#1
What is this called?
What is this called?
#3
What is this called?
What board does this stud transfer weight directly to?
#5
What is this called?
Question # 6
What goes under the first floor’s subfloor?
Framing Vocabulary Test
Question # 7
What is this called?
Framing Vocabulary Test
Question # 8
What is this called?
Framing Vocabulary Test
Question # 9 C
A
B
D
Which one is not considered a plate?
Framing Vocabulary Test
Question # 10
Which ones can outside sheathing be made of?
Framing Vocabulary Test
Question # 11
It is important that this board be: b. Glued c. Plumb d. Centered e. Heavy duty f. Answer not listed
Framing Vocabulary Test
Question # 12
What is this called?
Framing Vocabulary Test
Question # 13
What is this called?
Framing Vocabulary Test
Question # 14
What is this called?
Framing Vocabulary Test
Question # 15 C
A
D
B E
Choose all of the king studs:
Framing Vocabulary Test
Question # 16
A king stud is (choose all that are correct): b. A vertical framing member c. The first full length stud around an opening d. A horizontal framing member e. The first stud around an opening f. Answer not listed
Framing Vocabulary Test
Question # 17
A plate is (choose all that are correct): b. A vertical framing member c. A horizontal framing member d. Directly around a door for extra support e. A board that ties the studs together f. Answer not listed
Framing Vocabulary Test
Question # 18
What is this wall called?
Framing Vocabulary Test
Question # 19
What is this called?
Framing Vocabulary Test
Question # 20
What is this called?
Framing Vocabulary Test
Question # 21
What is this wall called?
Framing Vocabulary Test
Question # 22
What is this called:
Framing Vocabulary Test
Question # 23
The space you put a window is called:
Framing Vocabulary Test
Question # 24
B
C
A D
Which one is not considered a stud?
Framing Vocabulary Test
Question # 25
What goes under this board?
Framing Vocabulary Test
Question # 26
Select all correct reasons for having two boards here:
Framing Vocabulary Test
Question # 27
What is this called:
Framing Vocabulary Test
Terms used on assessment 1. 2. 3. 4. 5.
Bottom plate Butt-wall By-wall Cripple stud Double top plate (double plate) 6. Floor joist 7. Header 8. King stud
1. 2. 3. 4. 5. 6. 7. 8.
Plate Plumb Rough opening (RO) Rough sill Sheathing Stud Subfloor Trimmer stud Framing Vocabulary Test