SPACE Infratech no: 51/5,
P. A. Koil Street, Kottur, Chennai : 600 085. Phone: 044 4230 3848 cell: 99142 98660 / 99520 35380
Ref. no. GD/SIT/ 332.2009.01 To, Mr.Gyan Prakash M/s. Intecc Chennai Dear Sir, This has in reference with the Dorma glass patch door, 10mm Clear Toughened Glass requirement in M/s. CTS, Third Floor, MEPZ, Tambaram, Chennai. Please find below our quote for your kind consideration Glass door size : 0.9 M x 2.1 M x 4nos. = 7.56 sqm [approximately 8.00 sqm (86.08 sft.)] S.no. 1 2
Description Cost of 10mm Toughened glass with cutout & holes VAT @ 12.5%
Rate 205
Quantity 86.5
Total Amont
Terms & Conditions: PAYMENT: 1. 100% advance to be paid for 10mm clear Toughened glass 2. The above given rates are net rates inclusive of all discounts and taxes. 3. Interest @ 18% will be charges if the payments terms are not complied with.
DELIVERY: Within 2 weeks form the date of Work order issued by the client along with the advance payment for 10mm clear Toughened glass
TOLERANCE & FORMS for Toughened glass: * Deviation of form +/- 6mm * Straightness of edges < 3mm/m * Twisting < 4mm/m QUOTATION The above glass rates and Quotation are valid for 15days only. Thanking you and assuring you for your best service always.
for
SPACE Infratech
Authorised Signatory
2 98660 / 99520 35380
ss requirement in
Amount 17,732.50 2,216.56
19,949.06
ance payment
SPACE Infratech no: 51/5,
P. A. Koil Street, Kottur, Chennai : 600 085. Phone: 044 4230 3848 cell: 99142 98660 / 99520 35380
Ref. no. GD/SIT/ 332.2009.01 To, Mr.Gyan Prakash M/s. Intecc Chennai Dear Sir, This has in reference with the Dorma patch door Installation requirement in M/s. CTS, Third Floor, MEPZ, Tambaram, Chennai. Please find below our quote for your kind consideration
S.no. 1 2 3 4
Description Installation of Patch door with floor spring Service Tax @ 12.36%
2000
Rate
Quantity 4 nos.
250
4 nos.
Total Wax filling for floor spring
Total Amont
Terms & Conditions: PAYMENT: 1. 100% advance to be paid for 10mm clear Toughened glass 2. The above given rates are net rates inclusive of all discounts and taxes. 3. Interest @ 18% will be charges if the payments terms are not complied with.
DELIVERY: Within 2 weeks form the date of Work order issued by the client along with the advance payment for 10mm clear Toughened glass & 50% of Instllation Charges.
TOLERANCE & FORMS for Toughened glass: * Deviation of form +/- 6mm * Straightness of edges < 3mm/m * Twisting < 4mm/m QUOTATION The above glass rates and Quotation are valid for 15days only. Thanking you and assuring you for your best service always.
for
SPACE Infratech
Authorised Signatory
2 98660 / 99520 35380
Amount 8,000.00 988.80 8,988.80 1,000.00
18,977.60
ance payment