General Responsibilities Of Engineering And Design Personnel Following Are The Key Responsibilities Applicable To All Individuals Participating In Engineering And Design Project Delivery Activities.docx

  • Uploaded by: Balderas Rosas Wilibaldo
  • 0
  • 0
  • October 2019
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View General Responsibilities Of Engineering And Design Personnel Following Are The Key Responsibilities Applicable To All Individuals Participating In Engineering And Design Project Delivery Activities.docx as PDF for free.

More details

  • Words: 580
  • Pages: 1
General responsibilities of Engineering and Design personnel Following are the key responsibilities applicable to all individuals participating in Engineering and Design Project Delivery activities. Quality – ensure that the quality and consistency of the input data and deliverables is maintained. Health and Safety – ensure safe design and compliance with relevant codes and standards in conformance with project requirements, ensure that the product is safe to use and operate and ensure that the product can be safely constructed, maintained, decommissioned and abandoned. Environment – ensure that the Customer is aware of the environmental effects of the delivered product and provide sufficient information to the Customer that they can make informed investment decisions. Risk – ensure all risks are identified and communicated and comply with any risk mitigation measure that are put in place. Integrity of Design – the following responsibilities apply: o Ensure conformance with relevant regulatory and project standards and guidelines. o Ensure the correct input data has been used. o Ensure “holds” and areas of uncertainty are highlighted. o Ensure the deliverable is constructible, operable and maintainable and can be safely demolished. o Ensure appropriate design methods are used. o Ensure appropriate design checks are undertaken. o Ensure correct materials are specified. On ‘miscellaneous’ sized projects, generally the projects cannot justify either a Project Engineering Manager or a Project Engineer. In this instance, the Project Manager assumes all responsibilities associated with the management of the overall project activities and the specific engineering coordination activities. Technical Peer Reviews Technical peer reviews are undertaken to assure the projects are positioned for success and any issues are identified early to provide for effective corrective measures. The technical peer reviews are normally undertaken using location staff but in some circumstances it is necessary to utilize independent reviewers. These may be from other offices in the organization or from outside the organization. Circumstances where this may be necessary include: Large and complex projects Where suitable independent reviewers are not available (e.g. small office, special project office, expertise limitations etc) Major projects will be reviewed as the design effort reaches prescribed milestones of completion. Ongoing services programs will be reviewed on a periodic basis with sampling of individual projects reviewed based on the percent complete at that point in time. Different types of review are available depending on the project size and risk classification and can include 20%, 60%, 90% reviews. Coordination and tracking of technical peer reviews is lead by the location Quality Management team in consultation with the location engineering management team, Where possible, technical peer reviews, project peer reviews and project quality assessments shall be combined to minimize the impact on project resources. N.B. Project Management teams will need to ensure that any required reviews are included in the project schedule and covered in the estimate of hours / costs. Nueva área de conocimiento de Gestión de Interesados. Alineado al ISO 21500. 2. Nuevos Procesos de Plan de gestión de alcance, Plan de gestión de Cronograma y Plan de gestión de costos, que en la versión actual no está explicito pero implícitamente siempre estuvo, con eso quedaría más explicito que todos los procesos de planificación tienen 1ro un plan. Son en total 47 procesos. 3. Se ha integrado más la ejecución con el control en Dirigir y Gestionar el Trabajo del Proyecto. 4. Los Procesos de Gestionar las expectativas de los interesados e Identificar Interesados se trasladan a la nueva área de conocimiento de gestión de interesados aunque con otro nombre.