Fixed Bin Concepts.docx

  • Uploaded by: Vishnu Kumar S
  • 0
  • 0
  • July 2020
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View Fixed Bin Concepts.docx as PDF for free.

More details

  • Words: 747
  • Pages: 10
SAP WM fixed bins This document is to give the brief overview on the fixed bin concept of SAP Warehouse Management and SAP Extended Warehouse Management. Most of warehouses prefer to keep the stock in constant storage bins , so that they can have some ease in doing the physical transactions especially for the warehouse users who are working in the warehouses since long time. In general fixed bin concept or fixed bin put away is nothing but every material is mapped with unique storage bin , so that when put away is happening , system will suggest the respective bin to storage that particular material. In SAP WM , to achieve the fixed bin we need to follow the below steps As a first step we need to assign the put away strategy “F- Fixed bin” to the storage type where we are going to store the materials Configuration path : IMG –> Logistics Execution –> Warehouse Management –> Master data –> Define Storage type

Once we assign the fixed bin strategy to the storage type , then we have make sure that every material is assigned with the storage bins of that particular storage type . This can be done in assigning the storage bin in material master – warehouse management 2 view T.Code : MM02 / MM01

by having these two settings we can activate the fixed bin strategy in SAP ERP WM. With proper “Activate storage type search” configuration, and stock placement indicator in material type helps to identify the storage type . Once the storage type identified then Fixed bin put away strategy will play a role to identify the storage bin. Here in SAP WM ,there is a limitation of assigning only one storage bin to the material master. we can only assign one bin to the material master. If the bin is occupied , then system will suggest reserve storage type based on our configuration . Some times “Near picking bin -K ” put away strategy helps in those conditions like if system could not place the stock in fixed bins.

This limitation has overcame in EWM , we can manage multiple storage bins for single material in EWM. In EWM we need to configure the storage type to deal with fixed bin storage. check boxes “Use Fixed bins” and “Check max no. bins” will influence the fixed bin storage. In customizing for SCM Extended Warehouse Management, go to Extended Warehouse Management → Master Data → Define Storage Type.

after having this check boxes marked , we need to adopt the storage type data and maintain the maximum number of bins in warehouse product /SCWM/MAT1

After this we need to assign the fixed storage bins to the product by using following path From the EWM Index screen, choose Extended Warehouse Management → Master Data → Storage Bin → Assign Fixed Storage Bins to Products or /SCWM/FBINASN

enter the product number , warehouse and storage type and No.of storage bins to be maintained for that product . With this transaction , system automatically assigns the storage bins based on the sequence.

or else fixed storage bins can be maintained manually using the below transaction or path From the EWM Index screen, choose Extended Warehouse Management → Master Data → Storage Bin → Maintain Fixed Storage bin

By clicking on new entry button , we can maintain the storage bin to warehouse product.

Once all this master data settings done , with the put away control indicator , Storage type search sequence configuration will helps to identify the right storage type to put away the goods . Once storage type identified system will suggest fixed bins based on our settings. fixed bins can be seen from the product master as well /SCWM/MAT1

Thanks Santhosh Surata

    

Like Alert Moderator Assigned tags 

SAP Extended Warehouse Management

Related Blogs 

Regarding Physical Inventory By Former Member, Aug 27, 2015





Moving stock directly to a fixed storage bin using a customized movement type By Former Member, Jun 06, 2014 Recommendations to Connect AS/RS subsystems to EWM as Black Box By Former Member, Aug 09, 2017

Related Questions SAP EWM - bin stock with HUn umbers By PV S, Nov 12, 2018  EWM 9.3 Voice Picking Integration with IBM Mainframe By Former Member, Aug 23, 2017  Maintain fix bin in /SCWM/BINMAT for storage bins in nonfixed-bin storage type By Yaping Wang, Jan 14, 2018 4 Comments 

Related Documents

Fixed
October 2019 79
Bin
August 2019 53
Bin
November 2019 60
Fixed Aging.docx
October 2019 22

More Documents from "Dedi Irwansyah"