Page 1

S C H E D U L E 'A' NAME OF WORK:- IMPROVEMENTS TO WORK SHOP SHED AND MECHANICAL SUB- DIVISION OFFICE SHED TO ESTABLISHMENT ON 21st CENTURY GURUKULAM INSTITUTE IN T.G.P. CAMP COLONY AT K.R.DAM. S.No. Approx.Quantity in Description of work APSS No. Estimate rates in Unit of Amount in figures & words figures & words calculations in figures & (Rs.) figures & words words (Rs.) 1 1

3 4 22.5 Cum Brick Masonry in CM 1:5 using country S.S.504 & Suppl. (Twenty Two point Five bricks including cost and conveyance of all cubic metres only) material and labour charges and all other Specification operations necessary to complete the finished item of work as directed by the Department.

5 2515.00 (Rupees Two thousand Five hundred and Fifteen only)

2

273 Sqm (Two hundred and Seventy Three Square metres only)

69.00 (Rupees Sixty Nine only)

3

2

9 Nos. (Nine numbers only)

CONTRACTOR

Plastering the exposed faces of brick S.S.901 & masonry in CM 1:4, 12mm thick including 904 and cost and conveyance of all material and Suppl. labour charges etc., and all other operations Specification necessary to complete the finished item of work as directed by the Department.

Suplying and fixing of door of size 3, Suppl. 7240.00 31/2'-"x6'-6"(1mx2m) made up of country (Rupees Seven wood frame (Vepa) and plywood door with Specification thousand Two decolam on both faces including frame with hundred and Forty necessry accessories like hinges, aldrops, only) tower bolt, doors stoppers, hydraulic wood classes etc., complete and all other operations necessary to complete the finished item of work as directed by the Department.

6 1Cum

7 56587.00 (Rupees Fifty (One Cubic metre Six thousand Five hundred only) and Eighty Seven only) 1Sqm (One Square metre only)

1No. (One number only)

18837.00 (Rupees Eighteen thousand Eight hundred and Thirty Seven only) 65160.00 (Rupees Sixty Five thousand One hundred and Sixty only)

EXECUTIE ENGINEER

Page 2

4

5 Nos. (Five numbers only)

5

27 Nos. (Twenty Seven numbers only)

6

Supplying and fixing of door of size 3, 3 1/2'Suppl. 2550.00 Each 12750.00 "x6'-6"(1mx2m) with country wood frame (Rupees Two (Each one only) (Rupees (vepa) and shutter, including fixing of all Specification thousand Five Twelve necessary accessories like hinges, aldrops, hundred and Fifty thousand tower bolts, door stoppers etc., complete only) Seven hundred including cost and conveyance of all and Fifty only) material and labour charges etc., complete and all other operations necessary to complete the finished item of work as directed by the Department.

Supplying and fixing of windows of size 3'-4" Suppl. 2763.00 with country wood frame and teak wood Specification (Rupees Two shutters with glased including fixing of all thousand Seven accessories like hinges, tower bolts,friction hundred and Sixty stag hinges etc., complete and all other Three only) operations necessary to complete the finished item of work as directed by the Department.

Painting of Doors and windows with best 78 Sqm Suppl. (Seventy Eight Square enamel paint in two coats over the finished Specification coat of wood primary coat including cost and metres only) conveyance of all material and labour charges etc., complete and all other operations necessary to complete the finished item of work as directed by the Department.

84.00 (Rupees Eighty Four only)

CONTRACTOR 7

1880 Sqm (One thousand Eight hundred and Eighty Square metres only)

1No. (One number only)

1Sqm (One Square metre only)

74601.00 (Rupees Seventy Four thousand Six hundred and One only)

6552.00 (Rupees Six thousand Five hundred and Fifty Two only)

EXECUTIE ENGINEER 908 & 5.20 White washing one coat with best shell lime of approved quality including cost and Suppl., (Rupees Five and conveyance of all material, bushes, Ganjee Specification paise Twenty powder(or) Gum, watering the wall before only) whole washing etc., complete and all other operations necessary to complete the finished item of work as directed by the Department.

1Sqm (One Square Metre only)

9776.00 (Rupees Nine thousand Seven hundred and Seventy Six only)

White washing one coat with best shell lime of approved quality including cost and conveyance of all material, bushes, Ganjee 3 powder(or) Gum, watering the wall Page before whole washing etc., complete and all other operations necessary to complete the finished item of work as directed by the Department. 8

(Rupees Five and paise Twenty only)

Dismantling of brick masonry ever 2.50 Cum Suppl., 244.00 (Two point Five Zero necessary for operning of windows and Specification (Rupees Two cubic metres only) doors and convey the debris to out side the hundred and Forty work shop yard with a average lead of 1KM Four only) including cost of conveyance and labour charges etc., complete and all other operations necessary to complete the finished item of work as directed by the Department.

(Rupees Nine thousand Seven hundred and Seventy Six only)

1Cum (One Cubic metres only)

Total : Rs. (Rupees Two lakh Forty Four thousand Eight hundred and Seventy Three only)

610.00 (Rupees Six hundred and Ten only)

244873.00

The Agreement is accepted with Estimated rates i.e., total amount of Rs.244873/-(Rupees Two lakh Forty Four thousand Eight hundred and Seventy Three only)

CONTRACTOR

EXECUTIVE ENGINEER.

Page 4

S C H E D U L E 'A' NAME OF WORK:- DISMANTLING AND REPACKING OF DISTURBED REVETMENT FROM KM.9.500 TO 9.700 ON U/S OF K.R.DAM. S.No. Approx.Quantity in Description of work APSS No. Estimate rates in Unit of Amount in figures & words figures & words calculations in figures & (Rs.) figures & words words (Rs.) 1 1

2

3 4 5 6 7 52 cUM Suppl. 299/1Cum 1Cum 15548.00 Dismantling of disturbed revetment and (Fifty Two cubic metres repacking with same stone including labour Specification (Rupees Two (Rupees charges etc., to the original profle thickness only) hundred and Fifteen (One Cubic metre of 0.45m including all other operations Ninety Nine only) thousand Five only) necessary including seigniorage charges hundred and and VAT and all other charges etc., Forty Eight complete for the finished item of work as only) directed by the Engineer-in-Charge.

1

16 Cum Suppl. Providing filters with 20 to 80mm size field (Sisteen Cubic metres picked metal including laying of filters and Specification cost and conveyance of all material only) including seigniorage charges and VAT and all other operations necessary to complete the finished item of work as directed by the Engineer-in-Charge.

273.00/1Cum (Rupees Two hundred and Seventy Three only)

1Cum

4368.00 (Rupees Four (One Cubic metre thousand Three hundred and only) Sixty Eight only) Total : Rs.

19916.00

(Rupees Nineteen thousand Nine hundred and Sixteen only) The Agreement is accepted with Estimated rates i.e., total amount of Rs.19,916/(Rupees Nineteen thousand Nine hundred and Sixteen only). Sd/CONTRACTOR

//T.C.F.//

Sd/EXECUTIVE ENGINEER.

Page 5

Divisional Accounts Officer (W)

Page 6

S C H E D U L E 'A' NAME OF WORK:- IMPROVEMENTS TO WORK SHOP SHED AND MECHANICAL SUB- DIVISION OFFICE SHED TO ESTABLISHMENT ON 21st CENTURY GURUKULAM INSTITUTE IN T.G.P. CAMP COLONY AT K.R.DAM. S.No.

1 1

2

3(a)

Approx.Quantity in figures & words

2 522 Sqm (Five hundred and Twenty Two Square metres only)

45 Sqm (Forty Five Square metres only)

22 Nos

Description of work

APSS No.

3 Supplying and fixing of thermocoal False Ceiling in 2' x 2' (609.6mm x 609.6mm) Gide fixing anodized alluminimum "L" angle of size 24X24X1mm far perimeter cross "T" of sixe 24X38X1mm including with all necessory fittings for finished item of work for 25mm thick cealing including seaffolding Charges etc. complete and all other operations necessary to complete for the finished item of work and as directed by the Engineer-in-Charge.

4

Estimate rates in Unit of figures & words calculations in (Rs.) figures & words 5 403.00 (Rupees Four hundred and Three only)

Providing tarfelting roof repairs duly appling one coat of appropriate grade of bitumen in hot condition @ 1.2 kg/ 1 Sqm of roof area fixing tar felt (manfaturers to IS 1322/1972 spcification) appling second coat of appropriate grade of hot bitmin @ 1.20 Kg/1 Sqm of roof area and spreading course aggregate(Sand) @0.063Cum/1 Sqm of roof area finished item to a width of 0.90m and repairs to G.I Sheet roofing holes with bolts and nuts and washers includng cost and converyance of all meterials and labour charges etc.complecte and all other operations necessary to complete for the finished item of work and as directed by the Engineer-in-Charge.

187.00 (Rupees One hundred and Eighty Seven only)

Painting to roof trushes with Metal Primary Coat and over that two coats of best enamel paint including cast and conveyance of all materials and labour charges, Centring, Scaffolding etc, complecte and all other operations necessary to complete for the finished item of work and as directed by the Engineer-in-Charge.

1500.00

6 1Sqm (One Square metre only)

1Sqm (One Square metre only)

Each Trusher

Amount in figures & words (Rs.) 7 210366.00 (Rupees Two lakh Ten thousand Three hundred and Sixty Six only)

8415.00 (Rupees Eigh thousand Four hundred and Fifteen only)

33000.00

Page 7

Painting to roof trushes with Metal Primary Coat and over (Twenty Two numbers that two coats of best enamel paint including cast and conveyance of all materials and labour charges, Centring, only) Scaffolding etc, complecte and all other operations necessary to complete for the finished item of work and as directed by the Engineer-in-Charge. 3(b)

For Perlins. 400 Rmt (Four hundred Running Metres only)

(Rupees One thousand and Five hundred only)

(Each Trusher only)

(Rupees Thirty Three Five thousands only)

15.00 (Rupees Fifteen only)

Rmt (One Running metre only)

6000.00 (Rupees Six thousands only)

4

2 Nos (Two numbers only)

Supplying and fixing of W.C Orissa pan white glazed W.C Ist Qulity ISI marcked, conforming to IS 2556-431981with"P"OR "S" Trap of standard company and all other operations necessary to complete for the finished item of work and as directed by the Engineer-in-Charge.

977.00 (Rupees Nine hundred and Seventy Seven only)

1No. (One number only)

1954.00 (Rupees One thousand Nine hundred and Fifty Four only)

5

2 Nos (Two numbers only)

Supplying and fixcing of European water closet of Ist Qulity ISI marcked, conforming to IS 2556-43-1981with"P"OR "S" Trap of standard company and all other operations necessary to complete for the finished item of work and as directed by the Engineer-in-Charge.

976.00 (Rupees Nine hundred and Seventy Six only)

1No.

1952.00 (Rupees One thousand Nine hundred and Fifty Two only)

2 Nos (Twp numbers only)

Supplyign and fixing best indian make plastic seat with lid for European water closet with rubber or plastic buffers as per IS 2548- 1996 and all other operations necessary to complete for the finished item of work and as directed by the Engineerin-Charge

308.00 (Rupees Three hundred and Eight only)

4 Nos (Four numbers only)

Supplying and fixcing of P.V.C Lowlevel cistern parry weare slim line with internal componetes and short bend 10 L capasity single flush and all other operations necessary to complete for the finished item of work and as directed by the Engineer-in-Charge.

1392.00 (Rupees One thousand Three hundred and Ninety Two only)

6

7

(One number only) 1No. (One number only)

1No. (One number only)

616.00 (Rupees Six hundred and Sixteen only)

5568.00 (Rupees Five thousand Five hundred and Sixty Eight only)

Supplying and fixcing of P.V.C Lowlevel cistern parry weare slim line with internal componetes and short bend 10 L capasity single flush and all other operations necessary to complete for the finished item of work and as directed by the Page 8 Engineer-in-Charge.

8

9

10

11

4 Nos (Four numbers only)

2 Nos. (Two numbers only)

Supplying abnd fixcing of white glayed flat Back boul urinals of size 440mmx 265mmx315mm with integral flushing rim fixed with scross complete Indian make conforming to IS 2556-1995 and all other operations necessary to complete for the finished item of work and as directed by the Engineerin-Charge.

(Rupees One thousand Three hundred and Ninety Two only)

515.00 (Rupees Five hundred and Fifteen only)

1344.00 (Rupees One thousand Three hundred and Forty Four only)

68 Rmt (Sixty Eight Running metres only)

191.00 (Rupees One hundred and Ninety One only)

21 Rmt (Twenty One running metre only)

131.00 (Rupees One hundred and Thirty One only)

(Rupees Five thousand Five hundred and Sixty Eight only) 1No. (One number only)

1No. (One number only)

1Rmt (One Running metre only)

1Rmt (One running metre only)

2060.00 (Rupees Two thousand and Sixty only)

2688.00 (Rupees Two thousand Six hundred and Eighty Eight only) 12988.00 (Rupees Twelve thousand Nine hundred and Eighty Eight only) 2751.00 (Rupees Two thousand Seven hundred and Fifty One only)

and Fifty One only) Page 9

12

13

14

15

16

12 Rmt (Twelve running metre only)

85.00 (Rupees Eighty Five only)

14 Nos (Fourteen numbers only)

223.00 (Rupees Two hundred and Twenty Three only)

8 Nos (Eight numbers only)

303.00 (Rupees Three hundred and Three only)

6 Nos (Six numbers only)

2.38 Cum (Two point Three Eight cubic metres only)

162.00 (Rupees One hundred and Sixty Two only)

2515.00 (Rupees Two thousand Five hundred and Fifteen only)

1Rmt (One running metre only)

1No. (One number only)

1Rmt (One running metre only)

1No. (One number only)

1Cum

1020.00 (Rupees One thousand and Twenty only)

3122.00 (Rupees Three thousand One hundred and Twenty Two only) 2424.00 (Rupees Two thousand Four hundred and Twenty Four only) 972.00 (Rupees Nine hundred and Seventy Two only)

5986.00 (Rupees Five (One cubic metre thousand Nine hundred and only) Eighty Six only)

Page 10

17

(Two point Three Eight cubic metres only)

(Rupees Two thousand Five hundred and Fifteen only)

1500 Ltr (One thousand and Five hundred Letres only)

6.50 (Rupees Six and paise Fifty only)

(Rupees Five (One cubic metre thousand Nine hundred and only) Eighty Six only)

1Ltr

9750.00 (Rupees Nine thousand Seven hundred (One Letre only) and Fiftyonly)

Total : Rs.

311632.00

(Rupees Two lakh Forty Four thousand Eight hundred and Seventy Three only) -3.00

CONTRACTOR

EXECUTIVE ENGINEER.

S C H E D U L E 'A' NAME OF WORK:- DISMANTLING AND REPACKING OF DISTURBED REVETMENT FROM KM.9.500 TO 9.700 ON U/S OF K.R.DAM.

Page 11

S.No.

Approx.Quantity in figures & words

Description of work

APSS No.

Estimate rates in Unit of figures & words calculations in (Rs.) figures & words

Amount in figures & words (Rs.)

1 1

2

3 4 5 6 7 52 cUM Suppl. 299/1Cum 1Cum 15548.00 Dismantling of disturbed revetment and repacking with same (Fifty Two cubic metres stone including labour charges etc., to the original profle Specification (Rupees Two (Rupees thickness of 0.45m including all other operations necessary only) hundred and Fifteen (One Cubic metre including seigniorage charges and VAT and all other charges Ninety Nine only) thousand Five only) etc., complete for the finished item of work as directed by the hundred and Engineer-in-Charge. Forty Eight only)

1

16 Cum Suppl. Providing filters with 20 to 80mm size field picked metal including laying of filters and cost and conveyance of all Specification (Sisteen Cubic metres material including seigniorage charges and VAT and all other only) operations necessary to complete the finished item of work as directed by the Engineer-in-Charge.

273.00/1Cum (Rupees Two hundred and Seventy Three only)

1Cum

4368.00 (Rupees Four (One Cubic metre thousand Three hundred and only) Sixty Eight only) Total : Rs.

19916.00

(Rupees Nineteen thousand Nine hundred and Sixteen only) The Agreement is accepted with Estimated rates i.e., total amount of Rs.19,916/-(Rupees Nineteen thousand Nine hundred and Sixteen only). Sd/CONTRACTOR

//T.C.F.//

Divisional Accounts Officer (W)

Sd/EXECUTIVE ENGINEER.

SCHEDULE-A PART-II NAME OF WORK:-PROTECTION WORKS TO O.T. SLUICE AT KM.0.990 OF K.R.DAM. S.No.

Description

Estimate amount in Figures and Words

1 1)

2 Insurance for the work during the contract period and maintenance Rs. charges during defective liability period.

2)

Supervision charges (Technical Personnel).

Rs. Total: Rs.

Note:-

3 919 (Rupees Nine hundred and Nineteen only)

4375 (Rupees Four thousand Three hundred and Seventy Five only) 5294 (Rupees Five thousand Two hundred and Ninety Four only)

The premium or discount quoted by the contractor will be applicable only for working items in Schedule-A (Part-I). However the provisions contained in Schedule-‘A’ (Part-II) above will be reimbursed to the Contractor not exceeding the amounts noted above against each on production of the Insurance policies. Copies of appointment/Orders with payment of vouchers, failing to comply with the above reimbursement shall not be allowed but suitable penality shall be imposed for not engaging technical personnel and Engineer-in-Charge shall take insurance policy at the cost of Contractor duly deducting the premium from the Contractor bill.

CONTRACTOR

EXECUTIVE ENGINEER.

S.No.

1 1

S C H E D U L E 'A' NAME OF WORK:- Formation of Ramp from Km.5.250 of K.R.Dam. Description of work APSS No. Estimate rates in Approx.Quantity in figures & words figures & words (Rs.) 2 3 4 5 5800 Cum S.S. 115.00 Earth Work Excavation in H.G.Soils and borrowed from approved quarry including conveyance of earth including loading and unloading 301 (Five thousand and (Rupees One Eight hundred Cubic charges, Seigniorage charges and all other operations necessary to hundred and complete the finished item of work as per drawings or as directed by metres only) Fifteen only) the Engineer-in-charge.

Unit of Amount in figures & calculations in words (Rs.) figures & words 6 7 1Cum 667000.00 (One Cubic metre (Rupees Six lakh and only) Sixty Seven thousand only)

2

5800 Cum. (Five thousand and Eight hundred Cubic metres only)

3

4 Cum (Four Cubic Metres only)

4

3 Cum 3095.00 1Cum 9285.00 V.C.C. (1:3:6) using 80% of 40mm and 20% of 20mm machine S.S.402 & (Three Cubic Metres crushed hard broken granite metal of approved quality including cost 403 I.S. (Rupees Three (One Cubic metre (Rupees Nine thousand and conveyance of all material and labour charges machine mixing only) thousand and only) Two hundred and Eighty 456-78 charges, Centering, Vibrating charges, Seigniorage charges, curing Ninety Five only) Five only) Suppl. and all incidental charges etc., complete for super structure of catch Specification drain and for head wall of R.C.C. hume pipe for the finished item of work as per drawings or as directed by the Engineer-in-Charge.

CONTRACTOR

24.00 1Cum 139200.00 Watering and Consolidation of Ramp with 8 to 10Tonne Power Roller S.S. 303 and to 98% proctors density and all other operations necessary to (Rupees Twenty (One Cubic metre (Rupees One lakh Thirty complete the finished item of work as per drawings or as directed by Suppl. Four only) only) Nine thousand and Two the Engineer-in-charge. hundred only) Specification 2530.00 1Cum 10120.00 V.C.C. (1:3:6) using 80% of 40mm and 20% of 20mm machine S.S.402 & crushed hard broken granite metal of approved quality including cost 403 I.S. (Rupees Two (One Cubic metre (Rupees Ten thousand and conveyance of all material and labour charges, machine mixing thousand Five only) One hundred and 456-78 charges, Vibrating charges, seigniorage charges curing and all hundred and Twenty only) Suppl. incidental charges etc., complete for foundation of Catch drain and Specification Thirty only) under R.C.C.hume pipe for the finished item of work as per drawings or as directed by the Engineer-in-Charge.

EXECUTIVE ENGINEER.

5

6

7

5 Cum (Five Cubic Metres only)

619 689.00 1Cum 3445.00 Providing Rough Stone dry packing for revetment for toe wall of ramp using rough stone of size 225mm thick with approved quality and (Rupees Six (One Cubic metre (Rupees Three thousand including cost and conveyance of all material loading and unloading, hundred and only) Four hundred and Forty Suppl. leads and lifts charges and seigniorage charges complete with all Specification Eighty Nine only) Five only) incidental charges and all other operations necessary for the finished item of work as per drawings or as directed by the Engineer-inCharge.

30 Cum 619 Providing Rough Stone dry packing for revetment for side slopes of ramp using rough stone of size 225mm thick stone with approved and (Thirty Cubic Metres quality including cost and conveyance of all material, leads and lifts only) Suppl. loading and unloading charges and seigniorage charges complete Specification with all incidental charges and all other operations necessary for the finished item of work as per drawings or as directed by the Engineerin-Charge. 15 Rmt (Fifteen Running metres only)

690.00 (Rupees Six hundred and Ninety only)

1Cum (One Cubic metre only)

20700.00 (Rupees Twenty thousand and Seven hundred only)

1Rmt. (One Running metre only)

24975.00 (Rupees Twenty Four thousand and Nine hundred and Seventy Five only)

1665.00 Supplying Laying and fixing of the R.C.C. Hume pipes of 600mm dia NP3 class pipes laying them carefully in the trench true to alignment Suppl. (Rupees One and gradient joining R.C.C.Hume pipes with Cement joints hump yarn Specification thousand Six etc., and twisting including filling and wiring and all material, labour hundred and Sixty charges including all other operations necessary to complete the Five only) work as per drawings or as directed by the Engineer-in-Chief.

Total : Rs. (Rupees Eight lakh Seventy Four thousand Seven hundred and Twenty Five only)

CONTRACTOR

EXECUTIVE ENGINEER.

874725.00

The Agreement is accepted with Estimated rates i.e., total amount of Rs.14,262/-(Rupees fourteen thousand two hundred and sixty two only)

NAME OF WORK:- Providing Ballast weights and rubber seals to the service gates of Low Level Sluice at Km.7.550 of K.R.Dam. Est.Rs 6,71,500 LAKHS DR.NO: 13/2007-08 Agt: No: 5EE /2007-08 N/C: M/S HAZARTH FRABICTION, PRO HAZARATH S.No.

Description of work

1 1

2 Disassembling of gear boxes and stem rods and other links to service gates including cost of welding ,skilled labour etc and all other operations required to complete the finished item of work as directed by the Engineer-in-Charge.

2

Lifting of screw rods ,stem rods ,service gate including cost of labour ,scoffolding charges,hire charges of crane etc operations required for finished item of work as directed by the Engineer-inCharge.

3

Disassembling of side rollers,bearings, M S plates and other links including cost of welding ,skilled labour etc and all other operations required to complete the finished item of work as directed by the Engineer-in-Charge.

UNIT

3

Ref

4

LS

AND PART BILL ABSTRACT

Up to date bill amount Qty

Rate

Amount

5

6

7

Deduct previsous bill amount Qty Rate Amount 8

9

10

Since last measurement Qty

Rate

Amount

11

12

13

Remarks

14

4

Supply and fixing of SKF ball bearings including cost and conveyance ,cost of labour and all other operations necessary to complete the finished item or work as directed by the Engineer-in-Charge.

5

Erection of side rollers with replaced bearings, M S Plates for extention of lip angle including cost of welding ,skilled labour etc and all other operations required to complete the finished item of work as directed by the Engineer-inCharge.

6

Supply and fixing of rubber seals including aligning cost and conveyance, cost of labour and all other operations necessary to complete the finished item or work as directed by the Engineer- in Charge

(a)

Bottom Seal

(b)

Top Seal

(c)

Side Seal

7

Checking and fixing alignment of service gate including cost skilled labour ,instruments etc required to complete the finished item of work as directed by the Engineer-in-Charge.

8

Providing ballast weights of required quantity using cast iron including cost of transportion fixing in position etc all other operations necessary to complete the finished item or work as directed by the Engineer-in-Charge.

9

Providing two coats of epoxy black paint including cleaning and removal of rust , cost of paints ,labour , transportion etc all other operations necessary to complete the finished item or work as directed by the Engineer-in-Charge.

10

Erection of service gates,screw rods,stem rods with replaced bearings, M S Plates ,rubber seals etc including cost of cutting and rewelding of MS plates,flanges, MS angulars , cost of skilled labour etc and all other operations required to complete the finished item of work as directed by the Engineer-in-Charge.

11

Assembling of gear boxes and stem rods and other links to service gates including cost of welding ,skilled labour etc and all other operations required to complete the finished item of work as directed by the Engineer-in-Charge.

12

Replacement of damaged service wire and reconnection to motors of gear boxes including cost of materials, labour etc and all other operations required to complete the finished item or work as directed by the Engineer-in-Charge.

13 Labour chargers for linking up of the stop log gate ( right vent ) to Stem road requiring divers inculuding the required equipment like masks Oxygen hoses and consumabul items like ropes wooden planks for staging and lighting arrangement at below water during the operation for removal of damaged bottom link etc, including the cost of hire charges for generator for unentrepted power suppy and compreseres for oxigen foar the day operation for the removing the bottom road and conveyed the damaged link to the work shop and rectified the same to the good condition including frabication of cottor pin to the required size and the same is to be convyed to works spot and refixing the same in positon with second operation as above per linking up to the stop log gate with required men for assistence to diverser complete and all other opration necessary to complete the finished item of work

14 Servicing the Gare boxes incuding straightenning the gare worm shaft by hydraulic press and revoing clenning, greassing and fitted duly removal of wornout washers and packing etc,including convyance charges form workspot to the work shop and back etc, complete and all other operation necessary to complete the finished item of work.

S C H E D U L E 'A' Name of work:- Providing Deck Platform connecting existing Hoist Bridges and fixing of foundation bolts to existing Hoist Bridges in C.C. for Kandaleru Left Canal Sluice at Km.0.990 of K.R.Dam. S.No.

Approx.Quantity in figures & words

Description of work

APSS No.

Estimate rates in Unit of Amount in figures & words calculations in figures & words (Rs.) figures & words (Rs.)

1 1

2

3 4 5 Supplying of 6mm thick M.S.Plate for Deck Platform 438 Kgs. Suppl. 35.30 (Four hundred and Thirty over the encovered portions of the O.T.Sluice well as Specifications. (Rupees Thirty Five Eight Kilograms only) directed by the Department. and paise Thirty only)

2

12 Nos. Suppl., 172 Supplying and fixing of Base plates of size 6"x6" in (Twelve Numbers only) 6mm thick plate included to platform and joint bolt of Specifications (One hundred and size 3/4"x1 foot long bolt including cost and Seventy Two only) conveyance of all material and labour charges etc., complete for finished item of work as directed by the Department.

2

0.32 Cum., Laying of Cement Concrete (1:11/2:3) using 20mm S.S.402.5.2.2 and (Zero point Three Two HBG Metal for base plate pillers including cost and Four Cubic metres only) conveyance of cement, sand and all other material Suppl., including labour charges and seigniorage charges Specifications etc., complete for finished item of work as directed by the department.

2824 (Rupees Two thousand Eight hundred and Twenty Four only)

6 1Kg. (One Kilogram only)

1No. (One Number only)

1Cum., (One Cubic Metre only)

7 15461.00 (Rupees Fifteen thousand Four hundred and Sixty One only) 2064.00 (Rupees Two thousand and Sixty Four only)

915.00 (Rupees Nine hundred and Fifteen only)

TOTAL: Rs.18,440/(Rupees Eighteen thousand Four hundred and Forty only) The Agreement is accepted with Estimated rates i.e., total amount of Rs.18,440/-(Rupees Eighteen thousand Four hundred and Forty only) CONTRACTOR

EXECUTIVE ENGINEER

S C H E D U L E 'A' NAME OF WORK:S.No.

1 1

2

Collection and supply of Sand Bags at Seepage points on D/S toe drain in between Km.9.455 to km.9.470 of K.R.Dam.

Approx.Quantity in figures & words

Description of work

APSS No.

Estimate rates in Unit of Amount in figures & words calculations in figures & words (Rs.) figures & words (Rs.)

2

3 4 5 Collection and supply of sand including cost and 40 Cum Suppl. 260.00 (Forty Cubic metres only) conveyance of sand, labour charges and seigniorage Specifications. (Rupees Two chargea and all other operations necessary to hundred and Sixty complete the finished item of work as directed by the only) Department. 568 Bags Suppl., 15.00 Supply of gunny bags to filling with sand and placed (Five hundred and Sixty at site in between Km.9.455 to Km.9.476 of K.R.Dam Specifications (Rupees Fifteen including cost of gunny bags and all other operations Eight bags only) only) necessary to complete the finished item of work as directed by the Department.

6 1Cum (One Cubic metre only)

7 10400.00 (Rupees Ten thousand and Four hundred only)

1Bag (One Bag only)

8520.00 (Rupees Eight thousand Five hundred and Twenty only)

Total: (Rupees Eighteen thousand Nine hundred and Twenty only)

The Agreement is accepted with Estimated rates i.e., total amount of Rs.18,920/-(Rupees Eighteen thousand Nine hundred and Twenty only)

CONTRACTOR

EXECUTIVE ENGINEER

18920.00

Related Documents

Formation
June 2020 25
Formation Of Milk
October 2019 23
Formation Of Shadows
May 2020 11
Formation Of The Egg
May 2020 21
Formation Of Tense (hsp)
November 2019 1