Grants Funded By The Odot Bicycle And Pedestrian Program

  • June 2020
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View Grants Funded By The Odot Bicycle And Pedestrian Program as PDF for free.

More details

  • Words: 4,023
  • Pages: 13
1986-2009 Grants funded by the ODOT Pedestrian & Bicycle Program Hillsboro (3 - 2003) $326,123

ON

MULTN OM A H

Tigard (4 -2009) Milwaukie $389,366 (3 - 2009) $745,400 Beaverton (1 - 2001) $100,000

TriMet (1 - 2007) $255975

Washington County (4 - 1999) $264,421

Mult. Co. (7 2005) $348,240

Clackamas County (8 - 2009) $670,240

Gladstone (1 - 1986) Durham West Linn $11,352 (1 - 2009) (1 $94,000 1988) Oregon City C L A C K AMAS $40,000 (3 - 1995) $68,000

Rockaway Beach (1 - 2007) $130,000

RIV

MA

S

Springfield (3 - 2001) $130400

ER

KA

LAN E

LANE

Central Point (1 - 2005) $87,690 Medford (2 - 2001) $118,400 Jacksonville Phoenix (3 - 2007) (1 - 2005) $326,535 $69,000

HINE JOSEP

Gold Hill (ODOT Dist 8) Eagle Point (1 - 1997) (2 - 2009) $48,640 $537,000

Amount to date Awarded

Cove (1 - 2009) $132,440

Joseph (1 - 2005) $70,000

Baker City (3 - 2007) $623,168

BAKER

CROOK Ontario (1 - 1997) $5,600

DESC HUTES

Burns (1 - 2007) $230,799

Roseburg (2 - 1990) $56,120

COOS

MALH EU R

Riddle (1 -1997) $80,000

HARNEY

KLAMATH

2,300,000

LaGrande (3 - 2001) $188,000

DOUGLAS

Coos Bay / County (2 - 1991) $16,900

Gold Beach (1 - 2007) $50,000

Applicant (Number of grants, Most recent award)

UNION

Douglas County (2 - 1998) $92,350

Talent (2 - 2007) $329,716 JACKSO N Ashland (2 - 2009) $200,000

Legend

WALLOWA

Bend (3 -2009) $325,880

Cottage Grove (1 - 1992) $5,000

Reedsport (2 - 1990) $34,079 Lakeside (1 - 1991) $50,000 North Bend (2 - 2005) $163,600

Redmond (3 - 2009) $542,056

Eugene Area (14 - 2009) $908,312

Florence (1 - 1991) $14,400

Grants Pass (3 - 2007) $459,750

Pendleton (3 - 1997) $105,840

OD

AC

TILLAMOOK

LINN

Jackson County (2 - 1999) $64,302

Umatilla County (1 - 1991) $19,292 UMATILLA

Hood River County (1 - 1991) $3,500 Portland Metro (56 - 2009) $4,540,705 The Dalles (1 - 1995) $50,000 MULTNOM AH

MORROW Yamhill County (2 - 1999) Wasco County (1 - 1996) $12,200 Newberg (1 - 1989) GI LLIAM $6,800 Aurora (2 - 2009) $11,050 Heppner (2 - 2003) YAMH ILL $469,987 $167,500 McMinnville (1 - 1996) Hubbard $50,000 Woodburn (2 - 2007) (1 - 2007) CLACKAMAS Maupin (1 - 2007) $680,500 $44,567 $449,900 Gervais (1 - 2007) Salem Area (28 - 2009) WASC O $226,000 $1,921,094 Lincoln City (2 - 2007) $209,600 POLK MARION Depoe Bay (1 - 2009) Lyons (1 - 2005) $151,200 $200,000 WHEELER Albany (7 - 2009) Newport (3 - 2003) LIN COLN JEF FERSON $219,008 $293,160 Toledo (1 - 1998) Madras (2 - 1997) $87,360 GR AN T Lebanon (1 - 2009) Corvallis Area (9 - 2007) $10,670 Lincoln County (1 - 1992) $500,000 $629,913 $13,000 LIN N Deschutes County (4 - 2003) John Day (1 - 2009) BENTON Linn County (1 - 1995) Crook County (2 - 1993) $243,212 $256,000 $12,300 $97,323

Silverton (1 - 1993) $3,359 Salem Cherriots (8 - 2009) POLK (Salem Transit) Independence $412,800 (2 - 2009) (2 - 2005) $422,100 Marion County Salem-Keizer $145,600 (6 - 2007) (1 - 1996) Monmouth Lyons $371,428 $9,075 (1 - 1991) (1 - 2005) Stayton (2 - 1994) $7,539 $200,000 $35,693

Lane County (1 - 1996) $10000 Eugene (8 - 2009) $715412

WASH INGTON

Tillamook County (4 - 1998) $173,541

CL

Keizer (5 - 2007) $513,500

Vernonia (1 - 2005) $350,000 Scappoose (1 - 1999) $10,000

HO

YA M HI L L

Tualatin (1 - 1986) $1,788

Lake Oswego (1 - 1986) $50,000

Astoria (4 - 2009 ) $338,500 Clatsop County (1 - 1991) $15,000 Clatskanie (1 - 1994) Columbia County (1 2005) $1,500 Gearhart (1 - 2007) $93,600 $49,000 COLU MBIA ODOT District 1 (1 - 2005) St. Helens (4 - 2009) CLATSOP $366,741 $492,200

Gresham (1 - 1998) $17,700

N

GT

MA

IN

Cornelius (1 - 2003) $184,700

Portland Bike/Ped (3 - 2009) $482,600

Portland (12 - 2005) $490,800

ER

SH

SH

WA

CURRY

Grants Pass (3 - 2007) $459,750

JOSEPHINE

LAKE

Medford Area (16 - 2009) $1,781,283

JAC KSON

Klamath County (2 - 1997) $7,550 Klamath Falls (3 - 2005) $292,000

Lake County (1 - 1996) $10,000

±

FY 1986 FY 1987 FY 1988 FY 1989 FY 1990 FY 1991 FY 1992 FY 1993 FY 1994 FY 1995 FY 1996 FY 1997 FY 1998 FY 1999 FY 00-01 FY 02-03 FY 04-05 FT 06-07 FT 08-09

Applications 34 26 26 18 22 29 28 22 34 38 35 52 36 34 57 90 88 99 57

All Applicants Total Project Cost Total Requested Average Cost $ 1,359,000.00 $ 935,000.00 $ 39,970.59 $ 1,101,000.00 $ 830,000.00 $ 42,346.15 $ 1,055,000.00 $ 795,000.00 $ 40,576.92 $ 999,000.00 $ 582,000.00 $ 55,500.00 $ 1,376,000.00 $ 888,000.00 $ 62,545.45 $ 1,606,000.00 $ 998,000.00 $ 55,379.31 $ 1,615,000.00 $ 886,000.00 $ 57,678.57 $ 1,074,000.00 $ 683,000.00 $ 48,818.18 $ 1,762,000.00 $ 934,000.00 $ 51,823.53 $ 2,303,000.00 $ 1,027,000.00 $ 60,605.26 $ 1,466,173.00 $ 926,933.00 $ 41,890.66 $ 4,867,720.00 $ 2,677,195.60 $ 93,610.00 $ 3,588,189.00 $ 2,448,524.00 $ 99,671.92 $ 3,761,890.00 $ 2,618,732.00 $ 110,643.82 $ 6,707,336.00 $ 4,472,674.00 $ 117,672.56 $ 20,883,638.00 $ 11,274,873.00 $ 232,040.42 $ 14,764,983.00 $ 10,810,324.00 $ 167,783.90 $ 35,922,913.00 $ 21,891,970.00 $ 362,857.71 $ 16,900,361.00 $ 13,487,712.00 $ 296,497.56

Granted Projects Average Request Awards Total Project Cost Total Awarded Average Cost Average Award $ 27,500.00 7 $ 418,362.00 $ 218,967.00 $ 59,766.00 $ 31,281.00 $ 31,923.08 9 $ 317,538.00 $ 215,220.00 $ 35,282.00 $ 23,913.33 $ 30,576.92 6 $ 286,708.00 $ 199,600.00 $ 47,784.67 $ 33,266.67 $ 32,333.33 5 $ 459,000.00 $ 181,600.00 $ 91,800.00 $ 36,320.00 $ 40,363.64 6 $ 356,500.00 $ 212,500.00 $ 59,416.67 $ 35,416.67 $ 34,413.79 11 $ 373,693.10 $ 231,630.98 $ 33,972.10 $ 21,057.36 $ 31,642.86 10 $ 402,750.00 $ 255,100.00 $ 40,275.00 $ 25,510.00 $ 31,045.45 11 $ 603,255.00 $ 325,693.00 $ 54,841.36 $ 29,608.45 $ 27,470.59 15 $ 471,786.00 $ 364,683.00 $ 31,452.40 $ 24,312.20 $ 27,026.32 14 $ 1,098,385.00 $ 395,778.00 $ 78,456.07 $ 28,269.86 $ 26,483.80 17 $ 637,754.00 $ 433,808.00 $ 37,514.94 $ 25,518.12 $ 51,484.53 13 $ 782,600.00 $ 490,910.00 $ 60,200.00 $ 37,762.31 $ 68,014.56 14 $ 1,106,069.00 $ 861,615.00 $ 79,004.93 $ 61,543.93 $ 77,021.53 13 $ 1,099,003.00 $ 802,755.00 $ 84,538.69 $ 61,750.38 $ 78,467.96 18 $ 1,562,688.00 $ 938,000.00 $ 86,816.00 $ 52,111.11 $ 125,276.37 17 $ 2,513,518.00 $ 1,514,659.00 $ 147,854.00 $ 89,097.59 $ 122,844.59 18 $ 3,262,943.00 $ 2,017,070.00 $ 181,274.61 $ 112,059.44 $ 221,131.01 22 $ 7,531,591.00 $ 4,958,679.00 $ 342,345.05 $ 225,394.50 $ 236,626.53 20 $ 6,162,674.00 $ 5,092,462.00 $ 308,133.70 $ 254,623.10

ODOT Pedestrian & Bicycle Program Grants Awarded, 1986 Applicant Clackamas County Corvallis Eugene Gladstone Lake Oswego Marion County Multnomah County Newport Pendleton Reedsport Tualatin TOTAL

Project Lake Road bikeway Monroe, Research, Technology, Western & Walnut bikeways Bikeway under I-105 @ Country Club Rd River Road bikeway Regional bikeway Hwy 43 to I-205 Country Club Drive Sn & Str 181/182 and Yamhill signing Sign routes in Newport 4' wide bike lane on Tutuilla Road 8' bike-ped path Martinazzi Ave signing

Grant Awarded $ 10,240.00 $ 14,460.00 $ 13,200.00 $ 11,352.00 $ 50,000.00 $ 39,068.00 $ 9,040.00 $ 2,400.00 $ 39,840.00 $ 27,579.00 $ 1,788.00 $ 218,967.00

Total Project Cost $ 12,800.00 $ 18,075.00 $ 16,500.00 $ 14,190.00 $ 204,127.00 $ 48,835.00 $ 11,300.00 $ 3,000.00 $ 49,800.00 $ 37,500.00 $ 2,235.00 $ 418,362.00

Grant Awarded $ 35,200.00 $ 38,500.00 $ 30,000.00 $ 20,800.00 $ 6,120.00 $ 39,600.00 $ 45,000.00 $ 215,220.00

Total Project Cost $ 57,146.00 $ 48,222.00 $ 39,500.00 $ 26,000.00 $ 33,170.00 $ 49,500.00 $ 64,000.00 $ 317,538.00

Grant Awarded $ 50,000.00 $ 18,400.00 $ 9,600.00 $ 50,000.00 $ 31,600.00 $ 40,000.00 $ 199,600.00

Total Project Cost $ 92,500.00 $ 23,000.00 $ 12,000.00 $ 69,800.00 $ 39,408.00 $ 50,000.00 $ 286,708.00

ODOT Pedestrian & Bicycle Program Grants Awarded, 1987 Applicant Hillsboro Keizer Klamath Falls Medford Roseburg Salem Washington County TOTAL

Project Class I/II Bikeway - Grant St Chemawa Rd bike lanes Class III bikeway, sn & str Sage Rd Bikeway Stewart Park/Golf Bikeway 6-ft bikeway on Liberty Rd S Walker - Murray to Ecole ODOT Pedestrian & Bicycle Program Grants Awarded, 1988

Applicant Crook County Parks & Rec LaGrande Lincoln City Marion County St Helens West Linn TOTAL

Project Ochoco Creek Path Connections Separated path along Willow St Signing & Racks Bike Lanes on State Street Bike Lanes on Oregon Street Bike Lanes on West A Street

ODOT Pedestrian & Bicycle Program Grants Awarded, 1989 Applicant Jackson County Newberg Salem Tigard Washington County TOTAL

Project Shoulder widening & bikeway on Main St (Ashland) Signs for city bikeways Pringle Road McDonald St Walker Road

Grant Awarded $ 50,000.00 $ 6,800.00 $ 50,000.00 $ 24,800.00 $ 50,000.00 $ 181,600.00

Total Project Cost $ 200,000.00 $ 8,500.00 $ 62,500.00 $ 31,000.00 $ 157,000.00 $ 459,000.00

Grant Awarded $ 32,000.00 $ 50,000.00 $ 50,000.00 $ 6,500.00 $ 50,000.00 $ 24,000.00 $ 212,500.00

Total Project Cost $ 40,000.00 $ 62,500.00 $ 110,000.00 $ 13,000.00 $ 71,000.00 $ 60,000.00 $ 356,500.00

Grant Awarded $ 15,000.00 $ 10,000.00 $ 6,900.00 $ 50,000.00 $ 14,400.00 $ 7,000.00 $ 50,000.00 $ 50,000.00 $ 7,539.18 $ 1,500.00 $ 19,291.80 $ 231,630.98

Total Project Cost $ 40,000.00 $ 20,000.00 $ 13,800.00 $ 67,500.00 $ 18,000.00 $ 14,000.00 $ 90,000.00 $ 68,200.00 $ 15,078.35 $ 3,000.00 $ 24,114.75 $ 373,693.10

ODOT Pedestrian & Bicycle Program Grants Awarded, 1990 Applicant Ashland Clackamas County Portland Reedsport Roseburg Tillamook County TOTAL

Project Bike Lanes E Main St Bike Lanes on Jennings Ave Connect I-205 path to I-84 path Master Plan Class III Bikeways Sandlake Rd Bikeway ODOT Pedestrian & Bicycle Program Grants Awarded, 1991

Applicant Clatsop County Coos Bay-North Bend Coos County Eugene Florence Hood River County Lakeside Marion County Monmouth-Independence Stayton Umatilla County TOTAL

Project Bikeway Master Plan Bikeway Master Plan Bikeway Master Plan Harlow Rd Bikeway Signing & stiping bikeways Bikeway Master Plan N 8th Street Bikeway Hazel Green Rd Bikeway Bikeway Master Plan Bikeway Master Plan Elm Street Bikeway

ODOT Pedestrian & Bicycle Program Grants Awarded, 1992 Applicant Astoria Cottage Grove Grants Pass Keizer Lincoln County Portland Redmond Springfield Tigard Yamhill County TOTAL

Project Bikeway Master Plan Bikeway Master Plan Bridge Street Bikeway Wheatland Rd Bikeway Bikeway Master Plan Terwilleger Blvd Bikeway Bikeway Master Plan Centennial Blvd Bikeway 97th Ave Bikeway Bikeway Master Plan

Grant Awarded $ 5,000.00 $ 5,000.00 $ 25,600.00 $ 50,000.00 $ 13,000.00 $ 50,000.00 $ 5,000.00 $ 50,000.00 $ 44,000.00 $ 7,500.00 $ 255,100.00

Total Project Cost $ 10,000.00 $ 10,000.00 $ 32,000.00 $ 68,750.00 $ 26,000.00 $ 96,000.00 $ 20,000.00 $ 70,000.00 $ 55,000.00 $ 15,000.00 $ 402,750.00

Grant Awarded $ 50,000.00 $ 47,323.00 $ 2,500.00 $ 37,360.00 $ 6,160.00 $ 50,000.00 $ 32,000.00 $ 3,359.00 $ 41,941.00 $ 5,050.00 $ 50,000.00 $ 325,693.00

Total Project Cost $ 80,100.00 $ 59,154.00 $ 5,000.00 $ 46,700.00 $ 6,120.00 $ 88,900.00 $ 40,000.00 $ 12,325.00 $ 52,427.00 $ 10,125.00 $ 202,404.00 $ 603,255.00

ODOT Pedestrian & Bicycle Program Grants Awarded, 1993 Applicant Cannon Beach Crook County Harrisburg Marion County Milton-Freewater Pendleton Salem Silverton Tillamook County Wasco County Washington County TOTAL

Project Hemlock St Bikeway Main St Bikeway Bikeway Masterplan Center St Bikeway Bikeway Masterplan Montee Dr Bikeway Center St Bikeway Bikeway Masterplan Brooten Rd Bikeway (Pacific City) Bikeway Masterplan Walker Road Bikeway

ODOT Pedestrian & Bicycle Program Grants Awarded, 1994 Applicant Baker County/City Benton County Clackamas County Clatskanie Corvallis Klamath County/City Oregon City Oregon City Phoenix Portland Portland Redmond St Helens Stayton Tigard TOTAL

Project Bikeway Master Plan Reservoit Road Bikeway Bikeway Map Bikeway Master Plan Bikeway Map Bikeway Master Plan Bikeway Master Plan Linn Avenue Bikeway Clover Rd Bikeway Bikeway Master Plan Multnomah Bikeway Antler Avenue Bikeway Deer Island Rd Bikeway Gardner Ave Bikeway 121st Ave Bikeway

Grant Awarded $ 3,638.00 $ 40,000.00 $ 10,000.00 $ 1,500.00 $ 3,000.00 $ 2,550.00 $ 6,000.00 $ 50,000.00 $ 27,602.00 $ 20,000.00 $ 50,000.00 $ 48,000.00 $ 18,200.00 $ 34,193.00 $ 50,000.00 $ 364,683.00

Total Project Cost $ 3,637.00 $ 10,000.00 $ 11,600.00 $ 1,500.00 $ 3,000.00 $ 2,550.00 $ 6,000.00 $ 100,000.00 $ 6,901.00 $ 41,500.00 $ 245,000.00 $ 12,000.00 $ 4,550.00 $ 8,548.00 $ 15,000.00 $ 471,786.00

Grant Awarded $ 7,850.00 $ 20,000.00 $ 50,000.00 $ 50,000.00 $ 12,300.00 $ 5,000.00 $ 50,000.00 $ 50,000.00 $ 12,000.00 $ 35,120.00 $ 10,000.00 $ 50,000.00 $ 43,508.00 $ 395,778.00

Total Project Cost $ 15,700.00 $ 44,500.00 $ 466,150.00 $ 75,320.00 $ 24,600.00 $ 10,000.00 $ 80,530.00 $ 100,000.00 $ 15,000.00 $ 43,900.00 $ 20,000.00 $ 148,300.00 $ 54,385.00 $ 1,098,385.00

ODOT Pedestrian & Bicycle Program Grants Awarded, 1995 Applicant Albany Clackamas County Deschutes County Keizer Linn County Madras Marion County Multnomah County Oregon City Salem Springfield The Dalles/Wasco Co Washington County TOTAL

Project Bicycle Plan Bicycle Plan Ferguson Road McLeod Lane Bicycle Plan Bicycle Plan Lancaster Drive SE 202nd Warner Parrott Rd Lancaster Drive Bicycle Plan Bike lanes Murray Blvd

Applicant Albany Albany Bend Corvallis Corvallis Deschutes Co. Douglas Co. Eugene Lake Co. Lane County McMinnville Portland Portland Portland Salem/Keizer St. Helens Wasco Co. TOTAL

Applicant Albany Clackamas County Eagle Point Klamath County Madras Multnomah County Multnomah County Ontario Pendleton Portland Riddle Salem Tillamook County TOTAL

ODOT Pedestrian & Bicycle Program Grants Awarded, 1996 Project Bike Lane Striping-Waverly Ave. Bike Lanes & RR Xing-Salem Ave. Curb Bulbs & Islands (Ped) Newport Ave. Curb Extensions Monroe Ave. Ped. Island Circle Blvd. Bike Map Bike Map Bike Lanes/Ped Island-29th St. Shoulder Widening-Roberta/S. 9th Bike Map BL Striping & Sidewalks-2nd St. Lovejoy Viaduct BL's/Ped Island Hawthorne Viaduct Bike Lanes Burnside Bridge Bike Lanes Bike Map Bike Lanes (Widening)-Old Portland Rd. Plan

ODOT Pedestrian & Bicycle Program Grants Awarded, 1997 Project Bike Map Oak Grove Blvd - Bike Lanes and Sidewalks Bike Lanes, Sidewalks and Curb ramps Bike Map B Street Bike Lanes Hogan Ave (242nd) Bike Lanes and Sidewalks Bike Map Idaho Ave - Bike Lane Restriping Carden Ave & Hailey Ave - Bike Lane Restriping Capitol Hwy & Taylor's Fy - Barbur TC (Island & Sidewalks) 5th Street - Bike Lanes and Sidewalks Center Street (Bike Lanes, Restriping, Parking Bays) Cape Lookout - shoulder widening

Grant Awarded $ 10,483.00 $ 37,520.00 $ 14,880.00 $ 50,000.00 $ 24,000.00 $ 3,500.00 $ 6,750.00 $ 35,600.00 $ 36,000.00 $ 10,000.00 $ 50,000.00 $ 50,000.00 $ 20,000.00 $ 20,000.00 $ 9,075.00 $ 50,000.00 $ 6,000.00 $ 433,808.00

Total Project Cost $ 13,104.00 $ 46,900.00 $ 18,600.00 $ 80,000.00 $ 30,000.00 $ 7,000.00 $ 13,500.00 $ 44,500.00 $ 45,000.00 $ 20,000.00 $ 78,000.00 $ 70,000.00 $ 25,000.00 $ 25,000.00 $ 18,150.00 $ 91,000.00 $ 12,000.00 $ 637,754.00

Grant Awarded $ 3,000.00 $ 80,000.00 $ 48,640.00 $ 5,000.00 $ 5,670.00 $ 80,000.00 $ 3,800.00 $ 5,600.00 $ 16,000.00 $ 44,000.00 $ 80,000.00 $ 77,200.00 $ 42,000.00 $ 490,910.00

Total Project Cost $ 6,000.00 $ 195,000.00 $ 60,800.00 $ 10,000.00 $ 7,200.00 $ 165,000.00 $ 7,600.00 $ 7,000.00 $ 20,000.00 $ 55,000.00 $ 100,000.00 $ 96,500.00 $ 52,500.00 $ 782,600.00

ODOT Pedestrian & Bicycle Program Grants Awarded, 1998 Applicant Albany Bend Benton Co. Deschutes Co. Douglas Co. Eugene Gresham Heppner La Grande Multnomah Co. Portland Salem Tillamook Co. Toledo TOTAL

Project Bike lane restriping on Columbus St., Hill St., and Salem Ave. Sidewalk on N. side of Penn Ave. from 8th St. to Eastwood Dr. Shoulders on 53rd St. from Country Club Dr. to Plymouth Dr. Sidewalk on Huntington Rd., 1st St., 3rd St., and 4th St. in LaPine Shoulder widening on Glide Loop Dr. in Glide near schools Eugene Bike Map Sidewalk on Kelly St. from Division St. to Burnside Rd. Sidewalk and realignment on Gale St. and Riverside Ave. Sidewalk on Sunset Dr., 2nd St., & K Ave. near schools Bike lanes and sidewalk on 49th Ave. from Hidalgo to McNary Colored bike lanes at various locations Curb extensions at Summer St. and Marion St. Shoulder widening to Cape Lookout on Netarts Bay Dr. Bike lanes on E. Slope Road from Old Hwy. 20 to 10th St.

Grant Awarded $ 31,155.00 $ 56,000.00 $ 100,000.00 $ 25,600.00 $ 5,400.00 $ 17,700.00 $ 64,000.00 $ 88,000.00 $ 100,000.00 $ 71,200.00 $ 64,000.00 $ 65,600.00 $ 87,360.00 $ 85,600.00 $ 861,615.00

Total Project Cost $ 38,944.00 $ 70,000.00 $ 125,000.00 $ 32,000.00 $ 10,800.00 $ 22,125.00 $ 80,000.00 $ 110,000.00 $ 150,000.00 $ 89,000.00 $ 80,000.00 $ 82,000.00 $ 109,200.00 $ 107,000.00 $ 1,106,069.00

Project Grant Awarded Sidewalks and bike lanes on Columbus St. from Grand Prairie Rd. to Moraga Ave. $ 64,000.00 Sidewalks and curb extensions on Oak St. from Hersey St. to Nevada St. $ 100,000.00 Sidewalk on Exchange Street from 17th St. to 22nd St. $ 100,000.00 100,000.00 Sidewalks and bike lanes on Fuller & Thompson from Whitcomb Elem. to Causey A$ Curb extension and covered bike parking on 2nd Street at mid-block location $ 28,240.00 Sidewalk on Griffin Creek Rd. from Stage Rd. to elementary school $ 14,302.00 Sidewalk infill and ramps on Eldorado and Dahlia from Del Moro to Campus Dr. $ 100,000.00 Sidewalks in various locations inside of school bus service boundary $ 100,000.00 Bike Map $ 10,000.00 Bike lanes and bike boulevard on Vancouver St. and Williams St. (a one-way couplet) from Broadway to Schmeer Rd. $ 95,600.00 Sidewalks and bike lanes on High School Way from Hwy. 30 to School $ 10,000.00 75,913.00 Traffic calming, curb extensions and pathway on 84th and Leahy near two schools $ Bike Map $ 4,700.00 $ 802,755.00

Total Project Cost $ 80,000.00 $ 147,684.00 $ 134,250.00 $ 156,000.00 $ 35,300.00 $ 17,878.00 $ 127,000.00 $ 144,600.00 $ 20,000.00

ODOT Pedestrian & Bicycle Program Grants Awarded, 1999 Applicant Albany Ashland Astoria Clackamas Co. Corvallis Jackson Co. Klamath Falls Newport Portland Portland Scappoose Washington Co. Yamhill Co. TOTAL

$ $ $ $ $

119,500.00 12,500.00 94,891.00 9,400.00 1,099,003.00

ODOT Pedestrian & Bicycle Program Grants Awarded, 2000-2001 Applicant Beaverton Clackamas Co. Eugene Independence La Grande Medford Milwaukie Multnomah Co Phoenix Springfield Talent TOTAL

Project Sidewalks and shoulder widen for bike lanes on SW Center, SW 113, SW Cabot, SW 110 Shoulder widen for bike lane on Roots Road Curb extensions on 15th AVE Sidewalks Gun Club Road Sidewalks on Sunset Drive Sidewalks and bike lanes on Hillcrest Road Sidewalks and traffic calming on SE Roswell St Sidewalks infill and pedestrian island-Powell Valley Road Sidewalks and shoulder widening for bike lanes on 1st St Bike lane striping 28th, 58th, Centennial, Mohawk, 14th Sidewalks and shoulder widening for bike lanes on W Main, Wagner Creek Rd

Grant Awarded

Total Project Cost

$ $ $ $ $ $ $ $ $ $ $ $

$ $ $ $ $ $ $ $ $ $ $ $

100,000.00 100,000.00 100,000.00 45,600.00 100,000.00 97,600.00 100,000.00 60,400.00 64,000.00 70,400.00 100,000.00 938,000.00

220,000.00 240,000.00 157,500.00 57,000.00 146,500.00 122,000.00 203,693.00 75,500.00 80,000.00 88,000.00 172,495.00 1,562,688.00

ODOT Pedestrian & Bicycle Program Grants Awarded, 2002-2003 Applicant Aurora Cornelius Corvallis Deschutes County Harrisburg Heppner Hillsboro Keizer Newport North Bend Woodburn TOTAL

Project Hwy 99E sidewalks, bulb outs, crosswalks Hwy 23 SW and BLs 35th Street SW and BLs Cook Ave bulb-outs City of Harrisburg SW and Ped Xings May & Court Street Intx Xing NE Grant Street Curb Extensions Alder Drive SW and BLs SE Bay Boulevard SW and BLs 16th Street SW Hwy 214 SW

Grant Awarded $ 127,987.00 $ 184,700.00 $ 200,000.00 $ 164,112.00 $ 50,000.00 $ 103,500.00 $ 100,000.00 $ 175,000.00 $ 190,760.00 $ 18,600.00 $ 200,000.00 $ 1,514,659.00

Total Project Cost $ 141,987.00 $ 249,300.00 $ 351,000.00 $ 205,141.00 $ 92,500.00 $ 115,000.00 $ 392,103.00 $ 300,000.00 $ 228,912.00 $ 23,375.00 $ 414,200.00 $ 2,513,518.00

ODOT Pedestrian & Bicycle Program Grants Awarded, 2004-2005 Applicant Astoria Baker City Central Point Columbia County Eugene Gold Hill/ODOT Grants Pass Independence Jacksonville Joseph Klamath Falls Lyons Milwaukie Multnomah County North Bend/ODOT Portland Portland Ped Salem Vernonia TOTAL

Project Columbia Field Sidewalk with Stadium Seating Shoulder Widening & BL Striping SW & BL Striping on N 2nd St Shoulder Widening & BL Striping on Old Hwy 30 Sidewalks, Ped X-ing Improvement on Amazon Parkway Sidewalks & BL Striping on OR 234 SW & X-ing Improvement on 9th St Sidewalks on OR 51 SW, Ped X-ing Improvement on E Street SW, BL striping & X-ing Improvements on McCully St X-ing Improvement Sidewalks & Bike Lane Striping on Main Street SW on SE 42nd Ave Ped X-ing Improvements on Stark Street SW & X-ing Imp on Cape Arago Hwy, Broadway, Newmark Bicycle Signal Ped X-ing Improvement on SE Tacoma St Median & Curb extension on Mission St & Church St Swon State Ave

Grant Awarded $ 112,000.00 $ 119,530.00 $ 87,690.00 $ 93,600.00 $ 40,600.00 $ 200,000.00 $ 84,150.00 $ 100,000.00 $ 69,000.00 $ 70,000.00 $ 162,000.00 $ 200,000.00 $ 200,000.00 $ 45,000.00 $ 145,000.00 $ 10,000.00 $ 200,000.00 $ 30,000.00 $ 48,500.00 $ 2,017,070.00

Total Project Cost $ 132,000.00 $ 165,000.00 $ 103,440.00 $ 117,000.00 $ 50,600.00 $ 825,466.00 $ 126,350.00 $ 160,000.00 $ 80,000.00 $ 90,000.00 $ 180,000.00 $ 242,219.00 $ 330,000.00 $ 56,250.00 $ 195,000.00 $ 13,000.00 $ 250,118.00 $ 40,000.00 $ 106,500.00 $ 3,262,943.00

ODOT Pedestrian & Bicycle Program Grants Awarded, 2006-2007 Applicant Baker City Burns Cherriots Corvallis Eugene Gearhart Gervais Gold Beach Grants Pass Hillsboro Hubbard Keizer Lincoln City Marion County Maupin ODOT-District 1 Phoenix Portland - Bike Rockaway Beach Talent Tri-Met Woodburn TOTAL

Project Sidewalks Sidewalks on US20/Hwy 78 from Diamond to Alder Curb extensions in downtown Salem Shoulder Widening/Bike Lane Striping on Brooklane Drive Ped X-ing Improvements Sidewalks/Curb Extensions on Pacific Way Sidewalks/Bike Lane Striping on Douglas Ave Sidewalks on Moore Street/Harbor Way Sidewalks/Bike Lane Striping/Streetscape on OR 99/ Hwy 60 Sidewalks Sidewalks on D Street & 4th Street Sidewalks and Bike Lanes on Dearborn Avenue Sidewalks on US 101 3 Ped Islands Sidewalks/Intersection Improvements on Deschutes Ave Shoulder Widening on OR 104 Sidewalks and Bike Lane Striping on Rose Street Bike Signal at E Burnside and 41st Ave Intersection Improvement @ US 101/Anchor St/2nd St Sidewalks/Bike Lanes on Wagner Street Sidewalks on Tualatin Valley Hwy Sidewalks and Ped Island on Hwy 214 and Front Street ramp

Grant Awarded $ 500,000.00 $ 230,799.00 $ 189,000.00 $ 170,213.00 $ 125,012.00 $ 49,000.00 $ 226,000.00 $ 50,000.00 $ 350,000.00 $ 190,923.00 $ 44,567.00 $ 200,000.00 $ 200,000.00 $ 145,000.00 $ 449,900.00 $ 366,741.00 $ 234,933.00 $ 140,400.00 $ 130,000.00 $ 229,716.00 $ 255,975.00 $ 480,500.00 $ 4,958,679.00

Total Project Cost $ 1,295,312.00 $ 256,599.00 $ 210,000.00 $ 340,427.00 $ 156,265.00 $ 54,000.00 $ 321,000.00 $ 55,757.00 $ 750,000.00 $ 224,615.00 $ 64,567.00 $ 550,000.00 $ 200,000.00 $ 185,000.00 $ 519,000.00 $ 366,741.00 $ 289,806.00 $ 147,900.00 $ 150,000.00 $ 344,190.00 $ 544,862.00 $ 505,550.00 $ 7,531,591.00

ODOT Pedestrian & Bicycle Program Grants Awarded, 2008-2009 Applicant Albany Ashland Astoria Aurora Bend Clackamas County Cove Depoe Bay Durham Eugene John Day Lebanon Milwaukie ODOT District 8 Portland Bike Program Redmond Salem Salem Transit St. Helens Tigard TOTAL

Project Pedestrain Crossings Railroad Crossing Pedestrian Crossing and sidewalks Sidewalks and Pedestrian Crossings Bike Lanes, Sidewalks, Pedestrian Crossing Bike Lanes and Sidewalks along Trolly Trail Sidewalks Pedestrian Crossings Bike Lanes and Sidewalks Bike Lanes, Sidewalks, Pedestrian Crossing Sidewalks, Pedestrian Bridge Sidewalks and Pedestrian Bridge Sidewalks, Streetscaping Shoulder Widening Bike Guide Signs Bike Lanes and Sidewalks Bike Lanes, Sidewalks, Pedestrian Crossing at Y Intersection Curb Extensions Bike and Pedestrian Bridges Sidewalk & Shoulder on Hall Blvd

Grant Awarded Total Project Cost $ 65,000.00 $ 80,000.00 $ 100,000.00 $ 130,000.00 $ 121,500.00 $ 135,000.00 $ 342,000.00 $ 380,000.00 $ 255,000.00 $ 290,000.00 $ 300,000.00 $ 630,000.00 $ 132,440.00 $ 152,440.00 $ 151,200.00 $ 168,000.00 $ 94,000.00 $ 105,000.00 $ 345,600.00 $ 384,000.00 $ 256,000.00 $ 284,867.00 $ 500,000.00 $ 247,900.00 $ 445,400.00 $ 758,700.00 $ 337,000.00 $ 375,000.00 $ 142,200.00 $ 158,000.00 $ 489,056.00 $ 632,360.00 $ 120,000.00 $ 150,000.00 $ 233,100.00 $ 259,000.00 $ 392,400.00 $ 436,000.00 $ 270,566.00 $ 406,407.00 $ 5,092,462.00 $ 6,162,674.00

Pedestrian and Bicycle Grants, 1986-2009 5,000,000

6.0%

4,500,000 5.0% 4,000,000 3,500,000

Grant $

3,000,000 2,500,000

3.0%

2,000,000 2.0% 1,500,000 1,000,000 1.0% 500,000 0

0.0% 1986

1988

1990

1992

1994

1996

1998

2000

2002

Biennium Beginning biennium real $ basis 1982-84

biennium actual $

annual inflation rate

2004

2006

2008

Inflation rate

4.0%

Related Documents