Gambar

  • Uploaded by: Joseph Gilbert
  • 0
  • 0
  • December 2019
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View Gambar as PDF for free.

More details

  • Words: 809
  • Pages: 8
Simbul

Page 1

Laporan praktek kerja industri di PT Krakatau Steel

DIAGRAM SIRKULASI CLOSED COOLING / SISTEM TERTUTUP

Nitrogen VO2 ( 1-2 ) V28

Air Compressor V06 & 106

Q = 430 N m3/h H = 30 bar

V = 15870 N m3/h P1 = 30 bar

V21

P2 = 6 bar V22

V3

V20

Tank Emergency T101 / T102

V19

V24

V23

V25

Tank Balance

T105 ( 1-2 ) V = 100 m3

T103/T104

175 m3 / Tank

28 - 30 bar

7 m3/Tank

6 bar

3 bar

V4

V5

V18

V7

V10

Basin Soft Water

Note :

V1 V2

P21.1-4 ( BSP )

Q = 360 m / h

V11

H = 50 mWS/ 75 kw

V12

V13

CC

Q = 210 m3/ h

P19.1-3 ( SSP-1 ) Q = 320 m3/ h H = 57 mWS / 75 kw

V14

V = 215 m3 P126-1 / 2 Q = 0 - 500 Lt / h H = 30 mWS / 0.37 kw

Q = 265 m3/ h

3

V16 MUW

V27

P18.1-4 ( BSP ) P17.1-3 ( SSP-1 )

V15 Tank Chemical V = 1000 Lt

V17

V6 V9

V8

H E

V26

P124-1 / 2 Q = 40 m3/ h H = 80 mWS / 18.5 kw

: Normal Line Circulation : Emergency Line Circulation : Filling line

SMK Negeri 2 Cilegon

18

Laporan praktek kerja industri di PT Krakatau Steel

GAMBAR SKEMATIK PROSES REGENERASI

V2 V3

F1

TK HCl

P25 -1/ 2

V4 V7 V5

F10 / F11

V8

Bak 23 V1

V6

CO1/CO2

V10 V11

V9

SMK Negeri 2 Cilegon

V12

V13

V14

22

Laporan praktek kerja industri di PT Krakatau Steel

DIAGRAM SIRCULASI SYSTEM KONTAK TERBUKA LANGSUNG ( DIRECT COOLING )

Concast COOLING TOWER CELL A

BSP

SSP-1

P10-1/2/3

P15-1/2/3

Q = 168 m/h

Q = 295 m/h

H = 83 mWS

H = 96 mWS

Gravel

V = 1600 M3

Filter

Make Up

Settling

Water

Cyclon P30 - 1/2/3/4

F03,04,05,07,08

SO1-SO3

Q = 475 m3/h Block Rake

H=4

bar

P12 - 1/2 ( BSP ) Q = 230 m3 / h H = 65 mWS

Scale mixing Cyclon

P14-1/2/3 Q = 118 m/h H = 70 mWS

SMK Negeri 2 Cilegon

11

DIAGRAM SIRCULASI SYSTEM KONTAK TERBUKA LANGSUNG ( DIRECT COOLING )

Concast COOLING TOWER CELL A

BSP

SSP-1

P10-1/2/3

P15-1/2/3

Q = 168 m/h

Q = 295 m/h

H = 83 mWS

H = 96 mWS

Gravel

V = 1600 M3

Gravel

Filter

Filter

Make Up

Settling

Water

Cyclon

Cyclon

SO1-SO3

SO4

P30 - 1/2/3/4

F03,04,05,07,08

Settling

F09

Q = 475 m3/h Block Rake P12 - 1/2 ( BSP )

P14-1/2/3

Q = 230 m3 / h

Q = 118 m/h

H = 65 mWS

H = 70 mWS

H=4

bar

Scale mixing Cyclon Oil separator

P-20 - 1/2

P08 - 1/2 ( Back Wash ) Emergency ( Filter tdk berfungsi ) P29 - 1/2 Canal ke laut

Canal ke laut Canal WTP

Keterangan : Sirkulasi air pendingin open machine dan secondary cooling BSP / SSP-1. Sirculasi Back Wash Gravel Filter. Saluran Pembuangan ( Emergency ). Aliran air bocoran dari closed system ( MC & CMC ) mengandung Nitrit yang keluar melalui oil separator.

Laporan praktek kerja industri di PT Krakatau Steel

DIAGRAM SIRKULASI SYSTEM KONTAK TERBUKA TAK LANGSUNG ( INDIRECT COOLING )

Pabrik Gas Industri P.01 - 1/2 Q = 530 m3/h H = 62 mWS Mainstation I

Bak Return

MAKE UP

Mainstation I COOLING TOWER

P132 - 1/2 Q = 490 m3 / h

WATER ( CELL BCD )

P.02-1/2

Mainstation II

Bak Return

Q = 1085 m3/h

Mainstation II

V = 4800 M3

P102 - 1/2 F06

By pass

Q = 535 m3 / h

Gravel filter P04 - 1/2 Q = 400 m3/h

Heat Exchanger Closed system

P05-1/2/3/4 Q = 1185 m3/h H = 2.5 bar E A F

Bak Return Furnace

SMK Negeri 2 Cilegon

P06 - 1/2/3/4/5/6/7

P31 - 1/2/3/4/5/6/7

Q = 530 m3 / h

Q = 535 m3 / h

P = 6 bar

P = 2.5 bar

14

Laporan praktek kerja industri di PT Krakatau Steel

21

SMK Negeri 2 Cilegon

14

Laporan praktek kerja industri di PT Krakatau Steel

DIAGRAM SIRKULASI SYSTEM KONTAK TERBUKA TAK LANGSUNG ( INDIRECT COOLING ) WATER COOLING PANEL ( WCP )

t : + 370C Cooling Tower Cell EF

By Pass

Make Up

Vol : 3200 m3

Water

Kap : 5400 m3 / h

Gravel Filter F 112

t : + 320C

P1.04 ( 4 - 2 ) Q = 350 m3 H = 35 mWS

EAF

P1.02 ( 4 - 9 ) BSP & SSP Q = 562 m3 H = 70 mWS Kap : per EAF BSP : 348 m3 / h SSP : 512 m3 / h Tek : + 5 bar Emgr Line DR Air Krenceng

SMK Negeri 2 Cilegon

15

Related Documents

Gambar
December 2019 76
Gambar
December 2019 76
Gambar
August 2019 75
Gambar
May 2020 50
Gambar
August 2019 74
Gambar
June 2020 40

More Documents from ""

Aliran Fluid Baru
December 2019 66
Penukar Panas Baru
December 2019 67
Biokimia-karbohidrat
December 2019 71
Dinamika Proses Baru
December 2019 74
Gambar
December 2019 93
Kompos2
December 2019 73