EMPLOYER :  MINISTRY OF PUBLIC WORKS MAIN CONTRACTOR :  ASIAN GROUP CO. FOR  GENERAL TRADING & CONTRACTING  W.L.L

• • • • • • •

Project  General Information. Project Description & Components. Location of the Site & General Layout. Site Staff Organization Chart. General Scope of  Work. Site Mobilization & Temporary Facilities. Project Planning Methodology. • Submittals & Approvals • Material & Procurements 

• • • •

Table  of  Contents 

Construction Activities. Power Connection procedures. Crew Movement. Construction Schedule. • • • • •

Proposed Master Schedule Plan . Schedule Work Break Down Structure (WBS) Proposed ID & Coding System Calendrers Authorities Approvals

• General Layouts

Project  General Information

Project Name 

The Public Authority For Civil Information (PACI) 

Location

Al Ahmadi

Employer

Ministry Of Public Works

End User 

Public Authority For Civil Information 

Contractor

Asian Group for General Trading and Contracting

Contract No.

267 HMA

Contract Value 

2,669,010.650 KD

Date of Enterprise

9th November 2016

Contract Duration 

730 day

Project completion  8th November 2018 Date 

The building of Public Authority of Civil  Information Consists of : Floor

Project  Description & Components

Consist Of

Area

2nd Basement  Floor

Car Park ‐ Stores – Pump Room – Diesel Tank

2000

1st Basement  Floor

Car Park – Electrical Substation – Operator Room ‐ Multi Purpose Hall  – Toilet 

2000

Ground Floor

Offices – Waiting Area –Clinic – Toilets ‐ Kitchen

1540

First Floor

Offices ‐ Waiting Area – Toilets ‐ Kitchen

1600

Second Floor

Head Offices – Offices ‐ Computer  Room –Toilets

1620

Lower Roof 

Pump Rooms – Lift Rooms‐ Chillers – Water Tank

1740

Upper Roof

230

Total built up  area

10730

Location of site  & General Layout

Project  Manager

Planning  Engineer

Quantity  Surveyor

Site  Engineer Supervisor

Site Staff  Organization  Chart

Site  Engineer Supervisor

Surveyor

The scope of work under this Contract comprises the construction, completion, handing over and maintenance of work related to Drawings, Specifications, BOQ and other Contract Documents. All of the Contract Documents shall be complementary to each other in defining the Scope of Work, in particular the following, but not limited to:

General  Scope of   Work

     

GENERAL MOBILIZATION SUBMITTALS APPROVALS PROCUREMENT EXCAVATION

        

ELECTRICAL WORKS PLUMBING FIRE FIGHTING WORKS HVAC WORKS CONVEYING SYSTEM WORKS INTERNAL FINISHING WORKS EXTERNAL FINISHING WORKS AUTHORITIES APPROVALS TESTING & COMMISSIONING

% of Division 0.80%

2.94%

21.67% 29.64% 10.60% 3.72%

6.65%

2.93% 0.39%

2.25% 0.22%

Scope  of  Work by  Value weight

2.80%

7.33%

5.28%

2.00%

0.77%

2‐Site works, 2.94%

3‐Concrete, 29.64%

4‐Masonry, 6.65%

5‐Metal works, 0.39%

6‐Wood& Plastic, 0.77%

7‐Thermal& Moisture Protection, 2.00%

8‐Doors & Windows, 5.28%

9‐Finishes, 7.33%

10‐Specialities, 2.80%

12‐Furnishings, 0.22%

14‐Conveying sys, 2.25%

15a‐Plumbing, 2.93%

15b‐Fire Fighting, 3.72%

15c‐HVAC, 10.60%

16‐Electrical Works, 21.67%

PR, .80%

The period for Mobilization is 30 Calendar days .During the mobilization period the following activities shall be completed: 1. 2. 3. 4.

Temporary access routes to, from, and upon the site. Removal of top soil & other rubbish. Installation of site offices, temporary fencing, gates, project sign boards. Installation of temporary power, water & drainage facilities.

5. The following main documentation works shall also be carried out during the period.

Site  Mobilization & Temporary  Facilities

1. Submission of subcontractors for : Shoring, dewatering system data for review & approval. 2. Submittal for approval : concrete ready mix supplier, materials for concreting , water proofing 3. Submittal of drawings for : excavation, foundation works for review & approval.

‫مكاتب‬ ‫جھاز‬ ‫االشراف‬

‫المبـــــــني‬

‫الحارس‬

‫‪Site ‬‬ ‫‪Mobilization‬‬ ‫‪plan‬‬

Project Planning Methodology Submittals & Approvals

A

Submittal

B

FF LAG 10 Approval

SS LAG 10

C

D

• A   Submittal date for 1st submittal to Engineer.  • B   Submittal date for last approved submittal to Engineer . • C   Action date for 1st submittal by Engineer. • D   Action date for last submittal by Engineer. The Contractor will submit Sub‐contractors, Shop drawings, Martials for approval by  Engineers. The Submittal period will be according to the material or equipment type 

Material & Procurement  The materials will be procured by the contractor & his subcontractors but all  procurements will be through the main contractor only, since it is his responsibility as  per contract conditions. Some materials will be procured directly after taking approval on them, because they are needed to proceed work at site, while some others will be procured later because the priority in storing in the site is to the material needed to proceed work first. The duration of procurement of materials will differ from materials to other depending on its availability in Kuwait .

Procurement of material Plan for example, and not as a limitation  a) Early Critical Materials DIV

Material

02

Termite Control

03

Steel Reinforcement

03

Formwork Systems

03

Ready Mix concrete

07

Water Stop

07

Water Proofing Material

15a

Drainage & Water supply  Pipes

c)  Long Lead Materials DIV.

Material

DIV.

Material

04

Exterior Stone Cladding

16

Light fittings

08

Aluminum windows & doors

16

Diesel Generator

08

Steel doors

16

Fuel Tank

08

Wooden doors

09

Ceramic & Porcelain tiles

09

Marble & Granite for floors and walls 

12

Kitchen Cabinet

14

Elevators

15

Fire Pumps

15

Plumbing Pumps

15

Fan coil unit 

15

Air handling unit 

15

Fans

15

BAS

Construction Activities SURVEY WORK :   The contractor shall install a permanent B.M and establish setting out for concrete work and also verify all the angles, curves, linear measurements, levels and shall check any contradiction of the measurements with the contract documents. The contractor representative shall submit all the particulars to the Engineer for review and approval, upon which setting out of work shall be based.

SHORING SYSTEM:   The shoring system is proposed around the site excavation. The contractor shall submit design calculations & drawings with construction techniques of H piles or soldier its bottom depth, protection of existing services (if any) before commencing the work. And its activities will be revised with the approved subcontractor according to his steps in works

DEWATERING :   After the subsurface investigation the water table height shall be determined in the entire site. The contractor shall submit the design & the detailed layout of dewatering system for the Engineer’s approval. The dewatering system shall run 24 hours and would maintained till downward pressure exerted by the building equals upward thrust from soil. At minimum 0.00 level according to specifications.

Site Works All excavation will be done using machines and the backfilling will be compacted by roller plate compactor and inspected by the engineer at different levels. Areas that are deeper than the water table will be carried out by the use of well‐point dewatering system. Earthwork will be carried out to complete all site clearing excavation, filling and grading including preparation of sub‐grade for slabs and pavement. Work will include the following: 1. Excavation to the level of foundations 2. Paved areas and kerbs 3. Filling grading and compaction 4. Testing 5. Clearing away surplus excavated material

Termite Control  Approved material for termite control will be used on site.  The concrete will be obtained from an approved ready mix plant as per approved design mix and will be transported to site by transit mixers by sequencing their movement in order to avoid under waiting period. Concrete discharge to the required formwork will be arranged by concrete pumps or by bucket crane depending upon location of casting. All precautions shall be taken during casting at hot weather in order to guarantee quality of concrete as per specifications. All concrete will be compacted using vibrators and casted concrete will be protected and cured as per specifications.

Formwork Formwork acceptable to engineer will be used taking into consideration safety and quality control requirements. Adequate formwork will be made available at site in order to ensure speedy progress and meet the construction milestones as presented in the construction schedule.

Reinforcement All reinforcement steel will be cut and bent to the required details and stored in proper order of use. All reinforcement shall be transported taking into consideration safety precautions and will be lifted manually to fixing position or by crane depending on locations. Beam reinforcement will be erected before slab in stages as work progresses from one end of slab to another.

Masonry walls  All concrete blocks and block accessories will be from an approved source as per quality control requirements. After removing shuttering of floor slab, masonry blocks works will start.

Plastering works After completion of block work and be cured for 3 days, Plastering works will start. The 1st step  for rendering and fix plastering accessories. The 2nd one to make the 1st coat plastering. The 3rd will be the 2nd coat of plastering. Each coat of plaster has to be cured for 3 days. The electro mechanical work and steel door frames have to be finished before starting the 1st layer of plastering.

Doors and Windows All doors and windows will be manufactured as per drawings / specifications and from an approved source. This item of work has 3 types: Alum doors& windows / Steel doors / Wooden doors. ‐ The Aluminum doors after painting coats and before the final painting coat. ‐ Steel & wooden doors frames will be painted and fixed to block or concrete during rendering works and before starting the plaster. The doors will be done after floor tiling and painting coats but before final coat.

Ceiling works All material for ceilings like hangers, framing, supports, ceiling tiles and special finishes will be from an approved source as per quality control requirements. All materials will be properly stored with adequate markings. All ceiling finishes shall be carried out in accordance / coordination with HVAC, Plumbing & Fire fighting and Electrical works on the ceiling for the anchors. The electrical drops for fittings shall be completed along with anchors for ceiling. After all above works are completed (ducts, pipes, … etc.), framing will start and afterwards ceiling finishes. Site fabrication and cutting shall be as per specifications. No extra protection is required on ceiling once the area is closed.

Painting works After completion of plastering work and be cured for 12 days, painting works will start . The 1st step is to work for surface preparation, primer and putty coats. The 2nd step is to make painting coats and this will be done after finishing the electro mechanical ducting and piping over the false ceiling . The 3rd step will be the final coat of painting. This step will be done after finalization of finishing, mechanical and electrical fixtures while testing and commissioning work be under progress.

Flooring works After finishing the coats of painting the contractor will start the work of flooring tiles. All material of floors such as mortar, marble, ceramic will be from an approved source as per specifications. All materials will be packed and handled in such away that the shape and size are not changed. Material will be stored at factory or at site on wooden platforms or as recommended. Before starting of any finishing on floors, all concealed items like pipes or other fixtures will be checked and approved by the engineer. Flooring works shall start after major heavy works are completed.

Roofing  Once all heavy works are completed on roof, and drainage and other inserts are fixed in place, the area will be cleaned and roofing works starts. All roofing layers shall be as per drawings / specifications / manufacturer recommendations. After each layer is completed, it will be inspected / approved by the engineer before applying the next layer. After roof work works are completed, flash up and rain water outlets and other roof fixtures shall be erected.

Mechanical works  ‐ Plumbing works All high level and inside shafts drainage & water supply pipes will be started before block walls  Water supply and drainage pipes inside toilets area will be installed after block works. Installing floor drains, ,traps and cleanouts will start before water proofing. Water closet concealed flash tanks will be installed before ceramic work. The other sanitary  fixtures will be installed after finishing ceramic works. Pumps, filters and GRP tanks & heaters will be installed after all mechanical room will be ready.  ‐ Fire fighting works  Sprinklers systems, pipes upright sprinkler heads work shall be started before any block work  Installation of Pipes, fittings, landing valves, fire cabinet fixation  will start after finish block works.   Other sprinklers types of will be installed after finishing false ceiling. Fire protection sprinklers  heads shall be finish to finish with ceiling suspension system . Fire cabinet and extinguishers, will  start during painting coats.

‐ HVAC works  Install smoke air ducts and supports will start before block work. Installing of AHU & FCU will start  when mechanical rooms be ready. Install HVAC ducts and chilled water pipes and supports will be  done before and during block works. Installing & connecting exhaust & fresh air fans will start  after ceiling suspension systems. Installation of diffusers & grilles will finish with finish of ceiling  panels.

Electrical works ‐ Cable trays installation will be followed by installing cables and wires. Then by the installation of data communication systems, CCTV cables. Then low voltage cables and outlets, wiring accessories and switches, low voltage equipment, fire alarm detectors, and finally light fittings and accessories as well as earthling copper tapes and connections. ‐ The conduits & fittings for light, power, fire alarm system and public address sys. Shall be laid in reinforcement steel before concrete casting of slab or walls. ‐ In the same way, the enclosure for distribution boards shall be fixed on the surface of block wall or semi recessed and connects all conduits. Pull the wires for light points, wiring devices and fire alarm system devices. Fix the support from the ceiling slab or wall for cable tray from the LT room up to field location Fix and terminate the wiring devices once the wall is painted.

EXTERNAL CLADDING, CURTAINWALLS & GLAZING : The external cladding would start after the completion of concrete work: The cladding work shall be commence of GF & proceed upwards along with completion of  concrete casting works of roof floor slab . Installation work of curtain walls & glazing shall succeeded stone cladding and shall start after the  completion of concrete works.

POWER Connection Procedure K.F.D submittals & approvals 1. The contractor shall submit shop drawings & equipment of smoke ventilation , Fire fighting System and Fire Alarm system for Ministry Engineers for Approval 2. After MPW Approval these approved drawings and equipment will be submitted to the KFD for Approval 3. After KFD approval , subcontractor will start work in site 4. After finishing FF & FA networks above false ceiling the KFD will be asked to the 1st inspection (Before closing the false ceiling ) 5. After the Approval letter from KFD to close the false ceiling 6. After finishing all civil works and finishing of all FF & FA & Ventilation systems the KFD will be asked for the 2nd inspection of Approval for POWER 7. The approval of KFD will be the 1st step for POWER ON 8. The 3rd appointment for KFD will be after POWER ON for testing all systems

MEW submittals & approvals 1. The contractor will submit for MEW the HVAC calculations and the Elect. load for approval. 2. After finishing all civil works of substation and its as built drawings the MEW will be asked for 1st inspection 3. After Approval MEW will lay high tension cable, transformers, high tension switch gear 4. After finishing all electrical works, AS BUILT drawings will be submitted to MEW for electrical & power load. 5. After the telephone and data system are finished, as‐built drawings will be submitted to MOC for approval. 6. After finishing façade works, the AS BUILT drawings will be send to the MINUCIBILITY for Approval 7. After Approval, cleaning certificate will be issued from MINUCIBILITY 8. The Approval of KFD, MEW and MINUCIBILITY will be taken to request power release 9. Field test for electrical works will be by MEW 10. After inspection & approval MEW will connect to the city main 11. POWER ON

Formwork A = 230 m2 Slab Formwork B  = 1630m2 Slab Formwork A  = 1630m2 Slab Formwork B  = 1630m2 Slab Formwork A = 1570 m2 Slab Formwork A = 2000 m2

Form work Movement

‐ ‐

Two separate form work to be provided. No zoning for each floor.

Construction Schedule  Structure 

Master Schedule Plan

The work breakdown structure, WBS, prepared in such a way to help in planning and organizing the schedule activities. To achieve the above purpose the WBS will contain FOUR primary levels consisting of. These levels are incorporated in the schedule as listed below :‐ Level 1: Phase Level 2: level Level 3: Type of work Level 4: Area Level 4: CSI Divisions of BOQ Level 5: Activity

WBS STRUCTURE

The diagram illustrates

PHASE LEVEL TYPE OF WORK AREA

the WBS levels

BOQ CSI DIVISION

and hierarchy.

ACTIVITY

Schedule Work Break Down Structure (WBS)

PACI-Rev1.ST.GE.GE

PACI-Rev1.ST.GE

PACI-Rev1.ST

PACI-Rev1

WBS Code

PACI-Rev1.MO.GE.GE

PACI-Rev1.MO.GE

PACI-Rev1.MO

PACI-Rev1.EN.SB.SB

PACI-Rev1.EN.SB

PACI-Rev1.EN

DIV.08 Doors & Windows DIV.09 Finishes DIV.10 Specialities DIV.12 Furnishing Div.14 Conveying System

PACI-R PACI-Rev1.EN.SB.SB.CV.D08 PACI-R PACI-Rev1.EN.SB.SB.CV.D09 PACI-R PACI-Rev1.EN.SB.SB.CV.D10 PACI-R PACI-Rev1.EN.SB.SB.CV.D12 PACI-R PACI-Rev1.EN.SB.SB.CV.D14

Page 1 of 9

DIV.07 Thermal & Moisture Protection

PACI-R PACI-Rev1.EN.SB.SB.CV.D07

DIV.07 Thermal & Moisture Protection DIV.08 Doors & Windows DIV.09 Finishes DIV.10 Specialities DIV.12 Furnishing Div.14 Conveying System

PACI-R PACI-Rev1.EN.SB.AP.CV.D07 PACI-R PACI-Rev1.EN.SB.AP.CV.D08 PACI-R PACI-Rev1.EN.SB.AP.CV.D09 PACI-R PACI-Rev1.EN.SB.AP.CV.D10 PACI-R PACI-Rev1.EN.SB.AP.CV.D12 PACI-R PACI-Rev1.EN.SB.AP.CV.D14

PACI-Rev1

PACI-Rev1.EN.SH.SB

PACI-Rev1.EN.SH

Submittals

Shop Drawings

DIV.16 Electrical Works

PACI-R PACI-Rev1.EN.SB.AP.1.D16 PACI-Rev1

DIV.15 Mechanical Works

PACI-R PACI-Rev1.EN.SB.AP.1.D15

Mechanical & Electrical Works

DIV.05 Metals

PACI-R PACI-Rev1.EN.SB.AP.CV.D05

PACI-Rev PACI-Rev1.EN.SB.AP.1

DIV.02 Site Works

Civil Works

Approvals

PACI-R PACI-Rev1.EN.SB.AP.CV.D02

PACI-Rev PACI-Rev1.EN.SB.AP.CV

PACI-Rev1.EN.SB.AP

DIV.16 Electrical Works

PACI-R PACI-Rev1.EN.SB.SB.1.D16 PACI-Rev1

DIV.15 Mechanical Works

PACI-R PACI-Rev1.EN.SB.SB.1.D15

Mechanical & Electrical Works

DIV.05 Metals

PACI-R PACI-Rev1.EN.SB.SB.CV.D05

PACI-Rev PACI-Rev1.EN.SB.SB.1

DIV.02 Site Works

Civil Works

Submittals

Subcontractors

Engineering

General

General

General

Mobilization

General

General

General

Start of Project

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Project Status

PACI Project @ Ahmad

The Public Authority For Civil Information in

WBS Name

PACI-R PACI-Rev1.EN.SB.SB.CV.D02

PACI-Rev PACI-Rev1.EN.SB.SB.CV

PACI-Rev1

PACI-Rev1

PACI-Rev1

PACI-Rev PACI-Rev1.MO.GE.GE.GE

PACI-Rev1

PACI-Rev1

PACI-Rev1

PACI-Rev PACI-Rev1.ST.GE.GE.GE

PACI-Rev1

PACI-Rev1

PACI-Rev1

PACI-Rev1

Project ID

Project ID

DIV.05 Metals DIV.08 Doors & Windows DIV.09 Finishes DIV.12 Furnishing Div.14 Conveying System

PACI-R PACI-Rev1.EN.SH.SB.CV.D05 PACI-R PACI-Rev1.EN.SH.SB.CV.D08 PACI-R PACI-Rev1.EN.SH.SB.CV.D09 PACI-R PACI-Rev1.EN.SH.SB.CV.D12 PACI-R PACI-Rev1.EN.SH.SB.CV.D14

Page 2 of 9

DIV.04 Masonry Works

PACI-R PACI-Rev1.EN.SH.SB.CV.D04

DIV.04 Masonry Works DIV.05 Metals DIV.08 Doors & Windows DIV.09 Finishes DIV.12 Furnishing Div.14 Conveying System

PACI-R PACI-Rev1.EN.SH.AP.CV.D04 PACI-R PACI-Rev1.EN.SH.AP.CV.D05 PACI-R PACI-Rev1.EN.SH.AP.CV.D08 PACI-R PACI-Rev1.EN.SH.AP.CV.D09 PACI-R PACI-Rev1.EN.SH.AP.CV.D12 PACI-R PACI-Rev1.EN.SH.AP.CV.D14

PACI-Rev1.EN.MT.SB

DIV.02 Site Works DIV.03 Concrete Works DIV.04 Masonry Works DIV.05 Metals DIV.06 Wood & Plastic DIV.07 Thermal & Moisture Protection DIV.08 Doors & Windows DIV.09 Finishes DIV.10 Specialities DIV.12 Furnishing Div.14 Conveying System

PACI-R PACI-Rev1.EN.MT.SB.CV.D03 PACI-R PACI-Rev1.EN.MT.SB.CV.D04 PACI-R PACI-Rev1.EN.MT.SB.CV.D05 PACI-R PACI-Rev1.EN.MT.SB.CV.D06 PACI-R PACI-Rev1.EN.MT.SB.CV.D07 PACI-R PACI-Rev1.EN.MT.SB.CV.D08 PACI-R PACI-Rev1.EN.MT.SB.CV.D09 PACI-R PACI-Rev1.EN.MT.SB.CV.D10 PACI-R PACI-Rev1.EN.MT.SB.CV.D12 PACI-R PACI-Rev1.EN.MT.SB.CV.D14

Civil Works

Submittals

Materials

PACI-R PACI-Rev1.EN.MT.SB.CV.D02

PACI-Rev PACI-Rev1.EN.MT.SB.CV

PACI-Rev1

PACI-Rev1.EN.MT

DIV.16 Electrical Works

PACI-R PACI-Rev1.EN.SH.AP.1.D16 PACI-Rev1

DIV.15 Mechanical Works

PACI-R PACI-Rev1.EN.SH.AP.1.D15

Mechanical & Electrical Works

DIV.03 Concrete Works

PACI-R PACI-Rev1.EN.SH.AP.CV.D03

PACI-Rev PACI-Rev1.EN.SH.AP.1

DIV.02 Site Works

Civil Works

Approvals

PACI-R PACI-Rev1.EN.SH.AP.CV.D02

PACI-Rev PACI-Rev1.EN.SH.AP.CV

PACI-Rev1.EN.SH.AP

DIV.16 Electrical Works

PACI-R PACI-Rev1.EN.SH.SB.1.D16 PACI-Rev1

DIV.15 Mechanical Works

PACI-R PACI-Rev1.EN.SH.SB.1.D15

Mechanical & Electrical Works

DIV.03 Concrete Works

PACI-R PACI-Rev1.EN.SH.SB.CV.D03

PACI-Rev PACI-Rev1.EN.SH.SB.1

DIV.02 Site Works

Civil Works

WBS Name

PACI-R PACI-Rev1.EN.SH.SB.CV.D02

PACI-Rev PACI-Rev1.EN.SH.SB.CV

WBS Code

PACI Project @ Ahmad

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Project Status

Project ID

Page 3 of 9

DIV.04 Masonry Works DIV.05 Metals DIV.06 Wood & Plastic DIV.07 Thermal & Moisture Protection DIV.08 Doors & Windows DIV.09 Finishes DIV.10 Specialities DIV.12 Furnishing Div.14 Conveying System

PACI-R PACI-Rev1.EN.MT.AP.CV.D04 PACI-R PACI-Rev1.EN.MT.AP.CV.D05 PACI-R PACI-Rev1.EN.MT.AP.CV.D06 PACI-R PACI-Rev1.EN.MT.AP.CV.D07 PACI-R PACI-Rev1.EN.MT.AP.CV.D08 PACI-R PACI-Rev1.EN.MT.AP.CV.D09 PACI-R PACI-Rev1.EN.MT.AP.CV.D10 PACI-R PACI-Rev1.EN.MT.AP.CV.D12 PACI-R PACI-Rev1.EN.MT.AP.CV.D14

PACI-Rev1.PR.AM.AL

PACI-Rev1.PR.AM

DIV.04 Masonry Works DIV.05 Metals DIV.06 Wood & Plastic DIV.07 Thermal & Moisture Protection DIV.08 Doors & Windows DIV.09 Finishes DIV.10 Specialities DIV.12 Furnishing Div.14 Conveying System

PACI-R PACI-Rev1.PR.AM.AL.CV1.D04 PACI-R PACI-Rev1.PR.AM.AL.CV1.D05 PACI-R PACI-Rev1.PR.AM.AL.CV1.D06 PACI-R PACI-Rev1.PR.AM.AL.CV1.D07 PACI-R PACI-Rev1.PR.AM.AL.CV1.D08 PACI-R PACI-Rev1.PR.AM.AL.CV1.D09 PACI-R PACI-Rev1.PR.AM.AL.CV1.D10 PACI-R PACI-Rev1.PR.AM.AL.CV1.D12 PACI-R PACI-Rev1.PR.AM.AL.CV1.D14

PACI-Rev1

PACI-Rev1.CO.SK

PACI-Rev1.CO

Skeleton

Construction

DIV.16 Electrical Works

PACI-R PACI-Rev1.PR.AM.AL.1.D16 PACI-Rev1

DIV.15 Mechanical Works

PACI-R PACI-Rev1.PR.AM.AL.1.D15

Mechanical & Electrical Works

DIV.03 Concrete Works

PACI-R PACI-Rev1.PR.AM.AL.CV1.D03

PACI-Rev PACI-Rev1.PR.AM.AL.1

DIV.02 Site Works

Civil Works

All Levels

All Materials

Procurement

PACI-R PACI-Rev1.PR.AM.AL.CV1.D02

PACI-Rev PACI-Rev1.PR.AM.AL.CV1

PACI-Rev1

PACI-Rev1

PACI-Rev1.PR

DIV.16 Electrical Works

PACI-R PACI-Rev1.EN.MT.AP.1.D16 PACI-Rev1

DIV.15 Mechanical Works

PACI-R PACI-Rev1.EN.MT.AP.1.D15

Mechanical & Electrical Works

DIV.03 Concrete Works

PACI-R PACI-Rev1.EN.MT.AP.CV.D03

PACI-Rev PACI-Rev1.EN.MT.AP.1

DIV.02 Site Works

Civil Works

Approvals

PACI-R PACI-Rev1.EN.MT.AP.CV.D02

PACI-Rev PACI-Rev1.EN.MT.AP.CV

PACI-Rev1.EN.MT.AP

DIV.16 Electrical Works

PACI-R PACI-Rev1.EN.MT.SB.1.D16 PACI-Rev1

DIV.15 Mechanical Works

Mechanical & Electrical Works

WBS Name

PACI-R PACI-Rev1.EN.MT.SB.1.D15

PACI-Rev PACI-Rev1.EN.MT.SB.1

WBS Code

PACI Project @ Ahmad

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Project Status

Project ID

PACI-Rev1.CO.SK.FD

PROVISIONAL

PACI-R PACI-Rev1.CO.SK.FD.AA.PR

Page 4 of 9

DIV.16 Electrical Works

PACI-R PACI-Rev1.CO.SK.FD.AA.D16

PACI-Rev1.CO.FI.B2

PACI-Rev1.CO.FI

DIV.02 Site Works DIV.04 Masonary Works

PACI-R PACI-Rev1.CO.FI.B2.AA.D04

All Area

Basement 2

Finishes

DIV.03 Concrete Works

All Area

Upper Roof

PACI-R PACI-Rev1.CO.FI.B2.AA.D02

PACI-Rev PACI-Rev1.CO.FI.B2.AA

PACI-Rev1

PACI-Rev1

PACI-R PACI-Rev1.CO.SK.UR.AA.D03

PACI-Rev PACI-Rev1.CO.SK.UR.AA

PACI-Rev1.CO.SK.UR

DIV.16 Electrical Works

PACI-R PACI-Rev1.CO.SK.LR.AA.D16 PACI-Rev1

DIV.03 Concrete Works

All Area

Lower Roof

PACI-R PACI-Rev1.CO.SK.LR.AA.D03

PACI-Rev PACI-Rev1.CO.SK.LR.AA

PACI-Rev1.CO.SK.LR

DIV.16 Electrical Works

PACI-R PACI-Rev1.CO.SK.2F.AA.D16 PACI-Rev1

DIV.03 Concrete Works

All Area

Second Floor

PACI-R PACI-Rev1.CO.SK.2F.AA.D03

PACI-Rev PACI-Rev1.CO.SK.2F.AA

PACI-Rev1.CO.SK.2F

DIV.16 Electrical Works

PACI-R PACI-Rev1.CO.SK.1F.AA.D16 PACI-Rev1

DIV.03 Concrete Works

All Area

First Floor

PACI-R PACI-Rev1.CO.SK.1F.AA.D03

PACI-Rev PACI-Rev1.CO.SK.1F.AA

PACI-Rev1.CO.SK.1F

DIV.16 Electrical Works

PACI-R PACI-Rev1.CO.SK.GR.AA.D16 PACI-Rev1

DIV.03 Concrete Works

All Area

Ground Floor

PACI-R PACI-Rev1.CO.SK.GR.AA.D03

PACI-Rev PACI-Rev1.CO.SK.GR.AA

PACI-Rev1.CO.SK.GR

DIV.16 Electrical Works

PACI-R PACI-Rev1.CO.SK.B1.AA.D16 PACI-Rev1

DIV.03 Concrete Works

All Area

Basement 1

PACI-R PACI-Rev1.CO.SK.B1.AA.D03

PACI-Rev PACI-Rev1.CO.SK.B1.AA

PACI-Rev1.CO.SK.B1

DIV.16 Electrical Works

PACI-R PACI-Rev1.CO.SK.B2.AA.D16 PACI-Rev1

DIV.03 Concrete Works

All Area

PACI-R PACI-Rev1.CO.SK.B2.AA.D03

PACI-Rev PACI-Rev1.CO.SK.B2.AA

Basement 2

DIV.07 Thermal & Moisture Protection

PACI-R PACI-Rev1.CO.SK.FD.AA.D07

PACI-Rev1.CO.SK.B2

DIV.03 Concrete Works

PACI-R PACI-Rev1.CO.SK.FD.AA.D03

PACI-Rev1

DIV.02 Site Works

All Area

Foundation

WBS Name

PACI-R PACI-Rev1.CO.SK.FD.AA.D02

PACI-Rev PACI-Rev1.CO.SK.FD.AA

PACI-Rev1

WBS Code

PACI Project @ Ahmad

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Project Status

Project ID

DIV.15 Mechanicl Works DIV.16 Electrical Works

PACI-R PACI-Rev1.CO.FI.B2.AA.D15 PACI-R PACI-Rev1.CO.FI.B2.AA.D16

Page 5 of 9

DIV.09 Finishes

PACI-R PACI-Rev1.CO.FI.B2.AA.D09

DIV.09 Finishes DIV.10 Specialities

PACI-R PACI-Rev1.CO.FI.B2.WA .D09 PACI-R PACI-Rev1.CO.FI.B2.WA .D10

PACI-Rev1.CO.FI.B1

DIV.05 Metals DIV.07 Thermal & Moisture Protection DIV.08 Doors & Windows DIV.09 Finishes DIV.15 Mechanicl Works DIV.16 Electrical Works

PACI-R PACI-Rev1.CO.FI.B1.AA.D05 PACI-R PACI-Rev1.CO.FI.B1.AA.D07 PACI-R PACI-Rev1.CO.FI.B1.AA.D08 PACI-R PACI-Rev1.CO.FI.B1.AA.D09 PACI-R PACI-Rev1.CO.FI.B1.AA.D15 PACI-R PACI-Rev1.CO.FI.B1.AA.D16

DIV.08 Doors & Windows DIV.09 Finishes DIV.10 Specialities

PACI-R PACI-Rev1.CO.FI.B1.WA .D08 PACI-R PACI-Rev1.CO.FI.B1.WA .D09 PACI-R PACI-Rev1.CO.FI.B1.WA .D10

DIV.10 Specialities DIV.15 Mechanicl Works

PACI-R PACI-Rev1.CO.FI.B1.WT.D10 PACI-R PACI-Rev1.CO.FI.B1.WT.D15

PACI-R PACI-Rev1.CO.FI.GR.AA.D02

PACI-Rev PACI-Rev1.CO.FI.GR.AA

DIV.02 Site Works

All Area

Ground Floor

DIV.09 Finishes

PACI-R PACI-Rev1.CO.FI.B1.WT.D09

PACI-Rev1.CO.FI.GR

DIV.08 Doors & Windows

PACI-R PACI-Rev1.CO.FI.B1.WT.D08

PACI-Rev1

DIV.07 Thermal & Moisture Protection

Wet Area

DIV.09 Finishes

PACI-R PACI-Rev1.CO.FI.B1.WT.D07

PACI-Rev PACI-Rev1.CO.FI.B1.WT

PACI-R PACI-Rev1.CO.FI.B1.OF.D09

Offices

DIV.05 Metals

PACI-R PACI-Rev1.CO.FI.B1.WA .D05

PACI-Rev PACI-Rev1.CO.FI.B1.OF

DIV.02 Site Works

PACI-R PACI-Rev1.CO.FI.B1.WA .D02

Waiting Area

DIV.04 Masonary Works

PACI-R PACI-Rev1.CO.FI.B1.AA.D04

PACI-Rev PACI-Rev1.CO.FI.B1.WA

DIV.02 Site Works

All Area

Basement 1

DIV.09 Finishes

PACI-R PACI-Rev1.CO.FI.B1.AA.D01

PACI-Rev PACI-Rev1.CO.FI.B1.AA

PACI-Rev1

PACI-R PACI-Rev1.CO.FI.B2.OF.D09

Offices

DIV.05 Metals

PACI-R PACI-Rev1.CO.FI.B2.WA .D05

PACI-Rev PACI-Rev1.CO.FI.B2.OF

DIV.02 Site Works

PACI-R PACI-Rev1.CO.FI.B2.WA .D02

Waiting Area

DIV.08 Doors & Windows

PACI-R PACI-Rev1.CO.FI.B2.AA.D08

PACI-Rev PACI-Rev1.CO.FI.B2.WA

DIV.07 Thermal & Moisture Protection

WBS Name

PACI-R PACI-Rev1.CO.FI.B2.AA.D07

WBS Code

PACI Project @ Ahmad

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Project Status

Project ID

DIV.08 Doors & Windows DIV.09 Finishes DIV.15 Mechanicl Works DIV.16 Electrical Works

PACI-R PACI-Rev1.CO.FI.GR.AA.D08 PACI-R PACI-Rev1.CO.FI.GR.AA.D09 PACI-R PACI-Rev1.CO.FI.GR.AA.D15 PACI-R PACI-Rev1.CO.FI.GR.AA.D16

Page 6 of 9

DIV.07 Thermal & Moisture Protection

PACI-R PACI-Rev1.CO.FI.GR.AA.D07

DIV.08 Doors & Windows DIV.09 Finishes DIV.10 Specialities DIV.15 Mechanicl Works

PACI-R PACI-Rev1.CO.FI.GR.WA .D08 PACI-R PACI-Rev1.CO.FI.GR.WA .D09 PACI-R PACI-Rev1.CO.FI.GR.WA .D10 PACI-R PACI-Rev1.CO.FI.GR.WA .D15

DIV.09 Finishes DIV.10 Specialities DIV.12 Furnishing DIV.15 Mechanicl Works

PACI-R PACI-Rev1.CO.FI.GR.WT.D09 PACI-R PACI-Rev1.CO.FI.GR.WT.D10 PACI-R PACI-Rev1.CO.FI.GR.WT.D12 PACI-R PACI-Rev1.CO.FI.GR.WT.D15

DIV.08 Doors & Windows DIV.09 Finishes DIV.15 Mechanicl Works DIV.16 Electrical Works

PACI-R PACI-Rev1.CO.FI.1F.AA.D08 PACI-R PACI-Rev1.CO.FI.1F.AA.D09 PACI-R PACI-Rev1.CO.FI.1F.AA.D15 PACI-R PACI-Rev1.CO.FI.1F.AA.D16

DIV.02 Site Works DIV.04 Masonary Works DIV.08 Doors & Windows DIV.09 Finishes DIV.10 Specialities

PACI-R PACI-Rev1.CO.FI.1F.WA.D02 PACI-R PACI-Rev1.CO.FI.1F.WA.D04 PACI-R PACI-Rev1.CO.FI.1F.WA.D08 PACI-R PACI-Rev1.CO.FI.1F.WA.D09 PACI-R PACI-Rev1.CO.FI.1F.WA.D10

Waiting Area

DIV.07 Thermal & Moisture Protection

PACI-R PACI-Rev1.CO.FI.1F.AA.D07

PACI-Rev PACI-Rev1.CO.FI.1F.WA

DIV.04 Masonary Works

All Area PACI-R PACI-Rev1.CO.FI.1F.AA.D04

PACI-Rev PACI-Rev1.CO.FI.1F.AA

First Floor

DIV.08 Doors & Windows

PACI-R PACI-Rev1.CO.FI.GR.WT.D08

PACI-Rev1.CO.FI.1F

DIV.07 Thermal & Moisture Protection

PACI-R PACI-Rev1.CO.FI.GR.WT.D07

PACI-Rev1

DIV.05 Metal Works

PACI-R PACI-Rev1.CO.FI.GR.WT.D05

Wet Area

DIV.09 Finishes

PACI-R PACI-Rev1.CO.FI.GR.OF.D09 PACI-Rev PACI-Rev1.CO.FI.GR.WT

DIV.05 Metal Works

PACI-R PACI-Rev1.CO.FI.GR.OF.D05

Offices

DIV.04 Masonary Works

PACI-R PACI-Rev1.CO.FI.GR.WA .D04

PACI-Rev PACI-Rev1.CO.FI.GR.OF

DIV.02 Site Works

PACI-R PACI-Rev1.CO.FI.GR.WA .D02

Waiting Area

DIV.05 Metal Works

PACI-R PACI-Rev1.CO.FI.GR.AA.D05

PACI-Rev PACI-Rev1.CO.FI.GR.WA

DIV.04 Masonary Works

WBS Name

PACI-R PACI-Rev1.CO.FI.GR.AA.D04

WBS Code

PACI Project @ Ahmad

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Project Status

Project ID

Page 7 of 9

DIV.09 Finishes DIV.10 Specialities DIV.12 Furnishing DIV.15 Mechanicl Works

PACI-R PACI-Rev1.CO.FI.1F.WT.D09 PACI-R PACI-Rev1.CO.FI.1F.WT.D10 PACI-R PACI-Rev1.CO.FI.1F.WT.D12 PACI-R PACI-Rev1.CO.FI.1F.WT.D15

DIV.08 Doors & Windows DIV.09 Finishes DIV.10 Specialities DIV.15 Mechanicl Works DIV.16 Electrical Works

PACI-R PACI-Rev1.CO.FI.2F.AA.D08 PACI-R PACI-Rev1.CO.FI.2F.AA.D09 PACI-R PACI-Rev1.CO.FI.2F.AA.D10 PACI-R PACI-Rev1.CO.FI.2F.AA.D15 PACI-R PACI-Rev1.CO.FI.2F.AA.D16

DIV.08 Doors & Windows DIV.09 Finishes DIV.10 Specialities DIV.15 Mechanicl Works

PACI-R PACI-Rev1.CO.FI.2F.WA.D08 PACI-R PACI-Rev1.CO.FI.2F.WA.D09 PACI-R PACI-Rev1.CO.FI.2F.WA.D10 PACI-R PACI-Rev1.CO.FI.2F.WA.D15

DIV.09 Finishes DIV.10 Specialities

PACI-R PACI-Rev1.CO.FI.2F.OF.D09 PACI-R PACI-Rev1.CO.FI.2F.OF.D10

DIV.05 Metal Works DIV.07 Thermal & Moisture Protection DIV.08 Doors & Windows DIV.09 Finishes DIV.10 Specialities

PACI-R PACI-Rev1.CO.FI.2F.WT.D05 PACI-R PACI-Rev1.CO.FI.2F.WT.D07 PACI-R PACI-Rev1.CO.FI.2F.WT.D08 PACI-R PACI-Rev1.CO.FI.2F.WT.D09 PACI-R PACI-Rev1.CO.FI.2F.WT.D10

Wet Area

DIV.06 Wood & Plastic

PACI-R PACI-Rev1.CO.FI.2F.OF.D06

PACI-Rev PACI-Rev1.CO.FI.2F.WT

DIV.05 Metal Works

PACI-R PACI-Rev1.CO.FI.2F.OF.D05

Offices

DIV.04 Masonary Works

PACI-R PACI-Rev1.CO.FI.2F.WA.D04

PACI-Rev PACI-Rev1.CO.FI.2F.OF

DIV.02 Site Works

PACI-R PACI-Rev1.CO.FI.2F.WA.D02

Waiting Area

DIV.07 Thermal & Moisture Protection

PACI-R PACI-Rev1.CO.FI.2F.AA.D07

PACI-Rev PACI-Rev1.CO.FI.2F.WA

DIV.04 Masonary Works

All Area

PACI-R PACI-Rev1.CO.FI.2F.AA.D04

PACI-Rev PACI-Rev1.CO.FI.2F.AA

Second Floor

DIV.08 Doors & Windows

PACI-R PACI-Rev1.CO.FI.1F.WT.D08

PACI-Rev1.CO.FI.2F

DIV.07 Thermal & Moisture Protection

PACI-R PACI-Rev1.CO.FI.1F.WT.D07

PACI-Rev1

DIV.05 Metal Works

PACI-R PACI-Rev1.CO.FI.1F.WT.D05

Wet Area

DIV.09 Finishes

PACI-R PACI-Rev1.CO.FI.1F.OF.D09 PACI-Rev PACI-Rev1.CO.FI.1F.WT

DIV.05 Metal Works

Offices

DIV.15 Mechanicl Works

WBS Name

PACI-R PACI-Rev1.CO.FI.1F.OF.D05

PACI-Rev PACI-Rev1.CO.FI.1F.OF

PACI-R PACI-Rev1.CO.FI.1F.WA.D15

WBS Code

PACI Project @ Ahmad

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Project Status

Project ID

DIV.09 Finishes DIV10 Specialities DIV.15 Mechanicl Works DIV.16 Electrical Works

PACI-R PACI-Rev1.CO.FI.LR.AA.D09 PACI-R PACI-Rev1.CO.FI.LR.AA.D10 PACI-R PACI-Rev1.CO.FI.LR.AA.D15 PACI-R PACI-Rev1.CO.FI.LR.AA.D16

PACI-Rev1.CO.FI.Facades

PACI-Rev1.CL.AT.GE

PACI-Rev1.CL.AT

PACI-Rev PACI-Rev1.CL.AT.GE.GE

PACI-Rev1

PACI-Rev1

PACI-Rev1.CL

Page 8 of 9

GENERAL

GENERAL

Authorities Approvals

Project Close Out

DIV-08 Doors & Windows

PACI-R PACI-Rev1.CO.FI.Facades.EL111.1 PACI-Rev1

DIV-04 Masonry Works

PACI-R PACI-Rev1.CO.FI.Facades.EL111.GE

Elevation -04

DIV-08 Doors & Windows

PACI-R PACI-Rev1.CO.FI.Facades.EL11.1 PACI-Rev PACI-Rev1.CO.FI.Facades.EL111

DIV-04 Masonry Works

PACI-R PACI-Rev1.CO.FI.Facades.EL11.GE

Elevation -03

DIV-08 Doors & Windows

PACI-R PACI-Rev1.CO.FI.Facades.EL1.1 PACI-Rev PACI-Rev1.CO.FI.Facades.EL11

DIV-04 Masonry Works

PACI-R PACI-Rev1.CO.FI.Facades.EL1.GE

Elevation -02

DIV-08 Doors & Windows

PACI-R PACI-Rev1.CO.FI.Facades.EL.1 PACI-Rev PACI-Rev1.CO.FI.Facades.EL1

DIV-04 Masonry Works

Elevation -01

Facades

DIV.14 Conveying Systems

ALL FLOORS

Conveying System

PACI-R PACI-Rev1.CO.FI.Facades.EL.GE

PACI-Rev PACI-Rev1.CO.FI.Facades.EL

PACI-Rev1

PACI-R PACI-Rev1.CO.FI.CV.AF.D14

PACI-Rev PACI-Rev1.CO.FI.CV.AF

PACI-Rev1.CO.FI.CV

DIV.05 Metal Works

PACI-R PACI-Rev1.CO.FI.ST.AF.D05 PACI-Rev1

DIV.09 Finishes

ALL FLOORS

Stairs

PACI-R PACI-Rev1.CO.FI.ST.AF.D09

PACI-Rev PACI-Rev1.CO.FI.ST.AF

PACI-Rev1.CO.FI.ST

DIV.15 Mechanicl Works

PACI-R PACI-Rev1.CO.FI.UR.AA.D15 PACI-Rev1

DIV.07 Thermal & Moisture Protection

All Area

PACI-R PACI-Rev1.CO.FI.UR.AA.D07

PACI-Rev PACI-Rev1.CO.FI.UR.AA

Upper Roof

DIV.08 Doors & Windows

PACI-R PACI-Rev1.CO.FI.LR.AA.D08

PACI-Rev1.CO.FI.UR

DIV.07 Thermal & Moisture Protection

PACI-R PACI-Rev1.CO.FI.LR.AA.D07

PACI-Rev1

DIV.04 Masonary Works

All Area

Lower Roof

PACI-R PACI-Rev1.CO.FI.LR.AA.D04

PACI-Rev PACI-Rev1.CO.FI.LR.AA

PACI-Rev1.CO.FI.LR

DIV.15 Mechanicl Works

PACI-R PACI-Rev1.CO.FI.2F.WT.D15 PACI-Rev1

DIV.12 Furnishing

WBS Name

PACI-R PACI-Rev1.CO.FI.2F.WT.D12

WBS Code

PACI Project @ Ahmad

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Project Status

Project ID

PACI-Rev1.CL.TC.GE

PACI-Rev1.CL.TC

PACI-Rev1.CL.SN.GE

PACI-Rev1.CL.SN

PACI-Rev1.HA.GE.GE

PACI-Rev1.HA.GE

PACI-Rev1.HA

PACI-Rev PACI-Rev1.HA.GE.GE.GE

PACI-Rev1

PACI-Rev1

PACI-Rev1

PACI-R PACI-Rev1.CL.SN.GE.GE.GE

PACI-Rev PACI-Rev1.CL.SN.GE.GE

PACI-Rev1

PACI-Rev1

PACI-R PACI-Rev1.CL.TC.GE.GE.GE

PACI-Rev PACI-Rev1.CL.TC.GE.GE

PACI-Rev1

PACI-Rev1

PACI-R PACI-Rev1.CL.AT.GE.GE.GE

WBS Code

Page 9 of 9

General

General

General

Project Handing Over

General

General

General

Snag List

General

General

General

Testing & Commissioning

GENERAL

WBS Name

PACI Project @ Ahmad

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Project Status

Activity ID ( Key Definition ) & Coding System

Activity ID The activity ID has structured to allow easy understanding and identifying the activity type, location and division ID - Key Definition 1

2

3

4

5

-

Phase

6

7

8

-

Level

9

10

11

12

-

Type of work

13

-

Area

CSI

Division

CN‐B1‐FI‐AL‐09.010 That means Phase – Construction Level – Basement 1 Type of work – Finishing Area – All area CSI Division – 09 : Finishes No. of Activity ‐ 010

15

16

17

.

Example:

ID  ‐ Key  Definition

14

ACT. Serial

18

ENGINEERING PROCUREMENT CONSTRUCTION PROJECT CLOSE OUT HANDING OVER

EN PR CN PC HO

Page 1 of 1

MOBILIZATION

MO

© Oracle Corporation

START OF PROJECT

Description

PACI-(1)PHASES

ST

Code Value

The Public Authority For Civil Information in

06-Feb-2017 16:02

MATERIAL SHOP DRWAING ALL MATERIAL FOUNDATION BASEMENT 2 BASEMENT 1 GROUND FLOOR 1ST FLOOR 2ND FLOOR LOWER ROOF FLOOR UPPER ROOF FLOOR

MT SH AM FD B2 B1 GR 01 02 LR UR

Page 1 of 1

SUBCONTRACTOR

SU

© Oracle Corporation

GENERAL

Description

PACI-(2) LEVELS

GE

Code Value

The Public Authority For Civil Information in

06-Feb-2017 16:03

Dewatering Works Termite Control Backfilling Kerb Stone Traffic Signs Road marking Boundary Wall Agriculture Soil & Plants

02.DW 02.TC 02.BF 02.KS 02.TS 02.RM 02.BW 02.AS

Reinforced Concrete Secreed

03.RC 03.SC

Exterior Stone Cladding

04.ST

Gutter & Gratings Steel Cat Ladder Chequred Plate Cover

05.GU 05.CL 05.CH

Roofing System Joint filler and Gaskets

07.RS 07.JF

HVAC Works

Low Voltage

16.LV

© Oracle Corporation

PR

CP.CM

Provisional Items

Composite

Composite

High Voltage

16.HV

Electrical Works

Fire Fighting 15.HV

CP

16

Plumbing Works 15.FF

Mechanical Works

15 15.PL

Conveying System

14

Over Head doors

08.OH

Furnishing

Sky Light

08.SK

Specialities

Curtain Walls & Glazing

08.CW

12

Steel Doors

08.SD

Finishes

Wodden Doors

08.WD

10

Aluminum Doors & Windows

08.AL

Doors & Windows

Water Proofing

07.WP

Thermal & Moisture Protection

Parquet Flooring & Skirting

Wood & Plastic

Handrail Works

05.HR

06.PF

Stainless Steel Skirting

05.SS

Metals Works

Masonry Blocks

04.MB

Masonry Works

Plain Concrete

03.PC

Concrete Works

Shoring Works

09

08

07

06

05

04

03

Excavation

02.SH

Site Works

02 02.EX

General

Description

GE

Code Value

The Public Authority For Civil Information in

Page 1 of 1

PACI-(3)-CSI Divitions

06-Feb-2017 15:58

We will add 3 types of calendars . 1. 7 work days ( full work days ) For activities as concrete curing – dewatering – concrete casting 2. 6 work days ( Friday off days + holidays ) For all construction activities – Submittals for all items

CALENDARS

3. 5 work days ( Saturdays + Fridays + holidays off ) For activities as ( all ministry activities like approvals – authority approvals – testing – snag list

Authority approvals, testing and commissioning activities are all linked to the completion of their respective works and are included in the schedule under a separate section. 1. The authorities’ approvals start by submitting the firefighting and smoke ventilation systems for approval from Kuwait Fire Department (KFD) 2. The contractor will submit for MEW the HVAC calculations and the Elect. load for approval. 3. After completing the substation civil works and approval of Elect. as‐built drawings, the contractor will ask MEW for inspection. Upon approval, MEW will install the high‐tension cable, transformer, and high‐tension switchgear. 4. After the contractor installs the firefighting network with its as‐built drawings, they will request a visual inspection from KFD engineers.

Authorities Approvals

5. After closing the false ceiling and fixing all the smoke detectors and sprinklers, the contractor will submit the as‐built drawings for KFD for the power approval. 6. After completing the electrical works and installing the accessories, the as‐ built drawings for electrical works and power load will be submitted for MOE for approval.

7. After the telephone and data system are finished, as‐built drawings will be submitted to MOC for approval. 8. Upon approval, MOC. will perform a site inspection in preparation for connecting with main TEL. lines. 9. After sanitary works are completed, as‐built drawings will be submitted to MPW for approval. 10. Upon approval, MPW will perform a site inspection prior to connecting the fresh water and drainage city main. 11. Upon completion of the external works, including work on the structure, as‐built drawings will be submitted to the Municipality for approval.

Authorities Approvals

12. After approval of item 11, a cleaning certificate will be issued from Municipality. 13. The contractor will obtain the KFD & Municipality approvals to apply client request to connect the power

14. MEW will provide the permanent power subject to approval of Electricity site inspection and upon receiving the letter from Municipality that they have no objection to connect power. 15. After releasing the power, then Testing & Commissioning will start  for all systems such as but not limited to: • Electrical works  • Drainage services • Fresh water supply • Fire protection and fire alarm system will be finally tested for  commissioning  by KFD . • HVAC system • Telephones and other low voltage systems. • Elevators and conveying system.

Authorities Approvals

After successful testing & commissioning ,and completion of snag list  items, the project will be ready for handing over.

Productivity Rate (Unit/day) for Crew

Steel Reinforcement - Walls Steel Reinforcement - solid slab Shuttering - Columns Shuttering - Walls Shuttering - solid slab

3 4 5 6 7

Roofing Works

2

Plaster Works - External Terrazzo / Ceramic / Porcelain tiles Marble & stone tiles Gypsum Ceiling (tiles 60 * 60) Gypsum Ceiling (Board) Painting Works (preperations & putty) Painting Works (Painting)

2 3 4 5 6 7 8

Drainage pipes Floor Drains Sanitay Fixtures

2 3 4

Sprinkler Heads Hose & Landing Valves Pumps & Storage Tanks & Equipments

2 3 4

Duct pipes FCU Duct diffusers & grills Air handing units & other equipments

2 3 4 5

Emmbedded Conduits Exposed Conduits Cable Trays Distribution Board / back Box Wiring Works Pulling Cables Earthing system D.B & Termination Wiring devices Install MSB & SMSB

1 2 3 4 5 6 7 8 9 10

Electrical Works

Duct works

1

HVAC Works

Fire Fighting pipes

1

Fire Fighting

Water supply pipes

1

Plumbing

Plaster Works - Internal

1

Finishing works

Waterproofing Membrane

1

Waterproofing Works

Masonry Works (blocks 40*20*20cm)

Masonry Works

Steel Reinforcement - Columns

2

1

Steel Reinforcement - Raft

1

Concrete Works

Backfilling in 300mm layers

2

Site Works Excavation Works in Normal Soil

ITEM

1

No.

+ Helper + Helper

Electrician + Helper

Electrician + Helper

Electrician + Helper

Electrician + Helper

Electrician + Helper

Electrician + Helper

Electrician + Helper

Electrician + Helper

Electrician + Helper

Electrician + Helper

Fixer + Helper

Fixer + Helper

Fixer + Helper

Pipe Fixer + Helper

Duct Fixer + Helper

Plumber + Helper

Plumber + Helper

Plumber + Helper

Welder + Helper

Plumber + Helper

Plumber + Helper

Plumber + Helper

Plumber + Helper

Painter + Helper

Painter + Helper

Fixer + Helper

Fixer + Helper

Fixer + Helper

Fixer + Helper

Plasterer + Helper

Plasterer + Helper

Worker

Worker

Mason + Helper

Carpenter + Helper

Carpenter + Helper

Carpenter + Helper

Steel Fixer + Helper

Steel Fixer + Helper

Steel Fixer + Helper

Steel Fixer + Helper

Loader + Roller Compactors + 2 Dump Trucks

Excavator + 3 Dump Trucks

Crew Description

Productivity Rate (Unit/day) for Crew

Nos.

Nos.

Nos.

M

M

M

Nos.

M

M

M

Nos.

Nos.

Nos.

M

Kg

No.

No.

No.

M

No.

No.

M

M

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

m2

m2

No.

Ton

Ton

Ton

Ton

M3

M3

Unit

22

30

1

30

40

400

3

25

40

100

2

10

4

30

90

1

1

30

30

3

7

40

40

100

50

15

20

5

30

30

40

5

40

15

10

6

2

0.312

0.25

0.35

0.48

350

300

Productivity Rate (Unit/day)

Remarks

Related Documents

Full Method Statement.pdf
December 2019 17
Method
November 2019 62
Method
November 2019 65
Method
November 2019 56
Method
June 2020 29
Full
November 2019 94

More Documents from ""

Full Method Statement.pdf
December 2019 17
Pathology Of Lying..
November 2019 19
Latihan.docx
May 2020 16
Search For Human Remains
November 2019 22
Forensic Anthropology
November 2019 30