Foam Panels, Full Hud Proposal

  • November 2019
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View Foam Panels, Full Hud Proposal as PDF for free.

More details

  • Words: 3,616
  • Pages: 8
SUMMARY OF PROPOSED PROJECT: NUNAVIK, LLC Kotzebue IRA will establish a for-profit subsidiary to be known as Nunavik, LLC. The company will run an Expanded Polystyrene (EPS) Manufacturing Plant to manufacture and sell Structural Insulated Panels (SIP’s) for residential/commercial construction and polystyrene boards for civil applications. Kotzebue IRA will also provide training in using SIPs for construction to Alaska Natives from each village where the plant’s products are to be used. The project will create both year round and permanent seasonal jobs in Kotzebue as well as a steadily growing number of temporary seasonal jobs in other communities as the plant’s business grows. Economic development, job creation, reduced maintenance cost, a better building material, and Tribal revenue are the benefits that will be realized by the community as a result of this venture. This proposal is submitted under Funding Category 2) Support for Innovative Activities. The purpose of the proposal is to cover the costs of specialized manufacturing equipment which will be needed to set up the plant and begin operations. 1) CAPACITY OF KOTZEBUE IRA AND RELEVANT ORGANIZATIONAL EXPERIENCE a) Experience in Leveraging Other Funds The Kotzebue IRA (KIRA) is a not-for-profit organization, whose primary function is to meet the various needs of its' tribal members, located in Kotzebue, within the Northwest Arctic Borough of the State of Alaska (see attached map). Per your limitations on the definitions of a "rural area", we qualify as being an area outside an identified Metropolitan Service Area and with a population not in excess of 20,000 (see attached map). We recently accepted the challenge of providing affordable housing opportunities to our low income tribal families using NAHASDA funds. We have vast experience in the operating and reporting responsibilities of various federal grant programs. These include BIA's Home Improvement Program, which is very similar to HUD's CIAP/CGP programs, Indian Child Welfare Act (ICWA), General Assistance, Tribal Operations, Realty, Contract Support, and also EPA's Environmental Assistance program. b.ii) Support for Innovative Rural Housing and Economic Development Activities (remember to change this to b.i in other proposal) While the KIRA Council, which consists of seven tribal members, will be charged with the ultimate responsibility of assuring that the awarded grant is followed per the contract agreement, the technical responsibilities will be overseen by the Executive Director of the Housing Department. The Director, Planner, and support staff will work in conjunction with the Finance Department to assume the task of running the necessary daily operations required to attain the organizations' goal. The project directors will also work closely with two consultants who have direct experience with expanded polystyrene manufacturing plants. Both the consultants and the relevant staff are described in detail below. 1

ASSIGNMENT OF RESPONSIBILITIES Consultants and Partners William S. Bobbitt, of Bobbitt’s Manufactured Structures Group in Hershey, Pennsylvania, will serve as the chief consultant for the project. Mr. Bobbitt has been involved with the building industry since 1965 and has worked with numerous panelized housing manufacturing companies, including: Scholz Design Homes, Kaplan Building Systems, American Mohawk Wood Enterprises and Global Building Systems. Mr. Bobbitt assisted in producing the Business Plan for the plant and will work closely with Roger Nettlow of KIRA’s staff on defining Mr. Nettlow’s role as General Manager of the Plant, developing operational pro formas, salary and wage plans, new business development and forward planning. Charles D. Ward is the President and CEO of WardCo, Inc., an expanded polystyrene (EPS) manufacturing plant based in Fairbanks, Alaska, and will serve as the primary consultant during the start-up phase of the project. Mr. Ward holds a BS in Mechanical Engineering and is working on an MS in Engineering Management. He is registered as a State of Alaska Mechanical Engineer and has worked as a Project Engineer for Wardco since 1986. Mr. Ward has previous involvement in construction and start-up operations of EPS plants in Guam, Fairbanks and Nevada. Wardco has been involved with the planning process for this plant and will continue to be involved as a plant layout and training consultant. Wardco will provide training in Kotzebue so that KIRA’s manufacturing plant personnel will learn proper operation and maintenance of all equipment on-site in addition to specialized training that they may receive later through Insulspan Corporation. Insulspan Corporation, of Blissfield, Michigan, will provide KIRA with a license agreement. Insulspan’s structural insulated panels are accredited by the National Evaluation Report, No. NER-520, which encompasses the BOCA, SBCCI, and ICBO building codes. Insulspan panels are recognized by HUD and Insulspan is an ally in the Environmental Protection Agency’s ENERGY STAR Homes Program. KIRA will also enroll in this program, which will help to guarantee the home buyer they are receiving the best protection from the elements that modern technology can offer. In addition, Insulspan will assist KIRA with training, engineering, and technical support in the design and construction of SIP buildings. Insulspan offers regular workshops and seminars on SIP manufacture and construction, which will be made available to the KIRA factory workers. KIRA Staff Overall project management will be conducted by Peter Tarruq Schaeffer (Inupiaq), Executive Director of Kotzebue IRA. Mr. Schaeffer has had oversight for many Federally funded projects during his term with KIRA, including a BIA Home Improvement Program, an Indian Child Welfare Act Block Grant and an EPA Environmental Assistance grant. Mr. Schaeffer served as a member of the Board for KIRA from 1986 through 1989 and as Chairman from 1989 through 1997, giving him a long-term familiarity with the organization, its staff, and the importance of project management.

2

Katie Cruthers (Inupiaq), serves as Deputy Director for Kotzebue IRA. She has worked for KIRA in various capacities since 1992 and was promoted to Deputy Director in 1998. Ms. Cruthers has extensive experience in carrying out state and federal contracts and grants. She has held responsibility for all aspects of project management, including developing policies and procedures, developing program and operating budgets, training employees, setting priorities and delegating responsibilities. Walter Porter (Tlingit) serves as the Executive Director of Tupiq Services, Inc., KIRA's Tribally Designated Housing Entity. Mr. Porter is responsible for the administration of the Tribe's existing NAHASDA funds, for negotiating home and land acquisitions by the tribe and for reporting progress to the Council. Mr. Porter has served on the Board of Tlingit & Haida Regional Housing Authority since 1991 and has worked as a laborer and foreman for numerous construction companies. He also served as an ANA Project Director for the Yakutat Tlingit Tribe from 1992 through 1996. Roger Nettlow works as Planner/Construction Manager for TSI and will fill the Plant Manager position once the Tribe's Manufacturing Plant is completed. He holds a BS in Manufacturing Engineering from Arizona State University and has lived and worked in Northern Alaska since 1977. Prior to this position, he has worked as a City Inspector for the City of Kotzebue and as Maintenance Director for the Northwest Inupiat Housing Authority. Leonora Atienza is a Certified Public Accountant and holds a BS in Business Administration with an emphasis in Accounting from The Phillipine Women's University. Ms. Atienza serves as Accountant for KIRA. She has worked as a Grants Accountant for the City of Kotzebue, and as Assistant Controller for Kikiktagruk Inupiat Corporation, Kotzebue's Village Corporation. 2) NEED AND EXTENT OF PROBLEM The community of Kotzebue has a total population of almost 3,000, with more than 75% recognized as tribal members. There are a total of 330 Alaska Native families in Kotzebue, 25 percent of these families are classified as low income, 59 percent are living in substandard housing and 21 percent are living in over-crowded conditions (see Attachment A). According to the Alaska Dept. of Community & Regional Affairs, Kotzebue’s unemployment level is at 13.1%, compared to the State's 7.2% figure for March, 1999 (see Attachment B). Our poverty rates are similar in nature, 12.7% for Kotzebue as opposed to the state level of 7.5% (see Attachment B). The number of tribal families on some form of state or federal assistance is at 155 as of April 1 (see Attachment C). Our school drop out rate is at approximately 10%, or twice the state average (see Attachment D). Please note that most of the supporting documents were attained from various State agencies either from their website or by direct contact, and are in the format received in response to our queries. Northwest Inupiat Housing Authority (NIHA) was responsible for accommodating the communities housing needs before KIRA assumed this responsibility in 1998. NIHA’s last housing project here in Kotzebue was in 1995, and of the forty plus families on their waiting list, only 22 units were constructed. During KIRA's recent acceptance of applications for housing assistance, a waiting list of 19 families, with an average household size of five, was added (see Attachment E).

3

Approval of this grant application, and the subsequent purchase of the manufacturing equipment, will allow KIRA to provide permanent positions for our tribal members and to create a product which will reduce the overall costs of constructing affordable, energy efficient housing units within our community. The use of the manufactured building panels should reduce the overall construction costs by 15% to 20%. These savings are due to the ability to use the product in creating the entire shell of the unit, i.e. roof, walls, subfloor, etc., the time it takes to wall-in a building versus conventional stick built methods, and reduced freight costs associated with the required building materials. The project will impact many families by lowering the cost of home purchase and the cost of utilities payments for both new construction and remodeled units. Currently, an 80' x 100' lot in Kotzebue costs $35,000 and the cost of an average 1,250 square foot 4 bedroom unit is approximately $185,000. The combined cost of $210,000 is out of reach for many middle class Native families, let alone lower income families. Using manufactured building panels will reduce the cost of materials and shipping substantially, reducing the overall cost of such a home by $27,750 or more. Fuel oil in Kotzebue costs $2.75 per gallon, and it is not uncommon for even a low-income family to spend as much as $300 to $400 per month on heating fuel. Use of manufactured panels will help residents save over 15 percent over what they would pay to heat a new stick-built house, and up to 50% over what many families are paying in existing substandard units. This will save approximately $2,000 annually that can be used for other family needs. There are already several infrastructure and development project planned for the Northwest Arctic Borough over the next 10 years, and the plant should stimulate the construction of further projects by delivering an advanced technological product at a competitive price to the various private and commercial entities in our community and region. KIRA’s business plan for the plant calls for an ever increasing range of housing related products and services as the plant’s service area expands and the number of projects within that area grows. An eventual goal is for KIRA to be able to offer complete turn key construction services from choosing the lot to installing the utilities, appliances and cabinets to painting the window trim. This will make it possible to provide a greater number of manufacturing jobs at the plant and a greater number of construction jobs in outlying communities as business increases. The 4-6 initial employees of the plant will receive pertinent training in a new field of industry for the community. For those tribal members who seek employment in the construction industry, it is our intent to combine resources with our local vocational school, Alaska Technical Center, and provide training opportunities for them to gain the skills necessary to build houses using structural insulated panels. Opportunities such as workshops, limited scale pilot projects, plant tours, etc., are just a few of the training sessions planned. Many of the jobs associated with construction of stick-built homes require a lengthy training process which is only obtainable in urban centers such as Anchorage or Fairbanks. Homes made from structural insulated panels are easier to build, in addition to being better insulated, and so it is possible for residents to obtain training in just three weeks without leaving their community. 3) SOUNDNESS OF APPROACH 4

a) Description of and Rationale for Proposed Activities The creation of an expanded polystyrene manufacturing plant in Kotzebue will be an innovative activity for rural Alaska generally, where economic development efforts have generally focused on the international sale of natural resources such as timber or fish. Remarkably few communities have chosen to pursue an industry which uses local labor to fulfill local needs. Kotzebue fits the pattern described in the Rural Housing and Economic Development Notice of Funding Availability as a rural area which experiences in-migration due to job opportunities but does not have sufficient housing for the new residents. This has contributed to the severe overcrowding which now exists, and the lack of housing has also prevented many residents from outlying villages from applying for jobs in Kotzebue which they would otherwise pursue. For example, Maniilaq Association, the health and social service agency for the region, recently built a new hospital in Kotzebue, creating a variety of skilled and unskilled positions. However, Inupiat from outlying villages who have looked into the option of moving to Kotzebue to take these jobs have been discouraged by the lack of anyplace to live. Although Maniilaq Association built worker housing to go with the facility, so far all of this housing has gone to skilled workers from outside of the region. Maniilaq Association is presently planning to build 8 new clinics in the surrounding villages and increase their housing stock in Kotzebue by 100 units. They have assured KIRA that they will take advantage of locally available products for these projects. In 1999, KIRA began work on a new road in Kotzebue, which will open up additional locations where new houses can be built by Maniilaq Association and other organizations over the next several years. b) Management Plan and Method The program will be managed by the consultants and KIRA staff described under the section on Assignment of Responsibilities. Following are the activities which have been completed to date towards establishing the manufacturing plant and the projected dates of completion for the remaining activities.

Activities Completed Activities Identify Project Director (Porter): Identify Plant Manager (Nettlow): Feasibility Study: 11/99 Business Plan: 3/00 Identify Primary Consultant (Bobbitt): Identify SIP licensing agency (Insulspan):

Date Completed

Ongoing and Future Activities Marketing:

Start 10/1/99

3/00 3/00

5

to

Completion Continuous

Obtain Funding: Locate Equipment: Purchase Equipment: Purchase Raw Materials (year 1): Ship Equipment and Raw Materials: Office Setup: Plant Setup: Plant Startup: Train Core Staff: Plant Listing (ICBO): Manufacture Pilot Project: Train Construction Workers: Pilot Project: Manufacture Panels: Deliver Products:

10/1/99 3/1/00 4/1/00 4/1/00 6/1/00 6/15/00 7/15/00 9/1/00 9/1/00 10/1/00 2/1/01 2/1/01 2/8/01 4/1/01 4/1/01

to to to to to to to to to to to to to to to

Continuous 4/30/00 5/15/00 5/15/00 7/15/00 7/15/00 9/1/00 9/1/00 10/1/00 2/1/01 2/8/01 4/1/01 4/1/01 8/1/01 8/30/01

c) Expected Outcomes By 2002, KIRA will require a total of 15 staff to manage the plant. This will include 9 manufacturing plant staff and 6 administrative or support personnel. Three of these positions currently exist, the general manager, accountant, and secretary, so twelve new jobs will be created in Kotzebue. The project will also create at least 10 construction jobs in Kotzebue and outlying communities during the 2001 buiding season, and this number is expected to grow over time to as many as 25 construction jobs by 2005. KIRA products will be used for the creation of new housing, the renovation of exisiting housing, and the construction of clinics, schools, and recreational facilities. They will also be used for civil applications such as insulating pipes and roadways from the underlying permafrost. They will help to create homes which cost less to purchase initially and less to heat over time, making it possible for more families to purchase a home rather than renting. KIRA products will boost the level of construction activity taking place throughout the region by lowering the overall costs of projects that were previously considered financially out of reach. Five year financial projections for the plant show a profit of $140,000 in 2001 and over $200,000 each year beginning in 2002 (see Attachment ?). These profits will help reduce Kotzebue IRA's dependency on federal and state monies and may be used for other social and economic needs of the tribe. d) Coordination and Cost-Efficiency KIRA intends to convert an existing structure into the needed manufacturing plant. This will be done by partnering with either NANA Corporation or Kikiktagruk Inupiat Corporation (KIC), as both companies own buildings which would be appropriate for the purpose and are currently vacant.

6

KIRA is seeking to establish a Limited Liability Company in which the building value will represent NANA or KIC’s investment in the project, providing them with equity interest in the company. The financial projections in the Business Plan indicate that by reducing the up-front costs in this fashion, it will be possible for KIRA to pay off bank financing within the first five years of operations. After all loan payments are taken care of, KIRA will develop a plan for KIRA to buy out the partner’s equity, obtaining sole ownership of the manufacturing plant no later than 2010. e) Budget and Cost Estimates (talk about where the #’s come from, remember, this is different from one grant to the other) Estimates for the cost of manufacturing plant equipment are based on advice from both Charles Ward of Wardco, Inc. and William Bobbitt of Bobbitt Manufacturing, Inc., both of whom are familiar with start-up costs for similar plants in a variety of locations. Detailed budget information is provided on the appropriate HUD forms. f) Program Evaluation Mr. Walter Porter, KIRA’s Housing Program Director, and Ms. Leonora Atienza, KIRA’s Grants Accountant, will share the responsibility for tracking information that will be used to evaluate this project. Both of these individuals have experience in grants management, including grants from the Administration for Native Americans and HUD’s NAHASDA program. Ms. Atienza will be responsible for creating a database of KIRA’s clients and trainees. This database will be updated regularly with information on client satisfaction and trainee job opportunities. Project success will be measured by the financial stability of the company in 2003, the third year of full operations. Success will also be measured by the ability of construction workers who have learned to use KIRA products to find work using these skills each construction season. g) Equal Opportunity Housing 20 percent of the Native families in Kotzebue are elderly, and an additional 34 percent are near elderly (see Attachment A). Many Elders are subjected to the substandard housing and overcrowded conditions prevalent in Kotzebue. This project will ease their burden by making it possible for children and grandchildren to purchase homes of their own nearby. KIRA’s housing department is currently using NAHASDA funds to provide weatherization, renovation, and additions for existing homes to improve energy efficiency and better accommodate large families. In the future, KIRA will seek additional funds to continue this work making use of structural insulated panels from the manufacturing plant as a part of these efforts. In addition, KIRA has entered into discussions with Cordes Development in regards to the possible establishment of a residence for Seniors and Disabled individuals in Kotzebue. 4) COMPREHENSIVENESS AND COORDINATION

7

Kotzebue is located 30 miles above the Arctic Circle on the Baldwin Peninsula and serves as the transportation and economic center for Northwest Alaska. The Northwest Arctic Borough is one of the most culturally and economically unified regions in Alaska. The Borough population of 6,844 is 87 percent Native American, comprised mostly of Inupiat whose ancestors have lived in the area for thousands of years. Nearly half of the Borough's population lives in Kotzebue, with the other half living in the villages of Ambler, Buckland, Deering, Kiana, Kivalina, Kobuk, Kotzebue, Noatak, Noorvik, Selawik and Shungnak. These 11 communities share close cultural ties and belong to the same regional service organizations for a variety of purposes. These organizations include the Northwest Arctic Native Association (NANA), the Northwest Inupiat Housing Authority, the Northwest Arctic Borough School District, and Maniilaq Association, a health and social service provider. Because these agencies all serve the same small population, there is frequent communication amongst them and they are able to work on a variety of projects in an atmosphere of mutual support. The proposed Expanded Polystyrene Manufacturing Plant is one such project. The Kotzebue IRA intends to have a positive economic impact on the entire Borough through this project and has received strong indications of support from regional organizations in the Borough. Several of these organizations are planning construction projects over the next five years and have expressed their support for the Tribe's plan. Maniilaq Association and the Northwest Inupiat Housing Authority have both written letters of support stating that they would like to use the Tribe's products in their future construction plans as a way to enhance local employment and profits. The project is strongly supported both by NANA Regional Corporation, a for-profit corporation representing the Native population of the entire Northwest Arctic Borough, and Kikiktagruk Inupiat Corporation, which represents Kotzebue. KIRA is currently negotiating with both of these entities to form a Limited Liability Company (LLC) and carry out this project in an equity-based partnership with one or both serving as contributing partners. Their support of our project is evidenced by the attached letters of support, as well as those from the offices of the City of Kotzebue and the Northwest Arctic Borough.

8

Related Documents

Foam Panels, Excerpt
November 2019 18
Hud
December 2019 48
Hud
November 2019 42