Job Safety Analysis Sheet Job: Pig Launching

JSA Ref. No. JSA / KOC / 16 WORK Area / Equipment:

Facility:

Permit No: Date:

PERSONAL PROTECTIVE EQUIPMENT & TOOLS NEEDED FOR WORK ACTIVITIES: Hard Hat, Safety Shoes, Safety Goggles, Face Shield, Hand Gloves, Hammer, Spanner, Gas Monitor, Airline Unit, Portable Radio SEQUENCE OF BASIC JOB STEPS

POTENTIAL HAZARDS

Yes / No

PRECAUTIONS



Plan the work involving personnel responsible for preparation (isolation, depressurization, draining, flushing, purging etc) of the pipeline to be pigged.



Review Scope of Work & step by step procedure.



Obtain the required work permit



Conduct Tool Box Talk

Lack of Communication

Non-compliance of KOC - HSEMS Procedures

Incorrect Isolation Pre - work



Identify the valve to be closed referring P & ID.



Ensure the valves are closed fully.



Use Lock & Tag



Depressurize the pig barrel to safe location.



Drain the liquid content to trap / sump / safe location.

• Confirm the absence of pressure by opening a vent to safe location as well as observe pressure gauges reading.

Presence of Flammable / Toxic vapors

• Flush the pig barrel with water for possible presence of Pyrophoric deposit.



Asses the risk & Override gas detectors in case required. •

Carry out gas test for safe working area.



Confirm isolation valve integrity by slight opening the nearest vent / drain point. Isolation Valve Passing

Spark Generation / Fire



Confirm the absence of pressure at least from 2 independent sources (e.g. pressure gauges fixed at different location of pig barrel).



Use non sparking tools in hazardous location.



Keep Fire Extinguishers & fire hose in ready condition. Purge with nitrogen (if required) to remove toxic content.

Exposure to Toxic Vapor Work Splash of Hazardous Fluid

Use air line unit if required.



Use safety goggles& Face Shield.



Loosen the bolts / studs slowly.



Do not stand in front of pig barrel door while opening it.

• Leak & Spill

Residual Hazard

Ensure the closure of pig barrel door after loading the

pig.



Ensure the closure of all vents & drain valves before start pressurizing the pig barrel. • Ensure the normalization of all valves including vent, drain, pressure gauges, gas detectors, liquid trap etc. •

Ensure proper housekeeping of the area.

Additional Hazards (Other than indicated above)

JSA Done By

Name:

Designation:

KOC / ID. No.

Company:

Controlling Team:

Contract No.(If Applicable):

Signature:

Date:

Related Documents

Jsa #16-pig Launching
June 2020 5
Jsa Aislamiento.xlsx
November 2019 23
Launching Weblog
November 2019 22
6575js2 Jsa
October 2019 24
Jsa Presentation
June 2020 13
Jsa Insulation.docx
December 2019 27