Graphite Furnace Maintenance
Objectives • Outline a suitable protocol for routine maintenance covering: – Furnace workhead – Furnace autosampler – Instrument body • Maintain instrument performance
2
GTA Maintenance • • • • •
3
Graphite Tube Electrodes Shroud Windows Chimney
Maintenance Log
4
Daily Inspection Schedule • Exhaust system • Utilities – Water – Gas • Instrument case • Furnace compartment • Instrument windows
5
Check Exhaust
6
Clean Spills
7
Daily Inspection of the Workhead • Graphite Tube • Injection Port/Chimney • Windows • Electrodes • Shroud
8
Examine the Electrodes
Chips
Plugged gas holes
9
Clean the Electrodes
10
Check Shroud
11
Clean End Windows
12
Clean Chimney
13
Daily Inspection of the Autosampler • Check capillary • Check tubing leading to/from syringe • Clean up any spills • Check/refill rinse solution • Empty waste container
14
Dirty Capillary
Rinse with Aqua Regia
15
Trimming Capillary When Required
16
PSD Maintenance • Check syringe • Check capillary tubing leading to/from syringe • Clean up spills
17
Bubble in Syringe
18
Tapping Plunger on Bench Top
19
Components Required for Maintenance • Items required for cleaning – Methanol solution (10-20%) – Cotton buds or Q-tips – Lens tissue – Scalpel knife
20
Periodic Maintenance • Check water recirculator – Check flow rate – Check water level • Gas delivery system – Regulators working properly – Leaks (hoses, fittings, etc...) • Windows – HCL & compartment – GTA – Workhead compartment • Change electrodes 21
Check Utilities Gas Delivery Pressure • Argon 30 - 40 psi Water Supply • Required flow rate 1.5 - 2.0 L/min • Maximum of 30 psi • Maximum temperature 40 oC • Recommended 20 - 25 oC
22
Clean Windows YES, YOU MUST DO THE WINDOWS!
23
Summary • Discussed benefits of routine maintenance • Reviewed items to be inspected daily – Workhead – PSD • Items for periodic maintenance
24