOR

Jumlah Harga PPN 10% Jumlah Total Harga Dibulatkan

Mengetahui, Direksi Lapangan Dinas Pekerjaan Umum dan Perumahan Rakyat

339,901,695.64 663,285,649.60 44,303,014.03 21,237,563.22 87,475,239.47 151,969,858.89 7,270,796.75 1,331,190,353.00 247,183,337.59 13,971,391.82 8,568,126.48 22,343,559.04 1,503,337.84 6,136,402.00 2,946,340,325.37

8,068,507.60 25,539,157.80 33,607,665.40 3,351,759,727.17 335,175,972.72 3,686,935,699.88 3,686,935,600.00

Disetujui Oleh ; Kontraktor Pelaksana PT. MUTIS EKA KARYA MANDIRI

Kabupaten Kupang

NASAR PAINTIK, ST NIP. 19811123 201001 1 027

IMAM BUDI CAHYONO General Superintenden / GS

ORAN KEMAJUAN PEKERJAAN MINGGUAN

MINGGUAN KE PERIODE REALISASI S/D MINGGU INI RENCANA MINGGU INI DEVIASI ( + / - )

BOBOT % 7

KEMAJUAN S/D MINGG LALU Volume Jumlah Harga Bobot % (Rp.) 8 9 10

2.02 2.02

0.50

0.59 0.55 6.18 7.32

338.52 200.20 -

0.03 0.59 0.42 0.70 0.01 1.75

-

PROGRESS PEKERJAAN KEMAJUAN MINGGU INI Volume Jumlah Harga Bobot % (Rp.) 11 12 13

33,760,157.14 33,760,157.14

1.01 1.01

-

19,858,355.03 18,408,424.03 38,266,779.06

0.59 0.55 1.14

-

-

-

-

-

: : : : :

-

-

-

-

-

-

20 ( DUA PULUH ) 06 September 2016

s/d

36.19 63.33 -27.14

% % %

KEMAJUAN S/D MINGGU INI Volume Jumlah Harga Bobot % (Rp.) 14 15 16 0.50

33,760,157.14 33,760,157.14

1.01 1.01

338.52 200.20 -

19,858,355.03 18,408,424.03 38,266,779.06

0.59 0.55 1.14

-

-

-

-

10.14 19.79 1.32 0.63 2.61 4.53 0.22 39.72 7.37 0.42 0.26 0.67 0.04 0.18 87.90

0.24 0.76 1.00 100.00

r Pelaksana KARYA MANDIRI

316.28 52.43 13.77 59.42 8,918.42 26,037.64 -

-

465,649,146.03 44,303,014.03 14,233,393.45 87,475,239.47 132,057,126.13 385,545,519.36 1,129,263,438.46

1,201,290,374.67

13.89 1.32 0.42 2.61 3.94 11.50 33.69

-

7.95 -

-

11,704,573.21 11,704,573.21

-

-

35.84

11,704,573.21

0.35 0.35

-

324.23 52.43 13.77 59.42 8,918.42 26,037.64 -

-

477,353,719.24 44,303,014.03 14,233,393.45 87,475,239.47 132,057,126.13 385,545,519.36 1,140,968,011.68

-

-

0.35

1,212,994,947.88

Kupang, 12 September 2016

Dibuat Oleh : Konsultan Pengawas CV. PUTRA TIMOR RAYA

14.24 1.32 0.42 2.61 3.94 11.50 34.04

36.19

I CAHYONO erintenden / GS

Ir.HANAFI Site Engineering

12 September 2016

BOBOT PRESTASI Terhadap Pekerjaan 17 49.89

100.00 100.00 0.00

0.00 0.00 0.00 0.00 0.00

Keterangan 18

0.00 71.97 100.00 67.02 0.00 100.00 86.90 0.00 28.96 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00

36.19

%

LAPORAN KEMAJUAN NAMA PAKET PROP./KAB./KODYA PEKERJAAN LOKASI TAHUN ANGGARAN WAKTU PELAKSANAAN KONSULTAN PENGAWAS KONTRAKTOR PELAKSANA

: : : : : : : :

PEMBANGUNAN JEMBATAN AIR BAUN NUSA TENGGARA TIMUR/KUPANG PENGAWASAN TEKNIS PEMBANGUNAN JEMBATAN AIR BAUN KECAMATAN KUPANG TENGAH 2016 210 (DUA RATUS SEPULUH) HARI KALENDER CV. PUTRA TIMOR RAYA PT. MUTIS EKA KARYA MANDIRI

NO. MATA PEMBAYA RAN

URAIAN PEKERJAAN

SATUAN

VOLUME

HARGA SATUAN (Rp)

JUMLAH HARGA (Rp)

1

2

3

4

5

6

DIVISI 1. UMUM 1.2 Mobilisasi

Ls

1.00

67,675,000.00

67,675,000.00 67,675,000.00

M3 M3 M3

338.52 200.20 962.41

58,662.28 91,950.17 215,179.75

19,858,355.03 18,408,424.03 207,090,734.36 245,357,513.42

Liter Ton Ton Kg Kg

63.00 15.57 1.09 467.07 168.31

16,037.42 1,273,740.21 12,922,232.53 50,449.65 1,405.50

1,010,357.46 19,831,036.47 14,137,536.19 23,563,726.13 236,566.73 58,779,222.98

JUMLAH HARGA PEKERJAAN DIVISI 1. UMUM

DIVISI 3. PEKERJAAN TANAH 3.1.3 Galian Struuktur dengan Kedalaman 0 - 2 meter 3.1.4 Galian Struuktur dengan Kedalaman 0 - 4 meter 3.2.2 Timbunan Pilihan JUMLAH HARGA PEKERJAAN DIVISI 3. PEKERJAAN TANAH

DIVISI 6. PERKERASAN ASPAL 6.1.(2).a Lapis Perekat - Aspal Cair 6.3.4 a Lataston Lapis Pondasi (HRS-Base) Gradasi Senjang/Semi Senjang 6.3.8 .a Apal Minyak 6.3.9 Aditif Anti Pengelupasan 6.3.10 a Bahan Pengisi (Filler) Tambahan (Semen) JUMLAH HARGA PEKERJAAN DIVISI 6. PERKERASAN ASPAL

DIVISI 7. STRUKTUR 7.1.(5) Beton Mutu Sedang dengan fc'=20 MPa (K-350) 7.1.(7) Beton Mutu Sedang dengan fc'=20 MPa (K-250) 7.1.(9) Beton Siklop fc' Mpa (K-175) 7.1.(10) Beton Mutu Rendah dengan fc'=10 MPa (K-125) Fondasi Sumuran K250 - Alas + Topping (Isian Atas dan Bawah) Baja Tulangan BJ 39 Ulir (Untuk Dinding) 7.3.(1) Baja Tulangan BJ 24 Polos 7.3.(4) Baja Tulangan BJ 39 Ulir 7.9 Pasangan Batu 7.11.(6) Expansion Joint Tipe Baja bersudut (Besi Siku 7 x 7 cm) 7.12.(6) Bearing Pad (30 x 400 x 410) 7.13. Sandarang (Railing) 7.14. Papan Nama Jembatan 7.16. Pipa Cucuran Baja

M3 M3 M3 M3

193.33 450.52 52.43 20.54

1,758,170.67 1,472,273.36 844,961.36 1,033,780.02

M3 Kg Kg Kg M3 M Buah M Buah M

59.42 10,263.21 526.33 89,901.32 411.10 62.40 24.00 140.80 2.00 40.00

1,472,273.36 14,807.24 13,814.06 14,807.24 601,270.06 223,900.51 357,005.27 158,690.05 751,668.92 153,410.05

Buah M

40.00 36.00

201,712.69 709,421.05

JUMLAH HARGA PEKERJAAN DIVISI 7. STRUKTUR

DIVISI 8. PENGEMBALIAN KONDISI DAN PEKERJAAN MINOR 8.4.(5) Patok Pengarah 8.4.7 Rel Pengaman JUMLAH HARGA PEK. DIVISI 8. PENGEMBALIAN KONDISI DAN PEKERJAAN MINOR

Jumlah Harga PPN 10% Jumlah Total Harga Dibulatkan

Mengetahui, Direksi Lapangan Dinas Pekerjaan Umum dan Perumahan Rakyat

339,901,695.64 663,285,649.60 44,303,014.03 21,237,563.22 87,475,239.47 151,969,858.89 7,270,796.75 1,331,190,353.00 247,183,337.59 13,971,391.82 8,568,126.48 22,343,559.04 1,503,337.84 6,136,402.00 2,946,340,325.37

8,068,507.60 25,539,157.80 33,607,665.40 3,351,759,727.17 335,175,972.72 3,686,935,699.88 3,686,935,600.00

Disetujui Oleh ; Kontraktor Pelaksana PT. MUTIS EKA KARYA MANDIRI

Kabupaten Kupang

NASAR PAINTIK, ST NIP. 19811123 201001 1 027

IMAM BUDI CAHYONO General Superintenden / GS

RAN KEMAJUAN PEKERJAAN MINGGUAN

MINGGUAN KE PERIODE REALISASI S/D MINGGU INI RENCANA MINGGU INI DEVIASI ( + / - )

BOBOT % 7

PROGRESS PEKERJAAN KEMAJUAN MINGGU INI Volume Jumlah Harga Bobot % (Rp.) 11 12 13

KEMAJUAN S/D MINGG LALU Volume Jumlah Harga Bobot % (Rp.) 8 9 10

2.02 2.02

0.50

33,760,157.14 33,760,157.14

1.01 1.01

0.11

0.59 0.55 6.18 7.32

338.52 200.20 -

19,858,355.03 18,408,424.03 38,266,779.06

0.59 0.55 1.14

-

-

-

0.03 0.59 0.42 0.70 0.01 1.75

-

-

: : : : :

-

7,579,600.00 7,579,600.00

0.23 0.23

-

-

-

-

21 ( DUAPULUH SATU )

13 September 2016 41.00 69.33 -28.33

% % %

KEMAJUAN S/D MINGGU INI Volume Jumlah Harga Bobot % (Rp.) 14 15 16 0.61

41,339,757.14 41,339,757.14

1.23 1.23

338.52 200.20 -

19,858,355.03 18,408,424.03 38,266,779.06

0.59 0.55 1.14

-

s/d

-

-

RYA MANDIRI

10.14 19.79 1.32 0.63 2.61 4.53 0.22 39.72 7.37 0.42 0.26 0.67 0.04 0.18 87.90

0.24 0.76 1.00 100.00

324.23 52.43 13.77 59.42 8,918.42 26,037.64 -

-

477,353,719.24 44,303,014.03 14,233,393.45 87,475,239.47 132,057,126.13 385,545,519.36 1,140,968,011.68

1,212,994,947.88

14.24 1.32 0.42 2.61 3.94 11.50 34.04

-

1,344.80 9,025.07 -

-

19,912,732.76 133,636,377.51 153,549,110.26

-

-

36.19

161,128,710.26

0.59 3.99 4.58

-

324.23 52.43 13.77 59.42 10,263.21 35,062.71 -

-

477,353,719.24 44,303,014.03 14,233,393.45 87,475,239.47 151,969,858.89 519,181,896.87 1,294,517,121.94

-

-

4.81

1,374,123,658.14

7.44 2.63

14.24 1.32 0.42 2.61 4.53 15.49 38.62

41.00 43.63 41.00

Kupang, 19 September 2016 Dibuat Oleh : Konsultan Pengawas CV. PUTRA TIMOR RAYA

tenden / GS

Ir.HANAFI Site Engineering

19 September 2016

BOBOT PRESTASI Terhadap Pekerjaan 17 61.09

100.00 100.00 0.00

0.00 0.00 0.00 0.00 0.00

Keterangan 18

0.00 71.97 100.00 67.02 100.00 100.00 0.00 39.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00

41.00

%

LAPORAN KEMAJUAN NAMA PAKET PROP./KAB./KODYA PEKERJAAN LOKASI TAHUN ANGGARAN WAKTU PELAKSANAAN KONSULTAN PENGAWAS KONTRAKTOR PELAKSANA

: : : : : : : :

PEMBANGUNAN JEMBATAN AIR BAUN NUSA TENGGARA TIMUR/KUPANG PENGAWASAN TEKNIS PEMBANGUNAN JEMBATAN AIR BAUN KECAMATAN KUPANG TENGAH 2016 210 (DUA RATUS SEPULUH) HARI KALENDER CV. PUTRA TIMOR RAYA PT. MUTIS EKA KARYA MANDIRI

NO. MATA PEMBAYA RAN

URAIAN PEKERJAAN

SATUAN

VOLUME

HARGA SATUAN (Rp)

JUMLAH HARGA (Rp)

1

2

3

4

5

6

DIVISI 1. UMUM 1.2 Mobilisasi

Ls

1.00

67,675,000.00

67,675,000.00 67,675,000.00

M3 M3 M3

338.52 200.20 962.41

58,662.28 91,950.17 215,179.75

19,858,355.03 18,408,424.03 207,090,734.36 245,357,513.42

Liter Ton Ton Kg Kg

63.00 15.57 1.09 467.07 168.31

16,037.42 1,273,740.21 12,922,232.53 50,449.65 1,405.50

1,010,357.46 19,831,036.47 14,137,536.19 23,563,726.13 236,566.73 58,779,222.98

JUMLAH HARGA PEKERJAAN DIVISI 1. UMUM

DIVISI 3. PEKERJAAN TANAH 3.1.3 Galian Struktur dengan Kedalaman 0 - 2 meter 3.1.4 Galian Struktur dengan Kedalaman 0 - 4 meter 3.2.2 Timbunan Pilihan JUMLAH HARGA PEKERJAAN DIVISI 3. PEKERJAAN TANAH

DIVISI 6. PERKERASAN ASPAL 6.1.(2).a Lapis Perekat - Aspal Cair 6.3.4 a Lataston Lapis Pondasi (HRS-Base) Gradasi Senjang/Semi Senjang 6.3.8 .a Apal Minyak 6.3.9 Aditif Anti Pengelupasan 6.3.10 a Bahan Pengisi (Filler) Tambahan (Semen) JUMLAH HARGA PEKERJAAN DIVISI 6. PERKERASAN ASPAL

DIVISI 7. STRUKTUR 7.1.(5) Beton Mutu Sedang dengan fc'=20 MPa (K-350) 7.1.(7) Beton Mutu Sedang dengan fc'=20 MPa (K-250) 7.1.(9) Beton Siklop fc' Mpa (K-175) 7.1.(10) Beton Mutu Rendah dengan fc'=10 MPa (K-125) Fondasi Sumuran K250 - Alas + Topping (Isian Atas dan Bawah) Baja Tulangan BJ 39 Ulir (Untuk Dinding) 7.3.(1) Baja Tulangan BJ 24 Polos 7.3.(4) Baja Tulangan BJ 39 Ulir 7.9 Pasangan Batu 7.11.(6) Expansion Joint Tipe Baja bersudut (Besi Siku 7 x 7 cm) 7.12.(6) Bearing Pad (30 x 400 x 410) 7.13. Sandarang (Railing) 7.14. Papan Nama Jembatan 7.16. Pipa Cucuran Baja

M3 M3 M3 M3

193.33 450.52 52.43 20.54

1,758,170.67 1,472,273.36 844,961.36 1,033,780.02

M3 Kg Kg Kg M3 M Buah M Buah M

59.42 10,263.21 526.33 89,901.32 411.10 62.40 24.00 140.80 2.00 40.00

1,472,273.36 14,807.24 13,814.06 14,807.24 601,270.06 223,900.51 357,005.27 158,690.05 751,668.92 153,410.05

Buah M

40.00 36.00

201,712.69 709,421.05

JUMLAH HARGA PEKERJAAN DIVISI 7. STRUKTUR

DIVISI 8. PENGEMBALIAN KONDISI DAN PEKERJAAN MINOR 8.4.(5) Patok Pengarah 8.4.7 Rel Pengaman JUMLAH HARGA PEK. DIVISI 8. PENGEMBALIAN KONDISI DAN PEKERJAAN MINOR

Jumlah Harga PPN 10% Jumlah Total Harga Dibulatkan

Mengetahui, Direksi Lapangan Dinas Pekerjaan Umum dan Perumahan Rakyat

339,901,695.64 663,285,649.60 44,303,014.03 21,237,563.22 87,475,239.47 151,969,858.89 7,270,796.75 1,331,190,353.00 247,183,337.59 13,971,391.82 8,568,126.48 22,343,559.04 1,503,337.84 6,136,402.00 2,946,340,325.37

8,068,507.60 25,539,157.80 33,607,665.40 3,351,759,727.17 335,175,972.72 3,686,935,699.88 3,686,935,600.00

Disetujui Oleh ; Kontraktor Pelaksana PT. MUTIS EKA KARYA MANDIRI

Kabupaten Kupang

NASAR PAINTIK, ST NIP. 19811123 201001 1 027

IMAM BUDI CAHYONO General Superintenden / GS

RAN KEMAJUAN PEKERJAAN MINGGUAN

MINGGUAN KE PERIODE REALISASI S/D MINGGU INI RENCANA MINGGU INI DEVIASI ( + / - )

BOBOT % 7

KEMAJUAN S/D MINGG LALU Volume Jumlah Harga Bobot % (Rp.) 8 9 10

2.02 2.02

0.61

0.59 0.55 6.18 7.32

338.52 200.20 -

0.03 0.59 0.42 0.70 0.01 1.75

-

PROGRESS PEKERJAAN KEMAJUAN MINGGU INI Volume Jumlah Harga Bobot % (Rp.) 11 12 13

41,339,757.14 41,339,757.14

1.23 1.23

-

19,858,355.03 18,408,424.03 38,266,779.06

0.59 0.55 1.14

-

-

-

-

-

: : : : :

-

-

-

-

-

-

22 ( DUAPULUH DUA )

20 September 2016 43.42 79.92 -36.51

% % %

KEMAJUAN S/D MINGGU INI Volume Jumlah Harga Bobot % (Rp.) 14 15 16 0.61

41,339,757.14 41,339,757.14

1.23 1.23

338.52 200.20 -

19,858,355.03 18,408,424.03 38,266,779.06

0.59 0.55 1.14

-

-

s/d

-

-

ARYA MANDIRI

10.14 19.79 1.32 0.63 2.61 4.53 0.22 39.72 7.37 0.42 0.26 0.67 0.04 0.18 87.90

0.24 0.76 1.00 100.00

324.23 52.43 13.77 59.42 10,263.21 35,062.71 -

-

477,353,719.24 44,303,014.03 14,233,393.45 87,475,239.47 151,969,858.89 519,181,896.87 1,294,517,121.94

1,374,123,658.14

14.24 1.32 0.42 2.61 4.53 15.49 38.62

81,056,009.83 -

2.42 -

379.28 52.43 13.77

558,409,729.07 44,303,014.03 14,233,393.45

16.66 1.32 0.42

-

81,056,009.83

2.42

59.42 10,263.21 35,062.71 -

87,475,239.47 151,969,858.89 519,181,896.87 1,375,573,131.78

2.61 4.53 15.49 41.04

-

-

41.00

81,056,009.83

-

55.06 -

-

-

-

2.42

1,455,179,667.98

Kupang, 26 September 2016 Dibuat Oleh : Konsultan Pengawas CV. PUTRA TIMOR RAYA

43.42

ntenden / GS

Ir.HANAFI Site Engineering

26 September 2016

BOBOT PRESTASI Terhadap Pekerjaan 17 61.09

100.00 100.00 0.00

0.00 0.00 0.00 0.00 0.00

Keterangan 18

0.00 84.19 100.00 67.02 100.00 100.00 0.00 39.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00

43.42

%

LAPORAN KEMAJUAN NAMA PAKET PROP./KAB./KODYA PEKERJAAN LOKASI TAHUN ANGGARAN WAKTU PELAKSANAAN KONSULTAN PENGAWAS KONTRAKTOR PELAKSANA

: : : : : : : :

PEMBANGUNAN JEMBATAN OLI'O NUSA TENGGARA TIMUR/KUPANG PENGAWASAN TEKNIS PEMBANGUNAN JEMBATAN OLI'O KECAMATAN KUPANG TENGAH 2017 210 (DUA RATUS SEPULUH) HARI KALENDER CV. PUTRA TIMOR RAYA PT. MUTIS EKA KARYA MANDIRI

NO. MATA PEMBAYA RAN

URAIAN PEKERJAAN

SATUAN

VOLUME

HARGA SATUAN (Rp)

JUMLAH HARGA (Rp)

1

2

3

4

5

6

DIVISI 1. UMUM 1.2 Mobilisasi

Ls

1.00

67,675,000.00

67,675,000.00 67,675,000.00

M3 M3 M3

338.52 200.20 962.41

58,662.28 91,950.17 215,179.75

19,858,355.03 18,408,424.03 207,090,734.36 245,357,513.42

Liter Ton Ton Kg Kg

63.00 15.57 1.09 467.07 168.31

16,037.42 1,273,740.21 12,922,232.53 50,449.65 1,405.50

1,010,357.46 19,831,036.47 14,137,536.19 23,563,726.13 236,566.73 58,779,222.98

JUMLAH HARGA PEKERJAAN DIVISI 1. UMUM

DIVISI 3. PEKERJAAN TANAH 3.1.3 Galian Struktur dengan Kedalaman 0 - 2 meter 3.1.4 Galian Struktur dengan Kedalaman 0 - 4 meter 3.2.2 Timbunan Pilihan JUMLAH HARGA PEKERJAAN DIVISI 3. PEKERJAAN TANAH

DIVISI 6. PERKERASAN ASPAL 6.1.(2).a Lapis Perekat - Aspal Cair 6.3.4 a Lataston Lapis Pondasi (HRS-Base) Gradasi Senjang/Semi Senjang 6.3.8 .a Apal Minyak 6.3.9 Aditif Anti Pengelupasan 6.3.10 a Bahan Pengisi (Filler) Tambahan (Semen) JUMLAH HARGA PEKERJAAN DIVISI 6. PERKERASAN ASPAL

DIVISI 7. STRUKTUR 7.1.(5) Beton Mutu Sedang dengan fc'=20 MPa (K-350) 7.1.(7) Beton Mutu Sedang dengan fc'=20 MPa (K-250) 7.1.(9) Beton Siklop fc' Mpa (K-175) 7.1.(10) Beton Mutu Rendah dengan fc'=10 MPa (K-125) Fondasi Sumuran K250 - Alas + Topping (Isian Atas dan Bawah) Baja Tulangan BJ 39 Ulir (Untuk Dinding) 7.3.(1) Baja Tulangan BJ 24 Polos 7.3.(4) Baja Tulangan BJ 39 Ulir 7.9 Pasangan Batu 7.11.(6) Expansion Joint Tipe Baja bersudut (Besi Siku 7 x 7 cm) 7.12.(6) Bearing Pad (30 x 400 x 410) 7.13. Sandarang (Railing) 7.14. Papan Nama Jembatan 7.16. Pipa Cucuran Baja

M3 M3 M3 M3

193.33 450.52 52.43 20.54

1,758,170.67 1,472,273.36 844,961.36 1,033,780.02

M3 Kg Kg Kg M3 M Buah M Buah M

59.42 10,263.21 526.33 89,901.32 411.10 62.40 24.00 140.80 2.00 40.00

1,472,273.36 14,807.24 13,814.06 14,807.24 601,270.06 223,900.51 357,005.27 158,690.05 751,668.92 153,410.05

Buah M

40.00 36.00

201,712.69 709,421.05

JUMLAH HARGA PEKERJAAN DIVISI 7. STRUKTUR

DIVISI 8. PENGEMBALIAN KONDISI DAN PEKERJAAN MINOR 8.4.(5) Patok Pengarah 8.4.7 Rel Pengaman JUMLAH HARGA PEK. DIVISI 8. PENGEMBALIAN KONDISI DAN PEKERJAAN MINOR

Jumlah Harga PPN 10% Jumlah Total Harga Dibulatkan

Mengetahui, Direksi Lapangan Dinas Pekerjaan Umum dan Perumahan Rakyat

339,901,695.64 663,285,649.60 44,303,014.03 21,237,563.22 87,475,239.47 151,969,858.89 7,270,796.75 1,331,190,353.00 247,183,337.59 13,971,391.82 8,568,126.48 22,343,559.04 1,503,337.84 6,136,402.00 2,946,340,325.37

8,068,507.60 25,539,157.80 33,607,665.40 3,351,759,727.17 335,175,972.72 3,686,935,699.88 3,686,935,600.00

Disetujui Oleh ; Kontraktor Pelaksana PT. MUTIS EKA KARYA MANDIRI

Kabupaten Kupang

NASAR PAINTIK, ST NIP. 19811123 201001 1 027

IMAM BUDI CAHYONO General Superintenden / GS

AN KEMAJUAN PEKERJAAN MINGGUAN

MINGGUAN KE PERIODE PROGRES S/D MINGGU INI RENCANA MINGGU INI DEVIASI ( + / - )

BOBOT % 7

KEMAJUAN S/D MINGG LALU Volume Jumlah Harga Bobot % (Rp.) 8 9 10

2.02 2.02

0.61

0.59 0.55 6.18 7.32

338.52 200.20 -

0.03 0.59 0.42 0.70 0.01 1.75

-

PROGRESS PEKERJAAN KEMAJUAN MINGGU INI Volume Jumlah Harga Bobot % (Rp.) 11 12 13

41,339,757.14 41,339,757.14

1.23 1.23

-

19,858,355.03 18,408,424.03 38,266,779.06

0.59 0.55 1.14

-

-

-

-

-

: : : : :

-

-

-

-

-

-

23 ( DUAPULUH TIGA )

27 September 2016 45.09 89.88 -44.79

% % %

KEMAJUAN S/D MINGGU INI Volume Jumlah Harga Bobot % (Rp.) 14 15 16 0.61

41,339,757.14 41,339,757.14

1.23 1.23

338.52 200.20 -

19,858,355.03 18,408,424.03 38,266,779.06

0.59 0.55 1.14

-

-

s/d

-

-

RYA MANDIRI

10.14 19.79 1.32 0.63 2.61 4.53 0.22 39.72 7.37 0.42 0.26 0.67 0.04 0.18 87.90

0.24 0.76 1.00 100.00

379.28 52.43 13.77 59.42 10,263.21 35,062.71 -

-

558,409,729.07 44,303,014.03 14,233,393.45 87,475,239.47 151,969,858.89 519,181,896.87 1,375,573,131.78

1,455,179,667.98

16.66 1.32 0.42 2.61 4.53 15.49 41.04

-

28.00 1,012.22 -

-

41,223,654.08 14,988,184.47 56,211,838.55

-

-

43.42

56,211,838.55

1.23 0.45 1.68

-

407.28 52.43 13.77 59.42 10,263.21 36,074.93 -

-

599,633,383.15 44,303,014.03 14,233,393.45 87,475,239.47 151,969,858.89 534,170,081.34 1,431,784,970.33

-

-

1.68

1,511,391,506.53

Kupang, 03 Oktober 2016

Dibuat Oleh : Konsultan Pengawas CV. PUTRA TIMOR RAYA

17.89 1.32 0.42 2.61 4.53 15.94 42.72

45.09

tenden / GS

Ir.HANAFI Site Engineering

03 Oktober 2016

BOBOT PRESTASI Terhadap Pekerjaan 17 61.09

100.00 100.00 0.00

0.00 0.00 0.00 0.00 0.00

Keterangan 18

0.00 90.40 100.00 67.02 100.00 100.00 0.00 40.13 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00

45.09

%