Format Perkiraan Baru

  • June 2020
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View Format Perkiraan Baru as PDF for free.

More details

  • Words: 301
  • Pages: 4
PENYATA TUNTUTAN GAJI DAN ELAUN MULAI ……………………………………………. NAMA NO.K/P JAWATAN NO.GAJI BULAN KENAIKAN GAJI BULAN

1.1.2009 -

GAJI

ITKA

COLA

JUMLAH GAJI &

KWSP

JUMLAH

BAYARAN

ELAUN

PEKERJA(11%)

MAJIKAN

POTONGAN

BERSIH

1901.80

300.00

200.00

2401.80

267.00

291.00

267.00

2134.00

JUMLAH

1901.80

300.00

200.00

2401.80

267.00

291.00

267.00

2134.80

KWSP (M)*

291.00

291.00

291.00

JUMLAH BESAR

2192.80

2692.80

558.00

31.1.2009

300.00

200.00

291.00 291.00

558.00

(RINGGIT MALAYSIA) : …………………………………………………………………………………………………………………..

* SEMUA TUNGGAKAN GAJI DAN LANTIKAN BARU HENDAKLAH ADA POTONGAN KWSP * BERMULA JAN 2009, KWSP PEKERJA ADALAH 8% * SEKIRANYA KWSP TETAP 11% HENDAKLAH DINYATAKAN

2134.80

CONTOH PENGIRAAN TUNGGAKAN INSENTIF SUBJEK PENDIDIKAN (BISP)/ELAUN MULAI …………………………….. NAMA NO.K/P JAWATAN NO.GAJI BULAN KENAIKAN GAJI BULAN

BISP

1.8.2007 -

P.T :

98.36

31.12.2007

T.T :

-

(5 BULAN)

JUMLAH

98.36 x

5 491.80

1.1.2008 -

P.T :

98.36

30.06.2008

T.T :

-

(6 BULAN)

491.80

98.36 x

6 590.16

1.7.2008 -

P.T :

31.12.2008

T.T :

590.16

102.88 -

(6 BULAN)

102.88 x

6 617.28

617.28

JUMLAH

1699.24

1699.24

TAHUN LEPAS

(KOD)

(KOD)

1.1.2009 -

P.T :

28.02.2008

T.T :

102.88 -

(2 BULAN)

102.88 x

2 205.76

205.76

JUMLAH

205.76

205.76

TAHUN SEMASA

(KOD)

(KOD)

JUMLAH BESAR

1905.00

1905.00

*SEMUA PEMBAYARAN ELAUN/ ELAUN BAYARAN BALIK MESTI MENGIKUT FORMAT DI ATAS

PERKIRAAN BAYARAN BALIK ITP KERANA MENDUDUKI KUARTERS MULAI …………………………. NAMA NO.K/P JAWATAN NO.GAJI BULAN KENAIKAN GAJI BULAN

ITP

BAYARAN MENGIKUT KOD 4017

1.8.2008 31.12.2008

RM180.00 X 5 = RM900.00

(5 BULAN)

SEWA RMH KERAJAAN

4122

RM45.00 X 5 = RM225.00

225.00

PERBEZAAN RM900.00 - RM225.00=RM 675.00 JUMLAH TAHUN LEPAS 1.1.2009 -

900.00 900.00

225.00

RM180.00 X 2 = RM360.00

28.02.2009 (2 BULAN)

SEWA RMH KERAJAAN RM45.00 X 2 = RM90.00

90.00

PERBEZAAN RM360.00 - RM90.00=RM270.00 JUM. THN SEMASA

JUMLAH BESAR

270.00 90.00

270.00

945.00

315.00 1260.00

*SEWA RUMAH KERAJAAN BENGANTUNG KEPADA KUARTERS YANG DIDUDUKI

Related Documents