James Mankin Aty Gillette Wy

  • May 2020
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View James Mankin Aty Gillette Wy as PDF for free.

More details

  • Words: 849
  • Pages: 3
GLOBAL STEEL INC. 1435 North Cascade Avenue, Colorado Springs, CO 80908 719-338-2157 MOBIL 719-634-1300 OFFICE 719-634-0366 FAX www.globalsteelinc.com WEB Steel Building Labor Contract Only

This agreement is binding when accepted by GLOBAL STEEL INC, hereinafter called the Erector and, James Mankin, hereinafter called the Owner. Building Description: 30’x40’x12’ ATY Building The erector will erect a building that includes 1. R-10 Roof and Wall Insulation 2. 1:12 Roof Pitch 3. 4-4’x4’ Framed Openings 4. 1-6’x4’ Framed Opening 5. 2-3070 Walk Doors This price is not prevailing wage. The erection price and any and all sums of money due hereunder from Owner to Erector shall be payable, and Owner promises to pay the same under the following terms: $ 2,500.00 Upon crew arrival $ 2,500.00 Payable upon completion of red iron $__ 2,500.00 Payable upon building completion. $ 7,500.00 Total Contract Agreement. Additional options not included in the above price: 1. All materials shall be in good condition, workmanship shall be of good quality. 2. The Erector will be responsible for the building to be erected according to the manufacturer’s plans and specifications. 3. The Owner shall secure and pay for all permits and assessments necessary for carrying out this project.

4. Erector shall not be liable for the expense, loss, or delay resulting from inclement weather, fires, strikes, concealed, or unexpected conditions. All erection commitments are approximate. While every effort is made to maintain schedule, Erector is not liable for delays beyond his control. 5. Erector shall provide standard erecting equipment, including all equipment necessary for construction of project. 6. This contract is based on a clean, open and accessible jobsite. Perimeter of building shall be level and free of any obstructions for a minimum of (25) feet. If access is restricted the original contract will be adjusted to cover extra time and expenses such as rental of special equipment and/or working from ladders. If access is limited and there are no additions for this on the original contract there will be an invoice generated is to be paid upon completion of building. 7. Owner shall purchase and maintain property insurance upon the entire work of the site to the full insurable value thereof. This insurance shall insure against the perils of fire, weather damage, vandalism, and theft. 8. Owner shall furnish electricity, trash dumpster, sanitary facility, all dirt work and a foundation according to plan with proper anchor bolts in correct location, and building package including all fasteners at the job site. If owner fails to provide electricity, trash dumpster or sanitary facility Erector may do so at Owner’s expense. 9. If Erector finds problem(s) with concrete or anchor bolt placement, owner is responsible for costs incurred to fix/repair problem(s) completed by erector as detailed in an invoice—services report. 10.Responsibility for cleaning mud or dirt off building/structure and concrete upon completion of structure is Owner’s, unless created by erector. 11.Erector shall give Owner notice by telephone or fax when the milestones described in the payment schedule occur. There is no retention of funds. 12.Erector will keep Owner informed of project progress. Owner will be notified at least three days in advance of time of completion. An owner representative will be available to walk through and punchout will be done at this time. Final payment will be made to Erector at this time or penalties will apply. Failure of Owner to

have a representative at the job site for final inspection shall be waiver of Owner’s final inspection right. 13.Erector will supply workers compensation and general liability insurance to cover Erector’s employees. 14.In an insulated building concrete installed after erection of the building can cause moisture transference into any installed insulation. The owner is responsible for proper ventilation in this situation and shall not hold the erector responsible. 15.Delays or work stoppages caused by the owner will be subject to $1000 per day penalty until delay is resolved. Changes to project will be billed in detail at a rate of $75.00 per man-hour, and must be signed off on before erector makes changes. 16.Owner will provide a contact person to answer any questions that may arise at any time (including weekends) during the erection of this project, said contact person shall have the ability to make decisions concerning this project. 17.In the event of termination of this agreement for any reason, which may be done by either party by written notice, Owner shall pay Erector a sum equal to the current fair value of material and labor actually furnished by the Erector. 18.In the event of any action by Erector to enforce the provisions of this agreement or any of its rights there under, Owner shall pay the Erector for all costs and expenses including reasonable attorney’s fees whether or not such actions result in litigation. 19.No additions/changes to this contract will be acceptable without prior approval from Erector. Accepted by the Owner this ________ day of ____________, 2009 BY: (Owner) _________________________________________ Approved by GLOBAL STEEL. this _29 th___ day of___June___, 2009 BY: __________________________JAMIN

STEEL INC.

JACKSON – GLOBAL

Prices valid only is signed and faxed back within 20 days

Related Documents

Gillette
November 2019 8
Wy Appliances
May 2020 5
Shane Gillette
November 2019 14
Gillette New
June 2020 7