First Article Inspection: The purpose of carrying out an FAI is to give objective evidence that all engineering, design and specification requirements are correctly understood, accounted for, verified and recorded. An FAI should be performed on all new products that are representative of the first production of each component. The FAIs should be performed in accordance with BS EN 9102:2015.
WTG Cans – Long Seam & Cir Seam – Fit-up inspection, in process inspection, weld visual and NDT X-Braces Transition Piece Service Crane Anodes Boat Landing – Jacket Leg – External J-Tube – Pile – Gratings & Railings – Ladder -
OPS
Form 1 – Part Number Accountability Form 2 – Product Accountability Form 3 – Characteristics Accountability