J NAMA PAKET PROP./KAB./KODYA PEKERJAAN LOKASI TAHUN ANGGARAN WAKTU PELAKSANAAN KONSULTAN PENGAWAS KONTRAKTOR PELAKSANA

NO. DIVISI

: : : : : : : :

PEMBANGUNAN JEMBATAN OLI'O NUSA TENGGARA TIMUR/KUPANG PENGAWASAN TEKNIS PEMBANGUNAN JEMBATAN OLI'O KECAMATAN KUPANG TENGAH 2017 210 Hari Kalender CV. PUTRA TIMOR RAYA PT. MUTIS EKA KARYA MANDIRI

URAIAN PEKERJAAN

1

2 DIVISI 1. UMUM 1.2 Mobilisasi

SATUAN

3

VOLUME

4

5

Ls

1.00

2.02 2.02

M3 M3 M3

338.52 200.20 962.41

0.59 0.55 6.18 7.32

Liter Ton Ton Kg Kg

63.00 15.57 1.09 467.07 168.31

0.03 0.59 0.42 0.70 0.01

JUMLAH HARGA PEKERJAAN DIVISI 1. UMUM

DIVISI 3. PEKERJAAN TANAH 3.1.3 Galian Struuktur dengan Kedalaman 0 - 2 meter 3.1.4 Galian Struuktur dengan Kedalaman 0 - 4 meter 3.2.2 Timbunan Pilihan JUMLAH HARGA PEKERJAAN DIVISI 3. PEKERJAAN TANAH

DIVISI 6. PERKERASAN ASPAL 6.1.(2).a Lapis Perekat - Aspal Cair 6.3.4 a Lataston Lapis Pondasi (HRS-Base) Gradasi Senjang/Semi Senjang 6.3.8 .a Apal Minyak 6.3.9 Aditif Anti Pengelupasan 6.3.10 a Bahan Pengisi (Filler) Tambahan (Semen)

BOBOT

M.1

APRIL - MEI M.2 M.3

M.4

M.5

MEI - JUNI M.6

26 - 02'

03 - 09'

10 - 16'

17 - 23'

24 - 30'

31 - 06'

7 Hari 6

7 Hari 7

7 Hari 8

7 Hari 9

7 Hari 10

7 Hari 11

0.067

0.067

0.067

0.59 0.55

0.067

0.067

0.067

1.75

JUMLAH HARGA PEKERJAAN DIVISI 6. PERKERASAN ASPAL

DIVISI 7. STRUKTUR 7.1.(5) Beton Mutu Sedang dengan fc'=20 MPa (K-350) 7.1.(7) Beton Mutu Sedang dengan fc'=20 MPa (K-250) 7.1.(9) Beton Siklop fc' Mpa (K-175) 7.1.(10) Beton Mutu Rendah dengan fc'=10 MPa (K-125) Fondasi Sumuran K250 - Alas + Topping (Isian Atas dan Bawah) Baja Tulangan BJ 39 Ulir (Untuk Dinding) 7.3.(1) Baja Tulangan BJ 24 Polos 7.3.(4) Baja Tulangan BJ 39 Ulir 7.9 Pasangan Batu 7.11.(6) Expansion Joint Tipe Baja bersudut (Besi Siku 7 x 7 cm) 7.12.(6) Bearing Pad (30 x 400 x 410) 7.13. Sandarang (Railing) 7.14. Papan Nama Jembatan 7.16. Pipa Cucuran Baja

M3 M3 M3 M3

193.33 450.52 52.43 20.54

M3 Kg Kg Kg M3 M Buah M Buah M

59.42 10,263.21 526.33 89,901.32 411.10 62.40 24.00 140.80 2.00 40.00

Buah M

40.00 36.00

JUMLAH HARGA PEKERJAAN DIVISI 7. STRUKTUR

DIVISI 8. PENGEMBALIAN KONDISI DAN PEKERJAAN MINOR 8.4.(5) Patok Pengarah 8.4.7 Rel Pengaman JMLH HARGA PEK. DIVISI 8. PENGEMBALIAN KONDISI DAN PEK. MINOR

BOBOT TOTAL (%) KEMAJUAN SESUAI MINGGUAN KOMULATIF KEMAJUAN SESUAI DENGAN RENCANA KEMAJUAN SESUAI DENGAN REALISASI DEVIASI (+ / - )

10.14 19.79 1.32 0.63 2.61 4.53 0.22 39.72 7.37 0.42 0.26 0.67 0.04 0.18 87.90

0.44

0.44

0.44

4.53

0.24 0.76 1.00 100.00 0 0

0.07 0.07 0.00 -0.067

0.66 0.73 0.00 -0.727

0.62 1.34 0.00 -1.344

Keterangan : Schedule Realisasi Acuan Dari Schedule Rencana Kontraktor Pelaksana PT. MUTIS EKA KARYA MANDIRI (Mengikuti Schedule Penawaran Kontrak)

0.51 1.85 0.00 -1.851

0.51 2.36 0.00 -2.36

5.04 7.40 0.31 -7.09

=

Garis Schedule Rencana

=

Garis Schedule Realisasi

JADWAL PELAKSANAAN PEKERJAAN (KURVA - S)

MEI - JUNI M.7

JUNI - JULI M.10 M.11

M.8

M.9

07 - 13'

14 - 20'

21 - 27'

28 - 04'

7 Hari 12

7 Hari 13

4 Hari 14

7 Hari 15

0.067

0.067

0.067

0.067

WAKTU PELAKSANAAN = 210 HARI KALENDER JULI - AGUSTUS AGUSTUS - SEPTEMBER M.14 M.15 M.16 M.17 M.18 M.19 M.20

SEPTEMBER - OKTOBER M.21 M.22 M.23

M.12

M.13

05 - 11'

12 - 18'

19 - 25'

26 - 01'

02 - 08'

09 - 15'

16 - 22'

23 - 29'

30 - 05'

06 - 12'

13 - 19'

20 - 26'

27 - 03'

7 Hari 16

7 Hari 17

7 Hari 18

7 Hari 19

7 Hari 20

7 Hari 21

7 Hari 22

7 Hari 23

7 Hari 24

7 Hari 25

7 Hari 26

7 Hari 27

7 Hari 28

0.067

0.067

0.067

0.067

0.067

0.067

0.067

0.067

0.067

KURVA RENCANA

0.067

0.067

0.067

0.067

5.07

5.07 9.89

9.89

0.63 1.30

1.30 0.22 3.61

3.61

3.61

3.61

3.61

3.61

3.61

3.61

3.61 2.46

3.61 2.46

3.61 2.46 0.42 0.26

0.18

1.37 8.77 2.49 -6.28

1.37 10.15 3.98 -6.16

0.28 10.43 4.76 -5.67

3.68 14.11 4.83 -9.28

3.68 17.79 5.87 -11.92

3.68 21.46 8.77 -12.69

3.68 25.14 13.06 -12.08

3.68 28.82 18.08 -10.74

3.68 32.50 18.37 -14.13

3.68 36.18 22.85 -13.33

3.68 39.85 30.29 -9.57

6.14 45.99 34.08 -11.91

6.14 52.13 35.84 -16.28

11.21 63.33 36.19 -27.14

5.99 69.33 41.00 -28.33

10.60 79.92 43.42 -36.51

9.96 89.88 45.09 -44.79

OKTOBER M.24

OKTOBER - NOVEMBER M.25 M.26 M.27 M.28

NOVEMBER M.29 M.30

04 - 10'

11 - 17'

18 - 24'

25 - 31'

01 - 07'

08 - 14'

15 - 21'

7 Hari 29

7 Hari 30

7 Hari 31

7 Hari 32

3 Hari 33

7 Hari 34

7 Hari 35

0.067

0.067

0.067

0.067

0.067

0.067

0.067

KETERANGAN 210 Hari Kalender 100%

90%

6.18 80%

0.03 0.59 0.42 0.70 0.01

70%

60%

70%

60%

50%

-

40%

KURVA REALISASI

30%

20%

0.67 0.04

10%

0.24 0.76

6.25 96.13

0.10 96.23

1.20 97.42

0.66 98.08

1.07 99.15

0%

0.78 99.93

Dibuat : Konsultan Pengawas CV. PUTRA TIMOR RAYA

0.07 100.0

Ir. HANAFI Site Engineer

5 2 203 205

6.58

100.00 #REF!

0.24

6.82

Related Documents

Kurva S Realisasi.xlsx
November 2019 20
Kurva Who.docx
December 2019 44
Kurva Biofar
August 2019 49
Kurva Titrasi.docx
May 2020 32
Kurva Who.docx
July 2020 29
Kurva Baku.docx
June 2020 15

More Documents from "Hernamirah"

Kurva S Realisasi.xlsx
November 2019 20
Bab_v[1].docx
November 2019 9
Niar.docx
November 2019 5