2018 GIS INSTALLATION REPORT

Prepared by: Eng. Mohamed Mustafa Elgweiny followed by: Eng. Ali Abo ashour (site manager) Checked by: Eng. Tawfik Elsaid (project manager)

‫ محمد مصطفى الجوينى‬.‫م‬

Uptown Cairo Project Mokattam, Cairo – Egypt Zahraa El Mokattam 220/22 KV GIS Substation (2*75 MVA) Power Transformers

Client

: Emaar Misr for Development S.A.E.

Supervision : Shaker Consultancy Group

Contractor

: Consortium: (KN / HHI)

Page 1

‫ محمد مصطفى الجوينى‬.‫م‬

Table of contents Table of contents ............................................................................................................................................. 2 General information and specifications for GIS................................................................................................ 3 

General specifications.......................................................................................................................... 3



GIS main components information ....................................................................................................... 4



GIS sub components information. ...................................................................................................... 21

2. General requirements for GIS installation. ................................................................................................ 30 

Preparation of Site Condition ............................................................................................................. 30



Preparation for Installation ................................................................................................................. 31



Ground marking and Transportation sequence. ................................................................................ 33



Transportation process ...................................................................................................................... 35

3. Installation process. .................................................................................................................................. 36 

Initial assembly process ..................................................................................................................... 36



Docking process ................................................................................................................................ 39



Vacuum and SF6 gas works .............................................................................................................. 43

4. Accessories installation .............................................................................................................................. 46 

Earthing shield ................................................................................................................................... 46



Linkage bars ...................................................................................................................................... 47



Platforms ............................................................................................................................................ 47



Supports............................................................................................................................................. 48



Cables work ....................................................................................................................................... 49

5. Schematic diagram for OHTL Bay. ............................................................................................................ 50 

List of contents ................................................................................................................................... 50



External wire specification ................................................................................................................. 50



SLD, layout, interlock, internal arrangement and sf6 system ............................................................. 50



DC and AC systems........................................................................................................................... 50



Closing and tripping circuits for C.B ................................................................................................... 50



Closing and opining circuits for D.S and E.S ..................................................................................... 50



Alarms, indicators, monitoring and control circuits ............................................................................. 50



C.Ts and V.Ts wiring.......................................................................................................................... 50

Page 2

‫ محمد مصطفى الجوينى‬.‫م‬

General information and specifications for GIS 

General specifications

maximum voltage / Nominal voltage

245kv rms / 220kv rms

Entrance and out let

Through GIB

Rated current for bus bar

2000 A

Rated short time withstand current

50KA / 1sec

Maximum ambient temperature

50 ºC C.B

7 bar

Others

5 bar

C.B

6.5 bar

others

4.5 bar

Rated gas pressure

Minimum gas pressure

2 OHTL 2 Transformers No. of bays

5 bays+3 future

1 Bus coupler 2 future underground cable bays 1 transformer future bay

Page 3

‫ محمد مصطفى الجوينى‬.‫م‬



GIS main components information 

Bays single line diagram (SLD).



Double bus bar single breaker system.



7 LCCs panels.



4 voltage transformers for each bus bar.

Page 4

‫م‪ .‬محمد مصطفى الجوينى‬

‫‪Page 5‬‬

‫ محمد مصطفى الجوينى‬.‫م‬

1.

Circuit breaker (C.B).



Circuit breaker is designed to protect the circuit from damage caused by excess current from an overload or short circuit. Its basic function is to interrupt current flow after a fault is detected.       

Rated voltage 245KV. Rated current 1600A except bus coupler 2000A. Short circuit 50KA /1s Rated gas pressure 7 bars. First stage leak alarm 6.7 bar. Second stage leak alarm 6.5 bar. Bursting pressure of relief 15 bars.

 Circuit breaker components. 1. Close coil 2. Two trip coils 3. Mechanism box per phase. 4. Position indicator (open or close) 5. Operation Counter 6. Spring indicator (Charged or Discharged) 7. Charging Hand (crank) 8. Charging motor 9. Spring for close coil 10. Spring for trip coils 11. Terminal blocks 12. Connection socket 13. Close push Button 14. Open push Button 15. Movable and fixed contacts. Page 6

‫م‪ .‬محمد مصطفى الجوينى‬

‫‪Page 7‬‬

‫ محمد مصطفى الجوينى‬.‫م‬

 Mechanical operation for CB per phase. 1. 2. 3. 4. 5. 6.

Charge the spring. Press at close push button (close order). Press at trip push button (open order). Close time around 65ms. Trip time around 25ms. The charged spring is enough to operate both close and open orders.

 CB SITE TEST. Contact resistance (mΩ).

1. 

By inject 100A DC and measuring the voltage, and then get the resistance.

Micro-ohm meter

Resistance must be less than 20 MΩ.

Page 8

‫ محمد مصطفى الجوينى‬.‫م‬

2.

Timing test 

This test to be done to determine the close and open time for circuit breaker



This test is done for all electrical D.S / E.S.

Page 9

‫ محمد مصطفى الجوينى‬.‫م‬

2.

Disconnector switches (D.S) and Earthing switch (E.S).



Used to isolate or connect circuits for maintenance, test, and load transfer and operation reliability.

 

Each phase in separate compartment with or without E.S. In each bay there are one or more D.S depend on its function.



Operation of D.S / E.S done off load.

D.S (Q1)

E.S (Q51)

D.S (Q2) E.S (Q52)

      

Rated voltage 245KV. Rated current 1600A except bus coupler 2000A. Short circuit 50KA /1s Rated gas pressure 5 bars. First stage leak alarm 4.7 bar. Second stage leak alarm 4.5 bar. Bursting pressure of relief 10 bars.

Page 10

D.S (Q9) E.S (Q8)

‫ محمد مصطفى الجوينى‬.‫م‬

 Disconnector and Earth switch components. 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11.

Main box for 3phases Dc motor Moving Mechanism Open limit switch Close limit switch Door limit switch Selector switch (operate and lock) Terminal block Socket Mechanism per phase Link rods between 3 phases the Mechanism

Page 11

‫ محمد مصطفى الجوينى‬.‫م‬

 Mechanical operation for (DS/E.S). 1. 2. 3. 4. 5. 6. 7. 8. 9. 10.

Open the door. Put selector on operate position. Check lock pin appear or No. When Appears, you must release interlock. Insert manual handle. Check position (open or close). Follow operation direction mark. Remove handling. Close the door. Close operation time around 2.5: 3 s the three phase mechanisms operate simultaneously at same time by Linked operation rods.

 Difference between (E.S) and (DS). 1. 2. 3.

Isolate the mechanism by plastic material. Isolate the bolts by plastic material. Copper plate to connect mechanism to body (enclosure).

Page 12

‫ محمد مصطفى الجوينى‬.‫م‬

4. E.S rod is conductor (metallic) opposite to D.S which is insulator.

D.S isolator rod

E.S Metallic rod

3.

High speed earthing switches

(HSES). 

Same components as E.S but include hydraulic piston (damper).

 Mechanical operation for (HSES). 

The motor charges piston and the piston suddenly perform the operation of main.



contacts at smaller time than normal ES (very short time) Used at overhead transmission line or long underground cable for fast discharge

Page 13

‫ محمد مصطفى الجوينى‬.‫م‬

 Mechanical interlock between DS (Q9) with ES (Q8). 

Used allow for one equipment only closing D.S or E.S.

Mechanical inter lock

4.

Local control cubical (LCC). 

The local control of GIS equipment through LCC panel.



All signals of V.Ts, C.Ts, and position indicators of (C.B, D.S, E.S...) transferred to LCC panel by L.V cables.



These signals transferred to control and protection panels from LCC panels by L.V cables.

Page 14

‫ محمد مصطفى الجوينى‬.‫م‬





LCC components: 1.

Mimic diagram.

2.

Annunciator.

3.

Ammeters, voltmeters, multi meters.

4.

Terminal blocks, Wiring.

5.

Push buttons / selector switches.

6.

Test switch.

7.

Heaters.

8.

MCB (AC/DC/VT).

9.

Contactors, Auxiliary relay

10.

Timer

11.

Ventilation fans.

12.

Semaphore

13.

Lamps

14.

Thermostat

Annunciator, push bottoms, selectors

Ammeters, voltmeters, test switch

Operation Procedures from LCC: 1. 2. 3. 4. 5. 6.

All MCB close All signal DC and AC ok Interlock ok Block operation ok Indication ok Put selector switch at local 

7.

Put selector switch at emergency 

8.

Operation DS , ES and CB at test position

Operation CB at normal operation

Push the push button for operate

Page 15

Mimic diagram, semaphore, selectors

‫ محمد مصطفى الجوينى‬.‫م‬



Relationship between LCC with other panels.

Page 16

‫ محمد مصطفى الجوينى‬.‫م‬

5.

Current transformer (C.T). 

Measurement of current in small values available through secondary windings to connected to measuring and protection devices.



CT Components:

1. 2. 3. 4. 5. 

Primary winding (main conductor) Secondary winding (coils) Pushing for secondary Terminal Terminal block with sliding links Test switch for core measurement at LCC.

Types: 

According to class:

1. 2. 

Class (5P20, 5P10) for protection. Class (0.5CL) for Measurement. According to secondary ratio:

1. 2. 3. 

1A for numerical relays 5A for mechanical and static relays 2A for special use (winding temperature indicator) According to location:

1. 2. 3.



Around bushing BCT Switch gear CT Outdoor CT

CT connection    

Facility for shorting CT Facility for use any ratio Facility for reverse polarity Facility for Earthing CT

Page 17

‫ محمد مصطفى الجوينى‬.‫م‬



Terminal block connection.



C.T site tests:

1. 2. 3. 4.



Polarity test Ratio test Exciting current characteristic test Megger test

Technical data:

Page 18

‫ محمد مصطفى الجوينى‬.‫م‬

6.

Voltage transformer (V.T, P.T). 

Measurement of voltage in small values available through secondary windings connected to measuring and protection devices.



VT Components:

1. 2. 3. 4. 5. 6. 

Primary winding. Secondary winding. MCB with auxiliary contact on secondary side. Terminal block. Hand Earthing for primary winding at CCVT. Manual Isolating DS for underground Bays.

Types:

1. 2.

GIS type(Inductive) VT Outdoor type (coupling capacitive voltage transformer) CCVT



Technical data:



Terminal block connection



C.T site tests: 1. 2.

Ratio test Megger test

Page 19

‫ محمد مصطفى الجوينى‬.‫م‬

7.

Gas isolated bus (GIB). 

There are two methods to Connect between OHTL and transformer bays inside GIS room with outdoor gantry and transformer respectively. 1. 2.



Gas isolated bus (GIB) Underground cable

In our case:  

GIB for the current OHTL, transformer bays. Underground Cables for future bays.



GIB or cables connect with gantry or transformer bushing through SF6/air bushing.



GIB divided to two parts inside and outside GIS room.  

8.

Inside part connect to GIS equipment. Outside part connect to SF6/air bushing.

Air / SF6 bushing.  

SF6/air bushing to be installed after installation the gantry to avoid any damage due to gantry installation process. There are 12 bushings for 4 circuits.

Page 20

‫ محمد مصطفى الجوينى‬.‫م‬



GIS sub components information.  Bays gas sections schemes.

Page 21

‫ محمد مصطفى الجوينى‬.‫م‬

   

Normal pressure for C.B = 7 bar Normal pressure for other compartment =5 bar Minimum pressure for C.B = 6.5 bar Minimum pressure for other compartment =4.5 bar

Page 22

‫ محمد مصطفى الجوينى‬.‫م‬

1.

Pressure disc.  

2.

This device used to release SF6 gas when its pressure increases inside the compartment. It is fabricated from aluminum and must be replaced after damage.

Absorbent zeoram.   

This material used to absorb humidity from SF6; it must be used for each compartment. It’s attached to pressure disc flange or man holes covers which used for cleaning. This material must change directly before vacuum process or after open its flange.

Page 23

‫ محمد مصطفى الجوينى‬.‫م‬

3.

Pressure gauges.  

Used to monitor the pressure of SF6 gas inside the gas section. Have two contacts: 1- alarm contact when the pressure reaches to first stage. 2- Trip contact when the pressure reaches to second stage.

4.

Insulation spacer (gas tight).  

Used to isolate gas between two sections supporting the conductors centralized. Marked by yellow color from outside.

Page 24

‫ محمد مصطفى الجوينى‬.‫م‬

5.

Insulation spacer (gas through).  

6.

Used to supporting the conductors centralized. Marked by silver color from outside.

Ultra high frequency partial discharge sensor (UHF PD).   

Used to measure the partial discharge for check wave around conductor symmetrical without distortion. The PD test is applied at 1.2 design voltage per phase. Acceptance criteria: less than 5pC.

Page 25

‫ محمد مصطفى الجوينى‬.‫م‬

7.

Non return valve (normally open). 

8.

Used to connect between SF6 gas inside the enclosure and gas gauge and to link between multi compartments to become one gas section.

Non return valve (normally closed). 

Used to vacuum process, gas filling and test point (dew point).

Page 26

‫ محمد مصطفى الجوينى‬.‫م‬

9.

Inspection windows.  

Used for inspection of moving mechanism and inside area of each compartment. Do not look inside which mechanism is operating.

Page 27

‫ محمد مصطفى الجوينى‬.‫م‬

10.

SF6 GAS. (SULFUR HEXAFLORIDE)

 Advantages:      

SF6 is non-flammable Electrical insulating capability is much than air SF6-Gas is a cooling gas New and clean SF6 is NOT poisonous SF6 is chemically stable SF6 has approx. 5,7x higher density than air

This cylinder is ≈ 600 KG and ≈ 23 bar

Page 28

higher

‫ محمد مصطفى الجوينى‬.‫م‬

11.

Supporting insulators  

12.

Supporting conductors fixed in the center of the enclosure

Conductor.     

Conductor s fabricated from pure aluminum in tubular shape Enclosure outer bay 322mm Enclosure thickness 8mm Conductor 93mm Enclosure thickness 10mm

Page 29

‫ محمد مصطفى الجوينى‬.‫م‬

2. General requirements for GIS installation. 

Preparation of Site Condition  Access road should be backfilled, compacted and settled for safely received package boxes before transportation and slope road ground near the main entrance before transportation.  Lighting fixtures should be installed before GIS installation.

 Painted the Epoxy paint on the floor  Installing and loading test for over-head crane for GIS equipment transportation inside GIS room.

Page 30

‫ محمد مصطفى الجوينى‬.‫م‬

 Closed all opening holes by wooden plate and Fabricated of temporary door or the perpetually door (roll up door) must be installed; that should be done before transportation for keeping to clean room condition & safety.  Check and prepare tools for installation completely. 

Tools for tightening and assembly, lifting and erection and for unpacking Vacuum cleaner for installation.

 Arrangement of transportation equipment     



Hi‐dro crane hand‐lift Fork‐lift Steel pipes Hydraulic jack

: for lifting GIS equipment. : in order to easy for transportation of GIS equipment into GIS room. : in order to easy and fast for transportation of GIS equipment. : for carrying of GIS main‐body equipment. : for adjust the height and level of equipment.

Preparation for Installation  Checking boxes 

Before start the installation process we should check the equipment boxes if there are any damage or loose.

 Man power. 

The requested man power depends on bays number and time available for mission, in normal conditions 4Technicians, 4 helpers, 1 erection engineer and 1project engineer.

Page 31

‫ محمد مصطفى الجوينى‬.‫م‬

 Transportation and equipment arrangement plan.   

In the beginning erection engineer should study the packing list and its drawings to can put suitable transportation plan and arrangement for equipment in GIS room, erection schedule is depend on this study. All required documents like inspection and test plan (ITP), method of statements and tools certificates…etc.). Should be prepared.

Preparation of vacuum pump at the least two sets and prepares the vacuum hose and torr gauge.

 Fabricated of shelf should be installed before starting the erection to arrange and keeps installation materials, prepare fabricated of shim plates for adjusted of alignment each of thickness like (1mm, 2mm, 3mm), Preparing the wooden plates for protecting the GIS equipment.

Page 32

‫ محمد مصطفى الجوينى‬.‫م‬



Ground marking and Transportation sequence. 

Check the finishing condition and embedded plate position according to the foundation plan and measure height on each of embedded plate surface.

 Marking center line on the embedded plate surface floor for positioning of main-body equipment and draw the main bus and datum line of each bay  Ground marking executed according to layout drawing and civil drawings that contain all dimensions of equipment and distance between them.  The basic lines in ground marking are X-axis and Y-axis which representative of C.Bs centers and transformer GIB holes centers respectively. 1.Surveyor takes several points on X-axis and Y-axis lines, and then start connects between these points making these 2 lines. 2.Draw parallel and vertically lines according to drawings. 3.These lines representative of bus bar line, center of bus coupler C.B, all C.Bs positions points and M/B supports which hold the V.Ts.

4.Then take height and level of plates take in consideration that, bus coupler plate is the reference level. 5.Using shim plates with different thickness we can adjust the level between plates.

Page 33

‫م‪ .‬محمد مصطفى الجوينى‬

‫‪Page 34‬‬

‫ محمد مصطفى الجوينى‬.‫م‬



Transportation process  After revise and compare the packing list drawings with packing list and boxes, start transport the boxes and unpacking the equipment then arrange this equipment inside GIS room according to the installation process.  The amount of equipment to be transported inside GIS room is determined on the basis of the area of GIS room, so the transportation process may divide to more than one stage.  In general the transportation and arrangement process is executed as follow:   

Each C.B to be moved near to its final position Each D.S, E.S, C.Ts and V.Ts moved near to its breaker (bay) Each bus bar and support moved near to its final position.

 Plate form and all accessories after installation of main equipment

Page 35

‫ محمد مصطفى الجوينى‬.‫م‬

3. Installation process. 

Initial assembly process  After arrange the equipment and completely close all doors, windows and holes, start the installation process as follow:  

Install of each C.B equipment without any docking between bays or any ground welding Install of C.T, D.S, E.S, supports and bus bars for each C.B.

Installing of C.Ts with C.B

Installing of D.S/E.S with C.B

Notes:  C.T and D.S compartment may be in one compartment or separate depend on them size.

One compartment

Separate compartment Page 36

‫ محمد مصطفى الجوينى‬.‫م‬

 Some compartment needs to assembly its conductor before installing.

 Installation starts by remove the transportation cover then replace gasket by a new one, and cleaning the spacer, flange, gasket and conductor by alcohol and wipes.

Page 37

‫ محمد مصطفى الجوينى‬.‫م‬

 Replace the old grease of flange (yellow grease) and conductor contact positions (white grease) with new grease.

 After preparing the flange of equipment for assembling cover it till assembling it. .

Page 38

‫ محمد مصطفى الجوينى‬.‫م‬

 After assembling the C.B equipment, it become ready to install and temporary welding in ground.



Docking process  There are two methods two to docking the bays together as follow: 1.

Install all C.Bs in it positions and temporary welding, then start assembling the equipment of (bay1) in direction to the extension for future bays, then bus bars and GIB reach to AIR/SF6 bushing.

2.

Just install bus coupler C.B and temporary welded then start assembling the equipment and docking it to this C.B from it both sides to the final sides of GIS (used method).

 Sequence of docking regarding to method (no.2) 

After assembling the equipment of each C.B and welded the bus coupler C.B start docking the bays together.  Note that: the amount of assembling equipment with C.B depends on the capacity of overhead crane and Available empty space.

Page 39

‫ محمد مصطفى الجوينى‬.‫م‬



In our case:  



Capacity of overhead crane = 6.3 tons No empty space

So C.B assembled with:    



C.Ts. D.S/E.S. Supports for D.S/E.S. Bus bar in one side.

After welded bus coupler C.B by temporary welding: 1. 2. 3.

Assembling the tie bus bar with bus coupler Install the D.S/E.S for sections in the both sides B.C Install the D.S/E.S for V.Ts in the both sides of B.C

1

2

Page 40

3

‫ محمد مصطفى الجوينى‬.‫م‬

4.

Docking transformer bays with V.Ts sections in the both sides

4

5.

Docking the OHTL bays with transformer bays in the both sides

5

6.

Installing of V.Ts in the both sides 

In our case V.Ts installation postponed after H.V test.

6

Page 41

‫ محمد مصطفى الجوينى‬.‫م‬

7.

Gas isolated bus (GIB)

7

8.

SF6 / AIR bushing

8

Page 42

‫ محمد مصطفى الجوينى‬.‫م‬



Vacuum and SF6 gas works  Vacuum work 

After welding a bay start opening the flange of absorbent zeoram and add new silica gel for all separate champers.



All tools and equipment are already prepared (DILO MACHINE, ADAPTER and HOSES).



Then connect the hose of (DILO MACHINE) to non-return valve (normally closed) and running the machine.



Vacuum continue at least 1 hour at 1torr (1mmHg), but the actual process reach to 3 hours at (0.45 torr).

Notes:  Vacuum process can do to each phase separately but to save time we use adapter to execute the process for the three phases one time. (One hose from machine to adapter and three from adapter to phases).  For C.B compartment the vacuum period from 20 to 24 hours to can reach to (0.6mm bar/0.45torr) but other compartment as same as mentioned above.  The vacuum period and value depend on the machine capacity and age, so period and value of vacuum process are inverse related depend on one another as follow: 

If the vacuum value can increase more the period is decrease also.

 In the begging of vacuum process the value of vacuum is out of range, wait just few minutes then the value appear of machine in range of 100 m bar then start gradually decrease till machine capacity (0.6m bar).  In case of opening any compartment for any reason it should be replace the silica gel and take vacuum again.  We use Green Sticker to sign the vacuumed compartment from other.

Page 43

‫ محمد مصطفى الجوينى‬.‫م‬

 Gas filling 

After vacuum process of each compartment start the gas filling process directly.



The same tools as vacuum in addition to gas filling device and SF6 gas cylinder.



Connect the gas filling device to cylinder and other side to adapter or to DILO machine and then to adapter select gas filling function from multi functions selector in DILO machine.

 

Open valve cylinder and gas filling device then control the gas pressure by gas regulator. As a first stage of gas filling continue filling to 1bar. The second stage continues to final value 7 bar for C.B, 5 bar for others.

Page 44

‫ محمد مصطفى الجوينى‬.‫م‬

Notes:  As the vacuum process the gas filling process can do to each phase separately but to save time we use adapter to execute the process for the three phases one time. (One hose from machine to adapter and three from adapter to phases).  We use red sticker to sign the vacuumed compartment from other.  When the pressure inside the cylinder decrease, gas temperature decrease and gas freezes, so we use the compressor in DILO machine.  Gas filling process carried out to all compartment in stages of different pressures not one time to save the barrier spacer condition although it bear the pressure difference but for more confirmation.

 Gas test 

Gas leakage test   



Dew point test   



Used to check tightness for pipes and enclosure Device mane :Portable Gas leak detector Continuous sound alarm meaning gas leakages

Used to check humidity for gas to clarify Insulating gas efficiency Device mane :Portable dew point meter

Acceptance criteria  

C.B parts: Dew point less than150 PPM Volume Others: Dew point less than 300 PPM Volume below.

Page 45

‫ محمد مصطفى الجوينى‬.‫م‬

4. Accessories installation 

Earthing shield 

There are already installed earhing shields with equipment like E.S bars and its shields, but the main earthing bars needs to be assembled in site and installed.



There are several types of earthings connection bars shapes depend on its position.



These shapes are assembled from earthing accessories.

Page 46

‫ محمد مصطفى الجوينى‬.‫م‬



Linkage bars   



Linkage bars between the mechanism and phase’s movable part are assembled and installed in site. There are two types of length and two types contact point. These linkages contain flexible joint to adjust the required space.

Platforms  

Firstly unpacking the platform box then start arranges and numbering its parts regarding to drawings. Start assembling these parts according to drawings.

Page 47

‫ محمد مصطفى الجوينى‬.‫م‬



Supports  As plat form; 

Firstly unpacking the platform box then start arranges and numbering its parts regarding to drawings.



Start assembling these parts according to drawings.

Page 48

‫ محمد مصطفى الجوينى‬.‫م‬



Cables work  Cable tray 

As plat form;  

Firstly unpacking the trays box then start arranges its parts regarding to drawings. There are several lengths and dimensions of trays, we use the suitable part according to its function and position regarding to drawings.

 Cable termination 

After installed the cable trays, start the cable termination process according to cable list schedule.

Page 49

‫ محمد مصطفى الجوينى‬.‫م‬

5. Schematic diagram for OHTL Bay.

 Including: 

List of contents



External wire specification



SLD, layout, interlock, internal arrangement and sf6 system



DC and AC systems



Closing and tripping circuits for C.B



Closing and opining circuits for D.S and E.S



Alarms, indicators, monitoring and control circuits



C.Ts and V.Ts wiring

Page 50

A3_B_COVER

S SPECIFICATION

CHEMATIC DIAGRAM FOR GIS LCC

245kV 50kA GIS

PROJECT NAME

OHTL 1 D01

GIS BAY REFERENCE NO.

CONTRACT NUMBER HHI REFERENCE NO.

GIS BAY NAME

16316

REVISION NO.

04

ZAHRAA EL-MOKATTAM 220/22kV GIS SUBSTATION

HEAVY INDUSTRIES CO.,LTD.

A3(420mm * 297mm)

1

2

3

4

5

6

7

8

Project

A

A

DRAWING LIST SHEET NO

B

C

D

REVISION

DESCRIPTION REV.0

REV.1

REV.2

REV.3

REV.4

1

COVER

01.SEP.2016

19.JUN.2017

09.AUG.2017

10.AUG.2017

24.JAN.2018

2

LIST OF CONTENTS

01.SEP.2016

19.JUN.2017

09.AUG.2017

10.AUG.2017

24.JAN.2018

3

LIST OF CONTENTS

01.SEP.2016

19.JUN.2017

09.AUG.2017

10.AUG.2017

24.JAN.2018

4

LIST OF CONTENTS

01.SEP.2016

19.JUN.2017

09.AUG.2017

10.AUG.2017

24.JAN.2018

5

LIST OF CONTENTS

01.SEP.2016

19.JUN.2017

09.AUG.2017

10.AUG.2017

24.JAN.2018

6

INTERNAL WIRE SPECIFICATION

01.SEP.2016

19.JUN.2017

09.AUG.2017

10.AUG.2017

24.JAN.2018

7

EXTERNAL WIRE SPECIFICATION

01.SEP.2016

19.JUN.2017

09.AUG.2017

10.AUG.2017

24.JAN.2018

8

FERRULING SYSTEM

01.SEP.2016

19.JUN.2017

09.AUG.2017

10.AUG.2017

24.JAN.2018

9

SYMBOL LEGEND

01.SEP.2016

19.JUN.2017

09.AUG.2017

10.AUG.2017

24.JAN.2018

10

SF6 GAS SCHEME DIAGRAM

01.SEP.2016

19.JUN.2017

09.AUG.2017

10.AUG.2017

24.JAN.2018

11

220kV GIS SINGLE LINE DIAGRAM

01.SEP.2016

19.JUN.2017

09.AUG.2017

10.AUG.2017

24.JAN.2018

12

INTERLOCK DIAGRAM FOR T/L

01.SEP.2016

19.JUN.2017

09.AUG.2017

10.AUG.2017

24.JAN.2018

13

LCC LAYOUT FOR T/L

01.SEP.2016

19.JUN.2017

09.AUG.2017

10.AUG.2017

24.JAN.2018

14

LCC MIMIC DIAGRAM FOR T/L

01.SEP.2016

19.JUN.2017

09.AUG.2017

10.AUG.2017

24.JAN.2018

15

LCC ANNUNCIATOR LIST

01.SEP.2016

19.JUN.2017

09.AUG.2017

10.AUG.2017

24.JAN.2018

16

INTERNAL ARRANGEMENT OF T/L (1)

01.SEP.2016

19.JUN.2017

09.AUG.2017

10.AUG.2017

24.JAN.2018

17

INTERNAL ARRANGEMENT OF T/L (2)

01.SEP.2016

19.JUN.2017

09.AUG.2017

10.AUG.2017

24.JAN.2018

18

DC POWER SUPPLY

01.SEP.2016

19.JUN.2017

09.AUG.2017

10.AUG.2017

24.JAN.2018

19

DC POWER SUPPLY

01.SEP.2016

19.JUN.2017

09.AUG.2017

10.AUG.2017

24.JAN.2018

20

AC POWER SUPPLY

01.SEP.2016

19.JUN.2017

09.AUG.2017

10.AUG.2017

24.JAN.2018

Reference DWG

DATE

NO. DWG

REV.

B

EMPLOYER / DEVELOPER

21

CB CLOSE CONTROL

01.SEP.2016

19.JUN.2017

09.AUG.2017

10.AUG.2017

24.JAN.2018

22

CB TRIP 1 CONTROL

01.SEP.2016

19.JUN.2017

09.AUG.2017

10.AUG.2017

24.JAN.2018

23

CB TRIP 2 CONTROL

01.SEP.2016

19.JUN.2017

09.AUG.2017

10.AUG.2017

24.JAN.2018

24

CB MOTOR CONTROL

01.SEP.2016

19.JUN.2017

09.AUG.2017

10.AUG.2017

24.JAN.2018

25

CB MOTOR POWER

01.SEP.2016

19.JUN.2017

09.AUG.2017

10.AUG.2017

24.JAN.2018

26

CB MECHANISM 1

01.SEP.2016

19.JUN.2017

09.AUG.2017

10.AUG.2017

24.JAN.2018

27

CB MECHANISM 2

01.SEP.2016

19.JUN.2017

09.AUG.2017

10.AUG.2017

24.JAN.2018

28

BUS DS(-Q1) CONTROL

01.SEP.2016

19.JUN.2017

09.AUG.2017

10.AUG.2017

24.JAN.2018

29

BUS DS(-Q1) MECHANISM

01.SEP.2016

19.JUN.2017

09.AUG.2017

10.AUG.2017

24.JAN.2018

30

BUS DS(-Q2) CONTROL

01.SEP.2016

19.JUN.2017

09.AUG.2017

10.AUG.2017

24.JAN.2018

C

PROJECT MANAGER.

SUPERVISION CONSULTANT

D

04 03 02 01 00

REV.

24.JAN.2018 10.AUG.2017 09.AUG.2017 19.JUN.2017 01.SEP.2016

DATE

REVISED AS PER COMMENT REVISED AS PER COMMENT REVISED AS PER COMMENT REVISED AS PER COMMENT FOR APPROVAL

ISSUED TO / FOR :

CONTRACTOR: CONSORTIUM( KN / HHI )

E

E

1000, Bangeojinsinhawn-doro, Dong-gu, Ulsan, Korea DRAWING TITLE:

LIST OF CONTENTS Drawing Number :

F

PREPARED :

PK55-SD-EL-GS-14 ACTION MANUFACTURER/VENDER NAME

A B C DRAWING NUMBER

16316 01 EA

SHEET NO.

2

OF

92

REV NO.

04

D

Project No.:

Scale :

CHECKED :

Plot Date:

APPROVED :

008006400 Sheet Size : Rev. :

A3

04

K.H.SONG

S.Y.JANG

01.SEP.2016

C.Y.HONG

F

1

2

3

4

5

6

7

8

Project

A

A

DRAWING LIST SHEET NO

B

C

D

REVISION

DESCRIPTION REV.0

REV.1

REV.2

REV.3

REV.4

31

BUS DS(-Q2) MECHANISM

01.SEP.2016

19.JUN.2017

09.AUG.2017

10.AUG.2017

24.JAN.2018

32

LINE DS(-Q9) CONTROL

01.SEP.2016

19.JUN.2017

09.AUG.2017

10.AUG.2017

24.JAN.2018

33

LINE DS(-Q9) MECHANISM

01.SEP.2016

19.JUN.2017

09.AUG.2017

10.AUG.2017

24.JAN.2018

34

WORK ES(-Q51) CONTROL

01.SEP.2016

19.JUN.2017

09.AUG.2017

10.AUG.2017

24.JAN.2018

35

WORK ES(-Q51) MECHANISM

01.SEP.2016

19.JUN.2017

09.AUG.2017

10.AUG.2017

24.JAN.2018

36

WORK ES(-Q52) CONTROL

01.SEP.2016

19.JUN.2017

09.AUG.2017

10.AUG.2017

24.JAN.2018

37

WORK ES(-Q52) MECHANISM

01.SEP.2016

19.JUN.2017

09.AUG.2017

10.AUG.2017

24.JAN.2018

38

LINE ES(-Q8) CONTROL

01.SEP.2016

19.JUN.2017

09.AUG.2017

10.AUG.2017

24.JAN.2018

39

LINE ES(-Q8) MECHANISM

01.SEP.2016

19.JUN.2017

09.AUG.2017

10.AUG.2017

24.JAN.2018

40

MULTIPLY CONTACT

01.SEP.2016

19.JUN.2017

09.AUG.2017

10.AUG.2017

24.JAN.2018

41

MULTIPLY CONTACT

01.SEP.2016

19.JUN.2017

09.AUG.2017

10.AUG.2017

24.JAN.2018

42

MULTIPLY CONTACT

01.SEP.2016

19.JUN.2017

09.AUG.2017

10.AUG.2017

24.JAN.2018

43

OPERATING CONDITION

01.SEP.2016

19.JUN.2017

09.AUG.2017

10.AUG.2017

24.JAN.2018

44

DS/ES INCOMPLETE CONDITION

01.SEP.2016

19.JUN.2017

09.AUG.2017

10.AUG.2017

24.JAN.2018

45

INTERLOCK (CB)

01.SEP.2016

19.JUN.2017

09.AUG.2017

10.AUG.2017

24.JAN.2018

46

INTERLOCK (BUS DS)

01.SEP.2016

19.JUN.2017

09.AUG.2017

10.AUG.2017

24.JAN.2018

47

INTERLOCK (LINE DS/ES)

01.SEP.2016

19.JUN.2017

09.AUG.2017

10.AUG.2017

24.JAN.2018

48

GAS MONITORING

01.SEP.2016

19.JUN.2017

09.AUG.2017

10.AUG.2017

24.JAN.2018

49

GAS MONITORING

01.SEP.2016

19.JUN.2017

09.AUG.2017

10.AUG.2017

24.JAN.2018

50

GAS MONITORING

01.SEP.2016

19.JUN.2017

09.AUG.2017

10.AUG.2017

24.JAN.2018

Reference DWG

DATE

NO. DWG

REV.

B

EMPLOYER / DEVELOPER

51

GAS MONITORING

01.SEP.2016

19.JUN.2017

09.AUG.2017

10.AUG.2017

24.JAN.2018

52

GAS MONITORING

01.SEP.2016

19.JUN.2017

09.AUG.2017

10.AUG.2017

24.JAN.2018

53

GAS MONITORING

01.SEP.2016

19.JUN.2017

09.AUG.2017

10.AUG.2017

24.JAN.2018

54

POSITION INDICATOR

01.SEP.2016

19.JUN.2017

09.AUG.2017

10.AUG.2017

24.JAN.2018

55

POSITION INDICATOR

01.SEP.2016

19.JUN.2017

09.AUG.2017

10.AUG.2017

24.JAN.2018

56

HEATER CONTROL

01.SEP.2016

19.JUN.2017

09.AUG.2017

10.AUG.2017

24.JAN.2018

57

HEATER CONTROL

01.SEP.2016

19.JUN.2017

09.AUG.2017

10.AUG.2017

24.JAN.2018

58

ANNUNCIATOR (H1)

01.SEP.2016

19.JUN.2017

09.AUG.2017

10.AUG.2017

24.JAN.2018

59

ANNUNCIATOR (H1)

01.SEP.2016

19.JUN.2017

09.AUG.2017

10.AUG.2017

24.JAN.2018

60

ANNUNCIATOR (H1)

01.SEP.2016

19.JUN.2017

09.AUG.2017

10.AUG.2017

24.JAN.2018

C

PROJECT MANAGER.

SUPERVISION CONSULTANT

D

04 03 02 01 00

REV.

24.JAN.2018 10.AUG.2017 09.AUG.2017 19.JUN.2017 01.SEP.2016

DATE

REVISED AS PER COMMENT REVISED AS PER COMMENT REVISED AS PER COMMENT REVISED AS PER COMMENT FOR APPROVAL

ISSUED TO / FOR :

CONTRACTOR: CONSORTIUM( KN / HHI )

E

E

1000, Bangeojinsinhawn-doro, Dong-gu, Ulsan, Korea DRAWING TITLE:

LIST OF CONTENTS Drawing Number :

F

PREPARED :

PK55-SD-EL-GS-14 ACTION MANUFACTURER/VENDER NAME

A B C DRAWING NUMBER

16316 01 EA

SHEET NO.

3

OF

92

REV NO.

04

D

Project No.:

Scale :

CHECKED :

Plot Date:

APPROVED :

008006400 Sheet Size : Rev. :

A3

04

K.H.SONG

S.Y.JANG

01.SEP.2016

C.Y.HONG

F

1

2

3

4

5

6

7

8

Project

A

A

DRAWING LIST SHEET NO

B

C

D

REVISION

DESCRIPTION REV.0

REV.1

REV.2

REV.3

REV.4

61

ANNUNCIATOR (H1)

01.SEP.2016

19.JUN.2017

09.AUG.2017

10.AUG.2017

24.JAN.2018

62

ANNUNCIATOR (H1)

01.SEP.2016

19.JUN.2017

09.AUG.2017

10.AUG.2017

24.JAN.2018

63

ANNUNCIATOR (H1)

01.SEP.2016

19.JUN.2017

09.AUG.2017

10.AUG.2017

24.JAN.2018

64

ANNUNCIATOR (H1)

01.SEP.2016

19.JUN.2017

09.AUG.2017

10.AUG.2017

24.JAN.2018

65

METERING (1)

01.SEP.2016

19.JUN.2017

09.AUG.2017

10.AUG.2017

24.JAN.2018

66

METERING (2)

01.SEP.2016

19.JUN.2017

09.AUG.2017

10.AUG.2017

24.JAN.2018

67

REMOTE

01.SEP.2016

19.JUN.2017

09.AUG.2017

10.AUG.2017

24.JAN.2018

68

REMOTE

01.SEP.2016

19.JUN.2017

09.AUG.2017

10.AUG.2017

24.JAN.2018

69

REMOTE

01.SEP.2016

19.JUN.2017

09.AUG.2017

10.AUG.2017

24.JAN.2018

70

CURRENT TRANSFORMER

01.SEP.2016

19.JUN.2017

09.AUG.2017

10.AUG.2017

24.JAN.2018

71

CURRENT TRANSFORMER

01.SEP.2016

19.JUN.2017

09.AUG.2017

10.AUG.2017

24.JAN.2018

72

CURRENT TRANSFORMER

01.SEP.2016

19.JUN.2017

09.AUG.2017

10.AUG.2017

24.JAN.2018

73

SWITCH

01.SEP.2016

19.JUN.2017

09.AUG.2017

10.AUG.2017

24.JAN.2018

74

SWITCH

01.SEP.2016

19.JUN.2017

09.AUG.2017

10.AUG.2017

24.JAN.2018

75

SWITCH

01.SEP.2016

19.JUN.2017

09.AUG.2017

10.AUG.2017

24.JAN.2018

76

SWITCH

01.SEP.2016

19.JUN.2017

09.AUG.2017

10.AUG.2017

24.JAN.2018

77

PARTS LIST FOR LCC

01.SEP.2016

19.JUN.2017

09.AUG.2017

10.AUG.2017

24.JAN.2018

78

PARTS LIST FOR LCC

01.SEP.2016

19.JUN.2017

09.AUG.2017

10.AUG.2017

24.JAN.2018

79

PARTS LIST FOR LCC

01.SEP.2016

19.JUN.2017

09.AUG.2017

10.AUG.2017

24.JAN.2018

80

PARTS LIST FOR LCC

01.SEP.2016

19.JUN.2017

09.AUG.2017

10.AUG.2017

24.JAN.2018

Reference DWG

DATE

NO. DWG

REV.

B

EMPLOYER / DEVELOPER

81

PARTS LIST FOR LCC

01.SEP.2016

19.JUN.2017

09.AUG.2017

10.AUG.2017

24.JAN.2018

82

PARTS LIST FOR LCC

01.SEP.2016

19.JUN.2017

09.AUG.2017

10.AUG.2017

24.JAN.2018

83

PARTS LIST FOR LCC

01.SEP.2016

19.JUN.2017

09.AUG.2017

10.AUG.2017

24.JAN.2018

84

PARTS LIST FOR MECHANISM

01.SEP.2016

19.JUN.2017

09.AUG.2017

10.AUG.2017

24.JAN.2018

85

PARTS LIST FOR MECHANISM

01.SEP.2016

19.JUN.2017

09.AUG.2017

10.AUG.2017

24.JAN.2018

86

PARTS LIST FOR MECHANISM

01.SEP.2016

19.JUN.2017

09.AUG.2017

10.AUG.2017

24.JAN.2018

87

PARTS LIST FOR MECHANISM

01.SEP.2016

19.JUN.2017

09.AUG.2017

10.AUG.2017

24.JAN.2018

88

PARTS LIST FOR MECHANISM

01.SEP.2016

19.JUN.2017

09.AUG.2017

10.AUG.2017

24.JAN.2018

89

PARTS LIST FOR MECHANISM

01.SEP.2016

19.JUN.2017

09.AUG.2017

10.AUG.2017

24.JAN.2018

90

PARTS LIST FOR MECHANISM

01.SEP.2016

19.JUN.2017

09.AUG.2017

10.AUG.2017

24.JAN.2018

C

PROJECT MANAGER.

SUPERVISION CONSULTANT

D

04 03 02 01 00

REV.

24.JAN.2018 10.AUG.2017 09.AUG.2017 19.JUN.2017 01.SEP.2016

DATE

REVISED AS PER COMMENT REVISED AS PER COMMENT REVISED AS PER COMMENT REVISED AS PER COMMENT FOR APPROVAL

ISSUED TO / FOR :

CONTRACTOR: CONSORTIUM( KN / HHI )

E

E

1000, Bangeojinsinhawn-doro, Dong-gu, Ulsan, Korea DRAWING TITLE:

LIST OF CONTENTS Drawing Number :

F

PREPARED :

PK55-SD-EL-GS-14 ACTION MANUFACTURER/VENDER NAME

A B C DRAWING NUMBER

16316 01 EA

SHEET NO.

4

OF

92

REV NO.

04

D

Project No.:

Scale :

CHECKED :

Plot Date:

APPROVED :

008006400 Sheet Size : Rev. :

A3

04

K.H.SONG

S.Y.JANG

01.SEP.2016

C.Y.HONG

F

1

2

3

4

5

6

7

8

Project

A

A

DRAWING LIST SHEET NO

B

REVISION

DESCRIPTION REV.0

REV.1

REV.2

REV.3

REV.4

91

PARTS LIST FOR TERMINAL BLOCK

01.SEP.2016

19.JUN.2017

09.AUG.2017

10.AUG.2017

24.JAN.2018

92

PARTS LIST FOR TERMINAL BLOCK

01.SEP.2016

19.JUN.2017

09.AUG.2017

10.AUG.2017

24.JAN.2018

Reference DWG

DATE

NO. DWG

REV.

B

EMPLOYER / DEVELOPER

C

C

PROJECT MANAGER.

SUPERVISION CONSULTANT

D

D

04 03 02 01 00

REV.

24.JAN.2018 10.AUG.2017 09.AUG.2017 19.JUN.2017 01.SEP.2016

DATE

REVISED AS PER COMMENT REVISED AS PER COMMENT REVISED AS PER COMMENT REVISED AS PER COMMENT FOR APPROVAL

ISSUED TO / FOR :

CONTRACTOR: CONSORTIUM( KN / HHI )

E

E

1000, Bangeojinsinhawn-doro, Dong-gu, Ulsan, Korea DRAWING TITLE:

LIST OF CONTENTS Drawing Number :

F

PREPARED :

PK55-SD-EL-GS-14 ACTION MANUFACTURER/VENDER NAME

A B C DRAWING NUMBER

16316 01 EA

SHEET NO.

5

OF

92

REV NO.

04

D

Project No.:

Scale :

CHECKED :

Plot Date:

APPROVED :

008006400 Sheet Size : Rev. :

A3

04

K.H.SONG

S.Y.JANG

01.SEP.2016

C.Y.HONG

F

1

2

3

4

5

6

7

8

Project

A

A

WIRE SPECIFICATION WIRE

WIRE NO. MARK

KINDS OF WIRE

ADDITIONAL MARK TERMINAL LUG

INSULATION

COLOR

SIZE

SLEEVE COLOR

INSULATION CAP

MARKING

SLEEVE COLOR

LETTER COLOR

MARKING

AC

XHHW/SIS

BLACK

2.5mm²

WHITE

BLUE

WIRE NO.

N/A

N/A

N/A

DC

XHHW/SIS

GRAY

2.5mm²

WHITE

BLUE

WIRE NO.

N/A

N/A

N/A

TRIP

XHHW/SIS

GRAY

2.5mm²

WHITE

RED

WIRE NO.

RED

N/A

N/A

ALARM

XHHW/SIS

GRAY

2.5mm²

WHITE

BLUE

WIRE NO.

N/A

N/A

N/A

DC(+)

XHHW/SIS

GRAY

2.5mm²

WHITE

BLUE

WIRE NO.

WHITE

BLACK

+

DC(-)

XHHW/SIS

GRAY

2.5mm²

WHITE

BLUE

WIRE NO.

WHITE

BLACK

-

AC(A)

XHHW/SIS

RED

2.5mm²

WHITE

BLUE

WIRE NO.

WHITE

BLACK

A

AC(B)

XHHW/SIS

YELLOW

2.5mm²

WHITE

BLUE

WIRE NO.

WHITE

BLACK

B

WIRE NO.

WHITE

BLACK

C

REMARK

Reference DWG

B

CIRCUIT CONTROL

POWER SUPPLY C

REV.

B

BLADE TYPE

EMPLOYER / DEVELOPER

AC(C)

XHHW/SIS

BLUE

2.5mm²

WHITE

BLUE

AC(N)

XHHW/SIS

GREEN

2.5mm²

WHITE

BLUE

WIRE NO.

WHITE

BLACK

N

A

XHHW/SIS

RED

6.0mm²

WHITE

BLUE

WIRE NO.

WHITE

BLACK

A

B

XHHW/SIS

YELLOW

6.0mm²

WHITE

BLUE

WIRE NO.

WHITE

BLACK

B

C

XHHW/SIS

BLUE

6.0mm²

WHITE

BLUE

WIRE NO.

WHITE

BLACK

C

N

XHHW/SIS

GREEN

6.0mm²

WHITE

BLUE

WIRE NO.

WHITE

BLACK

N

A

XHHW/SIS

RED

4.0mm²

WHITE

BLUE

WIRE NO.

WHITE

BLACK

A

B

XHHW/SIS

YELLOW

4.0mm²

WHITE

BLUE

WIRE NO.

WHITE

BLACK

B

C

XHHW/SIS

BLUE

4.0mm²

WHITE

BLUE

WIRE NO.

WHITE

BLACK

C

N

XHHW/SIS

GREEN

4.0mm²

WHITE

BLUE

WIRE NO.

WHITE

BLACK

N

CT SECONDARY CIRCUIT

DATE

NO. DWG

C BLADE TYPE

PROJECT MANAGER.

SUPERVISION CONSULTANT

D

VT SECONDARY CIRCUIT

RING TYPE

D

04 03 02 01 00

REV.

BLADE TYPE

24.JAN.2018 10.AUG.2017 09.AUG.2017 19.JUN.2017 01.SEP.2016

DATE

REVISED AS PER COMMENT REVISED AS PER COMMENT REVISED AS PER COMMENT REVISED AS PER COMMENT FOR APPROVAL

ISSUED TO / FOR :

CONTRACTOR: CONSORTIUM( KN / HHI )

GROUND

XHHW/SIS

GREEN

4.0mm²

WHITE

BLUE

WIRE NO.

WHITE

BLACK

EARTH

XHHW ( Cross-linked Polyethylene High Heat-resistant Water-resistant )

E

- Rated Voltage : 600/1000V

E

- Heat resistant temperature : 90℃ (By Standard of UL) - Conductor : Plain or Tinned annealed copper wire Power supply circuit is defined as circuit from power supply to MCB. N/A : Not applicable 1000, Bangeojinsinhawn-doro, Dong-gu, Ulsan, Korea DRAWING TITLE:

INTERNAL WIRE SPECIFICATION Drawing Number :

F

PREPARED :

PK55-SD-EL-GS-14 ACTION MANUFACTURER/VENDER NAME

A B C DRAWING NUMBER

16316 01 EB

SHEET NO.

6

OF

92

REV NO.

04

D

Project No.:

Scale :

CHECKED :

Plot Date:

APPROVED :

008006400 Sheet Size : Rev. :

A3

04

K.H.SONG

S.Y.JANG

01.SEP.2016

C.Y.HONG

F

1

2

3

4

5

6

7

8

Project

A

A

MUTI-CABLE SPECIFICATION NO

A

KINDS OF WIRING DC CONTROL CIRCUIT

SPEC.

INSULATION

FR-CCV-SB

XLPE

NO. OF CORES

CROSSSECTIONAL AREA

COLOR OF SHEATH

SHIELD

24 CORES

2.5SQMM

BLACK

COPPER BRAID

REMARK

Reference DWG

DATE

NO. DWG

REV.

B

B B

GAS CONTROL CIRCUIT

FR-CCV-SB

XLPE

6 CORES

2.5SQMM

BLACK

COPPER BRAID

C

CT CONTROL CIRCUIT

FR-CCV-SB

XLPE

6 CORES

6.0SQMM

BLACK

COPPER BRAID

VT CONTROL CIRCUIT

FR-CCV-SB

XLPE

6 CORES

4.0SQMM

BLACK

COPPER BRAID

D

EMPLOYER / DEVELOPER

C E

HEATER CONTROL

FR-CCV-SB

XLPE

2 CORES

4.0SQMM

BLACK

C

COPPER BRAID

FR-CCV-SB : Flame retardant control cross linked polyethylene sheathed cable

PROJECT MANAGER.

- Rated Voltage : 0.6/1KV - Heat resistant temperature : 90 degrees ( By Standard of UL) - Conductor : Plain or Tinned annealed copper wire SUPERVISION CONSULTANT

GAS MONITORING BOX

D

B

A B

SECONDARY BOX OF CT

C

LOCAL CONTROL CUBICLE

E

D

CUBICLE

04 03 02 01 00

REV.

A SECONDARY BOX OF VT

D

LOCAL CONTROL

E

MECHANISM OF DISCONNECTOR & EARTHING SWITCH

24.JAN.2018 10.AUG.2017 09.AUG.2017 19.JUN.2017 01.SEP.2016

DATE

REVISED AS PER COMMENT REVISED AS PER COMMENT REVISED AS PER COMMENT REVISED AS PER COMMENT FOR APPROVAL

ISSUED TO / FOR :

CONTRACTOR: CONSORTIUM( KN / HHI )

E E

1000, Bangeojinsinhawn-doro, Dong-gu, Ulsan, Korea DRAWING TITLE:

EXTERNAL WIRE SPECIFICATION Drawing Number :

F

PREPARED :

PK55-SD-EL-GS-14 ACTION MANUFACTURER/VENDER NAME

A B C DRAWING NUMBER

16316 01 EB

SHEET NO.

7

OF

92

REV NO.

04

D

Project No.:

Scale :

CHECKED :

Plot Date:

APPROVED :

008006400 Sheet Size : Rev. :

A3

04

K.H.SONG

S.Y.JANG

01.SEP.2016

C.Y.HONG

F

1

2

3

4

5

6

7

8

Project

A

A

DETAILS OF FERRULING

DETAILS OF CABLE CONNECTION Reference DWG

DATE

NO. DWG

REV.

B

B

DETAILS TERMINAL TYPE

3

6

4

5

K201-14 / X1-79 1

RING TYPE

BLADE TYPE

K201-13 / X1-71

K201-13 / X1-71

C

2

1

WIRE FERRULING A. WHITE SLEEVE WITH BLACK LETTERS

2

ADDITIONAL MARKING

3

LETTERS DIRECTION

4

INSULATED CAP A. TRIP : RED B. OTHERS : BLUE

5

TERMINAL

6

WIRE

INTERNAL WIRING

TERMINAL BLOCK

X21 1

1

2

2

3

3

4

4

DETAIL "A" TERMINAL BLOCK

PVC DUCT

EMPLOYER / DEVELOPER

C

EXTERNAL WIRING PVC DUCT

DETAIL "A" X1-71 / K201-13

-K201 X1-71 / K201-13

PROJECT MANAGER.

-X1 71 72 73

13

21

31 43

MULTI CORE CABLE

74

GROUND WIRE

75

BOTTOM PLATE (FOR GLAND)

SUPERVISION CONSULTANT

CABLE GLAND

-K201

DETAIL "B"

76

D

14

22

33 44

D

77 78 79

X1-79 / K201-14

80

X1-79 / K201-14

CABLE ENTRY HOLE

GROUND BUS-BAR

BOTTOM PLATE

REV.

K201-14 / X1-79

K201-14 / X1-79

DETAIL "B"

04 03 02 01 00

24.JAN.2018 10.AUG.2017 09.AUG.2017 19.JUN.2017 01.SEP.2016

DATE

REVISED AS PER COMMENT REVISED AS PER COMMENT REVISED AS PER COMMENT REVISED AS PER COMMENT FOR APPROVAL

ISSUED TO / FOR :

CONTRACTOR: CONSORTIUM( KN / HHI )

E

E

1000, Bangeojinsinhawn-doro, Dong-gu, Ulsan, Korea DRAWING TITLE:

FERRULING SYSTEM Drawing Number :

F

PREPARED :

PK55-SD-EL-GS-14 ACTION MANUFACTURER/VENDER NAME

A B C DRAWING NUMBER

16316 01 EB

SHEET NO.

8

OF

92

REV NO.

04

D

Project No.:

Scale :

CHECKED :

Plot Date:

APPROVED :

008006400 Sheet Size : Rev. :

A3

04

K.H.SONG

S.Y.JANG

01.SEP.2016

C.Y.HONG

F

1

2

3

4

5

6

7

8

Project

A

A

SYMBOLS

DESCRIPTION

SYMBOLS

DESCRIPTION

CIRCUIT BREAKER

LIMIT SWITCH

OPERATED BY HYDRAULIC

MECHANICALLY OPERATED

DISCONNECTOR OPERATED

LIMIT SWITCH

BY MOTOR SPRING

MECHANICALLY OPERATED

SYMBOLS

DESCRIPTION

SYMBOLS

DESCRIPTION

RELAY COIL

INDICATOR

DIODE

HORN

Reference DWG

DATE

NO. DWG

REV.

B

B

DISCONNECTOR OPERATED BY MOTOR

MAKE CONTACT

THERMAL RELAY

HEATER

EARTHING SWITCH OPERATED BY MOTOR SPRING

BREAK CONTACT

TIMER

RESISTOR

CURRENT TRANSFORMER

EARLY MAKE CONTACT MECHANICALLY OPERATED

COUNTER

ILLUMICATION EMPLOYER / DEVELOPER

C

C

LATE BREAK CONTACT VOLTAGE TRANSFORMER

MECHANICALLY OPERATED

SURGE ARRESTER

DELAYED MAKE CONTACT

CABLE HEAD

DELAYED BREAK CONTACT

ANNUNCIATOR

OUTLET

A

AMMETER

PLUG & SOCKET

V

VOLTMETER

CONDUCTOR

PROJECT MANAGER.

SUPERVISION CONSULTANT

SF6/AIR BUSHING

P

D

EARTH

P

MINIATURE CIRCUIT BREAKER

MAKE CONTACT DENSITY METER

M

BREAK CONTACT DENSITY METER

M

THERMOSTAT

DIRECT CURRENT MOTOR

CONNECTION D

INDUCTION MOTOR 3 PHASE

EXTERNAL EQUIPMENT BOUNDARY 04 03 02 01 00

GIS EQUIPMENT BOUNDARY

REV.

24.JAN.2018 10.AUG.2017 09.AUG.2017 19.JUN.2017 01.SEP.2016

DATE

REVISED AS PER COMMENT REVISED AS PER COMMENT REVISED AS PER COMMENT REVISED AS PER COMMENT FOR APPROVAL

ISSUED TO / FOR :

CONTRACTOR: CONSORTIUM( KN / HHI )

OPERATED BY KEY

OPERATING MECHANIAM

E

E

EXTERNAL EQUIPMENT

OTHER LCC 1000, Bangeojinsinhawn-doro, Dong-gu, Ulsan, Korea DRAWING TITLE:

SYMBOL LEGEND Drawing Number :

F

PREPARED :

PK55-SD-EL-GS-14 ACTION MANUFACTURER/VENDER NAME

A B C DRAWING NUMBER

16316 01 EB

SHEET NO.

9

OF

92

REV NO.

04

D

Project No.:

Scale :

CHECKED :

Plot Date:

APPROVED :

008006400 Sheet Size : Rev. :

A3

04

K.H.SONG

S.Y.JANG

01.SEP.2016

C.Y.HONG

F

1

2

3

4

5

6

7

8

Project

OHTL1

A

A

(=D01)

NOTE

G/A BUSHING

1. RATED GAS PRESSURE CB : 7 Bar MAIN BUS : 5 Bar OTHERS : 5 Bar



G01-07A

-Z1



G01-07B CØ

G01-07C AØ

G01-06A

B



G01-06B CØ

G01-06C

M HS

HSES



G01-05A

(-Q8)



G01-05B CØ

G01-05C

DS

M

(-Q9) AØ

G01-04A

2. SETTING PRESSURE(at 20°C) OF DENSITY MONITOR IS AS FOLLOWS SF6 GAS PRESSURE EQUIPMENT DESCRIPTION (20°C) FIRST STAGE LEAK ALARM 6.7 Bar (RE-FILLING STAGE) CB SECOND STAGE LEAK ALARM 6.5 Bar (PRESSURE FAILURE) FIRST STAGE LEAK ALARM OTHERS 4.7 Bar (RE-FILLING STAGE) (DS,ES,CT) SECOND STAGE LEAK ALARM 4.5 Bar (VT, BUS,etc) (PRESSURE FAILURE)

Reference DWG

DATE

NO. DWG

REV.

B

ES



G01-04B

(-Q52)

M



* ACCURACY RANGE : ±1% (at 20°C), ±2.5% (at -20°C ~ 60°C)

G01-04C C5

3. GAS SECTION NUMBER OF GAS MONITORING IS AS FOLLOWS DESCRIPTION

C4

C

C3

CT (-T1)

EMPLOYER / DEVELOPER

C

C2 C1

G X X -

X X A PHASE MARKING GAS COMPARTMENT NO. GIS BAY NO.



G01-00A BØ

CB (-Q0)

G01-00B

PROJECT MANAGER.



G01-00C

4. BURSTING PRESSURE OF PRESSURE RELIEF DEVICE CB : 15 Bar OTHERS : 10 Bar



G01-03A BØ

G01-03B

ES CØ

G01-03C

(-Q51)

M

SUPERVISION CONSULTANT

LEGEND SYMBOL

D

DESCRIPTION

D

NON-RETURN VALVE (NORMALLY OPEN) NON-RETURN VALVE (NORMALLY CLOSED)

M

M DS

DS

(-Q2)

(-Q1)

04 03 02 01 00

GAS PRESSURE MONITOR INSULATION SPACER (GAS TIGHT)

REV.

INSULATION SPACER (GAS THROUGH)

24.JAN.2018 10.AUG.2017 09.AUG.2017 19.JUN.2017 01.SEP.2016

DATE

REVISED AS PER COMMENT REVISED AS PER COMMENT REVISED AS PER COMMENT REVISED AS PER COMMENT FOR APPROVAL

ISSUED TO / FOR :

CONTRACTOR: CONSORTIUM( KN / HHI )

245kV, 2000A, 50kA, 1s, 50Hz, BB-I ABSORBENT ZEORAM RUPTURE DISC (PRESSURE RELIEF DEVICE) AØ











UHF PD SENSOR

E G01-01B

G01-01C

G01-01A

G07-08A

G07-08B

G07-08C

E

245kV, 2000A, 50kA, 1s, 50Hz, BB-II

1000, Bangeojinsinhawn-doro, Dong-gu, Ulsan, Korea DRAWING TITLE: AØ











G01-02C

G01-02B

G01-02A

G01-09C

F

G01-09B

G01-09A

SF6 GAS SCHEME DIAGRAM Drawing Number : ACTION MANUFACTURER/VENDER NAME

A B C DRAWING NUMBER

16316 01 EB

SHEET NO.

10

OF

92

REV NO.

04

PREPARED :

PK55-SD-EL-GS-14

D

Project No.:

Scale :

CHECKED :

Plot Date:

APPROVED :

008006400 Sheet Size : Rev. :

A3

04

K.H.SONG

S.Y.JANG

01.SEP.2016

C.Y.HONG

F

1

2

3

4

5

6

7

8

Project

A

A

OHTL 1

BUS COUPLER

MBP-1

(=D01)

(=D03)

(=DMP1)

-Z1

OHTL 2

MBP-2

(=D05)

(=DMP2)

FUTURE (=D07)

-Z1 -Q8 50kA/1s

M HS

-Q9 1600A 50kA/1s

-Q9 1600A 50kA/1s

-Q52 50kA/1s M

P2

P2

C5

B

M

M

M

M

M

M

-Q52 50kA/1s M

Reference DWG

DATE

NO. DWG

REV.

B

C3

-T1

C2

C2

C1

P1

P1 -T3

245kV 1600A 50kA/1s

-T15

M

-Q3 2000A 50kA/1s

M

-Q51 50kA/1s

-Q25 50kA/1s

M

C2

-Q11 2000A 50kA/1s

-Q15 50kA/1s

M

C2

M

M

M

-Q52 50kA/1s

M

245kV 1600A 50kA/1s -Q51 50kA/1s

M

-Q21 2000A 50kA/1s

M

-Q1 2000A 50kA/1s

-Q0

-T16

P2

-Q35 50kA/1s

M

-Q2 1600A 50kA/1s

P1

C1 -T4

P2

-Q51 50kA/1s

M

C1

P1 C1

-Q1 1600A 50kA/1s

M

C4

245kV 2000A 50kA/1s

-Q0

C3

-Q0

-Q8 50kA/1s

-Z2

C5

C4 -T1

(=D08)

-Z2

M HS

M

FUTURE

-Q2 2000A 50kA/1s

M HS

-Q5 2000A 50kA/1s

M

M

-Q1 1600A 50kA/1s

-Q45 50kA/1s

M

M

-Q65 50kA/1s

M

M

M

-Q55 50kA/1s M

-Q2 1600A 50kA/1s

-Q31 2000A 50kA/1s

M

M

M

M

M HS

M

245kV, 2000A, 50kA, 1s, 50Hz, BB-I M

M

M

EMPLOYER / DEVELOPER 245kV, 2000A, 50kA, 1s, 50Hz, BB-II

C

-Q1 M 1600A 50kA/1s

M

-Q2 1600A 50kA/1s

-Q51 50kA/1s 245kV 1600A 50kA/1s

M HS

-Q4 2000A 50kA/1s

M

-Q0

-Q16 50kA/1s

M

M

-Q12 2000A 50kA/1s

M

-Q22 2000A 50kA/1s

-Q36 50kA/1s

-Q32 2000A 50kA/1s

-Q46 50kA/1s

M

-Q1 M 1600A 50kA/1s

-Q6 2000A 50kA/1s

M

-Q26 50kA/1s

M

C1

C2

C2

C3

C3

-T2

C4

C4

C5

C5

P2

M

P2 M

M

-Q52 50kA/1s

-Z1

TR 2

FUTURE

(=D02)

(=D04)

(=D06)

2. TECHNICAL DATA FOR CT

HS

MOTOR SPRING MECHANISM

DISCONNECTING SWITCH

MOTOR MECHANISM

EARTHING SWITCH

MOTOR MECHANISM

E

HIGH SPEED EARTHING SWITCH

3. TECHNICAL DATA FOR VT

REMARK

EQUIPMENT NAME CIRCUIT BREAKER

M

M

-Z1

TR 1

1. LEGEND FOR EACH EQUIPMENT

M

SUPERVISION CONSULTANT

-Q52 50kA/1s

-Z1

SYMBOL

PROJECT MANAGER.

P1 C1

D

M

245kV 1600A 50kA/1s

-T26

P1

-T2

C

M

-Q51 50kA/1s -Q0

-T25

M

-Q66 50kA/1s

M

-Q56 50kA/1s

M

-Q2 1600A 50kA/1s

M HS

MOTOR SPRING MECHANISM

SPECIFICATION LOCATION

OHTL FEEDER (D01, D05)

CT No.

-T1

CLASS

Vk

Rct @75°C

Im

BURDEN

C1

1600-800/1A

5P30

-

‎≤ 5.0-2.5 Ω

-

60-30 VA

C2

1600-800/1A

5P30

-

‎≤ 5.0-2.5 Ω

-

60-30 VA

C3

1600-800/1A

0.2FS5

-

REV.

2'nd

220/ √3kV : 100/ √3V

3P

200 VA

3. RATED CURRENT

: 2000 / 1600 A

3'rd

220/ √3kV : 100/ √3V

3P

200 VA

4. RATED POWER FREQUENCY WITHSTAND VOLTAGE

: 460 / 530 kV : 1050 / 1200 kV

60-30 VA

6. RATED SHORT-TIME WITHSTAND CURRENT

: 50 kA

-

60-30 VA

7. RATED DURATION

:1s

≥ 1200 V

‎≤ 2.0 Ω

≤ 60.0 mA

8. RATED PEAK WITHSTAND CURRENT

: 125 kA

9. RATED SF6 GAS PRESSURE at 20℃(CB / Others)

: 7.0 / 5.0 bar.G

10. RATED CONTROL VOLTAGE (DC / AC)

: 220 Vdc / 220 Vac

5P30

800-400/1A

5P30

CABLE HEAD BOX (FOR FUTURE BAY)

Z2

PX

≥ 600 V -

24.JAN.2018 10.AUG.2017 09.AUG.2017 19.JUN.2017 01.SEP.2016

DATE

REVISED AS PER COMMENT REVISED AS PER COMMENT REVISED AS PER COMMENT REVISED AS PER COMMENT FOR APPROVAL

ISSUED TO / FOR :

CONTRACTOR: CONSORTIUM( KN / HHI )

-

1600-800/1A

C1

BUS COUPLER (D03)

: 50 Hz

‎≤ 5.0-2.5 Ω

C5

Z1

5P30

: 245 kV

2. RATED FREQUENCY

‎≤ 2.5-1.25 Ω

CURRENT TRANSFORMER GAS TO AIR BUSHING (CONDENSER TYPE)

400/1A

100 VA

1. RATED VOLTAGE

-

-

800-400/1A

0.2

BURDEN

-

5P30

C3

220/ √3kV : 100/ √3V

CLASS

60-30 VA

1600-800/1A

C2

30-15 VA

1'st 1PH, INDUCTIVE

VOLTAGE RATIO

-

C4

RING AND BUSHING TYPE CT

-T2

-

WIND NO.

‎≤ 5.0-2.5 Ω

INDUCTIVE TYPE

800/1A

‎≤ 6.2-3.1 Ω

-T15 -T16 -T25 -T26

TYPE

04 03 02 01 00

4. SUMMARIZED SPECIFICATION

5. RATED LIGHTNING IMPULSE WITHSTAND VOLTAGE

VOLTAGE TRANSFORMER (1PH)

TR FEEDER (D02, D04)

PT NO.

RATIO

D

E

‎≤ 1.0 Ω ≤ 120.0 mA ‎≤ 2.5-1.25 Ω

-

60-30 VA

C4

800-400/1A

0.2FS5

-

‎≤ 1.8-0.9 Ω

-

30-15 VA

C5

800-400/1A

5P30

-

‎≤ 2.5-1.25 Ω

-

60-30 VA

11. FIRST POLE TO CLEAR FACTOR

: 1.3

C1

2000-1000/1A

5P30

-

‎≤ 11.2-5.6 Ω

-

60-30 VA

12. PAINTING COLOR

: RAL 7032

C2

2000-1000/1A

5P30

-

‎≤ 11.2-5.6 Ω

-

60-30 VA

C1

2000-1000/1A

0.2FS5

-

‎≤ 6.3-3.3 Ω

-

30-15 VA

C2

2000-1000/1A

5P30

-

‎≤ 11.2-5.6 Ω

-

60-30 VA

-T3

1000, Bangeojinsinhawn-doro, Dong-gu, Ulsan, Korea

-T4

DRAWING TITLE:

220kV GIS SINGLE LINE DIAGRAM Drawing Number :

F

PREPARED :

PK55-SD-EL-GS-14 ACTION MANUFACTURER/VENDER NAME

A B C DRAWING NUMBER

16316 01 EB

SHEET NO.

11

OF

92

REV NO.

04

D

Project No.:

Scale :

CHECKED :

Plot Date:

APPROVED :

008006400 Sheet Size : Rev. :

A3

04

K.H.SONG

S.Y.JANG

01.SEP.2016

C.Y.HONG

F

1

2

3

4

5

6

7

8

Project

OHTL 1 (=D01)

A

A

-Z1 EQUIPMENT REF.

-Q8 50kA/1s

M HS B

-Q9 1600A 50kA/1s

DS -Q1

STATUS OF THE RELATED EQUIPMENT CONTROL

-

-

-

C

C

C

C

-

-

-

-

-

O

-

-

-

-

-

-

-

C

C

C

C

C

-

-

-

-

-

-

-

-

O

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

C

-

-

-

-

-

-

-

-

-

-

-

C

-

-

-

-

-

-

-

-

-

-

-

-

C

-

-

-

-

-

-

-

-

-

C

-

-

-

C

-

-

-

-

-

-

-

-

-

-

C

-

C

-

-

-

-

-

-

-

-

-

TEST

-

-

-

-

-

-

-

-

-

-

-

-

-

-

INTERLOCK BYPASS

LOCAL CLOSE &REMOTE /OPEN LOCAL

O

O

-

-

-

O

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

LOCAL CLOSE &REMOTE /OPEN LOCAL

-

-

O

O

O

-

O

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

INTERLOCK BYPASS

LOCAL CLOSE &REMOTE /OPEN LOCAL

-

-

-

-

-

O

-

-

-

-

-

-

-

-

LINE DEAD

-

-

-

-

-

-

-

-

-

-

-

-

-

-

INTERLOCK BYPASS

LOCAL

DS -Q2

LOCAL CLOSE /REMOTE /OPEN

M

LOCAL

P2 C5

ES -Q51

C4

LOCAL CLOSE &REMOTE /OPEN LOCAL

C

REMOTE

C3

-T1

C2

CB -Q0

C1

CLOSE LOCAL

P1 245kV 1600A 50kA/1s

-Q0

ES -Q52

D

-Q51 50kA/1s

M

DS -Q9

ES -Q8

DS -Q1

DS -Q2

ES DS -Q52 -Q9

ES -Q8

-

O

O

O

O

-

-

O

-

-

-

-

C

-

-

-

-

-

-

-

C

-

-

-

-

-

-

-

-

-

O

-

O

O

O

-

-

-

C

-

-

-

-

-

-

-

-

-

-

-

-

O

O

-

-

-

-

-

-

-

C

-

-

-

C

C

REMARK DS -Q2

LOCAL CLOSE /REMOTE /OPEN

ES CB -Q51 -Q0

B/C =D03 CB -Q0

M

-Q52 50kA/1s

T/L =D01

ES ES DS DS DS -Q15 -Q16 -Q11 -Q12 -Q1

Reference DWG

DATE

NO. DWG

REV.

BUS TRANSFER

B

INTERLOCK BYPASS

BUS TRANSFER INTERLOCK BYPASS

INTERLOCK BYPASS

EMPLOYER / DEVELOPER

C

EMERGENCY LOCAL CLOSE

PROJECT MANAGER.

SUPERVISION CONSULTANT

INTERLOCK BYPASS D

04 03 02 01 00

REV.

24.JAN.2018 10.AUG.2017 09.AUG.2017 19.JUN.2017 01.SEP.2016

DATE

REVISED AS PER COMMENT REVISED AS PER COMMENT REVISED AS PER COMMENT REVISED AS PER COMMENT FOR APPROVAL

ISSUED TO / FOR :

CONTRACTOR: CONSORTIUM( KN / HHI )

M

M

-Q1 1600A 50kA/1s

E

-Q2 1600A 50kA/1s

BB-I

* REMARK O : OPEN STATE C : CLOSED STATE - : NO RELATION

E

* FOLLOWING CONDITIONS SHALL BE SATISFIED ALSO. 1. DISCONNECTING SWICHES ARE NOT INTERMEDIATE POSITION. 2. MECH. DOOR FOR MANUAL OPERATION IS NOT OPENED.

1000, Bangeojinsinhawn-doro, Dong-gu, Ulsan, Korea

BB-II

DRAWING TITLE:

INTERLOCK DIAGRAM FOR T/L Drawing Number :

F

PREPARED :

PK55-SD-EL-GS-14 ACTION MANUFACTURER/VENDER NAME

A B C DRAWING NUMBER

16316 01 EB

SHEET NO.

12

OF

92

REV NO.

04

D

Project No.:

Scale :

CHECKED :

Plot Date:

APPROVED :

008006400 Sheet Size : Rev. :

A3

04

K.H.SONG

S.Y.JANG

01.SEP.2016

C.Y.HONG

F

1

2

3

4

5

6

7

8

Project

A

A

220kV GIS LCC (=D01) OHTL 1

FILTER &MESH

VENTILATION COVER

H1 ANNUNCIATOR

UC625 CH40

Reference DWG

DATE

NO. DWG

REV.

S11 CONTROL LOCATION SELECTION

B AM1

AM2

AM3

AMMETER 1

AMMETER 2

AMMETER 3

G01-08

S1

S2

S3

CB MOTOR LOCK - USE

CB MOTOR LONG RUN RESET

INTERLOCK BYPASS INTERLOCK - RELEASE

S12

ER O

T

BUS BAR - II

BUS DS Q2 BUS DS Q1

DE R E VO

R

B

BUS DS Q2

P O R W ME

SE

G01-02

BUS DS Q1

VM1

SF6 GAS COMPARTMENT N/P

S5 HEATER TEST

BUS BAR - I

G01-01

G01-09

GIS N/P

S4 LAMP TEST

WORK ES Q51 WORK ES Q51

G01-03

STOPPER

S2C-H6R

S2C-H6R S2C-H11L

CIRCUIT BREAKER Q0

G01-00

F8A2

STOPPER S2C-H11L

2250 mm

F8A1

CIRCUIT BREAKER Q0

WORK ES Q52 WORK ES Q52

G01-04

LINE DS Q9

S2C-H6R STOPPER

F8D4

S2C-H6R S2C-H11L

F8D3

S2C-H6R S2C-H11L

S2C-A2

S2C-H6R S2C-H11L

STOPPER S2C-H11L

F8D2

F8D1

LINE DS Q9

G01-05

LINE ES Q8 LINE ES Q8

GIS N/P

G01-06

EMPLOYER / DEVELOPER

S2C-H6R STOPPER

S2C-H6R S2C-H11L

F8D7

S2C-H6R S2C-H11L

STOPPER S2C-H11L

F8D6

C

F8D5

G01-07

C

GAS TO AIR BUSHING

STORAGE BOX FOR PLUG

SOCKET OUTLET AC 380V (3-PH)

SOCKET OUTLET AC 220V (1-PH)

PROJECT MANAGER.

850 mm

1600 mm

FRONT VIEW

D

SUPERVISION CONSULTANT

SIDE VIEW

INTERNAL DOOR

INTERNAL DOOR

( LEFT SIDE)

( RIGHT SIDE)

D

04 03 02 01 00

PANEL SPEICIFICATION

REV.

1. PROTECTION DEGREE 2. PAINT COLOR 3. MIMIC COLOR

E

4. 5. 6. 7.

850 mm

MATERIAL THICKNESS EARTHING BUS BAR MATERIAL EARTHING BUS BAR SIZE

IP 54

24.JAN.2018 10.AUG.2017 09.AUG.2017 19.JUN.2017 01.SEP.2016

DATE

REVISED AS PER COMMENT REVISED AS PER COMMENT REVISED AS PER COMMENT REVISED AS PER COMMENT FOR APPROVAL

ISSUED TO / FOR :

CONTRACTOR: CONSORTIUM( KN / HHI )

RAL 7032 220kV: RAL 1016 (YELLOW) EARTHING: RAL 9005 (BLACK) COLD ROLLED STEEL SHEET PANEL - 2.3mm BOTTOM & INDOOR PLATE - 3.2mm

E

CU 30mm X 5T

HEATER

8. OUT DOOR OPENING ANGLE INNER DOOR OPENING ANGLE

170˚ 90˚

1600 mm 1000, Bangeojinsinhawn-doro, Dong-gu, Ulsan, Korea

BOTTOM VIEW

DRAWING TITLE:

LCC LAYOUT FOR T/L Drawing Number :

F

PREPARED :

PK55-SD-EL-GS-14 ACTION MANUFACTURER/VENDER NAME

A B C DRAWING NUMBER

16316 01 EB

SHEET NO.

13

OF

92

REV NO.

04

D

Project No.:

Scale :

CHECKED :

Plot Date:

APPROVED :

008006400 Sheet Size : Rev. :

A3

04

K.H.SONG

S.Y.JANG

01.SEP.2016

C.Y.HONG

F

1

2

3

4

5

6

7

8

Project

A

A

-M4

1. MIMIC BUS (220kV: RAL 1016 (YELLOW)) (EARTHING: RAL 9005 (BLACK)) 2. CONTROL SWITCH (OPEN - CLOSE) 3. POSITOIN INDICATOR (LED TYPE) 4. S11: CONTROL SWITCH WITH KEY (LOCAL - REMOTE)

H1 ANNUNCIATOR

10

UC625 CH40 B

8

5 S11 CONTROL LOCATION SELECTION

S1

S2

S3

CB MOTOR LOCK - USE

CB MOTOR LONG RUN RESET

INTERLOCK BYPASS INTERLOCK - RELEASE

S4

S5

LAMP TEST

HEATER TEST

4 6

G01-08

9

7. S3 : SELECTOR SWITCH WITH KEY (INTERLOCK - RELEASE)

7

8. S4 : PUSH BUTTON SWITCH (LAMP TEST)

1

9. S5 : PUSH BUTTON SWITCH (HEATER TEST) 10. ANNUNCIATOR

BUS BAR - I

G01-01

G01-09

G01-02

BUS DS Q1

BUS BAR - II

BUS DS Q2 BUS DS Q1

5. S1 : SELECTOR SWITCH (CB MOTOR OPERATION) 6. S2 : PUSH BUTTON SWITCH (CB MOTOR LONG RUN RESET)

BUS DS Q2

2

C 3

Reference DWG

DATE

NO. DWG

REV.

B

EMPLOYER / DEVELOPER

11. OUTLET SOCKET (AC 220V)

C

12. OUTLET SOCKET (AC 380V) WORK ES Q51 WORK ES Q51

PROJECT MANAGER.

G01-03

CIRCUIT BREAKER Q0

CIRCUIT BREAKER Q0

G01-00

WORK ES Q52 WORK ES Q52

SUPERVISION CONSULTANT

G01-04

LINE DS Q9 LINE DS Q9

D

D

G01-05

WORK ES Q53 WORK ES Q53

G01-06

04 03 02 01 00

G01-07

REV. GAS TO AIR BUSHING

24.JAN.2018 10.AUG.2017 09.AUG.2017 19.JUN.2017 01.SEP.2016

DATE

REVISED AS PER COMMENT REVISED AS PER COMMENT REVISED AS PER COMMENT REVISED AS PER COMMENT FOR APPROVAL

ISSUED TO / FOR :

CONTRACTOR: CONSORTIUM( KN / HHI )

E

E STORAGE BOX FOR PLUG

SOCKET OUTLET AC 380V (3-PH)

SOCKET OUTLET AC 220V (1-PH)

11

12

1000, Bangeojinsinhawn-doro, Dong-gu, Ulsan, Korea DRAWING TITLE:

LCC MIMIC DIAGRAM FOR T/L

MOUNTING PLATE

F

(FRONT SIDE OF RIGHT DOOR)

MANUFACTURER/VENDER NAME

Drawing Number : ACTION A B C

DRAWING NUMBER

16316 01 EB

SHEET NO.

14

OF

92

REV NO.

04

PREPARED :

PK55-SD-EL-GS-14

D

Project No.:

Scale :

CHECKED :

Plot Date:

APPROVED :

008006400 Sheet Size : Rev. :

A3

04

K.H.SONG

S.Y.JANG

01.SEP.2016

C.Y.HONG

F

1

2

3

4

5

6

7

40CHANNEL SPEC. : UC625-40YW-HH-024D-R-M3 MANUFACTURER : RTK MAKER :

8

Project

REMARKS

A

A

RTK

INSTRUMENTS

1

9

5

13

DS/ES MOTOR RUNNING TIME EXCEEDED

CB MOTOR LONG RUN AND STOP

17 G01-00 GAS LOW 1 (ALARM)

DC SUPPLY MCB TRIP/OFF

21 G01-04 GAS LOW 1 (ALARM)

25 G01-08 GAS LOW 1 (ALARM)

33

29

G01-02 GAS LOW 2

G01-06 GAS LOW 2

37

SPARE

MAIN DC SUPPLY FAIL

SPARE

Reference DWG

DATE

NO. DWG

REV.

B

B 2

6 CB MOTOR OVER LOAD AND STOP

3

10 DS/ES SWITCHING INCOMPLETE

7

14 G01-01 GAS LOW 1 (ALARM)

AC SUPPLY FAIL

11

18

22 G01-05 GAS LOW 1 (ALARM)

15

19

26 G01-09 GAS LOW 1 (ALARM)

23

30

G01-03 GAS LOW 2

27

34

G01-07 GAS LOW 2

31

38

SPARE

AUX. AC SUPPLY FAIL

SPARE

39

35

SUPPLY 1 CB MOTOR SPRING UNCHARGED/LOCK

INTERLOCK BY-PASS ON

G01-02 GAS LOW 1 (ALARM)

220VDC SUPPLY 1 FAIL

G01-06 GAS LOW 1 (ALARM)

G01-00 GAS LOW 2 (LOCKOUT)

G01-04 GAS LOW 2

G01-08 GAS LOW 2

SUPPLY 2

SPARE

SPARE

EMPLOYER / DEVELOPER

C

C 4

8

POLE DISCREPANCY

12

AC SUPPLY MCB TRIP/OFF

16

220VDC SUPPLY 2 FAIL

20 G01-03 GAS LOW 1 (ALARM)

24

28

32

40

36

TEST ACK

G01-07 GAS LOW 1 (ALARM)

G01-01 GAS LOW 2

G01-05 GAS LOW 2

G01-09 GAS LOW 2

SPARE

SPARE

PROJECT MANAGER.

MUTE RESET

UC625

SUPERVISION CONSULTANT

D

D INPUT OUTPUT

CH.

COLOR

1

(YELLOW)

NO

NO

2

(YELLOW)

NO

3

(YELLOW)

NO

REMARKS

INPUT OUTPUT

CH.

COLOR

RESPONSE TIME : 5ms

16

(YELLOW)

NO

NO

NO

RESPONSE TIME : 5ms

17

(YELLOW)

NO

NO

RESPONSE TIME : 5ms

18

(YELLOW)

NO

CONTACT CONTACT

REMARKS

INPUT OUTPUT

REMARKS

CH.

COLOR

RESPONSE TIME : 5sec

31

(YELLOW)

NO

NO

RESPONSE TIME : 5sec

NO

RESPONSE TIME : 5sec

32

(YELLOW)

NO

NO

RESPONSE TIME : 5sec

NO

RESPONSE TIME : 5sec

33

(YELLOW)

NO

NO

RESPONSE TIME : 5ms

CONTACT CONTACT

CONTACT CONTACT

REV.

24.JAN.2018 10.AUG.2017 09.AUG.2017 19.JUN.2017 01.SEP.2016

REVISED AS PER COMMENT REVISED AS PER COMMENT REVISED AS PER COMMENT REVISED AS PER COMMENT FOR APPROVAL

DATE

ISSUED TO / FOR :

CONTRACTOR: CONSORTIUM( KN / HHI )

4

(YELLOW)

NO

NO

RESPONSE TIME : 5ms

19

(YELLOW)

NO

NO

RESPONSE TIME : 5sec

34

(YELLOW)

NO

NO

RESPONSE TIME : 5ms

5

(YELLOW)

NO

NO

RESPONSE TIME : 5ms

20

(YELLOW)

NO

NO

RESPONSE TIME : 5sec

35

(YELLOW)

NO

NO

RESPONSE TIME : 5ms

6

(YELLOW)

NO

NO

RESPONSE TIME : 5ms

21

(YELLOW)

NO

NO

RESPONSE TIME : 5sec

36

(YELLOW)

NO

NO

RESPONSE TIME : 5ms

7

(YELLOW)

NO

NO

RESPONSE TIME : 5ms

22

(YELLOW)

NO

NO

RESPONSE TIME : 5sec

37

(YELLOW)

NO

NO

RESPONSE TIME : 5ms

8

(YELLOW)

NO

NO

RESPONSE TIME : 5ms

23

(YELLOW)

NO

NO

RESPONSE TIME : 5sec

38

(YELLOW)

NO

NO

RESPONSE TIME : 5ms

9

(YELLOW)

NO

NO

RESPONSE TIME : 5ms

24

(YELLOW)

NO

NO

RESPONSE TIME : 5sec

39

(YELLOW)

NO

NO

RESPONSE TIME : 5ms

10

(YELLOW)

NO

NO

RESPONSE TIME : 5ms

25

(YELLOW)

NO

NO

RESPONSE TIME : 5sec

40

(YELLOW)

NO

NO

RESPONSE TIME : 5ms

11

(YELLOW)

NO

NO

RESPONSE TIME : 5ms

26

(YELLOW)

NO

NO

RESPONSE TIME : 5sec

12

(YELLOW)

NO

NO

RESPONSE TIME : 5ms

27

(YELLOW)

NO

NO

RESPONSE TIME : 5sec

13

(YELLOW)

NO

NO

RESPONSE TIME : 5sec

28

(YELLOW)

NO

NO

RESPONSE TIME : 5sec

14

(YELLOW)

NO

NO

RESPONSE TIME : 5sec

29

(YELLOW)

NO

NO

RESPONSE TIME : 5sec

15

(YELLOW)

NO

NO

RESPONSE TIME : 5sec

30

(YELLOW)

NO

NO

RESPONSE TIME : 5sec

E

04 03 02 01 00

E

1000, Bangeojinsinhawn-doro, Dong-gu, Ulsan, Korea DRAWING TITLE:

F

LCC ANNUNCIATOR LIST Drawing Number : ACTION

MANUFACTURER/VENDER NAME

A B C DRAWING NUMBER

16316 01 EB

SHEET NO.

15

OF

92

REV NO.

04

PREPARED :

PK55-SD-EL-GS-14

D

Project No.:

Scale :

CHECKED :

Plot Date:

APPROVED :

008006400 Sheet Size : Rev. :

A3

04

K.H.SONG

S.Y.JANG

01.SEP.2016

C.Y.HONG

F

DRAWING NUMBER

16316 01 EB 16 OF

60

E 2

SHEET NO.

92 REV NO.

04 19

1 20

X0C(A) PHOENIX

PHOENIX

X0C(B) 2

XA 4

5

6 4

5

6

7

8

1

PHOENIX PHOENIX

1

7

8

PHOENIX

4

5

6

1

7

8

PHOENIX

4

5

6

7

8

1

PHOENIX

3

4

5

6

1

01~80

7

PHOENIX PHOENIX PHOENIX PHOENIX PHOENIX PHOENIX

X1C X2C X8C X9C X51C 8

X52C

3

4

5

6

01~65

PHOENIX PHOENIX PHOENIX PHOENIX PHOENIX PHOENIX PHOENIX

X1 X2 X8 X9 X51 X52 XS

3

DUCT 100x100

2

16 1 1 1 1 1 1 1

2 2 2 2 2 2 2

PHOENIX

4

5

6

AT8N PG-08

AT8N PG-08

AT8N PG-08

AT8N PG-08

AT8N PG-08

AT8N PG-08

NF40E-13

NF22E-13 CA4-22N

NF40E-13

NF22E-13 CA4-22N

MT-32/2H5

MT-32/2H5

PHOENIX

PHOENIX

K204T

T88

T48B

T47A

CR-M230AC4

3

7

8

01~90

NF40E-13

NF40E-13 CA4-40N

HRN-37

HRN-37

HRN-37

CR-M230AC4

CR-M230AC4

CR-M220DC4

CR-M220DC4

CR-M220DC4

CR-M220DC4

CR-M220DC4

CR-M220DC4

CR-M220DC4

CR-M220DC4

CR-M220DC4

CR-M220DC4

CR-M220DC4

CR-M220DC4

CR-M220DC4

CR-M220DC4

CR-M220DC4

CR-M220DC4

CR-M220DC4

CR-M220DC4

CR-M220DC4

CR-M220DC4

CR-M220DC4

CR-M220DC4

CR-M220DC4

CR-M220DC4

K203T

K102T

K104

K103

K49

K102

F49C

F49B

01~60

DUCT 100x100 = L880

PHOENIX

K11.1

K11

KG0.2B

KG0.2A

KG0.2

KG0.1

KLR

KL8

KL51

KL9

KL2

KL1

K204

K205

K203

K201

K202

F49A

K88MC

K88MB

K88MA

K47B

KQ0T2

K47A

KQ0T1

K101C

K101B

1 1

2 2

4 4

5 5

6 6

3

4 1

5 2

6

4

5

3

PHOENIX

9 6

10 7

11 8

12 9

PHOENIX

13

1

8

2

F MANUFACTURER/VENDER NAME

ACTION A

B

C

D

DUCT 80x100

01~130

NF40E-13 CA4-40N

NF40E-13 CA4-40N

NF22E-13 CA4-13N

NF22E-13 CA4-13N

NF22E-13 CA4-13N

NF22E-13 CA4-22N

NF40E-13 CA4-40N

NF40E-13

NF40E-13

NF40E-13

NF40E-13

KQ8C

XA1

CR-M220DC4

PHOENIX

XA2

K101A

PHOENIX

X0 CR-M230AC4

PHOENIX

KQ0C

PHOENIX

PHOENIX

PHOENIX

PHOENIX

PHOENIX

PHOENIX

PHOENIX

KHTS1

KHTS

K501 K502 K503

KA4

KA3

KA2

KG9.2

KG9.1

KG8.2

KG8.1

KG7.2

KG7.1

KG6.2

KG6.1

KG5.2

KG5.1

KG4.2

KG4.1

KG3.2

KG3.1

KG2.2

KG2.1

KG1.2

KG1.1

KD7

KD6

KD5

KD4

KD3

KD2

KD1

KA1

-M1

01~100

PHOENIX

KQ8

AF09-30-10-13

KQ52T

MT-32/2H5

AF09-30-10-13

KQ8T

AF09-30-10-13

NF40E-13 CA4-40N

KQ51T KQ52C

AF09-30-10-13

NF40E-13 CA4-40N

KQ9T KQ51C

AF09-30-10-13

KQ9C

KQ2T

NF22E-13

NF22E-13

NF22E-13

PHOENIX

5

DUCT 80x100

KDN-220DC

PHOENIX

NF40E-13

AF09-22-00-13 CA4-22E

AF09-22-00-13

NF40E-13

AF09-22-00-13 CA4-22E

NF22E-13

AF09-30-10-13 CA4-22M

AF09-30-10-13 CA4-22M

AF09-30-10-13 CA4-22M

AF09-30-10-13 CA4-22M

AF09-30-10-13 CA4-22M

AF09-30-10-13 CA4-22M

AF09-30-10-13 CA4-22M

PHOENIX

DUCT 80x100

PHOENIX

KQ52

KQ51

KQ9

KQ2

KQ1

XAD

DUCT 80x100

3

01~80

11

80x100

KDN-220DC

2

DUCT 80x100

01~80

3

DUCT 80x100

DUCT 80x100

3

KDN-220DC

KDN-220DC

KDN-220DC

KDN-220DC

AF09-30-10-13 CA4-22M

AF09-30-10-13 CA4-22M

KQ2C

KQ1T

AF09-30-10-13

4

01~40

D 3

DUCT 80x100

01~15

18

3

01~15

17

DUCT 80x100

DUCT 80x100

3

DUCT 80x100

PHOENIX

01~80

15

DUCT 80x100

PHOENIX

01~15

2 14

01~80

9

KQ0.1

8

AF09-30-10-13 CA4-22M

6

KQ1C

2

01~15

XD 3

AF09-30-10-13 CA4-22M

7 PHOENIX

2

01~15

10

KQ0

1

AF09-30-10-13 CA4-22M

1

KDN-220DC

PHOENIX

01~200

DUCT 80x100

DUCT 80x100

12

KDN-220DC

5

DUCT 100x100

4

01~80

1 13

DUCT 80x100

01~30

-M2

DUCT 80x100

XH

DUCT 80x100

PHOENIX

01~20

01~30

B

01~15

01~20

01~25

C

01~20

01~20

DUCT 80x100

1 6 7

XR1

7

1

1 1 2

04 03 02 01 00

REV.

8

Project

A A

DUCT 80x100 -M3

DUCT 80x100

Reference DWG

A3

NO. DWG

24.JAN.2018 10.AUG.2017 09.AUG.2017 19.JUN.2017 01.SEP.2016

DATE

Drawing Number :

PK55-SD-EL-GS-14

Project No.:

008006400

Sheet Size : Rev. :

04 01.SEP.2016

DATE

PREPARED : K.H.SONG

Scale : CHECKED :

Plot Date: APPROVED :

S.Y.JANG

C.Y.HONG

REV.

3

B

XG

PHOENIX

1 7

2 8

PHOENIX

9

EMPLOYER / DEVELOPER

C

3

PROJECT MANAGER.

SUPERVISION CONSULTANT

XR2

PHOENIX

10

D

PHOENIX

REVISED AS PER COMMENT REVISED AS PER COMMENT REVISED AS PER COMMENT REVISED AS PER COMMENT FOR APPROVAL

CONTRACTOR: CONSORTIUM( KN / HHI )

ISSUED TO / FOR :

X0C(C) PHOENIX

1 3

1

PHOENIX

2 PHOENIX

4

PHOENIX

PHOENIX

E

1000, Bangeojinsinhawn-doro, Dong-gu, Ulsan, Korea DRAWING TITLE:

INTERNAL ARRANGEMENT OF T/L (1) F

1

2

3

4

5

6

7

8

Project

A

A

PHOENIX

XC1

Reference DWG

DATE

NO. DWG

REV.

1 2

B

B

3 4 5 6 7 8 9

PHOENIX

PHOENIX

10 11 12 13 14 15 16 17 18

PHOENIX

PHOENIX

19

EMPLOYER / DEVELOPER

20 21 22

C

C

23 24 25 26 27

PHOENIX

545

PHOENIX

28 29

PROJECT MANAGER.

30 31

-M4

32

DUCT 60X80

33 34 35 36

PHOENIX

PHOENIX

37 38 39

SUPERVISION CONSULTANT

40 41

DUCT 60X80

42 43 44 45

D

D

DUCT 60X80

DUCT 60X80

922

DUCT 60X80

PHOENIX

PHOENIX

04 03 02 01 00

XM 1 2 3 4

REV.

PHOENIX

24.JAN.2018 10.AUG.2017 09.AUG.2017 19.JUN.2017 01.SEP.2016

DATE

REVISED AS PER COMMENT REVISED AS PER COMMENT REVISED AS PER COMMENT REVISED AS PER COMMENT FOR APPROVAL

ISSUED TO / FOR :

CONTRACTOR: CONSORTIUM( KN / HHI ) PHOENIX

XC2

HTS

TH

DUCT 60X80

PHOENIX

PHOENIX

PHOENIX

E

1 PHOENIX

E DUCT 40X80

MOUNTING PLATE (REAR SIDE OF LEFT DOOR)

MOUNTING PLATE (INSIDE OF LEFT)

MOUNTING PLATE (INSIDE OF RIGHT)

1000, Bangeojinsinhawn-doro, Dong-gu, Ulsan, Korea DRAWING TITLE:

INTERNAL ARRANGEMENT OF T/L (2) Drawing Number :

F

PREPARED :

PK55-SD-EL-GS-14 ACTION MANUFACTURER/VENDER NAME

A B C DRAWING NUMBER

16316 01 EB

SHEET NO.

17

OF

92

REV NO.

04

D

Project No.:

Scale :

CHECKED :

Plot Date:

APPROVED :

008006400 Sheet Size : Rev. :

A3

04

K.H.SONG

S.Y.JANG

01.SEP.2016

C.Y.HONG

F

1

2

3

4

5

6

7

8

Project

A

A

=DC DIST

=DC DIST

=DC DIST

DC 220V

DC 220V

DC 220V

+

-

+

-

+

-

Reference DWG

DATE

NO. DWG

REV.

B

B

-XD

2

-XD

11

3

1

4

2

-F8D1

C

-XD

1

-XD

-XD

10

-XD

3

12

3

1

4

2

-XD

7

-XD

-F8D2

S202M-K6UC S2C-H11L

-XD

16

4

-XD

-XD

13

3

1

4

2

-F8D3

S202M-K6UC S2C-A2

5

-XD

14

3

1

4

2

EMPLOYER / DEVELOPER

-F8D4

S202M-K16UC S2C-H11L

S202M-K16UC S2C-H11L

C

C1 PROJECT MANAGER.

-F8D2 C2 23

-K203 /43.E6

24 SUPERVISION CONSULTANT

D

D 21

-K202 /43.E2

22

/75.B2

REV.

12

(-)220V_F4

10/75.B2

(+)220V_F4

21.E1

LOCAL

11

REMOTE_F4

21.B1

-S11

REMOTE

LOCAL_F4

/75.B2

8

(-)220V_F3

6/75.B2

9

(+)220V_F3

28.E1

LOCAL

7

REMOTE_F3

28.B1

-S11

REMOTE

LOCAL_F3

/75.B2

4

(-)220V_F2

2/75.B2

5

(+)220V_F2

48.E1

LOCAL

REMOTE_F2

(-)220V_F1

48.B1

3

-S11

LOCAL_F2

(+)220V_F1

1 REMOTE

04 03 02 01 00

22.B1

22.E1

24.JAN.2018 10.AUG.2017 09.AUG.2017 19.JUN.2017 01.SEP.2016

DATE

REVISED AS PER COMMENT REVISED AS PER COMMENT REVISED AS PER COMMENT REVISED AS PER COMMENT FOR APPROVAL

ISSUED TO / FOR :

CONTRACTOR: CONSORTIUM( KN / HHI )

E 28.B1

SIGNAL LAMP & ALARM DC SUPPLY 13 21 34 32

14 22 /68.D3 31 /64.B4

28.A1

E 21.B1

DS/ES MOTOR & INTERLOCK DC SUPPLY C1

C2 /18.C3

13 21 34 32

14 22 /68.D4 31 /64.B4

21.A1

22.B1

CB CLOSE DC SUPPLY

13 21 34 32

14 22 /68.D4 31 /64.B5

22.A1

CB TRIP1 DC SUPPLY

13 21 34 32

14 22 /68.D4 31 /64.B5

1000, Bangeojinsinhawn-doro, Dong-gu, Ulsan, Korea DRAWING TITLE:

DC POWER SUPPLY Drawing Number :

F

PREPARED :

PK55-SD-EL-GS-14 ACTION MANUFACTURER/VENDER NAME

A B C DRAWING NUMBER

16316 01 EC

SHEET NO.

18

OF

92

REV NO.

04

D

Project No.:

Scale :

CHECKED :

Plot Date:

APPROVED :

008006400 Sheet Size : Rev. :

A3

04

K.H.SONG

S.Y.JANG

01.SEP.2016

C.Y.HONG

F

1

2

3

4

5

6

7

8

Project

A

A

=DC DIST

=DC DIST

+

-XD

6

-

-XD

+

15

-XD

21

-XD

-

22 Reference DWG

DATE

NO. DWG

REV.

B

B

-XD

3

1

-XD

3

-F8D5

C

8

1

-F8D6

S202M-K16UC S2C-H11L

4

9

-XD

18

3

1

4

2

EMPLOYER / DEVELOPER

-F8D7

S202M-K16UC S2C-H11L

2

-XD

17

4

2

S202M-K16UC S2C-H11L

C

PROJECT MANAGER.

SUPERVISION CONSULTANT

D

D

21

23

(-)220V_F6

(+)220V_F7

(-)220V_F7

LOCAL_F5

REV.

24

(+)220V_F6

22 REMOTE /75.B3

(-)220V_F5

LOCAL

(+)220V_F5

-S11 REMOTE_F5

-S11 /75.B3

04 03 02 01 00

24.B1

24.E1

25.A1

25.E1

24.JAN.2018 10.AUG.2017 09.AUG.2017 19.JUN.2017 01.SEP.2016

DATE

REVISED AS PER COMMENT REVISED AS PER COMMENT REVISED AS PER COMMENT REVISED AS PER COMMENT FOR APPROVAL

ISSUED TO / FOR :

CONTRACTOR: CONSORTIUM( KN / HHI )

E 23.B1

23.A1

CB TRIP 2 DC SUPPLY

13 21 34 32

14 22 /68.D4 31 /64.B6

23.A1 23.E1

CB MOTOR CONTROL DC SUPPLY

13 21 34 32

14 22 /68.D5 31 /64.B6

E

CB MOTOR POWER DC SUPPLY

13 21 34 32

14 22 /68.D5 31 /64.B6

1000, Bangeojinsinhawn-doro, Dong-gu, Ulsan, Korea DRAWING TITLE:

DC POWER SUPPLY Drawing Number :

F

PREPARED :

PK55-SD-EL-GS-14 ACTION MANUFACTURER/VENDER NAME

A B C DRAWING NUMBER

16316 01 EC

SHEET NO.

19

OF

92

REV NO.

04

D

Project No.:

Scale :

CHECKED :

Plot Date:

APPROVED :

008006400 Sheet Size : Rev. :

A3

04

K.H.SONG

S.Y.JANG

01.SEP.2016

C.Y.HONG

F

1

2

3

4

5

6

7

8

Project

A

A

A

-XA

1

N

-XA

3

-XA

2

-XA

-XA

4

A

B

C

N

5-XA

7-XA

9-XA

11

-XA

6-XA

8-XA

10-XA

12

Reference DWG

DATE

NO. DWG

REV.

B

B

3

1

-F8A1

1

3

5

7N

2

4

6

8N

-F8A2

S202M-K6UC S2C-H11L

4

2

S203M-K32NA S2C-H11L

EMPLOYER / DEVELOPER

C

C

PROJECT MANAGER.

SUPERVISION CONSULTANT

(772 13)

D

-SOCKET(1-PH)

(5 552 89) -SOCKET(3-PH)

1 1

A220V_F1

N220V_F1

A1

56.A1

E

SOCKET OUTLET CONTROL SUPPLY

(16A)

A2

u=220V AC 1-phase

14 22 /68.D1 31 /64.B2

3

u=380V AC 3-phase

(32A)

A1

A1

-KA3 SOCKET OUTLET CONTROL SUPPLY

-KA4 SOCKET OUTLET CONTROL SUPPLY

A2

04 03 02 01 00

A2

REV.

24.JAN.2018 10.AUG.2017 09.AUG.2017 19.JUN.2017 01.SEP.2016

DATE

REVISED AS PER COMMENT REVISED AS PER COMMENT REVISED AS PER COMMENT REVISED AS PER COMMENT FOR APPROVAL

ISSUED TO / FOR :

CONTRACTOR: CONSORTIUM( KN / HHI )

56.E1

HEATING & ANNUNCIATOR AC SUPPLY

13 21 34 32

4

2

-KA2

D

2

SOCKET OUTLET ‎AC (3Φ 380V & 1Φ 220V) SUPPLY

14 12 24 22 34 32 44 42

11 /64.C2 21 /68.D2 31 41

7N 13 21 34 32

8N /20.C4 14 22 /68.D2 31 /64.B2

E

14 12 24 22 34 32 44 42

11 /64.C2 21 /68.D2 31 41

14 12 24 22 34 32 44 42

11 /64.C3 21 /68.D3

1000, Bangeojinsinhawn-doro, Dong-gu, Ulsan, Korea

31

DRAWING TITLE:

41

AC POWER SUPPLY Drawing Number :

F

PREPARED :

PK55-SD-EL-GS-14 ACTION MANUFACTURER/VENDER NAME

A B C DRAWING NUMBER

16316 01 EC

SHEET NO.

20

OF

92

REV NO.

04

D

Project No.:

Scale :

CHECKED :

Plot Date:

APPROVED :

008006400 Sheet Size : Rev. :

A3

04

K.H.SONG

S.Y.JANG

01.SEP.2016

C.Y.HONG

F

1

2

3

4

5

6

7

8

Project

CB CLOSE A

CLOSE CIRCUIT (A)

+Remote Control Panel

REMOTE_F3

/ 18.E5

-XR1

1

CLOSE CIRCUIT (B)

CLOSE CIRCUIT (C) A

+Protection Panel

-XR1

2

-XR1

86

87

-XR1

88

-XR1

14

-XR1

15

16

(+)220V_F3

/ 18.E5

LOCAL_F3

/ 18.E4

1L1

3L2

-KQ0C

5L3

-KQ0C

/21.E1

-KQ0C

/21.E1

2T1

Reference DWG

/21.E1

4T2

DATE

NO. DWG

REV.

6T3

B

B 3

-SQ0 CLOSE

4

-X0C(A)

3

-J1

3

-Q0(A)

/73.B3

1

-J1

B4 / 45.A1 / 45.E1

CB INT.1

CB INT(CRP).1

CB INT.2

CB INT(CRP).2

/ 45.A5 / 45.E5

-XR1 =CRP C

3

-J1

3

-Q0(B)

1 LA1

B04

-X1

-X1

2

-J1

4 4

-J1

2

-X0C(B)

2 14

6

/21.E3

22

D

-XR1

7

13

/48.E4

-XR1

R3

1

B4

LA1

B04

LA01

1 1 EMPLOYER / DEVELOPER

-X1

2

-J1

4 4

-J1

2

-X0C(C)

2

21 /21.E5

/24.E3

14 /21.E5

22

/48.E4

C

2

-J1

4 4

13

2 2 PROJECT MANAGER.

21

14

-K101C

-K101B

/21.E6

-K101C /21.E6

22

13

62

-K102 /24.E3

31 31

-KG0.2

22

-J1

2

-K102 21 21

-KG0.2 8

-X1

32

-K102 /24.E3

-XR1

LA01

1 1

-K101B

-K101A

1

-52C

22

-XR1

3

2

-K101A /21.E3

-J1

-Q0(C)

1

-52C

-X0C(A)

3

LA1

B04

-X1

-52C

-X0C(C)

-S1

LA01

1 1

21 5

-J1

-S1

-X1

4

1

B4

-S1

-J1

-XR1

3

2

86 RY

-XR1

-X0C(B)

61 61

SUPERVISION CONSULTANT

-KG0.2 /48.E4

32

D

62

9

-K201 /43.E5

R4

-XR1

10

-XR1

11

-XR1

12

04 03 02 01 00

R4

-K205 /44.E2

R3

REV.

CLOSE

E

A1

-K101A ANTI-PUMPING

A2

-XR1

(-)220V_F3

/ 18.E5

1L1 3L2 5L3 13

2T1 /21.B3 4T2 /21.B4 6T3 /21.B5 14

DATE

REVISED AS PER COMMENT REVISED AS PER COMMENT REVISED AS PER COMMENT REVISED AS PER COMMENT FOR APPROVAL

ISSUED TO / FOR :

CONTRACTOR: CONSORTIUM( KN / HHI )

A1

-KQ0C

24.JAN.2018 10.AUG.2017 09.AUG.2017 19.JUN.2017 01.SEP.2016

A1

-K101B A2

ANTI-PUMPING

A1

A1

-K101C A2

ANTI-PUMPING

-KD3 CB CLOSE POWER SUPPLY

A2

A2

E

13

14 21 31 43

13 /21.C4 22 /21.C3 32 44

14 21 31 43

13 /21.C5 22 /21.C4 32 44

14 21 31 43

14 12 24 22 34 32 44 42

13 /21.C6 22 /21.C5 32 44

11 /64.C4 21

1000, Bangeojinsinhawn-doro, Dong-gu, Ulsan, Korea 31 /68.D6 DRAWING TITLE:

41

CB CLOSE CONTROL Drawing Number :

F

PREPARED :

PK55-SD-EL-GS-14 ACTION MANUFACTURER/VENDER NAME

A B C DRAWING NUMBER

16316 01 EC

SHEET NO.

21

OF

92

REV NO.

04

D

Project No.:

Scale :

CHECKED :

Plot Date:

APPROVED :

008006400 Sheet Size : Rev. :

A3

04

K.H.SONG

S.Y.JANG

01.SEP.2016

C.Y.HONG

F

1

2

3

4

5

6

7

8

Project

PHASE-A TRIP 1

CB OPEN A

+Remote Control Panel

-XR2 REMOTE_F4

/ 18.E6

1

2

PHASE-B TRIP 1

PHASE-C TRIP 1

POLE DISCREPANCY 1 A

+Protection Panel

23

24

-XR2

25

3

4

-XR2

5

6

7

-XR2

8

9

10

11

(+)220V_F4

/ 18.E6

LOCAL_F4

/ 18.E6

1L1

-KQ0T1

1

4T2

/22.E1

13

-SQ0

-K47A

OPEN

/22.E6

2

Reference DWG

-KQ0T1

/22.E1

2T1

1

5L3

-KQ0T1

/22.E1

B

-XS

3L2

B

33

-K47A

-X0

-K47A

/22.E6

14

/22.E6

24

34

-Q0(A) -J2

1

-X0

1

-Q0(B)-J2

A4

-J2 -Q0(A)

-J1

5

-X0C(A)

5

-J1

* A2

C

-S1

* A02 -X1 -52T1

*

-X1 -J1* -X0C(A)

3 1

6 6

* B2

-X0C(B) -Q0(B)

-J1

7 7

/48.E4

D

5

-J1

* A2

B02

* A02 -X1

*

-X1 -J1* -X0C(B)

21

-KG0.2A

-X0C(B)

-S1

-52T1 2 4

5

3 1

-XR1

17

-XR1

18

-XR1

19

6

* B2

-X0C(C)

5

-X0C(C)

6

-J1

5

-J1

6

-Q0(C)

* A2

-S1

B02

* A02 -X1 -52T1

2 4 7 7

*

-X1 -J1* -X0C(C)

31

-KG0.2A 22

6

/48.E4

3 1

-X0

3

-X0

1

-Q0(C) -J2

5 1

A4

-S1 -X0C(A)

REV.

6T3

23

/73.B3

DATE

NO. DWG

A4

-S1 A04 2

-J2 -X0

2

-S1 A04 2

-J2 -X0

4

A04 2 6 EMPLOYER / DEVELOPER

* B2

C

B02

-X0

35

-X0

37

-X0

-Q0(A) -J2

13

-Q0(B)-J2

13

-Q0(C) -J2

B5

-J2 -X0

7

-S1 B05

-J2

14

-X0

36

PROJECT MANAGER.

B5

-S1 B05

7

13

B5

-S1

2 4

39

B05

-J2

14

-X0

38

14 40 SUPERVISION CONSULTANT

61

-KG0.2A 32

/48.E4

62

D

4

3

04 03 02 01 00

-T47A /22.E6

1

REV.

24.JAN.2018 10.AUG.2017 09.AUG.2017 19.JUN.2017 01.SEP.2016

DATE

REVISED AS PER COMMENT REVISED AS PER COMMENT REVISED AS PER COMMENT REVISED AS PER COMMENT FOR APPROVAL

ISSUED TO / FOR :

CONTRACTOR: CONSORTIUM( KN / HHI )

A1

A1

-XR1

-KQ0T1 OPEN

E

-XR1

1L1 3L2 5L3 13

2T1 /22.B3 4T2 /22.B4 6T3 /22.B5 14

F

7

-K47A POLE DISCREPANCY

A2

(-)220V_F4

/ 18.E6

20

A1

-KD4

-T47A A2

POLE DESCREPANCY (SET:100mSEC)

CB TRIP1 POWER SUPPLY

2

[NOTE] PLEASE REFER TO CLOUDED PART. TRIP CIRCUIT SUPERVISION RELAYS WILL BE CONNECTED TO THIS PART.

13 23 33 43 53 63 73 83

14 24 34 44 54 64 74 84

/22.B3 /22.B4 /22.B5 /59.B3 /68.B3

3 4 6 5

1 /22.D5 8

ACTION A B C

16316 01 EC

SHEET NO.

22

OF

92

REV NO.

04

E

21

MANUFACTURER/VENDER NAME

DRAWING NUMBER

A2

D

14 12 24 22 34 32 44 42

11 /64.C4 21

1000, Bangeojinsinhawn-doro, Dong-gu, Ulsan, Korea DRAWING TITLE:

CB TRIP 1 CONTROL

31 /68.D6 41

Drawing Number :

PREPARED :

PK55-SD-EL-GS-14 Project No.:

Scale :

CHECKED :

Plot Date:

APPROVED :

008006400 Sheet Size : Rev. :

A3

04

K.H.SONG

S.Y.JANG

01.SEP.2016

C.Y.HONG

F

1

2

3

4

PHASE-A TRIP 2

CB OPEN +Remote Control Panel

5

PHASE-B TRIP 2

6

7

8

Project

PHASE-C TRIP 2

POLE DISCREPANCY 2

+Protection Panel

A

A

-XR2 12 -XR2 REMOTE_F5

/ 19.E2

13

26

27

-XR2

28

14

15

16

-XR2

17

18

-XR2

19

20

21

22

(+)220V_F5

/ 19.E2

LOCAL_F5

/ 19.E2

1L1

3L2

-KQ0T2 /23.E1

B

5L3

-KQ0T2 /23.E1

2T1

-XS

-KQ0T2 4T2

/23.E1

6T3

Reference DWG

-X0 -Q0(A) -J2

-SQ0 6 13

/73.B3

23

-K47B /23.E5

33

-K47B /23.E5

14

/23.E5

24

-X0C(A)

8

-X0C(A)

9

-J1

8

-J1

9

*

B3

-Q0(A)

*

C

A3

-S1

* -X1 -52T2

*

-X1

*

-J1 -X0C(A)

A03 5 1

-X0C(B)

8

-X0C(B)

9

-J1

8

-J1

9

*

B3

-Q0(B)

*

-S1

*

B03

-X1 -52T2

2 6

*

-X1

*

10

-J1

10

-X0C(B)

21

D

34

-KG0.2B

/48.E5

/48.E5

-XR1

A03 5 1

-X0C(C)

9

-J1

8

-J1

9

*

B3

*

-S1

*

B03

-X1 -52T2

2 6

A3

*

-X1

*

10

-J1

10

-X0C(C)

A03

-X0 -J2 -Q0(C)

9 3 A5

8

3

-S1 A05

-J2 -X0

4

11

A05

-J2 -X0

4 10

4 12

EMPLOYER / DEVELOPER

-X0 -Q0(A) -J2

-X0 -Q0(B)-J2

41 15 B6

B03

2 6

16 42

C

15

-S1 B06

-J2 -X0

45

B6

-S1 B06

-J2 -X0

15 B6

-S1

5 1

-X0 -J2 -Q0(C)

43

B06

-J2 -X0

16 44

PROJECT MANAGER.

16 46

10 10

SUPERVISION CONSULTANT

61

-KG0.2B 32

/48.E5

D

62

22 4

3 04 03 02 01 00

-T48B /23.E6

-XR1

1

REV.

23

A1

-XR1

A2

-XR1

(-)220V_F5

/ 19.E3

1L1 3L2 5L3 13

2T1 /23.B3 4T2 /23.B4 6T3 /23.B5 14

F

24

7

-K47B POLE DISCREPANCY

-T48B A2

POLE DESCREPANCY (SET:100mSEC)

CB TRIP2 POWER SUPPLY

2

[NOTE] PLEASE REFER TO CLOUDED PART. TRIP CIRCUIT SUPERVISION RELAYS WILL BE CONNECTED TO THIS PART.

13 23 33 43 53 63 73 83

14 24 34 44 54 64 74 84

/23.B3 /23.B4 /23.B5 /59.B3 /68.B3

3 4

1 /23.D5

6 5

8

14 12 24 22 34 32 44 42

ACTION

C

16316 01 EC

23

92

REV NO.

04

A2

E

25

B

OF

ISSUED TO / FOR :

A1

A

SHEET NO.

DATE

REVISED AS PER COMMENT REVISED AS PER COMMENT REVISED AS PER COMMENT REVISED AS PER COMMENT FOR APPROVAL

-KD5

MANUFACTURER/VENDER NAME

DRAWING NUMBER

24.JAN.2018 10.AUG.2017 09.AUG.2017 19.JUN.2017 01.SEP.2016

CONTRACTOR: CONSORTIUM( KN / HHI )

A1

-KQ0T2 E

REV.

A5

-S1 A05

8

31

-KG0.2B 22

A3

3

-S1

-X0C(C) -Q0(C)

-X0 -Q0(B)-J2

7

A5

-K47B

-J2 -X0

OPEN

DATE

NO. DWG

B

5 OPEN

2

D

11 /64.C6 21

1000, Bangeojinsinhawn-doro, Dong-gu, Ulsan, Korea DRAWING TITLE:

CB TRIP 2 CONTROL

31 /68.D6 41

Drawing Number :

PREPARED :

PK55-SD-EL-GS-14 Project No.:

Scale :

CHECKED :

Plot Date:

APPROVED :

008006400 Sheet Size : Rev. :

A3

04

K.H.SONG

S.Y.JANG

01.SEP.2016

C.Y.HONG

F

1

2

3

4

5

6

7

8

Project

A

A

/ 19.E4

(+)220V_F6

1

97

-S1

B

USE

-F49A

2

3

-F49C

/25.B2

/75.C5

Reference DWG

97 /25.B5

98

/75.D5

13 13

15

-J1

15

-X0C(B) -Q0(B) -J1

13 13

15

-J1

15

-X0C(C) -Q0(C) -J1

13 13

-F49B

15

-J1

4

/25.B3

/24.E6

-K88MA 14

1

15

c

-LS1

c d

-LS2

c

-LS3

C

c

-J1 -X0C(A)

-J1

14

16 16

-J1 -X0C(B)

/24.E4

14

1

13

-K88MC 14

/24.E3

14

-K103 13

-LS2

c

d

EMPLOYER / DEVELOPER

d

-LS3 d

14

B

c d

-LS3 d

-LS1

-LS2

c

d

REV.

c

-LS1 d

/24.E1

DATE

NO. DWG

3

-K102T

13

/24.E5 c

/24.E2

4

3

-T88 98

4

-K88MB

-S2

98

97

-X0C(A) -Q0(A) -J1

13

C d

-J1

14 14

16 16

-J1 -X0C(C)

-J1

14 14

16 PROJECT MANAGER.

16

SUPERVISION CONSULTANT

D

D 95

95

-F49A /25.B2

/25.B3

96 22

/25.B5

96

/24.E5

21 A1

-K103 /24.E5

31 A1

-K88MA

CB MOTOR OPERATION

A2

REV.

61

-K88MC CB MOTOR OPERATION

A2

A1

-K102 A2

24.JAN.2018 10.AUG.2017 09.AUG.2017 19.JUN.2017 01.SEP.2016

DATE

REVISED AS PER COMMENT REVISED AS PER COMMENT REVISED AS PER COMMENT REVISED AS PER COMMENT FOR APPROVAL

ISSUED TO / FOR :

CONTRACTOR: CONSORTIUM( KN / HHI )

A1

-K88MB

CB MOTOR OPERATION

04 03 02 01 00

96 62

-K103

/24.E5

/ 19.E4

-F49C

32

-K103

E

95

-F49B

CB MOTOR SPRING UNCHARGED

A2

7

A1

A1

-K102T

-K49

-K103

SPRING UNCHARGED SET:30sec

2 CB MOTOR OVER LOAD

A2 CB MOTOR LONG RUN

7

A1

-T88 MOTOR LONG RUN SET:1Min

A2

A1

-KD6

-K104 2

CB MOTOR SPRING CHARGING FAULTY

CB MOTOR CONTROL SUPPLY

A2

A2

E

(-)220V_F6 1L1 3L2 5L3 13

2T1 /25.B2 4T2 6T3 /25.E2 14 /24.B5

F

1L1 3L2 5L3 13

2T1 /25.B3 4T2 6T3 /25.E3 14 /24.B5

1L1 3L2 5L3 13

2T1 /25.B5 4T2 6T3 /25.E5 14 /24.B6

13 22 32 43 53 62 71 83

14 21 /21.D3 31 /21.D4 44 54 61 /21.D5 72 84

3 4 6 5

1 /24.B6 13 23 8 33 43

14 /59.B2 14 24 /68.B2 22 32 34 43 44 53 62 71 83

13 21 31 44 54 61 72 84

/24.B5 /24.E1 /24.E2 /59.B1 /68.B2 /24.E3

3 4

1 /24.B5

6 5

8

13 23 33 43

14 /59.B3 24 /68.B3 34 44

ACTION A B C

16316 01 EC

SHEET NO.

24

OF

92

REV NO.

04

11 /64.C5 21

1000, Bangeojinsinhawn-doro, Dong-gu, Ulsan, Korea DRAWING TITLE:

31 /68.D6

CB MOTOR CONTROL

41 Drawing Number :

PREPARED :

PK55-SD-EL-GS-14

MANUFACTURER/VENDER NAME

DRAWING NUMBER

14 12 24 22 34 32 44 42

D

Project No.:

Scale :

CHECKED :

Plot Date:

APPROVED :

008006400 Sheet Size : Rev. :

A3

04

K.H.SONG

S.Y.JANG

01.SEP.2016

C.Y.HONG

F

1

2

3

4

5

6

7

8

Project

A

CB MOTOR OPERATION (A PHASE) / 19.E5

CB MOTOR OPERATION (B PHASE)

(+)220V_F7 1L1

1L1

-K88MA

-K88MC

/24.E2

2T1

-X0C(A)

11

-J1

11

-X1

7

/26.A5 u=220V AC

1

2

11

-J1

11

-X1

7

(16A)

3

-X1

DC

4

/26.B4

C

9 1

-S13

-S13

AC

2 AC /26.B5

/26.B4

10 5

M

/26.C4 6

8

-X1 -J1

D

-X0C(A)

8

M

-M1

/25.B2

/24.E1

DC

/26.C4

8

-X1 -J1

-X0C(B)

/ 19.E5

8

7

-S13

AC

2 AC /26.C5

10 5

-OUTLET_C /26.E5 u=220V AC

-X1

-S13 DC

4

/26.E4 6

1 9 1

-S13

-S13

AC

2 AC /26.E5

/26.E4

2

(16A) 10 5 EMPLOYER / DEVELOPER

6

C

M1

M

-M1

PROJECT MANAGER.

M01 7 DC

/26.E4

12

-X1 -J1

-X0C(C)

5 /25.B3

8

D

12 12

-F49C 6

04 03 02 01 00

5 /25.B5

5L3 /24.E2

SUPERVISION CONSULTANT

8

12

-K88MB 6T3

-X1

(16A)

-S13

5L3

-K88MA

2

7

-F49B 6

11

M01

5

-F49A

-J1

M1

12 12

9

-S13 /26.C4

-S13

DC

1

1

4

7

/26.B4

11

3

-X1

DC

M01

-S13

/26.C5 u=220V AC

-S13

M1

-M1

-X0C(C) -Q0(C)

-OUTLET_B

2

3

-S13

A1

6

5L3

REV.

-KD7 CB MOTOR POWER SUPPLY

24.JAN.2018 10.AUG.2017 09.AUG.2017 19.JUN.2017 01.SEP.2016

DATE

REVISED AS PER COMMENT REVISED AS PER COMMENT REVISED AS PER COMMENT REVISED AS PER COMMENT FOR APPROVAL

ISSUED TO / FOR :

CONTRACTOR: CONSORTIUM( KN / HHI )

A2

-K88MC 6T3

/24.E3

6T3

(-)220V_F7

E

14 12 24 22 34 32 44 42

F

11 /64.C5 21

1000, Bangeojinsinhawn-doro, Dong-gu, Ulsan, Korea DRAWING TITLE:

31 /68.D7

CB MOTOR POWER

41 Drawing Number :

PREPARED :

PK55-SD-EL-GS-14 ACTION MANUFACTURER/VENDER NAME

A B C DRAWING NUMBER

16316 01 EC

REV.

B

/25.D5 SET: 5A

2

-X0C(B) -Q0(B)

-OUTLET_A

DATE

NO. DWG

-F49C

/25.D3 SET: 5A

2

Reference DWG

1

-F49B

/25.D2 SET: 5A

2T1

1

-F49A

-Q0(A)

/24.E3

2T1

1

B

1L1

-K88MB

/24.E1

E

A

CB MOTOR OPERATION (C PHASE)

SHEET NO.

25

OF

92

REV NO.

04

D

Project No.:

Scale :

CHECKED :

Plot Date:

APPROVED :

008006400 Sheet Size : Rev. :

A3

04

K.H.SONG

S.Y.JANG

01.SEP.2016

C.Y.HONG

F

-W1

/56.D5

/56.B5

/24.B1

/24.B1

/25.B2

7

/24.C1

6 /24.C1

5 /25.D2

4 /23.D3

/23.C3

/23.C3

/22.D3

/22.C3

/22.C3

/21.B3

/21.B3

-X0C(A)

3

/21.C3

2 /21.C3

1

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

1

2

3

6

4

5

7

8

9

10

11

12

13

14

15

16

-XH -W4

8

Project

9

12

1

2

A

A -Q0(A)

-J1 1

2

3

LA1

4

*

B4

5 A2

6

* B2 *

7

*

8 A3

9

* B3 *

10

11

-X1

-S1 LA01

B04

-X1

A02

1

2

* *

-X1

B02

A03

3

4

* *

12

7

8

/25.B2 u=220V AC

-X1

B03 3

5

6

-S13 DC

DC

4

/25.C2

8

/25.D2

1

-S13

AC

2 AC /25.C3

/25.C2

-LS1

15

16

1

2

c d c

5

-S13

14

c 10

1

-JA 13

(16A)

2

9

7

-S13

-J1

-OUTLET_A

-LS2

6

1 d

-LS3

-HT

d

2 Reference DWG

M1

-W2

2

B

/56.D5

/56.B5

/24.C2

/24.B2

/24.C2

/24.B2

/25.B3

/23.D4

M01

/23.C4

/21.B4

DC 220V, 60 Ohm

2

/21.C4

2

REV.

M

-M1

-52T2

/23.C4

DC 220V, 60 Ohm

1

/22.D4

-52T1

DC 220V, 60 Ohm

/22.C4

-52C

/21.C5

/21.B5

-X0C(B)

1

/25.D3

1

/22.C4

B

DATE

NO. DWG

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

1

2

3

6

4

5

7

8

9

10

11

12

13

14

15

16

-XH -W5

10

13

1

2

EMPLOYER / DEVELOPER

C

-Q0(B)

-J1 1

2

3

LA1

*5 *6 *7

4

A2

B4

* 8 * 9 * 10 A3

B2

11

12

7

8

B3

-X1

-S1 LA01

B04

-X1

1

*

2

A02

-X1

B02

*

3

*

4

A03

-X1

5

*

/25.B4 u=220V AC

B03 3 6

-S13

DC

4

/25.C3

8

/25.D3

1

-S13

AC

2 AC /25.C4

/25.C4

-LS1

15

C

16

1

2

c d c

5

-S13

14

c 10

1

-JA 13

(16A)

2

9

7

-S13

DC

-J1

-OUTLET_B

1 d

-LS3

6

PROJECT MANAGER.

-LS2 -HT

d

2

M1

-W3

-Q0(C)

D

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

1

2

3

6

4

5

7

8

9

10

11

12

13

14

15

16

10

11

12

13

14

15

16

-J1 2

3

LA1

B4

LA01

B04

4

*

5 A2

6

* B2 *

A02

B02

7

*

8 A3

9

* B3 *

A03

B03

-S1

-X1 -X1

1

2

*

-X1

3

4

*

5

6

7

7

-S13 DC

4

/25.C5

1

(16A)

2

/25.D5

8

9 1

-S13

-S13

AC

2 AC /25.C6

/25.C6

-XH -W6

11

14

1

2

04 03 02 01 00

REV.

24.JAN.2018 10.AUG.2017 09.AUG.2017 19.JUN.2017 01.SEP.2016

DATE

REVISED AS PER COMMENT REVISED AS PER COMMENT REVISED AS PER COMMENT REVISED AS PER COMMENT FOR APPROVAL

ISSUED TO / FOR :

CONTRACTOR: CONSORTIUM( KN / HHI )

-JA 1

2

c

8

3 DC

/25.B6 u=220V AC

-X1

-S13

-J1

-OUTLET_C

/56.D6

/56.B6

/24.C3

/24.B3

/25.B5

/23.D5

M01

/23.C5

/22.D5

/22.C5

/22.C5

2

SUPERVISION CONSULTANT

/24.C3

DC 220V, 60 Ohm

2

/23.C5

DC 220V, 60 Ohm

M

-M1

1

1

E

/21.B5

/21.C6

/21.B6

-X0C(C)

2

/21.C5

DC 220V, 60 Ohm

D

1

-52T2

/24.B3

1

-52T1

/25.D5

1

-52C

10

-LS1 d c

5

-LS2

1 d

-LS3 6

E

c

-HT

d

2

M1

1000, Bangeojinsinhawn-doro, Dong-gu, Ulsan, Korea 1

-52C DC 220V, 60 Ohm

F

-52T1 2

DC 220V, 60 Ohm

*

1

-52T2 2

DC 220V, 60 Ohm

*

1

2

-M1

M

DRAWING TITLE:

CB MECHANISM 1 M01 Drawing Number :

PREPARED :

PK55-SD-EL-GS-14 ACTION MANUFACTURER/VENDER NAME

A B C DRAWING NUMBER

16316 01 EC

SHEET NO.

26

OF

92

REV NO.

04

D

Project No.:

Scale :

CHECKED :

Plot Date:

APPROVED :

008006400 Sheet Size : Rev. :

A3

04

K.H.SONG

S.Y.JANG

01.SEP.2016

C.Y.HONG

F

1

2

3

4

5

6

7

8

-Q0(A)

7

13

19

25

31

35

41

47

53

59

65

1

3

5

7

9

11

13

15

17

21

19

23

-J2

1

3

5

7

9

11

13

15

17

19

21

23-J3

A4

A5

A6

A7

A8

LB1

B5

B6

B7

B8

B9

INTERLOCK WITH Q9

INTERLOCK WITH Q1

INTERLOCK WITH Q2

/46.C2

/46.C5

LATCHED RELAY FOR MULTIPLY

/40.B4

/47.B2

OPEN/CLOSE INDICATION

LATCHED RELAY FOR MULTIPLY

/40.B3

1

-W7

/54.B3

OPEN/CLOSE INDICATION

-X0

69

73

77

81

85

89

93

97

101

105

109

113

1

3

5

7

9

11

13

15

17

21

19

23

1

3

5

7

9

11

13

15

17

19

21

23-J4

LA1

A2

A3

A4

A5

A6

A7

A8

LB1

B2

B3

B4

LA01

A02

A03

A04

A05

A06

A07

A08

LB01

B02

B03

B04

-W10

A

117

121

125

129

1

3

5

7

1

3

5

7

B5

B6

B7

B8

B9

B05

B06

B07

B08

B09

-W13

-S2 LB01

B05

B06

B07

B08

B09

-J2

2

4

6

8

10

12

14

16

18

20

22

24-J3

2

4

6

8

10

12

14

16

18

20

22

24-J4

2

4

6

8

-W7

2

4

6

8

10

12

14

16

18

22

20

24-W10

2

4

6

8

10

12

14

16

18

22

20

24

2

4

6

8

-X0

2

8

14

20

26

32

36

42

48

54

60

66

70

74

78

82

86

90

94

98

102

106

110

114

118

122

126

130

CB TRIP1 CICUIT

CB TRIP2 CIRCUIT

/23.B6

1

3

5

7

9

11

13

15

17

21

19

23

1

3

5

7

-X0

3

9

15

21

27

-W8

1

3

5

7

9

11

-W13

Reference DWG

DATE

NO. DWG

REV.

B

/67.B3 REMOTE

CB TRIP2 CIRCUIT

A08

/23.C6

A07

CB TRIP1 CICUIT

A06

/22.C6

A05

/67.B2 REMOTE

A04

/22.B6

-S1 B

/54.B3

CB TRIP2 CIRCUIT

/23.C5

/67.B2 REMOTE

CB TRIP1 CICUIT

/22.C6

CB TRIP2 CIRCUIT

/23.B5

/67.B1 REMOTE

CB TRIP1 CICUIT

A

/22.B6

Project

37

43

49

55

61

13

15

17

21

19

23

-W11

-W14

EMPLOYER / DEVELOPER

C

C -Q0(B)

-J2

1

3

5

7

9

11

A4

A5

A6

A7

A8

LB1

B5

13

B6

15

B7

17

B8

19

B9

A04

A05

A06

A07

A08

LB01

B05

B06

B07

B08

B09

-J2

2

4

6

8

10

12

14

16

18

20

22

-W8

2

4

6

8

10

12

14

16

18

22

-X0

4

10

16

22

28

33

38

44

50

56

-Q0(C)

3

5

7

9

11

13

15

1

3

5

7

A2

A3

A4

A5

A6

A7

A8

LB1

B2

B3

B4

B5

B6

B7

B8

B9

19

21

LA01

A02

A03

A04

A05

A06

A07

A08

LB01

B02

B03

B04

B05

B06

B07

B08

B09

24-J3

2

4

6

8

10

12

14

16

18

20

22

24-J4

2

4

6

8

20

24-W11

2

4

6

8

10

12

14

16

18

22

20

24

2

4

6

8

62

67

71

75

79

83

87

91

95

99

103

107

111

115

119

123

127

131

-S2

CB TRIP2 CIRCUIT

/23.C6

/67.B4 REMOTE

CB TRIP1 CICUIT

/22.C6

CB TRIP2 CIRCUIT

/23.B6

/67.B3 REMOTE

CB TRIP1 CICUIT

/22.B6

D

-X0

5

11

17

23

29

39

45

51

57

63

-W9

1

3

5

7

9

11

13

15

17

21

19

23

-J2

1

3

5

7

9

11

13

15

17

19

21

23-J3

A4

A5

A6

A7

A8

LB1

B5

-W14

PROJECT MANAGER.

SUPERVISION CONSULTANT

B6

B7

B8

B9

1

3

5

7

9

11

13

15

17

21

19

23

1

3

5

7

9

11

13

15

17

19

21

23-J4

LA1

A2

A3

A4

A5

A6

A7

A8

LB1

B2

B3

B4

LA01

A02

A03

A04

A05

A06

A07

A08

LB01

B02

B03

B04

-W12

1

3

5

7

1

3

5

7

B5

B6

B7

B8

B9

B05

B06

B07

B08

B09

-W15

04 03 02 01 00

REV.

24.JAN.2018 10.AUG.2017 09.AUG.2017 19.JUN.2017 01.SEP.2016

DATE

REVISED AS PER COMMENT REVISED AS PER COMMENT REVISED AS PER COMMENT REVISED AS PER COMMENT FOR APPROVAL

ISSUED TO / FOR :

CONTRACTOR: CONSORTIUM( KN / HHI )

-S2

-S1

E

17

23-J4

1

LA1

-S1

D

23-J3

21

A04

A05

A06

A07

A08

LB01

B05

B06

B07

B08

B09

-J2

2

4

6

8

10

12

14

16

18

20

22

24-J3

2

4

6

8

10

12

14

16

18

20

22

24-J4

2

4

6

8

-W9

2

4

6

8

10

12

14

16

18

22

20

24-W12

2

4

6

8

10

12

14

16

18

22

20

24

2

4

6

8

-X0

6

12

18

24

30

34

40

46

52

58

64

68

72

76

80

84

88

92

96

100

104

108

112

116

120

124

128

132

133

135

151

153

E

-X0

137

139

141

143

145

147

-X0

149

155

157

159

161

-W15

163

1000, Bangeojinsinhawn-doro, Dong-gu, Ulsan, Korea L13 L11

L14 L12

L9 L7

L10 L8

L5

L6

R8 R10 R7 R9

R12 R14 R11 R13

-KQ0 /40.E3

L13 L11

L14 L12

L9 L7

L10 L8

L5

L6

R8 R10 R7 R9

R12 R14 R11 R13

DRAWING TITLE:

-KQ0.1 L3

L4

R6

R5

R4

R3

/40.E4

CB MECHANISM 2 L3

L4

R6

R5

R4

R3 Drawing Number :

F

-X0

134

136

138

140

142

144

146

148

-X0

150

152

154

156

158

160

162

164

ACTION

MANUFACTURER/VENDER NAME

A B C DRAWING NUMBER

16316 01 EC

SHEET NO.

27

OF

92

REV NO.

04

PREPARED :

PK55-SD-EL-GS-14

D

Project No.:

Scale :

CHECKED :

Plot Date:

APPROVED :

008006400 Sheet Size : Rev. :

A3

04

K.H.SONG

S.Y.JANG

01.SEP.2016

C.Y.HONG

F

1

2

3

4

5

6

7

8

Project

BUS DS (BB-1) CLOSE A

BUS DS (BB-1) OPEN

MANUAL OPERATION

BUS DS (BB-1) MOTOR OPERATION A

+CRP

-XR1 REMOTE_F2

/ 18.E3 / 18.E3 / 18.E3

-XR1

26

-XR1

27

28

REMOTE_F2

(+)220V_F2

(+)220V_F2

LOCAL_F2

LOCAL_F2

/ 30.A1 / 30.B1 / 30.B1 Reference DWG

B

2T1 1

3 CLOSE

/28.C2

OPEN

4

REV.

B

2T1

-KQ1T

-SQ1

-SQ1

DATE

NO. DWG

-KQ1C /28.C2

1L1

1L1

2

/73.C3

/73.C3

3L2

3L2

-KQ1T 14

/28.C2

14

-KQ1C

-KQ1C /28.C2

4T2

4T2

-KQ1T

/28.C2

/28.C2

13

13 EMPLOYER / DEVELOPER

C

C 21 A1

A1

-KQ1C CLOSE

-KQ1C

-KQ1T OPEN

A2

/28.C2 A2

22 22

PROJECT MANAGER.

-KQ1T /28.C2

-Q1

-X1C

1

-X1C

2

-X1C

3

-J1

1

-J1

2

-J1

3

1 c

c

-LSA D

2

-LSA b

5

-J1

21 7 7 SUPERVISION CONSULTANT

M1 a

d

a

-DS1

-J1

-Q1

-DS2

d a

5

c

-ILM

-LSB d

-X1C

-M

a b

-DS2

D b

-LSB b

M M01

OPERATION

2

1

04 03 02 01 00

-PS -J1 -X1C

44

-KL1

E

/46.E3

43

/28.C2

4

-X1C

44

-KQ1T 43

-J1

/28.C2

6

/28.C2

2T1 4T2 6T3 14 21 31 44 53

F

1L1 3L2 5L3 13 22 32 43 54

/28.B5 /28.B5 /28.E5 /28.C1 /28.C5 /28.E3 /43.B2

2T1 4T2 6T3 14 22 31 44 53

1L1 3L2 5L3 13 21 32 43 54

5L3

/28.C2

E

5L3

/28.B4 /28.B4 /28.E6 /28.C3 /28.C5

DRAWING TITLE:

BUS DS(-Q1) CONTROL

/28.E4 /43.B2

Drawing Number :

C

16316 01 EC

28

92

04

PREPARED :

PK55-SD-EL-GS-14 B

REV NO.

/ 30.E1

1000, Bangeojinsinhawn-doro, Dong-gu, Ulsan, Korea

A

OF

ISSUED TO / FOR :

6T3

ACTION

SHEET NO.

DATE

-KQ1T

MANUFACTURER/VENDER NAME

DRAWING NUMBER

REVISED AS PER COMMENT REVISED AS PER COMMENT REVISED AS PER COMMENT REVISED AS PER COMMENT FOR APPROVAL

CONTRACTOR: CONSORTIUM( KN / HHI )

6T3

-KQ1C 43

REV.

6

(-)220V_F2

(-)220V_F2

/ 18.E4

44

-KQ1C

4

24.JAN.2018 10.AUG.2017 09.AUG.2017 19.JUN.2017 01.SEP.2016

D

Project No.:

Scale :

CHECKED :

Plot Date:

APPROVED :

008006400 Sheet Size : Rev. :

A3

04

K.H.SONG

S.Y.JANG

01.SEP.2016

C.Y.HONG

F

1

2

3

4

5

6

7

8

A

/57.D1

/57.B1

/28.D5

/28.E5

/28.D5

/28.E4

/28.D4

/28.D2

/28.D2

Project

-X1C

1

2

3

4

5

6

7

8

9

-W2

1

2

3

4

5

6

7

8

9

-J1

1

2

3

4

5

6

7

8

9

-XH

21

15

-W4

1

2

-JA

1

2

A

-Q1

-J1

c c

-DS2

c

-LSA

a d

-LSB d

-DS2

OPERATION

1

d

1

B

2

-M

a

a

-DS1

Reference DWG

DC220V, 350W

a

DATE

NO. DWG

REV.

d

B

M1

2

DC220V, 6.2W, 9200 Ohm

-DS1 b

-PS

-ILM

c

1

M

-HT 2

M01

-LSA -LSB b

b

b

EMPLOYER / DEVELOPER

-W1

D

-Q1

-J2

3

5

7

9

11

13

15

17

19

21

23

1

3

5

7

9

11

13

15

17

19

21

23

1

3

5

7

9

11

13

15

17

19

21

23

A1

A2

A3

A4

A5

B1

B2

B3

B4

B5

B6

A01

A02

A03

A04

A05

B01

B02

B03

B04

B05

B06

2

4

6

8

10

12

14

16

18

20

22

-X1 -W3

INTERLOCK WITH Q11

INTERLOCK WITH Q51, Q52

/47.B3

PROJECT MANAGER.

=D03/67.B3

INTERLOCK WITH Q2

/46.B4

/45.B3

INTERLOCK WITH Q0 CLOSE (LOCAL)

COUPLING INTERLOCK

=D03/70.B1

/44.B1

1

25

27

29

31

33

35

37

39

41

43

45

47

1

3

5

7

9

11

13

15

17

19

21

23

1

3

5

7

9

11

13

15

17

19

21

23

A1

A2

A3

A4

A5

A6

A01

A02

A03

A04

A05

A06

B01

B02

B03

B04

B05

B06

2

4

6

8

10

12

14

16

18

20

22

24

SUPERVISION CONSULTANT

D

-Q1

-J3

Wc1

-S1 -J2

INTERLOCK WITH /46.B6 Q2

DS/ES INCOMPLETE CONDITION

INTERLOCK WITH Q15

=D03/66.C4

LATCHED RELAY FOR MULTIPLY

/41.B2

/67.E2 REMOTE

/54.B4

/67.B5 REMOTE

OPEN/CLOSE INDICATION

LATCHED RELAY FOR MULTIPLY

/41.B2

/67.E1 REMOTE

OPEN/CLOSE INDICATION

/54.B3

-X1

/67.B4 REMOTE

INTERLOCK WITH Q0 CLOSE (REMOTE)

C

/45.B5

C

B1

B2

B3

B4

B5

B6

-S2 Wc01 24

-J3

04 03 02 01 00

REV.

24.JAN.2018 10.AUG.2017 09.AUG.2017 19.JUN.2017 01.SEP.2016

DATE

REVISED AS PER COMMENT REVISED AS PER COMMENT REVISED AS PER COMMENT REVISED AS PER COMMENT FOR APPROVAL

ISSUED TO / FOR :

CONTRACTOR: CONSORTIUM( KN / HHI ) -W1

-X1

E

2

4

6

8

10

12

14

16

18

20

22

24

2

4

6

8

10

12

14

16

18

20

22

24

-W3

-X1

2

4

6

8

10

12

14

16

18

20

22

24

26

28

30

32

34

36

38

40

42

44

46

48

E

-X1

49

51

L13 L11

L14 L12

53

55

L9 L7

L10 L8

L5

L6

57

59

61

R8 R10 R7 R9

63

R12 R14 R11 R13

1000, Bangeojinsinhawn-doro, Dong-gu, Ulsan, Korea

-KQ1 /41.E2

L3

L4

R6

R5

R4

R3

DRAWING TITLE:

BUS DS(-Q1) MECHANISM -X1

50

52

54

56

58

60

62

64 Drawing Number :

F

PREPARED :

PK55-SD-EL-GS-14 ACTION MANUFACTURER/VENDER NAME

A B C DRAWING NUMBER

16316 01 EC

SHEET NO.

29

OF

92

REV NO.

04

D

Project No.:

Scale :

CHECKED :

Plot Date:

APPROVED :

008006400 Sheet Size : Rev. :

A3

04

K.H.SONG

S.Y.JANG

01.SEP.2016

C.Y.HONG

F

1

2

3

4

5

6

7

8

Project

BUS DS (BB-2) CLOSE A

BUS DS (BB-2) OPEN

MANUAL OPERATION

BUS DS (BB-2) MOTOR OPERATION A

+CRP

-XR1 REMOTE_F2

/ 28.A6 / 28.B6 / 28.B6

-XR1

29

-XR1

30

31

REMOTE_F2

(+)220V_F2

(+)220V_F2

LOCAL_F2

LOCAL_F2

/ 32.A1 / 32.B1 / 32.B1 Reference DWG

2T1

B 3

-KQ2T

1

-SQ2

/30.C2

-SQ2

CLOSE

OPEN

4

/73.D3

2

/30.C2

1L1

14

B

1L1 3L2

-KQ2T /30.C2

REV.

-KQ2C

3L2

/73.D3

DATE

NO. DWG

2T1

-KQ2C /30.C2

4T2

4T2

14

-KQ2C

-KQ2T

/30.C2

/30.C2

13

13 EMPLOYER / DEVELOPER

C

C 21 A1

A1

-KQ2C CLOSE

-KQ2C

-KQ2T OPEN

A2

/30.C2 A2

22 22

PROJECT MANAGER.

-KQ2T /30.C2

-Q2

-X2C

1

-X2C

2

-X2C

3

-J1

1

-J1

2

-J1

3

1 c

c

-LSA D

-J1

5

-Q2

2 a

-LSA

7

M1 a

d

a

b

-J1

21 7

SUPERVISION CONSULTANT

-DS2

d

-DS1

5

c

-ILM

-LSB d

-X2C

-M

a b

-DS2

D b

-LSB b

M M01

OPERATION

2

1

04 03 02 01 00

-PS -J1 -X2C

44

-KL2

E

/46.E6

43

/30.C2

4

-X2C

44

-KQ2T 43

-J1

/30.C2

6

/30.C2

2T1 4T2 5L3 14 21 31 44 53 6L3

F

1L1 3L2 6T3 13 22 32 43 54 5T3

/30.B5 /30.B5 /30.C1 /30.C5 /30.E3 /43.B3 /30.E5

2T1 4T2 6T3 14 22 31 44 53

1L1 3L2 5L3 13 21 32 43 54

5T3

/30.C2

E

5L3

/ 32.E1

/30.B4 /30.B4 /30.E6 /30.C3 /30.C5

1000, Bangeojinsinhawn-doro, Dong-gu, Ulsan, Korea DRAWING TITLE:

BUS DS(-Q2) CONTROL

/30.E4 /43.B3

Drawing Number :

B C

16316 01 EC

30

92

REV NO.

04

PREPARED :

PK55-SD-EL-GS-14 A

OF

ISSUED TO / FOR :

6T3

ACTION

SHEET NO.

DATE

-KQ2T

MANUFACTURER/VENDER NAME

DRAWING NUMBER

REVISED AS PER COMMENT REVISED AS PER COMMENT REVISED AS PER COMMENT REVISED AS PER COMMENT FOR APPROVAL

CONTRACTOR: CONSORTIUM( KN / HHI )

6L3

-KQ2C 43

REV.

6

(-)220V_F2

(-)220V_F2

/ 28.E6

44

-KQ2C

4

24.JAN.2018 10.AUG.2017 09.AUG.2017 19.JUN.2017 01.SEP.2016

D

Project No.:

Scale :

CHECKED :

Plot Date:

APPROVED :

008006400 Sheet Size : Rev. :

A3

04

K.H.SONG

S.Y.JANG

01.SEP.2016

C.Y.HONG

F

1

2

3

4

5

6

7

8

A

/57.D2

/57.B2

/30.D5

/30.E5

/30.D5

/30.E4

/30.D4

/30.D2

/30.D2

Project

-X2C

1

2

3

4

5

6

7

8

9

-W2

1

2

3

4

5

6

7

8

9

-J1

1

2

3

4

5

6

7

8

9

-XH

22

16

-W4

1

2

-JA

1

2

A

-Q2

-J1

c c

c

-LSA

a

-DS2

-LSB

-DS2

OPERATION

d

d

1

d

B

2

a

-M

a

-DS1

d

Reference DWG

M1

2

-ILM DC220V, 6.2W, 9200 Ohm

-DS1 b

-PS

1

c

DC220V, 350W

a

DATE

NO. DWG

REV.

B

1

M

-HT 2

M01

-LSA -LSB

b

b

b

EMPLOYER / DEVELOPER

-W1

D

-Q2

-J2

3

5

7

9

11

13

15

17

19

21

23

1

3

5

7

9

11

13

15

17

19

21

23

1

3

5

7

9

11

13

15

17

19

21

23

A1

A2

A3

A4

A5

B1

B2

B3

B4

B5

B6

A01

A02

A03

A04

A05

B01

B02

B03

B04

B05

B06

2

4

6

8

10

12

14

16

18

20

22

-X2 -W3

INTERLOCK WITH Q12

INTERLOCK WITH Q51, Q52

/47.B3

PROJECT MANAGER.

=D03/67.B5

INTERLOCK WITH Q1

/46.B1

/45.B3

INTERLOCK WITH Q0 CLOSE (LOCAL)

COUPLING INTERLOCK

=D03/70.C1

/46.B3

1

25

27

29

31

33

35

37

39

41

43

45

47

1

3

5

7

9

11

13

15

17

19

21

23

1

3

5

7

9

11

13

15

17

19

21

23

A1

A2

A3

A4

A5

A6

A01

A02

A03

A04

A05

A06

B01

B02

B03

B04

B05

B06

2

4

6

8

10

12

14

16

18

20

22

24

SUPERVISION CONSULTANT

D

-Q2

-J3

Wc1

-S1 -J2

INTERLOCK WITH Q1

DS/ES INCOMPLETE CONDITION

/44.B2

=D03/68.C2

INTERLOCK WITH Q16

LATCHED RELAY FOR MULTIPLY

/41.B4

/67.E3 REMOTE

/54.B4

/67.B6 REMOTE

OPEN/CLOSE INDICATION

LATCHED RELAY FOR MULTIPLY

/41.B3

/67.E2 REMOTE

OPEN/CLOSE INDICATION

/54.B4

-X2

/67.B5 REMOTE

INTERLOCK WITH Q0 CLOSE (REMOTE)

C

/45.B6

C

B1

B2

B3

B4

B5

B6

-S2 Wc01 24

-J3

04 03 02 01 00

REV.

24.JAN.2018 10.AUG.2017 09.AUG.2017 19.JUN.2017 01.SEP.2016

DATE

REVISED AS PER COMMENT REVISED AS PER COMMENT REVISED AS PER COMMENT REVISED AS PER COMMENT FOR APPROVAL

ISSUED TO / FOR :

CONTRACTOR: CONSORTIUM( KN / HHI ) -W1

-X2

E

2

4

6

8

10

12

14

16

18

20

22

24

2

4

6

8

10

12

14

16

18

20

22

24

-W3

-X2

2

4

6

8

10

12

14

16

18

20

22

24

26

28

30

32

34

36

38

40

42

44

46

48

E

-X2

49

51

L13 L11

L14 L12

53

55

L9 L7

L10 L8

L5

L6

57

59

61

R8 R10 R7 R9

63

R12 R14 R11 R13

1000, Bangeojinsinhawn-doro, Dong-gu, Ulsan, Korea

-KQ2 /41.E3

L3

L4

R6

R5

R4

R3

DRAWING TITLE:

BUS DS(-Q2) MECHANISM -X2

50

52

54

56

58

60

62

64 Drawing Number :

F

PREPARED :

PK55-SD-EL-GS-14 ACTION MANUFACTURER/VENDER NAME

A B C DRAWING NUMBER

16316 01 EC

SHEET NO.

31

OF

92

REV NO.

04

D

Project No.:

Scale :

CHECKED :

Plot Date:

APPROVED :

008006400 Sheet Size : Rev. :

A3

04

K.H.SONG

S.Y.JANG

01.SEP.2016

C.Y.HONG

F

1

2

3

4

5

6

7

8

Project

LINE DS CLOSE A

LINE DS OPEN

MANUAL OPERATION

LINE DS MOTOR OPERATION A

+CRP

-XR1 REMOTE_F2

/ 30.A6 / 30.B6 / 30.B6

-XR1

32

-XR1

33

34

REMOTE_F2

(+)220V_F2

(+)220V_F2

LOCAL_F2

LOCAL_F2

/ 34.A1 / 34.B1 / 34.B1 Reference DWG

2T1

B

-KQ9T /32.C2

1

3

-SQ9

-SQ9 CLOSE

OPEN

4

/32.C2

1L1

14

B

1L1 3L2

-KQ9T /32.C2

REV.

-KQ9C

3L2

2

/73.E3

/73.E3

DATE

NO. DWG

2T1

-KQ9C /32.C2

4T2

4T2

14

-KQ9C

-KQ9T

/32.C2

/32.C2

13

13 EMPLOYER / DEVELOPER

C

C 21 A1

A1

-KQ9C CLOSE

-KQ9C

-KQ9T OPEN

A2

/32.C2 A2

22 22

PROJECT MANAGER.

-KQ9T /32.C2

-Q9

-X9C

1

-X9C

2

-X9C

3

-J1

1

-J1

2

-J1

3

1 c

c

-LSA D

2

-LSA b

5

-J1

21 7 7 SUPERVISION CONSULTANT

M1 a

d

a

-DS1

-J1

-Q9

-DS2

d a

5

c

-ILM

-LSB d

-X9C

-M

a b

-DS2

D b

-LSB b

M M01

OPERATION

2

1

04 03 02 01 00

-PS -J1 -X9C

44

-KL9

E

/47.E2

43

/32.C2

4

-X9C

44

-KQ9T 43

-J1

/32.C2

6

/32.C2

2T1 4T2 6T3 14 21 31 44 53

F

1L1 3L2 5L3 13 22 32 43 54

/32.B5 /32.B5 /32.E5 /32.C1 /32.C5 /32.E3 /43.B4

2T1 4T2 6T3 14 22 31 44 53

1L1 3L2 5L3 13 21 32 43 54

5L3

/32.C2

E

5L3

/ 34.E1

/32.B4 /32.B4 /32.E6 /32.C3 /32.C5

1000, Bangeojinsinhawn-doro, Dong-gu, Ulsan, Korea DRAWING TITLE:

LINE DS(-Q9) CONTROL

/32.E4 /43.B4

Drawing Number :

B C

16316 01 EC

32

92

REV NO.

04

PREPARED :

PK55-SD-EL-GS-14 A

OF

ISSUED TO / FOR :

6T3

ACTION

SHEET NO.

DATE

-KQ9T

MANUFACTURER/VENDER NAME

DRAWING NUMBER

REVISED AS PER COMMENT REVISED AS PER COMMENT REVISED AS PER COMMENT REVISED AS PER COMMENT FOR APPROVAL

CONTRACTOR: CONSORTIUM( KN / HHI )

6T3

-KQ9C 43

REV.

6

(-)220V_F2

(-)220V_F2

/ 30.E6

44

-KQ9C

4

24.JAN.2018 10.AUG.2017 09.AUG.2017 19.JUN.2017 01.SEP.2016

D

Project No.:

Scale :

CHECKED :

Plot Date:

APPROVED :

008006400 Sheet Size : Rev. :

A3

04

K.H.SONG

S.Y.JANG

01.SEP.2016

C.Y.HONG

F

1

2

3

4

5

6

7

8

-X9C

A

1

2

3

4

5

6

/57.D2

/57.B2

/32.D5

/32.E5

/32.D5

/32.E4

/32.D4

/32.D2

/32.D2

Project

7

8

9

8

9

8

9

-W2

1

2

3

4

5

6

7

-J1

1

2

3

4

5

6

7

-XH

23

17

-W4

1

2

-JA

1

2

A

-Q9

-J1

c c

-DS2

c

-LSA

a

-LSB d

d

OPERATION

1

d

B

DC220V, 6.2W, 9200 Ohm

2

a

-M

a

-DS1

d

Reference DWG

M1

2

-ILM

-DS1 b

-PS

1

c

-DS2

DC220V, 350W

a

DATE

NO. DWG

REV.

B

1

M

-HT 2

M01

-LSA -LSB

b

b

b

1

3

5

7

9

11

13

15

17

19

21

23

1

3

5

7

9

11

13

15

17

19

21

23

-X9 -W3

INTERLOCK WITH Q8

INTERLOCK WITH Q51, Q52

/47.B4

/47.C3

/45.C3

INTERLOCK WITH Q0 CLOSE (LOCAL)

DS/ES INCOMPLETE CONDITION

/44.B2

LATCHED RELAY FOR MULTIPLY

/41.B5

/54.B5

/67.D2 REMOTE

OPEN/CLOSE INDICATION

LATCHED RELAY FOR MULTIPLY

/41.B5

OPEN/CLOSE INDICATION

/54.B5

-X9 -W1

/67.D1 REMOTE

INTERLOCK WITH Q0 CLOSE (REMOTE)

C

/45.B5

EMPLOYER / DEVELOPER

C

PROJECT MANAGER.

25

27

29

31

33

35

37

39

41

43

45

47

1

3

5

7

9

11

13

15

17

19

21

23

SUPERVISION CONSULTANT -Q9

-J2

D

1

3

5

7

9

11

17

13

15

19

21

23

A1

A2

A3

A4

A5

B1

B2

B3

B4

B5

B6

Wc1

A01

A02

A03

A04

A05

B01

B02

B03

B04

B05

B06

Wc01

2

4

6

8

10

12

18

14

16

20

22

24

2

4

6

8

10

12

14

16

18

20

22

24

-S1

-Q9

-J3

1

3

5

7

9

11

13

15

17

19

21

23

A1

A2

A3

A4

A5

A6

B1

B2

B3

B4

B5

B6

A01

A02

A03

A04

A05

A06

B01

B02

B03

B04

B05

B06

2

4

6

8

10

12

14

16

18

20

22

24

2

4

6

8

10

12

14

16

18

20

22

24

D

-S2

-J2 -W1

-J3 -W3

04 03 02 01 00

REV.

24.JAN.2018 10.AUG.2017 09.AUG.2017 19.JUN.2017 01.SEP.2016

DATE

REVISED AS PER COMMENT REVISED AS PER COMMENT REVISED AS PER COMMENT REVISED AS PER COMMENT FOR APPROVAL

ISSUED TO / FOR :

CONTRACTOR: CONSORTIUM( KN / HHI )

-X9

2

4

6

8

10

12

14

16

18

20

22

24

-X9

26

28

30

32

34

36

38

40

42

44

46

48

E

E

-X9

49

51

L13 L11

L14 L12

53

55

L9 L7

L10 L8

L5

L6

57

59

61

R8 R10 R7 R9

63

R12 R14 R11 R13

-KQ9 /41.E5

L3

L4

R6

R5

R4

1000, Bangeojinsinhawn-doro, Dong-gu, Ulsan, Korea

R3

DRAWING TITLE:

-X9

50

52

54

56

58

60

62

LINE DS(-Q9) MECHANISM

64

Drawing Number :

F

PREPARED :

PK55-SD-EL-GS-14 ACTION MANUFACTURER/VENDER NAME

A B C DRAWING NUMBER

16316 01 EC

SHEET NO.

33

OF

92

REV NO.

04

D

Project No.:

Scale :

CHECKED :

Plot Date:

APPROVED :

008006400 Sheet Size : Rev. :

A3

04

K.H.SONG

S.Y.JANG

01.SEP.2016

C.Y.HONG

F

1

2

3

4

5

6

7

8

Project

WORK ES CLOSE A

WORK ES OPEN

MANUAL OPERATION

WORK ES MOTOR OPERATION A

+CRP

-XR1 REMOTE_F2

/ 32.A6 / 32.B6 / 32.B6

-XR1

35

-XR1

36

37

REMOTE_F2

(+)220V_F2

(+)220V_F2

LOCAL_F2

LOCAL_F2

/ 36.A1 / 36.B1 / 36.B1 Reference DWG

2T1

B

-KQ51T /34.C2

1

3

-SQ51

-SQ51 CLOSE

OPEN

4

/34.C2

1L1

-KQ51T /34.C2

14

REV.

B

-KQ51C 1L1

3L2

2

/74.B3

/74.B3

DATE

NO. DWG

2T1

3L2

-KQ51C /34.C2

4T2

4T2

14

-KQ51C

-KQ51T

/34.C2

/34.C2

13

13 EMPLOYER / DEVELOPER

C

C 21 A1

A1

-KQ51C CLOSE

-KQ51C

-KQ51T OPEN

A2

/34.C2 A2

22 22

PROJECT MANAGER.

-KQ51T /34.C2

-X51C

1

-X51C

2

-J1

1

-J1

2

-Q51

c

-LSB d

D

3

1

-J1

3

2

-DS2

-ILM

c

-LSA

-X51C

-X51C

5

-J1

5

-Q51

7

c

SUPERVISION CONSULTANT

M1 a

d

d a

a

-DS1

-J1

21 7

-LSA b

-M

a b

-DS2

D b

-LSB b

M M01

OPERATION

2

1

04 03 02 01 00

-PS -J1 -X51C

44

-KL51

E

/47.E3

43

/34.C2

4

-X51C

44

-KQ51T 43

-J1

/34.C2

6

/34.C2

2T1 4T2 6T3 14 21 31 44 53

F

1L1 3L2 5L3 13 22 32 43 54

/34.B5 /34.B5 /34.E5 /34.C1 /34.C5 /34.E3 /43.B4

2T1 4T2 6T3 14 22 31 44 53

1L1 3L2 5L3 13 21 32 43 54

6T3

5L3

/34.C2

E

5L3

/34.B4 /34.B4 /34.E6 /34.C3 /34.C5

DRAWING TITLE:

WORK ES(-Q51) CONTROL

/34.E4 /43.B5

Drawing Number :

B C

16316 01 EC

34

92

REV NO.

04

PREPARED :

PK55-SD-EL-GS-14 A

OF

/ 36.E1

1000, Bangeojinsinhawn-doro, Dong-gu, Ulsan, Korea

ACTION

SHEET NO.

ISSUED TO / FOR :

-KQ51T

MANUFACTURER/VENDER NAME

DRAWING NUMBER

DATE

REVISED AS PER COMMENT REVISED AS PER COMMENT REVISED AS PER COMMENT REVISED AS PER COMMENT FOR APPROVAL

CONTRACTOR: CONSORTIUM( KN / HHI )

6T3

-KQ51C 43

REV.

6

(-)220V_F2

(-)220V_F2

/ 32.E6

44

-KQ51C

4

24.JAN.2018 10.AUG.2017 09.AUG.2017 19.JUN.2017 01.SEP.2016

D

Project No.:

Scale :

CHECKED :

Plot Date:

APPROVED :

008006400 Sheet Size : Rev. :

A3

04

K.H.SONG

S.Y.JANG

01.SEP.2016

C.Y.HONG

F

1

2

3

4

5

6

7

8

-X51C

1

2

3

4

5

6

7

8

9

-W2

1

2

3

4

5

6

7

8

9

-J1

1

2

3

4

5

6

7

8

9

-Q51

-J1

-XH

A

/57.D3

/57.B3

/34.D5

/34.E5

/34.D5

/34.E4

/34.D4

/34.D2

A

/34.D2

Project

24

18

-W4

1

2

-JA

1

2

c Reference DWG

-DS2 c

B

c

-LSA

a

d

-LSB

-DS2

OPERATION

d

1

-ILM 2

-M

a

a

B

d

M1

2

DC220V, 6.2W, 9200 Ohm

-DS1

b

-PS

DC220V, 350W

a

REV.

-DS1

1

d

DATE

NO. DWG

c

1

M

-HT 2

M01

-LSA -LSB

b

b

b EMPLOYER / DEVELOPER

-W1

D

-Q51

-J2

3

5

7

9

11

13

15

17

19

21

23

1

3

5

7

9

11

13

15

17

19

21

23

1

3

5

7

9

11

13

15

17

19

21

23

A1

A2

A3

A4

A5

B2

B3

B4

B5

B6

-X51 -W3

-Q51

-J3

Wc1

-S1

INTERLOCK WITH Q1

INTERLOCK WITH Q2

INTERLOCK WITH Q9

/46.D1

/46.D4

/47.B2

/45.C4

1

B1

INTERLOCK WITH Q0 CLOSE (LOCAL)

DS/ES INCOMPLETE CONDITION

/44.B3

LATCHED RELAY FOR MULTIPLY

/42.B2

/67.D3 REMOTE

OPEN/CLOSE INDICATION

/54.B6

/42.B2

/67.D2 REMOTE

/54.B6

-X51

LATCHED RELAY FOR MULTIPLY

C

OPEN/CLOSE INDICATION

C

PROJECT MANAGER.

SUPERVISION CONSULTANT

25

27

29

31

33

35

37

39

41

43

45

47

1

3

5

7

9

11

13

15

17

19

21

23

1

3

5

7

9

11

13

15

17

19

21

23

A1

A2

A3

A4

A5

A6

B1

B2

B3

B4

B5

B6

A01

A02

A03

A04

A05

A06

B01

B02

B03

B04

B05

B06

D

04 03 02 01 00

-S2 A01

-J2 -W1

A02

A03

A04

A05

B01

B02

B03

B04

B05

B06

Wc01

2

4

6

8

10

12

14

16

18

20

22

24

2

4

6

8

10

12

14

16

18

20

22

24

2

4

6

8

10

12

14

16

18

20

22

24

-J3 -W3

REV.

2

4

6

8

10

12

14

16

18

20

22

24

2

4

6

8

10

12

14

16

18

20

22

24

26

28

30

32

34

36

38

40

42

44

46

48

24.JAN.2018 10.AUG.2017 09.AUG.2017 19.JUN.2017 01.SEP.2016

DATE

REVISED AS PER COMMENT REVISED AS PER COMMENT REVISED AS PER COMMENT REVISED AS PER COMMENT FOR APPROVAL

ISSUED TO / FOR :

CONTRACTOR: CONSORTIUM( KN / HHI )

E

-X51

-X51

49

51

L13 L11

L14 L12

53

L9 L7

55

L10 L8

57

59

61

R8 R10 R7 R9

-X51

E

63

1000, Bangeojinsinhawn-doro, Dong-gu, Ulsan, Korea

R12 R14 R11 R13

DRAWING TITLE:

-KQ51 /42.E2

L3

L4

L5

L6

R6

R5

R4

WORK ES(-Q51) MECHANISM

R3

Drawing Number :

F

-X51

50

52

54

56

58

60

62

ACTION MANUFACTURER/VENDER NAME

A B C DRAWING NUMBER

16316 01 EC

SHEET NO.

35

OF

92

REV NO.

04

PREPARED :

PK55-SD-EL-GS-14

64

D

Project No.:

Scale :

CHECKED :

Plot Date:

APPROVED :

008006400 Sheet Size : Rev. :

A3

04

K.H.SONG

S.Y.JANG

01.SEP.2016

C.Y.HONG

F

1

2

3

4

5

6

7

8

Project

WORK ES CLOSE A

WORK ES OPEN

MANUAL OPERATION

WORK ES MOTOR OPERATION A

+CRP

-XR1 REMOTE_F2

/ 34.A6 / 34.B6 / 34.B6

-XR1

38

-XR1

39

40

REMOTE_F2

(+)220V_F2

(+)220V_F2

LOCAL_F2

LOCAL_F2

/ 38.A1 / 38.B1 / 38.B1 Reference DWG

2T1

B

-KQ52T /36.C2

1

3

-SQ52

-SQ52 CLOSE

OPEN

4

/36.C2

1L1

-KQ52T /36.C2

14

REV.

B

-KQ52C 1L1

3L2

2

/74.C3

/74.C3

DATE

NO. DWG

2T1

3L2

-KQ52C /36.C2

4T2

4T2

14

-KQ52C

-KQ52T

/36.C2

/36.C2

13

13 EMPLOYER / DEVELOPER

C

C 21 A1

A1

-KQ52C CLOSE

-KQ52C

-KQ52T OPEN

A2

/36.C2 A2

22 22

PROJECT MANAGER.

-KQ52T /36.C2

-X52C

1

-X52C

2

-X52C

3

-J1

1

-J1

2

-J1

3

-Q52

c

-LSA

a

-LSA b

5

-J1

21 7 7 SUPERVISION CONSULTANT

M1 a

d

a

-DS1

-J1

-Q52

-DS2 2

d

5

c

-ILM

-LSB d

D

1

c

-X52C

-M

a

-DS2

D b

-LSB b

M M01

OPERATION

b

2

1

04 03 02 01 00

-PS -J1 -X52C

34

-KL51

E

/47.E3

34

/36.C2

4

-X52C

44

-KQ52T 43

-J1

/36.C2

6

/36.C2

2T1 4T2 6T3 14 21 31 44 53

F

1L1 3L2 5L3 13 22 32 43 54

/36.B5 /36.B5 /36.E5 /36.C1 /36.C5 /36.E3 /43.B5

2T1 4T2 6T3 14 22 31 44 53

1L1 3L2 5L3 13 21 32 43 54

6T3

5L3

/36.C2

E

5L3

/36.B4 /36.B4 /36.E6 /36.C3 /36.C5

DRAWING TITLE:

WORK ES(-Q52) CONTROL

/36.E4 /43.B5

Drawing Number :

B C

16316 01 EC

36

92

REV NO.

04

PREPARED :

PK55-SD-EL-GS-14 A

OF

/ 38.E1

1000, Bangeojinsinhawn-doro, Dong-gu, Ulsan, Korea

ACTION

SHEET NO.

ISSUED TO / FOR :

-KQ52T

MANUFACTURER/VENDER NAME

DRAWING NUMBER

DATE

REVISED AS PER COMMENT REVISED AS PER COMMENT REVISED AS PER COMMENT REVISED AS PER COMMENT FOR APPROVAL

CONTRACTOR: CONSORTIUM( KN / HHI )

6T3

-KQ52C 43

REV.

6

(-)220V_F2

(-)220V_F2

/ 34.E6

44

-KQ52C

4

24.JAN.2018 10.AUG.2017 09.AUG.2017 19.JUN.2017 01.SEP.2016

D

Project No.:

Scale :

CHECKED :

Plot Date:

APPROVED :

008006400 Sheet Size : Rev. :

A3

04

K.H.SONG

S.Y.JANG

01.SEP.2016

C.Y.HONG

F

1

2

3

4

5

6

7

8

A

-X52C

1

2

3

4

5

6

7

8

9

-W2

1

2

3

4

5

6

7

8

9

-J1

1

2

3

4

5

6

7

8

9

-Q52

/57.D3

/57.B3

/36.D5

/36.E5

/36.D5

/36.E4

/36.D4

/36.D2

/36.D2

Project

-J1

-XH -W4

-JA

25

19

1

2

1

2

A

c

-DS2 c

c

-LSA

a

d

-LSB d

1

d

1

B

-M a

-DS1

DATE

NO. DWG

REV.

B

2

a

Reference DWG

d

M1

2

DC220V, 6.2W, 9200 Ohm

-DS1 b

-PS

-ILM

c

-DS2

OPERATION

DC220V, 350W

a

1

M

-HT 2

M01

-LSA -LSB

b

b

b

EMPLOYER / DEVELOPER

-W1

D

-Q52

-J2

3

5

7

9

11

13

15

17

19

21

23

1

3

5

7

9

11

13

15

17

19

21

23

1

3

5

7

9

11

13

15

17

19

21

23

A1

A2

A3

A4

A5

B2

B3

B4

B5

B6

-X52 -W3

-Q52

-J3

Wc1

-S1

INTERLOCK WITH Q1

INTERLOCK WITH Q2

INTERLOCK WITH Q9

/46.D1

/46.D4

/47.B2

/45.C4

1

B1

INTERLOCK WITH Q0 CLOSE (LOCAL)

DS/ES INCOMPLETE CONDITION

/44.B3

LATCHED RELAY FOR MULTIPLY

/42.B4

/67.D4 REMOTE

OPEN/CLOSE INDICATION

/55.B2

/42.B3

/67.D3 REMOTE

/55.B2

-X52

LATCHED RELAY FOR MULTIPLY

C

OPEN/CLOSE INDICATION

C

PROJECT MANAGER.

25

27

29

31

33

35

37

39

41

43

45

47

1

3

5

7

9

11

13

15

17

19

21

23

1

3

5

7

9

11

13

15

17

19

21

23

A1

A2

A3

A4

A5

A6

B1

B2

B3

B4

B5

B6

A01

A02

A03

A04

A05

A06

B01

B02

B03

B04

B05

B06

2

4

6

8

10

12

14

16

18

20

22

24

2

4

6

8

10

12

14

16

18

20

22

24

26

28

30

32

34

36

38

40

42

44

46

48

SUPERVISION CONSULTANT

D

-S2

-J2

A01

A02

A03

A04

A05

B01

B02

B03

B04

B05

B06

2

4

6

8

10

12

14

16

18

20

22

24

2

4

6

8

10

12

14

16

18

20

22

24

2

4

6

8

10

12

14

16

18

20

22

24

Wc01

-J3

04 03 02 01 00

REV. -W1

-X52

-W3

-X52

24.JAN.2018 10.AUG.2017 09.AUG.2017 19.JUN.2017 01.SEP.2016

DATE

REVISED AS PER COMMENT REVISED AS PER COMMENT REVISED AS PER COMMENT REVISED AS PER COMMENT FOR APPROVAL

ISSUED TO / FOR :

CONTRACTOR: CONSORTIUM( KN / HHI )

E

E

-X52

49

51

L13 L11

L14 L12

53

55

L9 L7

L10 L8

L5

L6

57

59

61

R8 R10 R7 R9

63

1000, Bangeojinsinhawn-doro, Dong-gu, Ulsan, Korea

R12 R14 R11 R13

-KQ52 /42.E3

-X52

F

DRAWING TITLE:

L3

L4

50

52

54

56

R6

58

R5

60

R4

62

R3

WORK ES(-Q52) MECHANISM Drawing Number :

64 ACTION

MANUFACTURER/VENDER NAME

A B C DRAWING NUMBER

16316 01 EC

SHEET NO.

37

OF

92

REV NO.

04

PREPARED :

PK55-SD-EL-GS-14

D

Project No.:

Scale :

CHECKED :

Plot Date:

APPROVED :

008006400 Sheet Size : Rev. :

A3

04

K.H.SONG

S.Y.JANG

01.SEP.2016

C.Y.HONG

F

1

2

3

4

5

6

7

8

Project

LINE ES CLOSE

LINE ES OPEN

MANUAL OPERATION

LINE ES MOTOR OPERATION

+CRP

A

A

-XR1

-XR1

41

-XR1

42

43

REMOTE_F2

/ 36.A6

(+)220V_F2

(+)220V_F2

/ 36.B6

/ 40.A1

LOCAL_F2

/ 36.B6

Reference DWG

DATE

NO. DWG

REV.

B

B 1

3

-SQ8

-SQ8 CLOSE

2T1

OPEN

4

-KQ8C

2

/74.D3

/74.D3

/38.C2

6T3

2T1

-KQ8T 1L1

/38.C2

1L1

6T3

-KQ8C

-KQ8T

/38.C2

/38.C2

5L3

5L3 EMPLOYER / DEVELOPER

C

C A1

A1

-KQ8C CLOSE

-X8C

-KQ8T OPEN

A2

-X8C

1

A2

PROJECT MANAGER.

-X8C

2

-X8C

3

-J1

-Q8

-J1 1 B1

2 A5

3 c

5 SUPERVISION CONSULTANT

-DS2

-S1 B01

D

M1

A05

d

a

1

-DS1

2

44

-KL8 /47.E4

-J1

4

-X8C

4

14 /38.C2

04 03 02 01 00

1

-KQ8C 43

D

M M01

OPERATION

2

E

-M

-PS

-ILM b

6

-X8C

6

14

-KQ8T 13

-J1

/38.C2

REV.

4T2

-KQ8C 13

/38.C2

2T1 4T2 6T3 14 21 31 43 53

F

1L1 3L2 5L3 13 22 32 44 54

/38.B5 /38.E5 /38.C1 /38.E4

/43.B3

2T1 4T2 6T3 14 21 31 43 53

1L1 3L2 5L3 13 22 32 44 54

3L2

/38.C2

E

/38.B5 /38.E5 /38.C3 /38.E4

DRAWING TITLE:

LINE ES(-Q8) CONTROL Drawing Number :

/43.B3

38

92

04

PREPARED :

PK55-SD-EL-GS-14

C

16316 01 EC

/ 40.E1

1000, Bangeojinsinhawn-doro, Dong-gu, Ulsan, Korea

B REV NO.

ISSUED TO / FOR :

3L2

A

OF

DATE

4T2

ACTION

SHEET NO.

REVISED AS PER COMMENT REVISED AS PER COMMENT REVISED AS PER COMMENT REVISED AS PER COMMENT FOR APPROVAL

-KQ8T

MANUFACTURER/VENDER NAME

DRAWING NUMBER

24.JAN.2018 10.AUG.2017 09.AUG.2017 19.JUN.2017 01.SEP.2016

CONTRACTOR: CONSORTIUM( KN / HHI )

(-)220V_F2

(-)220V_F2

/ 36.E6

5

D

Project No.:

Scale :

CHECKED :

Plot Date:

APPROVED :

008006400 Sheet Size : Rev. :

A3

04

K.H.SONG

S.Y.JANG

01.SEP.2016

C.Y.HONG

F

1

2

3

4

5

6

7

8

-X8C

1

2

3

4

5

6

7

8

-W1

1

2

3

4

5

6

23

24

-J1

1

2

3

4

5

6

23

24

B1

A5

-Q8

B

B01

-J1

c 1

d

-W3

1

2

-JA

1

2

OPERATION

DATE

NO. DWG

REV.

B 1

2

M

-M DC220V, 210W

1

Reference DWG

d

M1

-PS

a

20

-DS1

OPERATION

A05

-XH

A

26

c

-DS2

-S1

/57.D4

/57.B4

/38.E5

/38.C5

/38.E4

/38.C3

A

/38.C2

/38.C2

Project

-HT 2

M01

-ILM

-DS1 b

DC220V, 5.94W, 9200 Ohm

2

EMPLOYER / DEVELOPER

INTERLOCK WITH Q9

PROJECT MANAGER.

/47.C2

LATCHED RELAY FOR MULTIPLY

/42.B5

OPEN/CLOSE INDICATION

/55.B3

/67.D5 REMOTE

LATCHED RELAY FOR MULTIPLY

/67.D4 REMOTE

/55.B3

/42.B5

C

OPEN/CLOSE INDICATION

C

-X8

1

3

5

7

9

11

13

15

-X8

17

19

21

23

25

27

29

31

33

35

37

39

-W1

7

9

11

13

15

17

19

21

-W2

1

3

5

7

9

11

13

15

17

19

21

23

SUPERVISION CONSULTANT

D

D -Q8

-J1

7

9

11

13

15

17

19

21

A1

A2

A3

A4

B2

B3

B4

B5

A01

A02

A03

A04

B02

B03

B04

B05

8

10

12

14

16

18

20

22

-W1

8

10

12

14

16

18

20

22

-X8

2

4

6

8

10

12

14

16

-S1

-Q8

-J2

1

3

5

7

9

11

13

15

17

19

21

23

A1

A2

A3

A4

A5

A6

B1

B2

B3

B4

B5

B6

A01

A02

A03

A04

A05

A06

B01

B02

B03

B04

B05

B06

2

4

6

8

10

12

14

16

18

20

22

24

-W2

2

4

6

8

10

12

14

16

18

20

22

24

-X8

18

20

22

24

26

28

30

32

34

36

38

40

04 03 02 01 00

-S2

REV.

-J1

-J2

24.JAN.2018 10.AUG.2017 09.AUG.2017 19.JUN.2017 01.SEP.2016

DATE

REVISED AS PER COMMENT REVISED AS PER COMMENT REVISED AS PER COMMENT REVISED AS PER COMMENT FOR APPROVAL

ISSUED TO / FOR :

CONTRACTOR: CONSORTIUM( KN / HHI )

E

-X8

41

43

L13 L11

L14 L12

45

47

L9 L7

L10 L8

L5

L6

49

51

53

R8 R10 R7 R9

E

55

1000, Bangeojinsinhawn-doro, Dong-gu, Ulsan, Korea

R12 R14 R11 R13

-KQ8

DRAWING TITLE:

/42.E5

L3

-X8

F

42

L4

44

46

48

R6

50

R5

52

R4

54

R3

LINE ES(-Q8) MECHANISM Drawing Number :

56 ACTION

MANUFACTURER/VENDER NAME

A B C DRAWING NUMBER

16316 01 EC

SHEET NO.

39

OF

92

REV NO.

04

PREPARED :

PK55-SD-EL-GS-14

D

Project No.:

Scale :

CHECKED :

Plot Date:

APPROVED :

008006400 Sheet Size : Rev. :

A3

04

K.H.SONG

S.Y.JANG

01.SEP.2016

C.Y.HONG

F

1

2

3

4

5

6

7

8

Project

A

A

/ 38.B6

(+)220V_F2

(+)220V_F2

/ 41.A1

Reference DWG

-X0 -Q0(A)-J3

B

73 3

DATE

NO. DWG

REV.

105

-J3

A3

B

19 B3

-S2 A03

-J3 -X0 -Q0(B)-J3

4

B03

-J3

74 3

20 106

-J3

A3

19 B3

-S2 A03

-J3 -X0 -Q0(C)-J3

C

4

B03

-J3

75 3

EMPLOYER / DEVELOPER

20

C

107

-J3

A3

19 B3

-S2 A03

-J3 -X0

4 76

B03

-J3

PROJECT MANAGER.

20 108

SUPERVISION CONSULTANT

D

D

04 03 02 01 00

REV.

L1

R1

L2

R2

-KQ0

L1

R1

L2

R2

24.JAN.2018 10.AUG.2017 09.AUG.2017 19.JUN.2017 01.SEP.2016

DATE

REVISED AS PER COMMENT REVISED AS PER COMMENT REVISED AS PER COMMENT REVISED AS PER COMMENT FOR APPROVAL

ISSUED TO / FOR :

CONTRACTOR: CONSORTIUM( KN / HHI )

-KQ0.1

CB -Q0 MULTIPLY

CB -Q0 MULTIPLY

E

E / 38.E6

(-)220V_F2

(-)220V_F2 L11 L13 L12 L14 L7 L9 L8 L10 R10 R8 R9 R7 R14 R12 R13 R11

F MANUFACTURER/VENDER NAME

DRAWING NUMBER

16316 01 EC

SHEET NO.

40

OF

92

REV NO.

04

L3 /27.F2 L4 /27.F2 L5 /27.F2 L6 /27.F3 R6 /27.F3 R5 /27.F3 R4 /27.F3 R3 /27.F3

L11 L13 L12 L14 L7 L9 L8 L10 R10 R8 R9 R7 R14 R12 R13 R11

/ 41.E1

L3 /27.F4 L4 /27.F4 L5 /27.F4

1000, Bangeojinsinhawn-doro, Dong-gu, Ulsan, Korea DRAWING TITLE:

L6 /27.F5

MULTIPLY CONTACT

R6 /27.F5 R5 /27.F5 R4 /27.F5 R3 /27.F5

Drawing Number :

PREPARED :

PK55-SD-EL-GS-14 ACTION A B C D

Project No.:

Scale :

CHECKED :

Plot Date:

APPROVED :

008006400 Sheet Size : Rev. :

A3

04

K.H.SONG

S.Y.JANG

01.SEP.2016

C.Y.HONG

F

1

2

3

4

5

6

7

8

Project

A

A

/ 40.A6

(+)220V_F2

(+)220V_F2

-X1

9

-X2

19

9

19

-X9

7

-J2

7

/ 42.A1

17 Reference DWG

9

-Q1

B

-J2

19

A5

B5

A05

19

A5

B5

B05

A05

B05

20

10

-S1

-Q9

-S1

10

-X1

-J2

9

-Q2

-J2

10

-X2

20

-J2

DATE

NO. DWG

REV.

15

A4

B4

A04

B04

B

-S1 -J2

10

-J2

20

-X9

20

8

-J2

8

16 18

EMPLOYER / DEVELOPER

C

C

PROJECT MANAGER.

SUPERVISION CONSULTANT

D

D

04 03 02 01 00

L1

R1

-KQ1

/ 40.E6

R1

-KQ2

BUS DS -Q1 MULTIPLY

E

L1

L2

R2

L1

REV.

R1

L2

R2

LINE DS -Q9 MULTIPLY

L2

(-)220V_F2

F MANUFACTURER/VENDER NAME

L3 /29.F1 L4 /29.F1 L5 /29.F2 L6 /29.F2 R6 /29.F2 R5 /29.F2 R4 /29.F2 R3 /29.F3

L11 L13 L12 L14 L7 L9 L8 L10 R10 R8 R9 R7 R14 R12 R13 R11

L3 /31.F1 L4 /31.F1 L5 /31.F2 L6 /31.F2 R6 /31.F2 R5 /31.F2 R4 /31.F2 R3 /31.F3

L11 L13 L12 L14 L7 L9 L8 L10 R10 R8 R9 R7 R14 R12 R13 R11

L4 /33.F1 L5 /33.F2

1000, Bangeojinsinhawn-doro, Dong-gu, Ulsan, Korea

L6 /33.F2

DRAWING TITLE:

R6 /33.F2

MULTIPLY CONTACT

R5 /33.F2 Drawing Number :

R4 /33.F2 R3 /33.F3

16316 01 EC

41

OF

92

REV NO.

04

PREPARED :

PK55-SD-EL-GS-14 ACTION A

C SHEET NO.

E / 42.E1

L3 /33.F1

B DRAWING NUMBER

ISSUED TO / FOR :

R2

(-)220V_F2 L11 L13 L12 L14 L7 L9 L8 L10 R10 R8 R9 R7 R14 R12 R13 R11

DATE

REVISED AS PER COMMENT REVISED AS PER COMMENT REVISED AS PER COMMENT REVISED AS PER COMMENT FOR APPROVAL

CONTRACTOR: CONSORTIUM( KN / HHI )

-KQ9

BUS DS -Q2 MULTIPLY

24.JAN.2018 10.AUG.2017 09.AUG.2017 19.JUN.2017 01.SEP.2016

D

Project No.:

Scale :

CHECKED :

Plot Date:

APPROVED :

008006400 Sheet Size : Rev. :

A3

04

K.H.SONG

S.Y.JANG

01.SEP.2016

C.Y.HONG

F

1

2

3

4

5

6

7

8

Project

A

A

/ 41.A6

(+)220V_F2

(+)220V_F2

B

-X51

7

-X51

17

-X52

7

-X52

17

-X8

7

-X8

13

-Q51-J2

7

-J2

17

-Q52-J2

7

-J2

17

-J1

13

-J1

19

A4

B4

A04

B04

-S1 -J2 -X51

A4

B4

A04

B04

-Q8

-S1

8 8

-J2 -X51

-J2

18

-X52

18

A4

B4

A04

B04

/ 43.B1

Reference DWG

DATE

NO. DWG

REV.

B

-S1

8 8

-J2 -X52

-J1

18

-X8

18

14 8

-J1 -X8

20 14

EMPLOYER / DEVELOPER

C

C

PROJECT MANAGER.

SUPERVISION CONSULTANT

D

D

L1

R1

-KQ51

/ 41.E6

R1

-KQ52

WORK ES -Q51 MULTIPLY

E

L1

L2

R2

L1

04 03 02 01 00

R1

REV.

-KQ8

WORK ES -Q52 MULTIPLY

L2

R2

LINE ES -Q8 MULTIPLY

L2

F MANUFACTURER/VENDER NAME

L4 /35.F1 L5 /35.F2 L6 /35.F2 R6 /35.F2 R5 /35.F2 R4 /35.F3 R3 /35.F3

L11 L13 L12 L14 L7 L9 L8 L10 R10 R8 R9 R7 R14 R12 R13 R11

L3 /37.F1 L4 /37.F1 L5 /37.F2 L6 /37.F2 R6 /37.F2 R5 /37.F2 R4 /37.F2 R3 /37.F3

L11 L13 L12 L14 L7 L9 L8 L10 R10 R8 R9 R7 R14 R12 R13 R11

L4 /39.F2 L5 /39.F2

1000, Bangeojinsinhawn-doro, Dong-gu, Ulsan, Korea

L6 /39.F2

DRAWING TITLE:

R6 /39.F2

MULTIPLY CONTACT

R5 /39.F2 Drawing Number :

R4 /39.F3 R3 /39.F3

16316 01 EC

42

OF

92

REV NO.

04

PREPARED :

PK55-SD-EL-GS-14 ACTION A

C SHEET NO.

E / 43.E1

L3 /39.F1

B DRAWING NUMBER

ISSUED TO / FOR :

R2

(-)220V_F2 L3 /35.F1

DATE

REVISED AS PER COMMENT REVISED AS PER COMMENT REVISED AS PER COMMENT REVISED AS PER COMMENT FOR APPROVAL

CONTRACTOR: CONSORTIUM( KN / HHI )

(-)220V_F2 L11 L13 L12 L14 L7 L9 L8 L10 R10 R8 R9 R7 R14 R12 R13 R11

24.JAN.2018 10.AUG.2017 09.AUG.2017 19.JUN.2017 01.SEP.2016

D

Project No.:

Scale :

CHECKED :

Plot Date:

APPROVED :

008006400 Sheet Size : Rev. :

A3

04

K.H.SONG

S.Y.JANG

01.SEP.2016

C.Y.HONG

F

1

2

3

4

5

6

7

8

Project

A

A

DOUBLE INTERLOCKING / 42.A6

(+)220V_F2

(+)220V_F2

-XS

3

Reference DWG

=DMP1

B

-XS

3

-K201 /43.E5

-K213

53

53

-KQ1C -KQ1T 14

DATE

NO. DWG

REV.

B

13 13

=DMP1/47.E6

/ 44.B1

/28.C2

53

-KQ2C -KQ2T

54/28.C2

54 /30.C2

54/30.C2

53

53

53

-KQ8C -KQ8T -KQ9C 54 /38.C2

54/38.C2

54/32.C2

53

53

53

53

53

-KQ9T -KQ51C -KQ51T -KQ52C 54 /32.C2

54 /34.C2

54/34.C2

54 /36.C2

53

-KQ52T 54 /36.C2

4

3

-K203T /43.E2

54

1

14

-XS

4

-XS

4 EMPLOYER / DEVELOPER

C

C

43

PROJECT MANAGER.

-K201 /43.E5

44 13

-K202 /43.E2

SUPERVISION CONSULTANT

14

D

=DMP1/47.B1

D

-XS A1

-K202 DOUBLE INTERLOCKING

E

/ 42.E6

(-)220V_F2 13 21 31 43

F

7 DS/ES MOTOR RUNNING TIME EXCEEDED SET:5SEC

14 /43.D2 22 /18.D3 32 44

REV.

5

-K201 /43.E5

2

-XS

8 6

A1

1 /43.B6

6 5

8

DS/ES MOTOR OPERATING

DS/ES MOTOR RUNNING EXCEEDED

A2

E

1 R3 R5 7 13 21 31 43

2 R4 R6 8 14 22 32 44

/21.D1 /43.E5 /43.B2

13 23 33 43

14 /59.B4 24 /18.D3 34 /68.B4 44

DRAWING TITLE:

OPERATING CONDITION Drawing Number :

/43.C2

C

16316 01 EC

43

92

04

PREPARED :

PK55-SD-EL-GS-14 B

REV NO.

/ 44.E1

1000, Bangeojinsinhawn-doro, Dong-gu, Ulsan, Korea

A

OF

ISSUED TO / FOR :

A2

ACTION

SHEET NO.

DATE

-K203

MANUFACTURER/VENDER NAME

DRAWING NUMBER

REVISED AS PER COMMENT REVISED AS PER COMMENT REVISED AS PER COMMENT REVISED AS PER COMMENT FOR APPROVAL

A1

-K201

(-)220V_F2 3 4

24.JAN.2018 10.AUG.2017 09.AUG.2017 19.JUN.2017 01.SEP.2016

CONTRACTOR: CONSORTIUM( KN / HHI )

7

-K203T A2

04 03 02 01 00

D

Project No.:

Scale :

CHECKED :

Plot Date:

APPROVED :

008006400 Sheet Size : Rev. :

A3

04

K.H.SONG

S.Y.JANG

01.SEP.2016

C.Y.HONG

F

1

2

3

4

5

6

7

8

Project

A

A

(+)220V_F2

/ 43.B6

B

(+)220V_F2

-X1

23

-J2

23

-Q1

-Q2

-X2

23

-J2

23

Wc1

-S1 /29.D3

-J2 -X1

-Q9

/31.D3

-J2

24 24

23

-J2

23

Wc1

-X2

-X51

23

-J2

23

-Q51

Wc1

-S1 Wc01

-X9

-S1 -J2

24

-X9

24

/35.D3

Wc01

-J2

24

23

-J2

23

-Q52

Wc1

-S1 /33.D3

Wc01

-X52

-X51

24

24 24

Reference DWG

4

Wc1 /37.D3

-J2 -X52

DATE

NO. DWG

REV.

B 3

-K204T

-S1 Wc01

/ 46.A1

Wc01

/44.E1

1

24 24

EMPLOYER / DEVELOPER

C

C

PROJECT MANAGER.

SUPERVISION CONSULTANT

D

D

-XS

7 1

04 03 02 01 00

9

REV.

R5

/44.E2 A1

-K204T DS/ES SWITCH INCOMPLTE SET : 5sec

E

/ 43.E6

-XS

-K205 DS/ES SWITCH INCOMPLETE

2

2 8

10

A1

-K204 A2

E

(-)220V_F2

(-)220V_F2

3 4

1 /44.B4

6 5

8

F

1 R4 R5 7

2 R3 R6 8

/44.E2 /21.E1 /44.E3 /68.B5

1 R3 R5 7 13 21 31 43

2 /59.B5 R4 R6 8 /68.B6 14 22 32 44

DRAWING TITLE:

DS/ES INCOMPLETE CONDITION Drawing Number :

A B C

16316 01 EC

44

OF

92

REV NO.

04

PREPARED :

PK55-SD-EL-GS-14 ACTION

SHEET NO.

/ 46.F1

1000, Bangeojinsinhawn-doro, Dong-gu, Ulsan, Korea

MANUFACTURER/VENDER NAME

DRAWING NUMBER

ISSUED TO / FOR :

R6

DS/ES SWITCH INCOMPLETE FAIL

A2

DATE

REVISED AS PER COMMENT REVISED AS PER COMMENT REVISED AS PER COMMENT REVISED AS PER COMMENT FOR APPROVAL

CONTRACTOR: CONSORTIUM( KN / HHI )

-K205 7

24.JAN.2018 10.AUG.2017 09.AUG.2017 19.JUN.2017 01.SEP.2016

D

Project No.:

Scale :

CHECKED :

Plot Date:

APPROVED :

008006400 Sheet Size : Rev. :

A3

04

K.H.SONG

S.Y.JANG

01.SEP.2016

C.Y.HONG

F

1

2

3

4

5

6

7

8

Project

CB CLOSE (LOCAL)

A

/ 21.C1

CB CLOSE (REMOTE)

CB INT.1

/ 21.C2

-XS

A

CB INT(CRP).1

11 -Q1

-XS

12

-X1 -J2

1 1

-Q2

-X2 -J2

A1

-S1

13

-KLR /47.E5

-X1 -Q1 -J3

14

29 5

-Q2

-X2 -J3

A3

-S2

-X9 -Q9 -J3

6 30

-S1

A03

-J3 -X2

5

6

6 30

2

-X9 -J2

1

2

DATE

NO. DWG

REV.

-J2 -X2

B

2 2

1

30

-S1 -X51 -Q51-J3

A01 25

-J2 -X9

1 A1

2 2

-S2 -J3

A03

-J2 -X1

Reference DWG

A01

A1

29

-S2 -J3 -X9

-Q9

-S2

A3

C

5 A3

A03

-J3 -X1

29

1 A1

A01

B

1

-X51 -X52 -Q52-J3

EMPLOYER / DEVELOPER

A01 2

C

26 25 1

PROJECT MANAGER.

A1

-S2 -J3 -X52

A01 2 26 SUPERVISION CONSULTANT

D

D

04 03 02 01 00

REV.

24.JAN.2018 10.AUG.2017 09.AUG.2017 19.JUN.2017 01.SEP.2016

DATE

REVISED AS PER COMMENT REVISED AS PER COMMENT REVISED AS PER COMMENT REVISED AS PER COMMENT FOR APPROVAL

ISSUED TO / FOR :

CONTRACTOR: CONSORTIUM( KN / HHI )

E

-XS

/ 21.C1

CB INT.2

E

50

/ 21.C2

CB INT(CRP).2

1000, Bangeojinsinhawn-doro, Dong-gu, Ulsan, Korea DRAWING TITLE:

INTERLOCK (CB) Drawing Number :

F

PREPARED :

PK55-SD-EL-GS-14 ACTION MANUFACTURER/VENDER NAME

A B C DRAWING NUMBER

16316 01 EC

SHEET NO.

45

OF

92

REV NO.

04

D

Project No.:

Scale :

CHECKED :

Plot Date:

APPROVED :

008006400 Sheet Size : Rev. :

A3

04

K.H.SONG

S.Y.JANG

01.SEP.2016

C.Y.HONG

F

1

2

3

4

5

6

7

8

Project

A

A

BUS DS(-Q1) INTERLOCK / 44.B6

BUS DS(-Q2) INTERLOCK (+)220V_F2

(+)220V_F2

-Q2

-XS

13

-X2 -J3

37 13

-Q2

-X2 -J3

B1

B

-J3

A01 2

-X2

38

-X2

26

-XS

14

/47.E5

24

45 21 B5

-S2

C

=D03/44.E6

-J3 -X15

-X0 -Q0(A)-J4

121

22 46

-X0

-X51

37

-Q51-J3

13

122 3

B07

B1

-S2

-X0 -Q0(C)-J4

B01

-J3 -X51

14

-X52 -Q52-J3

37

D

25

-XS

16

4 123

-X11

-XS1

1

=D03/69.E2

-XS1

-J4 -X0

4 124

A01 2 26

-XS

-KLR /47.E5

A01 2

-X1

38

-X1

26

-XS

23

=D03 -X16 -Q16-J3

21

-X0 -J4 -Q0(A)

125

20

=D03 -X12 -Q12-J3

1

-S2 =D03/54.D4

-J3 -X12

A01 2 26

27

=D03 -X11 -Q11-J3

27 3

-S2

B8

-J4

-XS

=D03/52.D4

-XS

6

-J3 25

EMPLOYER / DEVELOPER

A02 4

-X11

28

-XS

28

-XS

29

=D03 -X12 -Q12-J3

27

C

22 46

-XS

24

-X51

39

-Q51-J3

15

-X0

126 5

-S2 B08

B2

-S2 B02

-J3 -X51

16

-X52 -Q52-J3

39

B1

=D03 -XS1

40

15 B2

-J4 -X0 -Q0(C) -J4

6 127

3 23

-KBL =D03/69.E2

-XS1

24 4

5

-XS B08

-J4 -X0

6 128

SUPERVISION CONSULTANT

3 A2

B8

-S2

PROJECT MANAGER.

26

-S2

D

=D03/54.D4

-J3

A02 4

-X12

28

-XS

30

04 03 02 01 00

-S2 B01

-XS

21

B02

-J3 -X52

14 38

REV.

A2

-S2

-Q0(B) -J4

25

DATE

NO. DWG

B

5

B08 B05

19

14

17

45

-S2 =D03/48.E6

Reference DWG

1

-S2

B5 34

25 A1

B8

-XS 2

-X1 -J3

-J3

-J3 -X16

-S2 -J3 -X52

-Q1

14

A1

-XS B07

33

13

-KBL

3

-S2

1

=D03

B7

38

13

=D03 -X11 -Q11-J3

-J3

4

-S2 -J4

18

-S2

B7 15

-XS

=D03/52.D4

-S2 -J4

13

B01

-J3

A1

B7

-Q0(B)-J4

-XS

37 B1

3

B07 B05

-X1 -J3

-S2

14

=D03 -X15 -Q15-J3

-Q1

-S2 B01

-J3

-KLR

1

22

A1

-S2

23

25

-XS

/ 47.A1

REV.

24.JAN.2018 10.AUG.2017 09.AUG.2017 19.JUN.2017 01.SEP.2016

DATE

REVISED AS PER COMMENT REVISED AS PER COMMENT REVISED AS PER COMMENT REVISED AS PER COMMENT FOR APPROVAL

ISSUED TO / FOR :

CONTRACTOR: CONSORTIUM( KN / HHI )

16 40

E

E

A1

-KL1

/ 44.E6

INTERLOCK (-Q1)

(-)220V_F2

A1

-KL2 A2

INTERLOCK (-Q2)

A2

(-)220V_F2

/ 47.E1

1000, Bangeojinsinhawn-doro, Dong-gu, Ulsan, Korea DRAWING TITLE:

13 23 33 44

F

14 24 34 43 /28.E3

13 23 33 44

14 24 34 43 /30.E3 ACTION

MANUFACTURER/VENDER NAME

A B C DRAWING NUMBER

16316 01 EC

SHEET NO.

46

OF

92

REV NO.

04

D

INTERLOCK (BUS DS) Drawing Number :

PREPARED :

PK55-SD-EL-GS-14 Project No.:

Scale :

CHECKED :

Plot Date:

APPROVED :

008006400 Sheet Size : Rev. :

A3

04

K.H.SONG

S.Y.JANG

01.SEP.2016

C.Y.HONG

F

1

2

3

4

5

6

7

8

Project

A

A

LINE DS(-Q9) INTERLOCK

WORK ES(-Q51, -Q52) INTERLOCK

LINE ES(-Q8) INTERLOCK

INTERLOCK RELEASE

(+)220V_F2

/ 46.A7

-XS

31

-X52

41

-X0

-Q52-J3

17

-J4 -Q0(A)

B3

-S2

B

-KLR /47.E5

44

-J3

18

-X52 -X51 -Q51-J3

42 41 17

18

-X51 -X8 -Q8 -J2

42 29 13

-X0 -J4 -Q0(B)

-X0 -J4 -Q0(C)

2 118

-X8

30

-XS

32

-XS

33

-KLR /47.E5

1

54

-X0

37

2 119 1

40 39 16

15 40 39

63

-J3 -X9

-KLR /47.E5

REV.

B

-S3 2

/75.C2

-K501 15 16 18

-K502 /66.E4

15

EMPLOYER / DEVELOPER

16 18

C

-K503 /66.E4

15

B02

-J3 -X9

15

-XS

38

-XS

39

-XS

40

PROJECT MANAGER.

40

+REMOTE VOLTAGE DEAD D

DATE

NO. DWG

1

38

RELEASE

64

Reference DWG

18

/75.B3

14

16 18

16

-S2

120

LOCAL

/66.E4

B2

2

-S11

B01

B02

-J3 -X2 -X9 -Q9 -J2

17

13 B1

15

B2

B06

-J4

-X9 -J3

-S2

-S2

-S2 14

53

-J3 -X1 -X2 -Q2 -J3

B6

B01

-Q9

37

B02

B06

-J4

16

-S2

B6

B1

-S2

39

-XS

B2

-S2

-J3

-X1 -J3

B06

-J4

B03

-J2

-Q1

34

B6

B3

-S2

C

1

-S2 B03

43

117

-XS

-XS

35

-XS

36

SUPERVISION CONSULTANT

-XS

41

-XS

42

-XS

43

D

04 03 02 01 00

REV.

24.JAN.2018 10.AUG.2017 09.AUG.2017 19.JUN.2017 01.SEP.2016

REVISED AS PER COMMENT REVISED AS PER COMMENT REVISED AS PER COMMENT REVISED AS PER COMMENT FOR APPROVAL

DATE

ISSUED TO / FOR :

CONTRACTOR: CONSORTIUM( KN / HHI )

A1

E

A1

-KL9 INTERLOCK (-Q9)

(-)220V_F2

/ 46.F7

13 23 33 44

F

-KL51 INTERLOCK (-Q51,-Q52)

A2

14 24 34 43 /32.E3

13 23 33 44 34

A1

-KL8 A2

14 24 34 43 /34.E3 34 /36.E3

INTERLOCK (-Q8)

13 23 33 44

A1

A1

A2

14 24 34 43 /38.E3

INTERLOCK RELEASE

13 23 33 43 53 63 73 83

DS/ES MOTOR & INTERLOCK SUPPLY

A2

14 24 34 44 54 64 74 84

/45.B2 /46.C1 /46.C4 /47.B1 /47.B3 /47.B4 /59.B5 /68.B5

A2

14 12 24 22 34 32 44 42

11 /64.C4 21 31 /68.D5

B C

16316 01 EC

47

92

REV NO.

04

INTERLOCK (LINE DS/ES) PREPARED :

PK55-SD-EL-GS-14 A

OF

DRAWING TITLE:

Drawing Number : ACTION

SHEET NO.

1000, Bangeojinsinhawn-doro, Dong-gu, Ulsan, Korea

41

MANUFACTURER/VENDER NAME

DRAWING NUMBER

E

-KD2

-KLR

D

Project No.:

Scale :

CHECKED :

Plot Date:

APPROVED :

008006400 Sheet Size : Rev. :

A3

04

K.H.SONG

S.Y.JANG

01.SEP.2016

C.Y.HONG

F

1

2

3

4

5

6

7

8

Project

- LOW STAGE 1 : UNDER 6.7 Bar - LOW STAGE 2 : UNDER 6.5 Bar A

A

SF6 GAS PRESSURE SF6 GAS PRESSURE SF6 GAS PRESSURE LOW STAGE 1 LOW STAGE 1 LOW STAGE 1 (G01-00A) (G01-00B) (G01-00C) SF6 GAS PRESSURE SF6 GAS PRESSURE SF6 GAS PRESSURE LOW STAGE 2 LOW STAGE 2 LOW STAGE 2 (G01-00A) (G01-00B) (G01-00C) (+)220V_F1

/ 18.E2

(+)220V_F1

/ 49.B1

Reference DWG

B

-XG

1

2

-XG

3

4

-XG

5

6

-W1

1

3

-W2

1

3

-W3

1

3

-G01_00A

-G01_00B 1

P

3 P

(6.7Bar) GAUGE -W1

-XG

2

(6.5Bar) GAUGE

2

4

61

64

3

1

P

(6.7Bar) GAUGE -W2

-XG

REV.

B

-G01_00C 1

P

4

DATE

NO. DWG

2

(6.5Bar) GAUGE

3

P

P

(6.7Bar) GAUGE

4

2

4

62

65

-W3

-XG

(6.5Bar) GAUGE

2

4

2

4

63

66 EMPLOYER / DEVELOPER

C

C

PROJECT MANAGER.

SUPERVISION CONSULTANT

D

D

04 03 02 01 00

REV.

24.JAN.2018 10.AUG.2017 09.AUG.2017 19.JUN.2017 01.SEP.2016

DATE

REVISED AS PER COMMENT REVISED AS PER COMMENT REVISED AS PER COMMENT REVISED AS PER COMMENT FOR APPROVAL

ISSUED TO / FOR :

CONTRACTOR: CONSORTIUM( KN / HHI )

A1

-KG0.1 CB GAS PRESSURE STAGE 1

E

A2

A1

A1

A1

-KG0.2

-KG0.2A

-KG0.2B

CB GAS PRESSURE STAGE 2

A2 CB GAS LEAK STAGE2

A2 CB GAS LEAK STAGE2

A2

E

(-)220V_F1

/ 18.E2

(-)220V_F1 13 21 31 43 53 61 71 83

F

14 /60.B4 22 32 44 /69.B2 54 62 72 84

13 21 31 43 53 61 71 81

14 22 32 44 54 62 72 82

/61.B5 /21.D3 /21.D4 /69.E2 /21.D5

13 21 31 43 53 61 71 81

14 22 /22.D3 32 /22.D4 44 54 62 /22.D5 72 82

13 21 31 43 53 61 71 81

14 22 /23.D3 32 /23.D4 44 54 62 /23.D5 72 82

1000, Bangeojinsinhawn-doro, Dong-gu, Ulsan, Korea DRAWING TITLE:

GAS MONITORING Drawing Number : ACTION A B C

16316 01 EC

SHEET NO.

48

OF

92

REV NO.

04

PREPARED :

PK55-SD-EL-GS-14

MANUFACTURER/VENDER NAME

DRAWING NUMBER

/ 49.E1

D

Project No.:

Scale :

CHECKED :

Plot Date:

APPROVED :

008006400 Sheet Size : Rev. :

A3

04

K.H.SONG

S.Y.JANG

01.SEP.2016

C.Y.HONG

F

1

2

3

4

5

6

7

8

Project

- LOW STAGE 1 : UNDER 4.7 Bar - LOW STAGE 2 : UNDER 4.5 Bar A

A

SF6 GAS PRESSURE LOW STAGE 1,2 (G01-01A)

SF6 GAS PRESSURE LOW STAGE 1,2 (G01-01B)

SF6 GAS PRESSURE LOW STAGE 1,2 (G01-01C)

SF6 GAS PRESSURE LOW STAGE 1,2 (G01-02A)

SF6 GAS PRESSURE LOW STAGE 1,2 (G01-02B)

SF6 GAS PRESSURE LOW STAGE 1,2 (G01-02C)

(+)220V_F1

/ 48.B6

(+)220V_F1 -XG

7

8

-W4

1

3

9

10

1

3

11

12

1

3

13

14

1

3

15

16

1

3

17

18

1

3

/ 50.B1

Reference DWG

-W5

-W6

-W7

-W8

-W9

DATE

NO. DWG

REV.

B

B

-G01_01A

-G01_01B 1

P

3 P

(4.7Bar) GAUGE -W4

-XG

2

(4.5Bar) GAUGE

-G01_01C 1

P

4

2

4

67

70

3 P

(4.7Bar) GAUGE -W5

2

-G01_02A 1

3

P

(4.5Bar) GAUGE

2

4

68

71

P

(4.7Bar) GAUGE

4

-W6

(4.5Bar) GAUGE

2

-G01_02B 1

P

P

(4.7Bar) GAUGE

4

2

4

69

72

3

-W7

2

(4.5Bar) GAUGE

-G01_02C 1

P

4

2

4

73

76

3

1

P

(4.7Bar) GAUGE -W8

2

3

P

(4.5Bar) GAUGE

(4.7Bar) GAUGE

4

2

4

74

77

P

-W9

(4.5Bar) GAUGE

2

4

2

4

75

78

EMPLOYER / DEVELOPER

C

C

PROJECT MANAGER.

SUPERVISION CONSULTANT

D

D

04 03 02 01 00

REV.

24.JAN.2018 10.AUG.2017 09.AUG.2017 19.JUN.2017 01.SEP.2016

DATE

REVISED AS PER COMMENT REVISED AS PER COMMENT REVISED AS PER COMMENT REVISED AS PER COMMENT FOR APPROVAL

ISSUED TO / FOR :

CONTRACTOR: CONSORTIUM( KN / HHI )

A1

A1

-KG1.1 01 GAS PRESSURE STAGE 1

E

A1

-KG1.2 01 GAS PRESSURE STAGE 2

A2

A1

-KG2.1 02 GAS PRESSURE STAGE 1

A2

-KG2.2 02 GAS PRESSURE STAGE 2

A2

A2

E

(-)220V_F1

/ 48.E6

(-)220V_F1 14 12 24 22 34 32 44 42

11 /60.B5 21 /69.B2 31 41

14 12 24 22 34 32 44 42

11 /61.B6 21 /69.E2 31 41

14 12 24 22 34 32 44 42

11 /60.B5 21 /69.B3 31 41

14 12 24 22 34 32 44 42

/ 50.E1

11 /62.B1

1000, Bangeojinsinhawn-doro, Dong-gu, Ulsan, Korea

21 /69.E3

DRAWING TITLE:

31

GAS MONITORING

41 Drawing Number :

F

PREPARED :

PK55-SD-EL-GS-14 ACTION MANUFACTURER/VENDER NAME

A B C DRAWING NUMBER

16316 01 EC

SHEET NO.

49

OF

92

REV NO.

04

D

Project No.:

Scale :

CHECKED :

Plot Date:

APPROVED :

008006400 Sheet Size : Rev. :

A3

04

K.H.SONG

S.Y.JANG

01.SEP.2016

C.Y.HONG

F

1

2

3

4

5

6

7

8

Project

- LOW STAGE 1 : UNDER 4.7 Bar - LOW STAGE 2 : UNDER 4.5 Bar A

A

SF6 GAS PRESSURE LOW STAGE 1,2 (G01-03A)

SF6 GAS PRESSURE LOW STAGE 1,2 (G01-03B)

SF6 GAS PRESSURE LOW STAGE 1,2 (G01-03C)

SF6 GAS PRESSURE LOW STAGE 1,2 (G01-04A)

SF6 GAS PRESSURE LOW STAGE 1,2 (G01-04B)

SF6 GAS PRESSURE LOW STAGE 1,2 (G01-04C)

(+)220V_F1

/ 49.B6

(+)220V_F1 -XG

19

20

1

3

21

22

1

3

23

24

1

3

25

26

1

3

27

28

1

3

29

30

1

3

/ 51.B1

Reference DWG

-W10

-W11

-W12

-W13

-W14

-W15

DATE

NO. DWG

REV.

B

B

-G01_03A

-G01_03B 1

P

(4.7Bar) GAUGE -W10

-XG

3 P

2

(4.5Bar) GAUGE

-G01_03C 1

P

4

2

4

79

82

(4.7Bar) GAUGE -W11

3 P

2

-G01_04A 1

3

P

(4.5Bar) GAUGE

(4.7Bar) GAUGE

4

2

4

80

83

-W12

P

(4.5Bar) GAUGE

2

-G01_04B 1

P

(4.7Bar) GAUGE

4

2

4

81

84

-W13

3 P

2

(4.5Bar) GAUGE

-G01_04C 1

P

4

2

4

85

88

(4.7Bar) GAUGE -W14

3

1

P

2

3

P

(4.5Bar) GAUGE

(4.7Bar) GAUGE

4

2

4

86

89

-W15

P

(4.5Bar) GAUGE

2

4

2

4

87

90

EMPLOYER / DEVELOPER

C

C

PROJECT MANAGER.

SUPERVISION CONSULTANT

D

D

04 03 02 01 00

REV.

24.JAN.2018 10.AUG.2017 09.AUG.2017 19.JUN.2017 01.SEP.2016

DATE

REVISED AS PER COMMENT REVISED AS PER COMMENT REVISED AS PER COMMENT REVISED AS PER COMMENT FOR APPROVAL

ISSUED TO / FOR :

CONTRACTOR: CONSORTIUM( KN / HHI )

A1

A1

-KG3.1 03 GAS PRESSURE STAGE 1

E

A1

-KG3.2 03 GAS PRESSURE STAGE 2

A2

A1

-KG4.1 04 GAS PRESSURE STAGE 1

A2

-KG4.2 04 GAS PRESSURE STAGE 2

A2

A2

E

(-)220V_F1

/ 49.E6

(-)220V_F1 14 12 24 22 34 32 44 42

11 /60.B6 21 /69.B3 31 41

14 12 24 22 34 32 44 42

11 /62.B2 21 /69.E3 31 41

14 12 24 22 34 32 44 42

11 /61.B1 21 /69.B4 31 41

14 12 24 22 34 32 44 42

/ 51.E1

11 /62.B3

1000, Bangeojinsinhawn-doro, Dong-gu, Ulsan, Korea

21 /69.E4

DRAWING TITLE:

31

GAS MONITORING

41 Drawing Number :

F

PREPARED :

PK55-SD-EL-GS-14 ACTION MANUFACTURER/VENDER NAME

A B C DRAWING NUMBER

16316 01 EC

SHEET NO.

50

OF

92

REV NO.

04

D

Project No.:

Scale :

CHECKED :

Plot Date:

APPROVED :

008006400 Sheet Size : Rev. :

A3

04

K.H.SONG

S.Y.JANG

01.SEP.2016

C.Y.HONG

F

1

2

3

4

5

6

7

8

Project

- LOW STAGE 1 : UNDER 4.7 Bar - LOW STAGE 2 : UNDER 4.5 Bar A

A

SF6 GAS PRESSURE LOW STAGE 1,2 (G01-05A)

SF6 GAS PRESSURE LOW STAGE 1,2 (G01-05B)

SF6 GAS PRESSURE LOW STAGE 1,2 (G01-05C)

SF6 GAS PRESSURE LOW STAGE 1,2 (G01-06A)

SF6 GAS PRESSURE LOW STAGE 1,2 (G01-06B)

SF6 GAS PRESSURE LOW STAGE 1,2 (G01-06C)

(+)220V_F1

/ 50.B6

(+)220V_F1 -XG

31

32

1

3

33

34

1

3

35

36

1

3

37

38

1

3

39

40

1

3

41

42

1

3

/ 52.B1

Reference DWG

-W16

-W17

-W18

-W19

-W20

-W21

DATE

NO. DWG

REV.

B

B

-G01_05A

-G01_05B 1

P

(4.7Bar) GAUGE -W16

-XG

3 P

2

(4.5Bar) GAUGE

-G01_05C 1

P

4

2

4

91

94

(4.7Bar) GAUGE -W17

3 P

2

-G01_06A 1

3

P

(4.5Bar) GAUGE

(4.7Bar) GAUGE

4

2

4

92

95

-W18

P

(4.5Bar) GAUGE

2

-G01_06B 1

P

(4.7Bar) GAUGE

4

2

4

93

96

-W19

3 P

2

(4.5Bar) GAUGE

-G01_06C 1

P

4

2

4

97

100

(4.7Bar) GAUGE -W20

3

1

P

2

3

P

(4.5Bar) GAUGE

(4.7Bar) GAUGE

4

2

4

98

101

-W21

P

(4.5Bar) GAUGE

2

4

2

4

99

102

EMPLOYER / DEVELOPER

C

C

PROJECT MANAGER.

SUPERVISION CONSULTANT

D

D

04 03 02 01 00

REV.

24.JAN.2018 10.AUG.2017 09.AUG.2017 19.JUN.2017 01.SEP.2016

DATE

REVISED AS PER COMMENT REVISED AS PER COMMENT REVISED AS PER COMMENT REVISED AS PER COMMENT FOR APPROVAL

ISSUED TO / FOR :

CONTRACTOR: CONSORTIUM( KN / HHI )

A1

A1

-KG5.1 05 GAS PRESSURE STAGE 1

E

A1

-KG5.2 05 GAS PRESSURE STAGE 2

A2

A1

-KG6.1 06 GAS PRESSURE STAGE 1

A2

-KG6.2 06 GAS PRESSURE STAGE 2

A2

A2

E

(-)220V_F1

/ 50.E6

(-)220V_F1 14 12 24 22 34 32 44 42

11 /61.B2 21 /69.B4 31 41

14 12 24 22 34 32 44 42

11 /62.B3 21 /69.E4 31 41

14 12 24 22 34 32 44 42

11 /61.B3 21 /69.B4 31 41

14 12 24 22 34 32 44 42

/ 52.E1

11 /62.B4

1000, Bangeojinsinhawn-doro, Dong-gu, Ulsan, Korea

21 /69.E4

DRAWING TITLE:

31

GAS MONITORING

41 Drawing Number :

F

PREPARED :

PK55-SD-EL-GS-14 ACTION MANUFACTURER/VENDER NAME

A B C DRAWING NUMBER

16316 01 EC

SHEET NO.

51

OF

92

REV NO.

04

D

Project No.:

Scale :

CHECKED :

Plot Date:

APPROVED :

008006400 Sheet Size : Rev. :

A3

04

K.H.SONG

S.Y.JANG

01.SEP.2016

C.Y.HONG

F

1

2

3

4

5

6

7

8

Project

- LOW STAGE 1 : UNDER 4.7 Bar - LOW STAGE 2 : UNDER 4.5 Bar A

A

SF6 GAS PRESSURE LOW STAGE 1,2 (G01-07A)

SF6 GAS PRESSURE LOW STAGE 1,2 (G01-07B)

SF6 GAS PRESSURE LOW STAGE 1,2 (G01-07C)

SF6 GAS PRESSURE LOW STAGE 1,2 (G07-08A)

SF6 GAS PRESSURE LOW STAGE 1,2 (G01-08B)

SF6 GAS PRESSURE LOW STAGE 1,2 (G01-08C)

(+)220V_F1

/ 51.B6

-XG

(+)220V_F1 43

44

1

3

45

46

1

3

47

48

1

3

49

50

1

3

51

52

1

3

53

54

1

3

/ 53.B1

Reference DWG

-W22

-W23

-W24

-W25

-W26

-W27

DATE

NO. DWG

REV.

B

B

-G01_07A

-G01_07B 1

3

P

(4.7Bar) GAUGE -W22

-XG

P

(4.5Bar) GAUGE

2

-G01_07C 1

3

P

4

2

4

103

106

(4.7Bar) GAUGE -W23

P

2

(4.5Bar) GAUGE

-G01_08A 1

3

P

(4.7Bar) GAUGE

4

2

4

104

107

-W24

P

(4.5Bar) GAUGE

2

-G01_08B 1

3

P

(4.7Bar) GAUGE

4

2

4

105

108

-W25

P

2

(4.5Bar) GAUGE

-G01_08C 1

3

P

4

2

4

109

112

(4.7Bar) GAUGE -W26

1

P

2

3

P

(4.5Bar) GAUGE

(4.7Bar) GAUGE

4

2

4

110

113

-W27

P

(4.5Bar) GAUGE

2

4

2

4

111

114

EMPLOYER / DEVELOPER

C

C

PROJECT MANAGER.

SUPERVISION CONSULTANT

D

D

04 03 02 01 00

REV.

24.JAN.2018 10.AUG.2017 09.AUG.2017 19.JUN.2017 01.SEP.2016

DATE

REVISED AS PER COMMENT REVISED AS PER COMMENT REVISED AS PER COMMENT REVISED AS PER COMMENT FOR APPROVAL

ISSUED TO / FOR :

CONTRACTOR: CONSORTIUM( KN / HHI )

A1

A1

-KG7.1 07 GAS PRESSURE STAGE 1

E

A1

-KG7.2 07 GAS PRESSURE STAGE 2

A2

A1

-KG8.1 08 GAS PRESSURE STAGE 1

A2

-KG8.2 08 GAS PRESSURE STAGE 2

A2

(-)220V_F1

/ 51.E6

A2

E

(-)220V_F1 14 12 24 22 34 32 44 42

11 /61.B3 21 /69.B5 31 41

14 12 24 22 34 32 44 42

11 /62.B5 21 /69.E5 31 41

14 12 24 22 34 32 44 42

11 /61.B4 21 /69.B5 31 41

14 12 24 22 34 32 44 42

/ 53.E1

11 /62.B5 21 /69.E5

1000, Bangeojinsinhawn-doro, Dong-gu, Ulsan, Korea DRAWING TITLE:

31

GAS MONITORING

41 Drawing Number :

F

PREPARED :

PK55-SD-EL-GS-14 ACTION MANUFACTURER/VENDER NAME

A B C DRAWING NUMBER

16316 01 EC

SHEET NO.

52

OF

92

REV NO.

04

D

Project No.:

Scale :

CHECKED :

Plot Date:

APPROVED :

008006400 Sheet Size : Rev. :

A3

04

K.H.SONG

S.Y.JANG

01.SEP.2016

C.Y.HONG

F

1

2

3

4

5

6

7

8

Project

- LOW STAGE 1 : UNDER 4.7 Bar - LOW STAGE 2 : UNDER 4.5 Bar

A

SF6 GAS PRESSURE LOW STAGE 1,2 (G01-09A) / 52.B6

SF6 GAS PRESSURE LOW STAGE 1,2 (G01-09B)

SF6 GAS PRESSURE LOW STAGE 1,2 (G01-09C)

(+)220V_F1

(+)220V_F1 -XG -W28

B

55

56

1

3

-G01_09A 3

P

-W28

-XG

58

1

3

-W30

-G01_09B 1

(4.7Bar) GAUGE

-W29

57

P

2

(4.5Bar) GAUGE

2

4

115

118

(4.7Bar) GAUGE -W29

59

60

1

3

/ 54.B1

Reference DWG

DATE

NO. DWG

REV.

B

-G01_09C 1

3

P

4

A

1

P

2

(4.5Bar) GAUGE

3

P

(4.7Bar) GAUGE

4

2

4

116

119

-W30

P

(4.5Bar) GAUGE

2

4

2

4

117

120 EMPLOYER / DEVELOPER

C

C

PROJECT MANAGER.

SUPERVISION CONSULTANT

D

D

04 03 02 01 00

REV.

24.JAN.2018 10.AUG.2017 09.AUG.2017 19.JUN.2017 01.SEP.2016

DATE

REVISED AS PER COMMENT REVISED AS PER COMMENT REVISED AS PER COMMENT REVISED AS PER COMMENT FOR APPROVAL

ISSUED TO / FOR :

CONTRACTOR: CONSORTIUM( KN / HHI )

A1

A1

-KG9.1 E

09 GAS PRESSURE STAGE 1

/ 52.E6

-KG9.2 09 GAS PRESSURE STAGE 2

A2

A2

E

(-)220V_F1

(-)220V_F1 14 12 24 22 34 32 44 42

11 /61.B5 21 /69.B6 31 41

14 12 24 22 34 32 44 42

/ 54.E1

11 /62.B6

1000, Bangeojinsinhawn-doro, Dong-gu, Ulsan, Korea

21 /69.E6

DRAWING TITLE:

31

GAS MONITORING

41 Drawing Number :

F

PREPARED :

PK55-SD-EL-GS-14 ACTION MANUFACTURER/VENDER NAME

A B C DRAWING NUMBER

16316 01 EC

SHEET NO.

53

OF

92

REV NO.

04

D

Project No.:

Scale :

CHECKED :

Plot Date:

APPROVED :

008006400 Sheet Size : Rev. :

A3

04

K.H.SONG

S.Y.JANG

01.SEP.2016

C.Y.HONG

F

1

2

3

4

5

6

7

8

Project

A

A

CB(-Q0)

BUS DS(-Q2)

LINE DS(-Q9)

WORK ES(-Q51)

(+)220V_F1

/ 53.B6

(+)220V_F1 -X0 -Q0(A)-J3

1

B

BUS DS(-Q1)

69 1

101

-J3

A2

17

-Q1

B2

A02

-J3 -XS

-X0 -Q0(B)-J3

51

3

-X1 -J2

13 13

-Q2

2 70 1

A02

-J2

18 102

-J3

A2

3 3

-X2 -J2

A2

13 13

-Q9

-X1

4 4

-X1

A02

-J2

14

-X2

14

3 3

-J2

A2

13

-X51

17

-Q51-J2

B2

4 4

-X2

A02

-J2

14

-X9

14

3

-J2

13 13

Reference DWG

DATE

NO. DWG

REV.

B2

B

-S1

B02

-J2

3 -X51 A2

-S1

B02

-J2

-X9 -J2

B2

-S1

B02

-J3

-X2 -J2

B2

-S1

2

/75.D2

3 A2

-S2

-S4 CLOSE

-X1 -J2

/ 55.B1

4

B02

-J2

4

A02

-J2

18

-X51

14

4

B02

-J2

4 -X51

14 14

17 B2

-S2 A02

-J3 -X0 -Q0(C)-J3

2

B02

-J3

71 1

103

-J3

A2

C

18 EMPLOYER / DEVELOPER

17 B2

C

-S2 A02

-J3 -X0

2

B02

-J3

72

18 PROJECT MANAGER.

104

SUPERVISION CONSULTANT

D

D

(+)220V_F1_1/ 55.D1 -XS

52 13

23

33

43

53

63

73

83

-K11 /54.E1

13

23

14

24

04 03 02 01 00

-K11.1 14

24

34

44

54

64

84 /54.E2

74

A1

A1

-K11 LAMP TEST

E

-LQ0

-K11.1 LAMP TEST

A2

HK-DSPI-GR-220V/S

A2

X2

X1 X0

-LQ1 HK-DSPI-GR-220V/R

X2

X1 X0

-LQ2 HK-DSPI-GR-220V/R

X2

X1 X0

-LQ9 HK-DSPI-GR-220V/R

X2

X1 X0

-LQ51 HK-DSPI-GR-220V/R

X2

DATE

REVISED AS PER COMMENT REVISED AS PER COMMENT REVISED AS PER COMMENT REVISED AS PER COMMENT FOR APPROVAL

ISSUED TO / FOR :

CONTRACTOR: CONSORTIUM( KN / HHI )

GREEN

RED

GREEN

RED

GREEN

RED

GREEN

RED

RED

GREEN

REV.

24.JAN.2018 10.AUG.2017 09.AUG.2017 19.JUN.2017 01.SEP.2016

X1 X0

E

/ 53.E6

(-)220V_F1 13 23 33 43 53 63 73 83

F

14 24 34 44 54 64 74 84

/54.D2 /54.D3 /54.D3 /54.D4 /54.D4 /54.D5 /54.D5 /54.D5

-XS 13 23 33 43 53 63 73 83

14 24 34 44 54 64 74 84

53

(-)220V_F1

/54.D6 /54.D6 /55.D2 /55.D2 /55.D3 /55.D3 /56.D2

1000, Bangeojinsinhawn-doro, Dong-gu, Ulsan, Korea DRAWING TITLE:

POSITION INDICATOR Drawing Number : ACTION A B C

16316 01 EC

SHEET NO.

54

OF

92

REV NO.

04

PREPARED :

PK55-SD-EL-GS-14

MANUFACTURER/VENDER NAME

DRAWING NUMBER

/ 55.E1

D

Project No.:

Scale :

CHECKED :

Plot Date:

APPROVED :

008006400 Sheet Size : Rev. :

A3

04

K.H.SONG

S.Y.JANG

01.SEP.2016

C.Y.HONG

F

1

2

3

4

5

6

7

8

Project

A

A

WORK ES(-Q52) / 54.B7

LINE ES(-Q8)

(+)220V_F1

(+)220V_F1 -X52 -Q52-J2

3 -X52

13

-J2

13

3 A2

B

-Q8

-X8 -J1

B2

3 9

-X8 -J1

A2

-S1

/ 58.B1

9 15

Reference DWG

DATE

NO. DWG

REV.

B2

B

-S1 A02

-J2 -X52

4

B02

-J2

4 -X52

A02

-J1

14

-X8

14

10 4

B02

-J1 -X8

16 10

EMPLOYER / DEVELOPER

C

C

PROJECT MANAGER.

SUPERVISION CONSULTANT

D / 54.D7

D

(+)220V_F1_1 33

43

53

63 04 03 02 01 00

-K11.1 /54.E2

34

44

54

64

-LQ52 HK-DSPI-GR-220V/R

E

X2

X1 X0

-LQ8 HK-DSPI-GR-220V/R

X2

DATE

REVISED AS PER COMMENT REVISED AS PER COMMENT REVISED AS PER COMMENT REVISED AS PER COMMENT FOR APPROVAL

ISSUED TO / FOR :

CONTRACTOR: CONSORTIUM( KN / HHI )

GREEN

RED

RED

GREEN

REV.

24.JAN.2018 10.AUG.2017 09.AUG.2017 19.JUN.2017 01.SEP.2016

X1 X0

E

/ 54.E7

(-)220V_F1

(-)220V_F1

/ 58.E1

1000, Bangeojinsinhawn-doro, Dong-gu, Ulsan, Korea DRAWING TITLE:

POSITION INDICATOR Drawing Number :

F

PREPARED :

PK55-SD-EL-GS-14 ACTION MANUFACTURER/VENDER NAME

A B C DRAWING NUMBER

16316 01 EC

SHEET NO.

55

OF

92

REV NO.

04

D

Project No.:

Scale :

CHECKED :

Plot Date:

APPROVED :

008006400 Sheet Size : Rev. :

A3

04

K.H.SONG

S.Y.JANG

01.SEP.2016

C.Y.HONG

F

1

2

3

4

5

6

7

8

Project

A

A

LIGHTING DOOR RIGHT DOOR LEFT

HEATER CONTROL

CB(-Q0)

A220V_F1

/ 20.E1

-XH

A220V_F1

-XH

1

2 13

33

-KHTS

-KHTS

/56.D3

/56.D3

/56.D3

14

24

Reference DWG

DATE

NO. DWG

REV.

B

34

NC NO COM

NC NO

23

-KHTS B

-DS1

/ 57.A1

-DS2 COM

X1

-S5

OFF MANUAL

AUTO

COM

-TH

‎Θ

SET : 5°C

COM

10

-Q0(B)

-JA

NC

-XH

9

-Q0(A)

‎Θ

-HTS SET : 80%

ON

X2

-XH

1

-XH

11

-JA

1

-Q0(C)

-JA

1

EMPLOYER / DEVELOPER

C

1

-HT -XH

-XH

3

-S5

1

3

/75.E5

2

4 /75.E5

/26.B6 AC220V HEATER MECHANISM

4

-S5

-JA -XH

73

1

-HT 2

2

12

/26.C6 AC220V HEATER MECHANISM

-JA -XH

C

1

-HT 2

2

13

/26.E6 AC220V HEATER MECHANISM

-JA -XH

2 PROJECT MANAGER.

2

14

SUPERVISION CONSULTANT

-K11.1 /54.E2

D

1

74

-XH

5

D

1 1

-IL1

-IL2

10W

10W 2

-HT AC220V, 100W 2

2

A1

A1

-KHTS

-KHTS1

HEATER OPERATING

HEATER A2 OPERATING

04 03 02 01 00

A2

REV.

-XH

8

DATE

REVISED AS PER COMMENT REVISED AS PER COMMENT REVISED AS PER COMMENT REVISED AS PER COMMENT FOR APPROVAL

ISSUED TO / FOR :

CONTRACTOR: CONSORTIUM( KN / HHI )

N220V_F1

/ 20.E2

24.JAN.2018 10.AUG.2017 09.AUG.2017 19.JUN.2017 01.SEP.2016

N220V_F1

/ 57.E1

E

E

13 23 33 43 53 63 73 83

F

14 24 34 44 54 64 74 84

/56.B5 /56.B5 /56.B6 /57.B1 /57.B2 /57.B2 /57.B3 /57.B3

13 23 33 43

14 /57.B4 24 34 44

1000, Bangeojinsinhawn-doro, Dong-gu, Ulsan, Korea DRAWING TITLE:

HEATER CONTROL Drawing Number : ACTION

MANUFACTURER/VENDER NAME

A B C DRAWING NUMBER

16316 01 EC

SHEET NO.

56

OF

92

REV NO.

04

PREPARED :

PK55-SD-EL-GS-14

D

Project No.:

Scale :

CHECKED :

Plot Date:

APPROVED :

008006400 Sheet Size : Rev. :

A3

04

K.H.SONG

S.Y.JANG

01.SEP.2016

C.Y.HONG

F

1

2

3

4

5

6

7

8

Project

A

A

BUS DS -Q1

BUS DS -Q2

LINE DS -Q9

WORK ES -Q51

WORK ES -Q52

LINE ES -Q8

A220V_F1

/ 56.A6

A220V_F1

43

53

-KHTS

B

/56.D3

/56.D3

44

-XH

-XH

21

-Q1

-KHTS

-XH

22

1

73

-KHTS 64

/56.D3

-XH

23

-Q9

-JA

1

/56.D3

54

-Q2

-JA

63

-KHTS

74

1

/56.D3

-XH

24

-Q51

-JA

83

-KHTS

1

13

Reference DWG

DATE

NO. DWG

REV.

-KHTS1 84

/56.D4

25

-Q52

-JA

/ 58.B1

B

14

-XH

26

-JA

1

-Q8

-JA

1

EMPLOYER / DEVELOPER

C

1

1

-HT

-HT

-HT

/29.B5 AC220V MECHANISM /29.B5

/31.B6 AC220V HEATER MECHANISM /31.B6

/33.B5 AC220V MECHANISM /33.B5

2

-JA

-JA

2

-XH

-XH

15

2

2

16

1

1

-JA -XH

-HT 2

2

17

/35.B5 AC220V HEATER MECHANISM /35.B5

-JA -XH

1

-HT 2

2

18

/37.B6 AC220V HEATER MECHANISM /37.B6

-JA -XH

1

C

-HT 2

2

19

/39.B5 AC220V HEATER MECHANISM /39.B5

-JA -XH

2 PROJECT MANAGER.

2

20

SUPERVISION CONSULTANT

D

D

04 03 02 01 00

REV.

24.JAN.2018 10.AUG.2017 09.AUG.2017 19.JUN.2017 01.SEP.2016

DATE

REVISED AS PER COMMENT REVISED AS PER COMMENT REVISED AS PER COMMENT REVISED AS PER COMMENT FOR APPROVAL

ISSUED TO / FOR :

CONTRACTOR: CONSORTIUM( KN / HHI )

N220V_F1

/ 56.E6

N220V_F1

/ 58.E1

E

E

1000, Bangeojinsinhawn-doro, Dong-gu, Ulsan, Korea DRAWING TITLE:

HEATER CONTROL Drawing Number :

F

PREPARED :

PK55-SD-EL-GS-14 ACTION MANUFACTURER/VENDER NAME

A B C DRAWING NUMBER

16316 01 EC

SHEET NO.

57

OF

92

REV NO.

04

D

Project No.:

Scale :

CHECKED :

Plot Date:

APPROVED :

008006400 Sheet Size : Rev. :

A3

04

K.H.SONG

S.Y.JANG

01.SEP.2016

C.Y.HONG

F

1

2

3

4

5

6

7

8

Project

A

A

(+)220V_F1

/ 55.B6

(+)220V_F1

/ 65.A3

A220V_F1

/ 57.A6

Reference DWG

DATE

NO. DWG

REV.

B

B

-XD

19

-XA

13

-H1 1+

2L EMPLOYER / DEVELOPER

SUPPLY 2 INPUT FAILURE ALARM

SIGNAL SUPPLY FAILURE

R1

R2

FC

2N

D

20

-XA

14

ANN1.1

-XS

-XD

COMMON ALARM

PROJECT MANAGER.

ALARM HORN A

ALARM HORN B

N

S1R

S1RC

44

45

64.C5 64.D5

-XS

S2R

S2RC

46

47

ANN1.2

1-

SUPPLY 1 INPUT FAILURE ALARM

ANN1.2

N

L

ANN1.1

L

SUPPLY 2 INPUT

C

SUPPLY 1 INPUT

C

-XS

A

B

48

49

GP

HNA

HNB SUPERVISION CONSULTANT

FG

D

1

-PE 04 03 02 01 00

64.C2 64.D2

REV.

A1

DATE

REVISED AS PER COMMENT REVISED AS PER COMMENT REVISED AS PER COMMENT REVISED AS PER COMMENT FOR APPROVAL

ISSUED TO / FOR :

CONTRACTOR: CONSORTIUM( KN / HHI )

-KA1 HEATER & ANN.

24.JAN.2018 10.AUG.2017 09.AUG.2017 19.JUN.2017 01.SEP.2016

A2

E

(-)220V_F1

/ 55.E6

E

(-)220V_F1

/ 65.B3

N220V_F1

/ 57.E6

14 12 24 22 34 32 44 42

11 /64.C1 21 /68.D2

1000, Bangeojinsinhawn-doro, Dong-gu, Ulsan, Korea DRAWING TITLE:

31

ANNUNCIATOR (H1)

41 Drawing Number :

F

PREPARED :

PK55-SD-EL-GS-14 ACTION MANUFACTURER/VENDER NAME

A B C DRAWING NUMBER

16316 01 EC

SHEET NO.

58

OF

92

REV NO.

04

D

Project No.:

Scale :

CHECKED :

Plot Date:

APPROVED :

008006400 Sheet Size : Rev. :

A3

04

K.H.SONG

S.Y.JANG

01.SEP.2016

C.Y.HONG

F

1

2

3

4

5

6

7

8

Project

A

A

CB MOTOR LONG RUN AND STOP

CB MOTOR OVER LOAD AND STOP

CB MOTOR SPRING UNCHARGED/LOCK

DS/ES MOTOR RUNNING TIME EXCEEDED

POLE DISCREPANCY

DS/ES SWITCHING INCOMPLETE

INTERLOCK BY-PASS ON

AC SUPPLY MCB TRIP/OFF

-XA1

Reference DWG

52

DATE

NO. DWG

REV.

B

B 43

13

-K103 /24.E5

-K49 /24.E4

44

43

13

-K47A

-K104 /24.E6

14

/22.E6

14

43

-K47B 44

/23.E5

1

13 /43.E6

-KLR

-K204

-K203 44

73

/44.E4

14

/47.E5

2

AC_MCB

74

64.B2

AC_MCB 64.B2

EMPLOYER / DEVELOPER

C

-XA1 -H1

-XA1

1

1C

-XA1

2

11

-XA1

3

22

-XA1

4

51

-XA1

33

5

-XA1

44

6

-XA1

5C

-XA1

7

51

-XA1

8

62

-XA1

9

73

10

C

84 PROJECT MANAGER.

-CH1

-CH2

(YELLOW) RESPONSE TIME : 5ms

-CH3

(YELLOW) RESPONSE TIME : 5ms

-CH4

(YELLOW) RESPONSE TIME : 5ms

-CH5

(YELLOW) RESPONSE TIME : 5ms

-CH6

(YELLOW) RESPONSE TIME : 5ms

-CH7

(YELLOW) RESPONSE TIME : 5ms

-CH8

(YELLOW) RESPONSE TIME : 5ms

(YELLOW) RESPONSE TIME : 5ms

SUPERVISION CONSULTANT

D

D

1R1

1RC

2R2

2RC

3R3

3RC

4R4

4RC

5R1

5RC

6R2

6RC

7R3

7RC

8R4

8RC

04 03 02 01 00

REV.

-XA2

1

2

-XA2

3

-XA2

4

-XA2

5

-XA2

6

-XA2

7

-XA2

8

-XA2

24.JAN.2018 10.AUG.2017 09.AUG.2017 19.JUN.2017 01.SEP.2016

DATE

REVISED AS PER COMMENT REVISED AS PER COMMENT REVISED AS PER COMMENT REVISED AS PER COMMENT FOR APPROVAL

ISSUED TO / FOR :

CONTRACTOR: CONSORTIUM( KN / HHI )

9

E

E

+SPARE

1000, Bangeojinsinhawn-doro, Dong-gu, Ulsan, Korea DRAWING TITLE:

ANNUNCIATOR (H1) Drawing Number :

F

PREPARED :

PK55-SD-EL-GS-14 ACTION MANUFACTURER/VENDER NAME

A B C DRAWING NUMBER

16316 01 EC

SHEET NO.

59

OF

92

REV NO.

04

D

Project No.:

Scale :

CHECKED :

Plot Date:

APPROVED :

008006400 Sheet Size : Rev. :

A3

04

K.H.SONG

S.Y.JANG

01.SEP.2016

C.Y.HONG

F

1

2

3

4

5

6

7

8

Project

A

A

DC SUPPLY MCB TRIP/OFF

-XA1

AC SUPPLY FAIL

-XA1

53

220VDC SUPPLY 1 FAIL

-XA1

54

220VDC SUPPLY 2 FAIL

-XA1

55

G01-00 GAS LOW 1 (ALARM)

G01-01 GAS LOW 1 (ALARM)

G01-02 GAS LOW 1 (ALARM)

G01-03 GAS LOW 1 (ALARM)

56 Reference DWG

B

DC_MCB

AC

DC_1

DC_2

64.B4

64.E1

64.E3

64.E6

13 /48.E3

-XA1

AC

DC_1

DC_2

64.B4

64.E2

64.E4

64.E6

-XA1

11

-XA1

12

-XA1

13

-XA1

14

15

REV.

B 12 14

-KG0.1

DC_MCB

DATE

NO. DWG

-XA1

16

-XA1

12 14

-KG1.1 /49.E3

14

-XA1

17

12 14

-KG2.1 /49.E5

11

-XA1

18

-KG3.1 /50.E3

11

-XA1

19

11

20

EMPLOYER / DEVELOPER

C

C -H1

9C

91

102

113

124

13C

131

142

153

164 PROJECT MANAGER.

-CH9

-CH10

(YELLOW) RESPONSE TIME : 5ms

-CH11

(YELLOW) RESPONSE TIME : 5ms

-CH12

(YELLOW) RESPONSE TIME : 5ms

-CH13

(YELLOW) RESPONSE TIME : 5ms

-CH14

(YELLOW) RESPONSE TIME : 5sec

-CH15

(YELLOW) RESPONSE TIME : 5sec

-CH16

(YELLOW) RESPONSE TIME : 5sec

(YELLOW) RESPONSE TIME : 5sec

SUPERVISION CONSULTANT

D

D

9R1

9RC

10R2 10RC

11R3 11RC

12R4 12RC

13R1 13RC

14R2 14RC

15R3 15RC

16R4 16RC

04 03 02 01 00

REV.

-XA2

10

11

-XA2

12

-XA2

13

-XA2

14

-XA2

15

-XA2

16

-XA2

17

-XA2

24.JAN.2018 10.AUG.2017 09.AUG.2017 19.JUN.2017 01.SEP.2016

DATE

REVISED AS PER COMMENT REVISED AS PER COMMENT REVISED AS PER COMMENT REVISED AS PER COMMENT FOR APPROVAL

ISSUED TO / FOR :

CONTRACTOR: CONSORTIUM( KN / HHI )

18

E

E

+SPARE

1000, Bangeojinsinhawn-doro, Dong-gu, Ulsan, Korea DRAWING TITLE:

ANNUNCIATOR (H1) Drawing Number :

F

PREPARED :

PK55-SD-EL-GS-14 ACTION MANUFACTURER/VENDER NAME

A B C DRAWING NUMBER

16316 01 EC

SHEET NO.

60

OF

92

REV NO.

04

D

Project No.:

Scale :

CHECKED :

Plot Date:

APPROVED :

008006400 Sheet Size : Rev. :

A3

04

K.H.SONG

S.Y.JANG

01.SEP.2016

C.Y.HONG

F

1

2

3

4

5

6

7

8

Project

A

A

G01-04 GAS LOW 1 (ALARM)

G01-05 GAS LOW 1 (ALARM)

G01-06 GAS LOW 1 (ALARM)

G01-07 GAS LOW 1 (ALARM)

G01-08 GAS LOW 1 (ALARM)

G01-09 GAS LOW 1 (ALARM)

G01-00 GAS LOW 2 (LOCKOUT)

G01-01 GAS LOW 2

Reference DWG

DATE

NO. DWG

REV.

B

B 12 14

12 14

-KG4.1 /50.E5

12 14

-KG5.1 /51.E3

11

12 14

-KG6.1 /51.E5

11

12 14

-KG7.1 /52.E3

11

-KG8.1 /52.E6

11

13

12 14 /53.E4

11

12 14

-KG0.2

-KG9.1

/48.E4

11

-KG1.2 /49.E3

14

11

EMPLOYER / DEVELOPER

C

-XA1

-XA1

21

-H1

17C

-XA1

22

171

-XA1

23

182

-XA1

24

193

25

-XA1

204

26

-XA1

21C

-XA1

27

211

-XA1

28

222

-XA1

29

233

30

C

244 PROJECT MANAGER.

-CH17

-CH18

(YELLOW) RESPONSE TIME : 5sec

-CH19

(YELLOW) RESPONSE TIME : 5sec

-CH20

(YELLOW) RESPONSE TIME : 5sec

-CH21

(YELLOW) RESPONSE TIME : 5sec

-CH22

(YELLOW) RESPONSE TIME : 5sec

-CH23

(YELLOW) RESPONSE TIME : 5sec

-CH24

(YELLOW) RESPONSE TIME : 5sec

(YELLOW) RESPONSE TIME : 5sec

SUPERVISION CONSULTANT

D

D

17R1 17RC

18R2 18RC

19R3 19RC

20R4 20RC

21R1 21RC

22R2 22RC

23R3 23RC

24R4 24RC

04 03 02 01 00

REV.

-XA2

19

20

-XA2

21

-XA2

22

-XA2

23

-XA2

24

-XA2

25

-XA2

26

-XA2

24.JAN.2018 10.AUG.2017 09.AUG.2017 19.JUN.2017 01.SEP.2016

DATE

REVISED AS PER COMMENT REVISED AS PER COMMENT REVISED AS PER COMMENT REVISED AS PER COMMENT FOR APPROVAL

ISSUED TO / FOR :

CONTRACTOR: CONSORTIUM( KN / HHI )

27

E

E

+SPARE

1000, Bangeojinsinhawn-doro, Dong-gu, Ulsan, Korea DRAWING TITLE:

ANNUNCIATOR (H1) Drawing Number :

F

PREPARED :

PK55-SD-EL-GS-14 ACTION MANUFACTURER/VENDER NAME

A B C DRAWING NUMBER

16316 01 EC

SHEET NO.

61

OF

92

REV NO.

04

D

Project No.:

Scale :

CHECKED :

Plot Date:

APPROVED :

008006400 Sheet Size : Rev. :

A3

04

K.H.SONG

S.Y.JANG

01.SEP.2016

C.Y.HONG

F

1

2

3

4

5

6

7

8

Project

A

A

G01-02 GAS LOW 2

G01-03 GAS LOW 2

G01-04 GAS LOW 2

G01-05 GAS LOW 2

G01-06 GAS LOW 2

G01-07 GAS LOW 2

G01-08 GAS LOW 2

G01-09 GAS LOW 2

Reference DWG

DATE

NO. DWG

REV.

B

B 12 14

12 14

-KG2.2 /49.E6

-XA1

-XA1

31

12 14

-KG3.2 /50.E3

11

-XA1

32

12 14

-KG4.2 /50.E6

11

-XA1

33

12 14

-KG5.2 /51.E3

11

-XA1

34

12 14

-KG6.2 /51.E6

11

35

-XA1

36

-XA1

12 14

-KG7.2 /52.E4

11

-XA1

37

12 14

-KG8.2 /52.E6

11

-XA1

38

-KG9.2 /53.E5

11

-XA1

39

11

EMPLOYER / DEVELOPER

40

C

C -H1

25C

251

262

273

284

29C

291

302

313

324 PROJECT MANAGER.

-CH25

-CH26

(YELLOW) RESPONSE TIME : 5sec

-CH27

(YELLOW) RESPONSE TIME : 5sec

-CH28

(YELLOW) RESPONSE TIME : 5sec

-CH29

(YELLOW) RESPONSE TIME : 5sec

-CH30

(YELLOW) RESPONSE TIME : 5sec

-CH31

(YELLOW) RESPONSE TIME : 5sec

-CH32

(YELLOW) RESPONSE TIME : 5sec

(YELLOW) RESPONSE TIME : 5sec

SUPERVISION CONSULTANT

D

D

25R1 25RC

26R2 26RC

27R3 27RC

28R4 28RC

29R1 29RC

30R2 30RC

31R3 31RC

32R4 32RC

04 03 02 01 00

REV.

-XA2

28

29

-XA2

30

-XA2

31

-XA2

32

-XA2

33

-XA2

34

-XA2

35

-XA2

24.JAN.2018 10.AUG.2017 09.AUG.2017 19.JUN.2017 01.SEP.2016

DATE

REVISED AS PER COMMENT REVISED AS PER COMMENT REVISED AS PER COMMENT REVISED AS PER COMMENT FOR APPROVAL

ISSUED TO / FOR :

CONTRACTOR: CONSORTIUM( KN / HHI )

36

E

E

+SPARE

1000, Bangeojinsinhawn-doro, Dong-gu, Ulsan, Korea DRAWING TITLE:

ANNUNCIATOR (H1) Drawing Number :

F

PREPARED :

PK55-SD-EL-GS-14 ACTION MANUFACTURER/VENDER NAME

A B C DRAWING NUMBER

16316 01 EC

SHEET NO.

62

OF

92

REV NO.

04

D

Project No.:

Scale :

CHECKED :

Plot Date:

APPROVED :

008006400 Sheet Size : Rev. :

A3

04

K.H.SONG

S.Y.JANG

01.SEP.2016

C.Y.HONG

F

1

2

3

4

5

6

7

8

Project

A

A

SPARE

-XA1

SPARE

-XA1

58

SPARE

-XA1

59

SPARE

-XA1

60

SPARE

-XA1

61

SPARE

-XA1

62

SPARE

-XA1

63

SPARE

-XA1

64

Reference DWG

65

DATE

NO. DWG

REV.

B

B

EMPLOYER / DEVELOPER

-XA1

C -H1

-XA1

41

33C

-XA1

42

331

-XA1

43

342

-XA1

44

353

45

-XA1

364

46

-XA1

37C

-XA1

47

371

-XA1

48

382

-XA1

49

393

C

50

404 PROJECT MANAGER.

-CH33

-CH34

(YELLOW) RESPONSE TIME : 5ms

-CH35

(YELLOW) RESPONSE TIME : 5ms

-CH36

(YELLOW) RESPONSE TIME : 5ms

-CH37

(YELLOW) RESPONSE TIME : 5ms

-CH38

(YELLOW) RESPONSE TIME : 5ms

-CH39

(YELLOW) RESPONSE TIME : 5ms

-CH40

(YELLOW) RESPONSE TIME : 5ms

SUPERVISION CONSULTANT

(YELLOW) RESPONSE TIME : 5ms

D

D

33R1 33RC

34R2 34RC

35R3 35RC

36R4 36RC

37R1 37RC

38R2 38RC

39R3 39RC

40R4 40RC

04 03 02 01 00

REV.

-XA2

37

38

-XA2

39

-XA2

40

-XA2

41

-XA2

42

-XA2

43

-XA2

44

-XA2

24.JAN.2018 10.AUG.2017 09.AUG.2017 19.JUN.2017 01.SEP.2016

DATE

REVISED AS PER COMMENT REVISED AS PER COMMENT REVISED AS PER COMMENT REVISED AS PER COMMENT FOR APPROVAL

ISSUED TO / FOR :

CONTRACTOR: CONSORTIUM( KN / HHI )

45

E

E

+SPARE

1000, Bangeojinsinhawn-doro, Dong-gu, Ulsan, Korea DRAWING TITLE:

ANNUNCIATOR (H1) Drawing Number :

F

PREPARED :

PK55-SD-EL-GS-14 ACTION MANUFACTURER/VENDER NAME

A B C DRAWING NUMBER

16316 01 EC

SHEET NO.

63

OF

92

REV NO.

04

D

Project No.:

Scale :

CHECKED :

Plot Date:

APPROVED :

008006400 Sheet Size : Rev. :

A3

04

K.H.SONG

S.Y.JANG

01.SEP.2016

C.Y.HONG

F

1

2

3

4

5

6

7

8

Project

A

A

AC SUPPLY MCB TRIP/OFF

59.B6 /

60.B1 /

AC_MCB

32 34

-F8A1 /20.C1

B 59.C6 /

DC SUPPLY MCB TRIP/OFF DC_MCB

32 34

32 34

-F8A2 /20.C4

31

-F8D1 /18.C2

31

32 34

-F8D2 31

32 34

-F8D3

/18.C3

31

32 34

-F8D4

/18.C4

31

/18.C6

32 34

-F8D5 /19.C2

31

32 34

-F8D6 31

/19.C4

32 34

-F8D7 31

Reference DWG

/19.C5

DATE

NO. DWG

REV.

31

B

AC_MCB 60.C1 /

DC_MCB

AC SUPPLY FAIL

220VDC SUPPLY 1 FAIL

220VDC SUPPLY 2 FAIL

EMPLOYER / DEVELOPER

C

C

ANN1.2

PROJECT MANAGER.

58.D3 12 14

-KA1 /58.E6

11

12 14

12 14

12 14

12 14

12 14

12 14

58.D3

-KA2

-KA3

-KA4

-KD1

-KD2

-KD3

ANN1.2

/20.D3

11 /20.D5

11 /20.D6

/66.B6

11 /47.E6

11 /21.E7

11

12 14

12 14

12 14

-KD4

-KD6

-KD7

/22.E7

11 /24.E7

11 /25.E7

11

11

12 14

ANN1.1

-KD5

58.D3

/23.E7

11

58.D3

ANN1.1 -XA1

D

66 -XA1

67

-XA1

76

-XA1

77

-XA1

-XA1

78

68

-XA1

69

-XA1

70

-XA1

71

-XA1

72

-XA1

73

-XA1

SUPERVISION CONSULTANT

-XA1

74

75

D

04 03 02 01 00

REV.

24.JAN.2018 10.AUG.2017 09.AUG.2017 19.JUN.2017 01.SEP.2016

DATE

REVISED AS PER COMMENT REVISED AS PER COMMENT REVISED AS PER COMMENT REVISED AS PER COMMENT FOR APPROVAL

ISSUED TO / FOR :

CONTRACTOR: CONSORTIUM( KN / HHI )

AC

AC

DC_1

DC_1

DC_2

DC_2

60.B2

60.C2

60.B3

60.C3

60.B3

60.C3

E

E

1000, Bangeojinsinhawn-doro, Dong-gu, Ulsan, Korea DRAWING TITLE:

ANNUNCIATOR (H1) Drawing Number :

F

PREPARED :

PK55-SD-EL-GS-14 ACTION MANUFACTURER/VENDER NAME

A B C DRAWING NUMBER

16316 01 EC

SHEET NO.

64

OF

92

REV NO.

04

D

Project No.:

Scale :

CHECKED :

Plot Date:

APPROVED :

008006400 Sheet Size : Rev. :

A3

04

K.H.SONG

S.Y.JANG

01.SEP.2016

C.Y.HONG

F

1

2

3

4

5

6

7

8

Project

A

A

/ 58.E6

/ 58.B6

(+)220V_F1 (-)220V_F1 (+)220V_F1

66.A2 /

Reference DWG

B

(-)220V_F1

-AM1

7

-AM2

8

16

C

7

DATE

NO. DWG

REV.

66.A2 /

B

-AM3

8

16

7

8

16

15

1

15

1

15

1

14

2

14

2

14

2

13

3

13

3

13

3

12

4

12

4

12

4

11

5

11

5

11

5

EMPLOYER / DEVELOPER

C

PROJECT MANAGER.

-TT1

D

IA_M

/ 71.E1

D

IB_M

/ 71.E2

8

9

12 F

11

14

13

16

15

18

17

G

IC_M

9

10 E

H

/ 71.E3

7

I

10

9

9

10

10

SUPERVISION CONSULTANT

D

04 03 02 01 00

6

6

REV.

6

24.JAN.2018 10.AUG.2017 09.AUG.2017 19.JUN.2017 01.SEP.2016

DATE

REVISED AS PER COMMENT REVISED AS PER COMMENT REVISED AS PER COMMENT REVISED AS PER COMMENT FOR APPROVAL

ISSUED TO / FOR :

CONTRACTOR: CONSORTIUM( KN / HHI )

IN_M

/ 71.E2

E

-XM

E 1

2

3

4

=CONTROL PNL

BKR. FAIL

1000, Bangeojinsinhawn-doro, Dong-gu, Ulsan, Korea DRAWING TITLE:

METERING (1) Drawing Number :

F

PREPARED :

PK55-SD-EL-GS-14 ACTION MANUFACTURER/VENDER NAME

A B C DRAWING NUMBER

16316 01 EC

SHEET NO.

65

OF

92

REV NO.

04

D

Project No.:

Scale :

CHECKED :

Plot Date:

APPROVED :

008006400 Sheet Size : Rev. :

A3

04

K.H.SONG

S.Y.JANG

01.SEP.2016

C.Y.HONG

F

1

2

3

4

5

6

7

8

Project

A

A

/ 65.B6

/ 65.B6

(+)220V_F1 (-)220V_F1

A1

-KD1 SIGNAL LAMP & ALARM SUPPLY

A2 Reference DWG

DATE

NO. DWG

REV.

=OUTDOOR CVT(AT OHTL)

B

B

-VM1 7

8

16 1

-XS

15

-XS

54

55

-XS

56

-XS

57

14 12 24 22 34 32 44 42

11 /64.C3 21 31 /68.D5 41

2 14 3 13

EMPLOYER / DEVELOPER

4

C

C

/76.B2

12

-S12

5

-TT1

11 2

9

/76.B3

5

/76.B3

10

9

/76.B3

3 6

14

13

18

17

/76.B3

D

1

2

A

PROJECT MANAGER.

/76.B3

10

1

B

SUPERVISION CONSULTANT

5

6

C

D

19 22

4

20

04 03 02 01 00

J

21

REV.

6

24.JAN.2018 10.AUG.2017 09.AUG.2017 19.JUN.2017 01.SEP.2016

DATE

REVISED AS PER COMMENT REVISED AS PER COMMENT REVISED AS PER COMMENT REVISED AS PER COMMENT FOR APPROVAL

ISSUED TO / FOR :

CONTRACTOR: CONSORTIUM( KN / HHI )

A1

~

-K501

A2

A1

~ UMAX : 150V UMIN : 30% A2 -K502 TIME : 1 Sec UMAX : 150V UMIN : 30% TIME : 1 Sec

E

E A1

~

-K503 A2

UMAX : 150V UMIN : 30% TIME : 1 Sec

1000, Bangeojinsinhawn-doro, Dong-gu, Ulsan, Korea 18 16

DRAWING TITLE:

15 /47.B4 18 16

18 16

F

METERING (2)

15 /47.C4 15 /47.C4

Drawing Number : ACTION

MANUFACTURER/VENDER NAME

A B C DRAWING NUMBER

16316 01 EC

SHEET NO.

66

OF

92

REV NO.

04

PREPARED :

PK55-SD-EL-GS-14

D

Project No.:

Scale :

CHECKED :

Plot Date:

APPROVED :

008006400 Sheet Size : Rev. :

A3

04

K.H.SONG

S.Y.JANG

01.SEP.2016

C.Y.HONG

F

1

2

3

4

5

6

7

8

Project

CB(-Q0.A)

CB(-Q0.B)

CB(-Q0.C)

BUS DS(-Q1)

BUS DS(-Q2)

A

A

-J2

-Q0(A)

-J2

5 A6

17 B7

13

-J2

17

B07

-J2

6

B7

14

47

-J2

48

-X0

15

5

-J2

17

A6

B7

B07

A06

B07

-J2

6

16

49

-J2

18

50

-X0

17

-J2

-Q1

5

-J2

15

A3

B3

A03

B03

-J2

-Q2

-S1

-S1 A06

18

-J2

-Q0(C)

-S1 A06

-X0

5 A6

-S1 -J2

-J2

-Q0(B)

-J2

6

18

51

-J2

18

52

-X1

5

-J2

5

15

A3

B3

A03

B03

-S1 -J2

6

6

15

-J2

16

16

-X2

5

-J2

6

6

15

16

16 Reference DWG

DATE

NO. DWG

REV.

B

B

=CRP

LINE ES(-Q9)

WORK ES(-Q51)

WORK ES(-Q52)

LINE ES(-Q8)

LOCAL

SELECTOR SWITCH REMOTE EMPLOYER / DEVELOPER

C

C

-J2

-Q9

5

-J2

A3

13 B3

5

-J2

15

B03

-J2

6

B3

6

15

-J2

16

-X51

5

5

-J2

A3

15

B03

-J2

6

6

15

-J2

16

-X52

5

11

-S1 -J2

6

15

-J1

16

16

-X8

5

17 B3

-S1 A03

B03

6

-J1

A3

B3

A03

16

-J1

-Q8

-S1 A03

14

-J2

-Q52

-S1 A03

-X9

5 A3

-S1 -J2

-J2

-Q51

B03

-J1

12

6

11

18

12

13

15

-S11

REMOTE

LOCAL

14/75.B3

PROJECT MANAGER.

16

/75.B3

-XR1

44

-XR1

45

-XR1

46

SUPERVISION CONSULTANT

D

D

=CRP 04 03 02 01 00

BUS DS(-Q1)

REV.

BUS DS(-Q2)

24.JAN.2018 10.AUG.2017 09.AUG.2017 19.JUN.2017 01.SEP.2016

DATE

REVISED AS PER COMMENT REVISED AS PER COMMENT REVISED AS PER COMMENT REVISED AS PER COMMENT FOR APPROVAL

ISSUED TO / FOR :

CONTRACTOR: CONSORTIUM( KN / HHI )

-J2

-Q1

7

-J2

E

7

-J2

8

8

17

7

-J2 -X2

7

E B04

A04

18

17 B4

-S1

-S1

18

-J2

A4

B04

A04

-X1

-J2

-Q2

-S1

-S1 -J2

17 B4

A4

-J2

8

8

17

18

18

1000, Bangeojinsinhawn-doro, Dong-gu, Ulsan, Korea DRAWING TITLE:

REMOTE =REMOTE

Drawing Number :

F

PREPARED :

PK55-SD-EL-GS-14 ACTION MANUFACTURER/VENDER NAME

A B C DRAWING NUMBER

16316 01 EC

SHEET NO.

67

OF

92

REV NO.

04

D

Project No.:

Scale :

CHECKED :

Plot Date:

APPROVED :

008006400 Sheet Size : Rev. :

A3

04

K.H.SONG

S.Y.JANG

01.SEP.2016

C.Y.HONG

F

1

2

3

4

5

6

7

8

Project

A

CB MOTOR CB MOTOR CB MOTOR SPRING POLE LONG RUN & STOP OVER LOAD CHARGING DESCRIPANCY FAULTY

53

23

-K103 /24.E5

B

-XR1

47

-K49 /24.E4

54

48

23

-K104 24

/24.E6

49

24

DS/ES MOTOR RUNNING TIME EXCEEDED

53

-K47B

/22.E6

54 /23.E5

50

33

53

-K47A

DS/ES SWITCH INCOMPLTE

-XR1

51

/44.E2

34

52

-XR1

53

54

7

83

-K205

/43.E6

54

INTERLOCK RELEASE

7

-K203

-K204

-KLR 8

/47.E5

-XR1

55

56

A

DS/ES SWITCH INCOMPLETE FAIL

/44.E4

84

57

-XR1

-XR1

58

Reference DWG

DATE

NO. DWG

REV.

8

B

59

EMPLOYER / DEVELOPER

=CRP

C

C

PROJECT MANAGER.

AC SUPPLY FAIL

DC SUPPLY FAIL

SUPERVISION CONSULTANT

21

D

21

-F8A1

-F8A2

/20.C1

/20.C4

22

22 24

-KA1

22 /58.E6

22 24

22 24

-KA2

-KA3

-KA4

21/20.D3

21/20.D5

21/20.D6

21

22 24

21

21

21

21

21

21

-F8D1

-F8D2

-F8D3

-F8D4

-F8D5

-F8D6

-F8D7

/18.C2

/18.C3

/18.C4

/18.C6

/19.C2

/19.C4

/19.C5

21

22

22

22

22

22

22

-KD1

22/66.B6

32 34

32 34

32 34

32 34

32 34

32 34

32 34

-KD2

-KD3

-KD4

-KD5

-KD6

-KD7

/47.E6 31

/21.E7 31

/22.E7 31

/23.E7 31

31/24.E7

31 /25.E7

D 31

04 03 02 01 00

-XR1

60

-XR1

61

-XR1

62

-XR1

REV.

63

24.JAN.2018 10.AUG.2017 09.AUG.2017 19.JUN.2017 01.SEP.2016

DATE

REVISED AS PER COMMENT REVISED AS PER COMMENT REVISED AS PER COMMENT REVISED AS PER COMMENT FOR APPROVAL

ISSUED TO / FOR :

CONTRACTOR: CONSORTIUM( KN / HHI )

REMOTE E

E

1000, Bangeojinsinhawn-doro, Dong-gu, Ulsan, Korea DRAWING TITLE:

REMOTE Drawing Number :

F

PREPARED :

PK55-SD-EL-GS-14 ACTION MANUFACTURER/VENDER NAME

A B C DRAWING NUMBER

16316 01 EC

SHEET NO.

68

OF

92

REV NO.

04

D

Project No.:

Scale :

CHECKED :

Plot Date:

APPROVED :

008006400 Sheet Size : Rev. :

A3

04

K.H.SONG

S.Y.JANG

01.SEP.2016

C.Y.HONG

F

1

2

3

4

5

6

7

8

Project

A

A

GAS6 GAS PRESSURE LOW STAGE 1

43

-KG0.1

B

/48.E3

-XR1

64

22 24

-KG1.1 44

/49.E3

65

22 24

-KG2.1 21

/49.E5

66

22 24

-KG3.1 21

/50.E3

67

22 24

-KG4.1 21

/50.E5

68

22 24

-KG5.1 21

/51.E3

69

22 24

-KG6.1 21

/51.E5

70

22 24

-KG7.1 21

/52.E3

71

22 24

-KG8.1 21

/52.E6

72

Reference DWG

22 24

DATE

NO. DWG

REV.

-KG9.1 21

/53.E4

73

B 21

74

EMPLOYER / DEVELOPER

C

=CRP

C

PROJECT MANAGER.

SUPERVISION CONSULTANT

GAS6 GAS PRESSURE LOW STAGE 2 D

D

04 03 02 01 00

43

-KG0.2 /48.E4

22 24

-KG1.2 44

/49.E3

22 24

-KG2.2 21

/49.E6

22 24

-KG3.2 21

/50.E3

22 24

-KG4.2 21

/50.E6

22 24

-KG5.2 21

/51.E3

22 24

-KG6.2 21

/51.E6

22 24

-KG7.2 21

/52.E4

22 24

-KG8.2 21

/52.E6

22 24

REV.

-KG9.2 21

/53.E5

24.JAN.2018 10.AUG.2017 09.AUG.2017 19.JUN.2017 01.SEP.2016

DATE

REVISED AS PER COMMENT REVISED AS PER COMMENT REVISED AS PER COMMENT REVISED AS PER COMMENT FOR APPROVAL

ISSUED TO / FOR :

CONTRACTOR: CONSORTIUM( KN / HHI )

21

E

-XR1

E 75

76

77

78

79

80

81

82

83

84

85

=CRP

1000, Bangeojinsinhawn-doro, Dong-gu, Ulsan, Korea DRAWING TITLE:

REMOTE Drawing Number :

F

PREPARED :

PK55-SD-EL-GS-14 ACTION MANUFACTURER/VENDER NAME

A B C DRAWING NUMBER

16316 01 EC

SHEET NO.

69

OF

92

REV NO.

04

D

Project No.:

Scale :

CHECKED :

Plot Date:

APPROVED :

008006400 Sheet Size : Rev. :

A3

04

K.H.SONG

S.Y.JANG

01.SEP.2016

C.Y.HONG

F

1

2

3

4

5

6

7

8

Project

A

A

T1-C1

T1-C2

CLASS : 5P30, 60-30VA

CLASS : 5P30, 60-30VA

TAP S1-S3 S1-S2

RATIO 1600A/1A 800A/1A

TAP S1-S3 S1-S2

-T1(C1)

RATIO 1600A/1A 800A/1A

-T1(C2) Reference DWG

P1 B

P1

P2

A

‎AΦ S1

CB SIDE

S2

S3

S1

P1

S2

S3

P1

P2

P2

B

‎BΦ S1

CB SIDE

S2

S3

S1

P1

S2

S3

P1

P2

P2

C

‎CΦ S1

CB SIDE

S2

DATE

NO. DWG

REV.

P2

S3

S1

S2

S3

B / 71.B1

/ 71.B1

/ 71.C1

EMPLOYER / DEVELOPER

C

-CTB1(A)

-CTB1(B)

1

-W1

-XC1

2

3

1

1

2

3

1

2

3

-W2

-XC1

-CTB1(C) 2

3

1

1

2

3

4

5

6

-W3

-XC1

-CTB1(A) 2

3

4

1

2

3

7

8

9

-W1

-XC1

-CTB1(B) 5

6

4

4

5

6

10

11

12

-W2

-XC1

C

-CTB1(C) 5

6

4

4

5

6

13

14

15

-W3

-XC1

5

6

4

5

6

16

17

18

PROJECT MANAGER.

SUPERVISION CONSULTANT

D

D 1

2

-XC2

-XC2

-E

-E

04 03 02 01 00

REV.

24.JAN.2018 10.AUG.2017 09.AUG.2017 19.JUN.2017 01.SEP.2016

DATE

REVISED AS PER COMMENT REVISED AS PER COMMENT REVISED AS PER COMMENT REVISED AS PER COMMENT FOR APPROVAL

ISSUED TO / FOR :

CONTRACTOR: CONSORTIUM( KN / HHI )

E

E

1000, Bangeojinsinhawn-doro, Dong-gu, Ulsan, Korea

=BUSBAR PROT.PANEL MAIN ZONE1

DRAWING TITLE:

=BUSBAR PROT.PANEL MAIN ZONE2

CURRENT TRANSFORMER Drawing Number :

F

PREPARED :

PK55-SD-EL-GS-14 ACTION MANUFACTURER/VENDER NAME

A B C DRAWING NUMBER

16316 01 EC

SHEET NO.

70

OF

92

REV NO.

04

D

Project No.:

Scale :

CHECKED :

Plot Date:

APPROVED :

008006400 Sheet Size : Rev. :

A3

04

K.H.SONG

S.Y.JANG

01.SEP.2016

C.Y.HONG

F

1

2

3

4

5

6

7

8

Project

A

A

T1-C3

T1-C4

CLASS : 0.2FS5, 30-15VA

CLASS : 5P30, 60-30VA

TAP S1-S3 S1-S2

RATIO 1600A/1A 800A/1A

TAP S1-S3 S1-S2

-T1(C3)

RATIO 1600A/1A 800A/1A

-T1(C4) Reference DWG

P1 B / 70.B6

/ 70.B6

/ 70.C6

P1

P2

A

A S1

S2

S3

S1

P1

B

S2

S3

P1

P2

S1

S2

S3

S1

P1

C

P2 S2

B

S3

P1

P2

S1

S2

DATE

NO. DWG

REV.

P2

S3

P2

S1

S2

C

S3

B / 72.B2

/ 72.B2

/ 72.C2

EMPLOYER / DEVELOPER

C

-CTB1(A) 7

-W4

-XC1

-CTB1(B) 8

9

7

1

2

3

19

20

21

-W5

-XC1

-CTB1(C) 8

9

7

1

2

3

22

23

24

-W6

-XC1

-CTB1(A) 8

9

10

1

2

3

25

26

27

-W4

-XC1

D

11

-CTB1(B) 12

10

4

5

6

28

29

30

-W5

-XC1

C

-CTB1(C) 11

12

10

4

5

6

31

32

33

-W6

-XC1

11

12

4

5

6

PROJECT MANAGER.

34

35

36

SUPERVISION CONSULTANT

3

D

4

-XC2

-XC2

-E

-E

04 03 02 01 00

REV.

24.JAN.2018 10.AUG.2017 09.AUG.2017 19.JUN.2017 01.SEP.2016

DATE

REVISED AS PER COMMENT REVISED AS PER COMMENT REVISED AS PER COMMENT REVISED AS PER COMMENT FOR APPROVAL

ISSUED TO / FOR :

CONTRACTOR: CONSORTIUM( KN / HHI )

E

E

IA_M IN_M

IB_M

IC_M

65.D1

65.D1

65.E1

65.E1

1000, Bangeojinsinhawn-doro, Dong-gu, Ulsan, Korea DRAWING TITLE:

CURRENT TRANSFORMER

METERING

Drawing Number :

F

PREPARED :

PK55-SD-EL-GS-14 ACTION MANUFACTURER/VENDER NAME

A B C DRAWING NUMBER

16316 01 EC

SHEET NO.

71

OF

92

REV NO.

04

D

Project No.:

Scale :

CHECKED :

Plot Date:

APPROVED :

008006400 Sheet Size : Rev. :

A3

04

K.H.SONG

S.Y.JANG

01.SEP.2016

C.Y.HONG

F

1

2

3

4

5

6

7

8

Project

T1-C5

A

A

CLASS : 5P30, 60-30VA TAP S1-S3 S1-S2

RATIO 1600A/1A 800A/1A

-T1(C5) P1 B

/ 71.B6

/ 71.B6

/ 71.C6

Reference DWG

P2

DATE

NO. DWG

REV.

‎AΦ

A S1

S2

S3

B

LINE SIDE P1

B

S1

P2 S2

‎BΦ

S3

LINE SIDE P1

C

P2

S1

S2

‎CΦ

S3

LINE SIDE EMPLOYER / DEVELOPER

-CTB1(A)

C

13

-W7

-XC1

14

-CTB1(B) 15

13

1

2

3

37

38

39

-W8

-XC1

-CTB1(C) 14

15

13

1

2

3

40

41

42

-W9

-XC1

C 14

15

1

2

3

43

44

45

PROJECT MANAGER.

SUPERVISION CONSULTANT

5

D

D

-XC2 -E

04 03 02 01 00

REV.

24.JAN.2018 10.AUG.2017 09.AUG.2017 19.JUN.2017 01.SEP.2016

DATE

REVISED AS PER COMMENT REVISED AS PER COMMENT REVISED AS PER COMMENT REVISED AS PER COMMENT FOR APPROVAL

ISSUED TO / FOR :

CONTRACTOR: CONSORTIUM( KN / HHI )

E

E

1000, Bangeojinsinhawn-doro, Dong-gu, Ulsan, Korea

=RCP

DRAWING TITLE:

CURRENT TRANSFORMER Drawing Number :

F

PREPARED :

PK55-SD-EL-GS-14 ACTION MANUFACTURER/VENDER NAME

A B C DRAWING NUMBER

16316 01 EC

SHEET NO.

72

OF

92

REV NO.

04

D

Project No.:

Scale :

CHECKED :

Plot Date:

APPROVED :

008006400 Sheet Size : Rev. :

A3

04

K.H.SONG

S.Y.JANG

01.SEP.2016

C.Y.HONG

F

1

2

3

4

5

6

7

8

Project

CLOSE

OPEN

CLOSE

OPEN

1

3

5

7

9

2

4

6

8

10 12

/23.B1

CB -Q0 OPEN/CLOSE

CLOSE

YSDNC3305-64RP20R

OPEN

SELECTOR SWITCH PULLING TURN & AUTOMATIC RETURN, HANDLE-PISTOL, COLOR-RED

/21.B1

A

/22.B1

A

OPEN

CLOSE

1 3 5 7

9 11

OPEN

11

-SQ0

CLOSE 2 4 6 8 10 12 Reference DWG

DATE

NO. DWG

REV.

CLOSE

3

5

7

OPEN

CLOSE

BUS DS -Q1 OPEN/CLOSE

2

4

6

1 3 5 7 OPEN

EMPLOYER / DEVELOPER

-SQ1 /28.B2

C

1

/28.B2

YSDNC3205-64RE20B

OPEN

SELECTOR SWITCH PULLING TURN & AUTOMATIC RETURN, HANDLE-EGG

CLOSE

B

OPEN

B

CLOSE

8

C

2 4 6 8

CLOSE

OPEN

CLOSE

YSDNC3205-64RE20B

1

3

5

7

2

4

6

8

/30.B2

D

OPEN

SELECTOR SWITCH PULLING TURN & AUTOMATIC RETURN, HANDLE-EGG

/30.B2

PROJECT MANAGER.

SUPERVISION CONSULTANT OPEN

CLOSE

-SQ2

BUS DS -Q2 OPEN/CLOSE

1 3 5 7

D

OPEN CLOSE 2 4 6 8 04 03 02 01 00

REV.

24.JAN.2018 10.AUG.2017 09.AUG.2017 19.JUN.2017 01.SEP.2016

DATE

REVISED AS PER COMMENT REVISED AS PER COMMENT REVISED AS PER COMMENT REVISED AS PER COMMENT FOR APPROVAL

ISSUED TO / FOR :

CLOSE

OPEN

CLOSE

LINE DS -Q9 OPEN/CLOSE

1

3

5

7

2

4

6

8

/32.B2

YSDNC3205-64RE20B

OPEN

SELECTOR SWITCH PULLING TURN & AUTOMATIC RETURN, HANDLE-EGG

E

/32.B2

CONTRACTOR: CONSORTIUM( KN / HHI )

-SQ9

E

OPEN

CLOSE

1 3 5 7 OPEN CLOSE 2 4 6 8

1000, Bangeojinsinhawn-doro, Dong-gu, Ulsan, Korea DRAWING TITLE:

SWITCH Drawing Number :

F

PREPARED :

PK55-SD-EL-GS-14 ACTION MANUFACTURER/VENDER NAME

A B C DRAWING NUMBER

16316 01 EC

SHEET NO.

73

OF

92

REV NO.

04

D

Project No.:

Scale :

CHECKED :

Plot Date:

APPROVED :

008006400 Sheet Size : Rev. :

A3

04

K.H.SONG

S.Y.JANG

01.SEP.2016

C.Y.HONG

F

1

2

3

4

5

6

7

8

Project

CLOSE

OPEN

CLOSE

/34.B2

CLOSE

OPEN

CLOSE

8

1

3

5

7

2

4

6

8

/36.B2

6

/34.B2

4

1 3 5 7 OPEN

Reference DWG

DATE

NO. DWG

REV.

CLOSE

B

2 4 6 8

EMPLOYER / DEVELOPER OPEN

CLOSE

1 3 5 7

C

OPEN

-SQ52

WORK ES -Q52 OPEN/CLOSE

CLOSE 2 4 6 8

PROJECT MANAGER.

CLOSE

OPEN

CLOSE

1

3

5

7

2

4

6

8

/38.B2

SUPERVISION CONSULTANT

SELECTOR SWITCH PULLING TURN & AUTOMATIC RETURN, HANDLE-EGG

LINE ES -Q8 OPEN/CLOSE

2

OPEN

C

YSDNC3205-64RE20B

7

/36.B2

SELECTOR SWITCH PULLING TURN & AUTOMATIC RETURN, HANDLE-EGG

D

5

-SQ51

WORK ES -Q51 OPEN/CLOSE

YSDNC3205-64RE20B

3

OPEN

B

1

/38.B2

YSDNC3205-64RE20B

OPEN

SELECTOR SWITCH PULLING TURN & AUTOMATIC RETURN, HANDLE-EGG

CLOSE

A

OPEN

A

-SQ8

D OPEN

CLOSE

1 3 5 7 OPEN 04 03 02 01 00

CLOSE 2 4 6 8

REV.

24.JAN.2018 10.AUG.2017 09.AUG.2017 19.JUN.2017 01.SEP.2016

DATE

REVISED AS PER COMMENT REVISED AS PER COMMENT REVISED AS PER COMMENT REVISED AS PER COMMENT FOR APPROVAL

ISSUED TO / FOR :

CONTRACTOR: CONSORTIUM( KN / HHI )

E

E

1000, Bangeojinsinhawn-doro, Dong-gu, Ulsan, Korea DRAWING TITLE:

SWITCH Drawing Number :

F

PREPARED :

PK55-SD-EL-GS-14 ACTION MANUFACTURER/VENDER NAME

A B C DRAWING NUMBER

16316 01 EC

SHEET NO.

74

OF

92

REV NO.

04

D

Project No.:

Scale :

CHECKED :

Plot Date:

APPROVED :

008006400 Sheet Size : Rev. :

A3

04

K.H.SONG

S.Y.JANG

01.SEP.2016

C.Y.HONG

F

1

2

3

4

5

6

7

8

Project

7

9

REMOTE

LOCAL

REMOTE

LOCAL

REMOTE

LOCAL

REMOTE

LOCAL

REMOTE

LOCAL

REMOTE (Key removable position)

11 13 15 17 19 21 23 25 27 29 31

LOCAL

DATE

NO. DWG

REV.

B

(Key removable position)

LOCK

RELEASE

1

2

3

4

CB MOTOR OPERATION

1

3

LOCK

LOCK

RELEASE

USE

INTERLOCK

KGS-C2M2

5

7

-S1 2

4

6

8

LOCK LOCK

USE

USE

1

2

3

4

5

6

7

8

EMPLOYER / DEVELOPER

C

/24.B1

4

/47.B5

2

SELECTOR SWITCH

MANUAL RETURN, 2NO 2NC

USE

/18.E5

-S3

/19.D2

/18.E4

3

/19.D2

/18.E3

INTERLOCK

1

10 12 14 16 18 20 22 24 26 28 30 32 /47.B5

8

/67.C6

6

/67.C5

4

/18.E3 KGK-J2R1A

Reference DWG

REMOTE 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32

RELEASE

KEY SWITCH

AUTO-RETURN, 1NO 1NC

INTERLOCK RELEASE

5

1 3 5 7 9 11 13 15 17 19 21 23 25 27 29 31 LOCAL

-S11 2

C

3

/18.E6

B

1

/18.E6

LOCAL - REMOTE SELECTOR

REMOTE

YSKDNC2801-79M20L

LOCAL

REMOTE

SELECTOR SWITCH WITH KEY MANUAL RETURN WITH KEY

REMOTE

A

LOCAL

A

LAMP TEST

-S4

CLOSE OPEN 1 3

/54.B1

2

4

KGF-CM2R 2 4

CB MOTOR LONG RUN RESET

RESET

3

SET

D

1

1

3

5

7

-S2 2

4

6

8

SET

RESET

SUPERVISION CONSULTANT

1

2

3

4

5

6

7

8

/24.B5

KGF-CM1B

RESET

SELF-RETURN, 2NO 2NC, COLOR-RED

OPEN

PUSH BUTTON SWITCH

SELF-RETURN, 1NO 1NC, COLOR-BLACK

CLOSE

PUSH BUTTON SWITCH

SET

PROJECT MANAGER.

D

04 03 02 01 00

REV.

OPEN

1

3

ISSUED TO / FOR :

CLOSE OPEN

X1

4

1

2

3

4

X1

X2

E

X2 /56.C3

2

/56.C3

-S5 /56.C3

HEATER TEST

CLOSE

MANUAL-RETURN, 1NO 1NC, YELLOW LED KGX-CMV21Y

DATE

REVISED AS PER COMMENT REVISED AS PER COMMENT REVISED AS PER COMMENT REVISED AS PER COMMENT FOR APPROVAL

CONTRACTOR: CONSORTIUM( KN / HHI )

PUSH BUTTON SWITCH WITH LED LAMP

E

24.JAN.2018 10.AUG.2017 09.AUG.2017 19.JUN.2017 01.SEP.2016

1000, Bangeojinsinhawn-doro, Dong-gu, Ulsan, Korea DRAWING TITLE:

SWITCH Drawing Number :

F

PREPARED :

PK55-SD-EL-GS-14 ACTION MANUFACTURER/VENDER NAME

A B C DRAWING NUMBER

16316 01 EC

SHEET NO.

75

OF

92

REV NO.

04

D

Project No.:

Scale :

CHECKED :

Plot Date:

APPROVED :

008006400 Sheet Size : Rev. :

A3

04

K.H.SONG

S.Y.JANG

01.SEP.2016

C.Y.HONG

F

1

2

3

4

5

6

7

8

Project

9

SPARE

7

N

5

SPARE

B

3

C

SPARE

1

SPARE

B

B

SPARE

YSDNC7602-64MR20B OFF-AB-BC-CA-AN-BN-CN SELECTOR

A

SELECTOR SWITCH MANUAL RETURN, HANDLE-CHRYSANTHEMUM, COLOR-BLACK

C

A

SPARE

A

1 3 5 7 9 11 13 15 17 19 21 23 OFF

CA BC

11 13 15 17 19 21 23

Reference DWG

DATE

NO. DWG

REV.

AB

AN

B

BC

-S12 /66.D3

10 12 14 16 18 20 22 24 /66.D3

8

/66.D3

6

/66.D3

4

/66.D3

/66.C3

2

AB

BN

CA AN

OFF

CN

BN CN 2 4 6 8 10 12 14 16 18 20 22 24

EMPLOYER / DEVELOPER

C

C

PROJECT MANAGER.

SUPERVISION CONSULTANT

D

D

04 03 02 01 00

REV.

24.JAN.2018 10.AUG.2017 09.AUG.2017 19.JUN.2017 01.SEP.2016

DATE

REVISED AS PER COMMENT REVISED AS PER COMMENT REVISED AS PER COMMENT REVISED AS PER COMMENT FOR APPROVAL

ISSUED TO / FOR :

CONTRACTOR: CONSORTIUM( KN / HHI )

E

E

1000, Bangeojinsinhawn-doro, Dong-gu, Ulsan, Korea DRAWING TITLE:

SWITCH Drawing Number :

F

PREPARED :

PK55-SD-EL-GS-14 ACTION MANUFACTURER/VENDER NAME

A B C DRAWING NUMBER

16316 01 EC

SHEET NO.

76

OF

92

REV NO.

04

D

Project No.:

Scale :

CHECKED :

Plot Date:

APPROVED :

008006400 Sheet Size : Rev. :

A3

04

K.H.SONG

S.Y.JANG

01.SEP.2016

C.Y.HONG

F

1

2

3

4

5

6

7

8

Project

A

A

PARTS LIST DEVICE NAME

SYMBOL

DIGITAL AC AMMETER

-AM1 B

DIGITAL AC AMMETER

-AM2

DIGITAL AC AMMETER

-AM3

-DS1

-DS2

MINIATURE CIRCUIT BREAKER

-F8D1

INDICATOR & ALARM

MINIATURE CIRCUIT BREAKER

-F8D2

DS/ES MOTOR & INTERLOCK

MINIATURE CIRCUIT BREAKER

-F8D3

CB CLOSE

MINIATURE CIRCUIT BREAKER

-F8D4

CB TRIP1

MINIATURE CIRCUIT BREAKER

-F8D5

CB TRIP2

MINIATURE CIRCUIT BREAKER

-F8D6

INDICATOR & ALARM

MINIATURE CIRCUIT BREAKER

-F8D7

INDICATOR & ALARM

THERMAL RELAY

-F49A

CB MOTOR OVERLOAD

THERMAL RELAY

-F49B

CB MOTOR OVERLOAD

E

THERMAL RELAY

-F49C

CB MOTOR OVERLOAD

ANNUNCIATOR

-H1

ANNUNCIATOR (1)

SPACER HEATER

-HT

LCC

HUMIDISTAT

-HTS

HUMIDITISTATE

SHEET NO

KYONGBO

KOREA

/65.B3

KYONGBO

KOREA

/65.B4

KYONGBO

KOREA

/65.B5

YONGSUNG

KOREA

/56.B1

YONGSUNG

KOREA

/56.B1

ABB

GERMANY

/20.C1

ABB

GERMANY

/20.C4

ABB

GERMANY

/18.C2

Reference DWG

DATE

NO. DWG

REV.

B

DM1T-AA21 SINGLE PHASE 1A, POWER 100-240VAC/DC, CLASS 0.2, OUTPUT 4-20MA, RS485

YSR1215GW-B

3-PH & 1-PH SOCKET OUTLET

ORIGIN

DM1T-AA21 SINGLE PHASE 1A, POWER 100-240VAC/DC, CLASS 0.2, OUTPUT 4-20MA, RS485

LIMIT SWITCH

MINIATURE CIRCUIT BREAKER

-F8A2

MANUFACTURER

DM1T-AA21 SINGLE PHASE 1A, POWER 100-240VAC/DC, CLASS 0.2, OUTPUT 4-20MA, RS485

YSR1215GW-B

HEATING & ANNUNCIATOR

C

MODEL NUMBER

LIMIT SWITCH

MINIATURE CIRCUIT BREAKER

-F8A1

D

DESCRIPTION

S202M-K6UC / S2C-H11L / S2C-H6R 2P, 6A, 10KA / 1NO 1NC / 1C

EMPLOYER / DEVELOPER

C

S203M-K32NA / S2C-H11L / S2C-H6R 3P+1N, 32A, 10KA / 1NO 1NC / 1C

S202M-K6UC / S2C-H11L / S2C-H6R 2P, 6A, 10KA / 1NO 1NC / 1C

PROJECT MANAGER.

S202M-K6UC / S2C-A2 / S2C-H11L / S2C-H6R 2P, 6A, 10KA / 1NO 1NC / 1C

ABB

GERMANY

/18.C3

ABB

GERMANY

/18.C4

ABB

GERMANY

/18.C6

ABB

GERMANY

/19.C2

ABB

GERMANY

/19.C4

ABB

GERMANY

/19.C5

S202M-K16UC / S2C-H11L / S2C-H6R 2P, 16A, 10KA / 1NO 1NC / 1C

S202M-K16UC / S2C-H11L / S2C-H6R 2P, 16A, 10KA / 1NO 1NC / 1C

SUPERVISION CONSULTANT

S202M-K16UC / S2C-H11L / S2C-H6R 2P, 16A, 10KA / 1NO 1NC / 1C

D

S202M-K16UC / S2C-H11L / S2C-H6R 2P, 16A, 10KA / 1NO 1NC / 1C

04 03 02 01 00

S202M-K16UC / S2C-H11L / S2C-H6R 2P, 16A, 10KA / 1NO 1NC / 1C

REV.

MT-32/2H5 4~6

LS

KOREA

/25.B2

LS

KOREA

/25.B3

LS

KOREA

/25.B5

RTK

United Kingdom

/58.C1

RARA

KOREA

/56.D3

RUN ELEC

KOREA

/56.C3

24.JAN.2018 10.AUG.2017 09.AUG.2017 19.JUN.2017 01.SEP.2016

DATE

REVISED AS PER COMMENT REVISED AS PER COMMENT REVISED AS PER COMMENT REVISED AS PER COMMENT FOR APPROVAL

ISSUED TO / FOR :

CONTRACTOR: CONSORTIUM( KN / HHI )

MT-32/2H5 4~6

MT-32/2H5 4~6

E

UC625-40YW-HH-024D-R-M3 40CHANNEL

RSHT 200 ‎100W, 500Ω

1000, Bangeojinsinhawn-doro, Dong-gu, Ulsan, Korea

RHC-80 HUMIDITY RANGE 20~80%

DRAWING TITLE:

PARTS LIST FOR LCC Drawing Number :

F

PREPARED :

PK55-SD-EL-GS-14 ACTION MANUFACTURER/VENDER NAME

A B C DRAWING NUMBER

16316 01 EE

SHEET NO.

77

OF

92

REV NO.

04

D

Project No.:

Scale :

CHECKED :

Plot Date:

APPROVED :

008006400 Sheet Size : Rev. :

A3

04

K.H.SONG

S.Y.JANG

01.SEP.2016

C.Y.HONG

F

1

2

3

4

5

6

7

8

Project

A

A

PARTS LIST DEVICE NAME

SYMBOL LED LAMP

-IL1

LCC

B

LED LAMP

-IL2

LCC

AUXILIARY RELAY

-K11

LAMP TEST

AUXILIARY RELAY

-K11.1

LAMP TEST

AUXILIARY RELAY

-K47A

POLE DISCREPANCY

AUXILIARY RELAY

-K47B

POLE DISCREPANCY

C

AUXILIARY RELAY

-K49

CB MOTOR OVER LOAD

MAGNETIC CONTACTOR

-K88MA

CB MOTOR OPERATION

MAGNETIC CONTACTOR

-K88MB

CB MOTOR OPERATION

MAGNETIC CONTACTOR

-K88MC

CB MOTOR OPERATION

AUXILIARY RELAY

-K101A D

DESCRIPTION

ANTI-PUMPING

AUXILIARY RELAY

-K101B

ANTI-PUMPING

AUXILIARY RELAY

-K101C

ANTI-PUMPING

AUXILIARY RELAY

-K102

CB MOTOR SPRING UNCHARGED

ON DELAY TIMER (A MODE)

-K102T

SPRING UNCHARGED

AUXILIARY RELAY

-K103

CB MOTOR LONG RUN

E

AUXILIARY RELAY

-K104

CB MOTOR SPRING CHARGING FAULTY

MAGNETIC CONTACTOR

-K201

DS/ES MOTOR OPERATING

AUXILIARY RELAY

-K202

DOUBLE INTERLOCKING

AUXILIARY RELAY

-K203

DS/ES MOTOR RUNNING EXCEEDED

MODEL NUMBER

MANUFACTURER

ORIGIN

SHEET NO

RUN ELEC

KOREA

/56.D1

RUN ELEC

KOREA

/56.D2

ABB

FRANCE

/54.E1

ABB

FRANCE

/54.E2

ABB

FRANCE

/22.E6

ABB

FRANCE

/23.E5

ABB

FRANCE

/24.E4

ABB

FRANCE

/24.E1

RLB-10WH AC220~240V, 50/60HZ

Reference DWG

DATE

NO. DWG

REV.

RLB-10WH AC220~240V, 50/60HZ

B

NF40E-13 / CA4-40N AC/DC 100~250V, 50/60HZ, 4NO / 4NO

NF40E-13 / CA4-40N AC/DC 100~250V, 50/60HZ, 4NO / 4NO

NF40E-13 / CA4-40N AC/DC 100~250V, 50/60HZ, 4NO / 4NO

NF40E-13 / CA4-40N AC/DC 100~250V, 50/60HZ, 4NO / 4NO

EMPLOYER / DEVELOPER

C

NF40E-13 AC/DC 100~250V, 50/60HZ, 4NO

AF09-30-10-13 AC/DC 100~250V, 50/60HZ, 3NO 1NO

PROJECT MANAGER.

AF09-30-10-13 AC/DC 100~250V, 50/60HZ, 3NO 1NO

ABB

FRANCE

/24.E2

ABB

FRANCE

/24.E3

ABB

FRANCE

/21.E3

ABB

FRANCE

/21.E5

ABB

FRANCE

/21.E6

ABB

FRANCE

/24.E3

AF09-30-10-13 AC/DC 100~250V, 50/60HZ, 3NO 1NO

NF22E-13 AC/DC 100~250V, 50/60HZ, 2NO 2NC

SUPERVISION CONSULTANT

NF22E-13 AC/DC 100~250V, 50/60HZ, 2NO 2NC

D

NF22E-13 AC/DC 100~250V, 50/60HZ, 2NO 2NC

04 03 02 01 00

NF22E-13 / CA4-22N AC/DC 100~250V, 50/60HZ, 2NO 2NC / 2NO 2NC

REV.

AT8N / PG-08 AC 100-240V / DC 24-240V, 2 CHANGE OVER CONTACT

AUTONICS

KOREA

/24.E4

ABB

FRANCE

/24.E5

ABB

FRANCE

/24.E6

ABB

FRANCE

/43.E5

ABB

FRANCE

/43.E2

ABB

FRANCE

/43.E6

24.JAN.2018 10.AUG.2017 09.AUG.2017 19.JUN.2017 01.SEP.2016

DATE

REVISED AS PER COMMENT REVISED AS PER COMMENT REVISED AS PER COMMENT REVISED AS PER COMMENT FOR APPROVAL

ISSUED TO / FOR :

CONTRACTOR: CONSORTIUM( KN / HHI )

NF22E-13 / CA4-22N AC/DC 100~250V, 50/60HZ, 2NO 2NC / 2NO 2NC

NF40E-13 AC/DC 100~250V, 50/60HZ, 4NO

E

AF09-22-00-13 / CA4-22E AC/DC 100~250V, 50/60HZ, 2NO 2NC / 2NO 2NC

NF22E-13 AC/DC 100~250V, 50/60HZ, 2NO 2NC

1000, Bangeojinsinhawn-doro, Dong-gu, Ulsan, Korea

NF40E-13 AC/DC 100~250V, 50/60HZ, 4NO

DRAWING TITLE:

PARTS LIST FOR LCC Drawing Number :

F

PREPARED :

PK55-SD-EL-GS-14 ACTION MANUFACTURER/VENDER NAME

A B C DRAWING NUMBER

16316 01 EE

SHEET NO.

78

OF

92

REV NO.

04

D

Project No.:

Scale :

CHECKED :

Plot Date:

APPROVED :

008006400 Sheet Size : Rev. :

A3

04

K.H.SONG

S.Y.JANG

01.SEP.2016

C.Y.HONG

F

1

2

3

4

5

6

7

8

Project

A

A

PARTS LIST DEVICE NAME

SYMBOL

ON DELAY TIMER (A MODE)

-K203T

DS/ES MOTOR RUNNING TIME EXCEEDED

B

MAGNETIC CONTACTOR

-K204

DS/ES SWITCH INCOMPLETE FAIL

ON DELAY TIMER (A MODE)

-K204T

DS/ES SWITCH INCOMPLTE

MAGNETIC CONTACTOR

-K205

DS/ES SWITCH INCOMPLETE

VOLTAGE CHECK RELAY

-K501

LINE VT (R PHASE) LIVE CONDITION

VOLTAGE CHECK RELAY

-K502

LINE VT (Y PHASE) LIVE CONDITION

C

VOLTAGE CHECK RELAY

-K503

LINE VT (B PHASE) LIVE CONDITION

CONTROL RELAY

-KA1

HEATER & ANN.

CONTROL RELAY

-KA2

SOCKET OUTLET CONTROL SUPPLY ALARM

CONTROL RELAY

-KA3

SOCKET OUTLET CONTROL SUPPLY ALARM

CONTROL RELAY

-KA4 D

DESCRIPTION

SOCKET OUTLET CONTROL SUPPLY ALARM

CONTROL RELAY

-KD1

SIGNAL LAMP & ALARM SUPPLY ALARM

CONTROL RELAY

-KD2

DS/ES MOTOR & INTERLOCK SUPPLY

CONTROL RELAY

-KD3

CB CLOSE POWER SUPPLY ALARM

CONTROL RELAY

-KD4

CB TRIP1 POWER SUPPLY ALARM

CONTROL RELAY

-KD5

CB TRIP2 POWER SUPPLY ALARM

E

CONTROL RELAY

-KD6

CB MOTOR CONTROL SUPPLY ALARM

CONTROL RELAY

-KD7

CB MOTOR POWER SUPPLY ALARM

AUXILIARY RELAY

-KG0.1

CB GAS PRESSURE STAGE 1

AUXILIARY RELAY

-KG0.2

CB GAS PRESSURE STAGE 2

MODEL NUMBER

MANUFACTURER

ORIGIN

SHEET NO

AT8N / PG-08 AC 100-240V / DC 24-240V, 2 CHANGE OVER CONTACT

AUTONICS

KOREA

/43.E2

ABB

FRANCE

/44.E4

AUTONICS

KOREA

/44.E1

ABB

FRANCE

/44.E2

ELKO

CZECH

/66.E4

ELKO

CZECH

/66.E4

ELKO

CZECH

/66.E4

ABB

POLAND

/58.E6

Reference DWG

DATE

NO. DWG

REV.

AF09-22-00-13 / CA4-22E AC/DC 100~250V, 50/60HZ, 2NO 2NC / 2NO 2NC

B

AT8N / PG-08 AC 100-240V / DC 24-240V, 2 CHANGE OVER CONTACT

AF09-22-00-13 AC/DC 100~250V, 50/60HZ, 2NO 2NC

HRN-37 AC24~150V, 1CHANGE OVER CONTACT

HRN-37 AC24~150V, 1CHANGE OVER CONTACT

EMPLOYER / DEVELOPER

C

HRN-37 AC24~150V, 1CHANGE OVER CONTACT

CR-M230AC4 AC 230V, 4 CHANGEOVER CONTACT

PROJECT MANAGER.

CR-M230AC4 AC 230V, 4 CHANGEOVER CONTACT

ABB

POLAND

/20.D3

ABB

POLAND

/20.D5

ABB

POLAND

/20.D6

ABB

POLAND

/66.B6

ABB

POLAND

/47.E6

ABB

POLAND

/21.E7

CR-M230AC4 AC 230V, 4 CHANGEOVER CONTACT

CR-M230AC4 AC 230V, 4 CHANGEOVER CONTACT

SUPERVISION CONSULTANT

CR-M220DC4 DC 220V, 4 CHANGEOVER CONTACT

D

CR-M220DC4 DC 220V, 4 CHANGEOVER CONTACT

04 03 02 01 00

CR-M220DC4 DC 220V, 4 CHANGEOVER CONTACT

REV.

CR-M220DC4 DC 220V, 4 CHANGEOVER CONTACT

ABB

POLAND

/22.E7

ABB

POLAND

/23.E7

ABB

POLAND

/24.E7

ABB

POLAND

/25.E7

ABB

FRANCE

/48.E3

ABB

FRANCE

/48.E4

24.JAN.2018 10.AUG.2017 09.AUG.2017 19.JUN.2017 01.SEP.2016

DATE

REVISED AS PER COMMENT REVISED AS PER COMMENT REVISED AS PER COMMENT REVISED AS PER COMMENT FOR APPROVAL

ISSUED TO / FOR :

CONTRACTOR: CONSORTIUM( KN / HHI )

CR-M220DC4 DC 220V, 4 CHANGEOVER CONTACT

CR-M220DC4 DC 220V, 4 CHANGEOVER CONTACT

E

CR-M220DC4 DC 220V, 4 CHANGEOVER CONTACT

NF22E-13 / CA4-22N AC/DC 100~250V, 50/60HZ, 2NO 2NC / 2NO 2NC

1000, Bangeojinsinhawn-doro, Dong-gu, Ulsan, Korea

NF22E-13 / CA4-13N AC/DC 100~250V, 50/60HZ, 2NO 2NC / 1NO 3NC

DRAWING TITLE:

PARTS LIST FOR LCC Drawing Number :

F

PREPARED :

PK55-SD-EL-GS-14 ACTION MANUFACTURER/VENDER NAME

A B C DRAWING NUMBER

16316 01 EE

SHEET NO.

79

OF

92

REV NO.

04

D

Project No.:

Scale :

CHECKED :

Plot Date:

APPROVED :

008006400 Sheet Size : Rev. :

A3

04

K.H.SONG

S.Y.JANG

01.SEP.2016

C.Y.HONG

F

1

2

3

4

5

6

7

8

Project

A

A

PARTS LIST DEVICE NAME

SYMBOL

AUXILIARY RELAY

-KG0.2A

CB GAS LEAK STAGE2

B

AUXILIARY RELAY

-KG0.2B

CB GAS LEAK STAGE2

CONTROL RELAY

-KG1.1

01 GAS PRESSURE STAGE 1

CONTROL RELAY

-KG1.2

01 GAS PRESSURE STAGE 2

CONTROL RELAY

-KG2.1

02 GAS PRESSURE STAGE 1

CONTROL RELAY

-KG2.2

02 GAS PRESSURE STAGE 2

C

CONTROL RELAY

-KG3.1

03 GAS PRESSURE STAGE 1

CONTROL RELAY

-KG3.2

03 GAS PRESSURE STAGE 2

CONTROL RELAY

-KG4.1

04 GAS PRESSURE STAGE 1

CONTROL RELAY

-KG4.2

04 GAS PRESSURE STAGE 2

CONTROL RELAY

-KG5.1 D

DESCRIPTION

05 GAS PRESSURE STAGE 1

CONTROL RELAY

-KG5.2

05 GAS PRESSURE STAGE 2

CONTROL RELAY

-KG6.1

06 GAS PRESSURE STAGE 1

CONTROL RELAY

-KG6.2

06 GAS PRESSURE STAGE 2

CONTROL RELAY

-KG7.1

07 GAS PRESSURE STAGE 1

CONTROL RELAY

-KG7.2

07 GAS PRESSURE STAGE 2

E

CONTROL RELAY

-KG8.1

08 GAS PRESSURE STAGE 1

CONTROL RELAY

-KG8.2

08 GAS PRESSURE STAGE 2

CONTROL RELAY

-KG9.1

09 GAS PRESSURE STAGE 1

CONTROL RELAY

-KG9.2

09 GAS PRESSURE STAGE 2

MODEL NUMBER

MANUFACTURER

ORIGIN

SHEET NO

NF22E-13 / CA4-13N AC/DC 100~250V, 50/60HZ, 2NO 2NC / 1NO 3NC

ABB

FRANCE

/48.E4

ABB

FRANCE

/48.E5

ABB

POLAND

/49.E3

ABB

POLAND

/49.E3

ABB

POLAND

/49.E5

ABB

POLAND

/49.E6

ABB

POLAND

/50.E3

ABB

POLAND

/50.E3

Reference DWG

DATE

NO. DWG

REV.

NF22E-13 / CA4-13N AC/DC 100~250V, 50/60HZ, 2NO 2NC / 1NO 3NC

B

CR-M220DC4 DC 220V, 4 CHANGEOVER CONTACT

CR-M220DC4 DC 220V, 4 CHANGEOVER CONTACT

CR-M220DC4 DC 220V, 4 CHANGEOVER CONTACT

CR-M220DC4 DC 220V, 4 CHANGEOVER CONTACT

EMPLOYER / DEVELOPER

C

CR-M220DC4 DC 220V, 4 CHANGEOVER CONTACT

CR-M220DC4 DC 220V, 4 CHANGEOVER CONTACT

PROJECT MANAGER.

CR-M220DC4 DC 220V, 4 CHANGEOVER CONTACT

ABB

POLAND

/50.E5

ABB

POLAND

/50.E6

ABB

POLAND

/51.E3

ABB

POLAND

/51.E3

ABB

POLAND

/51.E5

ABB

POLAND

/51.E6

CR-M220DC4 DC 220V, 4 CHANGEOVER CONTACT

CR-M220DC4 DC 220V, 4 CHANGEOVER CONTACT

SUPERVISION CONSULTANT

CR-M220DC4 DC 220V, 4 CHANGEOVER CONTACT

D

CR-M220DC4 DC 220V, 4 CHANGEOVER CONTACT

04 03 02 01 00

CR-M220DC4 DC 220V, 4 CHANGEOVER CONTACT

REV.

CR-M220DC4 DC 220V, 4 CHANGEOVER CONTACT

ABB

POLAND

/52.E3

ABB

POLAND

/52.E4

ABB

POLAND

/52.E6

ABB

POLAND

/52.E6

ABB

POLAND

/53.E4

ABB

POLAND

/53.E5

24.JAN.2018 10.AUG.2017 09.AUG.2017 19.JUN.2017 01.SEP.2016

DATE

REVISED AS PER COMMENT REVISED AS PER COMMENT REVISED AS PER COMMENT REVISED AS PER COMMENT FOR APPROVAL

ISSUED TO / FOR :

CONTRACTOR: CONSORTIUM( KN / HHI )

CR-M220DC4 DC 220V, 4 CHANGEOVER CONTACT

CR-M220DC4 DC 220V, 4 CHANGEOVER CONTACT

E

CR-M220DC4 DC 220V, 4 CHANGEOVER CONTACT

CR-M220DC4 DC 220V, 4 CHANGEOVER CONTACT

1000, Bangeojinsinhawn-doro, Dong-gu, Ulsan, Korea

CR-M220DC4 DC 220V, 4 CHANGEOVER CONTACT

DRAWING TITLE:

PARTS LIST FOR LCC Drawing Number :

F

PREPARED :

PK55-SD-EL-GS-14 ACTION MANUFACTURER/VENDER NAME

A B C DRAWING NUMBER

16316 01 EE

SHEET NO.

80

OF

92

REV NO.

04

D

Project No.:

Scale :

CHECKED :

Plot Date:

APPROVED :

008006400 Sheet Size : Rev. :

A3

04

K.H.SONG

S.Y.JANG

01.SEP.2016

C.Y.HONG

F

1

2

3

4

5

6

7

8

Project

A

A

PARTS LIST DEVICE NAME

SYMBOL

AUXILIARY RELAY

-KHTS

HEATER OPERATING

B

AUXILIARY RELAY

-KHTS1

HEATER OPERATING

AUXILIARY RELAY

-KL1

INTERLOCK (-Q1)

AUXILIARY RELAY

-KL2

INTERLOCK (-Q2)

AUXILIARY RELAY

-KL8

INTERLOCK (-Q8)

AUXILIARY RELAY

-KL9

INTERLOCK (-Q9)

C

AUXILIARY RELAY

-KL51

INTERLOCK (-Q51,-Q52)

AUXILIARY RELAY

-KLR

INTERLOCK RELEASE

LATCHED RELAY

-KQ0

CBMULTIPLY

LATCHED RELAY

-KQ0.1

CBMULTIPLY

MAGNETIC CONTACTOR

-KQ0C D

DESCRIPTION

CBCLOSE

MAGNETIC CONTACTOR

-KQ0T1

CBOPEN

MAGNETIC CONTACTOR

-KQ0T2

CBOPEN

LATCHED RELAY

-KQ1

BUS DSMULTIPLY

MAGNETIC CONTACTOR

-KQ1C

BUS DSCLOSE

MAGNETIC CONTACTOR

-KQ1T

BUS DSOPEN

E

LATCHED RELAY

-KQ2

BUS DSMULTIPLY

MAGNETIC CONTACTOR

-KQ2C

BUS DSCLOSE

MAGNETIC CONTACTOR

-KQ2T

BUS DSOPEN

LATCHED RELAY

-KQ8

LINE ESMULTIPLY

MODEL NUMBER

MANUFACTURER

ORIGIN

SHEET NO

NF40E-13 / CA4-40N AC/DC 100~250V, 50/60HZ, 4NO / 4NO

ABB

FRANCE

/56.D3

ABB

FRANCE

/56.D4

ABB

FRANCE

/46.E3

ABB

FRANCE

/46.E6

ABB

FRANCE

/47.E4

ABB

FRANCE

/47.E2

ABB

FRANCE

/47.E3

ABB

FRANCE

/47.E5

Reference DWG

DATE

NO. DWG

REV.

NF40E-13 AC/DC 100~250V, 50/60HZ, 4NO

B

NF40E-13 AC/DC 100~250V, 50/60HZ, 4NO

NF40E-13 AC/DC 100~250V, 50/60HZ, 4NO

NF40E-13 AC/DC 100~250V, 50/60HZ, 4NO

NF40E-13 AC/DC 100~250V, 50/60HZ, 4NO

EMPLOYER / DEVELOPER

C

NF40E-13 AC/DC 100~250V, 50/60HZ, 4NO

NF40E-13 / CA4-40N AC/DC 100~250V, 50/60HZ, 4NO / 4NO

PROJECT MANAGER.

KDN-220DC 8 CHANGE OVER CONTACTS

NIEAF-SMITT

NETHERLANDS

/40.E3

NIEAF-SMITT

NETHERLANDS

/40.E4

ABB

FRANCE

/21.E1

ABB

FRANCE

/22.E1

ABB

FRANCE

/23.E1

NIEAF-SMITT

NETHERLANDS

/41.E2

KDN-220DC 8 CHANGE OVER CONTACTS

AF09-30-10-13 AC/DC 100~250V, 50/60HZ, 3NO 1NO

SUPERVISION CONSULTANT

AF09-30-10-13 AC/DC 100~250V, 50/60HZ, 3NO 1NO

D

AF09-30-10-13 AC/DC 100~250V, 50/60HZ, 3NO 1NO

04 03 02 01 00

KDN-220DC 8 CHANGE OVER CONTACTS

REV.

AF09-30-10-13 / CA4-22M AC/DC 100~250V, 50/60HZ, 3NO 1NO / 2NO 2NC

ABB

FRANCE

/28.C2

ABB

FRANCE

/28.C2

NIEAF-SMITT

NETHERLANDS

/41.E3

ABB

FRANCE

/30.C2

ABB

FRANCE

/30.C2

NIEAF-SMITT

NETHERLANDS

/42.E5

24.JAN.2018 10.AUG.2017 09.AUG.2017 19.JUN.2017 01.SEP.2016

DATE

REVISED AS PER COMMENT REVISED AS PER COMMENT REVISED AS PER COMMENT REVISED AS PER COMMENT FOR APPROVAL

ISSUED TO / FOR :

CONTRACTOR: CONSORTIUM( KN / HHI )

AF09-30-10-13 / CA4-22M AC/DC 100~250V, 50/60HZ, 3NO 1NO / 2NO 2NC

KDN-220DC 8 CHANGE OVER CONTACTS

E

AF09-30-10-13 / CA4-22M AC/DC 100~250V, 50/60HZ, 3NO 1NO / 2NO 2NC

AF09-30-10-13 / CA4-22M AC/DC 100~250V, 50/60HZ, 3NO 1NO / 2NO 2NC

1000, Bangeojinsinhawn-doro, Dong-gu, Ulsan, Korea

KDN-220DC 8 CHANGE OVER CONTACTS

DRAWING TITLE:

PARTS LIST FOR LCC Drawing Number :

F

PREPARED :

PK55-SD-EL-GS-14 ACTION MANUFACTURER/VENDER NAME

A B C DRAWING NUMBER

16316 01 EE

SHEET NO.

81

OF

92

REV NO.

04

D

Project No.:

Scale :

CHECKED :

Plot Date:

APPROVED :

008006400 Sheet Size : Rev. :

A3

04

K.H.SONG

S.Y.JANG

01.SEP.2016

C.Y.HONG

F

1

2

3

4

5

6

7

8

Project

A

A

PARTS LIST DEVICE NAME

SYMBOL

MAGNETIC CONTACTOR

-KQ8C

LINE ESCLOSE

B

MAGNETIC CONTACTOR

-KQ8T

LINE ESOPEN

LATCHED RELAY

-KQ9

LINE DSMULTIPLY

MAGNETIC CONTACTOR

-KQ9C

LINE DSCLOSE

MAGNETIC CONTACTOR

-KQ9T

LINE DSOPEN

LATCHED RELAY

-KQ51

WORK ESMULTIPLY

C

MAGNETIC CONTACTOR

-KQ51C

WORK ESCLOSE

MAGNETIC CONTACTOR

-KQ51T

WORK ESOPEN

LATCHED RELAY

-KQ52

WORK ESMULTIPLY

MAGNETIC CONTACTOR

-KQ52C

WORK ESCLOSE

MAGNETIC CONTACTOR

-KQ52T D

DESCRIPTION

WORK ESOPEN

SEMAPHORE INDICATOR

-LQ0

MODEL NUMBER

SEMAPHORE INDICATOR

SEMAPHORE INDICATOR

SEMAPHORE INDICATOR

SEMAPHORE INDICATOR

SEMAPHORE INDICATOR

-LQ51

SEMAPHORE INDICATOR

SELECTOR SWITCH CB MOTOR OPERATION

PUSH BUTTON SWITCH

-S2

CB MOTOR LONG RUN RESET

FRANCE

/38.C2

NIEAF-SMITT

NETHERLANDS

/41.E5

ABB

FRANCE

/32.C2

ABB

FRANCE

/32.C2

NIEAF-SMITT

NETHERLANDS

/42.E2

ABB

FRANCE

/34.C2

ABB

FRANCE

/34.C2

DATE

NO. DWG

REV.

B

EMPLOYER / DEVELOPER

C

AF09-30-10-13 / CA4-22M AC/DC 100~250V, 50/60HZ, 3NO 1NO / 2NO 2NC

AF09-30-10-13 / CA4-22M AC/DC 100~250V, 50/60HZ, 3NO 1NO / 2NO 2NC

PROJECT MANAGER.

KDN-220DC 8 CHANGE OVER CONTACTS

NIEAF-SMITT

NETHERLANDS

/42.E3

ABB

FRANCE

/36.C2

ABB

FRANCE

/36.C2

HANKUK INSTRUMENT

KOREA

/54.E3

HANKUK INSTRUMENT

KOREA

/54.E4

HANKUK INSTRUMENT

KOREA

/54.E4

AF09-30-10-13 / CA4-22M AC/DC 100~250V, 50/60HZ, 3NO 1NO / 2NO 2NC

AF09-30-10-13 / CA4-22M AC/DC 100~250V, 50/60HZ, 3NO 1NO / 2NO 2NC

SUPERVISION CONSULTANT

HK-DSPI-GR-220V/S

D

HK-DSPI-GR-220V/R 04 03 02 01 00

HK-DSPI-GR-220V/R

REV.

HK-DSPI-GR-220V/R HANKUK INSTRUMENT

KOREA

/55.E3

HANKUK INSTRUMENT

KOREA

/54.E5

HANKUK INSTRUMENT

KOREA

/54.E6

HANKUK INSTRUMENT

KOREA

/55.E2

KG AUTO

KOREA

/75.C5

KG AUTO

KOREA

/75.D5

24.JAN.2018 10.AUG.2017 09.AUG.2017 19.JUN.2017 01.SEP.2016

DATE

REVISED AS PER COMMENT REVISED AS PER COMMENT REVISED AS PER COMMENT REVISED AS PER COMMENT FOR APPROVAL

ISSUED TO / FOR :

CONTRACTOR: CONSORTIUM( KN / HHI )

HK-DSPI-GR-220V/R

HK-DSPI-GR-220V/R

E

HK-DSPI-GR-220V/R LED TYPE WITH 2 COLOR-RED/GREEN, ROUND

-S1

ABB

Reference DWG

KDN-220DC 8 CHANGE OVER CONTACTS

LED TYPE WITH 2 COLOR-RED/GREEN, ROUND

-LQ52

/38.C2

AF09-30-10-13 / CA4-22M AC/DC 100~250V, 50/60HZ, 3NO 1NO / 2NO 2NC

LED TYPE WITH 2 COLOR-RED/GREEN, ROUND

E

FRANCE

AF09-30-10-13 / CA4-22M AC/DC 100~250V, 50/60HZ, 3NO 1NO / 2NO 2NC

LED TYPE WITH 2 COLOR-RED/GREEN, ROUND

-LQ9

ABB

KDN-220DC 8 CHANGE OVER CONTACTS

LED TYPE WITH 2 COLOR-RED/GREEN, ROUND

-LQ8

SHEET NO

AF09-30-10-13 / CA4-22M AC/DC 100~250V, 50/60HZ, 3NO 1NO / 2NO 2NC

LED TYPE WITH 2 COLOR-RED/GREEN, ROUND

-LQ2

ORIGIN

AF09-30-10-13 / CA4-22M AC/DC 100~250V, 50/60HZ, 3NO 1NO / 2NO 2NC

LED TYPE WITH 2 COLOR-RED/GREEN, SQURE

-LQ1

MANUFACTURER

KGS-C2M2 MANUAL RETURN, 2NO 2NC

1000, Bangeojinsinhawn-doro, Dong-gu, Ulsan, Korea

KGF-CM2R SELF-RETURN, 2NO 2NC, COLOR-RED

DRAWING TITLE:

PARTS LIST FOR LCC Drawing Number :

F

PREPARED :

PK55-SD-EL-GS-14 ACTION MANUFACTURER/VENDER NAME

A B C DRAWING NUMBER

16316 01 EE

SHEET NO.

82

OF

92

REV NO.

04

D

Project No.:

Scale :

CHECKED :

Plot Date:

APPROVED :

008006400 Sheet Size : Rev. :

A3

04

K.H.SONG

S.Y.JANG

01.SEP.2016

C.Y.HONG

F

1

2

3

4

5

6

7

8

Project

A

A

PARTS LIST DEVICE NAME

SYMBOL KEY SWITCH

-S3

INTERLOCK RELEASE

B

PUSH BUTTON SWITCH

-S4

LAMP TEST

PUSH BUTTON SWITCH WITH LED LAMP

-S5

HEATER TEST

SELECTOR SWITCH WITH KEY

-S11

LOCAL - REMOTE SELECTOR

SELECTOR SWITCH

-S12

OFF-AB-BC-CA-AN-BN-CN SELECTOR

OUTLET

-SOCKET(1-PH)

MODEL NUMBER

OUTLET

-SOCKET(3-PH)

SELECTOR SWITCH

-SQ1

LINE ESOPEN/CLOSE

SELECTOR SWITCH

-SQ9

LINE DSOPEN/CLOSE

SELECTOR SWITCH

-SQ51

WORK ESOPEN/CLOSE

SELECTOR SWITCH

-SQ52

WORK ESOPEN/CLOSE

ON DELAY TIMER (A MODE)

-T47A

POLE DESCREPANCY

ON DELAY TIMER (A MODE)

-T48B

POLE DESCREPANCY

E

ON DELAY TIMER (A MODE)

-T88

MOTOR LONG RUN

THERMALSTAT

-TH

THERMAL STATE

TEST SWITCH

-TT1

TEST SWITCH

DIGITAL AC VOLTMETER

-VM1

MULTI FUNCTION METER

/75.C2

KG AUTO

KOREA

/75.D2

KG AUTO

KOREA

/75.E5

YONGSUNG

KOREA

/75.B2

YONG SUNG

KOREA

/76.B2

LEGRAND

FRANCE

/20.D4

LEGRAND

FRANCE

/20.D5

YONGSUNG

KOREA

/73.B3

Reference DWG

DATE

NO. DWG

REV.

B

AC_OUTLET(1Ph) EMPLOYER / DEVELOPER

C

AC_OUTLET(3Ph)

YSDNC3305-64RP20R

YSDNC3205-64RE20B

SELECTOR SWITCH

-SQ8

KOREA

YSDNC7602-64MR20B MANUAL RETURN, HANDLE-CHRYSANTHEMUM, COLOR-BLACK

SELECTOR SWITCH

BUS DSOPEN/CLOSE

KG AUTO

YSKDNC2801-79M20L MANUAL RETURN WITH KEY

CBOPEN/CLOSE / CBOPEN / CLOSE

SELECTOR SWITCH

-SQ2

SHEET NO

KGX-CMV21Y MANUAL-RETURN, 1NO 1NC, YELLOW LED

PULLING TURN & AUTOMATIC RETURN, HANDLE-PISTOL, COLOR-RED

BUS DSOPEN/CLOSE

ORIGIN

KGF-CM1B SELF-RETURN, 1NO 1NC, COLOR-BLACK

OUTLET (380Vac, 32A, - 5 552 89)

-SQ0

MANUFACTURER

KGK-J2R1A AUTO-RETURN, 1NO 1NC

OUTLET (220Vac, 16A, - 772 13)

C

D

DESCRIPTION

PULLING TURN & AUTOMATIC RETURN, HANDLE-EGG

PROJECT MANAGER.

YONGSUNG

KOREA

/73.C3

YONGSUNG

KOREA

/73.D3

YONGSUNG

KOREA

/74.D3

YONGSUNG

KOREA

/73.E3

YONGSUNG

KOREA

/74.B3

YONGSUNG

KOREA

/74.C3

YSDNC3205-64RE20B PULLING TURN & AUTOMATIC RETURN, HANDLE-EGG

YSDNC3205-64RE20B PULLING TURN & AUTOMATIC RETURN, HANDLE-EGG

SUPERVISION CONSULTANT

YSDNC3205-64RE20B PULLING TURN & AUTOMATIC RETURN, HANDLE-EGG

D

YSDNC3205-64RE20B PULLING TURN & AUTOMATIC RETURN, HANDLE-EGG

04 03 02 01 00

YSDNC3205-64RE20B PULLING TURN & AUTOMATIC RETURN, HANDLE-EGG

REV.

AT8N / PG-08 AC 100-240V / DC 24-240V, 2 CHANGE OVER CONTACT

AUTONICS

KOREA

/22.E6

AUTONICS

KOREA

/23.E6

AUTONICS

KOREA

/24.E6

RUN ELEC

KOREA

/56.B3

ABB

USA

/65.C2

KYONGBO

KOREA

/66.B2

24.JAN.2018 10.AUG.2017 09.AUG.2017 19.JUN.2017 01.SEP.2016

DATE

REVISED AS PER COMMENT REVISED AS PER COMMENT REVISED AS PER COMMENT REVISED AS PER COMMENT FOR APPROVAL

ISSUED TO / FOR :

CONTRACTOR: CONSORTIUM( KN / HHI )

AT8N / PG-08 AC 100-240V / DC 24-240V, 2 CHANGE OVER CONTACT

AT8N / PG-08 AC 100-240V / DC 24-240V, 2 CHANGE OVER CONTACT

E

RT-50HT -10~50°C 1NO+1NC

FT-1 10POLE 10 POLE, P-P-P-C-C-C-C-C-C-P

1000, Bangeojinsinhawn-doro, Dong-gu, Ulsan, Korea

DM1T-AV22 SINGLE PHASE AC150V, POWER 100-240VAC/DC, CLASS 0.2, OUTPUT 4-20MA, RS485

DRAWING TITLE:

PARTS LIST FOR LCC Drawing Number :

F

PREPARED :

PK55-SD-EL-GS-14 ACTION MANUFACTURER/VENDER NAME

A B C DRAWING NUMBER

16316 01 EE

SHEET NO.

83

OF

92

REV NO.

04

D

Project No.:

Scale :

CHECKED :

Plot Date:

APPROVED :

008006400 Sheet Size : Rev. :

A3

04

K.H.SONG

S.Y.JANG

01.SEP.2016

C.Y.HONG

F

1

2

3

4

5

6

7

8

Project

A

A

PARTS LIST MECHANISM

A3-S-PART-MECH-005

DEVICE NAME

-Q0(A)

DESIGNATION

-52C

-HT B -J1

-J2

-J3

-J4

-JA

C

-LS1

-LS2

-LS3

-M1

-OUTLET_A

SOLENOID COIL CB -Q0(A) CLOSING COIL

HEATER CB -Q0(A)

CONNECTOR CB -Q0(A)

CONNECTOR CB -Q0(A)

CONNECTOR CB -Q0(A)

CONNECTOR -Q0(A)

CONNECTOR CB -Q0(A)

LIMIT SWITCH

LIMIT SWITCH

LIMIT SWITCH

UNIVERSAL MOTOR CB -Q0(A)

OUTLET

SPECIFICATION

MANUFACTURER

ORIGIN

4CG4382-D

HYUNDAI

KOREA

SPR 319-1

RARA

KOREA

M40

WIELAND-24P-M40

WIELAND

GERMANY

M40

WIELAND-24P-M40

WIELAND

GERMANY

M40

WIELAND-24P-M40

WIELAND

GERMANY

M40

WIELAND-24P-M40

WIELAND

GERMANY

DC 220V, 60 Ohm

MODEL NUMBER

Reference DWG

‎60W 2KΩ

DATE

NO. DWG

REV.

B

EMPLOYER / DEVELOPER

M20

WIELAND-5P-M20

WIELAND

GERMANY

10A

HSK-10

HYUNDAI

KOREA

10A

HSK-10

HYUNDAI

KOREA

10A

HSK-10

HYUNDAI

KOREA

3CG4457-002

DMK

KOREA

DC220V, 800W

C

PROJECT MANAGER.

SUPERVISION CONSULTANT

OUTLET (220Vac, 16A, - 772 13)

AC_OUTLET(1Ph)

LEGRAND

FRANCE

D

D -S1

-S2

-S13

-52T1

-52T2

E

-Q0(B)

-52C

-HT

AUXILIARY SWITCH CB -Q0(A)

AUXILIARY SWITCH CB -Q0(A)

SELECTOR SWITCH AC-DC SELECTOR FOR CB MOTOR OPERATION

SOLENOID COIL CB -Q0(A) TRIP COIL 1

SOLENOID COIL CB -Q0(A) TRIP COIL 2

SOLENOID COIL CB -Q0(B) CLOSING COIL

HEATER CB -Q0(B)

AUXILIARY SWITCH 8NO 9NC

2CG1180-010

YONG SUNG

KOREA

AUXILIARY SWITCH 8NO 9NC

2CG1180-010

YONG SUNG

KOREA

YSDNC2201-69MO20B

YONGSUNG

KOREA

MANUAL RETURN, HANDLE-COMPASS, COLOR-BLACK

04 03 02 01 00

REV.

24.JAN.2018 10.AUG.2017 09.AUG.2017 19.JUN.2017 01.SEP.2016

DATE

REVISED AS PER COMMENT REVISED AS PER COMMENT REVISED AS PER COMMENT REVISED AS PER COMMENT FOR APPROVAL

ISSUED TO / FOR :

CONTRACTOR: CONSORTIUM( KN / HHI )

DC 220V, 60 Ohm

4CG4382-D

HYUNDAI

KOREA

DC 220V, 60 Ohm

4CG4382-D

HYUNDAI

KOREA E

DC 220V, 60 Ohm

‎60W 2KΩ

4CG4382-D

HYUNDAI

KOREA

SPR 319-1

RARA

KOREA 1000, Bangeojinsinhawn-doro, Dong-gu, Ulsan, Korea DRAWING TITLE:

PARTS LIST FOR MECHANISM Drawing Number :

F

PREPARED :

PK55-SD-EL-GS-14 ACTION MANUFACTURER/VENDER NAME

A B C DRAWING NUMBER

16316 01 EE

SHEET NO.

84

OF

92

REV NO.

04

D

Project No.:

Scale :

CHECKED :

Plot Date:

APPROVED :

008006400 Sheet Size : Rev. :

A3

04

K.H.SONG

S.Y.JANG

01.SEP.2016

C.Y.HONG

F

1

2

3

4

5

6

7

8

Project

A

A

PARTS LIST MECHANISM

A3-S-PART-MECH-005

DEVICE NAME

-Q0(B)

DESIGNATION

-J1

-J2 B -J3

-J4

-JA

-LS1

-LS2

C

-LS3

-M1

-OUTLET_B

-S1

-S2 D -S13

-52T1

-52T2

-Q0(C)

-52C

-HT

E

-J1

-J2

CONNECTOR CB -Q0(B)

CONNECTOR CB -Q0(B)

CONNECTOR CB -Q0(B)

CONNECTOR -Q0(B)

CONNECTOR CB -Q0(B)

LIMIT SWITCH

LIMIT SWITCH

LIMIT SWITCH

UNIVERSAL MOTOR CB -Q0(B)

OUTLET

AUXILIARY SWITCH CB -Q0(B)

AUXILIARY SWITCH CB -Q0(B)

SELECTOR SWITCH AC-DC SELECTOR FOR CB MOTOR OPERATION

SOLENOID COIL CB -Q0(B) TRIP COIL 1

SOLENOID COIL CB -Q0(B) TRIP COIL 2

SOLENOID COIL CB -Q0(C) CLOSING COIL

HEATER CB -Q0(C)

CONNECTOR CB -Q0(C)

CONNECTOR CB -Q0(C)

SPECIFICATION

MODEL NUMBER

MANUFACTURER

ORIGIN

M40

WIELAND-24P-M40

WIELAND

GERMANY

M40

WIELAND-24P-M40

WIELAND

GERMANY

M40

WIELAND-24P-M40

WIELAND

GERMANY

M40

WIELAND-24P-M40

WIELAND

GERMANY

M20

WIELAND-5P-M20

WIELAND

GERMANY

10A

HSK-10

HYUNDAI

KOREA

Reference DWG

DATE

NO. DWG

REV.

B

EMPLOYER / DEVELOPER

10A

HSK-10

HYUNDAI

KOREA

10A

HSK-10

HYUNDAI

KOREA

3CG4457-002

DMK

KOREA

AC_OUTLET(1Ph)

LEGRAND

FRANCE

2CG1180-010

YONG SUNG

KOREA

DC220V, 800W

OUTLET (220Vac, 16A, - 772 13)

AUXILIARY SWITCH 8NO 9NC

C

PROJECT MANAGER.

SUPERVISION CONSULTANT

AUXILIARY SWITCH 8NO 9NC

2CG1180-010

YONG SUNG

KOREA D

MANUAL RETURN, HANDLE-COMPASS, COLOR-BLACK

YSDNC2201-69MO20B

YONGSUNG

KOREA

DC 220V, 60 Ohm

4CG4382-D

HYUNDAI

KOREA

DC 220V, 60 Ohm

4CG4382-D

HYUNDAI

KOREA

04 03 02 01 00

REV.

24.JAN.2018 10.AUG.2017 09.AUG.2017 19.JUN.2017 01.SEP.2016

DATE

REVISED AS PER COMMENT REVISED AS PER COMMENT REVISED AS PER COMMENT REVISED AS PER COMMENT FOR APPROVAL

ISSUED TO / FOR :

CONTRACTOR: CONSORTIUM( KN / HHI )

DC 220V, 60 Ohm

‎60W 2KΩ

4CG4382-D

HYUNDAI

KOREA

SPR 319-1

RARA

KOREA E

M40

WIELAND-24P-M40

WIELAND

GERMANY

M40

WIELAND-24P-M40

WIELAND

GERMANY 1000, Bangeojinsinhawn-doro, Dong-gu, Ulsan, Korea DRAWING TITLE:

PARTS LIST FOR MECHANISM Drawing Number :

F

PREPARED :

PK55-SD-EL-GS-14 ACTION MANUFACTURER/VENDER NAME

A B C DRAWING NUMBER

16316 01 EE

SHEET NO.

85

OF

92

REV NO.

04

D

Project No.:

Scale :

CHECKED :

Plot Date:

APPROVED :

008006400 Sheet Size : Rev. :

A3

04

K.H.SONG

S.Y.JANG

01.SEP.2016

C.Y.HONG

F

1

2

3

4

5

6

7

8

Project

A

A

PARTS LIST MECHANISM

A3-S-PART-MECH-005

DEVICE NAME

-Q0(C)

DESIGNATION

-J3

-J4 B -JA

-LS1

-LS2

-LS3

-M1

C

-OUTLET_C

-S1

-S2

-S13

-52T1 D -52T2

-Q1

-DS1

-DS2

-HT

-ILM

E

-J1

-J2

CONNECTOR CB -Q0(C)

CONNECTOR -Q0(C)

CONNECTOR CB -Q0(C)

LIMIT SWITCH

LIMIT SWITCH

LIMIT SWITCH

UNIVERSAL MOTOR CB -Q0(C)

OUTLET

AUXILIARY SWITCH CB -Q0(C)

AUXILIARY SWITCH CB -Q0(C)

SELECTOR SWITCH AC-DC SELECTOR FOR CB MOTOR OPERATION

SOLENOID COIL CB -Q0(C) TRIP COIL 1

SOLENOID COIL CB -Q0(C) TRIP COIL 2

LIMIT SWITCH BUS DS -Q1 DOOR OPEN

LIMIT SWITCH BUS DS -Q1 DOOR OPEN

HEATER BUS DS -Q1

SOLENOID COIL BUS DS -Q1 SOLENODE

CONNECTOR BUS DS -Q1

CONNECTOR BUS DS -Q1

SPECIFICATION

MODEL NUMBER

MANUFACTURER

ORIGIN

M40

WIELAND-24P-M40

WIELAND

GERMANY

M40

WIELAND-24P-M40

WIELAND

GERMANY

M20

WIELAND-5P-M20

WIELAND

GERMANY

10A

HSK-10

HYUNDAI

KOREA

10A

HSK-10

HYUNDAI

KOREA

10A

HSK-10

HYUNDAI

KOREA

Reference DWG

DATE

NO. DWG

REV.

B

EMPLOYER / DEVELOPER

3CG4457-002

DMK

KOREA

AC_OUTLET(1Ph)

LEGRAND

FRANCE

AUXILIARY SWITCH 8NO 9NC

2CG1180-010

YONG SUNG

KOREA

AUXILIARY SWITCH 8NO 9NC

2CG1180-010

YONG SUNG

KOREA

YSDNC2201-69MO20B

YONGSUNG

KOREA

DC220V, 800W

OUTLET (220Vac, 16A, - 772 13)

MANUAL RETURN, HANDLE-COMPASS, COLOR-BLACK DC 220V, 60 Ohm

C

PROJECT MANAGER.

SUPERVISION CONSULTANT

4CG4382-D

HYUNDAI

KOREA D

4CG4382-D

HYUNDAI

KOREA

10A

HSK-10

HYUNDAI

KOREA

10A

HSK-10

HYUNDAI

KOREA

DC 220V, 60 Ohm

04 03 02 01 00

REV.

24.JAN.2018 10.AUG.2017 09.AUG.2017 19.JUN.2017 01.SEP.2016

DATE

REVISED AS PER COMMENT REVISED AS PER COMMENT REVISED AS PER COMMENT REVISED AS PER COMMENT FOR APPROVAL

ISSUED TO / FOR :

CONTRACTOR: CONSORTIUM( KN / HHI )

‎60W 2KΩ

DC220V, 6.2W, 9200 Ohm

SPR 319-1

RARA

KOREA

4CS1161-002

HYUNDAI

KOREA E

M40

WIELAND-24P-M40

WIELAND

GERMANY

M40

WIELAND-24P-M40

WIELAND

GERMANY 1000, Bangeojinsinhawn-doro, Dong-gu, Ulsan, Korea DRAWING TITLE:

PARTS LIST FOR MECHANISM Drawing Number :

F

PREPARED :

PK55-SD-EL-GS-14 ACTION MANUFACTURER/VENDER NAME

A B C DRAWING NUMBER

16316 01 EE

SHEET NO.

86

OF

92

REV NO.

04

D

Project No.:

Scale :

CHECKED :

Plot Date:

APPROVED :

008006400 Sheet Size : Rev. :

A3

04

K.H.SONG

S.Y.JANG

01.SEP.2016

C.Y.HONG

F

1

2

3

4

5

6

7

8

Project

A

A

PARTS LIST MECHANISM DEVICE NAME

-Q1

DESIGNATION

-JA

-LSA B -LSB

-M

-PS

-S1

-S2

C

-Q2

-DS1

-DS2

-HT

-ILM

-J1 D -J2

-JA

-LSA

-LSB

-M

E

A3-S-PART-MECH-005

-PS

-S1

CONNECTOR BUS DS -Q1

LIMIT SWITCH BUS DS -Q1

LIMIT SWITCH BUS DS -Q1

DC MOTOR BUS DS -Q1

KEY SWITCH BUS DS -Q1

AUXILIARY SWITCH BUS DS -Q1

AUXILIARY SWITCH BUS DS -Q1

LIMIT SWITCH BUS DS -Q2 DOOR SWITCH

LIMIT SWITCH BUS DS -Q2 DOOR SWITCH

HEATER BUS DS -Q2

SOLENOID COIL BUS DS -Q2

CONNECTOR BUS DS -Q2

CONNECTOR BUS DS -Q2

CONNECTOR BUS DS -Q2

LIMIT SWITCH BUS DS -Q1

LIMIT SWITCH BUS DS -Q1

DC MOTOR BUS DS -Q2

KEY SWITCH BUS DS -Q1

AUXILIARY SWITCH BUS DS -Q2

SPECIFICATION

MODEL NUMBER

MANUFACTURER

ORIGIN

M20

WIELAND-5P-M20

WIELAND

GERMANY

10A

HSK-10

HYUNDAI

KOREA

HSK-10

HYUNDAI

KOREA

3CS9676-002

DMK

KOREA

KH-302K-2105

KUN HEUNG

KOREA

3CS3686-401

HYUNDAI

KOREA

Reference DWG

10A

DC220V, 350W

MANUAL RETURN, 1NO 1NC

AUXILIARY SWITCH 5NO 6NC 1WC

DATE

NO. DWG

REV.

B

EMPLOYER / DEVELOPER

3CS3686-601

HYUNDAI

KOREA

10A

HSK-10

HYUNDAI

KOREA

10A

HSK-10

HYUNDAI

KOREA

SPR 319-1

RARA

KOREA

4CS1161-002

HYUNDAI

KOREA

AUXILIARY SWITCH 6NO 6NC

‎60W 2KΩ

DC220V, 6.2W, 9200 Ohm

C

PROJECT MANAGER.

SUPERVISION CONSULTANT

M40

WIELAND-24P-M40

WIELAND

GERMANY D

M40

WIELAND-24P-M40

WIELAND

GERMANY

M20

WIELAND-5P-M20

WIELAND

GERMANY

10A

HSK-10

HYUNDAI

KOREA

04 03 02 01 00

REV.

24.JAN.2018 10.AUG.2017 09.AUG.2017 19.JUN.2017 01.SEP.2016

DATE

REVISED AS PER COMMENT REVISED AS PER COMMENT REVISED AS PER COMMENT REVISED AS PER COMMENT FOR APPROVAL

ISSUED TO / FOR :

CONTRACTOR: CONSORTIUM( KN / HHI )

10A

DC220V, 350W

HSK-10

HYUNDAI

KOREA

3CS9676-002

DMK

KOREA E

MANUAL RETURN, 1NO 1NC

AUXILIARY SWITCH 5NO 6NC 1WC

KH-302K-2105

KUN HEUNG

KOREA

3CS3686-401

HYUNDAI

KOREA 1000, Bangeojinsinhawn-doro, Dong-gu, Ulsan, Korea DRAWING TITLE:

PARTS LIST FOR MECHANISM Drawing Number :

F

PREPARED :

PK55-SD-EL-GS-14 ACTION MANUFACTURER/VENDER NAME

A B C DRAWING NUMBER

16316 01 EE

SHEET NO.

87

OF

92

REV NO.

04

D

Project No.:

Scale :

CHECKED :

Plot Date:

APPROVED :

008006400 Sheet Size : Rev. :

A3

04

K.H.SONG

S.Y.JANG

01.SEP.2016

C.Y.HONG

F

1

2

3

4

5

6

7

8

Project

A

A

PARTS LIST MECHANISM DEVICE NAME

B

DESIGNATION

-Q2

-S2

-Q8

-DS1

-HT

-ILM

-J1

-J2

-JA

C

-M

-PS

-S1

-S2

-Q9

-DS1

D -DS2

-HT

-ILM

-J1

-J2

E

A3-S-PART-MECH-005

AUXILIARY SWITCH BUS DS -Q2

LIMIT SWITCH LINE ES -Q8

HEATER LINE ES -Q8

SOLENOID COIL LINE ES -Q8

CONNECTOR LINE ES -Q8

CONNECTOR LINE ES -Q8

CONNECTOR LINE ES -Q8

DC MOTOR LINE ES -Q8

KEY SWITCH LINE ES -Q8

AUXILIARY SWITCH LINE ES -Q8

AUXILIARY SWITCH LINE ES -Q8

LIMIT SWITCH LINE DS -Q9

LIMIT SWITCH LINE DS -Q9

HEATER LINE DS -Q9

SOLENOID COIL LINE DS -Q9

CONNECTOR LINE DS -Q9

CONNECTOR

SPECIFICATION

MODEL NUMBER

MANUFACTURER

ORIGIN

AUXILIARY SWITCH 6NO 6NC

3CS3686-601

HYUNDAI

KOREA

HSK-10

HYUNDAI

KOREA

SPR 319-1

RARA

KOREA

3CS1860-005

HYUNDAI

KOREA

M40

WIELAND-24P-M40

WIELAND

GERMANY

M40

WIELAND-24P-M40

WIELAND

GERMANY

Reference DWG

10A

‎60W 2KΩ

DC220V, 5.94W, 9200 Ohm

DATE

NO. DWG

REV.

B

EMPLOYER / DEVELOPER

WIELAND-5P-M20

WIELAND

GERMANY

4CS1267-003

DMK

KOREA

MANUAL RETURN, 1NO 1NC

KH-302K-2105

KUN HEUNG

KOREA

AUXILIARY SWITCH 5NO 5NC

3CS3686-301

HYUNDAI

KOREA

AUXILIARY SWITCH 6NO 6NC

3CS3686-501

HYUNDAI

KOREA

M20

DC220V, 210W

C

PROJECT MANAGER.

SUPERVISION CONSULTANT

10A

HSK-10

HYUNDAI

KOREA D

10A

‎60W 2KΩ

DC220V, 6.2W, 9200 Ohm

HSK-10

HYUNDAI

KOREA

SPR 319-1

RARA

KOREA

4CS1161-002

HYUNDAI

KOREA

04 03 02 01 00

REV.

24.JAN.2018 10.AUG.2017 09.AUG.2017 19.JUN.2017 01.SEP.2016

DATE

REVISED AS PER COMMENT REVISED AS PER COMMENT REVISED AS PER COMMENT REVISED AS PER COMMENT FOR APPROVAL

ISSUED TO / FOR :

CONTRACTOR: CONSORTIUM( KN / HHI )

M40

WIELAND-24P-M40

WIELAND

GERMANY

M40

WIELAND-24P-M40

WIELAND

GERMANY E

-J3

-JA

CONNECTOR LINE DS -Q9

CONNECTOR LINE DS -Q9

M40

WIELAND-24P-M40

WIELAND

GERMANY

M20

WIELAND-5P-M20

WIELAND

GERMANY 1000, Bangeojinsinhawn-doro, Dong-gu, Ulsan, Korea DRAWING TITLE:

PARTS LIST FOR MECHANISM Drawing Number :

F

PREPARED :

PK55-SD-EL-GS-14 ACTION MANUFACTURER/VENDER NAME

A B C DRAWING NUMBER

16316 01 EE

SHEET NO.

88

OF

92

REV NO.

04

D

Project No.:

Scale :

CHECKED :

Plot Date:

APPROVED :

008006400 Sheet Size : Rev. :

A3

04

K.H.SONG

S.Y.JANG

01.SEP.2016

C.Y.HONG

F

1

2

3

4

5

6

7

8

Project

A

A

PARTS LIST MECHANISM DEVICE NAME

-Q9

DESIGNATION

-LSA

-LSB B -M

-PS

-S1

-S2

-Q51

C

-DS1

-DS2

-HT

-ILM

-J1

-J2 D -J3

-JA

-LSA

-LSB

-M

E

A3-S-PART-MECH-005

-PS

-S1

LIMIT SWITCH BUS DS -Q1

LIMIT SWITCH BUS DS -Q1

DC MOTOR LINE DS -Q9

KEY SWITCH BUS DS -Q1

AUXILIARY SWITCH LINE DS -Q9

AUXILIARY SWITCH LINE DS -Q9

LIMIT SWITCH WORK ES -Q51

LIMIT SWITCH WORK ES -Q51

HEATER WORK ES -Q51

SOLENOID COIL WORK ES -Q51

CONNECTOR WORK ES -Q51

CONNECTOR WORK ES -Q51

CONNECTOR WORK ES -Q51

CONNECTOR WORK ES -Q51

LIMIT SWITCH BUS DS -Q1

LIMIT SWITCH BUS DS -Q1

DC MOTOR WORK ES -Q51

KEY SWITCH BUS DS -Q1

AUXILIARY SWITCH WORK ES -Q51

SPECIFICATION

MODEL NUMBER

MANUFACTURER

ORIGIN

10A

HSK-10

HYUNDAI

KOREA

10A

HSK-10

HYUNDAI

KOREA

3CS9676-002

DMK

KOREA

KH-302K-2105

KUN HEUNG

KOREA

AUXILIARY SWITCH 5NO 6NC 1WC

3CS3686-401

HYUNDAI

KOREA

AUXILIARY SWITCH 6NO 6NC

3CS3686-402

HYUNDAI

KOREA

Reference DWG

DC220V, 350W

MANUAL RETURN, 1NO 1NC

DATE

NO. DWG

REV.

B

EMPLOYER / DEVELOPER

10A

HSK-10

HYUNDAI

KOREA

10A

HSK-10

HYUNDAI

KOREA

SPR 319-1

RARA

KOREA

4CS1161-002

HYUNDAI

KOREA

WIELAND-24P-M40

WIELAND

GERMANY

‎60W 2KΩ

DC220V, 6.2W, 9200 Ohm

M40

C

PROJECT MANAGER.

SUPERVISION CONSULTANT

M40

WIELAND-24P-M40

WIELAND

GERMANY D

M40

WIELAND-24P-M40

WIELAND

GERMANY

M20

WIELAND-5P-M20

WIELAND

GERMANY

10A

HSK-10

HYUNDAI

KOREA

04 03 02 01 00

REV.

24.JAN.2018 10.AUG.2017 09.AUG.2017 19.JUN.2017 01.SEP.2016

DATE

REVISED AS PER COMMENT REVISED AS PER COMMENT REVISED AS PER COMMENT REVISED AS PER COMMENT FOR APPROVAL

ISSUED TO / FOR :

CONTRACTOR: CONSORTIUM( KN / HHI )

10A

DC220V, 350W

HSK-10

HYUNDAI

KOREA

3CS9676-002

DMK

KOREA E

MANUAL RETURN, 1NO 1NC

AUXILIARY SWITCH 5NO 6NC 1WC

KH-302K-2105

KUN HEUNG

KOREA

3CS3686-401

HYUNDAI

KOREA 1000, Bangeojinsinhawn-doro, Dong-gu, Ulsan, Korea DRAWING TITLE:

PARTS LIST FOR MECHANISM Drawing Number :

F

PREPARED :

PK55-SD-EL-GS-14 ACTION MANUFACTURER/VENDER NAME

A B C DRAWING NUMBER

16316 01 EE

SHEET NO.

89

OF

92

REV NO.

04

D

Project No.:

Scale :

CHECKED :

Plot Date:

APPROVED :

008006400 Sheet Size : Rev. :

A3

04

K.H.SONG

S.Y.JANG

01.SEP.2016

C.Y.HONG

F

1

2

3

4

5

6

7

8

Project

A

A

PARTS LIST MECHANISM DEVICE NAME

B

DESIGNATION

-Q51

-S2

-Q52

-DS1

-DS2

-HT

-ILM

-J1

-J2

C

A3-S-PART-MECH-005

-J3

-JA

-LSA

-LSB

-M D -PS

-S1

-S2

AUXILIARY SWITCH WORK ES -Q51

LIMIT SWITCH WORK ES -Q52

LIMIT SWITCH WORK ES -Q52

HEATER WORK ES -Q52

SOLENOID COIL WORK ES -Q52

CONNECTOR WORK ES -Q52

CONNECTOR WORK ES -Q52

CONNECTOR WORK ES -Q52

CONNECTOR WORK ES -Q52

LIMIT SWITCH BUS DS -Q1

LIMIT SWITCH BUS DS -Q1

DC MOTOR WORK ES -Q52

KEY SWITCH BUS DS -Q1

AUXILIARY SWITCH WORK ES -Q52

AUXILIARY SWITCH WORK ES -Q52

SPECIFICATION

MODEL NUMBER

MANUFACTURER

ORIGIN

AUXILIARY SWITCH 6NO 6NC

3CS3686-402

HYUNDAI

KOREA

HSK-10

HYUNDAI

KOREA

HSK-10

HYUNDAI

KOREA

SPR 319-1

RARA

KOREA

4CS1161-002

HYUNDAI

KOREA

WIELAND-24P-M40

WIELAND

GERMANY

Reference DWG

10A

10A

‎60W 2KΩ

DC220V, 6.2W, 9200 Ohm

M40

DATE

NO. DWG

REV.

B

EMPLOYER / DEVELOPER

M40

WIELAND-24P-M40

WIELAND

GERMANY

M40

WIELAND-24P-M40

WIELAND

GERMANY

M20

WIELAND-5P-M20

WIELAND

GERMANY

10A

HSK-10

HYUNDAI

KOREA

10A

HSK-10

HYUNDAI

KOREA

C

PROJECT MANAGER.

SUPERVISION CONSULTANT

DC220V, 350W

3CS9676-002

DMK

KOREA D

KH-302K-2105

KUN HEUNG

KOREA

AUXILIARY SWITCH 5NO 6NC 1WC

3CS3686-401

HYUNDAI

KOREA

AUXILIARY SWITCH 6NO 6NC

3CS3686-402

HYUNDAI

KOREA

MANUAL RETURN, 1NO 1NC

04 03 02 01 00

REV.

24.JAN.2018 10.AUG.2017 09.AUG.2017 19.JUN.2017 01.SEP.2016

DATE

REVISED AS PER COMMENT REVISED AS PER COMMENT REVISED AS PER COMMENT REVISED AS PER COMMENT FOR APPROVAL

ISSUED TO / FOR :

CONTRACTOR: CONSORTIUM( KN / HHI )

E

E

1000, Bangeojinsinhawn-doro, Dong-gu, Ulsan, Korea DRAWING TITLE:

PARTS LIST FOR MECHANISM Drawing Number :

F

PREPARED :

PK55-SD-EL-GS-14 ACTION MANUFACTURER/VENDER NAME

A B C DRAWING NUMBER

16316 01 EE

SHEET NO.

90

OF

92

REV NO.

04

D

Project No.:

Scale :

CHECKED :

Plot Date:

APPROVED :

008006400 Sheet Size : Rev. :

A3

04

K.H.SONG

S.Y.JANG

01.SEP.2016

C.Y.HONG

F

1

2

3

4

5

6

7

8

Project

A

A

PARTS LIST FOR TERMINAL BLOCK DEVICE NAME

MODEL NUMBER

Manufacturer

ORIGIN

TERMINAL BLOCK FOR CB (-Q0)

UK 5 N

PHOENIX

GERMANY

-X0C(A)

TERMINAL BLOCK FOR CB (-Q0) A-PHASE CONTROL

UK 5 N

PHOENIX

GERMANY

-X0C(B)

TERMINAL BLOCK FOR CB (-Q0) B-PHASE CONTROL

UK 5 N

PHOENIX

GERMANY

-X0C(C)

TERMINAL BLOCK FOR CB (-Q0) C-PHASE CONTROL

UK 5 N

PHOENIX

GERMANY

TERMINAL BLOCK FOR BUS DS(-Q1)

UK 5 N

PHOENIX

GERMANY

TERMINAL BLOCK FOR BUS DS(-Q1) CONTROL

UK 5 N

PHOENIX

GERMANY

TERMINAL BLOCK FOR BUS DS(-Q2)

UK 5 N

PHOENIX

GERMANY

TERMINAL BLOCK FOR BUS DS(-Q2) CONTROL

UK 5 N

PHOENIX

GERMANY

TERMINAL BLOCK FOR LINE ES(-Q8)

UK 5 N

PHOENIX

GERMANY

TERMINAL BLOCK FOR LINE ES(-Q8) CONTROL

UK 5 N

PHOENIX

GERMANY

TERMINAL BLOCK FOR LINE DS(-Q9)

UK 5 N

PHOENIX

GERMANY

-X0

DESCRIPTION

Remarks

Reference DWG

B

-X1 -X1C

DATE

NO. DWG

REV.

B

EMPLOYER / DEVELOPER

-X2

C

-X2C -X8 -X8C -X9

C

PROJECT MANAGER.

SUPERVISION CONSULTANT

-X9C

TERMINAL BLOCK FOR LINE DS(-Q9) CONTROL

UK 5 N

PHOENIX

GERMANY

D

D

-X51 -X51C -X52

TERMINAL BLOCK FOR WORK ES(-Q51)

UK 5 N

PHOENIX

GERMANY

TERMINAL BLOCK FOR WORK ES(-Q51) CONTROL

UK 5 N

PHOENIX

GERMANY

TERMINAL BLOCK FOR WORK ES(-Q52)

UK 5 N

PHOENIX

GERMANY

04 03 02 01 00

REV.

24.JAN.2018 10.AUG.2017 09.AUG.2017 19.JUN.2017 01.SEP.2016

DATE

REVISED AS PER COMMENT REVISED AS PER COMMENT REVISED AS PER COMMENT REVISED AS PER COMMENT FOR APPROVAL

ISSUED TO / FOR :

CONTRACTOR: CONSORTIUM( KN / HHI )

-X52C -XA

E

TERMINAL BLOCK FOR WORK ES(-Q52) CONTROL

UK 5 N

PHOENIX

GERMANY

TERMINAL BLOCK FOR AC MAIN INPUT

UK 16 N

PHOENIX

CHINA E

-XA1

TERMINAL BLOCK FOR ANNUNCIATOR

UT 4-MT

PHOENIX

GERMANY

-XA2

TERMINAL BLOCK FOR ANNUNCIATOR

UT 4-MT

PHOENIX

GERMANY

-XAD

TERMINAL BLOCK FOR

1000, Bangeojinsinhawn-doro, Dong-gu, Ulsan, Korea DRAWING TITLE:

PARTS LIST FOR TERMINAL BLOCK Drawing Number :

F

PREPARED :

PK55-SD-EL-GS-14 ACTION MANUFACTURER/VENDER NAME

A B C DRAWING NUMBER

16316 01 EE

SHEET NO.

91

OF

92

REV NO.

04

D

Project No.:

Scale :

CHECKED :

Plot Date:

APPROVED :

008006400 Sheet Size : Rev. :

A3

04

K.H.SONG

S.Y.JANG

01.SEP.2016

C.Y.HONG

F

1

2

3

4

5

6

7

8

Project

A

A

PARTS LIST FOR TERMINAL BLOCK DEVICE NAME

DESCRIPTION

MODEL NUMBER

Manufacturer

ORIGIN

-XC1

TERMINAL BLOCK FOR CT

YSCT-03ACS

YONGSUNG

KOREA

-XC2

TERMINAL BLOCK FOR CT

USST 6-T

PHOENIX

POLAND

-XD

TERMINAL BLOCK FOR DC MAIN INPUT

UK 16 N

PHOENIX

CHINA

-XG

TERMINAL BLOCK FOR GAS GAUGE

UK 5 N

PHOENIX

GERMANY

-XH

TERMINAL BLOCK FOR HEATER CONTROL

UK 5 N

PHOENIX

GERMANY

-XM

TERMINAL BLOCK FOR CT

YSCT-04ACS

YONGSUNG

KOREA

-XR1

TERMINAL BLOCK FOR REMOTE

UK 5 N

PHOENIX

GERMANY

-XR2

TERMINAL BLOCK FOR PROTECTION TRIP

USST 10

PHOENIX

POLAND

TERMINAL BLOCK FOR INTERLOCK AND GENERAL

UK 5 N

PHOENIX

GERMANY

Remarks

Reference DWG

B

DATE

NO. DWG

REV.

B

EMPLOYER / DEVELOPER

C

-XS

C

PROJECT MANAGER.

SUPERVISION CONSULTANT

D

D

04 03 02 01 00

REV.

24.JAN.2018 10.AUG.2017 09.AUG.2017 19.JUN.2017 01.SEP.2016

DATE

REVISED AS PER COMMENT REVISED AS PER COMMENT REVISED AS PER COMMENT REVISED AS PER COMMENT FOR APPROVAL

ISSUED TO / FOR :

CONTRACTOR: CONSORTIUM( KN / HHI )

E

E

1000, Bangeojinsinhawn-doro, Dong-gu, Ulsan, Korea DRAWING TITLE:

PARTS LIST FOR TERMINAL BLOCK Drawing Number :

F

PREPARED :

PK55-SD-EL-GS-14 ACTION MANUFACTURER/VENDER NAME

A B C DRAWING NUMBER

16316 01 EE

SHEET NO.

92

OF

92

REV NO.

04

D

Project No.:

Scale :

CHECKED :

Plot Date:

APPROVED :

008006400 Sheet Size : Rev. :

A3

04

K.H.SONG

S.Y.JANG

01.SEP.2016

C.Y.HONG

F

Related Documents

Gis
May 2020 35
Gis
October 2019 50
Gis
October 2019 48
Gis
July 2019 45
Gis
November 2019 51
Gis Report
May 2020 1

More Documents from ""

Gis Installation.pdf
December 2019 17
December 2019 4