QUALITY ASSURANCE DEPARTMENT INTER OFFICE CHECK FORM PROJECT NO.

: SAT20007

OFFICE CHECK NO. :

JZ JOB NO.

:

DATE :

PROJECT TITLE :

Install Isolation Valve to Isolate Process Sides in/out of Deisobutanizer Reboiler 081-E-0006-A/B

###

ORIGINATING DISCIPLINE :

Civil

Note (1): "USE CHECKING COLOR CODES WHILE COMMENTING ON DRAWINGS." Note (2): After your completion of checking the attached drawings, please initial your copy of this routing slip before you forward the package to the next discipline. Note (3): Each comment should be initialled by the checker.

ROUTE

DEPARTMENT

NAME

DATE IN OUT

INITIAL

COMMENTS / REMARKS

PROCESS *

PIPING MECHANICAL HVAC INSTRUMENTATION CIVIL/STRUCTURAL ARCHITECTURAL ELECTRICAL COMMUNICATION PROCUREMENT CONSTRUCTION

*

DOCUMENT CONTROL PROJECT ENGINEER

*

PROJECT MANAGER

DRAWING NUMBERS SA-JER-CN081-JACZ-192006

QMS-IOC-13/04 (10-11)

DESCRIPTION Block "D" - Alkylation Unit - Unit 081 Foundation Details

QMS-IOC-13/04 (10-11)

Related Documents

Ioc Advice
June 2020 4
Ioc Structure.docx
December 2019 11
Ioc Form.xls
November 2019 26
Ioc Code Of Ethics
November 2019 18
Ioc Database Improvements
November 2019 7

More Documents from "Chicago Tribune"