JUNE JUNE 2008 2008
ASIA ASIA CLEAN CLEAN ENERGY ENERGY FORUM FORUM
1
Ⅰ Ⅱ Ⅲ
2
Ⅰ
3
KOREA’s Financial Support System y Fund established in 1980 y Loan : long term, low rate of interest loans for investing in energy efficiency & conservation facilities
y Tax incentives : 10% tax deduction (income tax or corporation tax) for investments of energy efficiency & conservation facilities
y Managed by MKE(government) and operated by KEMCO 4
Projects of Loan Rational use of energy Establishment of cogeneration facilities for industry or building, installation of energy efficiency & conservation facilities and ESCO projects etc.
Integrated Energy Supply District Heating, Community Energy System, Industrial Complex CHP (Combined Heat and Power System)
Dissemination of New & Renewable energy Installation of equipment using alternative energy such as solarheat, solar-light and bio-energy etc. 5
Loan Scale in 2008 Budget (million USD)
Category Rational Use of Energy
480
Integrated Energy Supply
100
Dissemination of New & Renewable energy
130
Total
710 (1 USD ≒1,000 won)
※ Rate of interest : 3.25~6% (variable) Repayment period : 4~15years (according to facilities or project)
6
Loan Procedure ① to apply
Applicant
KEMCO
② to recommend ③ ply ap
et
to ②
g iv he
n loa the for
to
no le n t if y da gr ee me nt
to
④
l oa
n
BANK 7
Ⅱ
8
ESCO System in KOREA y System is in operation since 1992 y ESCO should be registered before applying for a loan y 156 y But,
ESCOs have registered as of 2007 Active ESCOs are about 30~40
y Energy Performance Contracting model is almost the Shared Savings model (about 98%)
9
Two main models for EPC Shared savings model (ESCO: Fund raising and profit sharing)
Energy user
ESCO fund raise
Guaranteed savings model (ESCO: energy performance guarantee / Energy user: Fund raising)
Energy user
ESCO
fund raise
10
System of supporting ESCO Investment in facility
ESCO
Energy user sharing of cost savings
· Advertisement · Market expansion
· Financial support · Policy improvement
MKE & KEMCO ※ MKE : Ministry of Knowledge Economy KEMCO : Korea Energy Management Corporation 11
Number of registered ESCOs 180
159
160
163 163
No. of ESCOs
140
159
166
158 156
120 103
100 80 55
60 40 20
4
5
7
6
9
'9 2
'9 3
'9 4
'9 5
'9 6
16
28
0
Class 1(plant) 18 companies
'9 7
'9 8
Class 2(building) 47 companies 12
'9 9
'0 0
'0 1
'0 2
'0 3
'0 4
'0 5
'0 6
'0 7
Class 1 · 2 Total 91 companies 156 companies
Yearly Investment Performance 200 ESCO Fund(million USD)
548
150
500
491 140
133 136 400 328
100
100
86
244
75
300
83
65 50
202
139
167
156 106 100
30 0
200
0.5 3.9 2.8 5.5245.725 3 3 3
0
'93 '94 '95 '96 '97 '98 '99 Year '00 '01 '02 '03 '04 '05 '06 '07
13
No. of Projects
519
No. of Projects
ESCO Fund (M USD)
600
183
Investment by facility (’93∼’07) ESCO Fund(million USD)
1,771
No. of Projects
1,600
200 1,200 122
118
115
800
100
81
14
er Po w
oo l in g
y
ea t in g/ C
ec ov er H
H
ea tR
ve m
Pr
oc es s
Im pr o
Bo i le r
en t
81
0
400 239 6
21 53
13
s
139
173
th er
244
O
245
un ni ng
35
50
R
150
Li gh ti n C g og en er at io n
ESCO Fund (M USD)
250
2,000
276
274
-
No. of Projects
300
Examples of energy conservation in Industry y Waste Heat Recovery System - Heat Recovery Boiler - Mechanical(Thermal) Vapor Recompressor - Heat exchanger for heating or cooling
y Co-Generation (Steam + Electricity) y Process Improvement - Naphtha Cracking Heater Coil replacement - Ejector type replacement (Steam ⇒ EG)
15
Examples of energy conservation in Building
y Ice thermal storage system y Lighting System y Co-generation system (Apartment) y Heat recovery system (AHU, Steam) y Building automation control unit y Variable Voltage Variable Frequency
16
Energy Saving Performance (’93∼’07) Savings(million USD) thousand toe
291
100
284 78
77
80
300 250 200
60 150
148 36
40
37
32
108
113
100
15
20
50
9
39
22
19
0
17
s er th O
Po we r
Co
ol in
g
y He
at ing /
co ve r Re
at He
Pr
oc es s
Co
Im pr o
ve m
en t
i le r Bo
ge n
er
at
gh ti n
io n
g
0
Li
Savings (M USD)
350
110
thousand toe
120
Policies for supporting ESCOs y Operating Fund (1998) - Fund for small & medium sized ESCOs
y Credit loan system (1998) - Getting a credit loan from bank
y Factoring system (1999) y Guaranteed savings contract model (2004) y Excellent ESCO (2006) - accreditation program to superior ESCO
18
Ⅲ
19
y Rapid economic growth in a short period y Various policy-oriented Funds to induce faster economic development y Last five years EC Fund
(unit : million USD)
2003
2004
2005
2006
2007
305
282
458
433
467
y Estimated 700,000toe of energy savings yearly y Fund for new & renewable energy is increasing 20
y Financial support to 108 groups of energy saving facilities Group
Major Facilities
Integrated Energy Supply
District Heating & Cooling, Community Energy System, Combined Heat & Power for industrial complex
furnace, kiln, dyeing machine, drying machine, pulper, Energy efficient MVR, TVR, accumulator, air handling unit, Cogeneration, facilities building automation control unit , heat recovery boiler, heat exchanger etc. Certified high efficient products
Induction motor, pump, gas boiler, UPS, transformer, fluorescent lamp & ballast, inverter, vending machine, fan, blower, LED traffic light etc.
y Hard to estimate the effect of energy savings 21
y Economic structure in Korea
y Result of Korean Government’s strong will to energy saving 22
Thank you for more information e-mail :
[email protected] or
[email protected] 23