Gangavarm Port Phase 1

  • June 2020
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View Gangavarm Port Phase 1 as PDF for free.

More details

  • Words: 247
  • Pages: 2
Marine Facilities Berthing Facilities (5 Berths: Iron Ore 1; Coal 1; Multipurpose 3) Depth in harbor 19.5m below CD Mechanized Coal and Iron Ore discharge system for vessel size upto 200,000 DWT Mechanized Wagon Loading and Wagon Tippling System New generation Mobile Harbor Cranes for other bulk and break bulk cargoes Coal stackyard and Iron ore stackyard with storage capacity of approximately 1 MMT each Covered transit storage for bulk and break cargoes Extensive ancillary facilities and state-of-the-art utilities / services Flexibility for future expansion of cargo handling facilities as per demand Round the clock Cargo handling and Marine operations Environmental friendly operation Berths Size Alongside Depth 1 Coal Cargo 320 x 25 m 19.50 m below CD 2 Iron Ore Cargo 340 x 25 m 19.50 m below CD 3 Other Dry Cargo 275 x 31 m 15.50 m below CD 4 Multipurpose Cargo 281 x 31 m 15.50 m below CD 5 General Cargo 242 x 28 m 14.00 m below CD Berth Configuration in Phase 1 Cargo Handling Facilities New generation mechanized cargo handling system has being installed at Gangavaram Port for faster and efficient handling and evacuation of cargo with minimum handling loss. Cargo handling equipment installed in Phase-I development include, Ship Loader for bulk exports, Ship Unloaders for bulk imports, Mobile Harbour Cranes for bulk/break bulk cargo, associated conveyer system for transportation to and from stackyard, Stackers & Reclaimers for stackyard operations and Wagon loader & Wagon tipplers for handling Railway rakes.

Related Documents

Port 1
May 2020 10
Phase
November 2019 66
Port[1][1]
May 2020 5
Port
November 2019 44