EMPLOYER : MINISTRY OF PUBLIC WORKS MAIN CONTRACTOR : ASIAN GROUP CO. FOR GENERAL TRADING & CONTRACTING W.L.L
• • • • • • •
Project General Information. Project Description & Components. Location of the Site & General Layout. Site Staff Organization Chart. General Scope of Work. Site Mobilization & Temporary Facilities. Project Planning Methodology. • Submittals & Approvals • Material & Procurements
• • • •
Table of Contents
Construction Activities. Power Connection procedures. Crew Movement. Construction Schedule. • • • • •
Proposed Master Schedule Plan . Schedule Work Break Down Structure (WBS) Proposed ID & Coding System Calendrers Authorities Approvals
• General Layouts
Project General Information
Project Name
The Public Authority For Civil Information (PACI)
Location
Al Ahmadi
Employer
Ministry Of Public Works
End User
Public Authority For Civil Information
Contractor
Asian Group for General Trading and Contracting
Contract No.
267 HMA
Contract Value
2,669,010.650 KD
Date of Enterprise
9th November 2016
Contract Duration
730 day
Project completion 8th November 2018 Date
The building of Public Authority of Civil Information Consists of : Floor
Project Description & Components
Consist Of
Area
2nd Basement Floor
Car Park ‐ Stores – Pump Room – Diesel Tank
2000
1st Basement Floor
Car Park – Electrical Substation – Operator Room ‐ Multi Purpose Hall – Toilet
2000
Ground Floor
Offices – Waiting Area –Clinic – Toilets ‐ Kitchen
1540
First Floor
Offices ‐ Waiting Area – Toilets ‐ Kitchen
1600
Second Floor
Head Offices – Offices ‐ Computer Room –Toilets
1620
Lower Roof
Pump Rooms – Lift Rooms‐ Chillers – Water Tank
1740
Upper Roof
230
Total built up area
10730
Location of site & General Layout
Project Manager
Planning Engineer
Quantity Surveyor
Site Engineer Supervisor
Site Staff Organization Chart
Site Engineer Supervisor
Surveyor
The scope of work under this Contract comprises the construction, completion, handing over and maintenance of work related to Drawings, Specifications, BOQ and other Contract Documents. All of the Contract Documents shall be complementary to each other in defining the Scope of Work, in particular the following, but not limited to:
General Scope of Work
GENERAL MOBILIZATION SUBMITTALS APPROVALS PROCUREMENT EXCAVATION
ELECTRICAL WORKS PLUMBING FIRE FIGHTING WORKS HVAC WORKS CONVEYING SYSTEM WORKS INTERNAL FINISHING WORKS EXTERNAL FINISHING WORKS AUTHORITIES APPROVALS TESTING & COMMISSIONING
% of Division 0.80%
2.94%
21.67% 29.64% 10.60% 3.72%
6.65%
2.93% 0.39%
2.25% 0.22%
Scope of Work by Value weight
2.80%
7.33%
5.28%
2.00%
0.77%
2‐Site works, 2.94%
3‐Concrete, 29.64%
4‐Masonry, 6.65%
5‐Metal works, 0.39%
6‐Wood& Plastic, 0.77%
7‐Thermal& Moisture Protection, 2.00%
8‐Doors & Windows, 5.28%
9‐Finishes, 7.33%
10‐Specialities, 2.80%
12‐Furnishings, 0.22%
14‐Conveying sys, 2.25%
15a‐Plumbing, 2.93%
15b‐Fire Fighting, 3.72%
15c‐HVAC, 10.60%
16‐Electrical Works, 21.67%
PR, .80%
The period for Mobilization is 30 Calendar days .During the mobilization period the following activities shall be completed: 1. 2. 3. 4.
Temporary access routes to, from, and upon the site. Removal of top soil & other rubbish. Installation of site offices, temporary fencing, gates, project sign boards. Installation of temporary power, water & drainage facilities.
5. The following main documentation works shall also be carried out during the period.
Site Mobilization & Temporary Facilities
1. Submission of subcontractors for : Shoring, dewatering system data for review & approval. 2. Submittal for approval : concrete ready mix supplier, materials for concreting , water proofing 3. Submittal of drawings for : excavation, foundation works for review & approval.
مكاتب جھاز االشراف
المبـــــــني
الحارس
Site Mobilization plan
Project Planning Methodology Submittals & Approvals
A
Submittal
B
FF LAG 10 Approval
SS LAG 10
C
D
• A Submittal date for 1st submittal to Engineer. • B Submittal date for last approved submittal to Engineer . • C Action date for 1st submittal by Engineer. • D Action date for last submittal by Engineer. The Contractor will submit Sub‐contractors, Shop drawings, Martials for approval by Engineers. The Submittal period will be according to the material or equipment type
Material & Procurement The materials will be procured by the contractor & his subcontractors but all procurements will be through the main contractor only, since it is his responsibility as per contract conditions. Some materials will be procured directly after taking approval on them, because they are needed to proceed work at site, while some others will be procured later because the priority in storing in the site is to the material needed to proceed work first. The duration of procurement of materials will differ from materials to other depending on its availability in Kuwait .
Procurement of material Plan for example, and not as a limitation a) Early Critical Materials DIV
Material
02
Termite Control
03
Steel Reinforcement
03
Formwork Systems
03
Ready Mix concrete
07
Water Stop
07
Water Proofing Material
15a
Drainage & Water supply Pipes
c) Long Lead Materials DIV.
Material
DIV.
Material
04
Exterior Stone Cladding
16
Light fittings
08
Aluminum windows & doors
16
Diesel Generator
08
Steel doors
16
Fuel Tank
08
Wooden doors
09
Ceramic & Porcelain tiles
09
Marble & Granite for floors and walls
12
Kitchen Cabinet
14
Elevators
15
Fire Pumps
15
Plumbing Pumps
15
Fan coil unit
15
Air handling unit
15
Fans
15
BAS
Construction Activities SURVEY WORK : The contractor shall install a permanent B.M and establish setting out for concrete work and also verify all the angles, curves, linear measurements, levels and shall check any contradiction of the measurements with the contract documents. The contractor representative shall submit all the particulars to the Engineer for review and approval, upon which setting out of work shall be based.
SHORING SYSTEM: The shoring system is proposed around the site excavation. The contractor shall submit design calculations & drawings with construction techniques of H piles or soldier its bottom depth, protection of existing services (if any) before commencing the work. And its activities will be revised with the approved subcontractor according to his steps in works
DEWATERING : After the subsurface investigation the water table height shall be determined in the entire site. The contractor shall submit the design & the detailed layout of dewatering system for the Engineer’s approval. The dewatering system shall run 24 hours and would maintained till downward pressure exerted by the building equals upward thrust from soil. At minimum 0.00 level according to specifications.
Site Works All excavation will be done using machines and the backfilling will be compacted by roller plate compactor and inspected by the engineer at different levels. Areas that are deeper than the water table will be carried out by the use of well‐point dewatering system. Earthwork will be carried out to complete all site clearing excavation, filling and grading including preparation of sub‐grade for slabs and pavement. Work will include the following: 1. Excavation to the level of foundations 2. Paved areas and kerbs 3. Filling grading and compaction 4. Testing 5. Clearing away surplus excavated material
Termite Control Approved material for termite control will be used on site. The concrete will be obtained from an approved ready mix plant as per approved design mix and will be transported to site by transit mixers by sequencing their movement in order to avoid under waiting period. Concrete discharge to the required formwork will be arranged by concrete pumps or by bucket crane depending upon location of casting. All precautions shall be taken during casting at hot weather in order to guarantee quality of concrete as per specifications. All concrete will be compacted using vibrators and casted concrete will be protected and cured as per specifications.
Formwork Formwork acceptable to engineer will be used taking into consideration safety and quality control requirements. Adequate formwork will be made available at site in order to ensure speedy progress and meet the construction milestones as presented in the construction schedule.
Reinforcement All reinforcement steel will be cut and bent to the required details and stored in proper order of use. All reinforcement shall be transported taking into consideration safety precautions and will be lifted manually to fixing position or by crane depending on locations. Beam reinforcement will be erected before slab in stages as work progresses from one end of slab to another.
Masonry walls All concrete blocks and block accessories will be from an approved source as per quality control requirements. After removing shuttering of floor slab, masonry blocks works will start.
Plastering works After completion of block work and be cured for 3 days, Plastering works will start. The 1st step for rendering and fix plastering accessories. The 2nd one to make the 1st coat plastering. The 3rd will be the 2nd coat of plastering. Each coat of plaster has to be cured for 3 days. The electro mechanical work and steel door frames have to be finished before starting the 1st layer of plastering.
Doors and Windows All doors and windows will be manufactured as per drawings / specifications and from an approved source. This item of work has 3 types: Alum doors& windows / Steel doors / Wooden doors. ‐ The Aluminum doors after painting coats and before the final painting coat. ‐ Steel & wooden doors frames will be painted and fixed to block or concrete during rendering works and before starting the plaster. The doors will be done after floor tiling and painting coats but before final coat.
Ceiling works All material for ceilings like hangers, framing, supports, ceiling tiles and special finishes will be from an approved source as per quality control requirements. All materials will be properly stored with adequate markings. All ceiling finishes shall be carried out in accordance / coordination with HVAC, Plumbing & Fire fighting and Electrical works on the ceiling for the anchors. The electrical drops for fittings shall be completed along with anchors for ceiling. After all above works are completed (ducts, pipes, … etc.), framing will start and afterwards ceiling finishes. Site fabrication and cutting shall be as per specifications. No extra protection is required on ceiling once the area is closed.
Painting works After completion of plastering work and be cured for 12 days, painting works will start . The 1st step is to work for surface preparation, primer and putty coats. The 2nd step is to make painting coats and this will be done after finishing the electro mechanical ducting and piping over the false ceiling . The 3rd step will be the final coat of painting. This step will be done after finalization of finishing, mechanical and electrical fixtures while testing and commissioning work be under progress.
Flooring works After finishing the coats of painting the contractor will start the work of flooring tiles. All material of floors such as mortar, marble, ceramic will be from an approved source as per specifications. All materials will be packed and handled in such away that the shape and size are not changed. Material will be stored at factory or at site on wooden platforms or as recommended. Before starting of any finishing on floors, all concealed items like pipes or other fixtures will be checked and approved by the engineer. Flooring works shall start after major heavy works are completed.
Roofing Once all heavy works are completed on roof, and drainage and other inserts are fixed in place, the area will be cleaned and roofing works starts. All roofing layers shall be as per drawings / specifications / manufacturer recommendations. After each layer is completed, it will be inspected / approved by the engineer before applying the next layer. After roof work works are completed, flash up and rain water outlets and other roof fixtures shall be erected.
Mechanical works ‐ Plumbing works All high level and inside shafts drainage & water supply pipes will be started before block walls Water supply and drainage pipes inside toilets area will be installed after block works. Installing floor drains, ,traps and cleanouts will start before water proofing. Water closet concealed flash tanks will be installed before ceramic work. The other sanitary fixtures will be installed after finishing ceramic works. Pumps, filters and GRP tanks & heaters will be installed after all mechanical room will be ready. ‐ Fire fighting works Sprinklers systems, pipes upright sprinkler heads work shall be started before any block work Installation of Pipes, fittings, landing valves, fire cabinet fixation will start after finish block works. Other sprinklers types of will be installed after finishing false ceiling. Fire protection sprinklers heads shall be finish to finish with ceiling suspension system . Fire cabinet and extinguishers, will start during painting coats.
‐ HVAC works Install smoke air ducts and supports will start before block work. Installing of AHU & FCU will start when mechanical rooms be ready. Install HVAC ducts and chilled water pipes and supports will be done before and during block works. Installing & connecting exhaust & fresh air fans will start after ceiling suspension systems. Installation of diffusers & grilles will finish with finish of ceiling panels.
Electrical works ‐ Cable trays installation will be followed by installing cables and wires. Then by the installation of data communication systems, CCTV cables. Then low voltage cables and outlets, wiring accessories and switches, low voltage equipment, fire alarm detectors, and finally light fittings and accessories as well as earthling copper tapes and connections. ‐ The conduits & fittings for light, power, fire alarm system and public address sys. Shall be laid in reinforcement steel before concrete casting of slab or walls. ‐ In the same way, the enclosure for distribution boards shall be fixed on the surface of block wall or semi recessed and connects all conduits. Pull the wires for light points, wiring devices and fire alarm system devices. Fix the support from the ceiling slab or wall for cable tray from the LT room up to field location Fix and terminate the wiring devices once the wall is painted.
EXTERNAL CLADDING, CURTAINWALLS & GLAZING : The external cladding would start after the completion of concrete work: The cladding work shall be commence of GF & proceed upwards along with completion of concrete casting works of roof floor slab . Installation work of curtain walls & glazing shall succeeded stone cladding and shall start after the completion of concrete works.
POWER Connection Procedure K.F.D submittals & approvals 1. The contractor shall submit shop drawings & equipment of smoke ventilation , Fire fighting System and Fire Alarm system for Ministry Engineers for Approval 2. After MPW Approval these approved drawings and equipment will be submitted to the KFD for Approval 3. After KFD approval , subcontractor will start work in site 4. After finishing FF & FA networks above false ceiling the KFD will be asked to the 1st inspection (Before closing the false ceiling ) 5. After the Approval letter from KFD to close the false ceiling 6. After finishing all civil works and finishing of all FF & FA & Ventilation systems the KFD will be asked for the 2nd inspection of Approval for POWER 7. The approval of KFD will be the 1st step for POWER ON 8. The 3rd appointment for KFD will be after POWER ON for testing all systems
MEW submittals & approvals 1. The contractor will submit for MEW the HVAC calculations and the Elect. load for approval. 2. After finishing all civil works of substation and its as built drawings the MEW will be asked for 1st inspection 3. After Approval MEW will lay high tension cable, transformers, high tension switch gear 4. After finishing all electrical works, AS BUILT drawings will be submitted to MEW for electrical & power load. 5. After the telephone and data system are finished, as‐built drawings will be submitted to MOC for approval. 6. After finishing façade works, the AS BUILT drawings will be send to the MINUCIBILITY for Approval 7. After Approval, cleaning certificate will be issued from MINUCIBILITY 8. The Approval of KFD, MEW and MINUCIBILITY will be taken to request power release 9. Field test for electrical works will be by MEW 10. After inspection & approval MEW will connect to the city main 11. POWER ON
Formwork A = 230 m2 Slab Formwork B = 1630m2 Slab Formwork A = 1630m2 Slab Formwork B = 1630m2 Slab Formwork A = 1570 m2 Slab Formwork A = 2000 m2
Form work Movement
‐ ‐
Two separate form work to be provided. No zoning for each floor.
Construction Schedule Structure
Master Schedule Plan
The work breakdown structure, WBS, prepared in such a way to help in planning and organizing the schedule activities. To achieve the above purpose the WBS will contain FOUR primary levels consisting of. These levels are incorporated in the schedule as listed below :‐ Level 1: Phase Level 2: level Level 3: Type of work Level 4: Area Level 4: CSI Divisions of BOQ Level 5: Activity
WBS STRUCTURE
The diagram illustrates
PHASE LEVEL TYPE OF WORK AREA
the WBS levels
BOQ CSI DIVISION
and hierarchy.
ACTIVITY
Schedule Work Break Down Structure (WBS)
PACI-Rev1.ST.GE.GE
PACI-Rev1.ST.GE
PACI-Rev1.ST
PACI-Rev1
WBS Code
PACI-Rev1.MO.GE.GE
PACI-Rev1.MO.GE
PACI-Rev1.MO
PACI-Rev1.EN.SB.SB
PACI-Rev1.EN.SB
PACI-Rev1.EN
DIV.08 Doors & Windows DIV.09 Finishes DIV.10 Specialities DIV.12 Furnishing Div.14 Conveying System
PACI-R PACI-Rev1.EN.SB.SB.CV.D08 PACI-R PACI-Rev1.EN.SB.SB.CV.D09 PACI-R PACI-Rev1.EN.SB.SB.CV.D10 PACI-R PACI-Rev1.EN.SB.SB.CV.D12 PACI-R PACI-Rev1.EN.SB.SB.CV.D14
Page 1 of 9
DIV.07 Thermal & Moisture Protection
PACI-R PACI-Rev1.EN.SB.SB.CV.D07
DIV.07 Thermal & Moisture Protection DIV.08 Doors & Windows DIV.09 Finishes DIV.10 Specialities DIV.12 Furnishing Div.14 Conveying System
PACI-R PACI-Rev1.EN.SB.AP.CV.D07 PACI-R PACI-Rev1.EN.SB.AP.CV.D08 PACI-R PACI-Rev1.EN.SB.AP.CV.D09 PACI-R PACI-Rev1.EN.SB.AP.CV.D10 PACI-R PACI-Rev1.EN.SB.AP.CV.D12 PACI-R PACI-Rev1.EN.SB.AP.CV.D14
PACI-Rev1
PACI-Rev1.EN.SH.SB
PACI-Rev1.EN.SH
Submittals
Shop Drawings
DIV.16 Electrical Works
PACI-R PACI-Rev1.EN.SB.AP.1.D16 PACI-Rev1
DIV.15 Mechanical Works
PACI-R PACI-Rev1.EN.SB.AP.1.D15
Mechanical & Electrical Works
DIV.05 Metals
PACI-R PACI-Rev1.EN.SB.AP.CV.D05
PACI-Rev PACI-Rev1.EN.SB.AP.1
DIV.02 Site Works
Civil Works
Approvals
PACI-R PACI-Rev1.EN.SB.AP.CV.D02
PACI-Rev PACI-Rev1.EN.SB.AP.CV
PACI-Rev1.EN.SB.AP
DIV.16 Electrical Works
PACI-R PACI-Rev1.EN.SB.SB.1.D16 PACI-Rev1
DIV.15 Mechanical Works
PACI-R PACI-Rev1.EN.SB.SB.1.D15
Mechanical & Electrical Works
DIV.05 Metals
PACI-R PACI-Rev1.EN.SB.SB.CV.D05
PACI-Rev PACI-Rev1.EN.SB.SB.1
DIV.02 Site Works
Civil Works
Submittals
Subcontractors
Engineering
General
General
General
Mobilization
General
General
General
Start of Project
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Project Status
PACI Project @ Ahmad
The Public Authority For Civil Information in
WBS Name
PACI-R PACI-Rev1.EN.SB.SB.CV.D02
PACI-Rev PACI-Rev1.EN.SB.SB.CV
PACI-Rev1
PACI-Rev1
PACI-Rev1
PACI-Rev PACI-Rev1.MO.GE.GE.GE
PACI-Rev1
PACI-Rev1
PACI-Rev1
PACI-Rev PACI-Rev1.ST.GE.GE.GE
PACI-Rev1
PACI-Rev1
PACI-Rev1
PACI-Rev1
Project ID
Project ID
DIV.05 Metals DIV.08 Doors & Windows DIV.09 Finishes DIV.12 Furnishing Div.14 Conveying System
PACI-R PACI-Rev1.EN.SH.SB.CV.D05 PACI-R PACI-Rev1.EN.SH.SB.CV.D08 PACI-R PACI-Rev1.EN.SH.SB.CV.D09 PACI-R PACI-Rev1.EN.SH.SB.CV.D12 PACI-R PACI-Rev1.EN.SH.SB.CV.D14
Page 2 of 9
DIV.04 Masonry Works
PACI-R PACI-Rev1.EN.SH.SB.CV.D04
DIV.04 Masonry Works DIV.05 Metals DIV.08 Doors & Windows DIV.09 Finishes DIV.12 Furnishing Div.14 Conveying System
PACI-R PACI-Rev1.EN.SH.AP.CV.D04 PACI-R PACI-Rev1.EN.SH.AP.CV.D05 PACI-R PACI-Rev1.EN.SH.AP.CV.D08 PACI-R PACI-Rev1.EN.SH.AP.CV.D09 PACI-R PACI-Rev1.EN.SH.AP.CV.D12 PACI-R PACI-Rev1.EN.SH.AP.CV.D14
PACI-Rev1.EN.MT.SB
DIV.02 Site Works DIV.03 Concrete Works DIV.04 Masonry Works DIV.05 Metals DIV.06 Wood & Plastic DIV.07 Thermal & Moisture Protection DIV.08 Doors & Windows DIV.09 Finishes DIV.10 Specialities DIV.12 Furnishing Div.14 Conveying System
PACI-R PACI-Rev1.EN.MT.SB.CV.D03 PACI-R PACI-Rev1.EN.MT.SB.CV.D04 PACI-R PACI-Rev1.EN.MT.SB.CV.D05 PACI-R PACI-Rev1.EN.MT.SB.CV.D06 PACI-R PACI-Rev1.EN.MT.SB.CV.D07 PACI-R PACI-Rev1.EN.MT.SB.CV.D08 PACI-R PACI-Rev1.EN.MT.SB.CV.D09 PACI-R PACI-Rev1.EN.MT.SB.CV.D10 PACI-R PACI-Rev1.EN.MT.SB.CV.D12 PACI-R PACI-Rev1.EN.MT.SB.CV.D14
Civil Works
Submittals
Materials
PACI-R PACI-Rev1.EN.MT.SB.CV.D02
PACI-Rev PACI-Rev1.EN.MT.SB.CV
PACI-Rev1
PACI-Rev1.EN.MT
DIV.16 Electrical Works
PACI-R PACI-Rev1.EN.SH.AP.1.D16 PACI-Rev1
DIV.15 Mechanical Works
PACI-R PACI-Rev1.EN.SH.AP.1.D15
Mechanical & Electrical Works
DIV.03 Concrete Works
PACI-R PACI-Rev1.EN.SH.AP.CV.D03
PACI-Rev PACI-Rev1.EN.SH.AP.1
DIV.02 Site Works
Civil Works
Approvals
PACI-R PACI-Rev1.EN.SH.AP.CV.D02
PACI-Rev PACI-Rev1.EN.SH.AP.CV
PACI-Rev1.EN.SH.AP
DIV.16 Electrical Works
PACI-R PACI-Rev1.EN.SH.SB.1.D16 PACI-Rev1
DIV.15 Mechanical Works
PACI-R PACI-Rev1.EN.SH.SB.1.D15
Mechanical & Electrical Works
DIV.03 Concrete Works
PACI-R PACI-Rev1.EN.SH.SB.CV.D03
PACI-Rev PACI-Rev1.EN.SH.SB.1
DIV.02 Site Works
Civil Works
WBS Name
PACI-R PACI-Rev1.EN.SH.SB.CV.D02
PACI-Rev PACI-Rev1.EN.SH.SB.CV
WBS Code
PACI Project @ Ahmad
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Project Status
Project ID
Page 3 of 9
DIV.04 Masonry Works DIV.05 Metals DIV.06 Wood & Plastic DIV.07 Thermal & Moisture Protection DIV.08 Doors & Windows DIV.09 Finishes DIV.10 Specialities DIV.12 Furnishing Div.14 Conveying System
PACI-R PACI-Rev1.EN.MT.AP.CV.D04 PACI-R PACI-Rev1.EN.MT.AP.CV.D05 PACI-R PACI-Rev1.EN.MT.AP.CV.D06 PACI-R PACI-Rev1.EN.MT.AP.CV.D07 PACI-R PACI-Rev1.EN.MT.AP.CV.D08 PACI-R PACI-Rev1.EN.MT.AP.CV.D09 PACI-R PACI-Rev1.EN.MT.AP.CV.D10 PACI-R PACI-Rev1.EN.MT.AP.CV.D12 PACI-R PACI-Rev1.EN.MT.AP.CV.D14
PACI-Rev1.PR.AM.AL
PACI-Rev1.PR.AM
DIV.04 Masonry Works DIV.05 Metals DIV.06 Wood & Plastic DIV.07 Thermal & Moisture Protection DIV.08 Doors & Windows DIV.09 Finishes DIV.10 Specialities DIV.12 Furnishing Div.14 Conveying System
PACI-R PACI-Rev1.PR.AM.AL.CV1.D04 PACI-R PACI-Rev1.PR.AM.AL.CV1.D05 PACI-R PACI-Rev1.PR.AM.AL.CV1.D06 PACI-R PACI-Rev1.PR.AM.AL.CV1.D07 PACI-R PACI-Rev1.PR.AM.AL.CV1.D08 PACI-R PACI-Rev1.PR.AM.AL.CV1.D09 PACI-R PACI-Rev1.PR.AM.AL.CV1.D10 PACI-R PACI-Rev1.PR.AM.AL.CV1.D12 PACI-R PACI-Rev1.PR.AM.AL.CV1.D14
PACI-Rev1
PACI-Rev1.CO.SK
PACI-Rev1.CO
Skeleton
Construction
DIV.16 Electrical Works
PACI-R PACI-Rev1.PR.AM.AL.1.D16 PACI-Rev1
DIV.15 Mechanical Works
PACI-R PACI-Rev1.PR.AM.AL.1.D15
Mechanical & Electrical Works
DIV.03 Concrete Works
PACI-R PACI-Rev1.PR.AM.AL.CV1.D03
PACI-Rev PACI-Rev1.PR.AM.AL.1
DIV.02 Site Works
Civil Works
All Levels
All Materials
Procurement
PACI-R PACI-Rev1.PR.AM.AL.CV1.D02
PACI-Rev PACI-Rev1.PR.AM.AL.CV1
PACI-Rev1
PACI-Rev1
PACI-Rev1.PR
DIV.16 Electrical Works
PACI-R PACI-Rev1.EN.MT.AP.1.D16 PACI-Rev1
DIV.15 Mechanical Works
PACI-R PACI-Rev1.EN.MT.AP.1.D15
Mechanical & Electrical Works
DIV.03 Concrete Works
PACI-R PACI-Rev1.EN.MT.AP.CV.D03
PACI-Rev PACI-Rev1.EN.MT.AP.1
DIV.02 Site Works
Civil Works
Approvals
PACI-R PACI-Rev1.EN.MT.AP.CV.D02
PACI-Rev PACI-Rev1.EN.MT.AP.CV
PACI-Rev1.EN.MT.AP
DIV.16 Electrical Works
PACI-R PACI-Rev1.EN.MT.SB.1.D16 PACI-Rev1
DIV.15 Mechanical Works
Mechanical & Electrical Works
WBS Name
PACI-R PACI-Rev1.EN.MT.SB.1.D15
PACI-Rev PACI-Rev1.EN.MT.SB.1
WBS Code
PACI Project @ Ahmad
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Project Status
Project ID
PACI-Rev1.CO.SK.FD
PROVISIONAL
PACI-R PACI-Rev1.CO.SK.FD.AA.PR
Page 4 of 9
DIV.16 Electrical Works
PACI-R PACI-Rev1.CO.SK.FD.AA.D16
PACI-Rev1.CO.FI.B2
PACI-Rev1.CO.FI
DIV.02 Site Works DIV.04 Masonary Works
PACI-R PACI-Rev1.CO.FI.B2.AA.D04
All Area
Basement 2
Finishes
DIV.03 Concrete Works
All Area
Upper Roof
PACI-R PACI-Rev1.CO.FI.B2.AA.D02
PACI-Rev PACI-Rev1.CO.FI.B2.AA
PACI-Rev1
PACI-Rev1
PACI-R PACI-Rev1.CO.SK.UR.AA.D03
PACI-Rev PACI-Rev1.CO.SK.UR.AA
PACI-Rev1.CO.SK.UR
DIV.16 Electrical Works
PACI-R PACI-Rev1.CO.SK.LR.AA.D16 PACI-Rev1
DIV.03 Concrete Works
All Area
Lower Roof
PACI-R PACI-Rev1.CO.SK.LR.AA.D03
PACI-Rev PACI-Rev1.CO.SK.LR.AA
PACI-Rev1.CO.SK.LR
DIV.16 Electrical Works
PACI-R PACI-Rev1.CO.SK.2F.AA.D16 PACI-Rev1
DIV.03 Concrete Works
All Area
Second Floor
PACI-R PACI-Rev1.CO.SK.2F.AA.D03
PACI-Rev PACI-Rev1.CO.SK.2F.AA
PACI-Rev1.CO.SK.2F
DIV.16 Electrical Works
PACI-R PACI-Rev1.CO.SK.1F.AA.D16 PACI-Rev1
DIV.03 Concrete Works
All Area
First Floor
PACI-R PACI-Rev1.CO.SK.1F.AA.D03
PACI-Rev PACI-Rev1.CO.SK.1F.AA
PACI-Rev1.CO.SK.1F
DIV.16 Electrical Works
PACI-R PACI-Rev1.CO.SK.GR.AA.D16 PACI-Rev1
DIV.03 Concrete Works
All Area
Ground Floor
PACI-R PACI-Rev1.CO.SK.GR.AA.D03
PACI-Rev PACI-Rev1.CO.SK.GR.AA
PACI-Rev1.CO.SK.GR
DIV.16 Electrical Works
PACI-R PACI-Rev1.CO.SK.B1.AA.D16 PACI-Rev1
DIV.03 Concrete Works
All Area
Basement 1
PACI-R PACI-Rev1.CO.SK.B1.AA.D03
PACI-Rev PACI-Rev1.CO.SK.B1.AA
PACI-Rev1.CO.SK.B1
DIV.16 Electrical Works
PACI-R PACI-Rev1.CO.SK.B2.AA.D16 PACI-Rev1
DIV.03 Concrete Works
All Area
PACI-R PACI-Rev1.CO.SK.B2.AA.D03
PACI-Rev PACI-Rev1.CO.SK.B2.AA
Basement 2
DIV.07 Thermal & Moisture Protection
PACI-R PACI-Rev1.CO.SK.FD.AA.D07
PACI-Rev1.CO.SK.B2
DIV.03 Concrete Works
PACI-R PACI-Rev1.CO.SK.FD.AA.D03
PACI-Rev1
DIV.02 Site Works
All Area
Foundation
WBS Name
PACI-R PACI-Rev1.CO.SK.FD.AA.D02
PACI-Rev PACI-Rev1.CO.SK.FD.AA
PACI-Rev1
WBS Code
PACI Project @ Ahmad
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Project Status
Project ID
DIV.15 Mechanicl Works DIV.16 Electrical Works
PACI-R PACI-Rev1.CO.FI.B2.AA.D15 PACI-R PACI-Rev1.CO.FI.B2.AA.D16
Page 5 of 9
DIV.09 Finishes
PACI-R PACI-Rev1.CO.FI.B2.AA.D09
DIV.09 Finishes DIV.10 Specialities
PACI-R PACI-Rev1.CO.FI.B2.WA .D09 PACI-R PACI-Rev1.CO.FI.B2.WA .D10
PACI-Rev1.CO.FI.B1
DIV.05 Metals DIV.07 Thermal & Moisture Protection DIV.08 Doors & Windows DIV.09 Finishes DIV.15 Mechanicl Works DIV.16 Electrical Works
PACI-R PACI-Rev1.CO.FI.B1.AA.D05 PACI-R PACI-Rev1.CO.FI.B1.AA.D07 PACI-R PACI-Rev1.CO.FI.B1.AA.D08 PACI-R PACI-Rev1.CO.FI.B1.AA.D09 PACI-R PACI-Rev1.CO.FI.B1.AA.D15 PACI-R PACI-Rev1.CO.FI.B1.AA.D16
DIV.08 Doors & Windows DIV.09 Finishes DIV.10 Specialities
PACI-R PACI-Rev1.CO.FI.B1.WA .D08 PACI-R PACI-Rev1.CO.FI.B1.WA .D09 PACI-R PACI-Rev1.CO.FI.B1.WA .D10
DIV.10 Specialities DIV.15 Mechanicl Works
PACI-R PACI-Rev1.CO.FI.B1.WT.D10 PACI-R PACI-Rev1.CO.FI.B1.WT.D15
PACI-R PACI-Rev1.CO.FI.GR.AA.D02
PACI-Rev PACI-Rev1.CO.FI.GR.AA
DIV.02 Site Works
All Area
Ground Floor
DIV.09 Finishes
PACI-R PACI-Rev1.CO.FI.B1.WT.D09
PACI-Rev1.CO.FI.GR
DIV.08 Doors & Windows
PACI-R PACI-Rev1.CO.FI.B1.WT.D08
PACI-Rev1
DIV.07 Thermal & Moisture Protection
Wet Area
DIV.09 Finishes
PACI-R PACI-Rev1.CO.FI.B1.WT.D07
PACI-Rev PACI-Rev1.CO.FI.B1.WT
PACI-R PACI-Rev1.CO.FI.B1.OF.D09
Offices
DIV.05 Metals
PACI-R PACI-Rev1.CO.FI.B1.WA .D05
PACI-Rev PACI-Rev1.CO.FI.B1.OF
DIV.02 Site Works
PACI-R PACI-Rev1.CO.FI.B1.WA .D02
Waiting Area
DIV.04 Masonary Works
PACI-R PACI-Rev1.CO.FI.B1.AA.D04
PACI-Rev PACI-Rev1.CO.FI.B1.WA
DIV.02 Site Works
All Area
Basement 1
DIV.09 Finishes
PACI-R PACI-Rev1.CO.FI.B1.AA.D01
PACI-Rev PACI-Rev1.CO.FI.B1.AA
PACI-Rev1
PACI-R PACI-Rev1.CO.FI.B2.OF.D09
Offices
DIV.05 Metals
PACI-R PACI-Rev1.CO.FI.B2.WA .D05
PACI-Rev PACI-Rev1.CO.FI.B2.OF
DIV.02 Site Works
PACI-R PACI-Rev1.CO.FI.B2.WA .D02
Waiting Area
DIV.08 Doors & Windows
PACI-R PACI-Rev1.CO.FI.B2.AA.D08
PACI-Rev PACI-Rev1.CO.FI.B2.WA
DIV.07 Thermal & Moisture Protection
WBS Name
PACI-R PACI-Rev1.CO.FI.B2.AA.D07
WBS Code
PACI Project @ Ahmad
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Project Status
Project ID
DIV.08 Doors & Windows DIV.09 Finishes DIV.15 Mechanicl Works DIV.16 Electrical Works
PACI-R PACI-Rev1.CO.FI.GR.AA.D08 PACI-R PACI-Rev1.CO.FI.GR.AA.D09 PACI-R PACI-Rev1.CO.FI.GR.AA.D15 PACI-R PACI-Rev1.CO.FI.GR.AA.D16
Page 6 of 9
DIV.07 Thermal & Moisture Protection
PACI-R PACI-Rev1.CO.FI.GR.AA.D07
DIV.08 Doors & Windows DIV.09 Finishes DIV.10 Specialities DIV.15 Mechanicl Works
PACI-R PACI-Rev1.CO.FI.GR.WA .D08 PACI-R PACI-Rev1.CO.FI.GR.WA .D09 PACI-R PACI-Rev1.CO.FI.GR.WA .D10 PACI-R PACI-Rev1.CO.FI.GR.WA .D15
DIV.09 Finishes DIV.10 Specialities DIV.12 Furnishing DIV.15 Mechanicl Works
PACI-R PACI-Rev1.CO.FI.GR.WT.D09 PACI-R PACI-Rev1.CO.FI.GR.WT.D10 PACI-R PACI-Rev1.CO.FI.GR.WT.D12 PACI-R PACI-Rev1.CO.FI.GR.WT.D15
DIV.08 Doors & Windows DIV.09 Finishes DIV.15 Mechanicl Works DIV.16 Electrical Works
PACI-R PACI-Rev1.CO.FI.1F.AA.D08 PACI-R PACI-Rev1.CO.FI.1F.AA.D09 PACI-R PACI-Rev1.CO.FI.1F.AA.D15 PACI-R PACI-Rev1.CO.FI.1F.AA.D16
DIV.02 Site Works DIV.04 Masonary Works DIV.08 Doors & Windows DIV.09 Finishes DIV.10 Specialities
PACI-R PACI-Rev1.CO.FI.1F.WA.D02 PACI-R PACI-Rev1.CO.FI.1F.WA.D04 PACI-R PACI-Rev1.CO.FI.1F.WA.D08 PACI-R PACI-Rev1.CO.FI.1F.WA.D09 PACI-R PACI-Rev1.CO.FI.1F.WA.D10
Waiting Area
DIV.07 Thermal & Moisture Protection
PACI-R PACI-Rev1.CO.FI.1F.AA.D07
PACI-Rev PACI-Rev1.CO.FI.1F.WA
DIV.04 Masonary Works
All Area PACI-R PACI-Rev1.CO.FI.1F.AA.D04
PACI-Rev PACI-Rev1.CO.FI.1F.AA
First Floor
DIV.08 Doors & Windows
PACI-R PACI-Rev1.CO.FI.GR.WT.D08
PACI-Rev1.CO.FI.1F
DIV.07 Thermal & Moisture Protection
PACI-R PACI-Rev1.CO.FI.GR.WT.D07
PACI-Rev1
DIV.05 Metal Works
PACI-R PACI-Rev1.CO.FI.GR.WT.D05
Wet Area
DIV.09 Finishes
PACI-R PACI-Rev1.CO.FI.GR.OF.D09 PACI-Rev PACI-Rev1.CO.FI.GR.WT
DIV.05 Metal Works
PACI-R PACI-Rev1.CO.FI.GR.OF.D05
Offices
DIV.04 Masonary Works
PACI-R PACI-Rev1.CO.FI.GR.WA .D04
PACI-Rev PACI-Rev1.CO.FI.GR.OF
DIV.02 Site Works
PACI-R PACI-Rev1.CO.FI.GR.WA .D02
Waiting Area
DIV.05 Metal Works
PACI-R PACI-Rev1.CO.FI.GR.AA.D05
PACI-Rev PACI-Rev1.CO.FI.GR.WA
DIV.04 Masonary Works
WBS Name
PACI-R PACI-Rev1.CO.FI.GR.AA.D04
WBS Code
PACI Project @ Ahmad
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Project Status
Project ID
Page 7 of 9
DIV.09 Finishes DIV.10 Specialities DIV.12 Furnishing DIV.15 Mechanicl Works
PACI-R PACI-Rev1.CO.FI.1F.WT.D09 PACI-R PACI-Rev1.CO.FI.1F.WT.D10 PACI-R PACI-Rev1.CO.FI.1F.WT.D12 PACI-R PACI-Rev1.CO.FI.1F.WT.D15
DIV.08 Doors & Windows DIV.09 Finishes DIV.10 Specialities DIV.15 Mechanicl Works DIV.16 Electrical Works
PACI-R PACI-Rev1.CO.FI.2F.AA.D08 PACI-R PACI-Rev1.CO.FI.2F.AA.D09 PACI-R PACI-Rev1.CO.FI.2F.AA.D10 PACI-R PACI-Rev1.CO.FI.2F.AA.D15 PACI-R PACI-Rev1.CO.FI.2F.AA.D16
DIV.08 Doors & Windows DIV.09 Finishes DIV.10 Specialities DIV.15 Mechanicl Works
PACI-R PACI-Rev1.CO.FI.2F.WA.D08 PACI-R PACI-Rev1.CO.FI.2F.WA.D09 PACI-R PACI-Rev1.CO.FI.2F.WA.D10 PACI-R PACI-Rev1.CO.FI.2F.WA.D15
DIV.09 Finishes DIV.10 Specialities
PACI-R PACI-Rev1.CO.FI.2F.OF.D09 PACI-R PACI-Rev1.CO.FI.2F.OF.D10
DIV.05 Metal Works DIV.07 Thermal & Moisture Protection DIV.08 Doors & Windows DIV.09 Finishes DIV.10 Specialities
PACI-R PACI-Rev1.CO.FI.2F.WT.D05 PACI-R PACI-Rev1.CO.FI.2F.WT.D07 PACI-R PACI-Rev1.CO.FI.2F.WT.D08 PACI-R PACI-Rev1.CO.FI.2F.WT.D09 PACI-R PACI-Rev1.CO.FI.2F.WT.D10
Wet Area
DIV.06 Wood & Plastic
PACI-R PACI-Rev1.CO.FI.2F.OF.D06
PACI-Rev PACI-Rev1.CO.FI.2F.WT
DIV.05 Metal Works
PACI-R PACI-Rev1.CO.FI.2F.OF.D05
Offices
DIV.04 Masonary Works
PACI-R PACI-Rev1.CO.FI.2F.WA.D04
PACI-Rev PACI-Rev1.CO.FI.2F.OF
DIV.02 Site Works
PACI-R PACI-Rev1.CO.FI.2F.WA.D02
Waiting Area
DIV.07 Thermal & Moisture Protection
PACI-R PACI-Rev1.CO.FI.2F.AA.D07
PACI-Rev PACI-Rev1.CO.FI.2F.WA
DIV.04 Masonary Works
All Area
PACI-R PACI-Rev1.CO.FI.2F.AA.D04
PACI-Rev PACI-Rev1.CO.FI.2F.AA
Second Floor
DIV.08 Doors & Windows
PACI-R PACI-Rev1.CO.FI.1F.WT.D08
PACI-Rev1.CO.FI.2F
DIV.07 Thermal & Moisture Protection
PACI-R PACI-Rev1.CO.FI.1F.WT.D07
PACI-Rev1
DIV.05 Metal Works
PACI-R PACI-Rev1.CO.FI.1F.WT.D05
Wet Area
DIV.09 Finishes
PACI-R PACI-Rev1.CO.FI.1F.OF.D09 PACI-Rev PACI-Rev1.CO.FI.1F.WT
DIV.05 Metal Works
Offices
DIV.15 Mechanicl Works
WBS Name
PACI-R PACI-Rev1.CO.FI.1F.OF.D05
PACI-Rev PACI-Rev1.CO.FI.1F.OF
PACI-R PACI-Rev1.CO.FI.1F.WA.D15
WBS Code
PACI Project @ Ahmad
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Project Status
Project ID
DIV.09 Finishes DIV10 Specialities DIV.15 Mechanicl Works DIV.16 Electrical Works
PACI-R PACI-Rev1.CO.FI.LR.AA.D09 PACI-R PACI-Rev1.CO.FI.LR.AA.D10 PACI-R PACI-Rev1.CO.FI.LR.AA.D15 PACI-R PACI-Rev1.CO.FI.LR.AA.D16
PACI-Rev1.CO.FI.Facades
PACI-Rev1.CL.AT.GE
PACI-Rev1.CL.AT
PACI-Rev PACI-Rev1.CL.AT.GE.GE
PACI-Rev1
PACI-Rev1
PACI-Rev1.CL
Page 8 of 9
GENERAL
GENERAL
Authorities Approvals
Project Close Out
DIV-08 Doors & Windows
PACI-R PACI-Rev1.CO.FI.Facades.EL111.1 PACI-Rev1
DIV-04 Masonry Works
PACI-R PACI-Rev1.CO.FI.Facades.EL111.GE
Elevation -04
DIV-08 Doors & Windows
PACI-R PACI-Rev1.CO.FI.Facades.EL11.1 PACI-Rev PACI-Rev1.CO.FI.Facades.EL111
DIV-04 Masonry Works
PACI-R PACI-Rev1.CO.FI.Facades.EL11.GE
Elevation -03
DIV-08 Doors & Windows
PACI-R PACI-Rev1.CO.FI.Facades.EL1.1 PACI-Rev PACI-Rev1.CO.FI.Facades.EL11
DIV-04 Masonry Works
PACI-R PACI-Rev1.CO.FI.Facades.EL1.GE
Elevation -02
DIV-08 Doors & Windows
PACI-R PACI-Rev1.CO.FI.Facades.EL.1 PACI-Rev PACI-Rev1.CO.FI.Facades.EL1
DIV-04 Masonry Works
Elevation -01
Facades
DIV.14 Conveying Systems
ALL FLOORS
Conveying System
PACI-R PACI-Rev1.CO.FI.Facades.EL.GE
PACI-Rev PACI-Rev1.CO.FI.Facades.EL
PACI-Rev1
PACI-R PACI-Rev1.CO.FI.CV.AF.D14
PACI-Rev PACI-Rev1.CO.FI.CV.AF
PACI-Rev1.CO.FI.CV
DIV.05 Metal Works
PACI-R PACI-Rev1.CO.FI.ST.AF.D05 PACI-Rev1
DIV.09 Finishes
ALL FLOORS
Stairs
PACI-R PACI-Rev1.CO.FI.ST.AF.D09
PACI-Rev PACI-Rev1.CO.FI.ST.AF
PACI-Rev1.CO.FI.ST
DIV.15 Mechanicl Works
PACI-R PACI-Rev1.CO.FI.UR.AA.D15 PACI-Rev1
DIV.07 Thermal & Moisture Protection
All Area
PACI-R PACI-Rev1.CO.FI.UR.AA.D07
PACI-Rev PACI-Rev1.CO.FI.UR.AA
Upper Roof
DIV.08 Doors & Windows
PACI-R PACI-Rev1.CO.FI.LR.AA.D08
PACI-Rev1.CO.FI.UR
DIV.07 Thermal & Moisture Protection
PACI-R PACI-Rev1.CO.FI.LR.AA.D07
PACI-Rev1
DIV.04 Masonary Works
All Area
Lower Roof
PACI-R PACI-Rev1.CO.FI.LR.AA.D04
PACI-Rev PACI-Rev1.CO.FI.LR.AA
PACI-Rev1.CO.FI.LR
DIV.15 Mechanicl Works
PACI-R PACI-Rev1.CO.FI.2F.WT.D15 PACI-Rev1
DIV.12 Furnishing
WBS Name
PACI-R PACI-Rev1.CO.FI.2F.WT.D12
WBS Code
PACI Project @ Ahmad
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Project Status
Project ID
PACI-Rev1.CL.TC.GE
PACI-Rev1.CL.TC
PACI-Rev1.CL.SN.GE
PACI-Rev1.CL.SN
PACI-Rev1.HA.GE.GE
PACI-Rev1.HA.GE
PACI-Rev1.HA
PACI-Rev PACI-Rev1.HA.GE.GE.GE
PACI-Rev1
PACI-Rev1
PACI-Rev1
PACI-R PACI-Rev1.CL.SN.GE.GE.GE
PACI-Rev PACI-Rev1.CL.SN.GE.GE
PACI-Rev1
PACI-Rev1
PACI-R PACI-Rev1.CL.TC.GE.GE.GE
PACI-Rev PACI-Rev1.CL.TC.GE.GE
PACI-Rev1
PACI-Rev1
PACI-R PACI-Rev1.CL.AT.GE.GE.GE
WBS Code
Page 9 of 9
General
General
General
Project Handing Over
General
General
General
Snag List
General
General
General
Testing & Commissioning
GENERAL
WBS Name
PACI Project @ Ahmad
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Project Status
Activity ID ( Key Definition ) & Coding System
Activity ID The activity ID has structured to allow easy understanding and identifying the activity type, location and division ID - Key Definition 1
2
3
4
5
-
Phase
6
7
8
-
Level
9
10
11
12
-
Type of work
13
-
Area
CSI
Division
CN‐B1‐FI‐AL‐09.010 That means Phase – Construction Level – Basement 1 Type of work – Finishing Area – All area CSI Division – 09 : Finishes No. of Activity ‐ 010
15
16
17
.
Example:
ID ‐ Key Definition
14
ACT. Serial
18
ENGINEERING PROCUREMENT CONSTRUCTION PROJECT CLOSE OUT HANDING OVER
EN PR CN PC HO
Page 1 of 1
MOBILIZATION
MO
© Oracle Corporation
START OF PROJECT
Description
PACI-(1)PHASES
ST
Code Value
The Public Authority For Civil Information in
06-Feb-2017 16:02
MATERIAL SHOP DRWAING ALL MATERIAL FOUNDATION BASEMENT 2 BASEMENT 1 GROUND FLOOR 1ST FLOOR 2ND FLOOR LOWER ROOF FLOOR UPPER ROOF FLOOR
MT SH AM FD B2 B1 GR 01 02 LR UR
Page 1 of 1
SUBCONTRACTOR
SU
© Oracle Corporation
GENERAL
Description
PACI-(2) LEVELS
GE
Code Value
The Public Authority For Civil Information in
06-Feb-2017 16:03
Dewatering Works Termite Control Backfilling Kerb Stone Traffic Signs Road marking Boundary Wall Agriculture Soil & Plants
02.DW 02.TC 02.BF 02.KS 02.TS 02.RM 02.BW 02.AS
Reinforced Concrete Secreed
03.RC 03.SC
Exterior Stone Cladding
04.ST
Gutter & Gratings Steel Cat Ladder Chequred Plate Cover
05.GU 05.CL 05.CH
Roofing System Joint filler and Gaskets
07.RS 07.JF
HVAC Works
Low Voltage
16.LV
© Oracle Corporation
PR
CP.CM
Provisional Items
Composite
Composite
High Voltage
16.HV
Electrical Works
Fire Fighting 15.HV
CP
16
Plumbing Works 15.FF
Mechanical Works
15 15.PL
Conveying System
14
Over Head doors
08.OH
Furnishing
Sky Light
08.SK
Specialities
Curtain Walls & Glazing
08.CW
12
Steel Doors
08.SD
Finishes
Wodden Doors
08.WD
10
Aluminum Doors & Windows
08.AL
Doors & Windows
Water Proofing
07.WP
Thermal & Moisture Protection
Parquet Flooring & Skirting
Wood & Plastic
Handrail Works
05.HR
06.PF
Stainless Steel Skirting
05.SS
Metals Works
Masonry Blocks
04.MB
Masonry Works
Plain Concrete
03.PC
Concrete Works
Shoring Works
09
08
07
06
05
04
03
Excavation
02.SH
Site Works
02 02.EX
General
Description
GE
Code Value
The Public Authority For Civil Information in
Page 1 of 1
PACI-(3)-CSI Divitions
06-Feb-2017 15:58
We will add 3 types of calendars . 1. 7 work days ( full work days ) For activities as concrete curing – dewatering – concrete casting 2. 6 work days ( Friday off days + holidays ) For all construction activities – Submittals for all items
CALENDARS
3. 5 work days ( Saturdays + Fridays + holidays off ) For activities as ( all ministry activities like approvals – authority approvals – testing – snag list
Authority approvals, testing and commissioning activities are all linked to the completion of their respective works and are included in the schedule under a separate section. 1. The authorities’ approvals start by submitting the firefighting and smoke ventilation systems for approval from Kuwait Fire Department (KFD) 2. The contractor will submit for MEW the HVAC calculations and the Elect. load for approval. 3. After completing the substation civil works and approval of Elect. as‐built drawings, the contractor will ask MEW for inspection. Upon approval, MEW will install the high‐tension cable, transformer, and high‐tension switchgear. 4. After the contractor installs the firefighting network with its as‐built drawings, they will request a visual inspection from KFD engineers.
Authorities Approvals
5. After closing the false ceiling and fixing all the smoke detectors and sprinklers, the contractor will submit the as‐built drawings for KFD for the power approval. 6. After completing the electrical works and installing the accessories, the as‐ built drawings for electrical works and power load will be submitted for MOE for approval.
7. After the telephone and data system are finished, as‐built drawings will be submitted to MOC for approval. 8. Upon approval, MOC. will perform a site inspection in preparation for connecting with main TEL. lines. 9. After sanitary works are completed, as‐built drawings will be submitted to MPW for approval. 10. Upon approval, MPW will perform a site inspection prior to connecting the fresh water and drainage city main. 11. Upon completion of the external works, including work on the structure, as‐built drawings will be submitted to the Municipality for approval.
Authorities Approvals
12. After approval of item 11, a cleaning certificate will be issued from Municipality. 13. The contractor will obtain the KFD & Municipality approvals to apply client request to connect the power
14. MEW will provide the permanent power subject to approval of Electricity site inspection and upon receiving the letter from Municipality that they have no objection to connect power. 15. After releasing the power, then Testing & Commissioning will start for all systems such as but not limited to: • Electrical works • Drainage services • Fresh water supply • Fire protection and fire alarm system will be finally tested for commissioning by KFD . • HVAC system • Telephones and other low voltage systems. • Elevators and conveying system.
Authorities Approvals
After successful testing & commissioning ,and completion of snag list items, the project will be ready for handing over.
Productivity Rate (Unit/day) for Crew
Steel Reinforcement - Walls Steel Reinforcement - solid slab Shuttering - Columns Shuttering - Walls Shuttering - solid slab
3 4 5 6 7
Roofing Works
2
Plaster Works - External Terrazzo / Ceramic / Porcelain tiles Marble & stone tiles Gypsum Ceiling (tiles 60 * 60) Gypsum Ceiling (Board) Painting Works (preperations & putty) Painting Works (Painting)
2 3 4 5 6 7 8
Drainage pipes Floor Drains Sanitay Fixtures
2 3 4
Sprinkler Heads Hose & Landing Valves Pumps & Storage Tanks & Equipments
2 3 4
Duct pipes FCU Duct diffusers & grills Air handing units & other equipments
2 3 4 5
Emmbedded Conduits Exposed Conduits Cable Trays Distribution Board / back Box Wiring Works Pulling Cables Earthing system D.B & Termination Wiring devices Install MSB & SMSB
1 2 3 4 5 6 7 8 9 10
Electrical Works
Duct works
1
HVAC Works
Fire Fighting pipes
1
Fire Fighting
Water supply pipes
1
Plumbing
Plaster Works - Internal
1
Finishing works
Waterproofing Membrane
1
Waterproofing Works
Masonry Works (blocks 40*20*20cm)
Masonry Works
Steel Reinforcement - Columns
2
1
Steel Reinforcement - Raft
1
Concrete Works
Backfilling in 300mm layers
2
Site Works Excavation Works in Normal Soil
ITEM
1
No.
+ Helper + Helper
Electrician + Helper
Electrician + Helper
Electrician + Helper
Electrician + Helper
Electrician + Helper
Electrician + Helper
Electrician + Helper
Electrician + Helper
Electrician + Helper
Electrician + Helper
Fixer + Helper
Fixer + Helper
Fixer + Helper
Pipe Fixer + Helper
Duct Fixer + Helper
Plumber + Helper
Plumber + Helper
Plumber + Helper
Welder + Helper
Plumber + Helper
Plumber + Helper
Plumber + Helper
Plumber + Helper
Painter + Helper
Painter + Helper
Fixer + Helper
Fixer + Helper
Fixer + Helper
Fixer + Helper
Plasterer + Helper
Plasterer + Helper
Worker
Worker
Mason + Helper
Carpenter + Helper
Carpenter + Helper
Carpenter + Helper
Steel Fixer + Helper
Steel Fixer + Helper
Steel Fixer + Helper
Steel Fixer + Helper
Loader + Roller Compactors + 2 Dump Trucks
Excavator + 3 Dump Trucks
Crew Description
Productivity Rate (Unit/day) for Crew
Nos.
Nos.
Nos.
M
M
M
Nos.
M
M
M
Nos.
Nos.
Nos.
M
Kg
No.
No.
No.
M
No.
No.
M
M
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
m2
m2
No.
Ton
Ton
Ton
Ton
M3
M3
Unit
22
30
1
30
40
400
3
25
40
100
2
10
4
30
90
1
1
30
30
3
7
40
40
100
50
15
20
5
30
30
40
5
40
15
10
6
2
0.312
0.25
0.35
0.48
350
300
Productivity Rate (Unit/day)
Remarks