Department of Computer Engineering Sir Syed University of Engineering & Technology, Karachi-Pakistan
Monthly Progress Sheet of Final Year Project (FYP) 2009 Project Number: ____Project Title: __________________________________________
_
Category: ______________________________Internal Advisor: __________________________ Roll Numbers: ________________________________________ Month: __
_____________
1. Objectives/Functionalities of the Project: S. No 1.
Project Objectives
Grading
Date
A, B, C, D
Fill all the objectives and completion dates which were mentioned in the project proposal form (The same objectives mentioned in the proposal) Do not change or alter the objectives or dates without FYPC Incharge
2.
permission (do not change the objectives otherwise the monthly sheet will be
3. 4.
cancelled) Changes may results in the rejection of Project Grading will be filled by the Internal Advisor only A = 75% to 100% complete objective B = 50% to 75% complete objective
5.
Completion
C = 25% to 50% complete objective
D = 0% to 25% complete objective
2. Methodology: Software Programming Language Operating System Database Others
Hardware
The same Methodology mentioned before In the Proposal any change can be made By the approval of Incharge FYPC
3. Internal Advisor Remarks: ______Filled by the Internal Advisor___________________________________ Contains progress report of group members and any other remarks__________________________________________ Complains about a group or any group member can be mentioned here by the Internal Advisor_________________ _____________________________________________________________________________________________________
______________________________________________
____________________________________________
Name & Dated Signature of Internal Advisor
Name & Dated Signature of Group Leader