Jsa #10 - Removal Scaffolding

  • June 2020
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View Jsa #10 - Removal Scaffolding as PDF for free.

More details

  • Words: 331
  • Pages: 1
Job Safety Analysis Sheet JOB DESCRIPTION: Removal of Scaffolding

JSA Ref. No. JSA / KOC / 10

Facility:

Permit No. Date:

Work Area / Equipment:

PERSONAL PROTECTIVE EQUIPMENT: Hard Hat, Safety Shoes, Hand Gloves, Safety Harness. SEQUENCE OF BASIC JOB STEPS

Pre – Work

POTENTIAL HAZARDS

PRECAUTIONS

Location of Emergency Equipment near the Scaffolding



Ensure the emergency equipment will not be accidentally hit or damaged due to scaffolding removal.

Non-compliance of KOC -HSEMS Procedures, F & S Regulations & Engineering Standards



Refer Chapter -13 of KOC F & S Regulations, HSEMS Procedure Doc. No. SA.KOC.002 ‘Control & Use of Scaffolding, & Recommended Practice KOC – L – 025 “Scaffolding”



Obtain the Cold Work Permit



Take extreme care during removal and override it if needed.





Take proper care while dismantling the scaffold to prevent fall of scaffold parts. Hand tools to be tied with permanent structure or person. Use proper PPE during removal of scaffold.



If required barricade the area during dismantle work.

Accidental Fall of Person



The Scaffolder must use Safety Harness to prevent accidental fall .

Unstable Scaffold



Inspect the scaffold for its stability & support before removing in sequence. .

Loaded Scaffolding



Remove safely the load / equipment / plant from the scaffold before dismantling the scaffold.



The scaffolding is to be inspected for any damage before dismantling. Take extreme care while removing a loose part / attachment from the scaffold.

Unauthorized Removal of scaffolding Damage to onsite detectors or switches

Fall of objects / Tools.

Dismantling of Scaffold

Yes / No

Damaged Scaffold



• •

Scattered Materials Housekeeping Defective Part

• •

Arrange the dismantled parts of the scaffold and stack properly. Segregate different parts of scaffold and store it separately. Remove and discard the defective parts / attachment from the scaffold storage.

Additional Hazards (Other than indicated above)

JSA Done By

Name: KOC / ID. No. Controlling Team: Signature:

Designation: Company: Contract No.(If Applicable): Date:

Related Documents

Jsa Aislamiento.xlsx
November 2019 23
6575js2 Jsa
October 2019 24
Jsa Presentation
June 2020 13