LAMPIRAN SAMPEL PENGELOLAAN DATA SAMPLING VESSEL DT 1019 : 69 BCM ============== TriangleVolume ============== ********** Triangle Volumetrics ************** Upper Triangles : D:\KANGURU\HD1500_1.tr5 Lower Triangles : D:\KANGURU\BS HD1500_1.tr5 Sub Area : 10.0: - Cut Thick : 0.00 : Nett Volume cu.metres Area sq.metres Surface Area Aver_Thick
Positive 69 74 86 0.93
Negative 69 74 86
0 0 0
0.93
\ DT1066 : 83 BCM ********** Triangle Volumetrics ************** Upper Triangles : D:\KANGURU\HD1500_2.tr5 Lower Triangles : D:\KANGURU\BS HD1500_2.tr5 Sub Area : 10.0: - Cut Thick : 0.00 : Nett Volume cu.metres Area sq.metres Surface Area
T
Aver_Thick
Positive 83 92 107 0.90
Negative 83 92 107 0.90
0 0 0